THE U.S. DEPARTMENT OF STATE (DOS), Bureau of Overseas Buildings Operations (OBO)
is requesting submissions to pre-qualify firms for construction services for Warehouse Building
for U.S. Embassy facilities in Surabaya, Indonesia. This is a construction service for a new
Warehouse/Support Annex that includes maintenance shops, high bay storage, vehicle
maintenance, motor pool, and additional storage and support spaces.
2. Project Solicitation
The project solicitation will consist of two phases.
The contract will be a “firm fixed-price.” Construction services will include providing
construction labor and materials to execute the OBO-provided design; on-site organization with
management to ensure overall project coordination; and overall control throughout the life of the
project. Required services include preparation of construction documents, quality control plans,
safety plans, project schedules, cost estimates, and project close-out activities.
Due to time constraints, DOS anticipates that the pre-qualified Offerors will be required to
participate in a visit to the project site within 10 to 15 days after the issuance of the RFP. To
offset some of the cost of the site visit and other related costs, pre-qualified Offerors that do not
receive the construction contract award will be paid $15,000.00 for responsive project proposals
they submit in Phase II.
3. Prior Pre-Qualification of Certain Offerors NOT APPLICABLE
A. Not Applicable
5. DETAILED INSTRUCTIONS
A. Submission Requirements. The Offeror shall submit sufficient documentation to allow DOS to
evaluate its capabilities with respect to the factors listed in C below. Submissions that are
missing the required information may be eliminated from consideration at the government’s
discretion. Only the information in the submission and any additional information obtained from
any other sources concerning past performance shall be considered during the government’s
evaluation of the submission. Submittals shall be in the English language.
B. Submission Format: Submissions shall be provided in original, three copies, and one electronic
copy on compact disk (CD). The electronic copy shall include the entire submittal and be indexed
identical to the hard copies. Submittals shall be organized by factor according to the list in C
below. Maximum page limits for each factor are identified below. Two single-sided pages will
count as one double-sided page; 11”x17” fold-outs count as two pages on each side; no more than
25% of the total number of pages may be foldouts. The maximum paper size permitted is 11.5” x
17”. Submit offers in size twelve (12) font, except the SF Form 330 (available through:
http://www.gsa.gov/Portal/gsa/ep/formslibrary.do?formType=SF ) which may be prepared in size
ten (10) font. Project lists and other information required in the SF330 may be cross referenced in
other areas of the submission and need not be duplicated.
DOS will evaluate whether the proposed management plan clearly demonstrates a
comprehensive and effective approach to managing The Project, including coordination
of decision-making; project personnel; professional, trade, and other resources capacity;
project controls; schedules; and cost.
DOS will evaluate whether the financial capacity is sufficient to execute The Project.
DOS will evaluate whether the project examples demonstrate successful execution of
projects similar in scope, complexity, and dollar value to The Project.
DOS will evaluate whether the past and present performance demonstrates conformance
to specifications and compliance with contract terms and conditions. This may include,
but not be limited to, subcontracting plan goals for small disadvantaged businesses,
adherence to contract schedules, effectiveness in forecasting, managing, and controlling
contract costs; conformance to construction safety plans; adherence to security
requirement; responsiveness and business-like concern for the customer; and effective
management of subcontractors and key personnel, including the timely award of
subcontracts and selection, retention, and replacement (when necessary) of key
personnel.
ALL SUBMISSIONS MUST BE RECEIVED BY 3:00 P.M. Eastern Time July 21, 2010.
(DO NOT USE THE U.S. POSTAL SERVICE (PO Box) ADDRESS)
Include the project solicitation number(s) on the face of the package.
REQUESTS FOR CLARIFICATIONS must be submitted in writing to Zaldy Sabino and Jillian
Savage by email SabinoZN@state.gov and SavageJM@state.gov.