SCHEDLOG

Scheduling/Leveling Report - 25-Jan-11 - PM.exe


===============================================

Default Project..................................................HC098-22
Projects:
HC098-22.........................................................NEW
WORKSHOP FACILITIES (Recovery Plan- Rev-1)
Scheduling/Leveling Settings:
-----------------------------
General
-------
Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retained Logic
Calculate start-to-start lag from ...............................Early Start
Define critical activities as Total Float less than or equal to .0
Compute Total Float As ..........................................Finish Float
Calendar for scheduling Relationship Lag ........................Predecessor
Activity Calendar

Advanced
--------
Calculate multiple float paths...................................No

Statistics:
-----------
# Projects.......................................................1
# Activities.....................................................457
# Not Started....................................................300
# In Progress....................................................45
# Completed......................................................112
# Relationships..................................................671
# Activities with Constraint.....................................13
Project: HC098-22 Activity: A.11.6 Completion of
Facilities
Project: HC098-22 Activity: B.23.06 Completion of
Facilities
Project: HC098-22 Activity: C.23.06 Completion of
Facilities
Project: HC098-22 Activity: KM001 Commencement of
Project
Project: HC098-22 Activity: KM001A Completion of
Mobilization
Project: HC098-22 Activity: KM002 Completion of
Design for Overhead Crane
Project: HC098-22 Activity: KM003 Testing and
Commissioning of Electrical Maintenance Wrokshop
Project: HC098-22 Activity: KM004 Completion &
Hand over of Electrical Maintenance Workshop
Project: HC098-22 Activity: KM005 Testing and
Commissioning of New Instrument Workshop
Project: HC098-22 Activity: KM006 Completion &
Hand over of New Instrument Workshop
Project: HC098-22 Activity: KM007 Testing &
Commissioning of New A/C Workshop
Project: HC098-22 Activity: KM008 Completion &
Hand over of New A/C Workshop
Project: HC098-22 Activity: KM009 Contract
Completion
Errors:
-------
Warnings:
---------
Activities without predecessors..................................1
Project: HC098-22 Activity: KM001 Commencement of
Project
Page 1
SCHEDLOG
Activities without successors....................................1
Project: HC098-22 Activity: KM009 Contract
Completion
Out-of-sequence activities.......................................30
Project: HC098-22 Activity: A.1.1.1.2
Approval : Key Personnel
Project: HC098-22 Activity: A.11.2 Removal Scrap &
Surplus Materials
Project: HC098-22 Activity: A.6.5 Dismantle the
existing Crane end stoppers from the GL(6)
Project: HC098-22 Activity: A.7.1.5 Inspection at
Site by JO & Acceptance of Electrical Materials
Project: HC098-22 Activity: A.7.2.97
Installation of Conduit System, Trays & Trunking
Project: HC098-22 Activity: A.8.2.6 Painting of
Gantry Girders
Project: HC098-22 Activity: A4-005 Backfill for
ramps / plinth protection area
Project: HC098-22 Activity: A4-017 Grout using
premixed , ready to use cementicious grout for main frame
Project: HC098-22 Activity: A5-001 Dismantle the
Gable and wall cladding, sliding doors with all its accessories etc
Project: HC098-22 Activity: A5-006 Installation of
Metal Building System
Project: HC098-22 Activity: B.04.2 Issue of
Purchase Order for Civil Materials
Project: HC098-22 Activity: B.04.2.02
Excavation for Footing of Columns & Ground Beams
Project: HC098-22 Activity: B.04.3 Shipping &
Delivery of Civil Materials
Project: HC098-22 Activity: B.11.5.1.3 Issue
of Purchase Order for Mechanical related Materials
Project: HC098-22 Activity: B.15.1.1
Submittal : HVAC Package Units Materials
Project: HC098-22 Activity: B.15.1.12
Approval: BMS & Accessories
Project: HC098-22 Activity: B.15.1.2
Approval : HVAC Package Units Materials
Project: HC098-22 Activity: B.17.1.3 Issue
of Purchase Order for Electrical & Fire Alarm Materials
Project: HC098-22 Activity: B.3.1.2 Submission &
Approval of Civil Architectural & Electrical Drawings
Project: HC098-22 Activity: C.04.1.1
Submittal : Civil Materials
Project: HC098-22 Activity: C.04.2.03 Removal
