TABELA I - PLANILHA COM ALTERAÇÃO DE QUANTITATIVOS - 1ª RPFO - MOTIVO: ERROS & OMISSÕES

QUANTIDADE CUSTO TOTAL (R$)


CÓD.
Item DISCRIMINAÇÃO DOS SERVIÇOS UND. PREÇOS UNITARIOS DIFERENÇA COM CRITÉRIO
(ADMINISTRAÇÃO) LICITAÇÃO 1ª RPFO DIFERENÇA LICITAÇÃO 1ª RPFO DIFERENÇA DEFLATOR
DE PAGTO

1.0 TERRAPLENAGEM
1.3 Esc. carga transp. mat 1ª cat. DMT 50 m m3 1.44 24,776.00 29,830.98 5,054.98 35,677.44 42,956.61 7,279.17 6,357.74 83059
1.4 Esc. carga transp. mat 1ª cat DMT 50 a 200m c/e m3 4.99 59,413.00 67,696.10 8,283.10 296,470.87 337,803.54 41,332.67 36,100.57 83059
1.5 Esc. carga transp. mat 1ª cat DMT 200 a 400m c/e m 3 5.42 69,770.00 84,052.24 14,282.24 378,153.40 455,563.14 77,409.74 67,610.83 83059
1.6 Esc. carga transp. mat 1ª cat DMT 400 a 600m c/e m3 5.86 79,565.00 93,316.72 13,751.72 466,250.90 546,835.98 80,585.08 70,384.22 83059
1.7 Esc. carga transp. mat 1ª cat DMT 600 a 800m c/e m3 6.26 90,902.00 115,508.24 24,606.24 569,046.52 723,081.58 154,035.06 134,536.53 83059
1.8 Esc. carga transp. mat 1ª cat DMT 800 a 1000m c/e m3 6.63 12,310.00 17,988.28 5,678.28 81,615.30 119,262.30 37,647.00 32,881.45 83059
1.9 Esc. carga transp. mat 1ª cat DMT 1000 a 1200m c/e m3 7.01 41,710.00 47,525.29 5,815.29 292,387.10 333,152.28 40,765.18 35,604.92 83059
1.10 Esc. carga transp. mat 1ª cat DMT 1200 a 1400m c/e m3 7.36 10,375.00 13,919.50 3,544.50 76,360.00 102,447.52 26,087.52 22,785.23 83059
1.11 Esc. carga transp. mat 1ª cat DMT 1400 a 1600m c/e m3 7.64 44,932.00 63,324.50 18,392.50 343,280.48 483,799.18 140,518.70 122,731.14 83059
1.12 Esc. carga transp. mat 1ª cat DMT 1600 a 1800m c/e m3 7.78 45,257.00 68,207.82 22,950.82 352,099.46 530,656.84 178,557.38 155,954.69 83059
1.13 Esc. carga transp. mat 1ª cat DMT 1800 a 2000m c/e m3 8.36 16,159.00 18,411.91 2,252.91 135,089.24 153,923.57 18,834.33 16,450.18 83059
1.14 Esc. carga transp. mat 1ª cat DMT 2000 a 3000m c/e m3 9.39 171,632.00 231,889.38 60,257.38 1,611,624.48 2,177,441.28 565,816.80 494,192.88 83059
1.15 Esc. carga transp. mat 1ª cat DMT 3000 a 5000m c/e m3 12.50 594,772.00 649,655.29 54,883.29 7,434,650.00 8,120,691.13 686,041.13 599,198.61 83059
1.16 Transp. local c/ basc. 10m3 rodov. não pav (const) t/km 0.74 1,263,643.20 1,458,398.82 194,755.62 935,095.97 1,079,215.13 144,119.16 125,875.84 83059
1.17 Transp. local c/ basc. 10m3 rodov. não pav (const) t/km 0.74 649,824.00 740,423.74 90,599.74 480,869.76 547,913.57 67,043.81 58,557.07 83059
1.23 Esc. carga transp. mat 3ª cat DMT até 50m m3 25.79 64.00 640.25 576.25 1,650.56 16,512.05 14,861.49 12,980.25 83059
1.24 Esc. carga transp. mat 3ª cat DMT 400 a 600m m3 32.20 5,600.00 5,124.75 -475.25 180,320.00 165,016.95 -15,303.05 -13,365.91 83059
1.25 Compactação de aterros a 95% do proctor normal m3 2.38 457,519.00 596,325.66 138,806.66 1,088,895.22 1,419,255.07 330,359.85 288,541.25 83060
1.27 Contrução de corpo de aterro em rocha m3 6.75 5,664.00 5,765.00 101.00 38,232.00 38,913.75 681.75 595.45 83060
1.28 Compactação de material de "bota-fora" m3 1.88 174,590.00 160,877.00 -13,713.00 328,229.20 302,448.76 -25,780.44 -22,517.02 93008
1.31 Esc. carga transp. solos moles DMT 800 a 1000m m3 18.53 22,584.00 79,147.15 56,563.15 418,481.52 1,466,596.69 1,048,115.17 915,439.51 93010
1.33 Transp. local c/ basc. 10m3 rodov. não pav (const), (1,86km) t/km 0.74 - 168,331.93 168,331.93 - 124,565.63 124,565.63 108,797.49 83059
PN Esc. carga transp. Areia - camada drenante (60,39km) m3 89.90 - 65,047.62 65,047.62 - 5,847,781.26 5,847,781.26 5,107,539.87 93009
TOTAL DA FAMÍLIA TERRAPLENAGEM 9,591,354.38 8,377,232.78

