Vous êtes sur la page 1sur 180

Government of Nepal

Ministry of Water Resources


Department of Irrigation
Planning, Design, and Monitoring & Evaluation
Division
Jawalakhel, Lalitpur

DEVELOPMENT OF DATABASE FOR IRRIGATION


DEVELOPMENT IN NEPAL

Draft Report

FINAL REPORT
March, 2007

CENTER FOR ENGINEERING RESEARC AND DEVELOPMENT


Bishanlnagar, Kathmandu - 4. P.O. Box: 9839, Tel: 4431433
Email: cerd@cerd.wlink.com.np
ACRONOMY

AC Actual Completed
ADB Asian Development Bank
ADB/N Agricultural Development Bank of Nepal
ADPJ Agricultural Development Project, Janakpur
AGRIL/Y Agricultural Year
AIC Agricultural Input Corporation
APP Agricultural Prospective Plan
CA Command Area
CAD Command Area Development
CBS Central Bureau of Statistics
CCA Culturable Command Area
CGISP Community Ground Water Irrigation Sector project
Comp, Completed
Dev. Int. Development Intensity
DBID Data Base for Irrigation Development
DIDP Dhaulagiri Irrigation Development Project
DIO District Irrigation Office
DOA Department of Agriculture
DOI Department of Irrigation
DTW Deep Tubewell
ED Extensive Development
ECC European Economic Community
ERIP East Rapti Irrigation Project
FIWUD Farm Irrigation and Water Utilization Division
FMIS Farmer Managed Irrigation System
GADP Gandaki Anchal Agricultural Development Programme
GCA Gross Command Area
GTZ German Technical Cooperation
GW Ground Water
HFP Hill Food Programme
ID Intensive Development
IDA International Development Agency
IDP-MWR Irrigation Development Project Mid-Western Region
ILC Irrigation Line of Credit
ILO International Labour Organization
INGO International Non-Governmental Organization
Irr. Cap Irrigation Capability
ISP Irrigation Sector Project
JICA Japanese International Cooperation Agency
JM Joint Management
KBIRD Karnali Bheri Integrated Rural Development Project
KHILL Koshi Hill Area Rural Development Project
KHARDEP Koshi Hill Area Integrated Rural Development Project
KOR Gorvement of Koria
MAIN Maintenance Programme
MINOR Minor Irrigation Programme
MPLD Ministry of Panchyat and Local Development
MS Monsoon Season
M Hill Mechi Hill Programme
MIRDP Mahakali Integrated Rural Development Project
MTW Medium Tubewell
NCA Net Command Area
N/CARE CARE/Nepal
NGO Non-Governmental Organization
NISP Nepal Irrigation Sector Programme
NITP Non-Conventional Irrigation Technology Project
PC Project Completed
PDSP Planning and Design Strengthening Project
PEOPLE People Participation Programme
PP Participatory Programme
RIRDP Rapti Integrated Rural Development Project
SAU Saudi Fund
SAPL Second Agriculture Program Loan
SHIP Second Hill Irrigation Project
SI Small Irrigation
SINKALAMA Sindhupalchowk Kavreplanchowk Lalitpur and Makwanpur
Irrigation Project
SIP Small Irrigation Programme
SIRDP Sagarmatha Integrated Rural Development Project
SISP Second Irrigation Sector Project
SNV Netherland Development Cooperation
STW Sallow Tubewell
TO Turn Over
UI Un-irrigated
UNCDF United Nation Capital Development Fund
UNDP United Nation Development Programme
USAID United Stats Agency for International Development
VDC Village Development Committee
WECS Water and Energy Commission Secretariat
WUA Water User Association
WUI Water Use Inventory
YR Year Round
TABLE OF CONTENTS

Page no:
Acronyms
1. Introduction 1

2. Objective of the Study 1

3. Scope of Works 1

4. Data Incorporated from Different Agencies for 2


4.1 Surface Water Irrigation 2
4.2 Ground Water Irrigation 2
4.3 Non-Conventional Irrigation 2
5. Irrigation Database Compilation 2

