Vous êtes sur la page 1sur 5

lm..

________C_O_N_TE_N_T_S_ _
Volume 3, No. 2
Brief Cases
March/April1987

4
MB tary
usmess
R c \ ' iC\\'
Advocating Competition in the Marketplace

Published by
The Armed Services Board of Appeals has voided a contract awarded to
Military Business Publishers, Inc.
a company through the small business set-aside program because it
subcontracted work to others.

Q&A 5 Robert E. Orkand


Publisher
Small-business specialist Joseph T. Foglia explains how small-business J. Patrick Finneran
set-asides affect the Buy-American Act and how to find bidding oppor- Editor
tunities in the Commerce Business Daily. Sherry F. Orkand
Business Manager
Regulating defense contractors' conduct 6 Beth A. Hancock
Marketing Manager
As the government steps up its pursuit of improper defense contractor David Rubright
conduct, contractors will have to find better methods to self-govern their, Production Manager
and their employees ' behavior. Barbara Briggs
Nell Moody
Cover story: Acquisition czar gets his charter 8 Production Assistants

Military Business Review is published


Richard Godwin, the point-man in DOD 's effort to improve the acquisition bi-monthly by Military Business
system , has been given his official charter outlining his scope of power. Publishers, Inc , 2429 Bowland
Plus, a few MBR readers offer their suggestions for overhauling the Parkway, Suite 115, Virginia Beach,
system. Virginia, 23454 . Telephone (804)
498-4879 . Postage paid at Virginia
Making 600-Ship Navy Affordable 11 Beach , Virginia and additional mailing
offices. No part of this publication
may be reprinted or otherwise
Assistant Secretary of Defense for Shipbuilding and Logistics Everett reproduced without written permission
Pyatt on the Navy's efforts to streamline the acquisition process. from the publisher. Views and
opinions expressed herein do not
Value analysis: What's in it for me? 12 necessarily reflect those of Military
Business Pu blishers, Inc.
Contractors can reap large rewards for developing cost-saving techni-
Advertising - Inquiries should be
ques for defense programs - if they know how the system works.
directed to: Military Business Review,
Post Office Box 89 18, Virginia Beach,
The Conference Table 14 Virg inia, 23450 .

Educational opportunities in government contracting , trade shows and Subscriptions - $30.00 per year.
conferences relating to defense acquisition .
Editorial - Military Business Review is
seeking well-written, informative
Contractor purchasing system reviews 16
articles on matters relating to defense
procurement and the people who
A CPS reviewer explains what the government looks for when conduc- administer policy. If you have feature
ting CPSRs and how contractors should prepare for these audits. or short length pieces, or an idea for
such articles, contact the editor .
The Competitive Edge 20
POSTMASTER send all address
changes to Military Business
A look at new products and services that can help keep your business or
Publishers, Inc., Post Office Box
government agency where it should be. 8918 , Virginia Beach , Virginia, 23450 .
On The Cover: Undersecretary of Defense for Acq uisition Richard P. Godwin.
(Photo courtesy Department of Defense)