2.0 DRENAGEM E OAC


2.2 Enrocamento de pedra arrumada m3 131.23 7,742.50 1,415.20 -6,327.30 1,016,048.28 185,716.70 -830,331.58 -725,224.06 93011
2.3 DRENAGEM SUPERFICIAL
2.3.1 Valeta prot.cortes c/revest.concreto - VPC 03 m 103.92 240.00 635.00 395.00 24,940.80 65,989.20 41,048.40 35,852.29 84040
2.3.5 Sarjeta Triangular de Concreto - STC 03 m 36.90 43,374.30 3,518.32 -39,855.98 1,600,511.67 129,826.01 -1,470,685.66 -1,284,518.92 84040
2.3.7 Meio fio de concreto - MFC 01 m 65.39 13,590.00 - -13,590.00 888,650.10 - -888,650.10 -776,160.33 84040
PN Meio fio de concreto - MFC 03 m 31.50 13,590.00 13,590.00 428,085.00 428,085.00 373,895.86 84040
2.4 DRENAGEM SUBTERRÂNEA
2.4.1 Dreno longitudinal prof. p/corte em rocha - DPR 02 m 59.95 555.00 340.00 -215.00 33,272.25 20,383.00 -12,889.25 -11,257.66 151152
2.4.2 Boca saída p/dreno longitudinal prof. BSD 02 unid 223.45 4.00 2.00 -2.00 893.80 446.90 -446.90 -390.33 151152
2.4.3 Lastro de brita - Colchão Drenante m3 84.44 1,230.00 870.40 -359.60 103,861.20 73,496.58 -30,364.62 -26,520.92 151152
2.5 OAC
2.5.1 Corpo BSTC Ø 0,80 m 524.44 43.00 169.00 126.00 22,550.92 88,630.36 66,079.44 57,714.77 132573
2.5.4 Corpo BDTC Ø 1,00 m 1,492.37 18.00 37.00 19.00 26,862.72 55,217.82 28,355.09 24,765.76 132573
2.5.7 Boca BSTC Ø 0,80m - normal unid 1,370.64 4.00 18.00 14.00 5,482.57 24,671.56 19,188.99 16,759.96 132573
2.5.10 Boca BDTC Ø 1,00m - normal unid 2,948.49 2.00 4.00 2.00 5,896.98 11,793.96 5,896.98 5,150.51 132573
2.5.15 Corpo BSCC 2,00 x 2,00m alt. 0 a 1,00m m 2,304.58 20.00 - -20.00 46,091.52 - -46,091.52 -40,257.02 132573
2.5.18 Corpo BDCC 2,00 x 2,00m alt. 0 a 1,00m m 4,038.56 88.00 90.00 2.00 355,393.54 363,470.67 8,077.13 7,054.68 132573
2.5.23 Corpo BTCC 1,50 x 1,50m alt. 0 a 1,00m m 3,829.98 55.00 - -55.00 210,648.89 - -210,648.89 -183,983.90 132573
2.5.27 Corpo BTCC 3,00 x 3,00m alt. 0 a 1,00m m 9,785.80 73.00 51.00 -22.00 714,363.08 499,075.58 -215,287.50 -188,035.33 132573
2.5.29 Corpo BTCC 3,00 x 3,00m alt. 2,50 a 5,00m m 10,830.30 34.00 30.00 -4.00 368,230.20 324,909.00 -43,321.20 -37,837.39 132573
2.5.31 Boca BSCC 2,00 x 2,00m -esc. = 30 unid 15,881.51 2.00 - -2.00 31,763.01 - -31,763.01 -27,742.29 132573
2.5.41 Boca BTCC 3,00 x 3,00m - normal unid 40,643.49 10.00 8.00 -2.00 406,434.89 325,147.91 -81,286.98 -70,997.27 132573
TOTAL DA FAMÍLIA DRENAGEM E OAC -3,265,036.18 -2,851,731.58

4.0 PAVIMENTAÇÃO
4.4 Sub-base solo estabilizado granul. s/ mistura m³ 44.71 137,765.40 129,487.50 -8,277.90 6,159,485.07 5,789,380.52 -370,104.55 -323,254.87 8440
4.5 Sub base de macadame m³ 82.92 16,555.80 16,555.80 - 1,372,806.94 1,372,806.94 1,199,030.17 8440
4.6 Base de brita graduada m³ 112.68 132,983.27 -132,983.27 14,984,432.79 - -14,984,432.79 -13,087,628.37 93012
PN Base de brita graduada 1ªRPFO 106.43 132,983.27 132,983.27 - 14,153,409.43 14,153,409.43 12,361,800.09 93012
4.9 CBUQ FX C t 96.12 47,627.41 -47,627.41 4,578,132.84 - -4,578,132.84 -3,998,609.89 93014
PN CBUQ FX C 1ª RPFO 94.41 47,627.41 47,627.41 - 4,496,503.78 4,496,503.78 3,927,313.85 93014
4.10 CBUQ FX B t 79.17 119,734.07 -119,734.07 9,479,237.88 - -9,479,237.88 -8,279,308.56 93013
PN CBUQ FX B 1ª RPFO 79.22 119,734.07 119,734.07 - 9,485,333.03 9,485,333.03 8,284,632.14 93013
TOTAL DA FAMÍLIA PAVIMENTAÇÃO 96,145.10 83,974.58

TOTAL RPFO (ERROS & OMISSÕES) 6,422,463.30 5,609,475.78

DEFLATOR (DESCONTO = 12,6585%) 87.3415%

Valor Contratado (PI) R$ 100,660,000.00


TABELA II - PLANILHA COM ALTERAÇÃO DE QUANTIDADES - 1ª RPFO - MOTIVO: A PEDIDO DA ADMINISTRAÇÃO
QUANTIDADE CUSTO TOTAL (R$) (Preço Administração)
PREÇOS UNITARIOS DIFERENÇA COM CÓD.
Item DISCRIMINAÇÃO DOS SERVIÇOS UND. CRITÉRIO
(ADMINISTRAÇÃO) LICITAÇÃO 1ª RPFO DIFERENÇA LICITAÇÃO 1ª RPFO DIFERENÇA DEFLATOR
DE PAGTO

1.0 TERRAPLENAGEM
1.15 Esc. carga transp. mat 1ª cat DMT 3000 a 5000m c/e m3 12.50 594,772.00 692,501.99 97,729.99 7,434,650.00 8,656,274.88 1,221,624.88 1,066,985.49 83059
1.25 Compactação de aterros a 95% do proctor normal m3 2.38 457,519.00 595,244.76 137,725.76 1,088,895.22 1,416,682.53 327,787.31 286,294.35 83060
TOTAL DA FAMÍLIA TERRAPLENAGEM 1,549,412.18 1,353,279.84

6.0 OBRAS COMPLEMENTARES


6.4 Cercas de arame farpado com suportes de madeira m 17.54 137,390.45 50,990.45 -86,400.00 2,410,417.48 894,591.09 -1,515,826.39 -1,323,945.51 70020
PN Cercas de arame farpado com suportes de madeira - 8 fios m 21.02 86,240.00 86,240.00 - 1,812,764.80 1,812,764.80 1,583,295.97 70020
TOTAL DA FAMÍLIA OBRAS COMPLEMENTARES 296,938.41 259,350.46

TOTAL RPFO (À PEDIDO DA ADMINISTRAÇÃO) 1,846,350.59 1,612,630.30

DEFLATOR (DESCONTO = 12,6585%) 87.3415%

Valor Contratado (PI) R$ 100,660,000.00


TABELA III - CRITÉRIO DE PAGAMENTO - 1ª RPFO
CONTRATO 1ª RPFO VARIAÇÃO
Código Item Unid CLASSE
Qtde Preço Unit. Preço Total Qtde Preço Unit. Preço Total Qtde Preço Total
1 TERRAPLANAGEM
83059 ESCAVAÇÃO, CARGA E TRANSPORTE DE MATERIAL KM 68.520 216,881.4941 14,860,719.97 68.520 216,881.4941 14,860,719.97 0.000 0.00
83060 COMPACTAÇÃO DE ATERRO KM 63.420 38,343.7138 2,431,758.32 63.420 38,343.7138 2,431,758.32 0.000 0.00
83072 EMPRÉSTIMOS PARA TERRAPLENAGEM UND 24.000 7,911.7399 189,881.75 24.000 7,911.7399 189,881.75 0.000 0.00
93007 CORPO ESTRADAL KM 68.520 7,925.1266 543,029.67 68.520 7,925.1266 543,029.67 0.000 0.00
93008 ESPALHAMENTO E COMPACTAÇÃO DE BOTA-FORA UND 12.000 29,706.3659 356,476.39 12.000 29,706.3659 356,476.39 0.000 0.00
93009 CAMADA DRENANTE EM AREIA UND 1.000 2,874,262.5800 2,874,262.58 1.000 2,874,262.5800 2,874,262.58 0.000 0.00
93010 ESCAVAÇÃO CARGA E TRANSPORTE DE SOLO-MOLE UND 1.000 592,058.1100 592,058.11 1.000 592,058.1100 592,058.11 0.000 0.00
21,848,186.79 21,848,186.79 0.00

