02.16.02.01 EXCAVACION ZANJA ( PULSO ) P/TUBO T.N. DN 100-150 DE 1.01 A 1.25 M.,PROF. m 1.00 598.20 598.20 598.20
02.16.02.02 EXCAVACION ZANJA ( PULSO ) P/TUBO. T.N. DN 100-150 DE 1.76 A 2.00 M.,PROF. m 1.00 95.00 95.00 95.00
02.16.02.03 EXCAVACION ZANJA ( PULSO ) P/TUBO T.N. DN 200-250 DE 1.01 A 1.25 M., PROF. m 1.00 411.40 411.40 411.40
02.16.02.04 REFINE Y NIVELACION DE ZANJAS T.N. P/TUBO DN 100-150 P/TODA PROF. m 1.00 693.20 693.20 693.20
02.16.02.05 REFINE Y NIVELACION DE ZANJAS T.N. P/TUBO DN 200-250 P/TODA PROF. m 1.00 411.40 411.40 411.40
02.16.02.06 CAMA DE APOYO P/TUBERIAS e=0.10 C/MAT. PROPIO ZARANDEADO - DESAGUE m 1.00 1,104.60 1,104.60 1,104.60
02.16.02.07 PROTECCION DE ZANJA (PULSO) C/MAT. PROPIO ZARANDEADO P/TUBO DN 100-150 DE 1.01 M A 1.25 M. PROF. m 1.00 598.20 598.20 598.20
02.16.02.08 PROTECCION DE ZANJA (PULSO) C/MAT. PROPIO ZARANDEADO P/TUBO DN 100-150 DE 1.76 M A 2.00 M. PROF. m 1.00 95.00 95.00 95.00
02.16.02.09 PROTECCION DE ZANJA (PULSO) C/MAT.PROPIO ZARANDEADO P/TUBO DN 200-250 DE 1.01 M A 1.25 M. PROF. m 1.00 411.40 411.40 411.40
02.16.02.10 RELLENO DE ZANJA (PULSO) C/MAT. PROPIO ZARANDEADO P/TUBO DN 100-150 DE 1.01 M A 1.25 M PROF. m 1.00 598.20 598.20 598.20
02.16.02.11 RELLENO DE ZANJA (PULSO) C/MAT. PROPIO ZARANDEADO P/TUBO DN 100-150 DE 1.76 M A 2.00 M PROF. m 1.00 95.00 95.00 95.00
02.16.02.12 RELLENO DE ZANJA (PULSO) C/MAT. PROPIO ZARANDEADO P/TUBO DN 200-250 DE 1.01 M A 1.25 M PROF. m 1.00 411.40 411.40 411.40
02.16.02.13 ELIMINACION DE MATERIAL EXCEDENTE m3 1.25 1,104.60 0.80 0.10 110.46 110.46
02.16.02.14 RELLENO ADICIONAL PARA EL COLECTOR PRINCIPAL
RELLENO PARA EL TRAMO BZ-25 AL BZ-26 m3 90.45 90.45
AREA (1) 1.00 A1=23.50 1.50 35.25
VER DETALLE EN EL PERFIL
RELLENO PARA EL TRAMO BZ-26 AL BZ-PTAR (COLECTOR PRINCIPAL)
AREA (2) 1.00 A2=36.80 1.50 55.20
VER DETALLE EN EL PERFIL
02.16.03 SUMINISTRO E INSTALACION DE TUBERIAS
Página 1
HOJA DE METRADOS
02.16 RED DE ALCANTARILLADO-CENTRO POBLADO POMACCOCHA ( L = 1,104.60 m )
PROYECTO : " CREACIÓN DEL SISTEMA DE AGUA POTABLE, ALCANTARILLADO Y UNIDADES BASICAS DE SANEAMIENTO EN EL CENTRO POBLADO DE POMACCOCHA, HUANCUTE Y TAMBOBAMBA, DISTRITO SAN FRANCISCO DE RAVACAYCO -
PARINACOCHAS - AYACUCHO "
LUGAR : : RAVACAYCO - PARINACOCHAS - AYACUCHO
CENTRO POBLADO: POMACCOCHA
MEDIDAS
PARTIDA N° DESCRIPCION UND. PARCIAL TOTAL
CANT LARG. AN. AL.
02.17.03.02 CONSTRUCCION DE LOSA DE CONCRETO F'c= 175 KG/CM2 DE 0.80 X 0.60 X 0.10M und. 50.00 50.00 50.00
Página 2
METRADO DE COCHANI
TRAMO INICIO FINAL PROF.