2 March/Apri/1987
Government reviews of contractor
purchasing systems
By K. H. Ryesky

The legal and contractual interests of the federal government do manages the process until the final report is released.
not stop with the prime contractor. Government money spent in per- Approximately fou r to six weeks before the in-plant visit, letters are
formance of a prime contract must be spent by the prime contractor generated to various functional government entities requesting input
in a manner consistent with federal laws and policies. Many contrac- relative to the contractor 's purchasing function. Input is requested
tu al interests of the government " flow down " to subcontractors at all from such d iverse areas as transportation, production , packag ing ,
tiers. quality, engineering , Small Business, Department of Labor, financial,
To ensure that government interests are adequately protected etc. A request to the contractor for a data package is also forwarded
and asserted, th e government will often perform Contractor Pur- through the ACO at thi s time , covering areas such as general com-
chasing System Reviews (CPSRs) on major contractors and subcon- pany history, organizational charts, purchasing statistics and copies
tractors. The Federal Acquisition Regulation (FAR) Subpart 44.3 pro- of purchasing policies and procedures.
vides that contractors expected to receive , in a given year, over $10 The team captain will commence the in-plant visit with a brief en-
million in contracts award ed under other than sealed bidd ing pro- trance conference. At this conference, the objectives of the review
ced ures are subject to CPSRs. are explained , and protocol is arranged for coord ination between
In order to understand the objectives of a CPSR , it is necessary to the review team and the contractor during the visit Other relevant
know, at least generally, the requ irements of notification and con- topics and/or special problems affecting the purchasing function
sent Certain government contracts require that the contractor must may also be discussed at the entrance conference.
give the Administrative Contracting Officer (ACO) advance notifica- The review team spends most of the in-plant visit time sampling
tion, written justification, and/or must receive prior written consent and analyzing subcontracts and purchase orders. The sample
from the ACO in ord er to enter into a subcontract under the govern- period is generally a twelve month period one to four months prior to
ment contract Many of these requirements are waived , however, if the in-plant visit The sampling is divided into four dollar categories:
the contractor's pu rchasing system has been approved by the ACO. a) under $10 ,000; b) $10,000 - $25 ,000; c) $25,000- $1 00 ,000; and
The CPSR is the process by which the ACO derives the information d) over $100 ,000. Questions pertaining to any particular subcontract
necessary to grant or withhold such approval. CPSRs are performed or purchase order will be given in writing to the contractor liaison
by the agency having cognizance over administering the designated at the entrance conference, along with the applicable
contractor 's contracts. folder , for a written response. In addition to the folder sample review,
There are various types of CPSRs. The initial review, as the name discussions will be held with the purchasing department personnel
implies, is cond ucted of contractors with no prior CPSR. It is a broad- regarding policies, procedures and other relevant matters.
based study of diverse aspects of a contractor 's entire purchasing Based upon its observations, as well as input from other govern-
system, and includes within its scope the contractor's written pro- ment functions , the review team will set forth its findings and recom-
cedures, resumes of purchasing personnel , po:icies regarding com- mendations to the contractor at the exit conference, to be held on
petition, purchasing and sales statistics, organizational charts, etc . the last day of the in-plant vi_s it At or immediately following the exit
More often than not, the findings and recommendations from an conference, the ACO will present the review team 's formal findings
initial review do not support approval by the ACO. If a contractor to the contractor, and will request a written response within a two
''fails'' an initial review, but the deficiencies found by the review team week period . The response would include a plan for implementing
are deemed to be correctable, a follow-up review may be sched uled any necessary corrective actions to negative find ings.
to assess the effectiveness of corrective actions taken by the con- After evaluating the contractor 's actual written response, the team
tractor. The follow-up review is generally scheduled approximately captain will draft a formal written report to the ACO, along with
three months after the contractor completes the corrective recommendation to grant or withhold approval of the contractor's
measures. purchasing system. In the case of initial reviews, or where the review
Once approval is g ranted , a subsequent review is held every two team recommends a change in the contractor's approval status, the
years. The subsequent review covers most of the scope of the initial recommendations must be approved by a review board prior to
review, but in practice is simplified by building upon the data and fin - submittal to the ACO.
dings of prior reviews. In the "off years" when no subsequent review After receipt of the final report (a copy of which is forwarded to the
is scheduled, a surveillance review is performed , covering selected contractor) , the ACO will make a final decision and will send a letter
areas dealing mostly with statistics and written procedu res. to the contractor informi ng the contractor of the decision.
In certain other situations where the ACO deems it necessary to The major contractors are thus placed in the ongoing review cy-
have a CPSR, a special review may be arranged to cover any and all cle, to be given subsequent reviews every other year, and
appropriate areas as warranted by the situation. surveillance reviews in the " off years."
Though the in-plant visit portion of the review generally takes two The individuals who perform the reviews are analysts, not
weeks (one week for surveillance reviews), there is much work both auditors, and dislike being referred to by the latter term . They are not
before and after the actual visit The in-plant visit is scheduled ap- out to "gig " the contractor , but rather, would like nothing better than
proximately three to six months in advance. A procurement analyst to find that a contractor effectively asserts governmental interests
is designated as team captain , and has responsibility for the final
report to the ACO . The team captain, who may be assigned one or
more deputies, coordinates with the ACO to arrange the review, and -Continued on Page 18

16 March/Apn/1987
CPSR POUCH-TYPE LAMINATORS
Plastic/Strap Cl ips/Slot Punches
Survival MODEL-5000 LAMINATOR
Tips (Used for I.D. 's)

