Académique Documents
Professionnel Documents
Culture Documents
JSEA-ICS-002
Department/s Contractor Revision No
Job Title Installation of Rigid Steel Conduit (RSC) and Its Support (Integration of SWAS Monitoring System Unit 1&2) Effective Date October 11-17, 2019
EL
S
Refer to engineering drawing or the as- built documents of
EC
the
1. Allwork area to have completed the site specific
prsonnel
induction.
Site Survey of area Site Evaluation for the
for the conduit pipe work area. Evaluate the Occupational Site Hazards and Lay Bodily Injury, 2. precise coordination
1
installation possible hazard and risks Health & Safety out fracture, disability A
at the work area.
3. Ensure that
workers are educate on spotting potential hazards.
Personnel to wear mandatory PPE's on site such as but not
PPE limited to hardhat, safety glass, safety shoes,
earplug/earmuff.
EL
S
EC
Preparation of Prepare necessary Misccommunication Delay of Permit to
Documents or documents (pen and with Project Enduser 1. Coordinate the activity to the Enduser and Project owner
2 Permit to Work Operational Work (PTW)
papers) and Project Owner A before commencing work.
(PTW). 2. ensure all necessary and supporting
documents
PPE
EL 1. Check Vehicle of its road worthiness.
S
2. comply with plant road speed
EC limits and driving regulations.
Occupational Hit againts personnel bodily injuries,
Health & Safety or property property damage 3.
prepare tools, equipment A banksman or spotter shall be provided during loading,
and materials to be used unloading, moving operation.
for installing conduit pipe Personnel to wear mandatory PPE's on site such as but not
Preparation and (conduit pipe, unit strut
mobilization of PPE limited to hardhat, safety glass, safety shoes,
3 channel, unit strut clamp, earplug/earmuff.
tools, equipment portable electric drill,
and materials. 1. Keep access and egress routes clear and segregate the
combination wrench, work area from others and vehicles in access areas.
adjustable wrench, box EL 2. remove any items
wrench) that may obstruct the work activty; and
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
prepare tools, equipment
and materials to be used
Company
Preparation and for installing conduit pipe Instrumentation & Control Specialists, Inc Document ID No. JSEA-ICS-002
mobilization of (conduit pipe, unit strut
Department/s
3 tools, equipment channel, unit strut clamp, Contractor Revision No
Job Title
and materials. portable electric drill,
Installation of Rigid Steel Conduit (RSC) and Its Support (Integration of SWAS Monitoring System Unit 1&2) Effective Date October 11-17, 2019
combination wrench,
adjustable wrench, box
wrench)
Risk Procedure / Job Activities/Equipment/Pro Aspect / Hazard / Impact / Risk /
Item Steps ducts or Services Risk Category Risk Source / Threatsprains HOC Control Measures Action Plan Target Date
Occupational Slips,Vulnerability
trips and falls at cuts, bruises,
Health & Safety the same level and strains
1. Check for any items that may cause slips, trips and falls
A and remove or secure them as required.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Instrumentation & Control Specialists, Inc Document ID No. JSEA-ICS-002
Department/s Contractor Revision No
Job Title Installation of Rigid Steel Conduit (RSC) and Its Support (Integration of SWAS Monitoring System Unit 1&2) Effective Date October 11-17, 2019
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Manual Loading and Loading and unloading of
5 unloading
Company of
conduit pipe materials and other Instrumentation & Control Specialists, Inc Document ID No. JSEA-ICS-002
Department/s conduit accessories. Contractor Revision No
materials
Job Title Installation of Rigid Steel Conduit (RSC) and Its Support (Integration of SWAS Monitoring System Unit 1&2) Effective Date October 11-17, 2019
2. Rain is
Poor or bad weather causing a slippery work surface.(for abnormal situation)
conditon Bodily Injury S
EC
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Preparation of work Assess work area access Occupational
6
Company Instrumentation & Control Specialists, Inc Document ID No. JSEA-ICS-002
area and weather condition Health & Safety
Department/s Contractor Revision No
Job Title Installation of Rigid Steel Conduit (RSC) and Its Support (Integration of SWAS Monitoring System Unit 1&2) Effective Date October 11-17, 2019
1. Check for any items that may cause slips, trips and falls
A
and remove or secure them as required.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Fabricate Conduit Fabsicate Conmduit Occupational
7 Supports supports Health & Safety
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Fabricate Conduit Fabsicate Conmduit Occupational
7 Supports supports Health & Safety
EL
S
1. Complete edge protection to working flatform
2. safe access and
EC egress from the scaffold must be provided
3. Install independent
lifeline
1. Secure supporting PTW for working at heights
4. ensure
3 point of contact while descending and ascending on
scaffold ladder and working flatform.
