Project Cost: SAR700,000,000

Project Duration: 4 years Client: ARAMCO/SKEC Mar 2011-Oct 2015

 YERP/YASREF Project Yanbu, K.S.A


Interconnecting Pipe System with more than 1200 interfaces to other EPCs.
Project cost SAR800,000,000.00+ [$200,000,000.00+].
Project Duration: 3 years Client: ARAMCO/Sinopec Mar 2011-Aug 2014

 ZEPERELLE MKTG & CONSTRUCTION, Cavite City, Philippines 2005-2011


PROJECT CONSULTANT

 Planned, organized, acted as adviser for and managed the construction of local
government facilities.
 Responsible for preparation of contract documents and handling of procurement
processes. Ensured the feasibility of construction sites in accordance with building code
and city ordinances. Liaised with city officials for permits and requirements.
 Prepared and implemented safety management plans to ensure safety and security at
the workplaces.
 Prepared value engineering analysis for cost-effective project execution and successful
project delivery.

A 30-ft high political billboard along Batangas City highway.


Project cost P450,000.00 [$10,000.00]. Designed and constructed along main
thoroughfare.
Project Duration: 1month Client: Zeperelle Marketing/City of Batangas

 CJCLDS, Quezon City, Philippines 1997-2006


PROJECT SUPERVISOR
 Acting in the capacity of a Resident Engineer for and in behalf of the Owner
 Provided client with advanced managerial and general inspection services from the
planning phase of the projects up to the operation stage to ensure high quality facilities
for end-users.

Key Projects And Accomplishments:

 CJCLDS US-Standard Facilities Luzon Islands, Philippines


Averaging P50,000,000.00 [$1,250,000.00] per project
Project Duration: 9months (Average) Client: CJCLDS 1998-2006

Batangas Billboard Batangas City, Philippines


A 30-ft high political billboard along Batangas City highway.
Project cost P450,000.00 [$10,000.00]. Designed and constructed along main
thoroughfare.
Project Duration: 1month Client: Zeperelle Marketing/City of Batangas

-conditioning Project Goa, Bicol, Philippines

JosePercivalBorja CV Page |2
A P10,000,000.00 [$200,000.00] air-conditioning and renovation project.
Installation of VAC and major renovation and upgrade of facilities.
Project Duration: 9months Client: CJCLDS Aug 2005-May 2006

A P25,000,000.00 [$500,000.00] two storey-addition and renovation project


including installation of airconditioning units and electro-mechanical systems.
Project Duration: 10months Client: CJCLDS Jul 2004-Jul 2005

-120 Project Imus, Cavite, Philippines


A P30,000,000.00 [$600,000.00] new building construction project including
installation of airconditioning units and electro-mechanical systems.
Project Duration: 11months Client: CJCLDS Jul 2003-Jun 2004

-170 Project Silang, Cavite, Philippines


A P30,000,000.00 [$600,000.00] new building construction project including
installation of airconditioning units and electro-mechanical systems.
Project Duration: 9months Client: CJCLDS Sep 2002-Jun 2003

-37 Project Lopez, Quezon, Philippines


A P30,000,000.00 [$600,000.00] new building construction
project/planning/design phase.
Project Duration: 4months Client: CJCLDS Apr 2002-Aug 2002

-170 Project Narra, Palawan Philippines


A P30,000,000.00 [$600,000.00] new building construction project including
installation of airconditioning units and electro-mechanical systems. Project
Duration: 14months Client: CJCLDS Jan 2001-Mar 2002

Small-scale facility repair project on electrical and civil works


Project Duration: 2months Client: CJCLDS Dec 1999-Feb 2000

-3 Renovation Project Cavite City, Cavite, Philippines


Small-scale facility repair project on electrical and civil works
Project Duration: 2months Client: CJCLDS 1999

Rosario H-74 Renovation Project Rosario, Cavite, Philippines


Small-scale facility repair project on electrical and civil works
Project Duration: 2months Client: CJCLDS 1998

Small-scale facility repair project on painting, electrical and civil works


Project Duration: 2months Client: CJCLDS 1998

 STREAM GLOBAL SERVICES, Quezon City, Philippines 2007-2011

JosePercivalBorja CV Page |3
TECHNICAL SUPPORT PROFESSIONAL Level 2
 Worked to design best computing solutions around the needs of both our regular clients
and our customers, aiming at providing them the best customer experience.
 Promoted to 2nd Level in 12months time.
 Trained on handling client concerns using fluency on English language.

 JC General Services, Cavite City, Philippines 1997-2007


GENERAL MANAGER
 Owned, managed and controlled all business-related undertakings.
 Handled general building maintenance and construction services: civil, electro-
mechanical and general painting works.
 Provided innovative construction and operational management services.

EDUCATION AND PROFESSIONAL DEVELOPMENT

 B. Sc. In Civil Engineering, Guillermo de Vega Scholar, Graduated 1997


 Certificate - Construction Arbitration
 Certificate - Construction Project Cost Management
 Behavioral-based Safety Leadership Course
 Microsoft Office Training & Statistical Record-keeping
 Member, American Concrete Institute – Philippine Chapter
 Member, Philippine Institute of Civil Engineering - Manila Chapter
 Member, Toastmasters Club, International – Ascend Makati Chapter

COMPUTER SKILLS

 Well-versed in Microsoft Office 2010/13 [Word, Excel, PowerPoint, Outlook, Publisher,


Visio]
 Familiar with Primavera P3/P6 and MS Project
 Skilled in producing presentations using multimedia editing software
 Familiar with AutoCAD, SAP 2000, ETABS, TEKLA 14

OTHER SKILLS

 Skilled in the preparation and facilitation of trainings and workshops on technical


subjects
 Speaks and writes English fluently
 Knows how to drive (auto/manual)

JosePercivalBorja CV Page |4

Vous aimerez peut-être aussi