MINI PLANT MINYAK GORENG FORTIVIKASI VIT. A KAP. 1 TON CPO PER HARI
HARGA (RUPIAH)
NO. URAIAN KUANTUM
SATUA
I. PROCESS EQUIPMENT
1.1 CPO Mobile Pump 1 unit 40,000,000
1.2 CPO Storage Tank 1 unit 268,000,000
1.3 Transfer Pump 1 unit 96,000,000
1.4 NaOH Tank 1 unit 76,000,000
1.5 Hot Water Tank 1 unit 84,000,000
1.6 Pretreatment Tank 1 unit 636,000,000
1.7 Gum Pot 1 unit 36,000,000
1.8 Transfer Pump 1 unit 96,000,000
1.9 H3PO Tank 1 unit 36,000,000
1.10 Blaching Earth Hopper 1 unit 108,000,000
1.11 Condensor 1 unit 68,000,000
1.12 Cyclone 1 unit 68,000,000
1.13 Vacuum Pump 1 unit 164,000,000
1.14 Bleaching Tank 1 unit 748,000,000
1.15 Spent Earth Port 1 unit 36,000,000
1.16 Transfer Pump 1 unit 96,000,000
1.17 Niagara Filter 1 unit 664,000,000
1.18 Polishing Filter 1 unit 68,000,000
1.19 Bleached Oil Tank 1 unit 328,000,000
1.20 Transfer Pump 1 unit 96,000,000
1.21 FFA Scrubber 1 unit 388,000,000
1.22 FFA Cooler 1 unit 284,000,000
1.23 FFA Transfer Pump 1 unit 288,000,000
1.24 FFA Tank 1 unit 108,000,000
1.25 Vacuum System for Deodorizing 1 unit 3,132,000,000
1.26 Thermal Oil Heater 1 unit 1,396,000,000
1.27 Deodorizing Tank 1 unit 260,000,000
1.28 Dropped Oil Tank 1 unit 92,000,000
1.29 Transfer Pump 1 unit 24,000,000
1.30 Deodorized Oil Tank 1 unit 82,000,000
1.31 Transfer Pump 1 unit 24,000,000
1.32 Cooling Tower 1 unit 22,000,000
1.33 Chiller 1 unit 141,000,000
1.34 Chilled Water Tank 1 unit 17,000,000
1.35 Water Pump 1 unit 7,000,000
1.36 Chrystalizing Tank 1 unit 181,000,000
1.37 Diaphragma Pump 1 unit 43,000,000
1.38 Membrane Filter Press 1 unit 189,000,000
1.39 Stearin Pot 1 unit 9,000,000
1.40 Transfer Pump 1 unit 24,000,000
1.41 RBDP Stearin Tank 1 unit 82,000,000
1.42 RBDP Olein Tank 1 unit 82,000,000
1.43 Transfer Pump 1 unit 24,000,000
1.44 Vitamin A Tang 1 unit 12,000,000
1.45 Fortificating Tank 1 unit 152,000,000
1.46 Packaging 1 unit 433,000,000
Sub Total Process Equipment 11,308,000,000
IV. UTILITY
4.1 Generator Set 1 unit 210,000,000
4.2 Boiler 1 420,000,000
4.3 Water Treatment 1 27,000,000
4.4 Waste Water Treatment 1 41,000,000
4.5 Compressor 1 51,000,000
4.6 Alat Pemadam Kebakaran 1 lot 9,000,000
Sub Total Utility -
V. AUXILIARIES EQUIPMENT
5.1 Frame Structure 1 lot 83,000,000
5.2 Laboratory Equipment 1 lot 77,000,000
5.3 Workshop Equipment 1 lot 12,000,000
Sub Total Auxiliaries Equipment 172,000,000
Doyo Sudaryat
Direktur
AB)
TON CPO PER HARI
HARGA (RUPIAH)
TOTAL
40,000,000
268,000,000
96,000,000
76,000,000
84,000,000
636,000,000
36,000,000
96,000,000
36,000,000
108,000,000
68,000,000
68,000,000
164,000,000
748,000,000
36,000,000
96,000,000
664,000,000
68,000,000
328,000,000
96,000,000
388,000,000
284,000,000
288,000,000
108,000,000
3,132,000,000
1,396,000,000
260,000,000
92,000,000
24,000,000
82,000,000
24,000,000
22,000,000
141,000,000
17,000,000
7,000,000
181,000,000
43,000,000
189,000,000
9,000,000
24,000,000
82,000,000
82,000,000
24,000,000
12,000,000
152,000,000
433,000,000
11,308,000,000
87,000,000
59,000,000
146,000,000
108,000,000
163,000,000
271,000,000
210,000,000
420,000,000
27,000,000
41,000,000
51,000,000
9,000,000
758,000,000
83,000,000
77,000,000
12,000,000
172,000,000
12,655,000,000 2
06 September 2019
hem Bioindustri Mandiri
oyo Sudaryat
Direktur
RENCANA ANGGARAN BIAYA (RAB)
MINI PLANT MINYAK GORENG FORTIVIKASI VIT. A KAP. 1 TON CPO PER HARI