6. Highlights of Irrigation Development 3

6.1 Total Area vs Irrigated Area 3


6.2 Scheme-wise Irrigated Area 4
6.3 Present Status with CCA for Surface irrigation 4
6.4 Present Status with CCA for Ground Water irrigation 4
6.5 Present Status with Size of Project for Surface irrigation 4
6.6 CCA under Ecological Regions (Excluding Non-Assisted FMIS) 5
6.7 CCA under Development Regions (Excluding Non-Assisted FMIS) 5
6.8 Monsoon vs Year Round 5
6.9 ID vs ED and CAD 5
6.10 Planned vs Developed Command Area 6

List of Tables
Table–1 Ecological and Physiographical Division of the Districts of Nepal 7
Table -2 Present Status of DOI Surface Projects 10
Table -3 Command Area of Surface Farmer’s Managed Irrigation Scheme. 18
Table -4 Summary of total command area of Surface Farmer Managed
Irrigation Scheme up-to 2005/06 (Agency Assisted). 157
Table -5 Status of Shallow Tubewell in Nepal up-to 2005/06. 162
Table -6 Status of Deep Tubewell in Nepal up-to 2005/06. 163
Table -7 Present Level of Irrigation Development. 164
Table -8 Non Conventional Projects. 166
Table -8.1 Details of Non Conventional Projects. 168
Table -9 Planned vs Developed Command Area. 169
Table-10 Summary of Net Command Area (NCA) of Surface Irrigation System. 170
ACKNOWLEDGEMENTS

We would like to express our sincere gratitude to Planning, Design,


Monitoring and Evaluation Division of Department of Irrigation for giving us the
opportunity to carry out the present job of the Development of Database for
Irrigation Development in Nepal (DDIDN).

The Consultants extend thanks to the Er. Sudhir Man Baisyat, Deputy Director
General, Er. Rajendra Prasad Adhikari, Senior Divisional Engineer and Er. Basu
Dev Timilsina DoI for their valuable suggestions and guidelines during the
preparation of this study.

We would like to express our heartily appreciation to Mr. Pratap Singh Tater, Senior
Divisional Hydrologist, DoI and GWFOs, Ground Water Resources Development
Project and Er. Niranjan Dev Pandey, Project Manager, Non-Conventional
Irrigation Technology Project, DoI. for their co-operation and support for the
Report.

We are thankful to Agricultural Development Bank, Nepal and CARE Nepal, GTZ
Nepal and SNV Nepal for their cooperation and sincere help in providing data and
informations. We are also thankful to all who helped us during data collection of
Irrigation systems.

CENTER FOR ENGINEERING RESEARCH AND DEVELOPMENT


(CERD)
1. INTRODUCTION

Department of Irrigation (Dol), for the last 10 years, has been working in various circumstances for
the purposeful implementation of Management Information System within its organizational
capabilities as part of Information System Planning. So far, it has been successful in making the
staffs feel the need of computer and its capabilities for enhancing their day to day work. The use of
computers has been limited mostly to preparing reports, tables, charts and letters and in few cases
storing these outputs for future uses. Presently data on Irrigation Development in Nepal have been
prepared by different divisions and sections of the Department on the basis of as and when needed.
Due to the lack of central database system, the authenticity and integrity of such data has been in
question at times. Thus there is a great need of central database system for consistent and proper data
sets for the proper planning and development of the nation’s irrigation systems. Hence database
storage, retrieval and analysis has become more and more important and relevant nowadays for
better planning of the nation’s irrigation development and also for information dissemination on
what the department has been doing over the years.

For the purpose of updating the Data Base for Irrigation Development in Nepal (DBID), on a regular
basis a “DBID System” has to be developed so that, every year’s data can be entered and updated
reports can be printed and published. Department of Irrigation, Management Information System
Section wishes to engage local consulting firms to develop a ‘DBID System” for its regular update
of data.