Excavacion hmax(m)
TOTAL DE METRADO
DIAMETRO=160 mm
DIAMETRO=160 mm
DIAMETRO=160 mm
DIAMETRO=160 mm
DIAMETRO=160 mm
DIAMETRO=160 mm
DIAMETRO=160 mm
DIAMETRO=160 mm
DIAMETRO=160 mm
DIAMETRO=160 mm
DIAMETRO=160 mm
DIAMETRO=160 mm
DIAMETRO=200 mm
DIAMETRO=200 mm
DIAMETRO=200 mm
DIAMETRO=200 mm
DIAMETRO=200 mm
DIAMETRO=200 mm
DIAMETRO=200 mm
DIAMETRO=200 mm
DIAMETRO=200 mm
DIAMETRO=200 mm
DIAMETRO=200 mm
DIAMETRO=200 mm
DIAMETRO=200 mm
1.00 DIAMETRO 160
T-NORMAL H=0.50-
T-NORMAL H=0.80-
T-NORMAL H=1.01-
T-NORMAL H=1.26-
T-NORMAL H=1.51-
T-NORMAL H=1.76-
T-NORMAL H=2.01-
T-NORMAL H=2.26-
T-NORMAL H=2.51-
T-NORMAL H=2.76-
T-NORMAL H=3.01-
T-NORMAL H=3.51-
T-NORMAL H=4.01-
T-NORMAL H=4.51-
T-NORMAL H=1.01-
T-NORMAL H=1.26-
T-NORMAL H=1.51-
T-NORMAL H=1.76-
T-NORMAL H=2.01-
T-NORMAL H=2.26-
T-NORMAL H=2.76-
T-NORMAL H=3.01-
T-NORMAL H=3.51-
T-NORMAL H=4.01-
T-NORMAL H=4.51-
T-NORMAL H=5.01-
T-NORMAL H=2.51-
Tipo de Excavacion
Maxima Altura de
excavacion hp(m)
M=Maquinaria
EXCAVACION
N= Normal
DIAMETRO(mm)
Exc. Pulso.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
Exc. Maq.
P= Pulso
LONGITUD (m)
1.25
1.50
2.00
2.25
2.75
3.50
4.00
4.50
5.50
1.25
1.50
1.75
2.00
2.50
3.00
3.50
4.50
5.00
5.50
1.75
2.50
3.00
2.25
2.75
4.00
mm
mm
DE
AL
DE AL CT CS CT CLL DE AL
PIPE
PIPEEE BZ-04 BZ-09 3,883.48 3,882.28 3,881.21 3,880.01 1.20 1.20 160 12.60 1.20 1.20 N M --- --- 12.6 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-05 BZ-04 3,883.79 3,882.59 3,883.48 3,882.28 1.20 1.20 160 25.60 1.20 1.20 N M --- --- 25.6 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-15 BZ-18 3,879.50 3,878.30 3,876.82 3,875.62 1.20 1.20 160 28.45 1.20 1.20 N M --- --- 28.45 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-06 BZ-10 3,883.36 3,882.16 3,880.97 3,879.77 1.20 1.20 160 22.00 1.20 1.20 N M --- --- 22 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-10 BZ-16 3,880.97 3,879.77 3,879.23 3,878.03 1.20 1.20 160 27.00 1.20 1.20 N M --- --- 27 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-14 BZ-15 3,881.37 3,880.17 3,879.50 3,878.30 1.20 1.20 160 25.90 1.20 1.20 N M --- --- 25.9 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-16 BZ-19 3,879.23 3,878.03 3,877.00 3,875.80 1.20 1.20 160 28.45 1.20 1.20 N M --- --- 28.45 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-18 BZ-20 3,876.82 3,875.62 3,873.57 3,872.37 1.20 1.20 160 36.00 1.20 1.20 N M --- --- 36 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-19 BZ-21 3,877.00 3,875.80 3,873.15 3,871.95 1.20 1.20 160 40.00 1.20 1.20 N M --- --- 40 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-01 BZ-02 3,888.55 3,887.35 3,889.69 3,887.09 1.20 2.60 160 60.00 1.90 2.60 N M --- --- --- --- --- 60 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-02 BZ-03 3,889.69 3,887.09 3,884.34 3,883.14 2.60 1.20 160 35.00 1.90 1.20 N M --- --- --- --- --- 35 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-11 BZ-10 3,883.64 3,882.44 3,880.97 3,879.77 1.20 1.20 160 32.15 1.20 1.20 N M --- --- 32.15 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-03 BZ-04 3,884.34 3,883.14 3,883.48 3,882.28 1.20 1.20 160 33.60 1.20 1.20 N M --- --- 33.6 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-20 BZ-21 3,873.57 3,872.37 3,873.15 3,871.95 1.20 1.20 160 46.20 1.20 1.20 N M --- --- 46.2 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-17 BZ-16 3,880.81 3,879.61 3,879.23 3,878.03 1.20 1.20 160 37.00 1.20 1.20 N M --- --- 37 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-13 BZ-14 3,887.04 3,885.84 3,881.37 3,880.17 1.20 