JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S

CMCC33

SC-T37-3, SC-T15-3, SC-T16-3,


CHEMICAL DOSING CHEMICAL DOSING
CHEMDOS-RIOP-PANEL- RIOP C1SCP1 PULL PIT-15, PULL PIT-16, PULL "UNDER HOLD"
1 SYSTEM PANEL AT PUMP 1 19C 2.5 PVC A 1.1 120 120 SYSTEM PANEL AT
C01 1_9113_R1-UH301 PIT-18, PULL PIT-19, RCPH-T01-1, DRAWING IS NOT AVALLABLE
HOUSE PUMP HOUSE
FIELD ROUTE

MIGI RAPPER CONTROL


PANEL 1 for 1.222A Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
2
(1_222A_MIGI01_PNL)

MIGI RAPPER CONTROL Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
3 PANEL 2 for 1.222A
(1_222A_MIGI02_PNL)

4 SHUT-OFF DAMPER
BEFORE ESP 1
(1_221A3-MA001)
N X1-60 X1-61 X1-62 X1-63 SP

ON F/B, OVER LOAD


1221A3-CMCC33-RIOP- CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C3SCP2
1 5C 2.5 PVC A 1.1 70 70 F/B, GROUND FAULT
C01 (7F1) T14-3, SC-T15-3, SC-T16-3 (1_9113_R3_302)
F/B TO PLC

Q SP

N SP SP SP SP SP

TRIP, R-SELECTED,, SC-T16-3, SC-T15-3, SC-T53-3, SC-


L-SELECTED, T54-3, SC-T55-3, SC-T56-3, SC-T57- SHUT-OFF DAMPER
RIOP C3SCP2 TERMINAL NOS. 16,22,17,38,42,30, AND 34
1221A3-RIOP-MA001-C02 1 14C 2.5 PVC A 1.1 200 200 ACTUATOR READY, 3, WGF-T01-3, WGF-SH1-3, CG-T27- BEFORE ESP 1
(1_9113_R3_302) SHALL BE LOOPED AT ACTUATOR
ELS(C), ELS(O), 3, ESP1C-T01-3, 1.222A-T01-1, (1_221A3-MA001)
TLS(C) , TLS(O) F/B FIELD ROUTE

Q 16 15 21 19 18 39 43 31 35 SP SP SP SP SP

ON COMMAND, OFF SC-T16-3, SC-T15-3, SC-T53-3, SC-


COMMAND, T54-3, SC-T55-3, SC-T56-3, SC-T57- SHUT-OFF DAMPER
RIOP C3SCP2
1221A3-RIOP-MA001-C03 1 5C 2.5 PVC A 1.1 200 200 PERMISSIVE FOR 3, WGF-T01-3, WGF-SH1-3, CG-T27- BEFORE ESP 1
(1_9113_R3_302)
LOCAL OPERATION 3, ESP1C-T01-3, 1.222A-T01-1, (1_221A3-MA001)
FROM PLC FIELD ROUTE

Q 8 5 7 13 14

L&T CMCC03 : 1 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S
5 SHUT-OFF DAMPER
BEFORE ESP 1
(1_221A4-MA001)
N X1-60 X1-61 X1-62 X1-63 SP

ON F/B, OVER LOAD


1221A4-CMCC33-RIOP- CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C3SCP2
1 5C 2.5 PVC A 1.1 70 70 F/B, GROUND FAULT
C01 (8F4) T14-3, SC-T15-3, SC-T16-3 (1_9113_R3_302)
F/B TO PLC

Q SP

N SP SP SP SP SP

TRIP, R-SELECTED,, SC-T16-3, SC-T15-3, SC-T53-3, SC-


L-SELECTED, T54-3, SC-T55-3, SC-T56-3, SC-T57- SHUT-OFF DAMPER
RIOP C3SCP2 TERMINAL NOS. 16,22,17,38,42,30, AND 34
1221A4-RIOP-MA001-C02 1 14C 2.5 PVC A 1.1 210 210 ACTUATOR READY, 3, WGF-T01-3, WGF-SH1-3, CG-T27- BEFORE ESP 1
(1_9113_R3_302) SHALL BE LOOPED AT ACTUATOR
ELS(C), ELS(O), 3, ESP1C-T01-3, 1.222A-T01-1, (1_221A4-MA001)
TLS(C) , TLS(O) F/B FIELD ROUTE

Q 16 15 21 19 18 39 43 31 35 SP SP SP SP SP

ON COMMAND, OFF SC-T16-3, SC-T15-3, SC-T53-3, SC-


COMMAND, T54-3, SC-T55-3, SC-T56-3, SC-T57- SHUT-OFF DAMPER
RIOP C3SCP2
1221A4-RIOP-MA001-C03 1 5C 2.5 PVC A 1.1 210 210 PERMISSIVE FOR 3, WGF-T01-3, WGF-SH1-3, CG-T27- BEFORE ESP 1
(1_9113_R3_302)
LOCAL OPERATION 3, ESP1C-T01-3, 1.222A-T01-1, (1_221A4-MA001)
FROM PLC FIELD ROUTE

Q 8 5 7 13 14

6 BLEED-IN DAMPER
(1_221C11-MA001)

N X1-60 X1-61 X1-62 X1-63 SP

ON F/B, OVER LOAD


1221C11-CMCC33-RIOP- CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C3SCP2
1 5C 2.5 PVC A 1.1 70 70 F/B, GROUND FAULT
C01 (8F1) T14-3, SC-T15-3, SC-T16-3 (1_9113_R3_302)
F/B TO PLC

Q SP

N SP SP SP SP SP

TRIP, R-SELECTED,, SC-T16-3, SC-T15-3, SC-T53-3, SC-


L-SELECTED, T54-3, SC-T55-3, SC-T56-3, SC-T57-
RIOP C3SCP2 BLEED-IN DAMPER TERMINAL NOS. 16,22,17,38,42,30, AND 34
1221C11-RIOP-MA001-C02 1 14C 2.5 PVC A 1.1 210 210 ACTUATOR READY, 3, WGF-T01-3, WGF-SH1-3, CG-T27-
(1_9113_R3_302) (1_221C11-MA001) SHALL BE LOOPED AT ACTUATOR
ELS(C), ELS(O), 3, ESP1C-T01-3, 1.222A-T01-1,
TLS(C) , TLS(O) F/B FIELD ROUTE

Q 16 15 21 19 18 39 43 31 35 SP SP SP SP SP

N SP SP SP

SC-T16-3, SC-T15-3, SC-T53-3, SC-


PERMISSIVE FOR T54-3, SC-T55-3, SC-T56-3, SC-T57-
RIOP C3SCP1 BLEED-IN DAMPER
1221C11-RIOP-MA001-C03 1 5C 2.5 PVC A 1.1 210 210 LOCAL OPERATION 3, WGF-T01-3, WGF-SH1-3, CG-T27-
(1_9113_R3_301) (1_221C11-MA001)
FROM PLC 3, ESP1C-T01-3, 1.222A-T01-1,
FIELD ROUTE

Q 13 14 SP SP SP

N SP SP SP SP

SC-T16-3, SC-T15-3, SC-T53-3, SC-


PVC % OF T54-3, SC-T55-3, SC-T56-3, SC-T57-
RIOP C3SCP1 BLEED-IN DAMPER SEPARATE CABLE LAID AS PER CARD
1221C11-RIOP-MA001-C04 1 3P 1.5 SCREENE A 1.1 210 210 OPENING/POSITION 3, WGF-T01-3, WGF-SH1-3, CG-T27-
(1_9113_R3_301) (1_221C11-MA001) ALLOCATION OF PRIMETAL.
D F/B TO PLC 3, ESP1C-T01-3, 1.222A-T01-1,
FIELD ROUTE

Q 26 27 SP SP SP SP

N SP SP

SC-T16-3, SC-T15-3, SC-T53-3, SC-


PVC % OF OPENING T54-3, SC-T55-3, SC-T56-3, SC-T57-
RIOP C3SCP1 BLEED-IN DAMPER INSTRUMENTATION CABLE SHALL BE TAKEN
1221C11-RIOP-MA001-C05 1 2P 1.0 SCREENE A 1.1 210 210 COMMAND FROM 3, WGF-T01-3, WGF-SH1-3, CG-T27-
(1_9113_R3_301) (1_221C11-MA001) BY JSPL.
D PLC 3, ESP1C-T01-3, 1.222A-T01-1,
FIELD ROUTE

Q 9 10 SP SP

L&T CMCC03 : 2 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S

SUPPORT INSULATOR Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
7 HEATER GROUP
(1_222A_41-EB001)

SUPPORT INSULATOR Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
8 HEATER GROUP
(1_222A_42-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
9 FOR WASTE GAS ESP
(1_222A_61-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
10 FOR WASTE GAS ESP
(1_222A_62-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
11 FOR WASTE GAS ESP
(1_222A_63-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
12 FOR WASTE GAS ESP
(1_222A_64-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
13 FOR WASTE GAS ESP
(1_222A_65-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
14 FOR WASTE GAS ESP
(1_222A_66-EB001)

L&T CMCC03 : 3 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
15 FOR WASTE GAS ESP
(1_222A_67-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
16 FOR WASTE GAS ESP
(1_222A_68-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
17 FOR WASTE GAS ESP
(1_222A_69-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
18 FOR WASTE GAS ESP
(1_222A_70-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
19 FOR WASTE GAS ESP
(1_222A_71-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
20 FOR WASTE GAS ESP
(1_222A_72-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
21 FOR WASTE GAS ESP
(1_222A_73-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
22 FOR WASTE GAS ESP
(1_222A_74-EB001)

L&T CMCC03 : 4 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
23 FOR WASTE GAS ESP
(1_222A_75-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
24 FOR WASTE GAS ESP
(1_222A_76-EB001)

25 WASTE GAS BLOWER 1,


START-UP DAMPER
(1_225A2-MA001)
N X1-60 X1-61 X1-62 X1-63 SP

ON F/B, OVER LOAD


1225A2-CMCC33-RIOP- CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C3SCP1
1 5C 2.5 PVC A 1.1 70 70 F/B, GROUND FAULT
C01 (8F3) T14-3, SC-T15-3, SC-T16-3 (1_9113_R3_301)
F/B TO PLC

Q SP

"UNDER HOLD"

APPROVED DRAWING OF DAMPER IS NOT


N SP SP AVAILABLE.