MODEL-6000 LAMINATOR
A contractor scheduled for a first time
CPSR need not approach the event with (Run all the smaller sizes of I.D. 's Pouches
fear and dread, but rather, should view PLUS the larg er 9" X 11 112' ' & 9 " X 14112' '
the occasion as an opportunity to bring Legal Size Pouches. The 9" X 11V2 " pouch protects both sides
out the best in its purchasing of item to be laminated and leaves a 1/4" clear border around a
organization. The following do's and standard letterhead 8112" X 11 " ).
don ' t ' s may prove helpful
• DO communicate in advance with the PLASTIC I.D. POUCHES & ROLLS (Pouches Clear/Colors).
ACO, and also with the office that will be
performing the review. SLOT PUNCHES (Makes oblong hole in I.D. Pouches).
• DO submit pre-review data in an
organized and timely manner. The use STRAP-CLIPS (.14- each Delivered) (500 Minimum)
of a tabbed loose-leaf binder will not only (Made in Taiwan) .
be helpful to the reviewing personnel ,
but will also provide the contractor a ALUMINUM "Write-On" Tags (Excellent for Outdoor Storage) .
working volume that can be updated by
the contractor for use in the reviews that (Small BusinessNVoman Owned)
will follow.
• DO arrange for top management to
attend the entrance and exit conference.
1
L:
·QM"'r-\ INDUSTRIES INCORPORATED
P.O. Box 21188 Lansing , Mich . 48909
Top management's presence at these (517) 323-7880
conferences is a positive statement to Circle 105 on Reader Response Card.
the review team that the purchasing
department receives the backing it
needs.
• DO inform the review team of
particular situations/problems affecting
the company and its purchasing
SPECIFY SANTANA QUALITY
function. POLY-MAR HO® SOlid Plastic Products for Public Restrooms and Shower Facilities
• DON'T make endless excuses for the
purchasing department's shortcomings,
and DON'T deny that such
• Cost
Santana Products are the most cost effective choice when considered over
shortcomings exist. The members of the the life of the building in that its life cycle cost is less than metal finished
team are well aware that no purchasing products.
system is, was, or ever will be 100
percent perfect. DO, however, strive for • Maintenance
perfection in your purchasing system.
Low maintenance is the most attractive feature
of Poly Mar HD®. It resists ink, pencil.
• DON'Ttry to deceive the reviewers, or
cosmetics and a variety of other
misstate facts to them. They are usually implements.
on speaking terms with the ACO,
government auditors, security specialists • Durability
and other government specialists. Most 10-year life cycle
have served the government in other
economy. Partitions are
one inch thick, one
capacities in other offices, and have their
p iece construction.
" grapevines" extended accordingly .
Small Business - Woman O#ned
• Most team captains will brief the
GSA: GS-OOF-07480
purchasing manager or similar individual Gov. & Mil. Specs.
prior to the exit conference, so that no FED: RR-P-13528
" surprises" materialize at the exit CEGS - 10160
conference table. If, for some reason , NFGS - 10162
the team captain does not schedule
such a pre-conference briefing. DO
request one. ~
Santana
-PRODUCTS COMPANY-
P.O. Box 2021. Scranton, PA 18501
717-343-7921
112 on Reader Response Card .
Military Business Review 17
CPSRs are not performed in a vacuum . The reviews, and the in-
Government reviews of contractor dividuals who conduct them , operate in the dynamic and complex
world of federal procurement, and are influenced by the many
- Continued from Page 16 1ssues and developments occurring therein . When payment dis-
count terms became a topic of Pentagon and congressional con-
cern, for example, reviews began to take note of contractor policies
upon its su bcontractors, and responsibly expends taxpayers '
regarding such discounts. Congress' recent emphasis on competi-
money. As the ACO's "eyes and ears, " however, the reviewers are
tion , as embodied in the Competition in Contracting Act and other
duty-bou nd to note any aspects of a contractor 's system that might
legislation, has made 1ts mark on CPSRs, and review teams now take
comp romise the interests of the government.
speCial Interest in a contractor's policies and statistics regarding sub-
A contractor must tailor its purchasing department policies to fit its
contracting competition. Of late, public and cong ressional attention
particular situation. Certain policies and procedures, however , must
has focused upon perceptions of contractor kickbacks within the
be in force in order fo r the ACO to grant approval of a contractor 's
defense industry. Review teams are now closely evaluating the
purchasing system . These policies and procedures include:
polic1es, procedures, safeguards and contractor attitudes regard ing
• The p urchasing d epartment shall make the final decision as to
subcontractor kickbacks and related improprieties.
sources of supplies and services, and shall be solely responsible for
Due to the constant changes occurring within the government
making commitments with vendors. This is frequently a problem for
contracts arena, the specific review agenda for any one contractor is
contractors whose hierarchies are dominated by engineers and
likely to undergo changes from one year to the next. On this score,
technicians. Engineers can and should give input as to suggested