2. OBJECTIVE OF THE STUDY

The objective of study will be as follows;

• Review and update (if data set is missing) of existing DBID published in 1997.
• Update the same with the new data set up to fiscal year 2005/06 provided by Department of
Irrigation, ADB/N, NGOs, INGOs and other agencies if any.
• Submit the new document of DBID in hardcopy and printable form.

3. SCOPE OF WORKS

The scope of works limits to develop a part of module of Management Information System, DBID
Application Module. /

• Review existing DBID published in 1997,


• Make appropriate updates in DBID in exiting application, which will be beneficial to the
organizational needs
• The Data on Standard tables in existing DBID should be verified with additional Data as
required.
• Install all the data of the existing DBID up-to 1995/96 and update with the current data set
till FY 2005/06.
• Consultant will also obtain the data set from ADB/N and other NGOs/INGOs, which are
involved in developing irrigation systems and include it in updated DBID.

1
4. Data incorporated from Different Agencies

4.1 Surface Water Irrigation


In the existing DBID, the Sub-projects under Irrigation Line of Credit were on-going as well as
completed. To avoid duplication and confusion, the Sub-projects data are replaced as per ILC Project
Completion Report . As Nepal Irrigation Sector Project (NISP) was implemented as continuation of
ILC project, the list of ongoing sub-projects of ILC are omitted. The completed and ongoing sub-
projects under NISP are entered from its PCR.

Similarly, the status of on-going and completed projects under Irrigation Sector Project (ISP) is
omitted from the existing DBID and entered as per PCR of ISP. The on-going project of Second
Irrigation Sector Project is also omitted from existing DBID and entered as per PCR of SISP.

Data of the IDP-MWR Project is entered from its PCR. This project was started on 1998 and
completed on 2004.

After completion of SISP and NISP, one new project namely MIP is introduced and being
implemented to cover the rehabilitation work of Irrigation system of Nepal. The data of this project
is collected from DOI and entered in DBID.

In existing DBID, the data provided by ADB/N was entered as project-wise. But, at present, the data
provided by ADB/N is district-wise and the name of project is also not provided. The command area
development work under surface irrigation system by the ADB/N is limited after the 1995/96, so the
recent data is not incorporated, which may mislead.

4.2 Ground Water Irrigation


In existing DBID the details of DOI Ground Water Projects are not listed. The project-wise data of
Sallow Tubewell and Deep Tubewell are collected from the Ground Water Field Offices and worked
out with the help of Senior Geo-hydrologist of DOI

The recent district-wise data on Shallow Tubewell is collected from Agricultural Development
Bank/Nepal and incorporated to the DBID, where as the data of Agricultural Development Project,
Janakpur is taken from the existing DBID.

4.3 Non-Conventional Irrigation


The data on Non-Conventional Irrigation Project are updated by collecting the data from Non-
Conventional Irrigation Technology Project of the Department of Irrigation.

5. Irrigation Database Compilation

The following tables are developed for compilation of Irrigation Database.

Table–1 Ecological and Physiographical Division of the Districts of Nepal

Table -2 Present Status of DOI Surface Projects


(Chapakot I.P, Rampur Phant I.P. and Rainastar I.P. are rehabilitated under NISP
program but it is still being operated under Project Joint Management, hence these are
omitted from DOI project)

2
Table -3 Command Area of Surface Farmer’s Managed Irrigation Scheme. (Agency Assisted)
(For FMIS, the data up-to 1988, data after 1988 up-to 1994/95 is included along with
date from 1994/95 to 2005/06 in this table. This table includes the data of NISP, ILC,
ISP, SISP, ERIP, IDP-MWR and MIP along with the previous data)

Table -4 Summary of total command area of Surface Farmer Managed Irrigation Scheme up-to
2005/06 (Agency Assisted)
(The table includes the summary of new and rehabilitation project from all agencies
executed projects.)

Table -5 Status of Shallow Tubewell in Nepal up-to 2005/06


(Up-to-date status of Shallow Tubewell is collected from DOI, Ground Water
Division and ADB/N. The data of ADPJ is taken from existing DBID.)

