Insumos

Insumos 2018
Descripción Articulo Precio Por Cantidad Cantidad Precio Unitario
Acero de 3/8 x 20 Longitudinal RD$ 2132.80 13.33 Uds RD$ 160.00
Acero de 3/8 x 20 Transversal RD$ 1678.00 13.33 Uds RD$ 125.88
Acero de 3/8 x 25 Longitudinal RD$ 1846.00 10.64 Uds RD$ 173.50
Acero de 3/8 x 25 Transversal RD$ 1846.00 10.64 Uds RD$ 173.50
Acero de 3/8 x 30 Longitudinal RD$ 1826.00 8.87 Uds RD$ 205.86
Acero de 3/8 x 30 Transversal RD$ 1826.00 8.87 Uds RD$ 205.86
Acero de 3/8 x 35 Longitudinal RD$ 1798.00 7.60 Uds RD$ 236.58
Acero de 3/8 x 35 Transversal RD$ 1798.00 7.60 Uds RD$ 236.58
Acero de 1/2 x 20 Longitudinal RD$ 2119.67 7.49 Uds RD$ 283.00
Acero de 1/2 x 20 Transversal RD$ 1678.00 7.49 Uds RD$ 224.03
Acero de 1/2 x 25 Longitudinal RD$ 1793.00 5.99 Uds RD$ 299.33
Acero de 1/2 x 25 Transversal RD$ 1793.00 5.99 Uds RD$ 299.33
Acero de 1/2 x 30 Longitudinal RD$ 1791.00 4.00 Uds RD$ 447.75
Acero de 1/2 x 30 Transversal RD$ 1791.00 4.00 Uds RD$ 447.75
Acero de 1/2 x 35 Longitudinal RD$ 1790.00 4.28 Uds RD$ 418.22
Acero de 1/2 x 35 Transversal RD$ 1790.00 4.28 Uds RD$ 418.22
Acero de 3/4 x 20 Longitudinal RD$ 2149.00 3.33 Uds RD$ 645.35
Acero de 3/4 x 20 Transversal RD$ 2149.00 3.33 Uds RD$ 645.35
Acero de 3/4 x 25 Longitudinal RD$ 1988.00 2.66 Uds RD$ 747.37
Acero de 3/4 x 25 Transversal RD$ 1988.00 2.66 Uds RD$ 747.37
Acero de 3/4 x 30 Longitudinal RD$ 2385.00 2.22 Uds RD$ 1074.32
Acero de 3/4 x 30 Transversal RD$ 2385.00 2.22 Uds RD$ 1074.32
Acero de 3/4 x 35 Longitudinal RD$ 1800.00 1.90 Uds RD$ 947.37
Acero de 3/4 x 35 Transversal RD$ 1800.00 1.90 Uds RD$ 947.37
Acero de 1 x 20 Longitudinal RD$ 1772.00 1.87 Uds RD$ 947.59
Acero de 1 x 20 Transversal RD$ 1772.00 1.87 Uds RD$ 947.59
Acero de 1 x 25 Longitudinal RD$ 1772.00 1.50 Uds RD$ 1181.33
Acero de 1 x 25 Transversal RD$ 1772.00 1.50 Uds RD$ 1181.33
Acero de 1 x 30 Longitudinal RD$ 1772.00 1.25 Uds RD$ 1417.60
Acero de 1 x 30 Transversal RD$ 1772.00 1.25 Uds RD$ 1417.60
Acero de 1 x 35 Longitudinal RD$ 1772.00 1.07 Uds RD$ 1656.07
Acero de 1 x 35 Transversal RD$ 1772.00 1.07 Uds RD$ 1656.07
Alambre RD$ 30.00 1 Libra RD$ 30.00
Bloques de 6'' RD$ 26.00 1 Uds RD$ 26.00
Bloques de 8'' RD$ 34.00 1 Uds RD$ 34.00
Mano de Obra Bloques RD$ 17.00 1 Uds RD$ 17.00
Mortero Pegado de Bloques RD$ 3756.00 1 m3 RD$ 3500.00
Concreto Recamaras Bloques RD$ 3165.00 1 m3 RD$ 2613.00
Cemento RD$ 290.00 1 Uds RD$ 290.00
Arena RD$ 850.00 1 m3 RD$ 850.00
Insumos