of existing water supply line , sewage disposal lines
Project: HC098-22 Activity: C.06.1.09
Approval : BMS Systems
Project: HC098-22 Activity: C.06.1.12
Submission: HVAC Electrical & Control Systems
Project: HC098-22 Activity: C.17.1.1
Submittal : Electrical Materials
Project: HC098-22 Activity: C.17.1.2
Approval : Electrical Materials
Project: HC098-22 Activity: C.17.1.3 Issue
of Purchase Order for Electrical Materials
Project: HC098-22 Activity: C.17.2.02 Road
cutting, reinforced concrete PVC duct bank
Project: HC098-22 Activity: C.18.1.1
Submittal : Telephone Materials
Project: HC098-22 Activity: C.20.1.3 Issue
of Purchase Order for Fire alarm Materials
Project: HC098-22 Activity: C.3.3.1 Submission &
Approval of Telephone, Fire Alarm & Computer Speicifications
Activities with Actual Dates > Data Date.........................2
Project: HC098-22 Activity: B.11.5.1.3 Issue
of Purchase Order for Mechanical related Materials
Project: HC098-22 Activity: B.3.1.2 Submission &
Approval of Civil Architectural & Electrical Drawings
Milestone Activities with invalid relationships..................7
Project: HC098-22 Activity: A.11.6 Completion of
Page 2
SCHEDLOG
Facilities
Project: HC098-22 Activity: C.23.06 Completion of
Facilities
Project: HC098-22 Activity: KM003 Testing and
Commissioning of Electrical Maintenance Wrokshop
Project: HC098-22 Activity: KM005 Testing and
Commissioning of New Instrument Workshop
Project: HC098-22 Activity: KM006 Completion &
Hand over of New Instrument Workshop
Project: HC098-22 Activity: KM007 Testing &
Commissioning of New A/C Workshop
Project: HC098-22 Activity: KM008 Completion &
Hand over of New A/C Workshop
Scheduling/Leveling Results:
----------------------------
# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................457
# Relationships with other projects..............................0
Data Date........................................................25-Jan-11
Earliest Early Start Date........................................25-Jan-11
Latest Early Finish Date.........................................26-Nov-11
Exceptions:
-----------
Critical Activities..............................................327
Project: HC098-22 Activity: A.1.1.1.1
Submittal: CV's of Key Personnel
Project: HC098-22 Activity: A.1.1.1.2
Approval : Key Personnel
Project: HC098-22 Activity: A.1.3.13
Submission & Approval of Commissioning Procedure
Project: HC098-22 Activity: A.1.3.14
Submission & Approval of E & I Work Procedure
Project: HC098-22 Activity: A.10.2 As Built
Drawings for Building A
Project: HC098-22 Activity: A.10.9 Final QA/QC
Dossiers
Project: HC098-22 Activity: A.11.1 Starting of
Closeout / Demobilization
Project: HC098-22 Activity: A.11.2 Removal Scrap &
Surplus Materials
Project: HC098-22 Activity: A.11.3 Final Site
Cleaning & House Keeping
Project: HC098-22 Activity: A.11.6 Completion of
Facilities
Project: HC098-22 Activity: A.2.1 Provision of
all general requirement
Project: HC098-22 Activity: A.4.1.4 Shipping &
Delivery of Civil Materials
Project: HC098-22 Activity: A.4.1.5 Inspection at
Site by JO & Acceptance
Project: HC098-22 Activity: A.6.6 Install the
Existing Crane end Stoppers to GL(7)
Project: HC098-22 Activity: A.7.1.4 Shipping &
Delivery of Electrical Materials
Project: HC098-22 Activity: A.7.1.5 Inspection at
Site by JO & Acceptance of Electrical Materials
Project: HC098-22 Activity: A.7.2.1 Installation of
Power Cables , Earthing
Project: HC098-22 Activity: A.7.2.2 Testing &
Commissioning of Power Cables, Earthing
Project: HC098-22 Activity: A.7.2.3 Installation of
Main Switch Board & Control Panel
Project: HC098-22 Activity: A.7.2.4 Testing &
Commissioning of Main Switch Board, Main Control Pan
Project: HC098-22 Activity: A.7.2.7 Installation of
Main Lighting Panel and Main Power Panel
Project: HC098-22 Activity: A.7.2.9 Installation of
Distribution Power Sockets, Lights & Accessories
Project: HC098-22 Activity: A.7.2.91 Testing
& Commissioning of Power Sockets, Lightings & Fittings
Project: HC098-22 Activity: A.7.2.96
Electrical Connection for EOT Overhead Crane
Project: HC098-22 Activity: A.7.2.97
Installation of Conduit System, Trays & Trunking
Page 3
SCHEDLOG
Project: HC098-22 Activity: A.8.2.3 Painting of
Epoxy Resin Floor coating
Project: HC098-22 Activity: A.8.2.4 Painting of
Resin Floor Coating over Epoxy Coated Floor Surface.