the government has encountered both criticism and praise. Contrac-
sources and estimated prices, but the final procurement decisions
tors under review rightfu lly desire to know what is expected by the
must be made by the purchasing department.
review team , and annual changes in the CPSR agenda can create
• The contractor will take advantage of all available vendor dis-
some uncertainties. Additionally, many in the business community
counts to the maximum extent practicable.
v1ew the CPSR scope as being overly intrusive.
• Profits shall not be " pyramided " on intracompany work.
But a review process that is unresponsive to current
• Cost-plus-a-percentage-of-cost type contracts shall not be used .
developments in procurement cannot long serve the government's
• Purchasing personnel shall not engage in conduct creating ac-
best interests. As prime contractors increasingly su bcontract their
tual or apparent conflicts of interest.
work and exercise more and more say-so over the expenditures of
• All required subcontractor representations and certifications, in-
government monies, contractor accountability must be ensured and
cluding Nonsegregated Facilities, Clean Air and Water, Cost Ac-
monitored. This is particularly so in view of public and congressional
counting Standards, et cetera, shall be obtained from vendors prior
skepticism towards the federal procurement process.
to the release of the subcontract or purchase order .
Review team members do receive their share of praise , however.
• Truth in Negotiations Act, - For p rocurement actions exceeding
Many private sector managers have likened their CPSR reports to a
$100,000, this major provision statutorily applies to prime contrac-
private procurement consultant's report- without the charge of a
tors and to subcontractors.
hefty consultant 's fee. The CPSR team members, being government
• ACO Advance Notification and Consent- Certain contracts re-
employees with an inside view of many private sector contractors,
quire varying degrees of advance notification to the ACO prior to
have a unique perspective on procurement issues which can often
entering into subcontracts. These requirements are statutory and not
benefit the contractors.
negotiable as price or delivery are. Failure to have adequate pro-
The CPSR process is expanding , and the number of contractors
cedures regarding these requirements may cause a contractor to
under review is clearly on the increase. For example, eight of the 31
not only be in breach of the contract, but also in contravention of the
law. reviews scheduled for the first half of fiscal 1987 by the Defense
• Subcontract Administration and Flowdown Provisions- The Contract Administration Services Reg ion (DCASR) Ph iladelphia were
initial reviews.
government has an interest in all transactions arising under its con-
tracts. A prime contractor must have definitive written procedures for The dynamic and often turbulent atmosphere of defense contract-
administering its subcontracts, so as to preserve and assert the ing will undoubtedly throw both plaudits and punches at the SPCAR
governmental interests. Similarly, certain contractual provisions ap- mechanism and its personnel. Changes in CPSR format , and
p licable to the prime contractor are, by statute or regulation , equally demands for expanded topics of review coverage, are perennially
applicable to the subcontractors. dispatched from various governmental quarters. Such conditions
• Cost Accounting Standards- Where the government reim- have caused the CPSR to evolve into a complex, broadly based
burses a contractor for its contract-related costs, the contractor's process, and such evolution will most likely continue in the future .
methods of determining and allocating such costs must comply with But government reviews of contractor purchasing systems will
the applicable reg ulations. remain a fact of life, and a clear understanding of the essential
• Cost or Price Analysis; and elements of the review process by both government and contractor
• Sing le/Sole Sou rce Procurement-Govern ment buyers are personnel will serve the best interests on both sides of the negotiating
statutorily required to, in some way, justify each expenditure of table. ~
public funds they make. A subcontract let in support of a govern- About the Author-
ment p rime contract is the functional equivalent of a pu rchase by the Ryesky is a purchasing systems analyst with the Defense Contract
government, and must similarly be justified by the contractor. As in Administration SeNices Region in Philadelphia. He has seNed as
direct g overnment purchases, the justification p rocess must address procurement analyst on the competition advocate 's staff at the
both th e price paid and th e selection of the source. Defense Personnel Support Center and as branch chief and
The preced ing list is by no means all-inclusive. More detailed par- contracting officer at the Defense Industrial Supply Center. Ryesky
ticulars may be obtained from the ACO and/or the office performing holds the Certified Purchasing Manager designation from the National
the review. Association of Purchasing Management and the Certified Professional
Contracts Manager designation from the National Contracts
FAR 15.804, pursuant to 10 U.S.C. 2306 (0 Management Association.

18 March/April1 987

Vous aimerez peut-être aussi