Vous êtes sur la page 1sur 1

LEGEND:- 10

H
27 30
DT01/D7/28KW
SYMBOL DESCRIPTION 45 DT01/PATHAN COLONY-I100KVA
DT CODE-286
345
D14,C2,60KW

Composite Pole 9M STP No'S 13


41
Existing 9m STP Replaced by11 m STP No'S 01
Existing double Pole STP No'S 10 344

Existing DP PCC Replaced by 9m DP No'S 01 31

Existing Composite DP No'S 01


343
Existing Wooden Pole No'S 00
41
Existing HT Conductor 30 Sqmm C.mtr 1915
Existing HT Conductor 50 Sqmm C.mtr 4846
342

Existing HT Conductor 100 Sqmm C.mtr 353


Mtr Strengthening of sub transmission FEEDER 44
Existing HT Cable 757 and distribution system of Srinagar AHMAD NAGAR F02
PROJECT Circle under IPDS and PMDP NAME
Existing HT Conductor 150 Sqmm C.mtr 195
Schemes (URBAN)
NEAR CHILD WELFARE INST.
Existing DT No'S 22 (B)
RECEIVING 341

DT14/NEW DARYADIN/100KVA
OWNER KPDCL STATION 2*6.3MVA
NEAR CHILD WELFARE INST.
Dedicated DT No'S 7 (A) DT CODE-245
PIA REC PDCL 32
D11,3PH-1(3KW),47KW
Dismantle DT No'S 4 DT15/DARYADIN/250KVA PMA WAPCOS/RECTPCL
DT CODE-244 35
18 HT SHEET 2 OF 2 340

Replace Wooden by 9m STP No'S 01 D32,128KW


226 227 DT14/D12,C1, 50KW DT14/D9,3PH-1(5KW).41KW RECPDCL/J&K/IPDS-PMDP/
30 47
13 49 LOA SRINAGAR 2019-20/2357 & 2358 Dtd.28.08.2019
Existing PCC Pole No'S 48 H NO.
8 225
H 49
RECPDCL/J&K/IPDS-PMDP/2019-20/2359 All Dimensions are in Metres.
339

Replace PCC Pole by 9m STP No'S 31 37 & 2360 Dtd.28.08.19 SRINAGAR


20
33
STP Replaced by 9m STP (DAM/US) No'S 7 224/T
DT02/PATHAN COLONY-II/250KVA
Existing 9m STP No'S 204 35
DT CODE-58
D34,3PH-1(3KW),C1,141KW
Existing Wooden Pole Composite OPP.THE ORCHARD
No'S 01 223
Replaced by 11m STP 28
25

H Proposed 200 KVA No'S 08 338


222

H Proposed 100 KVA No'S 11 39


12
337/T
H Proposed 63 KVA No'S 10 221

H Proposed 250 KVA No'S 06


15 15 22 336

C.mtr 1632
21 H DT16/D34,136KW
Proposed HT Conductor 50 Sqmm
18
220
30
Damaged HT Conductor 50 Sqmm C.mtr 17
335
Reconductoring 30 to 50 Sq.mm C.mtr 713 27

42
Reconductoring from 50 to 100 Sqmm C.mtr 1019 DT17/PANDITH COLONY/250KVA 21
DT CODE-87
334
Reconducting from DAM 50 to 50 Sqmm C.mtr 475 31 D27,C6,120KW
DARYADIN COLONY III 28
Existing PCC Double pole No'S 2 27 30
38
219
17 25 25
DT08/D7,28KW H DT02/D13,52KW
Proposed double pole STP 9m No'S 1 H 319
217 218 27 30
29 DT16/GANAI MOHALLA-II/250KVA
PROPOSED 9M STP No'S 64 31 D31,C1,126KW
DT19D8,32KW 19
44
25
25
312 13 315
31
31
26 28
34 30 15
Existing PCC Pole Replaced by 11m STP No'S 01 216 H H H 314 H 313
35 30
6
28
18 DT04/D14,56KW 44 320
DT04/D12,C1,50KW
28 DT19/D11,44KW 30 37 H DT04/PATHAN COLONY-IV/100KVA 311 316 317 318
No'S 3 DT21/ROSE COLONY/100KVA 22 DT CODE-183
REPLACE EXISTING BY 11M STP 215 DT CODE-272 40 DT08/D9,36KW DT03/PATHAN COLONY-III/100KVA
D13,52KW 20
D12,48KW DT CODE-89
34 D9,C1,3PH-1(17KW),55KW
Proposed Line Isolator No'S 03 25 H DT17/D11,C9,62KW
21 321
214 37 OVER PREMISES
Receiving Station 310
20
23
15
00/T Pole Number/Tilted Pole No'S 26 38
42 24
322
213
DT19/DAR MOHALLA-II/100KVA
PROPOSED 11M STP No'S 1 205 DT CODE-243 309 333
30 37 12
D13,52KW 37 26
PROPOSED 50SQMM HT ABC C.mtr 936
DT18/GANAI MOHALLA-I/250KVA 19
TO BE DISMANTLED 17 14
PROPOSED 100SQMM HT ACSR C.mtr 280 DT CODE-72 33
D23,C17,3PH-2((10+3)KW), All Cantilevers to be Replaced 204
14 139KW for Proper Phase Clearance 43
26 308
29
212 TOWER/25KVA
198
DARYADIN COLONY 132 KV CROSSING DT08/BAGHI USMAN COLONY/250KVA 28
12 203
38
DT CODE-64
(A) D34,C1,138KW
211
43 307
12 197
H 13
30
28
202 19 H DT19/D13,52KW 40
DT10/D26,104KW
210 31
11 285 306 CHINAR AVENUE COLONY
18 196/T 48