Table -6 Status of Deep Tubewell in Nepal up-to 2005/06

Table -7 Present Level of Irrigation Development


(All DOI, FMIS and Non-Assisted Project of Surface Water, Shallow and Deep
Tubewell of DOI and other Agency are compiled in this table.)

Table -8 Non Conventional Projects


(District-wise data of existing DBID is up-dated from the data provided by NITP –
DOI)

Table -8.1 Detail of Non Conventional Projects


(Details of data provided by NITP – DOI)

Table -9 Planned vs Developed Command Area


(This table includes the summary of all Surface Water Projects such as planned,
developed and yet to be developed GCA and CCA. (excluding Non-Assisted FMIS)

Table-10 Summary of Net Command Area (NCA) of Surface Irrigation System


( Summary under development region , ecological region, project type and agency’s
name )

6. Highlights of Irrigation Development

The highlight of irrigation development till 2005/06 has been summarized in followings

Status of Government and Non-Governmental assistance in Surface and Ground water Project and
Non-assisted FMIS

6.1 Total Area vs Irrigated Area


Description Area (ha) Table
Total Area 264,1742 Table -7
Total Irrigable Area 1,765,840 Table -7
Total Irrigated Area 1,251,406 Table -7

3
6.2 Scheme-wise Irrigated Area
Scheme Command Area (ha) Table
Surface Water 960,237 Table -7
Ground Water 278,158 Table -7
Non Conventional Projects 13,011 Table -7
Total Irrigated Area(Ha.) 1,251,406

6.3 Present Status with CCA for Surface irrigation


Agency Command Area (ha) Remarks
DOI Project 314,521 Table - 7
Agency Assisted FMIS Project, New 38,169 Table - 7
Agency Assisted FMIS Project, Rehabilitation 295,258 Table - 7
Non Assisted FMIS 312,289 Table - 7
Total 960,237

6.4 Present Status with CCA for Ground Water irrigation


(A) Shallow Tubewell
Agency No Command Remarks
area (ha)
DOI Project 14,427 53,964 Table - 5
Agricultural Development Project, Janakpur 2,593 18,151 Table - 5
ADBN 50,685 1,67,943 Table - 5
Total 67,705 2,40,058

(B) Deep Tubewell/ Medium Tubewell


Agency No Command Remarks
area
DOI Project 630 34,455 Table - 6
Agricultural Development Project, Janakpur 81 3,645 Table – 6
Total 711 38,100

6.5 Present Status with Size of Project for Surface irrigation


Project Category DOI FMIS Total CCA (ha)
Major 269,310 31,800 301,110
Large 11,613 16,710 28,323
Medium 30,978 220,670 251,648
Small 2620 64,247 66,867
Total 314,521 333,427 647,948

Criteria:
Project Terai Hill
Major CCA> 5000 ha CCA>1000 ha
Large 2000 ha> CCA> 5000 ha 500 ha> CCA> 1000 ha
Medium 200 ha> CCA> 2000 ha 50 ha> CCA> 500 ha
Small CCA< 2000 ha CCA< 50 ha

4
6.6 CCA under Ecological Regions (Including Assisted FMIS)
Surface Water Ground Total
Category
DOI FMIS Total (ha) Water (ha) (ha)
Terai 295,698 209,815 505,513 277,426 782,939
Hill 16,963 100,531 117,494 732 118,226
Mountain 1,860 23,081 24,941 24,941
Total 314,521 333,427 647,948 278,158 926,106
Note: The Command area in Ground Water in Hill is to be referred as Inner Terai.

6.7 CCA Under Development Regions (Excluding Non-Assisted FMIS)


Surface Water Ground Total
Region
DOI FMIS Total (ha) Water (ha) (ha)
Eastern 128,070 78,436 206,506 91,037 297,543
Central 123,412 95,163 218,575 83,636 302,211
Western 34,681 61,388 96,069 47,461 143,530
Mid-Western 6,122 69,353 75,475 23,511 98,986
Far Western 22,236 29,087 51,323 32,513 83,836
Total 314,521 333,427 647,948 278,158 926,106

6.8 Monsoon vs Year Round


Surface Water Ground Total
Category
DOI FMIS Total (ha) Water (ha) (ha)
Monsoon (MS) 142,309 38,352 180,661 180,661
Year Round (YR) 172,212 295,075 467,287 278,158 745,445
Total of Nepal 314,521 333,427 647,948 278,158 926,106
For 866 FMIS Projects CCA 82724 ha, which have no MS or YR status available, CCA is included
in Year Monsoon and Year Round as per its weight-age.