Project: HC098-22 Activity: A.8.2.7 Painting of
Alkyd Enamel to Concrete for Ground Beams
Project: HC098-22 Activity: A.9.1 Testing of
Electrical Systems
Project: HC098-22 Activity: A4-016 Cast in place
and compact reinforced concrete for concrete plinth protection
Project: HC098-22 Activity: A4-020 Apply sealent
to construction joint in floor slab
Project: HC098-22 Activity: A4-021 Apply sealent
to construction joint in outside the building
Project: HC098-22 Activity: A4-022 Apply sealent
to expansion joint in floor slab
Project: HC098-22 Activity: A5-006 Installation of
Metal Building System
Project: HC098-22 Activity: B.04.1 Submission &
Approval of Civil Materials
Project: HC098-22 Activity: B.04.2 Issue of
Purchase Order for Civil Materials
Project: HC098-22 Activity: B.04.2.02
Excavation for Footing of Columns & Ground Beams
Project: HC098-22 Activity: B.04.2.06
Backfill for Building Plinth Area
Project: HC098-22 Activity: B.04.2.08 Bitumen
in expansion joints in concrete for plinth protection
Project: HC098-22 Activity: B.04.2.09
Bituminous lmp. Board expansion joints in concrete floor slab
Project: HC098-22 Activity: B.04.2.11 Fix Ms
Dowels to expansion joints
Project: HC098-22 Activity: B.04.2.12 Fixing
of various sizes Anchor Bolts
Project: HC098-22 Activity: B.04.2.13 Lay &
Fix PVC sleeves through the ground Beams
Project: HC098-22 Activity: B.04.2.17 Plain
Concrete Grade K-150 for Footing
Project: HC098-22 Activity: B.04.2.18 Plain
Concrete Grade K-150 for Ground Beams
Project: HC098-22 Activity: B.04.2.19
Reinforced Concrete Grade K-250 for columns/footings
Project: HC098-22 Activity: B.04.2.20
Reinforced Concrete Grade K-250 for column necks
Project: HC098-22 Activity: B.04.2.21
Reinforced concrete Grade K-250 for Ground Beams
Project: HC098-22 Activity: B.04.2.24
Bakcfilling of Footings/ Columns
Project: HC098-22 Activity: B.04.2.26
Reinforced Concrete Grade K-200 for Floor Slab on Grade in Shop Area and Wash Area
Project: HC098-22 Activity: B.04.2.27
Reinforced Concrete Grade K-200 for Floor Slab in Office Area
Project: HC098-22 Activity: B.04.2.28
Reinforced Concrete Grade K-200 for Concrete Plinth Protection
Project: HC098-22 Activity: B.04.2.29
Reinforced Concrete Grade K-200 for Mezzanine Floor Level
Project: HC098-22 Activity: B.04.2.30 Light
Weight Concrete in wet areas of Mezzanine Floor
Project: HC098-22 Activity: B.04.2.32 Fixing
of Sealent to Construction & Expansion Joints
Project: HC098-22 Activity: B.04.2.33
Excavation for Ground Beams
Project: HC098-22 Activity: B.04.3 Shipping &
Delivery of Civil Materials
Project: HC098-22 Activity: B.04.4 Inspection at
Site by JO & Acceptance of Civil Materials
Project: HC098-22 Activity: B.05.2.1
Construction of Partition Walls on Ground Floor Block Work
Project: HC098-22 Activity: B.05.2.2
Construction of Partition Walls on Mezzanine Floor
Project: HC098-22 Activity: B.06.2.1
Installation of Metal Building System
Project: HC098-22 Activity: B.08.1.1
Fabrication & Manufacturing of OH Crane & JIB Crane
Project: HC098-22 Activity: B.08.1.2
Page 4
SCHEDLOG
Installation of Crane Gantry Girder, Rails etc
Project: HC098-22 Activity: B.08.1.4
Shipping & Delivery of OH Crane & JIB Materials
Project: HC098-22 Activity: B.08.1.5
Inspection at Site by JO & Acceptance of OH Crane & JIB Materials
Project: HC098-22 Activity: B.08.2.1
Installation of EOT Overhead Crane
Project: HC098-22 Activity: B.08.2.2
Installation of JIB Crane
Project: HC098-22 Activity: B.09.2.1 Apply
water proofing to all Footings,Column Necks and Ground Beams
Project: HC098-22 Activity: B.09.2.2 Apply
Water Proofing to all Mahnoles , Sump Pit
Project: HC098-22 Activity: B.09.2.3 Apply
Water Proofing to Electrical Trench Hand Hole
Project: HC098-22 Activity: B.09.2.4 Damp
Proofing course over the compacted grade under slab and grade inside & Outside Building
Project: HC098-22 Activity: B.09.2.5 Fix
Accoustical mineral fibre / mineral wool insulation in gypsum board partition
Project: HC098-22 Activity: B.10.2.01 Fixing
of wooden door frames
Project: HC098-22 Activity: B.10.2.02 Fix
fire Retardant wood to steel doors
Project: HC098-22 Activity: B.10.2.07 Fixing
of Sealent to All windows & Doors
Project: HC098-22 Activity: B.10.2.15 Fix
anodized aluminium for windows
Project: HC098-22 Activity: B.11.1.2.1 Apply
Cement Plaster internally to all concrete base to stairs and on sides of steps and
block work
Project: HC098-22 Activity: B.11.1.2.2 Apply
Cement Plaster to wall of toilet and pantry in G.F
Project: HC098-22 Activity: B.11.1.2.3 Apply
Cement Plaster to Walls of toilet and Pantry in Mezzanine floor
Project: HC098-22 Activity: B.11.1.2.4 Cement
& Screed for Mezzanine floor ( Conference Room)/ IT cables
Project: HC098-22 Activity: B.11.1.2.6 Gypsum
Board Partition at Ground Floor
Project: HC098-22 Activity: B.11.1.2.91 Fix
fire resistant Gypsum partition
Project: HC098-22 Activity: B.11.2.2.1 Fix Non
Slip Ceramic Floor Tiles to Floors of Office Areas and Corridors in GF and MEZZ.
Project: HC098-22 Activity: B.11.2.2.2 Ceramic
Tiles skirting on gypsum wall
Project: HC098-22 Activity: B.11.2.2.3 Fix Non
Slip Ceramic Floor Tiles to Floors of Wet Area such as Toilet & Pantries
Project: HC098-22 Activity: B.11.3.2.1 Fix
exposed grid , accoustical mineral to the ceiling of office areas and corridors in GF
Project: HC098-22 Activity: B.11.3.2.2 Fix
exposed grid , accoustical mineral to the ceiling of office areas and cooridors in MEZZ
floor.
