Sewer computation table

Locat ion Residential fl ows

Lengt h Average Cumulative Cumulative


of : Population Populati on unit Flow average pea k flow.
sewer, Area. ~density. increment, flow. increment, flo w. Peaking m 3jd
Line Fmni To m Subarea' ha : persons jha perso ns Ljca pita . d m' j d m' j d factor ( II x 12)

( I) , (2) (3) (4) (5) (6) :(7) (8) (9) ( 10) (II) (12) ( 13)

707 A-I 200 : 40 8. 000 380 3040 3,040 2.9 8,8 16


707 A-2 3.040 2.9 8.8 16
A- 3 3,040 2.9 8.8 16
A-5 250 : 70 17.500 250 4375 7.415 2.7 20,021
4 1414 A-4 100 : 120 12.000 220 2640 10.055 2.6 26,143
A-7 300 40 12.000 3S0 4560 14.615 2.6 37,999
.j ,~ 5 707 A-6 200 ' 40 8.000 380 3040 17.655 2.5 44.13 8
5. (, 707 A-8 17.655 2.5 44.13 8
A-9 200 40 ~.OOO 3S0 3040 20.695 2.5 51,738
6 (, 707 A-I O 100 70 7.000 250 1750 22,445 2.5 56.113
7 8 707 A-II 250 40 10.000 380 3800 3,800t 2.9 11.020
9 707 707 A-12 26,245 2.5 65 ,613
Sewer computation table (Conlinued)
Indu str ial 110ws
Loca ti on Commc:rci,1i now~

A \'Crage Cumulative Cumulative


;\ \'erage CUITlUlatl\C Cumulative
Lcngl h peak flow,
average peak Aow. unit average
of unit
Area. flow, flow, Peaking m 3 jd
Area. now. !low. Peaking m' id
~e\\'er .
ha m' /ha d mJ jd factor (21 x 22)
Subarea' ha m.\ ." ha d m.l 'd faclol (16 x 17)
L'lle Fr\.)!l1 To m

(19) (20) (21 ) (22) (23)


( 5) ( 14) (15) (10) (17) ( 18)
(II 12) dl (4)

707 A-J
707 A-2
A- 3 50 20 1000 1.8 1800
A- 5 1000 1.0 ISOO
1~14 A-~ 1000 1.8 1800
4
A-7 1000 1.8 1800
707 A-6 1000 1.8 1800
~ ~
A-S 100 20 3000 1.8 5400
h 707
.'\-9 3000 1.8 5400
A-IO 3000 1.8 5400
6 i\ 707
70i A-II 2.1 12,600
1.8 5400 200 30 6000
9 707 A-12 3000

'~
~
'J'
'.-J

""'"

Sewer computation table (Col1linued)

Lnc( (ion
In stitutional Aows Cumulat ive subtotal, Inti lna tion

Cumulative Cumulati ve
Len gth Cumulative Cumu lative
Cum ulative average peak Aow.
or average Peak unit infiltration
peak Aow. flow: m.\ /d m'\ /d
sev.:cr, tlo\v, Cumulative Intiltrati on allowance,
Peaking m·1 /d ( II + 16 + (13+18+
Lin t.: Frll!l1 To In Suharca* . m" ,<1 Area. area, allowance m' /d
factor (24 x ::'5) 21 + 24)
--_._--------------- 2:l + 26) ha ha m' /ha . u (30 x 31)
III (::'1 pI (5) ( ::'4 1 (::'5) (26}

200::: 200 R.O 1600


50t 250 7.5 1875
25+ 275 7.5 2063
4 14 14 250 525 7.0 3675
100 625 6.5 4063
4 4 707 300 92-5 5.5 5088
707 200 1125 5.0 5625
50::: 11 75 5.0 5875
11 707 200 1375 4.9 6738
X 707 100 1475t 4.8 7080
9 707 250 250t 8.0 2000
100::: 1825 4.0 7300
Sewer computation table (Conril1ued)

Loca tion De sign flows: Sewer design Sewer layout

Ground surface Sewer pipe


elevation invert
Lengt h Cumulati ve Capacity Velocity elevation
of peak Aow, Cumulative Sewer when when At At
sewer, m' /d peak Mow ,§ diameter, Sl ope, full, full, upper lower Upper Lower
Line From To m Subarea • (28 + 32) m' /s: mm m/m m 3 /s m/s manhole manhole end end

(I) (2) (3) (4) (5) (33) (34) : (35) (36) (37) (38) (39) (40) (41) (42)

I 707 A·I 10,416 0.121: 450 0.0018 0.121 0.75 20.00 19.00 17.50 16.23
2 2 707 A·2 12,291 0.142:
A·3 14,279 0.165:
A·5 27,096 0.314: 750 0.0009 0.330 0.75 19.00 18.33 15.93 15.29
4 1414 A·4 33,6'06 0.389:
A·7 46,487 0.538: 900 0 .0009 0.540 0.85 18.33 17.40 15.14 U.86
4 4 707 A·6 53,163 061) 1050 00008~ 0.770 0 .87 17.40 17.00 13 .71 13.14
6 707 A·8 57.013 066~
A·q 65.476 0 758: 1050 00008~: 0.770 0.87 17.00 16.50 13.14 12.58
6 6 707 A·IO 70.193 0.81Z 1050 0.0009 0.820 0 .95 16.50 16.00 12.58 11.94
8 7 707 A·II 13,020 0.151: 525 0.0014 0.165 0.75 16.20 16.00 12.46 13.46
9 707 A·12 92.513 1.071; 1200 00008~ 1.100 0.98 16.00 15.00 11.79 11.22

• See figure (0).


t Line '/ receives flow from subarea A·ll only.
t 50 percent of area (see assumption 6b).
~ mJ /s = (m' /d) /(86.400 sid).
~ The minimum practical slope for construction is about 0.0008 m/m.