Agua RD$ 10.00 1 Gal RD$ 10.00


Grava RD$ 850.00 1 m3 RD$ 850.00
Maya Ciclónica 6 Pies Altura RD$ 3712.00 50 Pies RD$ 74.24
Concreto 210 kg/cm² RD$ 5200.00 1 m3 RD$ 5200.00
Mano de Obra Varilla Vigas y Col. RD$ 80.00 1m RD$ 80.00
Carpintería RD$ 220.00 1m RD$ 220.00
Mano de Obra Varilla Muros y losas RD$ 350.00 1 qq RD$ 350.00
Carpintería m2 RD$ 350.00 1 m2 RD$ 350.00
Andamio
Mano de Obra pañete Muros y Viga RD$ 48.00 1 m2 RD$ 48.00
Mano
Mano de
de Obra
Obra pañete
pañete Techo
Muros y Viga RD$ 86.50 1 m2 RD$ 86.50
Exterior RD$ 57.50 1 m2 RD$ 57.50
Mano de Obra Fino de Techo RD$ 420.00 1 m3 RD$ 420.00
Carpintería Vigas y Columnas RD$ 140.00 1m RD$ 140.00
Mano de Obra Varilla Zapata RD$ 45.00 1m RD$ 45.00
Cal
mezcla 1:1.5:5 (pañete) CON RD$ 120.00 1 fda RD$ 120.00
Pintura
ARENA GRUESA (Ref. Guía de RD$ 1000.00 1 Gal RD$ 1000.00
Análisis dePañete
Andamio Costoexterior
CODIA)(Ref. Guía RD$ 3875.00 0 m3 RD$ 193.75
de AnálisisMuros
Fraguache de Costo CODIA)
(Ref. Guía de RD$ 100.00 1 m2 RD$ 100.00
Análisis
Fino de Costo
de Techo CODIA)
Plano (Ref. Guía de RD$ 55.00 1 m2 RD$ 55.00
Análisis(Ref.
Cantos de Costo
Guía CODIA)
de Análisis de RD$ 535.00 1 m2 RD$ 535.00
Costo CODIA) RD$ 88.00 1 m2 RD$ 88.00
Pañete de Mochetas RD$ 185.00 1m RD$ 185.00
Precios
Ferreteria Grupo Cafra Ochoa Vitico

Adaptador PVC Hembra de 1/2" RD$ 4.00 RD$ 3.85


Adaptador PVC Macho de 1/2" RD$ 5.00 RD$ 2.83
Arena de pañete RD$ 950.00 RD$ 785.00
Codo de 1/2 PVC de Presion RD$ 5.00 RD$ 4.80
Codo de 1/2" HG RD$ 15.22
Codos de 4" x 45" Drenaje RD$ 53.58 RD$ 50.83
Codos de 4" x 90" Drenaje RD$ 89.74 RD$ 70.29
Limpiador de Tubo 32 oz RD$ 404.23
Niplex de 1/2" HG RD$ 14.40 RD$ 13.15
Tapon de 1/2" HG RD$ 10.80
Te ye de 4" Drenaje RD$ 108.58 RD$ 115.04
Tee de 1/2" PVC de presion RD$ 7.00 RD$ 7.32
Tubo Pvc de 4" SDR 41 RD$ 896.00 RD$ 945.01 RD$ 1000.00
Tubos de 1/2" SDR 13.5mm RD$ 88.00 RD$ 96.15
Tubos SCH-40 de 1/2" de presion RD$ 185.00 RD$ 159.52
Tubos SCH-40 de 3/4" de presion RD$ 185.00 RD$ 211.26
Ye de 4" Drenaje RD$ 123.02 RD$ 129.20
Insumos

