Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

1 Obtaining the WDT and Applying for a License


Scan the QR code to download the WDT APP

Note: Use smartphone


browser or scan tool. Do
not use WeChat or other
chatting tools

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 2
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

1 Obtaining the WDT and Applying for a License

Make sure to installed the latest WDT (Obtained from the Leader of the team & Huawei)

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 3
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

1 Obtaining the WDT and Applying for a License


Step Scan the QR code .
When the first time you start WDT after installed, display welcome page. Left sliding interface, and click to login WDT.
Open the WDT, click Scan to scan your exclusive QR code. Then, click Add Project. Fill in the blank with Register Name, Company Name and Phone Number, then
click Send.

Guide Page Click to Login WDT Step 1 Scan QR Code Step 2 Add Project after scanned Step 3 Input information and send

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 4
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

1 Obtaining the WDT and Applying for a License


QR Register code of OTA, ATM and AT projects

QR code QR code QR code AT


OTA project ATM project project

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 5
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

3 Preparation
3. Device Connection
Step 1 Verify that the AP works in AP mode.

Step 2 Connect the AP to the commissioning port of the main control board using a network cable.(GMPT/WMPT/LMPT and UMPT)

GTMU/WMPT/LMPT.
UMPT board.

Step 3 Power on the AP.


Turn on the switch. Turn off the power after deployment and detection.

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 6
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Deployment
3 Preparation Applying for License the WDT Detection Detection Verification Report

4. Site Preparation

Here is show you how to get the site script and software through WDT.

Step 5 Back to Local list,


Step 1 Start WDT at first time. Step 2 Switch to Online Sites. Step 3 Site filter. Step 4 Download file. Step 6 Enter in navigation page.
click site name.

Go to Online

Put Site code

Download

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 7
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Deployment
3 Preparation Applying for License the WDT Detection Detection Verification Report

4. Site Preparation_Naming Rule

When Huawei wireless engineer create sites in WDTRP system, add _3G or _4G or _3G4G in the back
of site name to differentiate 3G only/4G only/3G4G Co-MPT site, to make it easier for subcontractors to
understand and choose correct site in WDT tool to download script.

- 3A16X118_3G (3A16X118 is site ID,_3G means it is 3G only site, need to make commissioning and
test for 3G only)
- MBTS_A16X118_3G4G (MBTS_A16X118 is site ID,_3G4G means it is 3G4G Co-MPT site, need to
make commissioning for 3G4G in one time, and test for both 3G and 4G)

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 8
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

4 Deployment : Log in BTS


Enter in site navigation page, click Login , then, choose AP. WDT will automatically log in the base station.
After successful login base station, display BTS name, BTS version, Main Control Board, Standard.
Several terminals connected to base station, may result in operation failed. Please keep only one terminal connect
to base station. One key to deploy
Click to Login Select an AP

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 9
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

4 Deployment : Log in BTS


For Login :

• If the main control board UMPT/WMPT is newly delivered and the software version is
V200R015C00 or a later version, use the default local maintenance IP address:

192.168.0.49

• If the main control board UMPT/WMPT is legacy delivered and the software version is old than
V200R015C00 version, use the default local maintenance IP address:

17.21.2.15

User name: admin


Password: hwbs@com

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 10
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

4 Deployment : Log in BTS

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 11
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

4 Deployment : Downloading Software One-click deployment Visible progress and status

2. Software, Scripts, and License Downloading


Procedure:
Step 1 After logging in to the base station and click Deployment.
Step 2 Click Start Download to enter the delivering process
Step 4 After BTS restarted, click to re-login the BTS and enter in deployment interface. Check whether the version number is updated.

Step 1 Deployment. Step 2 Select a software version. Step 3 Start download. Step 4 Restart BTS. Step 5 Check version number.

Refresh button
Unavailable in 2G

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 12
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

5 Regular Detection
1. Primary Device Check–Board, RRU, Optical Power, Cell, GPS, Clock
Step 1 After logging in to the base station, click Primary Device Check. The following figure takes a macro base station as an example.
Step 2 Enable the WDT to automatically deliver MML query results and view the results by switching the tab page.
The GTMU does not support the detection of Primary Device Check.
Better understand all parts where a
problem occurs most easily.

Step 1 Click Primary Device Check Step 2 Deliver MML query results.

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 13
Obtaining WDT & Pre-configure Preparation Regular DetectionAdvanced Site Deployment Report Common
Introduction Applying for License the WDT Deployment Detection

5 Regular Detection
2. Trans-link Establish Process Detection (IP Scenario)
Procedure:
Step 1 After logging in to the base station, click Trans-link establish..
Step 2 The expert system automatically determines and checks detection items one by one.
Step 3 Check whether any indicator is in red. If it is, an exception occurs. Click the indicator to view details and locate the problem.

