Proposed FY 2020 DPWH Infrastructure Program


Based on NEP
REGION IV-A

Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)

Quezon 4th District Engineering Office 2,426,271

FIRST DISTRICT 223,000


Operations 223,000
ORGANIZATIONAL OUTCOME 1 223,000
Ensure Safe and Reliable National Road System
Asset Preservation Program 159,000
Preventive Maintenance - Primary Roads 44,776

1. Daang Maharlika (LZ) - K0135+(-732) - 1.448 Asphalt Overlay 2.90 lane km 44,776 Q
K0135+(-492), K0135+(-332) - K0135+(- 100mm with u
268), K0135+700 - K0135+720, K0136+662 - correction e
K0136+737, K0137+513 - K0137+600, z
K0140+300 - K0140+600, K0139 + 928 - o
K0139 + 978, K0142+500 - K0142+802, n
K0144 + 709 - K0144 + 909, K0147 + 300 -
K0147 + 410 4
t
Deleted Station Limits: K0139+928 - K0139+978 h

D
Rehabilitation/ Reconstruction/ Upgrading of 15,565 E
Damaged Paved Roads - Primary Roads O
/
1. Daang Maharlika (LZ) - K0150 + 400 - K0150 0.269 Concrete 0.54 lane km 15,565
+ 484, K0150 + 518 - K0150 + 600, K0153 + Reconstruction Q
197 - K0153 + 300 with 300mm Slab u
with Drainage e
z
Change in Station Limits: K0158+100 - K0158+140 o
n
Construction/ Upgrading/ Rehabilitation of Drainage along 12,659
National Roads - Primary Roads 4
t
Deleted Station Limits: K0137+628 - K0137+810
h

Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse 86,000 D


and Landslide - Primary Roads E
Transferred 86M from: Road Widening - Primary Roads -
O
Daang Maharlika (LZ) - K0151 + 594.50 - K0152 + 262, K0152
+ 274 - K0152 + 500, K0153 + 788 - K0153 + 795, K0153 +
877 - K0154 + 140, K0154 + 895 - K0155 + 826
P86,349M Allocation from NEP

Network Development Program 64,000


Road Widening - Primary Roads 64,000

Transferred 0.349M from: Road Widening - Primary Roads -


Daang Maharlika (LZ) - K0151 + 594.50 - K0152 + 262, K0152
+ 274 - K0152 + 500, K0153 + 788 - K0153 + 795, K0153 +
877 - K0154 + 140, K0154 + 895 - K0155 + 826
P63,651 Allocation from NEP
Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A

Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)

FOURTH DISTRICT 2,203,271


Operations 2,203,271
ORGANIZATIONAL OUTCOME 1 989,800
Ensure Safe and Reliable National Road System
Asset Preservation Program 271,153
Preventive Maintenance - Primary Roads 58,122

1. Daang Maharlika (LZ) - K0213 + 800 - K0213 0.96 Preventive 2.00 lane km 40,363 Q
+ 834, K0214 + 100 - K0214 + 818, K0219 + Maintenance of u
200 - K0219 + 250, K0227 + 200 - K0227 + Road: Asphalt e
214, K0231 + 500 - K0231 + 528, K0235 + Overlay z
600 - K0235 + 675, K0236 + 500 - K0236 + 100mm with o
541 correction n

Change in Station Limits: from K0215+151 to K0214+640 4


t
2. Daang Maharlika (LZ) - K0245 + 200 - K0245 0.201 Preventive 0.40 lane km 9,637 h
Q
+ 258, K0245 + 600 - K0245 + 643, K0245 + Maintenance of u
800 - K0245 + 864, K0246 + 424 - K0246 + Road: Asphalt D
e
460 Overlay zE
100mm with O
o
correction /n

Q
4
u
t
e
h
3. Quirino H-way - K0257 + 062 - K0257 + 100, 0.181 Preventive 0.36 lane km 8,122
z
K0257 + 200 - K0257 + 343 Maintenance of
o
D
Road: Asphalt
n
E
Overlay
100mm with O
4
/
correction
t
Change in Station Limit: From K0257+650 to K0257+306
h
Q
u
D
e
Rehabilitation/ Reconstruction/ Upgrading of 46,858
E
z
Damaged Paved Roads - Primary Roads O
o
n

4
t
0.055 Slope Protection square h
Work (RC Wall) 220 meter
(R/S) D
E
Change in Station Limit: from K0162 + 000 - K0162 + 300 to O
K0162+225 - K0162+255
Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A

Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)

