Sheet
Test Report 1/2
Description Ref. Cont
Cable Continuity Test – Control Cables CFA901 TR - 0001 2
Customer
PGPRC
Project
1 - 5.5MW Masbate Power Plant Project - Upgrade
Site
Brgy. Puru Aroroy, Masbate
CAUTION:
Ensure that the other end of the cable to be tested is clear and not connected to the load before making the
test.
2.2 Cables wiring, trays and fittings are complete and secured
Cable Cable
Panel/Eqpt. Size
Cores Screen ARMR Earth Remarks
No.
“ 51002 4 x 1.5
“ 51005 4 x 1.5
“ 51021 4 x 1.5
“ 51031 4 x 1.5
PMM WORKS, INC.
POWER, MANUFACTURING & MARINE WORKS, INC.
Sheet
Test Report 2/3
Description Ref. Cont
Cable Continuity Test – Control Cables CFA901 TR - 0001 3
Customer
PGPRC
Project
1 - 5.5MW Masbate Power Plant Project - Upgrade
Site
Brgy. Puru Aroroy, Masbate
Cable Cable
Panel/Eqpt. Size
Cores Screen ARMR Earth Remarks
No.
“ 51125 4 x 2.5
“ 51131 4 x 2.5
“ 51131 4 x 2.5
“ 51133 4 x 2.5
“ 51134 4 x 2.5
“ 51135 4 x 2.5
“ 51141 4 x 1.5
“ 51151 7 x 1.5
“ 51155 4 x 1.5
“ 51201 4 x 1.5
“ 51203 4 x 1.5
“ 51205 4 x 1.5
“ 51206 4 x 1.5
“ 51121 4 x 1.5
“ 51222 4 x 1.5
“ 51235 12 x 1.5
“ 51239 7 x 1.5
“ 51296 4 x 1.5
“ 51321 12 x 1.5
“ 51322 7 x 1.5
PMM WORKS, INC.
POWER, MANUFACTURING & MARINE WORKS, INC.
Sheet
Test Report 3/3
Description Ref. Cont
Cable Continuity Test – Control Cables CFA901 TR - 0001 -
Customer
PGPRC
Project
1 - 5.5MW Masbate Power Plant Project - Upgrade
Site
Brgy. Puru Aroroy, Masbate
Cable Cable
Panel/Eqpt. Size
Cores Screen ARMR Earth Remarks
No.
“ 51329 7 x 1.5
“ 51331 7 x 1.5
“ 51332 12 x 1.5