Académique Documents
Professionnel Documents
Culture Documents
Cabutaje, Valery A.
Ramos, Cathryn E.
Silva, Ma.Regina T.
BSIT 3Y2-1
1. Project Overview
This section provides an overview of the purpose, scope and objectives of the
system, the assumptions, constraints and risk of the system, a list of project
deliverables, the schedule and budget summary, the evolution of the plan, the
references and the definitions and acronyms.
Purpose:
The proposed system is intend for in depth evaluation of the existing manual
procedure of student evaluation of our lady of fatima university. the proponents will
develop a user-friendly system that will enhance the student faculty evaluation.
Objectives:
The main objective of the study is to have an easy way in evaluating the
professors and it is also a big help for the guidance councilor because it will lessen
their efforts in counting the evaluation form. This study shall view primarily as
development activity essential to providing the faculty with information needed to
improve the quality of service. The guidance will get some opinion in the students on
how the professor teaches.
• Provide security in handling and managing records and to minimize the time
being spent in tallying the summary reports being submitted.
• The proponents develop Student Faculty Evaluation System for Our Lady of
Fatima University to have an easy way in evaluating the faculty members within
the school facilities.
c. In budget and resources, the proposed system will need to have hardware
resources such as computer, hub, cables and RJ45 connector and software
resources such as Windows XP and PHP with MySQL.
• The proponents proposed system will provide a (Local Area Network) LAN-Based
feature to easily share information accurately and it also transfer data faster.
1.3.Project Deliverables
• Source Code
1.6 References
Internet:
http://www.fileguru.com/apps/evaluation_system_for_professor
http://www.pageinsider.com/professor.ritstuff.com
http://en.wikipedia.org/wiki/Trusted_Computer_System_Evaluation_Criteria
http://education.pearsonassessments.com/pai/ea/teacher/teacherhome.htm
http://www.google.com.ph/search?
sclient=psy&hl=en&biw=1024&bih=588&q=define:evaluation&aq=f&aqi=&
aql=&oq=&pbx=1
http://www.google.com.ph/search?
sclient=psy&hl=en&biw=1024&bih=588&q=define:LAN&aq=f&aqi=&aql=&o
q=&pbx=1
http://scholar.google.com.ph/scholar?q=LAN-
based+evaluation+system&hl=en&as_sdt=0&as_vis=1&oi=scholart
http://www.intranetjournal.com/php-cms/
http://www.intranetjournal.com/php-cms/
http://www.marcbowles.com/courses/adv_dip/module6/chapter4/amc6_ch4thr
ee2.htm
Book:
Definition of Terms
To further understand this study, the following terms used are defined:
Analysis – the storage of identifying, formulating, designing and implementing the
system
Data – raw materials that are processed and refined to generate information
Data Flow Diagram – the graphical representation of the flow of data through an
information system which can also be used for the visualization of data processing
LAN-Local Area Network a technology system is the connecting of two or more
computers to common peripheral resources.
Deliverable- a term used in project management to describe a tangible or intangible
object produced as a result of the project that is intended to be delivered to a customer
(either internal or external).
Confidentiality- entrusted with private information and the confidence of another.
2. Project Organization
This section provides the external interfaces of the system, the internal
structure and the roles and responsibilities.
External Interfaces
Dean
Human Resources
• The one who receive the final results given by the Guidance Counselor.
• After the Dean read the final result he/she also responsible to pass
the final result to the faculty member.
Guidance
• The one who monitor the student in evaluating their professors.
• Responsible for arranging the comments before they print the final
result.
Faculty
• The one who receive the evaluation results answered by the students
given by the Human Resources.
Student
This section defines the plans for project start-up, the work plan, the project
tracking plan, risk management plan and project closure plan. This section of
the IM/IT Project Management Plan specifies the project management
processes for the project. This section defines the plans for project start-up,
risk management, project work, project tracking and project close-out.
3.1.2. Estimates
3.1.3. Staffing
Cathryn Ramos ()
The existing guidance personel of our lady of fatima university will undergo
training within 2 to 3 months. The training should focus on php,Mysql and xampp
version 2.2.1.4.php used in the major parts of the encoding te system and mysql
used as the databased.Upon beginning the project, all existing guidance personnel
will attend a seminar about the technology that will be used in the our lady of
Fatima university for 2 to 3 months. The Head of the guidance will also be required
to train.
members will report the activities to the team leader on a daily basis so that
information can be kept current. After completing the course the system will
undergo for improving of their faculty evaluation system. The proponents will
fresh,they will change the content or add. The proponents should also check
3.3.4. Reporting