1.1 TERRAPLANAGEM - 1ª RPFO


PN ESCAVAÇÃO, CARGA E TRANSPORTE DE MATERIAL EST 62500 A 62725 KM 4.500 237,107.8867 1,066,985.49 4.500 1,066,985.49 APA
PN ESCAVAÇÃO, CARGA E TRANSPORTE DE MATERIAL KM 68.520 30,467.5091 2,087,633.72 68.520 2,087,633.72 EO
PN COMPACTAÇÃO DE ATERRO KM 63.420 4,559.0776 289,136.70 63.420 289,136.70 EO
PN COMPACTAÇÃO DE ATERRO EST 62500 A 62725 KM 4.500 63,620.9672 286,294.35 4.500 286,294.35 APA
PN ESPALHAMENTO E COMPACTAÇÃO DE BOTA-FORA UND 12.000 -1,876.42 -22,517.02 12.000 -22,517.02 EO
PN CAMADA DRENANTE EM AREIA UND 1.000 5,107,539.8716 5,107,539.87 1.000 5,107,539.87 EO
PN ESCAVAÇÃO CARGA E TRANSPORTE DE SOLO-MOLE UND 1.000 915,439.5108 915,439.51 1.000 915,439.51 EO
0.00 9,730,512.63 9,730,512.63

2 DRENAGEM E OAC
84040 DRENAGEM SUPERFICIAL KM 68.520 51,935.1495 3,558,596.44 68.520 51,935.1495 3,558,596.44 0.000 0.00
93011 ENROCAMENTO DE PEDRA ARRUMADA KM 3.260 311,827.7148 1,016,558.35 3.260 311,827.7148 1,016,558.35 0.000 0.00
132573 OBRAS DE ARTE CORRENTES KM 68.520 111,690.5027 7,653,033.24 68.520 111,690.5027 7,653,033.24 0.000 0.00
151152 DRENAGEM PROFUNDA KM 0.280 493,204.5715 138,097.28 0.280 493,204.5715 138,097.28 0.000 0.00
12,366,285.31 12,366,285.31 0.00

2.1 DRENAGEM E OAC - 1ª RPFO


84040 DRENAGEM SUPERFICIAL KM 68.520 24,094.1491 -1,650,931.10 68.520 -1,650,931.10 EO
93011 ENROCAMENTO DE PEDRA ARRUMADA KM 3.260 222,461.3669 -725,224.06 3.260 -725,224.06 EO
132573 OBRAS DE ARTE CORRENTES KM 68.520 6,383.6473 -437,407.51 68.520 -437,407.51 EO
151152 DRENAGEM PROFUNDA KM 0.280 136,317.5412 -38,168.91 0.280 -38,168.91 EO
0.00 -2,851,731.58 -2,851,731.58

3 PAVIMENTAÇÃO
8440 CAMADAS GRANULARES - SUB-BASE KM 68.520 89,936.6820 6,162,461.45 68.520 89,936.6820 6,162,461.45 0.000 0.00
93012 CAMADA DE BASE KM 68.520 218,792.6718 14,991,673.87 68.520 218,792.6718 14,991,673.87 0.000 0.00
93013 CAMADA DE BINDER (CBUQ FAIXA"B") KM 68.520 308,053.5888 21,107,831.90 68.520 308,053.5888 21,107,831.90 0.000 0.00
93014 CAPA DE ROLAMENTO (CBUQ FAIXA "C") KM 68.520 124,025.4299 8,498,222.45 68.520 124,025.4299 8,498,222.45 0.000 0.00
132499 REMOÇÃO DO REVESTIMENTO E CAMADA GRANULAR KM 10.100 37,343.6169 377,170.53 10.100 37,343.6169 377,170.53 0.000 0.00
132549 REGULARIZAÇÃO DO SUBLEITO KM 68.520 10,176.5831 697,299.47 68.520 10,176.5831 697,299.47 0.000 0.00
51,834,659.67 51,834,659.67 0.00

3.1 PAVIMENTAÇÃO 1ª RPFO


8440 CAMADA DE SUB-BASE KM 68.520 12,781.3092 875,775.30 68.520 875,775.30 EO
TABELA III - CRITÉRIO DE PAGAMENTO - 1ª RPFO
CONTRATO 1ª RPFO VARIAÇÃO
Código Item Unid CLASSE
Qtde Preço Unit. Preço Total Qtde Preço Unit. Preço Total Qtde Preço Total
93012 CAMADA DE BASE KM 68.520 10,592.9403 -725,828.27 68.520 -725,828.27 EO
93013 CAMADA DE BINDER (CBUQ FAIXA"B") KM 68.520 77.6939 5,323.59 68.520 5,323.59 EO
93014 CAPA DE ROLAMENTO (CBUQ FAIXA "C") KM 68.520 1,040.5144 -71,296.04 68.520 -71,296.04 EO
0.00 83,974.58 83,974.58

4 SINALIZAÇÃO
3009 SINALIZAÇÃO HORIZONTAL KM 68.520 24,531.5176 1,680,899.58 68.520 24,531.5176 1,680,899.58 0.000 0.00
132529 SINALIZAÇÃO VERTICAL KM 68.520 1,921.1232 131,635.36 68.520 1,921.1232 131,635.36 0.000 0.00
1,812,534.94 1,812,534.94 0.00
5.1
5 OBRAS COMPLEMENTARES
70020 OBRAS COMPLEMENTARES KM 68.520 91,214.3248 6,250,005.53 68.520 91,214.3248 6,250,005.53 0.000 0.00
6,250,005.53 6,250,005.53 0.00

OBRAS COMPLEMENTARES - 1ª RPFO


PN OBRAS COMPLEMENTARES KM 68.520 3,785.0329 259,350.46 68.520 259,350.46 APA
259,350.46 259,350.46

6 SERVIÇOS AMBIENTAIS
93015 CORPO ESTRADAL KM 68.520 6,941.4895 475,630.86 68.520 6,941.4895 475,630.86 0.000 0.00
93016 EMPRÉSTIMOS PARA TERRAPLENAGEM E OCORRÊNCIAS PARA UND 27.000 26,105.7545 704,855.37 27.000 26,105.7545 704,855.37 0.000 0.00
1,180,486.23 1,180,486.23 0.00

7 OAE - DEMOLIÇÃO DAS PONTES EXISTENTES


93017 DEMOLIÇÃO DAS PONTES EXISTENTES UND 1.000 520,462.2800 520,462.28 1.000 520,462.2800 520,462.28 0.000 0.00
520,462.28 520,462.28 0.00