6.9 ED vs ID and CAD


Surface Water Ground
Category Total (ha)
DOI FMIS Total (ha) Water (ha)
ED 110,440 78,173 188,613 - 188,613
ID 47,958 255,253 303,211 278,158 581,369
CAD 156,123 1 156,124 156,124
Total 314,521 333,427 647,948 278,158 926,106
For 533 FMIS Projects CCA 64905 ha, which have no ED or ID and CAD status available, CCA is
included in ED and ID by its weight-age.

Criteria:
Extensive Development (ED):- All schemes having primary and secondary canal but
lacking tertiary canal system, service block size 300 to
500 ha
Intensive Development (ID) :- All schemes having primary and secondary canal and
tertiary canal system, service block size 30 to 50 ha
Command Area Development (CAD) :- All schemes ID plus quaternary, service block size 3 to
5 ha

5
6.10 Planned vs Developed Command Area
Category No of Planned Planned Developed Developed
Project GCA (ha) CCA (ha) GCA (ha) CCA (ha)
FMIS 3,005 448,084 367,481 406,788 333,427
DOI 179 389,799 314,921 389,267 314,521
Total 3,184 837,883 682,402 796,055 647,948

6
TABLE 1
Ecological and Physiographical Division of the Districts of Nepal
Physiographic Division (% of area)
Development Ecological Total Area Siwalik Middle Mountain High Mountain
District Zone
Region Belt (Ha.) Terai High
valley Slope Valley Slope Valley Slope
Himal
Eastern Region
Jhapa Mechi Eastern Terai 156891 93.4 6.2 0.2 0.1 0.1 0 0 0
Morang Koshi Eastern Terai 184680 82.4 0.6 8.3 0 8.7 0 0 0
Sunsari Koshi Eastern Terai 127076 91.1 0.6 5.8 0 2.5 0 0 0
Saptari Sagarmatha Eastern Terai 135929 76.7 1.2 22.1 0 0 0 0 0
Siraha Sagarmatha Eastern Terai 122797 77.3 2.7 20 0 0 0 0 0
Eastern Terai 727373 84.2 2.3 11.3 0.0 2.3 0.0 0.0 0.0
Ilam Mechi Eastern Hill 171725 1.5 3.9 22.5 2.3 66.6 0 3.2 0
Panchthar Mechi Eastern Hill 124589 0 0 0 1.9 84.4 0 13.1 0.6
Terathum Koshi Eastern Hill 67163 0 0 0 1.2 98.2 0 0.6 0
Dhankuta Koshi Eastern Hill 90020 0 0 0.1 5.4 94.5 0 0 0
Bhojpur Koshi Eastern Hill 150994 0 0 0 3 85.2 0 11.8 0
Udaypur Sagarmatha Eastern Hill 203169 3.6 18 34.8 1.7 41.9 0 0 0
Khotang Sagarmatha Eastern Hill 160864 0 0 0 2.6 81.5 0 15.9 0
Okhaldhunga Sagarmatha Eastern Hill 108503 0 0 0 2.8 74.4 0 22.8 0
Eastern Hill 1077027 0.6 2.7 7.2 2.6 78.3 0.0 8.4 0.1
Taplejung Mechi Eastern Mountain 364221 0 0 0 0 12.6 0.1 38.2 49.1
Sankhuwasawa Koshi Eastern Mountain 345729 0 0 0 0.9 23.4 0.2 42.6 32.9
Solukhumbu Sagarmatha Eastern Mountain 339776 0 0 0 0 0.8 0.1 40.3 58.8
Eastern Mountain 1049726 0.0 0.0 0.0 0.3 12.3 0.1 40.4 46.9
Central Region
Dhanusha Janakpur Central Terai 121746 75 3.6 21.4 0 0 0 0 0
Mahottari Janakpur Central Terai 98745 83.1 2.7 14.2 0 0 0 0 0
Sarlahi Janakpur Central Terai 126327 84.7 1.9 13.4 0 0 0 0 0
Rautahat Narayani Central Terai 103709 92.5 0.1 7.4 0 0 0 0 0
Bara Narayani Central Terai 129564 87.2 0.8 12 0 0 0 0 0
Parsa Narayani Central Terai 138943 65.1 14.1 20.8 0 0 0 0 0
Chitwan Narayani Central Terai 219454 0 52.8 33.6 0.3 13.3 0 0 0
Central Terai 938488 69.7 10.9 17.5 0.0 1.9 0.0 0.0 0.0
Sindhuli Janakpur Central Hill 247709 0 14.4 47.8 1.3 36.5 0 0 0
Ramechap Janakpur Central Hill 150194 0 0 0 2.1 69.3 0.3 12 16.3
Makawanpur Narayani Central Hill 239076 0 16.6 42.6 2.5 38.2 0 0 0.1
Kavre Planchowk Bagmati Central Hill 140485 0 0.3 2.7 6 91 0 0 0
Lalitpur Bagmati Central Hill 39267 0 0.8 0.7 24.1 74.4 0 0 0
Bhaktapur Bagmati Central Hill 12017 0 0 0 60.2 39.8 0 0 0
Kathmandu Bagmati Central Hill 41202 0 0 0 47.4 52.6 0 0 0
Nuwakot Bagmati Central Hill 119649 0 0 0 8.3 76 0 13.5 2.2