Project: HC098-22 Activity: B.11.3.2.3 Fire
rated tiles in MEZZ floor.
Project: HC098-22 Activity: B.11.3.2.5
Aluminium strip ceiling with suspended system in toilet, wash area and pantry areas
Project: HC098-22 Activity: B.11.4.2.01 Fix
marbles to landing of stair case and steps of entrance and exit
Project: HC098-22 Activity: B.11.4.2.04 Fix
marbles to 150mm heights skirting on stairs and landings
Project: HC098-22 Activity: B.11.4.2.07 Carpet
tiles in MEZZ floor ( Conference Room)
Project: HC098-22 Activity: B.11.4.2.08 Raised
floor tiles with carpet tile over IT Cable Trench
Project: HC098-22 Activity: B.11.5.1.1
Submission & Approval of Mechanical related Materials
Project: HC098-22 Activity: B.11.5.1.3 Issue
of Purchase Order for Mechanical related Materials
Project: HC098-22 Activity: B.11.5.1.4
Shipping & Delivery of Mechanical related Materials
Project: HC098-22 Activity: B.11.5.1.5
Inspection at Site by JO & Acceptance of Mechanical related Materials
Project: HC098-22 Activity: B.11.5.2.02 Apply
two coat of epoxy resin floor coating
Project: HC098-22 Activity: B.11.5.2.04 Apply
two coat of glossy paint exposed structural steel items
Page 5
SCHEDLOG
Project: HC098-22 Activity: B.11.5.2.05 Apply
two coat of semi glossy paint to gypsum board wall surfaces
Project: HC098-22 Activity: B.11.5.2.06 Apply
two coat of emulsion paint to all plaster surfaces
Project: HC098-22 Activity: B.12.2.01 Fixing
of sealent around all fixtures and fitting of toilets and kitchen
Project: HC098-22 Activity: B.12.2.08 Install
& test HDPE or CPVC main water supply lines to the building
Project: HC098-22 Activity: B.12.2.10 Install
Packaged A/C Units & Air Filtration System
Project: HC098-22 Activity: B.12.2.11
Interfacing BMS System
Project: HC098-22 Activity: B.12.2.13 Fix
horizontal type water heater
Project: HC098-22 Activity: B.12.2.14 Install
central cartride water filter industrial type for domestic water supply
Project: HC098-22 Activity: B.13.2.01
Excavation for trenches for sanitary sewage
Project: HC098-22 Activity: B.13.2.03
Excavation for trenches for cut sleeve pipe for Electrical / IT Cables
Project: HC098-22 Activity: B.13.2.05
Sanitary sewer piping for CI pipe for sanitary sewage with existing cess pool
Project: HC098-22 Activity: B.13.2.12
sanitary sewer pipe underground and above ground in toilet for drain pipes , vent pipes
Project: HC098-22 Activity: B.14.2.01
Installation of Galvanized ducting work & Accessories
Project: HC098-22 Activity: B.14.2.02
Insulation and Cladding
Project: HC098-22 Activity: B.15.1.1
Submittal : HVAC Package Units Materials
Project: HC098-22 Activity: B.15.1.10
Inspection at Site by JO & Acceptance of Air Filtration Units
Project: HC098-22 Activity: B.15.1.11
Submittal: BMS & Accessories
Project: HC098-22 Activity: B.15.1.12
Approval: BMS & Accessories
Project: HC098-22 Activity: B.15.1.13
Shipping & Delivery of BMS & Accessories
Project: HC098-22 Activity: B.15.1.14
Inspection at Site by JO & Acceptance of BMS & Accessories
Project: HC098-22 Activity: B.15.1.15
Submittal: HVAC Electrical & Control Systems
Project: HC098-22 Activity: B.15.1.16
Approval : HVAC Electrical & Control Systems
Project: HC098-22 Activity: B.15.1.17
Shipping & Delivery of HVAC Electrical & Control Systems
Project: HC098-22 Activity: B.15.1.18
Inspection at Site by JO & Acceptance of HVAC Electrical & Control Systems
Project: HC098-22 Activity: B.15.1.2
Approval : HVAC Package Units Materials
Project: HC098-22 Activity: B.15.1.3 Issue
of Purchase Order HVAC Package Units Materials
Project: HC098-22 Activity: B.15.1.4
Shipping & Delivery of HVAC Package Units Materials
Project: HC098-22 Activity: B.15.1.5
Inspection at Site by JO & Acceptance of HVAC Materials
Project: HC098-22 Activity: B.15.1.9
Shipping & Delivery of Air Filtration Units
Project: HC098-22 Activity: B.15.2.4 BAS
system , Accessories & Fittings
Project: HC098-22 Activity: B.16.1.1
Submittal : Fire Proof Materials
Project: HC098-22 Activity: B.16.1.2
Approval : Fire Proof Materials
Project: HC098-22 Activity: B.16.1.3 Issue
of Purchase Order for Fire Proof Materials
Project: HC098-22 Activity: B.16.1.4
Shipping & Delivery of Fire Proof Materials
Project: HC098-22 Activity: B.16.1.5
Inspection at Site by JO & Acceptance of Fire Proof Materials
Project: HC098-22 Activity: B.16.2.01 Apply
two hours fire proof material to all primary members such as rigid main frames