TRIP, R-SELECTED,,
SC-T16-3, SC-T15-3, SC-T53-3, SC- WASTE GAS
L-SELECTED,
RIOP C3SCP1 T54-3, SC-T55-3, SC-T56-3, SC-T57- BLOWER 1, START-
1225A2-RIOP-MA001-C02 1 14C 2.5 PVC A 1.1 130 130 ACTUATOR READY,
(1_9113_R3_301) 3, WGF-T02-4, WGF-T04-4, FIELD UP DAMPER
ELS(C), ELS(O),
ROUTE (1_225A2-MA001)
TLS(C) , TLS(O) F/B

Q SP SP

N SP
"UNDER HOLD"
SC-T16-3, SC-T15-3, SC-T53-3, SC- WASTE GAS
PERMISSIVE FOR
RIOP C3SCP1 T54-3, SC-T55-3, SC-T56-3, SC-T57- BLOWER 1, START- APPROVED DRAWING OF DAMPER IS NOT
1225A2-RIOP-MA001-C03 1 5C 2.5 PVC A 1.1 130 130 LOCAL OPERATION
(1_9113_R3_301) 3, WGF-T02-4, WGF-T04-4, FIELD UP DAMPER AVAILABLE.
FROM PLC
ROUTE (1_225A2-MA001)

Q SP

N SP SP SP SP
"UNDER HOLD"

SC-T16-3, SC-T15-3, SC-T53-3, SC- WASTE GAS APPROVED DRAWING OF DAMPER IS NOT
PVC % OF
RIOP C3SCP2 T54-3, SC-T55-3, SC-T56-3, SC-T57- BLOWER 1, START- AVAILABLE.
1225A2-RIOP-MA001-C04 1 3P 1.5 SCREENE A 1.1 130 130 OPENING/POSITION
(1_9113_R3_302) 3, WGF-T02-4, WGF-T04-4, FIELD UP DAMPER
D F/B TO PLC
ROUTE (1_225A2-MA001)
SEPARATE CABLE LAID AS PER CARD
ALLOCATION OF PRIMETAL.
Q SP SP SP SP

N SP SP
"UNDER HOLD"

SC-T16-3, SC-T15-3, SC-T53-3, SC- WASTE GAS APPROVED DRAWING OF DAMPER IS NOT
PVC % OF OPENING
RIOP C3SCP2 T54-3, SC-T55-3, SC-T56-3, SC-T57- BLOWER 1, START- AVAILABLE.
1225A2-RIOP-MA001-C05 1 2P 1.0 SCREENE A 1.1 130 130 COMMAND FROM
(1_9113_R3_302) 3, WGF-T02-4, WGF-T04-4, FIELD UP DAMPER
D PLC
ROUTE (1_225A2-MA001)
INSTRUMENTATION CABLE SHALL BE TAKEN
BY JSPL.
Q SP SP

L&T CMCC03 : 5 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S
26 SHUT-OFF DAMPER
AFTER WASTE GAS
BLOWER 1
(1_226A81-MA001) N X1-60 X1-61 X1-62 X1-63 SP

ON F/B, OVER LOAD


1226A81-CMCC33-RIOP- CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C3SCP1
1 5C 2.5 PVC A 1.1 70 70 F/B, GROUND FAULT
C01 (9F1) T14-3, SC-T15-3, SC-T16-3 (1_9113_R3_301)
F/B TO PLC

Q SP

N SP SP SP SP SP

TRIP, R-SELECTED,,
SC-T16-3, SC-T15-3, SC-T53-3, SC- SHUT-OFF DAMPER
L-SELECTED,
RIOP C3SCP1 T54-3, SC-T55-3, SC-T56-3, SC-T57- AFTER WASTE GAS TERMINAL NOS. 16,22,17,38,42,30, AND 34
1226A81-RIOP-MA001-C02 1 14C 2.5 PVC A 1.1 120 120 ACTUATOR READY,
(1_9113_R3_301) 3, WGF-T02-4, WGF-T04-4, FIELD BLOWER 1 SHALL BE LOOPED AT ACTUATOR
ELS(C), ELS(O),
ROUTE (1_226A81-MA001)
TLS(C) , TLS(O) F/B

Q 16 15 21 19 18 39 43 31 35 SP SP SP SP SP

ON COMMAND, OFF
SC-T16-3, SC-T15-3, SC-T53-3, SC- SHUT-OFF DAMPER
COMMAND,
RIOP C3SCP1 T54-3, SC-T55-3, SC-T56-3, SC-T57- AFTER WASTE GAS
1226A81-RIOP-MA001-C03 1 5C 2.5 PVC A 1.1 120 120 PERMISSIVE FOR
(1_9113_R3_301) 3, WGF-T02-4, WGF-T04-4, FIELD BLOWER 1
LOCAL OPERATION
ROUTE (1_226A81-MA001)
FROM PLC

Q 8 5 7 13 14

27 AW PANEL FOR SWITCH


GEAR ROOM / PCC ROOM
OF +1_SC BLDG. AT
(+)0.00M LEVEL N X1-60 X1-61 X1-62 X1-63 SP
(1_LSCP_AW4)

ON F/B, OVER LOAD


CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C1SCP1
AW4-CMCC33-RIOP-C01 1 5C 2.5 PVC A 1.1 70 70 F/B, GROUND FAULT
(7F2) T14-3, SC-T37-3 1_9113_R1-UH301
F/B TO PLC

Q SP

N
AW PANEL FOR
CONTROL AND SIGNAL CABLES BETWEEN
SWITCH GEAR
FAN ON F/B, PUMP- SC-T37-3, SC-T14-3, SC-T45-2, SC- LSCP TO FIELD INSTRUMENTS/EQUIPMENTS
ROOM / PCC ROOM RIOP C1SCP1
AW4-LSCP-RIOP-C02 1 10C 2.5 PVC A 1.1 100 100 1 ON F/B, PUMP-2 T46-2, SC-T47-2, SC-T48-2, SC-T49- SHALL BE IN PACKAGE VENDOR SCOPE OF
OF +1_SC BLDG. AT 1_9113_R1-UH301
ON F/B TO PLC 2, SC-T50-2, FIELD ROUTE SUPPLY. SAME SHALL BE PROVIDED IN CABLE
(+)0.00M LEVEL
SCHEDULE OF PACKAGE VENDOR.
(1_LSCP_AW4)
Q

28 TUBE AXIAL FAN


(EXHAUST) FOR TRAFO
ROOM OF +1_SC AT
(+)0.00M LEVEL 73 N X1-12 X1-14 X1-16 X1-17 X1-21 SP SP
(VS 10.A)

EMG I/L, TRIP LAMP, SC-T55-3, SC-T54-3, SC-T53-3, SC-


CMCC33
VS10A-CMCC33-LCS-C01 1 7C 2.5 PVC A 1.1 70 70 LCS STOP, LCS T14-3, SC-T13-3, SC-T17-1, SC-SH1- LCS
(1F1)
START, NEUTRAL 1, SC-TR1-1, SC-TR2-1

Q 12 14 16 17 21 SP SP

N X1-60 X1-61 SP

CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C1SCP1


VS10A-CMCC33-RIOP-C02 1 3C 2.5 PVC A 1.1 60 60 ON F/B TO PLC
(1F1) T14-3, SC-T37-3 1_9113_R1-UH301

Q SP

L&T CMCC03 : 6 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S
29 TUBE AXIAL FAN
(EXHAUST) FOR TRAFO
ROOM OF +1_SC AT
(+)0.00M LEVEL 78 N X1-12 X1-14 X1-16 X1-17 X1-21 SP SP
(VS 10.B)

EMG I/L, TRIP LAMP, SC-T55-3, SC-T54-3, SC-T53-3, SC-


CMCC33
VS10B-CMCC33-LCS-C01 1 7C 2.5 PVC A 1.1 70 70 LCS STOP, LCS T14-3, SC-T13-3, SC-T17-1, SC-SH1- LCS
(1F2)
START, NEUTRAL 1, SC-TR1-1, FIELD ROUTE

Q 12 14 16 17 21 SP SP

N X1-60 X1-61 SP

CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C1SCP1


VS10B-CMCC33-RIOP-C02 1 3C 2.5 PVC A 1.1 60 60 ON F/B TO PLC
(1F2) T14-3, SC-T37-3 1_9113_R1-UH301

Q SP

30 TUBE AXIAL FAN


(EXHAUST) FOR TRAFO
ROOM OF +1_SC AT
(+)0.00M LEVEL 88 N X1-12 X1-14 X1-16 X1-17 X1-21 SP SP
(VS 10.C)

SC-T55-3, SC-T54-3, SC-T53-3, SC-


EMG I/L, TRIP LAMP,
CMCC33 T14-3, SC-T13-3, SC-T17-1, SC-SH1-
VS10C-CMCC33-LCS-C01 1 7C 2.5 PVC A 1.1 70 70 LCS STOP, LCS LCS
(1F3) 1, SC-TR1-1, SC-TR3-1, SC-TR5-1,
START, NEUTRAL
SC-TR6-1

Q 12 14 16 17 21 SP SP

N X1-60 X1-61 SP

CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C1SCP1


VS10C-CMCC33-RIOP-C02 1 3C 2.5 PVC A 1.1 75 75 ON F/B TO PLC
(1F3) T14-3, SC-T37-3 1_9113_R1-UH301

Q SP

31 TUBE AXIAL FAN


(EXHAUST) FOR TRAFO
ROOM OF +1_SC AT
(+)0.00M LEVEL 85 N X1-12 X1-14 X1-16 X1-17 X1-21 SP SP
(VS 10.D)

SC-T55-3, SC-T54-3, SC-T53-3, SC-


EMG I/L, TRIP LAMP,
CMCC33 T14-3, SC-T13-3, SC-T17-1, SC-SH1-
VS10D-CMCC33-LCS-C01 1 7C 2.5 PVC A 1.1 70 70 LCS STOP, LCS LCS
(1F4) 1, SC-TR1-1, SC-TR3-1, SC-TR5-1,
START, NEUTRAL
FIELD ROUTE

Q 12 14 16 17 21 SP SP

N X1-60 X1-61 SP

CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C1SCP1


VS10D-CMCC33-RIOP-C02 1 3C 2.5 PVC A 1.1 75 75 ON F/B TO PLC
(1F4) T14-3, SC-T37-3 1_9113_R1-UH301

Q SP

32 TUBE AXIAL FLOW FAN


(SUPPLY) FOR CABLE
CELLAR OF +1_SC AT
(+)0.00M LEVEL 45 N X1-12 X1-14 X1-16 X1-17 X1-21 SP SP
(VS 17.A)

EMG I/L, TRIP LAMP, SC-T55-3, SC-T54-3, SC-T53-3, SC-


CMCC33
VS17A-CMCC33-LCS-C01 1 7C 2.5 PVC A 1.1 70 70 LCS STOP, LCS T14-3, SC-T13-3, SC-T12-3, FIELD LCS
(2F1)
START, NEUTRAL ROUTE

Q 12 14 16 17 21 SP SP

N X1-60 X1-61 SP

CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C1SCP1


VS17A-CMCC33-RIOP-C02 1 3C 2.5 PVC A 1.1 60 60 ON F/B TO PLC
(2F1) T14-3, SC-T37-3 1_9113_R1-UH301

Q SP

L&T CMCC03 : 7 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S
33 TUBE AXIAL FLOW FAN
(SUPPLY) FOR CABLE
CELLAR OF +1_SC AT
(+)0.00M LEVEL 63 N X1-12 X1-14 X1-16 X1-17 X1-21 SP SP
(VS 17.B)

EMG I/L, TRIP LAMP,


CMCC33
VS17B-CMCC33-LCS-C01 1 7C 2.5 PVC A 1.1 70 70 LCS STOP, LCS SC-T49-3, SC-T50-3, FIELD ROUTE LCS
(2F2)
START, NEUTRAL

Q 12 14 16 17 21 SP SP

N X1-60 X1-61 SP

CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C1SCP1


VS17B-CMCC33-RIOP-C02 1 3C 2.5 PVC A 1.1 80 80 ON F/B TO PLC
(2F2) T14-3, SC-T37-3 1_9113_R1-UH301

Q SP

34 TUBE AXIAL FLOW FAN


(SUPPLY) FOR CABLE
CELLAR OF +1_SC AT
(+)0.00M LEVEL 62 N X1-12 X1-14 X1-16 X1-17 X1-21 SP SP
(VS 17.C)