Rehabilitation/ Reconstruction/ Upgrading of 42,853


Damaged Paved Roads - Tertiary Roads

Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse 42,050


and Landslide - Primary Roads

1. Quirino H-way - K0255 + 350 - K0255 + 400 0.05 Slope Protection 600 square 22,050
Works (Concrete meter
Slope Protection)
(R/S)

2. Daang Maharlika (LZ) - K0205 + 510 - K0205 20 Slope Protection 600 square 20,000 Q
+ 530 Works (RC Wall) meter u
(B/S) e
z
o
Additional Project n
Transferred 20.0M from: Jct MSR-Old Zigzag Rd - K0157 + 347
- K0157 + 887
4
t
h
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse 23,170
and Landslide - Secondary Roads D
E
1. MSR Jct Lopez-Hondagua Port Rd - K0222 + 0.035 Slope Protection 420.00 square 15,940 O
700 - K0222 + 735 Works (Concrete meter /
Slope Protection)
(L/S) Q
u
e
z
o
switched amount
n
2. MSR Jct-Lopez-Buenavista Rd - K0221 + 350 0.02 Slope Protection 200.00 square 7,230 Q
- K0221 +370 Works (Concrete meter u
4
Slope Protection) e
t
(R/S) zh
o
n
D
E
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse 38,100 4
O
and Landslide - Tertiary Roads t
h

Transferred 20.0 M to: Daang Maharlika (LZ) - K0205 + 510 - K0205 + 510, D
K0205 + 620 - K0205 + 627
E
O
2. Quezon-Alabat-Perez Rd - K0012 + 863 - 0.04 Slope Protection 280.00 square 8,100 Q
/
K0012 + 903 Works (Concrete meter u
Slope Protection) e
Q
(L/S) zu
o
e
n
z
Change in Station Limit: from K0004 + 550 - K0004 + 650,
K0012 + 800 - K0012 + 863 to K0012 + 863 - K0012 + 903
o
4
n
t
h
4
t
D
h
E
O
D
/E
O
Q
u
Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A

Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)

Construction/ Upgrading/ Rehabilitation of Drainage along 20,000


National Roads - Primary Roads

1. Daang Maharlika (LZ) - K0200 + 222 - K0200 0.718 Construction of 1,436 Lineal 20,000 Q
+ 940 concrete lined meters u
canal (BS) e
z
o
Change in Station Limit from K0201 + 022 to K0200 + 940
n

4
t
h

D
Network Development Program 584,447 E
O
Road Widening - Primary Roads 93,168 /

Q
u
2. Daang Maharlika (LZ) - K0195+000 - 0.307 Road Widening 614.00 lane km 20,408 Q
e
K0195+307 (2-4 lanes) u
z
including e
o
Drainage,sidewal zn
k, curb and o
gutter n
4
t
K0194 + 100 20 Construction of 20.00 lineal meters 4
h
Single Barrel t
RCBC h
D
Change in Station Limit and Allocation
E
D
O
From: Daang Maharlika (LZ) - K0185 + 500 - K0185 + 730,
K0197 + 650 - K0198 + 117 - P16,520M E
To: Daang Maharlika (LZ) - K0195+000 - K0195+307 O
P20,408M
Transferred 3.888M from: Rehabilitation/ Reconstruction/
/
Upgrading of Damaged Paved Roads - Primary Roads Daang
Maharlika (LZ) - K0195 + 890 - K0195 + 990 Q
u
Construction of By-Pass and Diversion Roads 300,000 e
z
1. Guinayangan-Tagkawayan Diversion Road, 1.5 Construction of 3.00 lane km 50,000 o
Package A, Quezon Gravel Road n

4
1.5 ROW Acquisition 45,000 square t
meter h
2. Guinayangan-Tagkawayan Diversion Road, 70 Construction of 667.80 lane km 50,000
Package B, Quezon Bridge
D
E
O
Additional Project -Transferred 50M from: 1.5 ROW Acquisition 45,000 square
Lopez By-Pass Road, Quezon - 30M
Pagbilao By-Pass Road, Quezon - 20M meter

3. Gumaca By-Pass Road, (Phase II), Package A, 1.5 Construction of 3.00 lane km 50,000
Quezon Concrete Road

1.5 ROW Acquisition 45,000 square


4. Lopez By-Pass Road, Quezon 0.6 Construction of 1.20 meter
lane km 20,000
Concrete Road

Transferred 30M to: Guinayangan-Tagkawayan Diversion


Road, Package B, Quezon
Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A

Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)