7
TABLE 1
Ecological and Physiographical Division of the Districts of Nepal
Physiographic Division (% of area)
Development Ecological Total Area Siwalik Middle Mountain High Mountain
District Zone
Region Belt (Ha.) Terai High
valley Slope Valley Slope Valley Slope
Himal
Dhading Bagmati Central Hill 192487 0 0 0 4.8 66.3 0 21.5 7.4
Central Hill 1182086 0.0 3.6 10.4 17.4 60.5 0.0 5.2 2.9
Dolakha Janakpur Central Mountain 214278 0 0 0 0.3 24.4 0.2 38.1 37
Sindhupalchowk Bagmati Central Mountain 248096 0 0 0 1.2 32.9 0.2 45.2 20.5
Rasuwa Bagmati Central Mountain 151179 0 0 0 0.1 2.7 0.4 45.4 51.4
Central Mountain 613553 0.0 0.0 0.0 0.5 20.0 0.3 42.9 36.3
Western Region
Nawalparasi Lumbini Western Terai 201613 27.5 24.6 32.5 1.9 13.5 0 0 0
Rupandehi Lumbini Western Terai 141351 85 0 14.5 0 0.5 0 0 0
Kapilvastu Lumbini Western Terai 175694 83.7 0 16.3 0 0 0 0 0
Western Terai 518658 65.4 8.2 21.1 0.6 4.7 0.0 0.0 0.0
Palpa Lumbini Western Hill 136595 0 0.9 18.4 6.7 74 0 0 0
Arghakhanchi Lumbini Western Hill 123272 0 2.6 31.5 2.7 63.2 0 0 0
Gulmi Lumbini Western Hill 107918 0 0 0 5 95 0 0 0
Tanahu Gandaki Western Hill 156878 0 1.1 0.7 13.9 84.3 0 0 0
Syangja Gandaki Western Hill 103555 0 0 0 8.4 91.6 0 0 0
Gorkha Gandaki Western Hill 361469 0 0 0 5.1 24 0.2 24.7 46
Lamjung Gandaki Western Hill 170871 0 0 0 5.4 37.2 0.5 38.2 18.7
Kaski Gandaki Western Hill 213167 0 0 0 8.8 29.7 0.4 30.4 30.7
Parbat Dhawalagiri Western Hill 54931 0 0 0 7.6 76.6 0.2 15.6 0
Baglung Dhawalagiri Western Hill 182745 0 0 0 1.5 35.7 2.2 53.4 7.2
Myagdi Dhawalagiri Western Hill 230007 0 0 0 0.2 2.4 0.7 54.5 42.2
Western Hill 1841408 0.0 0.4 4.6 5.9 55.8 0.4 19.7 13.2
Manang Gandaki Western Mountain 219625 0 0 0 0 0 0.1 5.2 94.7
Mustang Dhawalagiri Western Mountain 355951 0 0 0 0 0 0.1 1.2 98.7
Western Mountain 575576 0 0 0 0 0 0.1 3.2 96.7
Mid-Western Region
Dang Rapti Mid-Western Terai 297339 0.1 38.5 45.9 0.2 15.3 0 0 0
Banke Bheri Mid-Western Terai 235983 49.5 9.9 38 0 2.6 0 0 0
Bardiya Bheri Mid-Western Terai 203553 69.3 4.8 25.9 0 0 0 0 0
Mid-Western Terai 736875 39.6 17.7 36.6 0.1 6.0 0.0 0.0 0.0
Pyuthan Rapti Mid-Western Hill 129521 0 1 2.8 4.9 83.8 0 7.5 0
Rolpa Rapti Mid-Western Hill 187149 0 0 0 0.7 73.4 0 25.9 0
Salyan Rapti Mid-Western Hill 150102 0 0 0 3.6 96.4 0 0 0
Rukum Rapti Mid-Western Hill 290675 0 0 0 0.8 9.5 1 67.1 21.6

