Vous êtes sur la page 1sur 16

Star Exercise 1A

Purpose
1. To navigate and retrieve data from each library into respective devices
2. To test the protection and coordination settings of this system by generating TCCs
3. Demonstrate STAR TCC Features

Procedure
1. Open project STAR_Exercise1A
2. Create the One-line Diagram for the system
3. Input data for the elements shown below

ETAP Workshop Notes ©1996-2009 Operation Technology, Inc. Page 1 of 16


Star Exercise 1A

ETAP Workshop Notes ©1996-2009 Operation Technology, Inc. Page 2 of 16


Star Exercise 1A

Phase CT

Ground CT

ETAP Workshop Notes ©1996-2009 Operation Technology, Inc. Page 3 of 16


Star Exercise 1A

Overcurrent Relay

Select GE Multilin Relay 735/737.

Note that the selected relay type has two input types: Phase and Ground

ETAP Workshop Notes ©1996-2009 Operation Technology, Inc. Page 4 of 16


Star Exercise 1A

Phase Settings

Ground Settings

ETAP Workshop Notes ©1996-2009 Operation Technology, Inc. Page 5 of 16


Star Exercise 1A

Cable

ETAP Workshop Notes ©1996-2009 Operation Technology, Inc. Page 6 of 16


Star Exercise 1A

Fuse (AC)

ETAP Workshop Notes ©1996-2009 Operation Technology, Inc. Page 7 of 16


Star Exercise 1A

2-W Transformer

ETAP Workshop Notes ©1996-2009 Operation Technology, Inc. Page 8 of 16


Star Exercise 1A

Low Voltage Circuit Breaker (LVCB AC)

Circuit Breaker Rating:

ETAP Workshop Notes ©1996-2009 Operation Technology, Inc. Page 9 of 16


Star Exercise 1A

Trip Device Phase Settings:

Trip Device Ground Settings:

ETAP Workshop Notes ©1996-2009 Operation Technology, Inc. Page 10 of 16


Star Exercise 1A

Low Voltage Circuit Breaker (LVCB AC)

Circuit Breaker Rating:

ETAP Workshop Notes ©1996-2009 Operation Technology, Inc. Page 11 of 16


Star Exercise 1A

Trip Device Settings

ETAP Workshop Notes ©1996-2009 Operation Technology, Inc. Page 12 of 16


Star Exercise 1A

Induction Motor

ETAP Workshop Notes ©1996-2009 Operation Technology, Inc. Page 13 of 16


Star Exercise 1A

ETAP Workshop Notes ©1996-2009 Operation Technology, Inc. Page 14 of 16


Star Exercise 1A

Optional: Using motor acceleration plot from MS Study

ETAP Workshop Notes ©1996-2009 Operation Technology, Inc. Page 15 of 16


Star Exercise 1A

- Run Motor Acceleration with Mtr1 starting at 0.1 seconds. Name the output report as MTR1

- Select Motor Acceleration Study (MTR1) curve

ETAP Workshop Notes ©1996-2009 Operation Technology, Inc. Page 16 of 16

Vous aimerez peut-être aussi