1.20 160 38.20 1.20 1.20 N M --- --- 38.2 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-07 BZ-08 3,889.00 3,887.80 3,882.96 3,881.76 1.20 1.20 160 39.70 1.20 1.20 N M --- --- 39.7 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-08 BZ-09 3,882.96 3,881.76 3,881.21 3,880.01 1.20 1.20 160 39.70 1.20 1.20 N M --- --- 39.7 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-09 BZ-15 3,881.21 3,880.01 3,879.50 3,878.30 1.20 1.20 160 28.15 1.20 1.20 N M --- --- 28.15 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-21 BZ-22 3,873.15 3,871.95 3,870.01 3,868.81 1.20 1.20 200 40.00 1.20 1.20 N M --- --- --- --- --- --- --- --- --- --- --- --- --- --- 40 --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-25 BZ-26 3,864.01 3,862.81 3,863.52 3,862.32 1.20 1.20 200 60.00 1.20 1.20 N M --- --- --- --- --- --- --- --- --- --- --- --- --- --- 60 --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-26 BZ-PTAR 3,863.52 3,862.32 3,863.09 3,861.89 1.20 1.20 200 71.40 1.20 1.20 N M --- --- --- --- --- --- --- --- --- --- --- --- --- --- 71.4 --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-24 BZ-25 3,865.26 3,864.06 3,864.01 3,862.81 1.20 1.20 200 80.00 1.20 1.20 N M --- --- --- --- --- --- --- --- --- --- --- --- --- --- 80 --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-23 BZ-24 3,867.05 3,865.85 3,865.26 3,864.06 1.20 1.20 200 80.00 1.20 1.20 N M --- --- --- --- --- --- --- --- --- --- --- --- --- --- 80 --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-22 BZ-23 3,870.01 3,868.81 3,867.05 3,865.85 1.20 1.20 200 80.00 1.20 1.20 N M --- --- --- --- --- --- --- --- --- --- --- --- --- --- 80 --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-09B BZ-10 3,881.21 3,880.01 3,880.97 3,879.77 1.20 1.20 160 39.80 1.20 1.20 N M --- --- 39.8 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
PIPEEE BZ-27 BZ-03 3,886.98 3,885.78 3,884.34 3,883.14 1.20 1.20 160 17.70 1.20 1.20 N M --- --- 17.7 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- S25 S25
1,104.60 0 0 598.2 0 0 95 0 0 0 0 0 0 0 0 411.4 0 0 0 0 0 0 0 0 0 0 0 0 1104.6
T.N 0.00 0.00 598.20 0.00 0.00 95.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 411.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Página 3
RESUMEN DE CALCULO DE EXCVACION
BUZONES CANT. PROF. DIAM AREA VOL. DESP.
BUZON DE=1.20 26 1.20 1.60 2.01 62.73 78.41 78.41
BUZON DE=2.60 1 2.60 1.60 2.01 5.23 6.53 6.53
Página 4
ENCOFRAD
ENCOFRAD
OY CONCRETO
OY CONCRETO F TAPA DE
DESENCOF F´C=100
VOLUMEN DE DESENCOF ´C=210 CONCRETO
ELIMI MAT SOLADO RADO EN KG/CM2
EXCAVACION RADO DE KG/CM2 PARA ARMADO
EXCEDENTE (M2) LOZA PARA
(M3) MURO DE BUZONES PARA
MACIZA DE media caña BUZONES BUZONES
BUZONES loza inferior muro techo (M3) dados
BUZONES CANT. PROF. DIAM AREA DESP. BUZONES (M3) SOLAQ|UEO
(M2)
(M2)
hprom= 1.20 1.20 26 BUZON DE=1.20 26 1.20 1.60 2.01 78.41 98.02 98.02 78.41 78.41 52.27 52.27 26.14 26.14 156.83 117.62 274.45 10.45 31.37 8.98 50.81 0.21 7.35 7.56 26 130.69 130.69
hprom= 2.60 2.60 1 BUZON DE=2.60 1 2.60 1.60 2.01 5.83 7.29 7.29 5.83 5.83 2.01 2.01 1.01 1.01 13.07 9.80 22.87 0.40 2.61 0.35 3.36 0.01 0.28 0.29 1 5.03 5.03
27 27 105.30 105.30 27
27
Página 5
PLANILLA DE ACERO EN BUZONES
N° Veces Longitud Peso Peso
Ø 3/8" Ø 1/2" Ø 3/8" Ø 1/2" Kg (Total)
BUZON H=1.20
Losa Techo Superior
4 1.37 0 0.568 0 3.11
4 1.3 0 0.568 0 2.95
4 1.15 0 0.568 0 2.61
8 1.36 0 0.568 0 6.18
1.29
Total ==> 386.34 Kg
BUZON H= 2.50
Losa Techo Superior
4 1.37 0 0.568 0 3.11
4 1.30 0 0.568 0 2.95
4 1.15 0 0.568 0 2.61
1.29
Total ==> 8.68