EMG I/L, TRIP LAMP, SC-T55-3, SC-T54-3, SC-T53-3, SC-


CMCC33
VS17C-CMCC33-LCS-C01 1 7C 2.5 PVC A 1.1 70 70 LCS STOP, LCS T14-3, SC-T37-3, SC-T38-3, SC-T39- LCS
(22F1)
START, NEUTRAL 3, SC-T40-3, SC-T41-3

Q 12 14 16 17 21 SP SP

N X1-60 X1-61 SP

CMCC33 SC-T54-3, SC-T53-3, SC-T14-3, SC- RIOP C1SCP1


VS17C-CMCC33-RIOP-C02 1 3C 2.5 PVC A 1.1 70 70 ON F/B TO PLC
(22F1) T37-3 1_9113_R1-UH301

Q SP

35 TUBE AXIAL FLOW FAN


(EXHAUST) FOR CABLE
CELLAR OF +1_SC AT
(+)0.00M LEVEL 39 N X1-12 X1-14 X1-16 X1-17 X1-21 SP SP
(VS 17.D)

EMG I/L, TRIP LAMP,


CMCC33 SC-T54-3, SC-T42-3, SC-T60-2, SC-
VS17D-CMCC33-LCS-C01 1 7C 2.5 PVC A 1.1 70 70 LCS STOP, LCS LCS
(22F2) T38-3, FIELD ROUTE
START, NEUTRAL

Q 12 14 16 17 21 SP SP

N X1-60 X1-61 SP

CMCC33 SC-T54-3, SC-T53-3, SC-T14-3, SC- RIOP C1SCP1


VS17D-CMCC33-RIOP-C02 1 3C 2.5 PVC A 1.1 50 50 ON F/B TO PLC
(22F2) T37-3 1_9113_R1-UH301

Q SP

36 TUBE AXIAL FLOW FAN


(EXHAUST) FOR CABLE
CELLAR OF +1_SC AT
(+)0.00M LEVEL 37 N X1-12 X1-14 X1-16 X1-17 X1-21 SP SP
(VS 17.E)

EMG I/L, TRIP LAMP,


CMCC33 SC-T54-3, SC-T42-3, SC-T60-2, SC-
VS17E-CMCC33-LCS-C01 1 7C 2.5 PVC A 1.1 70 70 LCS STOP, LCS LCS
(22F3) T38-3, FIELD ROUTE
START, NEUTRAL

Q 12 14 16 17 21 SP SP

N X1-60 X1-61 SP

CMCC33 SC-T54-3, SC-T53-3, SC-T14-3, SC- RIOP C1SCP1


VS17E-CMCC33-RIOP-C02 1 3C 2.5 PVC A 1.1 45 45 ON F/B TO PLC
(22F3) T37-3 1_9113_R1-UH301

Q SP

L&T CMCC03 : 8 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S
37 TUBE AXIAL FLOW FAN
(EXHAUST) FOR CABLE
CELLAR OF +1_SC AT
(+)0.00M LEVEL 39 N X1-12 X1-14 X1-16 X1-17 X1-21 SP SP
(VS 17.F)

EMG I/L, TRIP LAMP,


CMCC33 SC-T54-3, SC-T53-3, SC-T14-3, SC-
VS17F-CMCC33-LCS-C01 1 7C 2.5 PVC A 1.1 70 70 LCS STOP, LCS LCS
(23F2) T15-3, SC-T16-3
START, NEUTRAL

Q 12 14 16 17 21 SP SP

N X1-60 X1-61 SP

CMCC33 SC-T54-3, SC-T53-3, SC-T14-3, SC- RIOP C1SCP1


VS17F-CMCC33-RIOP-C02 1 3C 2.5 PVC A 1.1 15 15 ON F/B TO PLC
(23F2) T37-3 1_9113_R1-UH301

Q SP

38 EXHAUST FAN
(BIFURCATED TYPE) FOR
BATTERY ROOM OF
+1_SC AT (+)3.50M LEVEL N X1-12 X1-14 X1-16 X1-17 X1-21 SP SP
(VS 17.G)

EMG I/L, TRIP LAMP,


CMCC33
VS17G-CMCC33-LCS-C01 1 10C 2.5 PVC A 1.1 70 70 LCS STOP, LCS SC-T49-3, SC-T50-3, FIELD ROUTE LCS
(2F5)
START, NEUTRAL

Q 12 14 16 17 21 SP SP

N X1-60 X1-61 SP

CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C1SCP1


VS17G-CMCC33-RIOP-C02 1 3C 2.5 PVC A 1.1 80 80 ON F/B TO PLC
(2F5) T14-3, SC-T37-3 1_9113_R1-UH301

Q SP

39 TUBE AXIAL FAN


(EXHAUST) FOR PUMP
HOUSE (PROPELLER
TYPE) N X1-12 X1-14 X1-16 X1-17 X1-21 SP SP
(VS 20.A)

SC-T55-3, SC-T54-3, SC-T53-3, SC-


EMG I/L, TRIP LAMP,
CMCC33 T15-3, SC-T16-3, PULL PIT-15, PULL
VS20A-CMCC33-LCS-C01 1 10C 2.5 PVC A 1.1 140 140 LCS STOP, LCS LCS
(2F3) PIT-16, PULL PIT-18, PULL PIT-19,
START, NEUTRAL
RCPH-T01-1, FIELD ROUTE

Q 12 14 16 17 21 SP SP

N X1-60 X1-61 SP

CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C1SCP1


VS20A-CMCC33-RIOP-C02 1 3C 2.5 PVC A 1.1 70 70 ON F/B TO PLC
(2F3) T14-3, SC-T37-3 1_9113_R1-UH301

Q SP

40 TUBE AXIAL FAN


(EXHAUST) FOR PUMP
HOUSE (PROPELLER
TYPE) N X1-12 X1-14 X1-16 X1-17 X1-21 SP SP
(VS 20.B)

SC-T55-3, SC-T54-3, SC-T53-3, SC-


EMG I/L, TRIP LAMP,
CMCC33 T15-3, SC-T16-3, PULL PIT-15, PULL
VS20B-CMCC33-LCS-C01 1 10C 2.5 PVC A 1.1 140 140 LCS STOP, LCS LCS
(2F4) PIT-16, PULL PIT-18, PULL PIT-19,
START, NEUTRAL
RCPH-T01-1, FIELD ROUTE

Q 12 14 16 17 21 SP SP

N X1-60 X1-61 SP

CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C1SCP1


VS20B-CMCC33-RIOP-C02 1 3C 2.5 PVC A 1.1 70 70 ON F/B TO PLC
(2F4) T14-3, SC-T37-3 1_9113_R1-UH301

Q SP

L&T CMCC03 : 9 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S
41 TUBE AXIAL FAN
(EXHAUST) FOR PUMP
HOUSE (PROPELLER
TYPE) N X1-12 X1-14 X1-16 X1-17 X1-21 SP SP
(VS 20.C)

SC-T54-3, SC-T53-3, SC-T15-3, SC-


EMG I/L, TRIP LAMP,
CMCC33 T16-3, PULL PIT-15, PULL PIT-16,
VS20C-CMCC33-LCS-C01 1 10C 2.5 PVC A 1.1 140 140 LCS STOP, LCS LCS
(22F4) PULL PIT-18, PULL PIT-19, RCPH-
START, NEUTRAL
T01-1, FIELD ROUTE

Q 12 14 16 17 21 SP SP

N X1-60 X1-61 SP

CMCC33 SC-T54-3, SC-T53-3, SC-T14-3, SC- RIOP C1SCP1


VS20C-CMCC33-RIOP-C02 1 3C 2.5 PVC A 1.1 70 70 ON F/B TO PLC
(22F4) T37-3 1_9113_R1-UH301

Q SP

MIGI RAPPER CONTROL


PANEL 1 for 1.222B Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
42
(1_222B_MIGI01_PNL)

MIGI RAPPER CONTROL


PANEL 2 for 1.222B Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
43
(1_222B_MIGI02_PNL)

44 SHUT-OFF DAMPER
BEFORE ESP 2
(1_221B3-MA001)
N X1-60 X1-61 X1-62 X1-63 SP

ON F/B, OVER LOAD


1221B3-CMCC33-RIOP- CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C3SCP2
1 5C 2.5 PVC A 1.1 60 60 F/B, GROUND FAULT
C01 (10F2) T14-3, SC-T15-3, SC-T16-3 (1_9113_R3_302)
F/B TO PLC

Q SP

N SP SP SP SP SP

TRIP, R-SELECTED,,
SC-T37-3, SC-T38-3, SC-T39-3, SC-
L-SELECTED, SHUT-OFF DAMPER
RIOP C3SCP2 T40-3, SC-T41-3, CG-SH10-3, CG- TERMINAL NOS. 16,22,17,38,42,30, AND 34
1221B3-RIOP-MA001-C02 1 14C 2.5 PVC A 1.1 240 240 ACTUATOR READY, BEFORE ESP 2
(1_9113_R3_302) T29-3, ESP2C-T01-3, 1.222B-T01-1, SHALL BE LOOPED AT ACTUATOR
ELS(C), ELS(O), (1_221B3-MA001)
FIELD ROUTE
TLS(C) , TLS(O) F/B

Q 16 15 21 19 18 39 43 31 35 SP SP SP SP SP

ON COMMAND, OFF
SC-T16-3, SC-T15-3, SC-T37-3, SC-
COMMAND, SHUT-OFF DAMPER
RIOP C3SCP2 T38-3, SC-T39-3, SC-T40-3, SC-T41-
1221B3-RIOP-MA001-C03 1 5C 2.5 PVC A 1.1 240 240 PERMISSIVE FOR BEFORE ESP 2
(1_9113_R3_302) 3, CG-SH10-3, CG-T29-3, ESP2C-
LOCAL OPERATION (1_221B3-MA001)
T01-3, 1.222B-T01-1, FIELD ROUTE
FROM PLC

Q 8 5 7 13 14

L&T CMCC03 : 10 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S
45 SHUT-OFF DAMPER
BEFORE ESP 2
(1_221B4-MA001)
N X1-60 X1-61 X1-62 X1-63 SP

ON F/B, OVER LOAD


1221B4-CMCC33-RIOP- CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C3SCP2
1 5C 2.5 PVC A 1.1 60 60 F/B, GROUND FAULT
C01 (10F3) T14-3, SC-T15-3, SC-T16-3 (1_9113_R3_302)
F/B TO PLC

Q SP

N SP SP SP SP SP

TRIP, R-SELECTED,,
SC-T16-3, SC-T15-3, SC-T37-3, SC-
L-SELECTED, SHUT-OFF DAMPER
RIOP C3SCP2 T38-3, SC-T39-3, SC-T40-3, SC-T41- TERMINAL NOS. 16,22,17,38,42,30, AND 34
1221B4-RIOP-MA001-C02 1 14C 2.5 PVC A 1.1 230 230 ACTUATOR READY, BEFORE ESP 2
(1_9113_R3_302) 3, CG-SH10-3, CG-T29-3, ESP2C- SHALL BE LOOPED AT ACTUATOR
ELS(C), ELS(O), (1_221B4-MA001)
T01-3, 1.222B-T01-1, FIELD ROUTE
TLS(C) , TLS(O) F/B

