Académique Documents
Professionnel Documents
Culture Documents
GIVEN
s := 5m
l := 6m
s
= 0.833
l
DEAD LOAD
kN
γconcrete := 24
3
m
Slab:
Beam:
kN
wbeam := γconcrete b h = 3
m
kN
wwall := 3kPa 3 m = 9
m
LIVE LOAD:
p LL := 2.9kPa
SOLUTION:
( ) (
p u := 1.2 p slab + p floor_finish + 1.6 p LL = 9.105 kPa )
pu s kN
wu.slab := = 15.175
3 m
kN
(
wu.beam := 1.2 wbeam + wwall = 14.4
m
)
kN
wu.1 := wu.slab + wu.beam = 29.575
m uniform load on the
beam
kN
wDL.beam := wbeam + wwall = 12
m
Live Load:
s kN
wLL := p LL = 4.833
3 m (ws)/3
Ultimate Load:
kN uniform load on the
( )
wu.2 := 1.2 wDL.slab + wDL.beam + 1.6 wLL = 29.575
m
( ) beam
using alternate method