5. Pagbilao By-Pass Road, Quezon 120 Construction of 1,144.80 lane km 30,000 Q


Concrete Bridge u
e
Completion of z
Bridge o
n
5.75 ROW Acquisition 300,000 square
Transferred 20M to: Guinayangan-Tagkawayan Diversion meter 4
Road, Package B, Quezon
t
6. Plaridel By-Pass, Package A, Quezon 1.75 Construction of 3.50 lane km 50,000 h
Q
Gravel Road u
D
e
E
z
1.75 ROW Acquisition 52,500 square
O
o
meter
/n
7. Tagkawayan-Labo Diversion Road, 1.37 Construction of 2.74 lane km 50,000 Q
(Tagkawayan Section), Package A, Quezon Gravel Road Q
4
u
tu
e
e
h
z
zo
1.37 ROW Acquisition 41,100 Square o
meters D
n
n
E
Construction of Missing Links/ New Roads 191,279
O
4
1. Atimonan-Mauban Road, Atimonan Section, 1.85 Construction of 3.70 lane km 50,000 /4
t
th
Quezon Gravel Road
h
Q
u
D
D
e
E
ROW Acquisition 55,500 Square
zE
O
meters O
o
/
2. Calauag-Guinayangan-Buenavista-Lopez 1.5 Construction of 3.00 50,000 n
Road, Quezon Gravel Road Q
4
u
t
e
h
z
1.5 ROW Acquisition 45,000 Lane Km
o
D
n
E
3. MSR JCT Canda - Hondagua Roma Point - 1.35 Construction of 2.70 Lane Km 50,000 O
4
Q
Quezon Road, Package A, Quezon Gravel Road tu
h
e
z
Additional Project
D
o
Transferred 41.279M from E
n
A. Construction of New Bridges (Bridge Management Cluster) - O
41.279M
B. Quezon - Alabat - Perez Circumferential Road, Quezon - 4
8.721M t
h

4. Quezon - Alabat - Perez Circumferential Road, 1 Construction of 2.00 Lane Km 41,279 D


Quezon Gravel Road E
O
/
Transferred 8.721M to: MSR JCT Canda - Hondagua Roma
Point - Quezon Road, Package A, Quezon
Q
u
e
Bridge Program 134,200 z
Retrofitting/ Strengthening of Permanent Bridges 10,000 o
n
1. Kaguisi Br. 1 (B00037AB) along Quezon- 14.6 Retrofitting / 1.00 Number of 6,000
Alabat-Perez Rd Strengthening of Bridges 4
Bridge t
h

D
E
O
Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A

Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)

2. Lipata Br. (B00041AB) along Quezon-Alabat- 8.2 Retrofitting / 1.00 Number of 4,000
Perez Rd Strengthening of Bridges
Bridge
Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A

Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)

Rehabilitation/ Major Repair of Permanent Bridges 10,000

1. Lagalag Br. (B02570LZ) along Daang 34.9 Rehabilitation / 1.00 Number of 10,000
Maharlika (LZ) Major Repair of Bridges
Bridge

Widening of Permanent Bridges 43,200

1. Inagbuhan Br. (B02574LZ) along Daang 23.9 Widening of 228.01 Square 28,800
Maharlika (LZ) Bridge meters

2. Lumutan Br. (B02571LZ) along Daang 11.53 Widening of 110.00 Square 14,400
Maharlika (LZ) Bridge meters

Replacement of Permanent Weak Bridges 71,000

1. Sumulong Br. (B02592LZ) along Daang 71.9 Widening of 685.93 Square 71,000 C
Maharlika (LZ) Bridge meters e
n
t
Change in Scope of Work: r
From: Widening of Permanent Bridges
To: Replacement of Permanent Weak Bridges a
l

Construction of New Bridges 41,279 O


1. Cogorin Br. along MSR Jct-Lopez-Catanauan Construction of 12,683 fC
Rd Concrete Bridge fe
in
ct
Transferred 12.683M to: MSR JCT Canda - Hondagua Roma e
r
Point - Quezon Road, Package A, Quezon /a
l
2. San Francisco Br. along MSR Jct-Lopez- Construction of 8,086 Q
C
Catanauan Rd Concrete Bridge u
e
O
e
n
f
ztf
o
ri
Transffered 8.086M to: MSR JCT Canda - Hondagua Roma
Point - Quezon Road, Package A, Quezon n
a
c
le
4
/C
3. San Miguel Dau Br. along MSR Jct-Lopez- Construction of 6,081 tO
Catanauan Rd Concrete Bridge e
h
fB
n
frt
D
ir
Transferred 6.081M to: MSR JCT Canda - Hondagua Roma
Point - Quezon Road, Package A, Quezon E
cd
a
O
e
g
l
/e
4. Sangirin Br. along Quezon-Alabat-Perez Rd Construction of 14,429 sO
C
Concrete Bridge B
e
f
rM
n
f
Transferred 14.429M to: MSR JCT Canda - Hondagua Roma ita
i
Point - Quezon Road, Package A, Quezon
rd
nc
g
a
e
le
g/
se
m
O
B
fM
er
fa
ni
in
td
Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A

Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)

ORGANIZATIONAL OUTCOME 2 332,860


Protect Lives and Properties Against Major Floods
Flood Management Program 332,860
Construction/ Maintenance of Flood Mitigation Structures 332,860
and Drainage Systems
Transferred 10.0M to:
Construction of Flood Control Structures along Ilosong River,
Plaridel, Quezon
Original Amount from NEP: 30.690M

Transferred 5.0M to:


Rehabilitation/ Reconstruction of Flood Control and Drainage
Structures along Pipisik River, Gumaca, Quezon
Original Amount from NEP: 20M

Transferred 25.0M to:


Construction of Seawall, Atimonan, Quezon
Original Amount from NEP: 35M

Transferred 20.0M to:


Construction of Flood Control Structures along Maling River,
Atimonan, Quezon
Original Amount from NEP: 30.0M

Transferred 20.0M from:


Construction of Flood Control Structures along Boong River,
Brgys. Villa Victoria and Bacong, Alabat, Quezon
Construction of Flood Control Structures along Sangirin River,
Perez, Quezon - 5.0M
Original Amount from NEP: 25.0M

Transferred 5.0M to:


Construction of Flood Control Structures along Boong River,
Brgys. Villa Victoria and Bacong, Alabat, Quezon
Original Amount from NEP: 5.0M

Additional Project - Transferred 30.0M from:


a. Construction of Protection Works (Seawall) along Frenza
River, Brgy. Manggagawa, Guinayangan, Quezon - 15.0M
b. Construction of drainage Structures along Brgy. Poblacion,
Tagkawayan, Quezon - 15.0M

Transferred 15.0M to:


Construction/ Rehabilitation of Flood Control Structures,
Talolong River, Package B, Lopez, Quezon
Original Amount from NEP: 30.0M

9. Rehabilitation of Drainage Structures along Construction of Lineal 21,480


Brgy. Poblacion, Tagkawayan, Quezon Flood Mitigation meters
Structure

Transferred 15.0M to:


Construction/ Rehabilitation of Flood Control Structures,
Talolong River, Package B, Lopez, Quezon
Original Amount from NEP: 36.480M

Transferred 5.0M from:


Construction of Flood Control along Caglate River,Alabat,
Quezon
Original Amount from NEP: 35.0M

Additional Project - Transferred 20M from:


a. Construction of Flood Control and Drainage Structures along
Bocboc Creek, Brgy. Gomez Lopez, Quezon-10.0M
b. Construction of Flood Control and Drainage Structure along
Bocboc Creek, Brgy. Bocboc Section Lopez, Quezon - 10.M
c. Construction of Flood Control Structures along Sangirin River,
Perez, Quezon - 5.0M

Additional Project - Transferred 25.69M from:


Construction of Flood Control and Drainage Structures along
Bocboc Creek, Brgy. Gomez Lopez, Quezon
Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A

Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)

Additional Project - Transferred 30.0M from:


a. Construction of Flood Control and Drainage Structure along
Pandanan River, Calauag, Quezon - 25.0M
b. Construction/ Rehabilitation of Flood Control Structures,
Talolong River, Lopez, Quezon - 5.0M
Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A

Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)

Convergence and Special Support Program 400,000


Construction/ Improvement of Access Roads leading to Seaports 12,600

Additional Project - Transferred 6.0M from:


Access Road leading to Alabat Port, Olivarez St., Brgy.
Poblacion, Alabat, Quezon

Construction/ Improvement of Access Roads leading to 244,000


Declared Tourism Destinations

Original Amount from NEP: 5.0M

Original Amount from NEP: 6.0M

Original Amount from NEP: 5.0M

Original Amount from NEP: 5.0M

Original Amount from NEP: 10.0M

Original Amount from NEP: 10.0M

Original Amount from NEP: 10.0M

Original Amount from NEP: 10.0M

Original Amount from NEP: 10.0M

Original Amount from NEP: 8.0M

Original Amount from NEP: 10.0M

Additional Project

Original Amount from NEP: 10.0M

Original Amount from NEP: 10.0M

Additional Project

Additional Project

Construction/ Improvement of Access Roads leading to 123,400


Trades, Industries and Economic Zones

Original Amount from NEP: 10.0M

Original Amount from NEP: 10.0M

Original Amount from NEP: 8.4M


Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A

Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)