Q 16 15 21 19 18 39 43 31 35 SP SP SP SP SP

ON COMMAND, OFF
SC-T16-3, SC-T15-3, SC-T37-3, SC-
COMMAND, SHUT-OFF DAMPER
RIOP C3SCP2 T38-3, SC-T39-3, SC-T40-3, SC-T41-
1221B4-RIOP-MA001-C03 1 5C 2.5 PVC A 1.1 230 230 PERMISSIVE FOR BEFORE ESP 2
(1_9113_R3_302) 3, CG-SH10-3, CG-T29-3, ESP2C-
LOCAL OPERATION (1_221B4-MA001)
T01-3, 1.222B-T01-1, FIELD ROUTE
FROM PLC

Q 8 5 7 13 14

46 BLEED-IN DAMPER
(1_221C21-MA001)

N X1-60 X1-61 X1-62 X1-63 SP

ON F/B, OVER LOAD


1221C21-CMCC33-RIOP- CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C3SCP3
1 5C 2.5 PVC A 1.1 60 60 F/B, GROUND FAULT
C01 (8F2) T14-3, SC-T15-3, SC-T16-3 (1_9113_R3_303)
F/B TO PLC

Q SP

N SP SP SP SP SP

TRIP, R-SELECTED,,
SC-T16-3, SC-T15-3, SC-T37-3, SC-
L-SELECTED,
RIOP C3SCP3 T38-3, SC-T39-3, SC-T40-3, SC-T41- BLEED-IN DAMPER TERMINAL NOS. 16,22,17,38,42,30, AND 34
1221C21-RIOP-MA001-C02 1 14C 2.5 PVC A 1.1 240 240 ACTUATOR READY,
(1_9113_R3_303) 3, CG-SH10-3, CG-T29-3, ESP2C- (1_221C21-MA001) SHALL BE LOOPED AT ACTUATOR
ELS(C), ELS(O),
T01-3, 1.222B-T01-1, FIELD ROUTE
TLS(C) , TLS(O) F/B

Q 16 15 21 19 18 39 43 31 35 SP SP SP SP SP

N SP SP SP

SC-T16-3, SC-T15-3, SC-T37-3, SC-


PERMISSIVE FOR
RIOP C3SCP2 T38-3, SC-T39-3, SC-T40-3, SC-T41- BLEED-IN DAMPER
1221C21-RIOP-MA001-C03 1 5C 2.5 PVC A 1.1 240 240 LOCAL OPERATION
(1_9113_R3_302) 3, CG-SH10-3, CG-T29-3, ESP2C- (1_221C21-MA001)
FROM PLC
T01-3, 1.222B-T01-1, FIELD ROUTE

Q 13 14 SP SP SP

N SP SP SP SP

SC-T16-3, SC-T15-3, SC-T37-3, SC-


PVC % OF
RIOP C3SCP1 T38-3, SC-T39-3, SC-T40-3, SC-T41- BLEED-IN DAMPER SEPARATE CABLE LAID AS PER CARD
1221C21-RIOP-MA001-C04 1 3P 1.5 SCREENE A 1.1 240 240 OPENING/POSITION
(1_9113_R3_301) 3, CG-SH10-3, CG-T29-3, ESP2C- (1_221C21-MA001) ALLOCATION OF PRIMETAL.
D F/B TO PLC
T01-3, 1.222B-T01-1, FIELD ROUTE

Q 26 27 SP SP SP SP

N SP SP

SC-T16-3, SC-T15-3, SC-T37-3, SC-


PVC % OF OPENING
RIOP C3SCP3 T38-3, SC-T39-3, SC-T40-3, SC-T41- BLEED-IN DAMPER INSTRUMENTATION CABLE SHALL BE TAKEN
1221C21-RIOP-MA001-C05 1 2P 1.0 SCREENE A 1.1 240 240 COMMAND FROM
(1_9113_R3_303) 3, CG-SH10-3, CG-T29-3, ESP2C- (1_221C21-MA001) BY JSPL.
D PLC
T01-3, 1.222B-T01-1, FIELD ROUTE

Q 9 10 SP SP

L&T CMCC03 : 11 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S
47 ISOLATION GATE
(1_221A81-MA001)

N X1-60 X1-61 X1-62 X1-63 SP

ON F/B, OVER LOAD


1221A81-CMCC33-RIOP- CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C3SCP1
1 5C 2.5 PVC A 1.1 60 60 F/B, GROUND FAULT
C01 (14F3) T14-3, SC-T15-3, SC-T16-3 (1_9113_R3_301)
F/B TO PLC

Q SP

N SP SP SP SP SP

TRIP, R-SELECTED,,
SC-T16-3, SC-T15-3, SC-T37-3, SC-
L-SELECTED,
RIOP C3SCP1 T38-3, SC-T39-3, SC-T40-3, SC-T41- ISOLATION GATE TERMINAL NOS. 16,22,17,38,42,30, AND 34
1221A81-RIOP-MA001-C02 1 14C 2.5 PVC A 1.1 250 250 ACTUATOR READY,
(1_9113_R3_301) 3, CG-SH10-3, CG-T29-3, ESP2C- (1_221A81-MA001) SHALL BE LOOPED AT ACTUATOR
ELS(C), ELS(O),
T01-3, 1.222B-T01-1, FIELD ROUTE
TLS(C) , TLS(O) F/B

Q 16 15 21 19 18 39 43 31 35 SP SP SP SP SP

ON COMMAND, OFF
SC-T16-3, SC-T15-3, SC-T37-3, SC-
COMMAND,
RIOP C3SCP3 T38-3, SC-T39-3, SC-T40-3, SC-T41- ISOLATION GATE
1221A81-RIOP-MA001-C03 1 5C 2.5 PVC A 1.1 250 250 PERMISSIVE FOR
(1_9113_R3_303) 3, CG-SH10-3, CG-T29-3, ESP2C- (1_221A81-MA001)
LOCAL OPERATION
T01-3, 1.222B-T01-1, FIELD ROUTE
FROM PLC

Q 8 5 7 13 14

SUPPORT INSULATOR Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
48 HEATER GROUP
(1_222B_41-EB001)

SUPPORT INSULATOR Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
49 HEATER GROUP
(1_222B_42-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
50 FOR WASTE GAS ESP
(1_222B_61-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
51 FOR WASTE GAS ESP
(1_222B_62-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
52 FOR WASTE GAS ESP
(1_222B_63-EB001)

L&T CMCC03 : 12 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
53 FOR WASTE GAS ESP
(1_222B_64-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
54 FOR WASTE GAS ESP
(1_222B_65-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
55 FOR WASTE GAS ESP
(1_222B_66-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
56 FOR WASTE GAS ESP
(1_222B_67-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
57 FOR WASTE GAS ESP
(1_222B_68-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
58 FOR WASTE GAS ESP
(1_222B_69-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
59 FOR WASTE GAS ESP
(1_222B_70-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
60 FOR WASTE GAS ESP
(1_222B_71-EB001)

L&T CMCC03 : 13 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
61 FOR WASTE GAS ESP
(1_222B_72-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
62 FOR WASTE GAS ESP
(1_222B_73-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
63 FOR WASTE GAS ESP
(1_222B_74-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
64 FOR WASTE GAS ESP
(1_222B_75-EB001)

HOPPER HEATER GROUP Refer Control Cable schedule WG ESP (JSPL Drg. No.- ANG2-05-E-18-20180-002)
65 FOR WASTE GAS ESP
(1_222B_76-EB001)

L&T CMCC03 : 14 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S
66 PNEUMATIC CONVEYING
SYSTEM FOR DUST (LCP)

(1_223G14-LCP)
N X4-1 X4-2 SP SP

PNEUMATIC
PVC CONVEYING PRESSURE
PR. MEASUREMENT OF
1223G14-LCP-PT114-C01 1 2P 1.5 SCREENE A 1.1 20 20
Pneumatic line SYSTEM FOR DUST FIELD ROUTE TRANSMITTER UNDER RIECO SCOPE OF SUPPLY
D (LCP) (PT 114)
(1_223G14-LCP)

Q + - SP SP

N X4-3 X4-4 SP SP

PNEUMATIC
PVC DIFF. PR. CONVEYING DIFF. PRESSURE
1223G14-LCP-DPT120-C02 1 2P 1.5 SCREENE A 1.1 20 20 MEASUREMENT OF BAG SYSTEM FOR DUST FIELD ROUTE TRANSMITTER UNDER RIECO SCOPE OF SUPPLY
D FILTER (LCP) (DPT 120)
(1_223G14-LCP)

Q + - SP SP

N X4-5 X4-6 SP SP

PNEUMATIC
PVC CONVEYING LEVEL
Radar LEVEL
1223G14-LCP-LI3171-C03 1 2P 1.5 SCREENE A 1.1 20 20
MEASUREMENT OF BIN SYSTEM FOR DUST FIELD ROUTE TRANSMITTER UNDER RIECO SCOPE OF SUPPLY
D (LCP) (LI-3171)
(1_223G14-LCP)

Q + - SP SP

N X4-7 X4-8 SP SP

PNEUMATIC
PVC PR. MEASUREMENT OF CONVEYING PRESSURE
1223G14-LCP-PT110-C04 1 2P 1.5 SCREENE A 1.1 20 20 Compressed air Line to SYSTEM FOR DUST FIELD ROUTE TRANSMITTER UNDER RIECO SCOPE OF SUPPLY
D pressure vessel (LCP) (PT 110)
(1_223G14-LCP)

Q + - SP SP

N SP SP
Pressure transmitter SC-T16-3, SC-T15-3, SC-T53-3, SC-
PT114, Differential PNEUMATIC
T54-3, SC-T55-3, SC-T56-3, SC-T57-
PVC Pressure transmitter CONVEYING
RIOP C5SC 3, WGF-T01-3, WGF-SH1-3, CG-T27-
1223G14-RIOP-LCP-C05 1 5P 1.5 SCREENE A 1.1 200 200 DPT120, level SYSTEM FOR DUST
transmitter LI3171 and 1_9113_R5-UH301 3, ESP1C-T01-3, 1.222A-T01-1,
D (LCP)
Pressure Transmitter PT 1.222A-SH1-1, 1.222A-T02-1, FIELD
(1_223G14-LCP)
110 ROUTE
Q XAI-1 XAI-2 XAI-3 XAI-4 XAI-5 XAI-6 XAI-7 XAI-8 SP SP

N TB1-1 TB1-2 SP

PNEUMATIC
CONVEYING
LOW PRESSURE Switch PRESSURE SWITCH
1223G14-LCP-PSL101-C06 1 3C 2.5 PVC A 1.1 20 20 at Air reciever SYSTEM FOR DUST FIELD ROUTE UNDER RIECO SCOPE OF SUPPLY
(PSL-101)
(LCP)
(1_223G14-LCP)

Q C NO SP

N TB1-3 TB1-4 SP

PNEUMATIC
CONVEYING
LOW PRESSURE Switch PRESSURE SWITCH
1223G14-LCP-PSL108-C07 1 3C 2.5 PVC A 1.1 20 20 after Air reciever SYSTEM FOR DUST FIELD ROUTE UNDER RIECO SCOPE OF SUPPLY
(PSL-108)
(LCP)
(1_223G14-LCP)

Q C NO SP

N TB1-5 TB1-6 SP

PNEUMATIC
CONVEYING
LOW PRESSURE Switch PRESSURE SWITCH
1223G14-LCP-PSL124-C08 1 3C 2.5 PVC A 1.1 20 20
at inlet of bag filter SYSTEM FOR DUST FIELD ROUTE UNDER RIECO SCOPE OF SUPPLY
(PSL-124)
(LCP)
(1_223G14-LCP)