Step 1 Click Trans-link establish. Step 2 Check detection items. Step 3 View detailed information.

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 14
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

5 Regular Detection Automatic test verification


No rework guarantee during the antenna construction
3. Antenna Check
Procedure:
Step 1 After logging in to the base station, click Antenna check.
Step 2 First enter in VSWR page, you can manually edit VSWR THD and filter CN/SRN/SN.
Step 3 Click VSWR Multi-Freq Check. Set the VSWR threshold to the default value and click Redetect to start detection.
Step 4Click Cross Feeder to execute detection and view whether exist cross feeder.

Step 5 Intermodulation
Step 1 Click Antenna check. Step 2 Filter CN/SRN/SN Step 3 VSWR detection. Step 4 VSWR Multi-Freq Check. Step 6 Cross Feeder detection.
detection.

Filter CN/SRN/SN

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 15
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

5 Regular Detection
4. Alarm Query
Procedure:
Step 1 After logging in to the base station, click Alarm.
Ensure that no engineering alarms exist before you leave
Step 2 Query BTS alarm information. sites to avoid possible future rework.
Step 3 View the troubleshooting suggestion. GSM and Pico base stations do not support troubleshooting.
This function can replace the external alarm detection board.

Step 1 Click Alarm. Step 2 Display query result. Step 3 Filter alarm information. Step 4 Click Troubleshooting button.

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 16
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

6 Advanced Detection
1. Antenna Detection - RET Tilt Query
Procedure:
Step 1 Log in to the base station and click RET Tilt Query.
Step 2 Display each preset RET tilt and device name. The unit is 0.1 degrees.
The current interface supports to requery.

Step 1 Click RET Tilt Query. Step 2 Query information. Step 3 Check the query result.

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 17
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

6 Advanced Detection The IP address of the base station automatically read and obtained.
The IP address of the service to be detected can be changed manually.
2. Cells Cross Detection
Procedure:
Step 1 Download Service Verification Scr of related site from Online files.
Step 2 Click Call Test than Normal Srv Test.
Step 3 Select the service you want to test (2G, 3G or 4G cells) .

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 18
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

6 Advanced Detection The IP address of the base station automatically read and obtained.
The IP address of the service to be detected can be changed manually.
2. Cells Cross Detection
Step 4 With Azimuth information you know on witch sector you are.
Step 5 With WDT application you know on witch Cell you are camped.

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 19
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

6 Advanced Detection The IP address of the base station automatically read and obtained.
The IP address of the service to be detected can be changed manually.
2. Cells Cross Detection

• S
1

• S
2

• S
3

In this example we can see, S1 OK but we have cross between S2 and S3

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 20
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

6 Advanced Detection The IP address of the base station automatically read and obtained.
The IP address of the service to be detected can be changed manually.
3. Transmission Detection – Ping & Tracert

Procedure:
Step 1 After logging in to the base station, click Ping & Tracert. The WDT automatically obtains related parameters.
Step 2 Click Advanced Setting, you can manually set the size of the ping packet and click Ping to display the ping packet process.
Step 3 If the ping test fails, use the TRACERT command to trace faults.

Step 1 Click Ping & Tracert. Step 2 Perform the ping test. Step 3 Perform the tracert test. Set the size of the ping packet.

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 21
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

6 Advanced Detection
4. Others - Environment Alarm
Procedure: Visual and automatic indicator lighting
Step 1 Log in to the base station and click Environment Alarm. replaces manual selection.
Step 2 Parse the configured alarm list, and display the alarm ID, description, severity, and status to users.
Step 3 Manually trigger an environmental alarm and click Query.
Step 4 Restore the environment and query the alarm again.

Step 4 Restore the environment and


Step 1 Click Environment Alarm. Step 2 Parse the alarm list. Step 3 Trigger and query the alarm.
verify that the alarm has been cleared.

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 22
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

8 Acceptance: ESN Collection


Procedure:
Preparation: Edit the ESN list in advance according to the project condition.
Step 1 Click ESN Collection on the Acceptance page.
Step 2 Click scan icon.
Step 3 Click to input barcode.
Avoid inefficiency and errors of manual ESN reading.
Step 4 Support to delete the added item.

Step 1 Click ESN Collection. Step 2 Click scan icon. Step 3 Scan ESN Step 4 Scan QR code Step 5 Click to input barcode. Step 6 Support to delete the
added item

Scan the bar code.


Scan the QR code.

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 23
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

9 Site Deployment Report


Single site upload:
Step 1 Click site name and enter in site main interface, click Data Upload.
Step 2 Choose result file name, and click Upload. Display upload progress.
Step 3 After upload successful, display result.

