Vous êtes sur la page 1sur 2

SITE-ANLY-INT

SITE ANALYSIS : INTERIOR PROJCT

ITEMS Options Remarks

A External Factors
1 Encroachments at propose plot Y/N
2 Nature of compound wall, gates etc. Exist / Do not exist
3 Existance of a guard block at the main gate clarify scope
4 Evident security hazards. High / Medium / Low
5 Noise levels from surrounding areas High / Medium / Low
6 Space for material loading - unloading Available / Not Available
7 Possible location for external signage Available / Not Available
8 Lighting conditions - natural lighting conditions Good / Medium / Bad
North
South
East
West
9 Approvals / Sanctions required from the local authorities, if any Y/N

B Roof Structure / RCC Superstructure


1 type of slab
RCC
reinforced brick slab
MS frame with stone slab
truss roof
2 quality of RCC super structure Good / Medium / Bad
3 RCC Slab thickness
less than 4"
in between 4" to 6"
more than 6"
any other type
4 ventilation / natural light conditions in basement Good / Medium / Bad

C Staircases / Elevators
1 Floor Finishes of main staircase Good / Medium / Bad
2 Nature / material of staircase handrail Retainable / Not Retainable
3 capacity of exisiting lifts persons per lift
4 Floor Finishes of lift lobby mention finishes
5 Provosion of Rescue Device in the elevator machine room in case of power
failure yes / no

D Plumbing Services
1 existing water supply sources
one source : municipal water supply
two sources : municipal water & bore well water
2 capacity of exisiting under ground water tank Litres
3 capacity of exisiting over head water tank Litres
4 capacity of septic tank
5 condition of regularized sewage connection into municipal sewerage Good / Medium / Bad
6 status of ventilation in all wet areas ( toilets & kitchens) Good / Medium / Bad
7 condition of exisiting toilets w r t Good / Medium / Bad
toilet flooring
toilet dado
sanitary fixtures
sanitary fittings
8 condition of toilet water supply system Good / Medium / Bad
9 condition of toilet drainage system Good / Medium / Bad
10 condition of damp / water proofing in basement Good / Medium / Bad

Edifice Architects Pvt Ltd


site-analysis.xls Page 1 of 2 FM / DN / 02
SITE-ANLY-INT

E Electrical
1 exisiting electrical supply Single phase / 3 phase
2 Exisiting electrical load permitted load in KW / KVA
3 Condition of existing cabling / wiring Good / Medium / Bad
4 Condition of all existing light fixtures / fittings Good / Medium / Bad
5 Power condition( voltage fluctuation ) in area Stable / Unstable
6 Load shedding Frequent / Average / Rare
7 condition of earthing system Good / Medium / Bad
8 type of material used as earth strips - copper / aluminum / GI
9 Provision of Lightning Protection system yes / no
10 provision of DG Back up yes / no

F HVAC
1 condition of existing AC ducts Good / Medium / Bad
2 condition of air handling indoor units Good / Medium / Bad
3 condition of air handling outdoor units Good / Medium / Bad
4 condition of existing chillers Good / Medium / Bad
5 condition of existing condensers Good / Medium / Bad
6 condition of existing cooling towers Good / Medium / Bad

G Fire Fighting
1 does the sprinkler system exist at the site Y/N
2 if yes, from which point does our scope begins mention scope
3 capacity of dedicated water tank for fire fighting purposes in Litres

H Interiors
1 quality of material of existing doors Good / Medium / Bad
2 quality of material of existing windows Good / Medium / Bad
3 quality of material of existing structural glazing Good / Medium / Bad
4 condition of existing false ceiling, if any Good / Medium / Bad
5 condition of existing loose furniture, if any Good / Medium / Bad
6 condition of existing fixed furniture, if any Good / Medium / Bad
7 type of construction of walls
RCC wall
brick wall
wooden partition
gypsum partition
partition in any other material
8 Are all wall surfaces plastered Y/N
9 Status of Internal Plastering Good / Medium / Bad
10 Mention finishes in lobby and staircase.
Flooring
Skirting
Walls
Wall panelling / cladding

I Kitchens & Canteens


1 condition of plumbing services in kitchen Good / Medium / Bad
2 capacity of exisiting canteen users

J Security - Fire Detection & Alarm, CCTV


1 Type of Fire Alarm system analogue /addressable
2 Existing capacity of the FACP panel -no of loops yes/no
3 if yes,permission to hook up additional area from builder / owner /client
4 Existing CCTV system yes / no
5 if yes,permission from builder / owner /client to hook up additional CCTV
cameras

Edifice Architects Pvt Ltd


site-analysis.xls Page 2 of 2 FM / DN / 02