Q C NO SP

L&T CMCC03 : 15 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S

N TB1-7 TB1-8 SP

PNEUMATIC
CONVEYING TEMPERATURE
HIGH TEMPERATURE
1223G14-LCP-TSH105-C09 1 3C 2.5 PVC A 1.1 20 20
Switch at Air reciever SYSTEM FOR DUST FIELD ROUTE SWITCH UNDER RIECO SCOPE OF SUPPLY
(LCP) (TSH-105)
(1_223G14-LCP)

Q C NO SP

N TB1-9 TB1-10 SP

PNEUMATIC
CONVEYING INLET DOME VALVE
1223G14-LCP-DV111ZSO- INLET DOME VALVE
1 3C 2.5 PVC A 1.1 20 20
OPEN LIMIT SWITCH F/B SYSTEM FOR DUST FIELD ROUTE OPEN LIMIT SWITCH UNDER RIECO SCOPE OF SUPPLY
C10 (DV111-ZSO)
(LCP)
(1_223G14-LCP)

Q C NO SP

N TB1-11 TB1-12 SP

PNEUMATIC
INLET DOME VALVE CONVEYING INLET DOME VALVE
1223G14-LCP-DV111ZSC- 1 3C 2.5 PVC A 1.1 20 20 CLOSED LIMIT SWITCH SYSTEM FOR DUST FIELD ROUTE CLOSED LIMIT SWITCH UNDER RIECO SCOPE OF SUPPLY
C11 F/B (DV111-ZSC)
(LCP)
(1_223G14-LCP)

Q C NO SP

N TB1-13 TB1-14 SP

PNEUMATIC
CONVEYING KG VALVE OPEN LIMIT
1223G14-LCP- KG VALVE OPEN LIMIT
1 3C 2.5 PVC A 1.1 20 20 SYSTEM FOR DUST FIELD ROUTE SWITCH UNDER RIECO SCOPE OF SUPPLY
KGV116ZSO-C12 SWITCH F/B (KGV116-ZSO)
(LCP)
(1_223G14-LCP)

Q C NO SP

N TB1-15 TB1-16 SP

PNEUMATIC
CONVEYING KG VALVE CLOSED LIMIT
1223G14-LCP- KG VALVE CLOSED LIMIT
1 3C 2.5 PVC A 1.1 20 20 SYSTEM FOR DUST FIELD ROUTE SWITCH UNDER RIECO SCOPE OF SUPPLY
KGV116ZSC-C13 SWITCH F/B (KGV116-ZSC)
(LCP)
(1_223G14-LCP)

Q C NO SP

N TB1-17 TB1-18 SP

PNEUMATIC
CONVEYING BF VALVE OPEN LIMIT
1223G14-LCP- BF VALVE OPEN LIMIT
1 3C 2.5 PVC A 1.1 20 20 SWITCH F/B SYSTEM FOR DUST FIELD ROUTE SWITCH UNDER RIECO SCOPE OF SUPPLY
BFV115ZSO-C14 (BFV115-ZSO)
(LCP)
(1_223G14-LCP)

Q C NO SP

N TB1-19 TB1-20 SP

PNEUMATIC
CONVEYING BF VALVE CLOSED LIMIT
1223G14-LCP- BF VALVE CLOSED LIMIT
1 3C 2.5 PVC A 1.1 20 20 SWITCH F/B SYSTEM FOR DUST FIELD ROUTE SWITCH UNDER RIECO SCOPE OF SUPPLY
BFV115ZSC-C15 (BFV115-ZSC)
(LCP)
(1_223G14-LCP)

Q C NO SP

N TB1-21 TB1-22 SP

PNEUMATIC
CONVEYING OUTLET DOME VALVE
1223G14-LCP-DV125ZSO- OUTLET DOME VALVE
1 3C 2.5 PVC A 1.1 20 20
OPEN LIMIT SWITCH F/B SYSTEM FOR DUST FIELD ROUTE OPEN LIMIT SWITCH UNDER RIECO SCOPE OF SUPPLY
C16 (DV125-ZSO)
(LCP)
(1_223G14-LCP)

Q C NO SP

L&T CMCC03 : 16 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S

N TB1-23 TB1-24 SP

PNEUMATIC
OUTLET DOME VALVE CONVEYING OUTLET DOME VALVE
1223G14-LCP-DV125ZSC- 1 3C 2.5 PVC A 1.1 20 20 CLOSED LIMIT SWITCH SYSTEM FOR DUST FIELD ROUTE CLOSED LIMIT SWITCH UNDER RIECO SCOPE OF SUPPLY
C17 F/B (DV125-ZSC)
(LCP)
(1_223G14-LCP)

Q C NO SP

N TB1-25 TB1-26 SP

PNEUMATIC
CONVEYING LEVEL SWITCH
1223G14-LCP-LSH112-C18 1 3C 2.5 PVC A 1.1 20 20 HIGH LEVEL SWITCH F/B SYSTEM FOR DUST FIELD ROUTE HIGH UNDER RIECO SCOPE OF SUPPLY
(LCP) (LSH-112)
(1_223G14-LCP)

Q C NO SP

N TB2-1 TB2-2 SP

PNEUMATIC
CONVEYING DOME VALVE
1223G14-LCP-DV111-C19 1 3C 2.5 PVC A 1.1 20 20 Dome VALVE OPEN CMD SYSTEM FOR DUST FIELD ROUTE OPENED CMD UNDER RIECO SCOPE OF SUPPLY
(LCP) (DV-111)
(1_223G14-LCP)

Q (+) (-) SP

N TB2-3 TB2-4 SP

PNEUMATIC
CONVEYING KG VALVE OPENED
1223G14-LCP-KGV116-C20 1 3C 2.5 PVC A 1.1 20 20 KG VALVE OPEN CMD SYSTEM FOR DUST FIELD ROUTE CMD UNDER RIECO SCOPE OF SUPPLY
(LCP) (KGV-116)
(1_223G14-LCP)

Q (+) (-) SP

N TB2-5 TB2-6 SP

PNEUMATIC
CONVEYING
SOL OPENED CMD
1223G14-LCP-SOV119-C21 1 3C 2.5 PVC A 1.1 20 20 SOL. VALVE OPEN CMD SYSTEM FOR DUST FIELD ROUTE UNDER RIECO SCOPE OF SUPPLY
(SOV-119)
(LCP)
(1_223G14-LCP)

Q (+) (-) SP

N TB2-7 TB2-8 SP

PNEUMATIC
CONVEYING BF VALVE OPENED
1223G14-LCP-BFV115-C22 1 3C 2.5 PVC A 1.1 20 20 BF VALVE OPEN CMD SYSTEM FOR DUST FIELD ROUTE CMD UNDER RIECO SCOPE OF SUPPLY
(LCP) (BFV-115)
(1_223G14-LCP)

Q (+) (-) SP

N TB2-9 TB2-10 SP

PNEUMATIC
CONVEYING
SOL OPENED CMD
1223G14-LCP-SOV109-C23 1 3C 2.5 PVC A 1.1 20 20 SOL. VALVE OPEN CMD SYSTEM FOR DUST FIELD ROUTE UNDER RIECO SCOPE OF SUPPLY
(SOV-109)
(LCP)
(1_223G14-LCP)

Q (+) (-) SP

N TB2-11 TB2-12 SP

PNEUMATIC
CONVEYING
SOL OPENED CMD
1223G14-LCP-SOV113-C24 1 3C 2.5 PVC A 1.1 20 20 SOL. VALVE OPEN CMD SYSTEM FOR DUST FIELD ROUTE UNDER RIECO SCOPE OF SUPPLY
(SOV-113)
(LCP)
(1_223G14-LCP)

Q (+) (-) SP

L&T CMCC03 : 17 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S

N TB2-13 TB2-14 SP

PNEUMATIC
CONVEYING DOME VALVE
DOME VALVE OPEN
1223G14-LCP-DV125-C25 1 3C 2.5 PVC A 1.1 20 20
CMD SYSTEM FOR DUST FIELD ROUTE OPENED CMD UNDER RIECO SCOPE OF SUPPLY
(LCP) (DV-125)
(1_223G14-LCP)

Q (+) (-) SP

N TB2-15 TB2-16 SP

PNEUMATIC
CONVEYING
SOL OPENED CMD
1223G14-LCP-SOV121-C26 1 3C 2.5 PVC A 1.1 20 20 SOL. VALVE OPEN CMD SYSTEM FOR DUST FIELD ROUTE UNDER RIECO SCOPE OF SUPPLY
(SOV-121)
(LCP)
(1_223G14-LCP)

Q (+) (-) SP

N TB2-17 TB2-18 SP

PNEUMATIC
CONVEYING
SOL OPENED CMD
1223G14-LCP-SOV122-C27 1 3C 2.5 PVC A 1.1 20 20 SOL. VALVE OPEN CMD SYSTEM FOR DUST FIELD ROUTE UNDER RIECO SCOPE OF SUPPLY
(SOV-122)
(LCP)
(1_223G14-LCP)

Q (+) (-) SP

N SP SP SP SP SP
INSTRUMENT TO PLC SC-T16-3, SC-T15-3, SC-T53-3, SC-
( PSL101, PSL108, PNEUMATIC
T54-3, SC-T55-3, SC-T56-3, SC-T57- TERMINAL NOS. X1-1, X1-3, X1-5, X1-7,X1-
PSL124, TSH105, DV111 CONVEYING
RIOP C5SC 3, WGF-T01-3, WGF-SH1-3, CG-T27- 13,X1-15
1223G14-RIOP-LCP-C28 1 19C 2.5 PVC A 1.1 200 200 Open & close, KGV116 SYSTEM FOR DUST
Open & close, BFV 115 1_9113_R5-UH301 3, ESP1C-T01-3, 1.222A-T01-1, X1-17, X1-19, X1-21, X1-23, X1-25, X1-27, X1-29
(LCP)
open and Close, DV125 1.222A-SH1-1, 1.222A-T02-1, FIELD SHALL BE LOOPED AT LCP
(1_223G14-LCP)
Open and Close, LSH112 ROUTE
Q X1-1 X1-2 X1-4 X1-6 X1-8 X1-14 X1-16 X1-18 X1-20 X1-22 X1-24 X1-26 X1-28 X1-30 SP SP SP SP SP

N SP
SC-T16-3, SC-T15-3, SC-T53-3, SC-
PNEUMATIC
T54-3, SC-T55-3, SC-T56-3, SC-T57-
CONVEYING
RIOP C5SC 3, WGF-T01-3, WGF-SH1-3, CG-T27-
1223G14-RIOP-LCP-C29 1 3C 2.5 PVC A 1.1 200 200 REMOTE SELECTED SYSTEM FOR DUST
1_9113_R5-UH301 3, ESP1C-T01-3, 1.222A-T01-1,
(LCP)
1.222A-SH1-1, 1.222A-T02-1, FIELD
(1_223G14-LCP)
ROUTE
Q X1-31 X1-32 SP

N SP
SC-T16-3, SC-T15-3, SC-T53-3, SC-
PNEUMATIC
T54-3, SC-T55-3, SC-T56-3, SC-T57-
CONVEYING
START PERMISSIVE RIOP C5SC 3, WGF-T01-3, WGF-SH1-3, CG-T27-
1223G14-RIOP-LCP-C30 1 3C 2.5 PVC A 1.1 200 200 FROM PLC SYSTEM FOR DUST
1_9113_R5-UH301 3, ESP1C-T01-3, 1.222A-T01-1,
(LCP)
1.222A-SH1-1, 1.222A-T02-1, FIELD
(1_223G14-LCP)
ROUTE
Q X3-1 X3-2 SP