8 PONTE SOBRE O BRAÇO DO RIACHO POÇÃO


8060 INFRAESTRUTURA UND 1.000 322,952.3400 322,952.34 1.000 322,952.3400 322,952.34 0.000 0.00
8061 MESOESTRUTURA UND 1.000 246,294.6900 246,294.69 1.000 246,294.6900 246,294.69 0.000 0.00
8062 SUPERESTRUTURA UND 1.000 861,260.1400 861,260.14 1.000 861,260.1400 861,260.14 0.000 0.00
8067 ACABAMENTOS UND 1.000 70,886.2600 70,886.26 1.000 70,886.2600 70,886.26 0.000 0.00
1,501,393.43 1,501,393.43 0.00

9 PONTE SOBRE O RIACHO POÇÃO


8060 PONTE SOBRE O RIACHO POÇÃO UND 1.000 367,084.3300 367,084.33 1.000 367,084.3300 367,084.33 0.000 0.00
8061 MESOESTRUTURA UND 1.000 268,001.1800 268,001.18 1.000 268,001.1800 268,001.18 0.000 0.00
8062 SUPERESTRUTURA UND 1.000 870,320.1600 870,320.16 1.000 870,320.1600 870,320.16 0.000 0.00
8067 ACABAMENTOS UND 1.000 70,886.2600 70,886.26 1.000 70,886.2600 70,886.26 0.000 0.00
1,576,291.93 1,576,291.93 0.00

10 PONTE SOBRE O RIACHO FRADE


8060 INFRAESTRUTURA UND 1.000 132,181.3300 132,181.33 1.000 132,181.3300 132,181.33 0.000 0.00
8061 MESOESTRUTURA UND 1.000 146,593.7900 146,593.79 1.000 146,593.7900 146,593.79 0.000 0.00
8062 SUPERESTRUTURA UND 1.000 482,712.2100 482,712.21 1.000 482,712.2100 482,712.21 0.000 0.00
TABELA III - CRITÉRIO DE PAGAMENTO - 1ª RPFO
CONTRATO 1ª RPFO VARIAÇÃO
Código Item Unid CLASSE
Qtde Preço Unit. Preço Total Qtde Preço Unit. Preço Total Qtde Preço Total
8067 ACABAMENTOS UND 1.000 49,786.8200 49,786.82 1.000 49,786.8200 49,786.82 0.000 0.00
811,274.15 811,274.15 0.00

11 PONTE SOBRE O RIACHO TOURÃO


8060 INFRAESTRUTURA UND 1.000 54,802.5400 54,802.54 1.000 54,802.5400 54,802.54 0.000 0.00
8061 MESOESTRUTURA UND 1.000 73,100.3700 73,100.37 1.000 73,100.3700 73,100.37 0.000 0.00
8062 SUPERESTRUTURA UND 1.000 765,525.9000 765,525.90 1.000 765,525.9000 765,525.90 0.000 0.00
8067 ACABAMENTOS UND 1.000 64,990.9300 64,990.93 1.000 64,990.9300 64,990.93 0.000 0.00
958,419.74 958,419.74 0.00

100,660,000.00 107,882,106.08 7,222,106.08

CONJUNTO DE ACRÉSCIMOS - À PEDIDO DA ADMINISTRAÇÃO 1,612,630.30 1.60%


CONJUNTO DE DECRÉSCIMOS - À PEDIDO DA ADMINISTRAÇÃO 0.00 0.00%
CONJUNTO DE ACRÉSCIMOS - ERROS E OMISSÕES 9,280,848.70 9.22%
CONJUNTO DE DECRÉSCIMOS -ERROS E OMISSÕES -3,671,372.92 -3.65%

Valor Contratado (PI) 100,660,000.00


TABELA IV - CRITÉRIO DE PAGAMENTO - 1ª RPFO - PLANILHA DE IMPLANTAÇÃO
CONTRATO 1ª RPFO VARIAÇÃO
Código Item Unid
Qtde Preço Unit. Preço Total Qtde Preço Unit. Preço Total Qtde Preço Total
1 TERRAPLANAGEM
83059 ESCAVAÇÃO, CARGA E TRANSPORTE DE MATERIAL KM 68.520 216,881.4941 14,860,719.97 68.520 216,881.4941 14,860,719.97 0.000 0.00
83060 COMPACTAÇÃO DE ATERRO KM 63.420 38,343.7138 2,431,758.32 63.420 38,343.7138 2,431,758.32 0.000 0.00
83072 EMPRÉSTIMOS PARA TERRAPLENAGEM UND 24.000 7,911.7399 189,881.75 24.000 7,911.7399 189,881.75 0.000 0.00
93007 CORPO ESTRADAL KM 68.520 7,925.1266 543,029.67 68.520 7,925.1266 543,029.67 0.000 0.00
93008 ESPALHAMENTO E COMPACTAÇÃO DE BOTA-FORA UND 12.000 29,706.3659 356,476.39 0.000 29,706.3659 0.00 -12.000 -356,476.39
93009 CAMADA DRENANTE EM AREIA UND 1.000 2,874,262.5800 2,874,262.58 1.000 2,874,262.5800 2,874,262.58 0.000 0.00
93010 ESCAVAÇÃO CARGA E TRANSPORTE DE SOLO-MOLE UND 1.000 592,058.1100 592,058.11 1.000 592,058.1100 592,058.11 0.000 0.00
21,848,186.79 21,491,710.40 -356,476.39

1.1 TERRAPLANAGEM - 1ª RPFO


PN ESCAVAÇÃO, CARGA E TRANSPORTE DE MATERIAL EST 62500 A 62725 KM 4.500 237,107.8867 1,066,985.49 4.500 1,066,985.49
PN ESCAVAÇÃO, CARGA E TRANSPORTE DE MATERIAL KM 68.520 30,467.5091 2,087,633.72 68.520 2,087,633.72
PN COMPACTAÇÃO DE ATERRO KM 63.420 4,559.0776 289,136.70 63.420 289,136.70
PN COMPACTAÇÃO DE ATERRO EST 62500 A 62725 KM 4.500 63,620.9672 286,294.35 4.500 286,294.35
PN ESPALHAMENTO E COMPACTAÇÃO DE BOTA-FORA UND 12.000 27,829.9475 333,959.37 12.000 333,959.37
PN CAMADA DRENANTE EM AREIA UND 1.000 5,107,539.8716 5,107,539.87 1.000 5,107,539.87
PN ESCAVAÇÃO CARGA E TRANSPORTE DE SOLO-MOLE UND 1.000 915,439.5108 915,439.51 1.000 915,439.51
0.00 10,086,989.02 10,086,989.02

2 DRENAGEM E OAC
84040 DRENAGEM SUPERFICIAL KM 68.520 51,935.1495 3,558,596.44 0.000 51,935.1495 0.00 -68.520 -3,558,596.44
93011 ENROCAMENTO DE PEDRA ARRUMADA KM 3.260 311,827.7148 1,016,558.35 0.000 311,827.7148 0.00 -3.260 -1,016,558.35
132573 OBRAS DE ARTE CORRENTES KM 68.520 111,690.5027 7,653,033.24 0.000 111,690.5027 0.00 -68.520 -7,653,033.24
151152 DRENAGEM PROFUNDA KM 0.280 493,204.5715 138,097.28 0.000 493,204.5715 0.00 -0.280 -138,097.28
12,366,285.31 0.00 -12,366,285.31