Cemento PVC 32 Oz Lanco RD$ 513.22 RD$ 513.22 RD$ 575.00


Curvas PVC de 3/4" RD$ 6.50 RD$ 6.63 RD$ 6.00
Tubo Pvc de 3/4" SDR 26 RD$ 90.00 RD$ 83.19 RD$ 120.00
Tubos de 4" Drenaje 19' RD$ 518.00 RD$ 450.71
Reduccion de 4" a 2" Drenaje RD$ 40.59 RD$ 40.59 RD$ 50.00
Reduccion P Inodoro RD$ 49.27
Tapon de 4" RD$ 59.17 RD$ 59.17 RD$ 80.00
Tubos de 2" Drenaje 19' RD$ 216.00 RD$ 184.85
Alambre Para Sondeo RD$ 74.14 RD$ 74.14
Codos de 2" x 45" Drenaje RD$ 10.15 RD$ 10.41 RD$ 20.00
Te de 4" a 2" Drenaje RD$ 58.67 RD$ 67.64 RD$ 75.00
Varillas 1/2 x 20 RD$ 280.00 RD$ 280.12 RD$ 300.00
Sifon Drenaje de 2" RD$ 53.97 RD$ 40.42 RD$ 70.00
Codos de 2" x 90"Drenaje RD$ 18.00 RD$ 12.89 RD$ 20.00
Tubo Pvc de 2" SDR 41 RD$ 271.51 RD$ 271.51 RD$ 325.00
Arena Gruesa RD$ 875.00 RD$ 980.00 RD$ 950.00
Tapon de 2" RD$ 12.44 RD$ 12.44 RD$ 20.00
Grava RD$ 875.00 RD$ 980.00 RD$ 950.00
Caja Octogonales Metalicas RD$ 28.00 RD$ 28.00 RD$ 30.00
Tubo Pvc de 1/2" SDR 26 RD$ 55.00 RD$ 44.70 RD$ 75.00
Cajas Metalicas 2x2x4 de 1/2" RD$ 28.23 RD$ 25.48 RD$ 30.00
Curva PVC de 1/2" RD$ 2.99 RD$ 2.99
Alambre Picado RD$ 36.00 RD$ 32.41 RD$ 35.00
Cemento Gris RD$ 285.00 RD$ 280.00
Varillas de 3/8 x 20 RD$ 160.00 RD$ 157.10 RD$ 157.89

Cemento PVC 32 Oz Lanco 1


Curvas PVC de 3/4" 1
Tubo Pvc de 3/4" SDR 26 1
Tubos de 4" Drenaje 19' 1
Reduccion de 4" a 2" Drenaje 2
Tapon de 4" 2
Insumos

Tubos de 2" Drenaje 19' 2


Soga Para Sondeo 3
Codos de 2" x 45" Drenaje 4
Te de 4" a 2" Drenaje 5
Varillas 1/2 x 20 5
Sifon Drenaje de 2" 6
Codos de 2" x 90"Drenaje 8
Tubo Pvc de 2" SDR 41 8
Arena Gruesa 9.18
Tapon de 2" 10
Grava 12.5
Caja Octogonales Metalicas 15
Tubo Pvc de 1/2" SDR 26 18
Cajas Metalicas 2x2x4 de 1/2" 22
Curva PVC de 1/2" 45
Alambre Picado 60
Cemento Gris 150
Varillas de 3/8 x 20 256
Insumos

Unidad
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Uds.
Libra
Uds.
Uds.
Uds.


Uds.