N SP SP SP SP SP SP
Command from PLC for SC-T16-3, SC-T15-3, SC-T53-3, SC-
PNEUMATIC
DV111 , KGV 116, T54-3, SC-T55-3, SC-T56-3, SC-T57-
CONVEYING
SOV119, BFV 115, RIOP C5SC 3, WGF-T01-3, WGF-SH1-3, CG-T27-
1223G14-RIOP-LCP-C31 1 24C 2.5 PVC A 1.1 200 200 SOV109, SOV113, SYSTEM FOR DUST
1_9113_R5-UH301 3, ESP1C-T01-3, 1.222A-T01-1,
DV125, SOV 121, SOV (LCP)
1.222A-SH1-1, 1.222A-T02-1, FIELD
122 (1_223G14-LCP)
ROUTE
Q X0-1 X0-2 X0-3 X0-4 X0-5 X0-6 X0-7 X0-8 X0-9 X0-10 X0-11 X0-12 X0-13 X0-14 X0-15 X0-16 X0-17 X0-18 SP SP SP SP SP SP

L&T CMCC03 : 18 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S
67 PNEUMATIC CONVEYING
SYSTEM FOR DUST (LCP)

(1_223G24-LCP)
N X4-1 X4-2 SP SP

PNEUMATIC
PVC CONVEYING PRESSURE
PR. MEASUREMENT OF
1223G24-LCP-PT214-C01 1 2P 1.5 SCREENE A 1.1 20 20
Pneumatic line SYSTEM FOR DUST FIELD ROUTE TRANSMITTER UNDER RIECO SCOPE OF SUPPLY
D (LCP) (PT 214)
(1_223G24-LCP)

Q + - SP SP

N X4-3 X4-4 SP SP

PNEUMATIC
PVC DIFF. PR. CONVEYING DIFF. PRESSURE
1223G24-LCP-DPT220-C02 1 2P 1.5 SCREENE A 1.1 20 20 MEASUREMENT OF BAG SYSTEM FOR DUST FIELD ROUTE TRANSMITTER UNDER RIECO SCOPE OF SUPPLY
D FILTER (LCP) (DPT 220)
(1_223G24-LCP)

Q + - SP SP

N X4-5 X4-6 SP SP

PNEUMATIC
PVC CONVEYING LEVEL
Radar LEVEL
1223G24-LCP-LI4171-C03 1 2P 1.5 SCREENE A 1.1 20 20
MEASUREMENT OF BIN SYSTEM FOR DUST FIELD ROUTE TRANSMITTER UNDER RIECO SCOPE OF SUPPLY
D (LCP) (LI-4171)
(1_223G24-LCP)

Q + - SP SP

N X4-7 X4-8 SP SP

PNEUMATIC
PVC PR. MEASUREMENT OF CONVEYING PRESSURE
1223G24-LCP-PT210-C04 1 2P 1.5 SCREENE A 1.1 20 20 Compressed air Line to SYSTEM FOR DUST FIELD ROUTE TRANSMITTER UNDER RIECO SCOPE OF SUPPLY
D pressure vessel (LCP) (PT 210)
(1_223G24-LCP)

Q + - SP SP

N SP SP
Pressure transmitter SC-T16-3, SC-T15-3, SC-T53-3, SC-
PT214, Differential PNEUMATIC
T54-3, SC-T55-3, SC-T56-3, SC-T57-
PVC Pressure transmitter CONVEYING
RIOP C5SC 3, WGF-T01-3, WGF-SH1-3, CG-T27-
1223G24-RIOP-LCP-C05 1 5P 1.5 SCREENE A 1.1 200 200 DPT220, level SYSTEM FOR DUST
transmitter LI4171 and 1_9113_R5-UH301 3, ESP1C-T01-3, 1.222A-T01-1,
D (LCP)
Pressure Transmitter PT 1.222A-SH1-1, 1.222A-T02-1, FIELD
(1_223G24-LCP)
210 ROUTE
Q XAI-1 XAI-2 XAI-3 XAI-4 XAI-5 XAI-6 XAI-7 XAI-8 SP SP

N TB1-1 TB1-2 SP

PNEUMATIC
CONVEYING
LOW PRESSURE Switch PRESSURE SWITCH
1223G24-LCP-PSL201-C06 1 3C 2.5 PVC A 1.1 20 20 at Air reciever SYSTEM FOR DUST FIELD ROUTE UNDER RIECO SCOPE OF SUPPLY
(PSL-201)
(LCP)
(1_223G24-LCP)

Q C NO SP

N TB1-3 TB1-4 SP

PNEUMATIC
CONVEYING
LOW PRESSURE Switch PRESSURE SWITCH
1223G24-LCP-PSL208-C07 1 3C 2.5 PVC A 1.1 20 20 after Air reciever SYSTEM FOR DUST FIELD ROUTE UNDER RIECO SCOPE OF SUPPLY
(PSL-208)
(LCP)
(1_223G24-LCP)

Q C NO SP

N TB1-5 TB1-6 SP

PNEUMATIC
CONVEYING
LOW PRESSURE Switch PRESSURE SWITCH
1223G24-LCP-PSL224-C08 1 3C 2.5 PVC A 1.1 20 20
at inlet of bag filter SYSTEM FOR DUST FIELD ROUTE UNDER RIECO SCOPE OF SUPPLY
(PSL-224)
(LCP)
(1_223G24-LCP)

Q C NO SP

L&T CMCC03 : 19 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S

N TB1-7 TB1-8 SP

PNEUMATIC
CONVEYING TEMPERATURE
HIGH TEMPERATURE
1223G24-LCP-TSH205-C09 1 3C 2.5 PVC A 1.1 20 20
Switch at Air reciever SYSTEM FOR DUST FIELD ROUTE SWITCH UNDER RIECO SCOPE OF SUPPLY
(LCP) (TSH-205)
(1_223G24-LCP)

Q C NO SP

N TB1-9 TB1-10 SP

PNEUMATIC
CONVEYING INLET DOME VALVE
1223G24-LCP-DV211ZSO- INLET DOME VALVE
1 3C 2.5 PVC A 1.1 20 20
OPEN LIMIT SWITCH F/B SYSTEM FOR DUST FIELD ROUTE OPEN LIMIT SWITCH UNDER RIECO SCOPE OF SUPPLY
C10 (DV211-ZSO)
(LCP)
(1_223G24-LCP)

Q C NO SP

N TB1-11 TB1-12 SP

PNEUMATIC
INLET DOME VALVE CONVEYING INLET DOME VALVE
1223G24-LCP-DV211ZSC- 1 3C 2.5 PVC A 1.1 20 20 CLOSED LIMIT SWITCH SYSTEM FOR DUST FIELD ROUTE CLOSED LIMIT SWITCH UNDER RIECO SCOPE OF SUPPLY
C11 F/B (DV211-ZSC)
(LCP)
(1_223G24-LCP)

Q C NO SP

N TB1-13 TB1-14 SP

PNEUMATIC
CONVEYING KG VALVE OPEN LIMIT
1223G24-LCP- KG VALVE OPEN LIMIT
1 3C 2.5 PVC A 1.1 20 20 SYSTEM FOR DUST FIELD ROUTE SWITCH UNDER RIECO SCOPE OF SUPPLY
KGV216ZSO-C12 SWITCH F/B (KGV216-ZSO)
(LCP)
(1_223G24-LCP)

Q C NO SP

N TB1-15 TB1-16 SP

PNEUMATIC
CONVEYING KG VALVE CLOSED LIMIT
1223G24-LCP- KG VALVE CLOSED LIMIT
1 3C 2.5 PVC A 1.1 20 20 SYSTEM FOR DUST FIELD ROUTE SWITCH UNDER RIECO SCOPE OF SUPPLY
KGV216ZSC-C13 SWITCH F/B (KGV216-ZSC)
(LCP)
(1_223G24-LCP)

Q C NO SP

N TB1-17 TB1-18 SP

PNEUMATIC
CONVEYING BF VALVE OPEN LIMIT
1223G24-LCP- BF VALVE OPEN LIMIT
1 3C 2.5 PVC A 1.1 20 20 SWITCH F/B SYSTEM FOR DUST FIELD ROUTE SWITCH UNDER RIECO SCOPE OF SUPPLY
BFV215ZSO-C14 (BFV215-ZSO)
(LCP)
(1_223G24-LCP)

Q C NO SP

N TB1-19 TB1-20 SP

PNEUMATIC
CONVEYING BF VALVE CLOSED LIMIT
1223G24-LCP- BF VALVE CLOSED LIMIT
1 3C 2.5 PVC A 1.1 20 20 SWITCH F/B SYSTEM FOR DUST FIELD ROUTE SWITCH UNDER RIECO SCOPE OF SUPPLY
BFV215ZSC-C15 (BFV215-ZSC)
(LCP)
(1_223G24-LCP)

Q C NO SP

N TB1-21 TB1-22 SP

PNEUMATIC
CONVEYING OUTLET DOME VALVE
1223G24-LCP-DV225ZSO- OUTLET DOME VALVE
1 3C 2.5 PVC A 1.1 20 20
OPEN LIMIT SWITCH F/B SYSTEM FOR DUST FIELD ROUTE OPEN LIMIT SWITCH UNDER RIECO SCOPE OF SUPPLY
C16 (DV225-ZSO)
(LCP)
(1_223G24-LCP)

Q C NO SP

L&T CMCC03 : 20 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S

N TB1-23 TB1-24 SP

PNEUMATIC
OUTLET DOME VALVE CONVEYING OUTLET DOME VALVE
1223G24-LCP-DV225ZSC- 1 3C 2.5 PVC A 1.1 20 20 CLOSED LIMIT SWITCH SYSTEM FOR DUST FIELD ROUTE CLOSED LIMIT SWITCH UNDER RIECO SCOPE OF SUPPLY
C17 F/B (DV225-ZSC)
(LCP)
(1_223G24-LCP)

Q C NO SP

N TB1-25 TB1-26 SP

PNEUMATIC
CONVEYING LEVEL SWITCH
1223G24-LCP-LSH212-C18 1 3C 2.5 PVC A 1.1 20 20 HIGH LEVEL SWITCH F/B SYSTEM FOR DUST FIELD ROUTE HIGH UNDER RIECO SCOPE OF SUPPLY
(LCP) (LSH-212)
(1_223G24-LCP)

Q C NO SP

N TB2-1 TB2-2 SP

PNEUMATIC
CONVEYING DOME VALVE
1223G24-LCP-DV211-C19 1 3C 2.5 PVC A 1.1 20 20 Dome VALVE OPEN CMD SYSTEM FOR DUST FIELD ROUTE OPENED CMD UNDER RIECO SCOPE OF SUPPLY
(LCP) (DV-211)
(1_223G24-LCP)

Q (+) (-) SP

N TB2-3 TB2-4 SP

PNEUMATIC
CONVEYING KG VALVE OPENED
1223G24-LCP-KGV216-C20 1 3C 2.5 PVC A 1.1 20 20 KG VALVE OPEN CMD SYSTEM FOR DUST FIELD ROUTE CMD UNDER RIECO SCOPE OF SUPPLY
(LCP) (KGV-216)
(1_223G24-LCP)