Project: HC098-22 Activity: B.16.2.02 Install
water fire extinguishers
Project: HC098-22 Activity: B.17.1.2
Page 6
SCHEDLOG
Approval : Electrical & fire Alarm Materials
Project: HC098-22 Activity: B.17.1.3 Issue
of Purchase Order for Electrical & Fire Alarm Materials
Project: HC098-22 Activity: B.17.1.4
Shipping & Delivery of Electrical & Fire Alarm Materials
Project: HC098-22 Activity: B.17.1.5
Inspection at Site by JO & Acceptance of Fire Alarm Materials
Project: HC098-22 Activity: B.17.2.02 Install
Power Cables, Sockets, Light Fittings & Earthing Works
Project: HC098-22 Activity: B.17.2.14 Install
Main switch board ,Distribution Boards
Project: HC098-22 Activity: B.17.2.25
Electrical Connection to EOT/JIB Cranes
Project: HC098-22 Activity: B.17.2.69 Install
entire cable trays ,trunking system & Conduits
Project: HC098-22 Activity: B.18.1.3 Issue
of Purchase Order of telephone Materials
Project: HC098-22 Activity: B.18.1.4
Shipping & Delivery of Telephone Materials
Project: HC098-22 Activity: B.18.1.5
Inspection at Site by JO & Acceptance of Telephone Materials
Project: HC098-22 Activity: B.18.2.2 Install
Main Distribution Frame, Terminal Cabinet at Ground Floor
Project: HC098-22 Activity: B.18.2.3 Install
Main Distribution Frame, Terminal Cabinet at MEZZ Floor
Project: HC098-22 Activity: B.18.2.4 Install
Cables, Sockets, Conduits & Accessories
Project: HC098-22 Activity: B.18.2.92 Install
Route Marker , bed type with all accessories
Project: HC098-22 Activity: B.18.2.94
Miscellaneous items if any to complete the system
Project: HC098-22 Activity: B.19.2.01 Install
fire alarm control panel
Project: HC098-22 Activity: B.19.2.02 Install
ionisation smoke detector, Sensors & Accessories
Project: HC098-22 Activity: B.19.2.12
Miscellaneous item if any to complete the system
Project: HC098-22 Activity: B.2.1 Provision of
all general requirement
Project: HC098-22 Activity: B.20.01 Install Network
LAN cabinet
Project: HC098-22 Activity: B.20.16 Install
Conduits,Transceiver Module, Cables & Sockets
Project: HC098-22 Activity: B.20.18 Miscellaneous
item if any to complete the system
Project: HC098-22 Activity: B.21.01 Testing &
Commissioning of EOT OH Crane
Project: HC098-22 Activity: B.21.02 Testing &
Commissioning of JIB Crane
Project: HC098-22 Activity: B.21.03 Testing &
Commissioning of HDPE / CPVC Main Water line
Project: HC098-22 Activity: B.21.04 Testing &
Commissioning of BAS System
Project: HC098-22 Activity: B.21.07 Testing &
Commissioning of complete Telephone system
Project: HC098-22 Activity: B.21.08 Testing &
Commissioning of Complete fire alarm control system
Project: HC098-22 Activity: B.21.09 Testing &
Commissioning of complete computer data system
Project: HC098-22 Activity: B.22.02 As Built
Drawings for Building B
Project: HC098-22 Activity: b.22.08 Operation &
Maintenance Manuals
Project: HC098-22 Activity: B.22.10 Final QA/QC
Dossiers
Project: HC098-22 Activity: B.23.01 Starting of
Closeout / Demobilization
Project: HC098-22 Activity: B.23.02 Removal Scrap &
Surplus Materials
Project: HC098-22 Activity: B.23.03 Final Site
Cleaning & House Keeping
Project: HC098-22 Activity: B.23.06 Completion of
Facilities
Project: HC098-22 Activity: B.3.1.1 Submission &
Approval of Civil Foundation Drawings
Page 7
SCHEDLOG
Project: HC098-22 Activity: B.3.1.2 Submission &
Approval of Civil Architectural & Electrical Drawings
Project: HC098-22 Activity: B.3.1.4 Submission &
Approval of Shop Drawings
Project: HC098-22 Activity: B.3.3.1 Submission &
Approval of HVAC Design including layout
Project: HC098-22 Activity: C.04.1.1
Submittal : Civil Materials
Project: HC098-22 Activity: C.04.1.2
Approval : Civil Materials
Project: HC098-22 Activity: C.04.1.3 Issue
of Purchase Order for Civil Materials
Project: HC098-22 Activity: C.04.1.4
Shipping & Delivery of Civil Materials
Project: HC098-22 Activity: C.04.1.5
Inspection at Site by JO & Acceptance of Civil Materials
Project: HC098-22 Activity: C.04.2.06
Excavation for footing of columns & Ground Beams
Project: HC098-22 Activity: C.04.2.08
Excavation for A/C foundations , protecting barriers & Road Crossings
Project: HC098-22 Activity: C.04.2.09
Excavation for trenches for laying of sanitary sewer lines
Project: HC098-22 Activity: C.04.2.10
Backfilling of A/C Foundation, Protecting Barriers & Road Crossings
Project: HC098-22 Activity: C.04.2.11
Backfill for building plinth area/Footing/Column/Ground Beam