2.1 DRENAGEM E OAC - 1ª RPFO


84040 DRENAGEM SUPERFICIAL KM 68.520 27,841.0003 1,907,665.34 68.520 1,907,665.34
93011 ENROCAMENTO DE PEDRA ARRUMADA KM 3.260 89,366.3466 291,334.29 3.260 291,334.29
132573 OBRAS DE ARTE CORRENTES KM 68.520 105,306.8554 7,215,625.73 68.520 7,215,625.73
151152 DRENAGEM PROFUNDA KM 0.280 356,887.0357 99,928.37 0.280 99,928.37
0.00 9,514,553.73 9,514,553.73

3 PAVIMENTAÇÃO
8440 CAMADAS GRANULARES - SUB-BASE KM 68.520 89,936.6820 6,162,461.45 68.520 89,936.6820 6,162,461.45 0.000 0.00
93012 CAMADA DE BASE KM 68.520 218,792.6718 14,991,673.87 0.000 218,792.6718 0.00 -68.520 -14,991,673.87
93013 CAMADA DE BINDER (CBUQ FAIXA"B") KM 68.520 308,053.5888 21,107,831.90 68.520 308,053.5888 21,107,831.90 0.000 0.00
93014 CAPA DE ROLAMENTO (CBUQ FAIXA "C") KM 68.520 124,025.4299 8,498,222.45 0.000 124,025.4299 0.00 -68.520 -8,498,222.45
132499 REMOÇÃO DO REVESTIMENTO E CAMADA GRANULAR KM 10.100 37,343.6169 377,170.53 10.100 37,343.6169 377,170.53 0.000 0.00
132549 REGULARIZAÇÃO DO SUBLEITO KM 68.520 10,176.5831 697,299.47 68.520 10,176.5831 697,299.47 0.000 0.00
51,834,659.67 28,344,763.35 -23,489,896.32
TABELA IV - CRITÉRIO DE PAGAMENTO - 1ª RPFO - PLANILHA DE IMPLANTAÇÃO
CONTRATO 1ª RPFO VARIAÇÃO
Código Item Unid
Qtde Preço Unit. Preço Total Qtde Preço Unit. Preço Total Qtde Preço Total

3.1 PAVIMENTAÇÃO 1ª RPFO


8440 CAMADA DE SUB-BASE KM 68.520 12,781.3092 875,775.30 68.520 875,775.30
93012 CAMADA DE BASE KM 68.520 208,199.7315 14,265,845.60 68.520 14,265,845.60
93013 CAMADA DE BINDER (CBUQ FAIXA"B") KM 68.520 77.6939 5,323.59 68.520 5,323.59
93014 CAPA DE ROLAMENTO (CBUQ FAIXA "C") KM 68.520 122,984.9154 8,426,926.40 68.520 8,426,926.40
0.00 23,573,870.89 23,573,870.89

4 SINALIZAÇÃO
3009 SINALIZAÇÃO HORIZONTAL KM 68.520 24,531.5176 1,680,899.58 68.520 24,531.5176 1,680,899.58 0.000 0.00
132529 SINALIZAÇÃO VERTICAL KM 68.520 1,921.1232 131,635.36 68.520 1,921.1232 131,635.36 0.000 0.00
1,812,534.94 1,812,534.94 0.00
5.1
5 OBRAS COMPLEMENTARES
70020 OBRAS COMPLEMENTARES KM 68.520 91,214.3248 6,250,005.53 68.520 91,214.3248 6,250,005.53 0.000 0.00
6,250,005.53 6,250,005.53 0.00

OBRAS COMPLEMENTARES - 1ª RPFO


PN OBRAS COMPLEMENTARES KM 68.520 3,785.0329 259,350.46 68.520 259,350.46
259,350.46 259,350.46

6 SERVIÇOS AMBIENTAIS
93015 CORPO ESTRADAL KM 68.520 6,941.4895 475,630.86 68.520 6,941.4895 475,630.86 0.000 0.00
93016 EMPRÉSTIMOS PARA TERRAPLENAGEM E OCORRÊNCIAS PARA UND 27.000 26,105.7545 704,855.37 27.000 26,105.7545 704,855.37 0.000 0.00
1,180,486.23 1,180,486.23 0.00

7 OAE - DEMOLIÇÃO DAS PONTES EXISTENTES


93017 DEMOLIÇÃO DAS PONTES EXISTENTES UND 1.000 520,462.2800 520,462.28 1.000 520,462.2800 520,462.28 0.000 0.00
520,462.28 520,462.28 0.00

8 PONTE SOBRE O BRAÇO DO RIACHO POÇÃO


8060 INFRAESTRUTURA UND 1.000 322,952.3400 322,952.34 1.000 322,952.3400 322,952.34 0.000 0.00
8061 MESOESTRUTURA UND 1.000 246,294.6900 246,294.69 1.000 246,294.6900 246,294.69 0.000 0.00
8062 SUPERESTRUTURA UND 1.000 861,260.1400 861,260.14 1.000 861,260.1400 861,260.14 0.000 0.00
8067 ACABAMENTOS UND 1.000 70,886.2600 70,886.26 1.000 70,886.2600 70,886.26 0.000 0.00
1,501,393.43 1,501,393.43 0.00

9 PONTE SOBRE O RIACHO POÇÃO


8060 PONTE SOBRE O RIACHO POÇÃO UND 1.000 367,084.3300 367,084.33 1.000 367,084.3300 367,084.33 0.000 0.00
8061 MESOESTRUTURA UND 1.000 268,001.1800 268,001.18 1.000 268,001.1800 268,001.18 0.000 0.00
8062 SUPERESTRUTURA UND 1.000 870,320.1600 870,320.16 1.000 870,320.1600 870,320.16 0.000 0.00
8067 ACABAMENTOS UND 1.000 70,886.2600 70,886.26 1.000 70,886.2600 70,886.26 0.000 0.00
TABELA IV - CRITÉRIO DE PAGAMENTO - 1ª RPFO - PLANILHA DE IMPLANTAÇÃO
CONTRATO 1ª RPFO VARIAÇÃO
Código Item Unid
Qtde Preço Unit. Preço Total Qtde Preço Unit. Preço Total Qtde Preço Total
1,576,291.93 1,576,291.93 0.00

10 PONTE SOBRE O RIACHO FRADE


8060 INFRAESTRUTURA UND 1.000 132,181.3300 132,181.33 1.000 132,181.3300 132,181.33 0.000 0.00
8061 MESOESTRUTURA UND 1.000 146,593.7900 146,593.79 1.000 146,593.7900 146,593.79 0.000 0.00
8062 SUPERESTRUTURA UND 1.000 482,712.2100 482,712.21 1.000 482,712.2100 482,712.21 0.000 0.00
8067 ACABAMENTOS UND 1.000 49,786.8200 49,786.82 1.000 49,786.8200 49,786.82 0.000 0.00
811,274.15 811,274.15 0.00