Q (+) (-) SP

N TB2-5 TB2-6 SP

PNEUMATIC
CONVEYING
SOL OPENED CMD
1223G24-LCP-SOV219-C21 1 3C 2.5 PVC A 1.1 20 20 SOL. VALVE OPEN CMD SYSTEM FOR DUST FIELD ROUTE UNDER RIECO SCOPE OF SUPPLY
(SOV-219)
(LCP)
(1_223G24-LCP)

Q (+) (-) SP

N TB2-7 TB2-8 SP

PNEUMATIC
CONVEYING BF VALVE OPENED
1223G24-LCP-BFV215-C22 1 3C 2.5 PVC A 1.1 20 20 BF VALVE OPEN CMD SYSTEM FOR DUST FIELD ROUTE CMD UNDER RIECO SCOPE OF SUPPLY
(LCP) (BFV-215)
(1_223G24-LCP)

Q (+) (-) SP

N TB2-9 TB2-10 SP

PNEUMATIC
CONVEYING
SOL OPENED CMD
1223G24-LCP-SOV209-C23 1 3C 2.5 PVC A 1.1 20 20 SOL. VALVE OPEN CMD SYSTEM FOR DUST FIELD ROUTE UNDER RIECO SCOPE OF SUPPLY
(SOV-209)
(LCP)
(1_223G24-LCP)

Q (+) (-) SP

N TB2-11 TB2-12 SP

PNEUMATIC
CONVEYING
SOL OPENED CMD
1223G24-LCP-SOV213-C24 1 3C 2.5 PVC A 1.1 20 20 SOL. VALVE OPEN CMD SYSTEM FOR DUST FIELD ROUTE UNDER RIECO SCOPE OF SUPPLY
(SOV-213)
(LCP)
(1_223G24-LCP)

Q (+) (-) SP

L&T CMCC03 : 21 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S

N TB2-13 TB2-14 SP

PNEUMATIC
CONVEYING DOME VALVE
DOME VALVE OPEN
1223G24-LCP-DV225-C25 1 3C 2.5 PVC A 1.1 20 20
CMD SYSTEM FOR DUST FIELD ROUTE OPENED CMD UNDER RIECO SCOPE OF SUPPLY
(LCP) (DV-225)
(1_223G24-LCP)

Q (+) (-) SP

N TB2-15 TB2-16 SP

PNEUMATIC
CONVEYING
SOL OPENED CMD
1223G24-LCP-SOV221-C26 1 3C 2.5 PVC A 1.1 20 20 SOL. VALVE OPEN CMD SYSTEM FOR DUST FIELD ROUTE UNDER RIECO SCOPE OF SUPPLY
(SOV-221)
(LCP)
(1_223G24-LCP)

Q (+) (-) SP

N TB2-17 TB2-18 SP

PNEUMATIC
CONVEYING
SOL OPENED CMD
1223G24-LCP-SOV222-C27 1 3C 2.5 PVC A 1.1 20 20 SOL. VALVE OPEN CMD SYSTEM FOR DUST FIELD ROUTE UNDER RIECO SCOPE OF SUPPLY
(SOV-222)
(LCP)
(1_223G24-LCP)

Q (+) (-) SP

N SP SP SP SP SP
INSTRUMENT TO PLC SC-T16-3, SC-T15-3, SC-T53-3, SC-
( PSL201, PSL208, PNEUMATIC
T54-3, SC-T55-3, SC-T56-3, SC-T57- TERMINAL NOS. X1-1, X1-3, X1-5, X1-7,X1-
PSL224, TSH205, DV211 CONVEYING
RIOP C5SC 3, WGF-T01-3, WGF-SH1-3, CG-T27- 13,X1-15
1223G24-RIOP-LCP-C28 1 19C 2.5 PVC A 1.1 200 200 Open & close, KGV216 SYSTEM FOR DUST
Open & close, BFV215 1_9113_R5-UH301 3, ESP1C-T01-3, 1.222A-T01-1, X1-17, X1-19, X1-21, X1-23, X1-25, X1-27, X1-29
(LCP)
open and Close, DV225 1.222A-SH1-1, 1.222A-T02-1, FIELD SHALL BE LOOPED AT LCP
(1_223G24-LCP)
Open and Close, LSH212 ROUTE
Q X1-1 X1-2 X1-4 X1-6 X1-8 X1-14 X1-16 X1-18 X1-20 X1-22 X1-24 X1-26 X1-28 X1-30 SP SP SP SP SP

N SP
SC-T16-3, SC-T15-3, SC-T53-3, SC-
PNEUMATIC
T54-3, SC-T55-3, SC-T56-3, SC-T57-
CONVEYING
RIOP C5SC 3, WGF-T01-3, WGF-SH1-3, CG-T27-
1223G24-RIOP-LCP-C29 1 3C 2.5 PVC A 1.1 200 200 REMOTE SELECTED SYSTEM FOR DUST
1_9113_R5-UH301 3, ESP1C-T01-3, 1.222A-T01-1,
(LCP)
1.222A-SH1-1, 1.222A-T02-1, FIELD
(1_223G24-LCP)
ROUTE
Q X1-31 X1-32 SP

N SP
SC-T16-3, SC-T15-3, SC-T53-3, SC-
PNEUMATIC
T54-3, SC-T55-3, SC-T56-3, SC-T57-
CONVEYING
START PERMISSIVE RIOP C5SC 3, WGF-T01-3, WGF-SH1-3, CG-T27-
1223G24-RIOP-LCP-C30 1 3C 2.5 PVC A 1.1 200 200 FROM PLC SYSTEM FOR DUST
1_9113_R5-UH301 3, ESP1C-T01-3, 1.222A-T01-1,
(LCP)
1.222A-SH1-1, 1.222A-T02-1, FIELD
(1_223G24-LCP)
ROUTE
Q X3-1 X3-2 SP

N SP SP SP SP SP SP
Command from PLC for SC-T16-3, SC-T15-3, SC-T53-3, SC-
PNEUMATIC
DV211 , KGV 216, T54-3, SC-T55-3, SC-T56-3, SC-T57-
CONVEYING
SOV219, BFV 215, RIOP C5SC 3, WGF-T01-3, WGF-SH1-3, CG-T27-
1223G24-RIOP-LCP-C31 1 24C 2.5 PVC A 1.1 200 200 SOV209, SOV213, SYSTEM FOR DUST
1_9113_R5-UH301 3, ESP1C-T01-3, 1.222A-T01-1,
DV225, SOV 221, SOV (LCP)
1.222A-SH1-1, 1.222A-T02-1, FIELD
222 (1_223G24-LCP)
ROUTE
Q X0-1 X0-2 X0-3 X0-4 X0-5 X0-6 X0-7 X0-8 X0-9 X0-10 X0-11 X0-12 X0-13 X0-14 X0-15 X0-16 X0-17 X0-18 SP SP SP SP SP SP

L&T CMCC03 : 22 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S
68 WASTE GAS BLOWER 2,
START-UP DAMPER
(1_225B2-MA001)
N X1-60 X1-61 X1-62 X1-63 SP

ON F/B, OVER LOAD


1225B2-CMCC33-RIOP- CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C3SCP3
1 5C 2.5 PVC A 1.1 60 60 F/B, GROUND FAULT
C01 (14F1) T14-3, SC-T15-3, SC-T16-3 (1_9113_R3_303)
F/B TO PLC

Q SP

"UNDER HOLD"

APPROVED DRAWING OF DAMPER IS NOT


N AVAILABLE.

TRIP, R-SELECTED,,
SC-T16-3, SC-T15-3, SC-T53-3, SC- WASTE GAS
L-SELECTED,
RIOP C3SCP3 T54-3, SC-T55-3, SC-T56-3, SC-T57- BLOWER 2, START-
1225B2-RIOP-MA001-C02 1 14C 2.5 PVC A 1.1 180 180 ACTUATOR READY,
(1_9113_R3_303) 3, WGF-T02-4, WGF-T04-4, WGF- UP DAMPER
ELS(C), ELS(O),
T06-4, WGF-T08-2, FIELD ROUTE (1_225B2-MA001)
TLS(C) , TLS(O) F/B

N SP
"UNDER HOLD"
SC-T16-3, SC-T15-3, SC-T53-3, SC- WASTE GAS
PERMISSIVE FOR
RIOP C3SCP2 T54-3, SC-T55-3, SC-T56-3, SC-T57- BLOWER 2, START- APPROVED DRAWING OF DAMPER IS NOT
1225B2-RIOP-MA001-C03 1 5C 2.5 PVC A 1.1 180 180 LOCAL OPERATION
(1_9113_R3_302) 3, WGF-T02-4, WGF-T04-4, WGF- UP DAMPER AVAILABLE.
FROM PLC
T06-4, WGF-T08-2, FIELD ROUTE (1_225B2-MA001)

Q SP

N
"UNDER HOLD"
SC-T16-3, SC-T15-3, SC-T53-3, SC- WASTE GAS
PVC % OF APPROVED DRAWING OF DAMPER IS NOT
RIOP C3SCP2 T54-3, SC-T55-3, SC-T56-3, SC-T57- BLOWER 2, START-
1225B2-RIOP-MA001-C04 1 3P 1.5 SCREENE A 1.1 180 180 OPENING/POSITION AVAILABLE.
(1_9113_R3_302) 3, WGF-T02-4, WGF-T04-4, WGF- UP DAMPER
D F/B TO PLC
T06-4, WGF-T08-2, FIELD ROUTE (1_225B2-MA001)
SEPARATE CABLE LAID AS PER CARD
ALLOCATION OF PRIMETAL.
Q

N
"UNDER HOLD"
SC-T16-3, SC-T15-3, SC-T53-3, SC- WASTE GAS
PVC % OF OPENING APPROVED DRAWING OF DAMPER IS NOT
RIOP C3SCP1 T54-3, SC-T55-3, SC-T56-3, SC-T57- BLOWER 2, START-
1225B2-RIOP-MA001-C05 1 2P 1.0 SCREENE A 1.1 180 180 COMMAND FROM AVAILABLE.
(1_9113_R3_301) 3, WGF-T02-4, WGF-T04-4, WGF- UP DAMPER
D PLC
T06-4, WGF-T08-2, FIELD ROUTE (1_225B2-MA001)
INSTRUMENTATION CABLE SHALL BE TAKEN
BY JSPL.
Q

69 SHUT-OFF DAMPER
AFTER WASTE GAS
BLOWER 2
(1_226B81-MA001) N X1-60 X1-61 X1-62 X1-63 SP

ON F/B, OVER LOAD


1226B81-CMCC33-RIOP- CMCC33 SC-T54-3, SC-T53-3, SC-T14-3, SC- RIOP C3SCP3
1 5C 2.5 PVC A 1.1 60 60 F/B, GROUND FAULT
C01 (15F1) T15-3, SC-T16-3 (1_9113_R3_303)
F/B TO PLC

Q SP

N SP SP SP SP SP

TRIP, R-SELECTED,,
SC-T16-3, SC-T15-3, SC-T53-3, SC- SHUT-OFF DAMPER
L-SELECTED,
RIOP C3SCP3 T54-3, SC-T55-3, SC-T56-3, SC-T57- AFTER WASTE GAS TERMINAL NOS. 16,22,17,38,42,30, AND 34
1226B81-RIOP-MA001-C02 1 14C 2.5 PVC A 1.1 170 170 ACTUATOR READY,
(1_9113_R3_303) 3, WGF-T02-4, WGF-T04-4, WGF- BLOWER 2 SHALL BE LOOPED AT ACTUATOR
ELS(C), ELS(O),
T06-4, WGF-T08-2, FIELD ROUTE (1_226B81-MA001)
TLS(C) , TLS(O) F/B