Step 2 Choose file and


Step 1 Click Data Submission. Step 3 Display upload result.
click Upload

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 24
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

10 Common: Operation Log Each operation is recorded precisely,


facilitating operation tracing and locating.
Procedure:
Step 1 Log in to the base station and click Operation Log.
Step 2 Check actions performed on the base station and packets returned from the base station.
.

Step 1 Click Operation Log. Step 2 View site deployment records. Step 1 Search for files. Step 2 Check details.

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 25
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

10 Common: Data Cleanup


Procedure:
Step 1 Enter in WDT setting page, and click Common->Data cleanup.
Step 2 WDT shows the file size which can be cleaned up.
Step 3 Click Site Data can edit the site list. Click Software can edit the software list.
Step 4 Click Cleanup will delete those selected site folders and BTS software package.

Step 5 Edit software checked


Step 1 Click Common Step 2 Click Data cleanup. Step 3 Show total size. Step 4 Edit site checked list.
list.

Generated report already.


Can be delete.

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 26
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

10 Common: Terminal Playback


Procedure: Represent the test process.
Record the detection result.
Step 1 Click Replay on the WDT navigation page. Check on the major procedure.
Step 2 Select the playback file according to the time segment.
Step 3 Select the test item you want to play back.
Step 4 Check the playback result.
Step 3 Select the function to be
Step 1 Click Replay. Step 2 Select the playback file. Step 4 Check the playback result.
played back.

Playback status

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 27
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

11 Conclusion
Special
Content for WDT Category Function Description
Requirement

Promotion Login in the base station Link smartphone to the base station by AP None
Load the base station software, hot patches,
configuration file (full and incremental script), CA None
root certificate, CRL file, and license files.
Site Deployment Site deployment
Support save multiple different version of
software and provide selection function during None
deployment.
Backup and Restore Enables users to backup and restore script. None
Provides the function of detecting boards, RRUs,
Primary Device Detection None
optical power, cells, GPS, clock, etc.
Enables users to check the status of the Ethernet
port, Ethernet MAC layer, E1/T1 port, PPP & MP
layer, and information about the O&M,
Transmission Link Establishment IP networking
connectivity between the base station and the
gateway, CERT, IPsec, SSL, S1 interface, and the
SCTP link.
One-key Detection
Offline test.
Provides the function of detecting the VSWR,
Services will
Antenna Check Intermodulation, Cross Feeder connection and
be interrupted
VSWR Muilt-freq Check..
during test.
Display common alarms and enables you to query
them, including the alarm ID, alarm name,
Alarm Query None
location information, alarm severity, board type,
etc.
Check configuration validity of environment
Environment Alarm None
alarm.
Assist Function In order to locate complex base station fault,
Upload BRDLOG WDT supports to extract BRDLOG in site None
management and return to WDTRP.

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 28
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

11 Conclusion
WDT Tool Application Scenes

Account Scenes Tool


OTA 3G New WDT Match
OTA 2G New/Swap Not Match
OTA 4G Overlay WDT Match(Only for Main board replacement scene)
OTA U900 Overlay Not Match
OTA Board Expansion Not Match
ATM 2G New Not Match
ATM 2G EXP (mainly DCS EXP) Not Match
ATM 3G New WDT Match
ATM 3G Swap WDT Match
ATM 4G New (with UL reconstruction) WDT Match
ATM WRFU board Replace Not Match
ATM inter BSC re-parenting Not Match
ATM UMTS Software EXP Not Match
ATM Lampsite UL Not Match
ATM RET Deployment Not Match
AT 4G New WDT Match

Every SC must master WDT tool, all 3G/3G4G new sites will be deployed using only WDT moreover
SC payment will be impacted if he doesn’t use WDT

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 29
Obtaining WDT & Pre-configure Preparation Regular Advanced Service Acceptance Site Deployment Common
Introduction Applying for License the WDT Deployment Detection Detection Verification Report

11 Conclusion
For any support you can contact:
OTA Project
Engineer Phone Number
HAMOUDI Mohamed Lamine 0-770580327
FILLI Faouzi 0-560037366
BELKESSAM Faycal 0-773857792
BERKANI Youcef Hocine 0-770386920
NAIT ALI Nafaa 0-770509661
MEDJANI Larbi 0-770385337

For registration issue you can contact:

Engineer Phone Number


HAFSSIL Mehdi 0- 782210407
BENSELLAM Mohamed El Amine 0- 782214669

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 30
Thank you!

HUAWEI TECHNOLOGIES
HISILICON CO., LTD.
SEMICONDUCTOR Page 31

Vous aimerez peut-être aussi