Original Amount from NEP: 10.0M

Original Amount from NEP: 10.0M

Original Amount from NEP: 10.0M

Original Amount from NEP: 10.0M

Original Amount from NEP: 10.0M

Original Amount from NEP: 10.0M

Original Amount from NEP: 10.0M

Additional Project

Construction/ Improvement of Various Infrastructure 20,000


in support of National Security

Local Program 480,611


National Building Program 100,611
Buildings And Other Structures 100,611
Multipurpose / Facilities 100,611

Construction / Repair / Rehabilitation / Improvement of 310,000


Various Infrastructure including Local Projects
Buildings And Other Structures 80,000
Multipurpose / Facilities 80,000

Local Roads and Bridges 187,000


Local Bridges 187,000
1. Construction of Bantad Bridge and Construction of sq m 33,000
Approaches, Gumaca, Quezon Bridge

Original Amount from NEP: 44.0M

2. Construction of Cabibihan Bridge and Construction of sq m 40,000


Approaches along Barangay Cabibihan, Bridge
Tagkawayan, Quezon

Original Amount from NEP: 45.0M

3. Construction of Dolores Bridge and Construction of sq m 18,000


Approaches, Lopez, Quezon Bridge

Original Amount from NEP: 15.0M

4. Construction of Jongo Bridge and Construction of sq m 18,000


Approaches, Lopez, Quezon Bridge

Original Amount from NEP: 15.0M


Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A

Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)

5. Construction of Lubi-Manggalayan Bridge and Construction of sq m 36,000


Approaches, Atimonan, Quezon Bridge Q
u
e
Original Amount from NEP: 31.0M z
o
6. Construction of San Andres-Labak Bridge and Construction of sq m 42,000 n
Approaches, Atimonan, Quezon Bridge
4
t
Original Amount from NEP: 37.0M
h

Water Management Facilities 43,000 D


E
Water Supply 43,000
Number of O
Construction of Calauag Water Supply Construction of
Water /
1. System, Brgy. Sabang II, Brgy. Water Supply 1.00 18,000
Supply
Pinagkamaligan, Calauag, Quezon Systems
Systems Q
2. Construction of Level III Water Supply 1.00 Number of 7,000 u
Construction of e
System, Alabat, Quezon Water
Water Supply z
Supply
Systems o
Systems
Original Amount from NEP: 25.0M n

3. Construction of Level III Water Supply 1.00 Number of 18,000 4


Construction of
System, Plaridel, Quezon Water t
Water Supply
Supply h
Systems
Systems
Additional Project D
E
O
Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A

Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)

Local Infrastructure Program 70,000


Buildings And Other Structures 51,500
Multipurpose / Facilities 51,500
Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A

Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)
Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A

Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)

Flood Control and Drainage 2,000


Drainage / Protection Works 2,000
Local Roads and Bridges 16,500
Local Roads 10,500

Local Bridges 6,000


Proposed FY 2020 DPWH Infrastructure Program
Based on NEP
REGION IV-A

Length
Type of Work/ Physical Amount
PROGRAMS / ACTIVITIES / PROJECTS (km for roads/
Scope of Work Target (P'000)
m for bridges)

Quezon 4th District Engineering Office 215,000


ORGANIZATIONAL OUTCOME 1 200,000
Ensure Safe and Reliable National Road System
Network Development Program 200,000
Construction of Missing Links/ New Roads 200,000

1. Construction of Concrete Bridge - MSR JCT 120 Construction of 1,668.00 sq m 200,000


Canda -Hondagua Roma Point - Quezon Concrete Bridge
Road, Package A,
Quezon
Transferred 100M from: MSR JCT Canda - Hondagua Roma
Point - Quezon Road, Package B, Quezon

Local Program 15,000


Local Infrastructure Program 15,000
Buildings And Other Structures 12,000
Multipurpose / Facilities 12,000
1. Construction of Multi-Purpose Building, Construction of 1.00 Number of 2,000
Barangay Villa Gomez, Quezon, Quezon Multi Purpose Buildings
Building

2. Construction of Multi-Purpose Building, Construction of 1.00 Number of 3,000


Binahaan, Pagbilao, Quezon Multi Purpose Buildings
Building

3. Construction of Multi-Purpose Building, Brgy. Construction of 1.00 Number of 7,000


4, Alabat, Quezon Multi Purpose Buildings
Building

Water Management Facilities 3,000


Water Supply 3,000
1. Construction of Water Supply Level II, Brgy. Construction of 1.00 Number of 3,000
Antipolo, Pagbilao, Quezon Water Supply Water
Systems Supply
Systems