Project: HC098-22 Activity: C.04.2.12 Fix
bitumen impregnated in expansion joints for plinth protection
Project: HC098-22 Activity: C.04.2.13
Construction of A/C Foundation/Manhole
Project: HC098-22 Activity: C.04.2.14 Fix
bitumen impregnated in expansion joints in concrete floor slab
Project: HC098-22 Activity: C.04.2.15 Fix MS
Dowels
Project: HC098-22 Activity: C.04.2.16 Fixing
Anchor bolts of various sizes
Project: HC098-22 Activity: C.04.2.17 Lay and
Fix PVC sleeves through ground beams
Project: HC098-22 Activity: C.04.2.20 Cast in
place concrete grade K-150 for footing
Project: HC098-22 Activity: C.04.2.21 Cast in
place concrete grade k-150 for ground beams
Project: HC098-22 Activity: C.04.2.22 Cast in
place concrete grade k-250 for column footing
Project: HC098-22 Activity: C.04.2.23 Cast in
place concrete grade k-250 for column necks
Project: HC098-22 Activity: C.04.2.24 Cast in
place reinforced concrete grade k-250 for ground beams
Project: HC098-22 Activity: C.04.2.25 Cast in
place reinforced concrete grade k-250 for steps, A/C foundations
Project: HC098-22 Activity: C.04.2.26 Cast in
place reinforced concrete grade k-250 for beams , lintels and windows sills in
superstructure
Project: HC098-22 Activity: C.04.2.27 Cast in
place reinforced concrete grade k-250 for suspended slabs and waists slabs in staircase
Project: HC098-22 Activity: C.04.2.28 Cast in
place reinforced concrete grade k-250 in stairway steps
Project: HC098-22 Activity: C.04.2.29 Cast in
place concrete k-200 floor slab in office area
Project: HC098-22 Activity: C.04.2.30 Cast in
place concrete grade k-200 floor slab in workshop area
Project: HC098-22 Activity: C.04.2.31 Cast in
place concrete grade k-250 for MEZZ floor
Project: HC098-22 Activity: C.04.2.32 Cast in
place insulating /light weight concrete in wet areas of Mezzanine floor
Project: HC098-22 Activity: C.04.2.33 Grout
for main frame bases
Project: HC098-22 Activity: C.05.2.01
Construct partition wall on ground floor Block work
Project: HC098-22 Activity: C.05.2.02
Construct partition wall on MEZZ floor
Project: HC098-22 Activity: C.06.1.01
Fabrication & Manufacturing of Metal Building System
Project: HC098-22 Activity: C.06.1.02
Shipping & Delivery of Metal Building System
Page 8
SCHEDLOG
Project: HC098-22 Activity: C.06.1.03
Material inspection at site by JO & Acceptance of Metal Building System
Project: HC098-22 Activity: C.06.1.06
Shipping & Delivery of Air Filtration Units
Project: HC098-22 Activity: C.06.1.07
Inspection at Site by JO & Acceptance of Air Filtration Units
Project: HC098-22 Activity: C.06.1.08
Submission : BMS Systems
Project: HC098-22 Activity: C.06.1.09
Approval : BMS Systems
Project: HC098-22 Activity: C.06.1.10
Shipping & Delivery of BMS Systems
Project: HC098-22 Activity: C.06.1.11
Inspection at Site by JO & Acceptance of BMS Systems
Project: HC098-22 Activity: C.06.1.12
Submission: HVAC Electrical & Control Systems
Project: HC098-22 Activity: C.06.1.13
Approval : HVAC Electrical & Control Systems
Project: HC098-22 Activity: C.06.1.14
Shipping & Delivery of HVAC Electrical & Control Systems
Project: HC098-22 Activity: C.06.1.15
Inspection at Site by JO & Acceptance of HVAC Electrical & Control Systems
Project: HC098-22 Activity: C.06.1.16
Installation of Crane Gantry Girder, Rails etc
Project: HC098-22 Activity: C.06.2.01
Installation of Metal Building System
Project: HC098-22 Activity: C.06.2.02 Fix
aluminium hand rail and balusters to stair case
Project: HC098-22 Activity: C.06.2.05 Fix GI
Pole antenna
Project: HC098-22 Activity: C.08.1.01
Fabrication & Manufacturing of EOT Overhead Crane
Project: HC098-22 Activity: C.08.1.02
Shipping & Deliver of EOT OVerhead Crane
Project: HC098-22 Activity: C.08.1.03
Inspection at Site by JO & Acceptance of EOT OVerhead Crane
Project: HC098-22 Activity: C.08.2.01
Installation of EOT OH Crane
Project: HC098-22 Activity: C.09.2.01 Apply
water proofing to all footings, column necks and ground beams
Project: HC098-22 Activity: C.09.2.02 Apply
water proofing to all manholes internally and externally
Project: HC098-22 Activity: C.09.2.04 Apply
water proofing on concrete surface in wet areas for slab and upstands
Project: HC098-22 Activity: C.09.2.05 Lay and
fixing polyethene sheet as damp proofing course
Project: HC098-22 Activity: C.09.2.06 Fix
insulation in gypsum board partition
Project: HC098-22 Activity: C.10.2.06 Fixing