11 PONTE SOBRE O RIACHO TOURÃO


8060 INFRAESTRUTURA UND 1.000 54,802.5400 54,802.54 1.000 54,802.5400 54,802.54 0.000 0.00
8061 MESOESTRUTURA UND 1.000 73,100.3700 73,100.37 1.000 73,100.3700 73,100.37 0.000 0.00
8062 SUPERESTRUTURA UND 1.000 765,525.9000 765,525.90 1.000 765,525.9000 765,525.90 0.000 0.00
8067 ACABAMENTOS UND 1.000 64,990.9300 64,990.93 1.000 64,990.9300 64,990.93 0.000 0.00
958,419.74 958,419.74 0.00

100,660,000.00 107,882,106.08 7,222,106.08

Valor Contratado (PI) 100,660,000.00

Valor Contratado (PI) + 1ª RPFO 107,882,106.08


TABELA V - EVOLUÇÃO CONTRATUAL
ADITIVO COM VALOR DO
MOTIVO DO ADITIVO AO PREÇO GLOBAL DESCONTO DE REFLEXO % CONTRATO APÓS A
12,658% (R$) REVISÃO (R$)
VALOR CONTRATADO A PI (SET/13)  - - 100,660,000.00
Conjunto de Acréscimos 9,280,848.70 9.220 -
Erros e
Conjunto de Decréscimos -3,671,372.92 -3.647 -
Omissões
Total 5,609,475.78 5.573 -
1ª RPFO
Conjunto de Acréscimos 1,612,630.30 1.602 -
A pedido da Conjunto de Decréscimos 0.00 0.000 -
Administração
Total 1,612,630.30 1.602 -
Conjunto de Acréscimos 10,893,479.00 10.822 -
Total Conjunto de Decréscimos -3,671,372.92 -3.647 -
Total 7,222,106.08 7.175 107,882,106.08
PLANILHA DE COMPOSIÇÃO ANALÍTICA DE PREÇOS UNITÁRIOS
DATA BASE: MARÇO 2013 CÓDIGO
SERVIÇO: Concreto Betuminoso Usinado a Quente (faixa "C") 2 S 02 540 01

BDI: 26,70% UNID. DATA

UTILIZAÇÃO CUSTO OPERACIONAL CUSTO


CÓDIGO A - EQUIPAMENTO QUANT.
PROD. IMPROD. PROD. IMPROD. HORÁRIO
E 007 TRATOR DE PENEUS 1.000000 0.240000 0.760000 59.14 11.85 23.20
E 102 ROLO TANDEN VIB. AUTOP. 10,2 T 1.000000 0.560000 0.440000 100.65 11.85 61.58
E 105 ROLO COMP. DE PENEUS 25T 2.000000 0.290000 0.710000 111.40 11.85 81.44
E 107 VASSOURA MECANICA 1.000000 0.240000 0.760000 4.58 0.00 1.10
E 149 VIBRO ACABADORA DE ASFALTO SEM ESTEIRA 1.000000 0.810000 0.190000 140.49 20.29 117.65
E 404 CAMINHAO BASCULANTE 10M3 1.530000 1.000000 0.000000 115.36 13.11 176.50

A) TOTAL 461.47
SALÁRIO CUSTO
CÓDIGO B - MÃO DE OBRA K,R QUANT.
BASE HORÁRIO
T 511 ENCARREGADO DE PAVIMENTAÇÃO 1.000000 26.29 26.29
T 701 SERVENTE 8.000000 7.25 58.00
ADICIONAL DE MÃO DE OBRA (15,51% MO) 13.07

B) TOTAL 97.36
C) PRODUÇÃO DA EQUIPE 75,0000 T / h CUSTO UNITÁRIO TOTAL (A+B) 558.83
D) CUSTO UNITÁRIO DA EXECUÇÃO ((A+B))/(C)=(D) 7.45
CUSTO
CÓDIGO C - MATERIAIS UNID. CUSTO CONSUMO
UNITÁRIO
1 A 01 390 02 USINAGEM DE CBUQ (faixa "C") T 58.000000 1.00000000 58.00

E) TOTAL 58.00
D.M.T. TOT. CUSTO
CÓDIGO F - TRANSPORTE D.M.T. (P) CUSTO CONSUMO
(T) D.M.T. UNITÁRIO
1 A 01 390 02 CBUQ - Transporte Local 17.780000 0.000000 17.780000 0.59 1.00000 10.49

F) TOTAL 10.49
CUSTO DIRETO TOTAL: (D)+(E)+(F) 75.94
BONIFICAÇÃO 20.28
PREÇO UNITÁRIO TOTAL 96.21
PLANILHA DE COMPOSIÇÃO ANALÍTICA DE PREÇOS UNITÁRIOS
DATA BASE: MARÇO 2013 CÓDIGO
SERVIÇO: Usinagem de CBUQ (faixa "C") 1 A 01 390 02

BDI: 26,70% UNID. DATA

UTILIZAÇÃO CUSTO OPERACIONAL CUSTO


CÓDIGO A - EQUIPAMENTO QUANT.
PROD. IMPROD. PROD. IMPROD. HORÁRIO
E 010 CARREGADEIRA DE PENEUS - 3,30 m3 1.000000 0.260000 0.740000 170.56 16.38 56.47
E 110 TANQUE ESTOC. DE ASFALTO 20000 l 2.000000 1.000000 0.000000 9.44 0.00 18.88
E 112 AQUECEDOR DE FLUIDO TERMICO 1.000000 1.000000 0.000000 24.46 0.00 24.46
E 147 USINA DE ASFALTO A QUENTE 90/120 1.000000 1.000000 0.000000 271.31 20.29 271.31
E 501 GRUPO GERADOR 36/40 Kva 1.000000 1.000000 0.000000 28.94 11.85 28.94
E 503 GRUPO GERADOR 164/180 Kva 1.000000 1.000000 0.000000 82.31 11.85 82.31

A) TOTAL 482.37
SALÁRIO CUSTO
CÓDIGO B - MÃO DE OBRA K,R QUANT.
BASE HORÁRIO
T 501 ENCARREGADO DE TURMA 1.000000 20.29 20.29
T 701 SERVENTE 8.000000 7.25 58.00
ADICIONAL DE MÃO DE OBRA (15,51% MO) 12.14

B) TOTAL 90.43
C) PRODUÇÃO DA EQUIPE 75,0000 T / h CUSTO UNITÁRIO TOTAL (A+B) 572.80
D) CUSTO UNITÁRIO DA EXECUÇÃO ((A+B))/(C)=(D) 7.64
CUSTO
CÓDIGO C - MATERIAIS UNID. CUSTO CONSUMO
UNITÁRIO
M 003 OLEO COMBUSTIVEL 1 A l 1.74 8.0000 13.92
1A 00 716 00 AREIA COMERCIAL m3 18.20 0.0533 0.97
1A 01 200 01 BRITA PRODUZIDA m3 29.35 0.5580 16.38
M 202 FILLER (cimento) kg 0.38 28.0000 10.64

