Vous êtes sur la page 1sur 2

Case Study Van Beek Page 1 of 2

Explicit Modeling in Use at Van Beek Conveys


Quality and Flexibility

Van Beek, Drunen, Netherlands


Superior quality and very short lead times are essential in Van Beek’s
business. The company’s stainless steel screw conveyors, which link
production stages together, are an indispensable part of manufactur-
ing lines. When assembling production lines, companies generally
order custom conveyor systems last. That in turn creates immense
pressure on Van Beek to deliver high-quality products within tight
lead times. As such, the company uses a highly automated logistical
process to produce efficient quotations, optimal customer support,
and an aligned supplier network.
Dutch-based Van Beek further improved performance by introducing
3D CAD and PDM to its environment. To remain ahead of the
competition it was necessary to improve product designs, raise
quality, and cut lead times and costs. This involved driving product
development from conception to completion by working flexibly and
fast on evolving design specifications. Moreover, Van Beek needed
an approach to product design that helped them to excel in speed.
The ability to quickly show design concepts to their clients was
considered to be very important.
Van Beek has some 70 years of experience and employs 30 people of
which 8 engineers manage around 1200 customer projects each year.
Each project consists of several screw conveyors.

The Challenge:
• Derive 3D representations of design projects quickly
• Effectively work on evolving design specifications
• Reduce lead times with better efficiency and factory performance
• Increase quality for best competitive advantage

The Solution:
• CoCreate Modeling
• CoCreate Model Manager

The Results: “The explicit modeling approach has proven to


• 50% faster design and 90% cut in data size in explorative design be very fast for us. Even after many iterations of
projects.
design changes the models can be handled by
• Unforeseen changes are easily incorporated late in the design
process anybody in the team. All our unexpected changes
• Explicit modeling approach can quickly change existing geometry could easily be incorporated into the models”
to reflect the new specs of the new project. Marten Verhoeven
• Error-free customer designs and better products by moving to 3D Head of ICT
• Increased control of business process - availability of the right Van Beek BV
data at the right time
Case Study Van Beek Page 2 of 2

Van Beek focuses its production entirely on producing high-quality


products within short lead times. Its ERP system is a home-built
solution that supports rapid production of quotes, provides direct
insight into order status, facilitates purchasing, and controls produc-
tion. In fact, the ERP system unifies all the company’s business data,
no matter the actual source.

To cut lead time further and assure quality, Van Beek migrated its
customized 2D software to 3D explicit CAD and PDM. With 3D CAD,
the company hoped to increase response times with the customer,
handle unforeseen changes at each stage of product development,
and with increased speed and flexibility produce error-free designs.
As a result, the company reasoned, 3D CAD would streamline
engineering and limit production stops in the factory.

“We started our search with 3D looking at PDM at the same time,”
says Marten Verhoeven, Head of ICT at Van Beek BV. “PDM-evalua-
tion followed immediately so implementation could be done
simultaneously.”

Verhoeven looked closely at the practical usability of a parametric The final implementation is so well integrated, engineers do every-
based application as well as the explicit modeling approach to 3D thing from quotation to delivery using only the CoCreate Modeling
product development. interface. They add metadata and CoCreate Model Manager adds
production-specific data from CoCreate Modeling.
Verhoeven quickly found that the CoCreate explicit modeling ap-
proach to 3D product development was better suited to their needs, The company’s ERP system can fully access the data. Bills of material
as the company is primarily interested in deriving a design quickly are fully synchronized including support for long lead items. “Pur-
without creating or maintaining a recipe of parametric design fea- chase orders for our supply network are based on the bills of mate-
tures that produce that geometry. “Since we have to cope with con- rial,” says Verhoeven. “The system automatically provides the right
stantly changing input from our clients we needed a system that data from CoCreate Model Manager.”
supports our need to incorporate a huge amount of unforeseeable
changes,” says Verhoeven. Drawings are generated automatically, including all annotation, DXF,
and PDF files.
Verhoeven and his team spent quite some time to evaluate the com-
peting modeling approaches. “In a pilot–project, we started to proc- “CoCreate Modeling and CoCreate Model Manager streamline the
ess customer orders, which is the best way to evaluate an engineer- Van Beek business process and meet the demands for improved
ing application,” explains Verhoeven. “The explicit modeling ap- quality and reduced lead times while keeping personnel happy. “Our
proach has proven to be very fast for us. Even after many iterations engineers are very fast and highly flexible in evolving their 3D based
of design changes the models can be handled by anybody in the designs.”
team. All our unexpected changes could easily be incorporated into
the models”, summarizes Verhoeven. Needless to say, the engineers
at Van Beek did not have to spend any time to think about building
intelligent models – they simply explored their various design alter-
natives by freely interacting with the geometry directly.

Van Beek also found that CoCreate Modeling was an ideal choice
when an existing design was to be the starting point for a new crea-
tive design project. The explicit modeling approach allowed them to
quickly change the existing geometry to reflect the new specs of the
new project.

Van Beek decided to invest in CoCreate Modeling. “We implemented


CoCreate Model Manager along with CoCreate Modeling to be sure
of accurate data management.” says Verhoeven. “This is important
to Van Beek’s processes because the ERP-system relies on the avail-
ability of the right data at the right time.”

© 2008 Parametric Technology GmbH (a subsidiary of Parametric Technology Corporation), All Rights
Reserved. Information described herein is furnished for informational use only, is subject to change without
notice, and should not be construed as a guarantee, commitment, condition or offer by PTC. PTC, the PTC
logotype, The Product Development Company, CoCreate and all PTC product names and logos are
trademarks or registered trademarks of PTC and/or its subsidiaries in the United States and in other
countries. All other product or company names are property of their respective owners.

CoCreate-Van Beek-CS-0208-EN