Ministry of Transport
GMS Ha Noi – Lang Son Expressway project
• 130 km/4‐6 lanes expressway
• 2011‐2013
• $ 1.300 M Lao Cai
• To be co‐ financed by ADB (900 M),
EDCF (140 M) and the Government of Thai Nguyen
Viet Nam (260 M); Ha Noi
Ha L
• The F/S of Ha Noi‐Lang Son Hoa Binh Hai Pho
Expressway Project is being prepared Ninh Binh
by Consultants. Final report will be
completed in December 2010. Bid for
detailed design is under preparation. . Thanh Hoa
The views expressed in this paper/presentation are the views of the author and do not necessarily reflect the views or
policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent. ADB does not
guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequence of their use.
Terminology used may not necessarily be consistent with ADB official terms.
1
GMS: Ha Long‐Mong Cai Expressway
144 km/4 lanes
expressway
$ 1.100.0 M
ADB consultants
recommended to
delay the investment
after 2015 when Hanoi
– Haiphong
Expressway
completed.
Second GMS Northern Transport Network Improvement Phase I :
2
Ben luc – Long Thanh Expressway
• 58 km/ 4‐6 lanes
expressway
• 2010‐2014
• $ 1,608.0 M
• Co‐financing by
ADB, JICA and the
Government of Viet
Nam. Amount to be
financed by ADB of
$636M, JICA 635 M
and the
Government of Viet
Nam 337 M.
• Project investment
has been approved
in October 2010.
• Detail Design
Contract was signed
in November 2010;
3
GMS Southern Coastal Corridor Project (Rehabilitation
HW 80 & 63)
2010‐2014
$ 400M
Financed by ADB (loan
$75 M); EDCF (Korea)
$220 M; Australia ($ 25
M); and the Government
of Viet Nam ($80 M).
For ADB & Australia’
funded components, civil
works commenced by
January 2011;
For 2 EDCF’ funded
components (Korea) civil
works will commence by
2st Quarter 2011;
Central Mekong Delta Transport Connectivity Phase I
2011‐2015
$ 751 M: $130M financed
by the Australian Gov;
$220M to be financed by
ADB; $ 200 M to be
financed by the Korean
Gov; The rest $ 201 M
will be financed by
Vietnamese GoV.
As planned detailed
design contract will be
signed by June 2011
Construction work will
be started by 2nd
Quarter of 2012 and will
be completed by 2015.
4
Bien Hoa – Vung Tau expressway
• Co‐financing from WB
632M, JICA 678M and the
Government of Viet Nam
162M.
• F/S has been approved in
Sep. 2010;
• Detailed design will be
started by January 2011.