Insumos

Gal

Pies

m
m
qq
m2

m2
m2
m3
m3
m
m
Fda.
Gal
m2
m2
m2
m2
m2
m

Yanet Juan Nu Bellon Sandy TOTAL A USAR

0
0
0
0
0
0
0
0
0
0
0
0
RD$ 1050.00 RD$ 896.00 0
0
0
0
0
Insumos

RD$ 550.00 RD$ 640.00 RD$ 493.00 1


RD$ 8.00 RD$ 10.00 RD$ 6.24 1
RD$ 100.00 RD$ 150.00 RD$ 88.00 1
RD$ 650.00 1
RD$ 50.00 RD$ 55.00 RD$ 46.00 2
2
RD$ 75.00 RD$ 110.00 RD$ 41.80 2
RD$ 270.00 2
RD$ 100.00 RD$ 65.60 3
RD$ 20.00 RD$ 20.00 RD$ 12.10 4
RD$ 130.00 RD$ 80.00 RD$ 56.82 5
RD$ 320.00 RD$ 297.15 RD$ 284.03 5
RD$ 75.00 RD$ 65.00 RD$ 51.00 6
RD$ 20.00 RD$ 20.00 RD$ 13.95 8
RD$ 325.00 RD$ 340.00 RD$ 258.00 8
RD$ 900.00 RD$ 900.00 RD$ 833.00 9.18
RD$ 25.00 RD$ 25.00 RD$ 19.83 10
RD$ 900.00 RD$ 900.00 RD$ 833.00 12.5
RD$ 30.00 RD$ 30.00 RD$ 28.00 15
RD$ 65.00 RD$ 70.00 RD$ 46.80 18
RD$ 36.00 RD$ 30.00 RD$ 25.95 22
RD$ 5.50 RD$ 5.00 RD$ 2.90 45
RD$ 28.00 RD$ 40.00 RD$ 35.50 60
RD$ 290.00 RD$ 285.00 RD$ 278.00 150
RD$ 161.00 RD$ 160.00 RD$ 159.29 256
Total
Insumos

Total
RD$ -
RD$ -
RD$ -
RD$ -
RD$ -
RD$ -
RD$ -
RD$ -
RD$ -
RD$ -
RD$ -
RD$ -
RD$ -
RD$ -
RD$ -
RD$ -
RD$ -
Insumos

RD$ 493.00
RD$ 6.00
RD$ 83.19
RD$ 450.71
RD$ 81.18
RD$ 98.54
RD$ 83.60
RD$ 369.70
RD$ 196.80
RD$ 40.59
RD$ 284.10
RD$ 1,400.00
RD$ 242.52
RD$ 103.12
RD$ 2,064.00
RD$ 7,646.94
RD$ 124.40
RD$ 10,412.50
RD$ 420.00
RD$ 804.60
RD$ 560.56
RD$ 130.50
RD$ 1,680.00
RD$ 41,700.00
RD$ 40,217.60
RD$ 109,694.15
Fases de la Obra

Presupuesto Cámara Séptica


Obra Séptico de Una Cámara Alojamiento General Fecha
Lugar Friusa, Bávaro.

Fases de la Obra Hasta Terminación


Ítem Descripción
1 Limpieza del Área
2 Excavación
2.1 Remoción de Capa Vegetal
2.2 Excavación con Compresor
2.3 Movimiento de Tierra
3 Losa De Piso y Zapata de Muros
3.1 Envarillado de Losa de Piso, Zapata de Muro y bastones
3.2 Vaciado de Concreto de Losa de Piso y Zapata de Muro
4 Colocación de Bloques
5 Colocacion de Tuberias
6 Pañete
6.1 Fraguache de Bloques y Frotado de Losa de Piso
6.2 Pañete de Muros de Block
7 Losa (Tapa)
7.1 Encofrado de Losa, viga de amarre y Guarderas
7.2 Envarillado de Losa y viga de amarre
7.3 Vaciado de Losa
7.4 Pulido de Losa
8 Tapa de Inspección

10
Fases de la Obra

1/21/2021

11
Analisis de C.U Obra Gris

Análisis de Costo Unitario Edificación


Obra Séptico de Una Cámara Alojamiento General Fecha 1/21/2021
Lugar Friusa, Bávaro. Unidad Analizada m2 y m3

Costo Unitario de Viga de amarre Ud= m3


No Partida Descr. Partida Unidad Cant. C/u Valor
1 Acero de 3/4 x 20 Longitudinal Uds. 34 RD$ 645.35 RD$ 21941.74
2 Alambre Libra 5 RD$ 30.00 RD$ 150.00
3 Mano de Obra Varilla Vigas y Col. m RD$ 80.00 RD$ 0.00
Total RD$ 22091.74

Costo Total de Losa


No Partida Descr. Partida Unidad Cant. C/u Valor
1 Acero de 3/8 x 20 Longitudinal Uds. 87 RD$ 160.00 RD$ 13920.00
2 Alambre Libra 26 RD$ 30.00 RD$ 780.00
3 Mano de Obra Varilla Muros y losas P/a RD$ 15000.00 RD$ 0.00
Total RD$ 14700.00