E) TOTAL 41.91
D.M.T. D.M.T. TOT. CUSTO
CÓDIGO F - TRANSPORTE CUSTO CONSUMO
(T) (P) D.M.T. UNITÁRIO
M 202 Filler - transp comercial 34.200000 0.000000 34.20 0.45 0.02800 0.43
M 202 Filler - transp comercial 0.000000 489.000000 489.00 0.30 0.02800 4.11
1A 00 716 00 Areia - Transp Comercial 40.340000 0.000000 40.34 0.46 0.08000 1.48
1A 01 200 01 Brita - Transp local 4.920000 0.000000 4.92 0.59 0.83700 2.43
F) TOTAL 8.45
CUSTO DIRETO TOTAL: (D)+(E)+(F) 58.00
BONIFICAÇÃO
PREÇO UNITÁRIO TOTAL
PLANILHA DE COMPOSIÇÃO ANALÍTICA DE PREÇOS UNITÁRIOS
DATA BASE: MARÇO 2013 CÓDIGO
SERVIÇO: Concreto Betuminoso Usinado a Quente (faixa "B") 2 S 02 540 02

BDI: 26,70% UNID. DATA

UTILIZAÇÃO CUSTO OPERACIONAL CUSTO


CÓDIGO A - EQUIPAMENTO QUANT.
PROD. IMPROD. PROD. IMPROD. HORÁRIO
E 007 TRATOR DE PENEUS 1.000000 0.240000 0.760000 59.14 11.85 23.20
E 102 ROLO TANDEN VIB. AUTOP. 10,2 T 1.000000 0.560000 0.440000 100.65 11.85 61.58
E 105 ROLO COMP. DE PENEUS 25T 1.000000 0.580000 0.420000 111.40 11.85 69.59
E 107 VASSOURA MECANICA 1.000000 0.240000 0.760000 4.58 0.00 1.10
E 149 VIBRO ACABADORA DE ASFALTO SEM ESTEIRA 1.000000 0.810000 0.190000 140.49 20.29 117.65
E 404 CAMINHAO BASCULANTE 10M3 1.530000 1.000000 0.000000 115.36 13.11 176.50

A) TOTAL 449.62
SALÁRIO CUSTO
CÓDIGO B - MÃO DE OBRA K,R QUANT.
BASE HORÁRIO
T 511 ENCARREGADO DE PAVIMENTAÇÃO 1.000000 26.29 26.29
T 701 SERVENTE 8.000000 7.25 58.00
ADICIONAL DE MÃO DE OBRA (15,51% MO) 13.07

B) TOTAL 97.36
C) PRODUÇÃO DA EQUIPE 75,0000 T / h CUSTO UNITÁRIO TOTAL (A+B) 546.98
D) CUSTO UNITÁRIO DA EXECUÇÃO ((A+B))/(C)=(D) 7.29
CUSTO
CÓDIGO C - MATERIAIS UNID. CUSTO CONSUMO
UNITÁRIO
1 A 01 390 02 USINAGEM DE CBUQ (faixa "B") T 44.930000 1.00000000 44.93

E) TOTAL 44.93
D.M.T. TOT. CUSTO
CÓDIGO F - TRANSPORTE D.M.T. (P) CUSTO CONSUMO
(T) D.M.T. UNITÁRIO
1 A 01 390 02 CBUQ - Transporte Local 17.490000 0.000000 17.490000 0.59 1.00000 10.32

F) TOTAL 10.32
CUSTO DIRETO TOTAL: (D)+(E)+(F) 62.54
BONIFICAÇÃO 16.70
PREÇO UNITÁRIO TOTAL 79.24
PLANILHA DE COMPOSIÇÃO ANALÍTICA DE PREÇOS UNITÁRIOS
DATA BASE: MARÇO 2013 CÓDIGO
SERVIÇO: Usinagem de CBUQ (faixa "B") 1 A 01 390 03

BDI: 26,70% UNID. DATA

UTILIZAÇÃO CUSTO OPERACIONAL CUSTO


CÓDIGO A - EQUIPAMENTO QUANT.
PROD. IMPROD. PROD. IMPROD. HORÁRIO
E 010 CARREGADEIRA DE PENEUS - 3,30 m3 1.000000 0.270000 0.730000 170.56 16.38 58.01
E 110 TANQUE ESTOC. DE ASFALTO 20000 l 2.000000 1.000000 0.000000 9.44 0.00 18.88
E 112 AQUECEDOR DE FLUIDO TERMICO 1.000000 1.000000 0.000000 24.46 0.00 24.46
E 147 USINA DE ASFALTO A QUENTE 90/120 1.000000 1.000000 0.000000 271.31 20.29 271.31
E 501 GRUPO GERADOR 36/40 Kva 1.000000 1.000000 0.000000 28.94 11.85 28.94
E 503 GRUPO GERADOR 164/180 Kva 1.000000 1.000000 0.000000 82.31 11.85 82.31

A) TOTAL 483.91
SALÁRIO CUSTO
CÓDIGO B - MÃO DE OBRA K,R QUANT.
BASE HORÁRIO
T 501 ENCARREGADO DE TURMA 1.000000 20.29 20.29
T 701 SERVENTE 8.000000 7.25 58.00
ADICIONAL DE MÃO DE OBRA (15,51% MO) 12.14

B) TOTAL 90.43
C) PRODUÇÃO DA EQUIPE 75,0000 T / h CUSTO UNITÁRIO TOTAL (A+B) 574.34
D) CUSTO UNITÁRIO DA EXECUÇÃO ((A+B))/(C)=(D) 7.66
CUSTO
CÓDIGO C - MATERIAIS UNID. CUSTO CONSUMO
UNITÁRIO
M 003 OLEO COMBUSTIVEL 1 A l 1.74 8.0000 13.92
1A 00 716 00 AREIA COMERCIAL m3 18.20 0.1610 2.93
1A 01 200 01 BRITA PRODUZIDA m3 29.35 0.4730 13.88

E) TOTAL 30.73
D.M.T. D.M.T. TOT. CUSTO
CÓDIGO F - TRANSPORTE CUSTO CONSUMO
(T) (P) D.M.T. UNITÁRIO
1A 00 716 00 Areia - Transp Comercial 40.340000 0.000000 40.34 0.46 0.24150 4.48
1A 01 200 01 Brita - Transp local 4.920000 0.000000 4.92 0.59 0.70950 2.06

F) TOTAL 6.54
CUSTO DIRETO TOTAL: (D)+(E)+(F) 44.93
BONIFICAÇÃO
PREÇO UNITÁRIO TOTAL
PLANILHA DE COMPOSIÇÃO ANALÍTICA DE PREÇOS UNITÁRIOS
DATA BASE: MARÇO 2013 CÓDIGO
SERVIÇO: Base de Brita Graduada Simples 2 S 02 230 00

BDI: 26,70% UNID. DATA

m3

UTILIZAÇÃO CUSTO OPERACIONAL CUSTO


CÓDIGO A - EQUIPAMENTO QUANT.
PROD. IMPROD. PROD. IMPROD. HORÁRIO
E 102 ROLO TANDEN VIB. AUTOP. 10,2 T 1.000000 0.730000 0.270000 100.65 11.85 76.67
E 105 ROLO COMP. DE PENEUS 25T 1.000000 0.750000 0.250000 111.40 11.85 86.51
E 109 DISTRIBUIDOR DE AGREGADOS 1.000000 0.890000 0.110000 138.38 16.38 124.96
E 404 CAMINHÃO BASC. 10M³ 3.560000 1.000000 0.000000 115.36 13.11 410.68
E 407 CAMINHÃO TANQUE- 10.000 L 1.000000 0.700000 0.300000 113.69 13.11 83.52