8
TABLE 1
Ecological and Physiographical Division of the Districts of Nepal
Physiographic Division (% of area)
Development Ecological Total Area Siwalik Middle Mountain High Mountain
District Zone
Region Belt (Ha.) Terai High
valley Slope Valley Slope Valley Slope
Himal
Surkhet Bheri Mid-Western Hill 249017 0 12.5 42.9 1.1 43.5 0 0 0
Jajarkot Bheri Mid-Western Hill 222183 0 0 0 1 27.9 0.4 60.8 9.9
Dailekh Bheri Mid-Western Hill 150054 0 0 0 2 81.4 0 16.6 0
Mid-Western Hill 1378701 0.0 1.9 6.5 2.0 59.4 0.2 25.4 4.5
Dolpa Karnali Mid-Western mountain 793230 0 0 0 0.2 0 0.1 12.3 87.4
Jumla Karnali Mid-Western mountain 254365 0 0 0 0 0 2.3 63.6 34.1
Kalikot Karnali Mid-Western mountain 174927 0 0 0 0 0 0.3 99.7 0
Mugu Karnali Mid-Western mountain 358282 0 0 0 0 0 0.2 47.4 52.4
Humla Karnali Mid-Western mountain 583826 0 0 0 0 0.3 0.5 17 82.2
Mid-Western Mountain 2164630 0.0 0.0 0.0 0.0 0.1 0.7 48.0 51.2
Far-Western Region
Kailali Seti Mid-Western Terai 324791 59.8 1.4 38.6 0.1 0.1 0 0 0
Kanchanpur Mahakali Mid-Western Terai 163678 87.5 0 12.5 0 0 0 0 0
Far-Western Terai 488469 73.7 0.7 25.6 0.1 0.1 0.0 0.0 0.0
Achham Seti Mid-Western Hill 169224 0 0 0 1.8 87.3 0 10.9 0
Doti Seti Mid-Western Hill 205704 0 0.3 3.9 1.8 90.5 0 3.5 0
Dadeldhura Mahakali Mid-Western Hill 149525 0.1 4.6 21.5 1.1 72.7 0 0 0
Baitadi Mahakali Mid-Western Hill 148678 0 0 0 1.1 98.1 0 0.8 0
Far-Western Hill 673131 0.0 1.2 6.4 1.5 87.2 0.0 3.8 0.0
Bajura Seti Mid-Western Mountain 202177 0 0 0 0 1.7 1 80 17.3
Bajhang Seti Mid-Western Mountain 347560 0 0 0 1.7 10 0.8 42.7 44.8
Darchula Mahakali Mid-Western Mountain 232960 0 0 0 0.5 15.9 0.3 40.9 42.4
Far-Western Mountain 782697 0.0 0.0 0.0 0.7 9.2 0.7 54.5 34.8
Total by Development Region
Eastern Districts 2854126 28.3 1.7 6.2 1.0 31.0 0.0 16.3 15.7
Central Districts 2734127 23.2 4.8 9.3 6.0 27.5 0.1 16.0 13.1
Western Districts 2935642 21.8 2.9 8.6 2.2 20.2 0.2 7.6 36.6
Mid Western Districts 4280206 13.2 6.6 14.4 0.7 21.8 0.3 24.5 18.6
Far Western Districts 1944297 24.6 0.6 10.6 0.7 32.1 0.2 19.4 11.6
Totals by Ecological Belt
Terai Districts 3409863 66.5 8.0 22.4 0.2 3.0 0.0 0.0 0.0
Hill Districts 6152353 0.1 2.0 7.0 5.9 68.2 0.1 12.5 4.1
Mountain Districts 5186182 0.0 0.0 0.0 0.3 8.3 0.4 37.8 53.2
Total for all Districts 14748398 22.2 3.3 9.8 2.1 26.5 0.2 16.8 19.1