I. PROCESS EQUIPMENT
1.1 CPO Mobile Pump 1 unit 10,000,000 ### 11,500,000
1.2 CPO Storage Tank 1 unit 67,000,000 ### 97,000,000
1.3 Transfer Pump 1 unit 24,000,000 ### 29,000,000
1.4 NaOH Tank 1 unit 19,000,000 ### 19,000,000
1.5 Hot Water Tank 1 unit 21,000,000 ### 23,500,000
1.6 Pretreatment Tank 1 unit 159,000,000 ### 227,000,000
1.7 Gum Pot 1 unit 9,000,000 ### 12,500,000
1.8 Transfer Pump 1 unit 24,000,000 ### 29,000,000
1.9 H3PO Tank 1 unit 9,000,000 ### 9,000,000
1.10 Blaching Earth Hopper 1 unit 27,000,000 ### 27,000,000
1.11 Condensor 1 unit 17,000,000 ### 26,500,000
1.12 Cyclone 1 unit 17,000,000 ### 28,000,000
1.13 Vacuum Pump 1 unit 41,000,000 ### 58,500,000
1.14 Bleaching Tank 1 unit 187,000,000 ### 297,000,000
1.15 Spent Earth Pot 1 unit 9,000,000 ### 12,500,000
1.16 Transfer Pump 1 unit 24,000,000 ### 29,000,000
1.17 Niagara Filter 1 unit 166,000,000 ### 276,000,000
1.18 Polishing Filter 1 unit 17,000,000 ### 24,500,000
1.19 Bleached Oil Tank 1 unit 82,000,000 ### 117,500,000
1.20 Transfer Pump 1 unit 24,000,000 ### 29,000,000
1.21 FFA Scrubber 1 unit 97,000,000 ### 138,500,000
1.22 FFA Cooler 1 unit 71,000,000 ### 101,500,000
1.23 FFA Transfer Pump 1 unit 72,000,000 ### 97,000,000
1.24 FFA Tank 1 unit 27,000,000 ### 41,000,000
1.25 Vacuum System for Deodorizing 1 unit 783,000,000 ### 987,500,000
1.26 Thermal Oil Heater 1 unit 349,000,000 ### 498,500,000
1.27 Deodorizing Tank 1 unit 260,000,000 ### 371,500,000
1.28 Dropped Oil Tank 1 unit 92,000,000 ### 131,500,000
1.29 Transfer Pump 1 unit 24,000,000 ### 29,000,000
1.30 Deodorized Oil Tank 1 unit 82,000,000 ### 127,000,000
1.31 Transfer Pump 1 unit 24,000,000 ### 29,000,000
1.32 Cooling Tower 1 unit 22,000,000 ### 31,500,000
1.33 Chiller 1 unit 141,000,000 ### 221,000,000
1.34 Chilled Water Tank 1 unit 17,000,000 ### 24,500,000
1.35 Water Pump 1 unit 7,000,000 ### 9,000,000
1.36 Chrystalizing Tank 1 unit 181,000,000 ### 258,500,000
1.37 Diaphragma Pump 1 unit 43,000,000 ### 71,000,000
1.38 Membrane Filter Press 1 unit 189,000,000 ### 277,000,000
1.39 Stearin Pot 1 unit 9,000,000 ### 12,500,000
1.40 Transfer Pump 1 unit 24,000,000 ### 29,000,000
1.41 RBDP Stearin Tank 1 unit 82,000,000 ### 117,500,000
1.42 RBDP Olein Tank 1 unit 82,000,000 ### 117,500,000
1.43 Transfer Pump 1 unit 24,000,000 ### 29,000,000
1.44 Vitamin A Tang 1 unit 12,000,000 ### 17,000,000
1.45 Fortificating Tank 1 unit 152,000,000 ### 246,000,000
1.46 Packaging 1 unit 433,000,000 ### 678,500,000
Sub Total Process Equipment 4,252,000,000 ### 6,074,500,000
IV. UTILITY
4.1 Generator Set 1 unit 210,000,000 ### 300,000,000
4.2 Boiler 1 420,000,000 ### 600,000,000
4.3 Water Treatment 1 27,000,000 ### 38,571,429
4.4 Waste Water Treatment 1 41,000,000 ### 58,571,429
4.5 Compressor 1 51,000,000 ### 72,857,143
4.6 Alat Pemadam Kebakaran 1 lot 9,000,000 ### 12,857,143
Sub Total Utility - ### -
V. AUXILIARIES EQUIPMENT
5.1 Frame Structure 1 lot 83,000,000 ### 118,571,429
5.2 Laboratory Equipment 1 lot 77,000,000 ### 110,000,000
5.3 Workshop Equipment 1 lot 12,000,000 ### 17,142,857
Sub Total Auxiliaries Equipment 172,000,000 ### -
Doyo Sudaryat
Direktur
Harga Jual BAGI 0,7 ### BAGI 0,7
HARGA (RUPIAH) HARGA (RUPIAH)
TOTAL SATUA TOTAL
7,998,785,714 7,998,571,429
7,998,571,429 BAGI 0,7 7,998,571,429