A) TOTAL 782.34
SALÁRIO CUSTO
CÓDIGO B - MÃO DE OBRA K,R QUANT.
BASE HORÁRIO
T 511 ENCARREGADO DE PAVIMENTAÇÃO 1.000000 26.29 26.29
T 701 SERVENTE 3.000000 7.25 21.75
ADICIONAL DE MÃO DE OBRA (15,51% MO) 7.45

B) TOTAL 55.49
C) PRODUÇÃO DA EQUIPE 121,000,0000 M³ / h CUSTO UNITÁRIO TOTAL (A+B) 837.84
D) CUSTO UNITÁRIO DA EXECUÇÃO ((A+B))/(C)=(D) 6.92
CUSTO
CÓDIGO C - MATERIAIS UNID. CUSTO CONSUMO
UNITÁRIO
1A 00 395 51 USINAGEM DE BRITA GRADUADA M³ 57.300 1.00000000 57.30

E) TOTAL 57.30
D.M.T. TOT. CUSTO
CÓDIGO F - TRANSPORTE D.M.T. (T) CUSTO CONSUMO
(P) D.M.T. UNITÁRIO
1A 00 395 51 BRITA GRADUADA 0.000000 17.510000 17.510000 0.59 2.4000 24.79

F) TOTAL 24.79
CUSTO DIRETO TOTAL: (D)+(E)+(F) 89.02
BONIFICAÇÃO 23.77
PREÇO UNITÁRIO TOTAL 112.78
PLANILHA DE COMPOSIÇÃO ANALÍTICA DE PREÇOS UNITÁRIOS
DATA BASE: MARÇO 2013 CÓDIGO
SERVIÇO: Usinagem de Base em BGS 1A 00 395 51

BDI: 26,70% UNID. DATA

m3

UTILIZAÇÃO CUSTO OPERACIONAL CUSTO


CÓDIGO A - EQUIPAMENTO QUANT.
PROD. IMPROD. PROD. IMPROD. HORÁRIO
E 010 CARREGADEIRA DE PNEUS-3,3 M³ 1.000000 0.980000 0.020000 170.56 16.38 167.48
E 016 USINA MISTURADORA DE SOLOS 1.000000 1.000000 0.000000 92.72 20.29 92.72
E 503 GRUPO GERADOR-164/180 KVA 1.000000 1.000000 0.000000 82.31 11.85 82.31

A) TOTAL 342.51
SALÁRIO CUSTO
CÓDIGO B - MÃO DE OBRA K,R QUANT.
BASE HORÁRIO
T 501 ENCARREGADO DE TURMA 1.000000 20.29 20.29
T 701 SERVENTE 5.000000 7.25 36.25
ADICIONAL DE MÃO DE OBRA (15,51% MO) 8.77

B) TOTAL 65.31
C) PRODUÇÃO DA EQUIPE 121,00 M³ / h CUSTO UNITÁRIO TOTAL (A+B) 407.82
D) CUSTO UNITÁRIO DA EXECUÇÃO ((A+B))/(C)=(D) 3.37
CUSTO
CÓDIGO C - MATERIAIS UNID. CUSTO CONSUMO
UNITÁRIO
1A 00 200 01 BRITA M³ 29.350000 1.60000000 46.96

E) TOTAL 46.96
D.M.T. D.M.T. TOT. CUSTO
CÓDIGO F - TRANSPORTE CUSTO CONSUMO
(P) (T) D.M.T. UNITÁRIO
1A 00 717 00 BRITA (1) 4.920000 0.000000 4.920000 0.59 2.4000 6.97

F) TOTAL 6.97
CUSTO DIRETO TOTAL: (D)+(E)+(F) 57.30
BONIFICAÇÃO
PREÇO UNITÁRIO TOTAL
PLANILHA DE COMPOSIÇÃO ANALÍTICA DE PREÇOS UNITÁRIOS
DATA BASE: MARÇO 2013 CÓDIGO
SERVIÇO: Cerca de arame farpado com suporte de madeira 2 S 06 410 00

BDI: 26,70% UNID. DATA

UTILIZAÇÃO CUSTO OPERACIONAL CUSTO


CÓDIGO A - EQUIPAMENTO QUANT.
PROD. IMPROD. PROD. IMPROD. HORÁRIO
E 402 Caminhão Carroceria Fixa 15T 0.010000 1.000000 0.000000 111.18 11.85 1.11

A) TOTAL 1.11
SALÁRIO CUSTO
CÓDIGO B - MÃO DE OBRA K,R QUANT.
BASE HORÁRIO
T 501 ENCARREGADO DE TURMA 0.040000 20.29 0.81
T 701 SERVENTE 0.400000 7.25 2.90
ADICIONAL DE MÃO DE OBRA (20,51% MO) 0.76

B) TOTAL 4.47
C) PRODUÇÃO DA EQUIPE 1 CUSTO UNITÁRIO TOTAL (A+B) 5.58
D) CUSTO UNITÁRIO DA EXECUÇÃO ((A+B))/(C)=(D) 5.58
CUSTO
CÓDIGO C - MATERIAIS UNID. CUSTO CONSUMO
UNITÁRIO
M 322 Grampo para cerca galvanizado 1x9 Kg 3.390000 0.00670000 0.02
M 321 Arame Farpado n 16 m 0.350000 4.00000000 1.40
M 403 Mourão madeira H=2,10m D=0,10m unid 13.730000 0.37000000 5.08
M 404 Mourão madeira H=2,20m D=0,15m unid 9.670000 0.02000000 0.19

E) TOTAL 6.70
D.M.T. D.M.T. TOT. CUSTO
CÓDIGO F - TRANSPORTE CUSTO CONSUMO
(T) (P) D.M.T. UNITÁRIO
M 403 Mourão H=2,10 - Transp Com. 32.300000 32.300000 0.45 0.04870 0.70
M 403 Mourão H=2,10 - Transp Com. 5.300000 5.300000 0.30 0.04870 0.08
M 403 Mourão H=2,10 - Transp Loc. 17.790000 17.790000 0.76 0.04870 0.66
M 404 Mourão H=2,20 - Transp Com. 32.300000 32.300000 0.45 0.00480 0.07
M 404 Mourão H=2,20 - Transp Com. 5.300000 5.300000 0.30 0.00480 0.01
M 404 Mourão H=2,20 - Transp Loc. 17.790000 17.790000 0.76 0.00480 0.06
M 321 Arame Farpado 32.300000 32.300000 0.45 0.00020 0.00
M 321 Arame Farpado 5.300000 5.300000 0.30 0.00020 0.00
M 321 Arame Farpado 17.790000 17.790000 0.76 0.00020 0.00

F) TOTAL 1.58
CUSTO DIRETO TOTAL: (D)+(E)+(F) 13.86
BONIFICAÇÃO 3.70
PREÇO UNITÁRIO TOTAL 17.56

Vous aimerez peut-être aussi