Costo Unitario Mampostería Block de 8" Ud= m2


No Partida Descr. Partida Unidad Cant. C/u Valor
1 Bloques de 8'' Uds. 12.5 RD$ 34.00 RD$ 425.00
2 Acero de 3/8 x 20 Longitudinal Uds. 0.2 RD$ 160.00 RD$ 32.00
3 Acero de 3/8 x 35 Transversal Uds. 0.5 RD$ 160.00 RD$ 80.00
4 Mano de Obra Bloques Uds. 12.5 RD$ 17.00 RD$ 212.50
5 Mortero Pegado de Bloques m³ 0.012 RD$ 3500.00 RD$ 42.00
6 Alambre Libra 0.43 RD$ 30.00 RD$ 12.90
7 Concreto Recamaras Bloques m³ 0.03 RD$ 2613.00 RD$ 78.39

12
Analisis de C.U Obra Gris

Total RD$ 882.79

Costo Unitario Pañete Techos Ud= m2


No Partida Descr. Partida Unidad Cant. C/u Valor
1 Mano de Obra pañete Techo m2 1 RD$ 86.50 RD$ 86.50
2 mezcla 1:1.5:5 (pañete) CON ARENA GR
m2 1 RD$ 193.75 RD$ 193.75
Total RD$ 280.25

13
Análisis de Costo Unitario Edificación
Obra Séptico de Una Cámara Alojamiento General
Lugar Friusa, Bávaro.

Item Actividad Ud Cant.


1 Limpieza de Area Dia Hombre 1
2 Excavación
2.1 Remoción de Capa Vegetal Uso Retro Pala Teca Horas 4
2.2 Excavación con Compresor Dia Hombre 6
2.3 Movimiento de Tierra Uso Retro Pala Teca Horas 4
3 Losa De Piso y Zapata de Muros
3.1 Envarillado de Losa de Piso, Zapata de Muro y bastones
Varillas Para Losa de Piso (0.20m x 0.20m) Ud 10
Varillas Para Zapata de Muro (0.60m) Ud 3
Varillas Para Bastones (3/8 c 0.4m) Ud 7
Alambre Picado Lb 10
Mano de Obra Varilla P/a 1

3.2 Vaciado de Concreto de Losa de Piso y Zapata de Muro m3 0.85

4 Colocación de Bloques m2 10.2

5 Colocacion de Tuberias p/a 1

6 Pañete
6.1 Fraguache de Bloques y Frotado de Losa de Piso m2 15.98
6.2 Pañete de Muros de Block m2 10.2

7 Losa (Tapa)
7.1 Encofrado de Losa, viga de amarre y Guarderas p/a 1

7.2 Envarillado de Losa y viga de amarre


Varillas losa ud 10
Alambre Picado lb 5
Mano de Obra Varilla p/a 1
Viga de Amarre m3 0.714

7.3 Vaciado de Losa m3 0.7

7.4 Pulido de Losa Dia hombre 1


8 Tapa de Inspección Ud 1
ario Edificación
Fecha 1/21/2021
Unidad Analizada m2 y m3

Precio Total
$ 700.00 $ 700.00
Total $ 700.00
$ 500.00 $ 2,000.00
$ 700.00 $ 4,200.00
$ 500.00 $ 2,000.00
Total $ 8,200.00

$ 180.00 $ 1,800.00
$ 180.00 $ 540.00
$ 180.00 $ 1,260.00
$ 40.00 $ 400.00
$ 3,000.00 $ 3,000.00
Total $ 7,000.00
$ 4,500.00 $ 3,825.00
Total $ 3,825.00
$ 910.00 $ 9,282.00
Total $ 9,282.00
$ 500.00 $ 500.00
Total $ 500.00

$ 280.00 $ 4,474.40
$ 280.00 $ 2,856.00
Total $ 7,330.40

$ 5,000.00 $ 5,000.00
Total $ 5,000.00

$ 645.00 $ 6,450.00
$ 40.00 $ 200.00
$ 1,000.00 $ 1,000.00
$ 5,590.00 $ 3,991.26
Total $ 11,641.26
$ 4,500.00 $ 3,150.00
Total $ 3,150.00
$ 700.00 $ 700.00
Total $ 700.00
$ 5,000.00 $ 5,000.00
Total $ 5,000.00

Total Gral. $ 54,128.66


Imprevistos $ 5,412.87
Comb. Trasnp. $ 5,000.00
Grand Total $ 64,541.53