aluminium windows
Project: HC098-22 Activity: C.10.2.07 Fix
hardwood door frames for door
Project: HC098-22 Activity: C.10.2.08 Fixing
of arcylic sealent to all windows and doors
Project: HC098-22 Activity: C.10.2.09
Installation of Wooden Door
Project: HC098-22 Activity: C.10.2.10
Installation of Steel Door
Project: HC098-22 Activity: C.11.1.2.03 Apply
cement plaster internally to all concrete base to walls of toilet and pantry in MEZZ
floor
Project: HC098-22 Activity: C.11.1.2.04 Apply
cement screed to MEZZ floor/Trench/IT Cables
Project: HC098-22 Activity: C.11.1.2.06 Fix
gypsum board partition on one face of the studs for external wall
Project: HC098-22 Activity: C.11.1.2.07 Fix
gypsum board partition
Project: HC098-22 Activity: C.11.1.2.09 Fix
Fire resistance Gypsum Board
Project: HC098-22 Activity: C.11.1.2.10 Fix
fire resistance on staircase MEZZ floor grid
Project: HC098-22 Activity: C.11.2.2.01 Fix non
slip ceramic floor tiles to floor of office areas and corridors in GF & MEZZ
Project: HC098-22 Activity: C.11.2.2.02 Fix
skirting
Page 9
SCHEDLOG
Project: HC098-22 Activity: C.11.2.2.04 Fix
acid resisting tiles in battery charging and battery store rooms
Project: HC098-22 Activity: C.11.3.2.01 Fix
exposed grid, modular, accoustical mineral to office areas and corridors in MEZZ floor
Project: HC098-22 Activity: C.11.3.2.02 Fix
fire rated tiles in staircase area and battery charge store rooms
Project: HC098-22 Activity: C.11.3.2.03 Fix
perforated sound absorption tiles in MEZZ floor conference room
Project: HC098-22 Activity: C.11.3.2.04 Fix
exposed grid, modular, accoustical mineral to office areas and corridors in GF
Project: HC098-22 Activity: C.11.3.2.05 Fix
aluminium strip ceiling in toilets, wash areas and pantry areas
Project: HC098-22 Activity: C.11.4.2.03 Fix
marble tiles to risers for staircase
Project: HC098-22 Activity: C.11.4.2.04 Fix
skirting on stairs and landings
Project: HC098-22 Activity: C.11.4.2.05 Fix
marble for entrance and exit steps / staircase
Project: HC098-22 Activity: C.11.4.2.09 Fix
carpet tiles in MEZZ floor
Project: HC098-22 Activity: C.11.4.2.10 Fix
raised floor tiles with carpet tile floor over IT cable trench
Project: HC098-22 Activity: C.11.4.2.11 Fix
coved skirting 150mm height to carpeted flooring
Project: HC098-22 Activity: C.11.5.2.02 Apply
two coats of an epoxy resin floor coating
Project: HC098-22 Activity: C.11.5.2.05 Apply
two coat of alkyde enamel paint to gypsum board wall
Project: HC098-22 Activity: C.11.5.2.06 Apply
two coats of emulsion paint to all plastered surfaces and concrete surfaces
Project: HC098-22 Activity: C.12.2.04 Fixing
Accessories at Toilet & Pantry
Project: HC098-22 Activity: C.12.2.08 Fix
toilet and pantry fixtures,HDPC,CPVC Hot & Cold water supply
Project: HC098-22 Activity: C.12.2.11 Fix
emergency eye wash basin & Shower
Project: HC098-22 Activity: C.12.2.19 Install
horizontal water heater
Project: HC098-22 Activity: C.13.2.01
Installation of sanitary sewer piping & Water line
Project: HC098-22 Activity: C.13.2.06 Sewage
pipe connection to the existing cess pool
Project: HC098-22 Activity: C.14.01 Galvanized
ducting works and accessories
Project: HC098-22 Activity: C.14.02 Insulation and
cladding
Project: HC098-22 Activity: C.15.1.01 Install
packaged A/C units & Air Filtration system
Project: HC098-22 Activity: C.15.1.05 BAS
system complete with controls , sensors/ Interfacing BMS
Project: HC098-22 Activity: C.16.2.01 Apply
fire resistant material to all primary member
Project: HC098-22 Activity: C.16.2.03 Install
Fire Extinguishers
Project: HC098-22 Activity: C.17.1.1
Submittal : Electrical Materials
Project: HC098-22 Activity: C.17.1.2
Approval : Electrical Materials
Project: HC098-22 Activity: C.17.1.3 Issue
of Purchase Order for Electrical Materials
Project: HC098-22 Activity: C.17.1.4
Shipping & Delivery of Electrical Materials
Project: HC098-22 Activity: C.17.1.5
Inspection at Site by JO & Acceptance of Electrical Materials
Project: HC098-22 Activity: C.17.2.01 Install
Main power Cable, Sockets, Exhaust Fan, Light Fittings & Earthing System
Project: HC098-22 Activity: C.17.2.10 Install
cable marking tiles/ Route Markers
Project: HC098-22 Activity: C.17.2.14 Install
main switch board, Distribution Boards
Project: HC098-22 Activity: C.17.2.26 Install
entire conduit system, Cable Trays & Trunking
Project: HC098-22 Activity: C.18.1.3 Issue