201 23 32
209 32 41
305
284
15 21
191/T 195/T 26 43
208 10 200 20 37
207
13
25 194/T
EXISTING 100KVA 36 26 193 304
27 283
199/T Augumented into 192
25 BAGHI USMAN COLONY
250KVA
206 43 (A) 33
27 190 35
30
TOWER/25KVA
22 14 184 17
25
24
27 H H PDT2/DT12/D6C6,36KW
39
282
303

17 189 DT20/DAR MOHALLA-I/100KVA 20 35


14 186
H 187 188
DT CODE-66
176 185
PDT-25/3/200 D29,C3,122KW 15 32
22
182
183
DT25/D22,C8,104KW
H 39 Prospective Growth 302

PDT1/DT12/D8,32KW 281
29
24 175
17 28 24 36
30 29 15 20
19
347 36 H
TOWER/25KVA 291 20
25 174 181 40 26 23
31 TOWER/25KVA 12 33 24 DT06/D6,C3,3PH-1(5KW)
43 31 292 346 29 35KW
DT12/MEHJOOR COLONY-I/100KVA 5 5 348
2
173
228
242
DT CODE-84 DT10/SAT-BONY/250KVA 286 287 288
289 290 H
252 DT CODE-77 25 DT03/D20,80KW
28 D14,56KW SHIFT D31,C7,138KW 275 32
22 17 349
15 23 6 6 DISCONNECTED MASJID
22 38 32 DT06/GULBERG COLONY-I/250KVA
36 238 239 35 261 16 30 8
170 171 177 178 179 180 229 240 18 251 19 33 5 37 24 2 19 269 23
164 165 166 167 168 169 172 15 17 18 17 44 44 27 23 DT CODE-103 28
32 27
22
H 23 20 19 21
241
246 247 248
H 253 254 255 256 259
260/T H 267 268
28 39 40 6 D32,C2,132KW 293 351

A+
30 29

Ganderbal Colony
23 28 32
H
21 39 39 29
H
243
H 244 245

FEEDER NO 1
249 250
DT11/MEHJOOR COLONY-II/200KVA
258
30 DT10/
D24,C1,3PH-1(9KW),107KW
18
16
21 271
272
273
274
276
DT05/D29,C3
122KW
19
H 22 23
352
DT11/D14,56KW D23,C2,96KW 350 353
DT25/D27,C11,3P-1(11KW)/141KW PDT-200KVA PDT-25/5/200KVA DT25/D16,C16,96KW 28 294
EXISTING 100KVA D19,C19,114KW D18,C11,3PH-1(05KW),99KW (UPTO POLE 246) 262
270
PHE/100KVA
19
Augumented into 17 FEEDER NO 1 10
DT /GULAB BAGH/630KVA 257
250KVA
H
DT26/GOVT.B.H.S.SCHOOL/100KVA
DT CODE-71 FEEDER NO 2 28 277
24 295 37
355
23
DT CODE-271 230 25 263
D25,C10,120KW
22 231 23
Proposed 33/11kv 28 296
354
37

30
278
30

H 19 232
TOWER/25KVA
264

26
R/Stn. Gulab Bagh 297 356
H 357
PDT-25/4/200KVA 28 29 31
265 PDT07
D19,C08,92KW 14
298 D13,C1,54KW
279 25
232 27
31
266
21
25 299
DT07/TAWHEED CHOWK/100KVA
234
25 D11,44KW
280
16 14

235
NOTE: DEDICATED DTS TO BE FED FROM FEEDER NO.1
300
DT09/ISLAMIA COLONY/250KVA
DT CODE-76 34
TOWER/25KVA
33 236 D33,C1,134KW 16
301

10
33
DT13/SYED COLONY/100KVA 33 DT05/GULBERG COLONY-II/250KVA
237
D15,60KW DT CODE-111
D34,136KW
5

25

12

42

29 PDT-76/100KVA
33 H D14,56KW

Vous aimerez peut-être aussi