Q 16 15 21 19 18 39 43 31 35 SP SP SP SP SP

ON COMMAND, OFF
SC-T16-3, SC-T15-3, SC-T53-3, SC- SHUT-OFF DAMPER
COMMAND,
RIOP C3SCP2 T54-3, SC-T55-3, SC-T56-3, SC-T57- AFTER WASTE GAS
1226B81-RIOP-MA001-C03 1 5C 2.5 PVC A 1.1 170 170 PERMISSIVE FOR
(1_9113_R3_302) 3, WGF-T02-4, WGF-T04-4, WGF- BLOWER 2
LOCAL OPERATION
T06-4, WGF-T08-2, FIELD ROUTE (1_226B81-MA001)
FROM PLC

Q 8 5 7 13 14

L&T CMCC03 : 23 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S
70 TWO-WAY DAMPER
(1_343A81-MA001)

N X1-60 X1-61 X1-62 X1-63 SP

ON F/B, OVER LOAD


1343A81-CMCC33-RIOP- CMCC33 SC-T54-3, SC-T53-3, SC-T14-3, SC- RIOP C3SCP3
1 5C 2.5 PVC A 1.1 60 60 F/B, GROUND FAULT
C01 (15F2) T15-3, SC-T16-3 (1_9113_R3_303)
F/B TO PLC

Q SP

N SP SP SP SP SP

TRIP, R-SELECTED,,
SC-T16-3, SC-T15-3, SC-T37-3, SC-
L-SELECTED,
RIOP C3SCP3 T38-3, SC-T39-3, SC-T40-3, SC-T41- TWO-WAY DAMPER TERMINAL NOS. 16,22,17,38,42,30, AND 34
1343A81-RIOP-MA001-C02 1 14C 2.5 PVC A 1.1 150 150 ACTUATOR READY,
(1_9113_R3_303) 3, CG-SH10-3, CG-T29-3, FIELD (1_343A81-MA001) SHALL BE LOOPED AT ACTUATOR
ELS(C), ELS(O),
ROUTE
TLS(C) , TLS(O) F/B

Q 16 15 21 19 18 39 43 31 35 SP SP SP SP SP

ON COMMAND, OFF
SC-T16-3, SC-T15-3, SC-T37-3, SC-
COMMAND,
RIOP C3SCP2 T38-3, SC-T39-3, SC-T40-3, SC-T41- TWO-WAY DAMPER
1343A81-RIOP-MA001-C03 1 5C 2.5 PVC A 1.1 150 150 PERMISSIVE FOR
(1_9113_R3_302) 3, CG-SH10-3, CG-T29-3, FIELD (1_343A81-MA001)
LOCAL OPERATION
ROUTE
FROM PLC

Q 8 5 7 13 14

71 AHU PANEL FOR IMCC &


VFD ROOM OF +1_SC
BLDG.AT (+)3.50M LEVEL
(1_LSCP_AHU5) N X1-60 X1-61 X1-62 X1-63 SP

ON F/B, OVER LOAD


CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C1SCP1
AHU5-CMCC33-RIOP-C01 1 5C 2.5 PVC A 1.1 60 60 F/B, GROUND FAULT
(8F5) T14-3, SC-T37-3 1_9113_R1-UH301
F/B TO PLC

Q SP

AHU PANEL FOR CONTROL AND SIGNAL CABLES BETWEEN


AHU FAN ON F/B, IMCC & VFD ROOM LSCP TO FIELD INSTRUMENTS/EQUIPMENTS
SC-T37-3, SC-T14-3, SC-T13-3, SC- RIOP C1SCP1
AHU5-LSCP-RIOP-C02 1 10C 2.5 PVC A 1.1 70 70 FRESH AIR FAN ON OF +1_SC BLDG.AT SHALL BE IN PACKAGE VENDOR SCOPE OF
T12-2, PIPE SLEEVE, FIELD ROUTE 1_9113_R1-UH301
F/B TO PLC (+)3.50M LEVEL SUPPLY. SAME SHALL BE PROVIDED IN CABLE
(1_LSCP_AHU5) SCHEDULE OF PACKAGE VENDOR.

72 SUMP PUMP PANEL FOR


SUMP PUMPS AT
PROCESS AND COOLING
WATER PUMP HOUSE N X1-60 X1-61 X1-62 X1-63 SP
(1_LSCP_SP6)

ON F/B, OVER LOAD


CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C1SCP1
SP6-CMCC33-RIOP-C01 1 5C 2.5 PVC A 1.1 60 60 F/B, GROUND FAULT
(9F2) T14-3, SC-T37-3 1_9113_R1-UH301
F/B TO PLC

Q SP

N SP SP SP SP
TERMINAL NOS. 19, 21 &23 SHALL BE LOOPED
PUMP-1 ON F/B, SUMP PUMP PANEL
AT SUMP PUMP PANEL END.
PUMP-2 ON F/B, SC-T37-3, SC-T15-3, SC-T16-3, FOR SUMP PUMPS
LEVEL SW. HI F/B, RIOP C1SCP1 PULL PIT-15, PULL PIT-16, PULL AT PROCESS AND
SP6-RIOP-LSCP-C02 1 10C 2.5 PVC A 1.1 140 140 CONTROL AND SIGNAL CABLES BETWEEN
LEVEL SW. HI-HI F/B, 1_9113_R1-UH301 PIT-18, PULL PIT-19, RCPH-T01-1, COOLING WATER
LSCP TO FIELD INSTRUMENTS/EQUIPMENTS
LEVEL SW. HI- HI-HI FIELD ROUTE PUMP HOUSE
SHALL BE IN PACKAGE VENDOR SCOPE OF
F/B TO PLC (1_LSCP_SP6)
SUPPLY.
Q 27 28 31 32 19 20 22 24 SP SP SP SP

L&T CMCC03 : 24 OF 25 11/29/2020


JSPL-SP / O12247 CONTROL CABLE SCHEDULE & INTERCONNECTION CHART -CMCC's DRG NO: ANG2-05-E-18-20177-002

CABLE DETAILS

VOLTAGE GRADE

ACTUAL LENGTH
(DESIGNATION)

Cu CABLE SIZE

TOTAL LENGTH
NO. OF CORE

UNIT LENGTH
INSULATION
NO. OF RUN
CABLE NO.

UNARM (U)
ARM (A) /
SL.

(IN MTR.)

(IN MTR.)
(SQ. MM)

TYPE OF
EQUIPMENT PURPOSE FROM THROUGH TO INTERCONNECTION CHART REMARKS
NO.

(kV)
A B C D E F G H J K L M N P Q R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 S
72 SUMP PUMP PANEL FOR
SUMP PUMPS AT WASTE
GAS BLOWER BUILDING
(1_LSCP_SP4) N X1-60 X1-61 X1-62 X1-63 SP

ON F/B, OVER LOAD


CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C1SCP1
SP4-CMCC33-RIOP-C01 1 5C 2.5 PVC A 1.1 60 60 F/B, GROUND FAULT
(10F1) T14-3, SC-T37-3 1_9113_R1-UH301
F/B TO PLC

Q SP

N SP SP SP SP
TERMINAL NOS. 19, 21 &23 SHALL BE LOOPED
PUMP-1 ON F/B,
SUMP PUMP PANEL AT SUMP PUMP PANEL END.
PUMP-2 ON F/B,
SC-T37-3, SC-T15-3, SC-T53-3, SC- FOR SUMP PUMPS
LEVEL SW. HI F/B, RIOP C1SCP1
SP4-RIOP-LSCP-C02 1 10C 2.5 PVC A 1.1 100 100 T54-3, SC-T55-3, SC-T56-3, SC-T57- AT WASTE GAS CONTROL AND SIGNAL CABLES BETWEEN
LEVEL SW. HI-HI F/B, 1_9113_R1-UH301
3, WGF-T02-4, FIELD ROUTE BLOWER BUILDING LSCP TO FIELD INSTRUMENTS/EQUIPMENTS
LEVEL SW. HI- HI-HI
(1_LSCP_SP4) SHALL BE IN PACKAGE VENDOR SCOPE OF
F/B TO PLC
SUPPLY.
Q 27 28 31 32 19 20 22 24 SP SP SP SP

73 SUMP PUMP PANEL FOR


SUMP PUMPS AT WASTE
MATERIAL BINS AT
EL(-)0.7M N X1-60 X1-61 X1-62 X1-63 SP
(1_LSCP_SP5)

ON F/B, OVER LOAD


CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C1SCP1
SP5-CMCC33-RIOP-C01 1 5C 2.5 PVC A 1.1 70 70 F/B, GROUND FAULT
(14F4) T14-3, SC-T37-3 1_9113_R1-UH301
F/B TO PLC

Q SP

N SP SP SP SP
SC-T37-3, SC-T14-3, SC-T13-3, SC- TERMINAL NOS. 19, 21 &23 SHALL BE LOOPED
PUMP-1 ON F/B, SUMP PUMP PANEL
T12-2, SC-T02-2, SC-T01-2, CG- AT SUMP PUMP PANEL END.
PUMP-2 ON F/B, FOR SUMP PUMPS
SH26-2, CG-T26-2, PBB-T02-2, PBB-
LEVEL SW. HI F/B, RIOP C1SCP1 AT WASTE
SP5-RIOP-LSCP-C02 1 10C 2.5 PVC A 1.1 140 140 T01-2, PBB-SH5-1, 1.168V1-T01-1, CONTROL AND SIGNAL CABLES BETWEEN
LEVEL SW. HI-HI F/B, 1_9113_R1-UH301 MATERIAL BINS AT
WBB-T01-1, WBB-T02-1, WBB-SH2- LSCP TO FIELD INSTRUMENTS/EQUIPMENTS
LEVEL SW. HI- HI-HI EL(-)0.7M
1, WBB-SH3-1, WBB-T04-1, FIELD SHALL BE IN PACKAGE VENDOR SCOPE OF
F/B TO PLC (1_LSCP_SP5)
ROUTE SUPPLY.
Q 27 28 31 32 19 20 22 24 SP SP SP SP

N X1-60 X1-61 X1-62 X1-63 SP

WGF-VVVF-AUX SUPPLY- ON F/B, OVER LOAD


1225BTAF01-CMCC33- CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C3SCP2
74 2 1 5C 2.5 PVC A 1.1 60 60 F/B, GROUND FAULT
RIOP-C01 (9F3) T14-3, SC-T15-3, SC-T16-3 (1_9113_R3_302)
(1_225B-TAF01-AUX2) F/B TO PLC

Q SP

N X1-60 X1-61 X1-62 X1-63 SP

WGF-VVVF-AUX SUPPLY- ON F/B, OVER LOAD


1225BTAF01-CMCC33- CMCC33 SC-T55-3, SC-T54-3, SC-T53-3, SC- RIOP C3SCP2
75 1 1 5C 2.5 PVC A 1.1 60 60 F/B, GROUND FAULT
RIOP-C01 (9F4) T14-3, SC-T15-3, SC-T16-3 (1_9113_R3_302)
(1_225A-TAF01-AUX1) F/B TO PLC

Q SP

L&T CMCC03 : 25 OF 25 11/29/2020