of Purchase Order for Telephone Materials
Project: HC098-22 Activity: C.18.1.4
Page 10
SCHEDLOG
Shipping & Delivery of Telephone Materials
Project: HC098-22 Activity: C.18.1.5
Inspection at Site by JO & Acceptance for Telephone Materials
Project: HC098-22 Activity: C.18.2.01 Install
main distribution frame, Terminal Cabinets at Ground Floor
Project: HC098-22 Activity: C.18.2.02 Install
Main Distribution Frame, Terminal Cabinets at MEZZ floor
Project: HC098-22 Activity: C.18.2.04 Install
Conduit Cables, Sockets & Accessories
Project: HC098-22 Activity: C.18.2.10 Install
route marker bed type with all accessories
Project: HC098-22 Activity: C.18.2.12
Miscellaneous item if any to complete the system
Project: HC098-22 Activity: C.19.2.01 Install
network LAN cabinet
Project: HC098-22 Activity: C.19.2.06 Install
Conduit transceiver module, Cables & Sockets
Project: HC098-22 Activity: C.19.2.15
Miscellaneous items if any to complete the system
Project: HC098-22 Activity: C.20.2.01 Install
fire alarm control panel ,Sensors & Accessories
Project: HC098-22 Activity: C.20.2.10 Install
interface modules unit
Project: HC098-22 Activity: C.20.2.17
Miscellaneous item if any to complete the system
Project: HC098-22 Activity: C.21.01 Testing &
Commissioning of EOT OH Crane
Project: HC098-22 Activity: C.21.03 Testing &
Commissioning of HDPE / CPVC Main Water line
Project: HC098-22 Activity: C.21.04 Testing &
Commissioning of BAS System
Project: HC098-22 Activity: C.21.07 Testing &
Commissioning of complete Telephone system
Project: HC098-22 Activity: C.21.08 Testing &
Commissioning of Complete fire alarm control system
Project: HC098-22 Activity: C.21.09 Testing &
Commissioning of computer data system
Project: HC098-22 Activity: C.22.02 As Built
Drawings for Building C
Project: HC098-22 Activity: C.22.09 Operation &
Maintenance Manuals
Project: HC098-22 Activity: C.22.10 Final QA/QC
Dossiers
Project: HC098-22 Activity: C.23.01 Starting of
Closeout / Demobilization
Project: HC098-22 Activity: C.23.02 Removal Scrap &
Surplus Materials
Project: HC098-22 Activity: C.23.03 Final Site
Cleaning & House Keeping
Project: HC098-22 Activity: C.23.04 Demobilization
of Site Office & Stores
Project: HC098-22 Activity: C.23.05 Demobilization
of Lay Down Yards
Project: HC098-22 Activity: C.23.06 Completion of
Facilities
Project: HC098-22 Activity: C.3.1.1 Submission &
Approval of Civil Drawings
Project: HC098-22 Activity: C.3.1.2 Submission &
Approval of EOT Crane
Project: HC098-22 Activity: C.3.1.4 Submission &
Approval of HVAC Drawings & Shop Drawing
Project: HC098-22 Activity: C.3.2.1 Submission &
Approval of Design for Metal Building system
Project: HC098-22 Activity: C.3.3.1 Submission &
Approval of Telephone, Fire Alarm & Computer Speicifications
Project: HC098-22 Activity: KM001A Completion of
Mobilization
Project: HC098-22 Activity: KM002 Completion of
Design for Overhead Crane
Project: HC098-22 Activity: KM003 Testing and
Commissioning of Electrical Maintenance Wrokshop
Project: HC098-22 Activity: KM004 Completion &
Hand over of Electrical Maintenance Workshop
Project: HC098-22 Activity: KM005 Testing and
Commissioning of New Instrument Workshop
Page 11
SCHEDLOG
Project: HC098-22 Activity: KM006 Completion &
Hand over of New Instrument Workshop
Project: HC098-22 Activity: KM007 Testing &
Commissioning of New A/C Workshop
Project: HC098-22 Activity: KM008 Completion &
Hand over of New A/C Workshop
Project: HC098-22 Activity: KM009 Contract
Completion
Activities with unsatisfied constraints..........................3
Project: HC098-22 Activity: KM001A Completion of
Mobilization
Project: HC098-22 Activity: KM002 Completion of
Design for Overhead Crane
Project: HC098-22 Activity: KM003 Testing and
Commissioning of Electrical Maintenance Wrokshop
Activities with unsatisfied relationships........................7
Project: HC098-22 Activity: A.11.6 Completion of
Facilities
Project: HC098-22 Activity: B.23.06 Completion of
Facilities
Project: HC098-22 Activity: C.23.06 Completion of
Facilities
Project: HC098-22 Activity: KM001A Completion of
Mobilization
Project: HC098-22 Activity: KM003 Testing and
Commissioning of Electrical Maintenance Wrokshop
Project: HC098-22 Activity: KM005 Testing and
Commissioning of New Instrument Workshop
Project: HC098-22 Activity: KM007 Testing &
Commissioning of New A/C Workshop

Activities with external dates...................................0

Page 12