5. Make sure all workers stayfully
Installation of conduit within the scaffold
1. personnel at all
to wear times.full body harness with double
suitable
supports prior for PPE
Installation of lanyards and shock absorber.
installation of conduit pipe
8 conduit supports (beam clamp, strut clamp, EL
and hanger strut channel) drilling or S
welded
1. All Raising and lowering of materials to be carried out in
EC controlled manner (i.e. hand to hand, by light-line, nylone
rope and fitting bags.)
2. Provide safety nets if necessary
Bodiliy injury,
Occupational Fall of materials disability, fatality,
Health & Safety property or
equipment damage
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Installation of conduit Instrumentation & Control Specialists, Inc Document ID No. JSEA-ICS-002
Department/s supports prior for Contractor Revision No
Installation of
installation of conduit pipe
Job8 Title
conduit supports
and hanger (beam clamp,Installation
strut clamp,of Rigid Steel Conduit (RSC) and Its Support (Integration of SWAS Monitoring System Unit 1&2) Effective Date October 11-17, 2019
strut channel) drilling or
welded
PPE
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Company Instrumentation & Control Specialists, Inc Document ID No. JSEA-ICS-002
Department/s Contractor Revision No
Job Title Installation of Rigid Steel Conduit (RSC) and Its Support (Integration of SWAS Monitoring System Unit 1&2) Effective Date October 11-17, 2019
EL
Ensure material is carried in small quantity to minimize the
S weight.
EC
Installation of conduit 1. Educate worker of correct manual lifting method. Assign stanbyman or
supports prior for
Installation and installation of conduit pipe Occupational Bodily injury/ bac k watchman below at the
10 laying of conduit Ergonomally hazards working area to warn others
pipe (beam clamp, strut clamp, Health & Safety pain 2. Advice worker to seek help if the load for unauthorized entry in
strut channel) drilling or A
is to heavy/large (Buddy Buddy System) the working area..
welded
3. avoid awkward
position to prevent body pain/back pain.
1. personnel to wear suitable full body harness with double
PPE lanyards and shock absorber.
EL
S
1. All Raising and lowering of materials to be carried out in
controlled manner (i.e. hand to hand, by light-line, nylone
EC rope and fitting bags.)
2. Provide safety nets if necessary
Installation of conduit
supports prior for 2. Only the material being used for
Installation and installation of conduit pipe Occupational Hit by falling Bodily injury/ fatality/ cable tray installation is to be lift up.
laying of conduit
(beam clamp, strut clamp, Health & Safety materials damage to property
pipe 3. materials to
strut channel) drilling or
welded be stored in a safe and secure manner, to prevent them
A
accidentally falling or being knocked off the working
platform when at height.
4. Ensure close monitoring and
supervision.
5. ensure
buddy system when lifting 3 meters and above to prevent
struck/striking injury.
PPE 1. personnel to wear suitable full body harness with double
lanyards and shock absorber.
EL
S
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019
Installation and Measuring, bending, Fall from height /Fall serious injury/
cutting and threading of Occupational
Company Instrumentation & Control Specialists, Inc Document ID No. JSEA-ICS-002
Department/s Contractor Revision No
Job Title Installation of Rigid Steel Conduit (RSC) and Its Support (Integration of SWAS Monitoring System Unit 1&2) Effective Date October 11-17, 2019
2. safe
EC access
1. andsupporting
Secure egress from thefor
PTW scaffold must
working be provided
at heights
4. ensure 3
point of contact while descending and ascending on scaffold
ladder and working flatform.
1. personnel to wear suitable full body harness with double 5.
PPE Make sure allshock
workers stayfully within the scaffold at all
lanyards and absorber.
times.
Housekeeping Housekeeping before, Occupational Slips, trips and falls at Slips, trips and falls at S
12 before, During and
after (5's) During and after (5's) Health & Safety the same level the same level
EC
1. Make sure the work area is left clean and tidy
A
2. Check for any items that may cause
slips, trips and falls and remove or secure them as required.
Job Safety Environmental Analysis Form CPC-SAF-PRO-029-F01Effectivity Date February 11, 2019