9
TABLE 2
Present Status of DOI Surface Projects
Actual Planned Command Developed Irrigated Command Ongoing

Programme
Percentage

Turn Over
Capability

Developed
Irrigation

Intensity

Number
Funding
Completed Area (ha.) Command Area Area (ha.) Command Area

Basin
Project District (AC) / Planned Basin Name
Completion Gross Net Gross Net Summer Winter Gross Net
(PC) Year
Eastern Development Region Terai Ecological Belt

KANKAI JHAPA 100 AC 1991 YR TOTAL 9600 8000 9600 8000 7000 1700 0 0 DOI NO ADB 11 KANKAI
ID 1877
CAD 6123
Total of JHAPA District 1 9600 8000 9600 8000 7000 1700 0 0

SUNSARI-MORANG P-3 MORANG 100 AC 1975 YR TOTAL 39375 33500 39375 33500 15924 3400 0 0 DOI NO INDIA 4 KOSHI
ED 19900
CAD 13600
Total of MORANG District 1 39375 33500 39375 33500 15924 3400 0 0

KOSI SAP TARI 100 AC 1990 MS ID 43125 34500 43125 34500 25000 15000 0 0 DOI NO INDIA 12 KOSHI
AMSOTA SAP TARI 100 AC 1989 MS ED 500 400 500 400 400 0 0 0 SIRDP NO ADB 12 SIWALIK RIVER
BHABADA DAHA SAP TARI 100 AC 1989 MS ID 88 70 88 70 70 0 0 0 SIRDP NO ANB 12 SIWALIK RIVER
CHAPIN MIP SAP TARI 100 AC 1986 MS ED 375 300 375 300 150 90 0 0 SIRDP NO ADB 12 SIWALIK RIVER
DEO DHARA MIP SAP TARI 100 AC 1985 MS ED 500 400 500 400 200 120 0 0 SIRDP NO ADB 12 SIWALIK RIVER
JHORADAH MIP SAP TARI 100 AC 1988 MS ID 75 60 75 60 30 15 0 0 SIRDP NO ADB 12 SIWALIK RIVER
KURRHA SAP TARI 100 AC 1989 MS ID 175 140 175 140 140 0 0 0 SIRDP NO ADB 12 SIWALIK RIVER
LABAKESWOR SAP TARI 100 AC 1989 MS ID 25 20 25 20 20 0 0 0 SIRDP NO ADB 12 SIWALIK RIVER
LOHAJARA DAHA SAP TARI 100 AC 1989 MS ID 125 100 125 100 100 0 0 0 SIRDP NO ADB 12 SIWALIK RIVER
BAMANA MIP SAP TARI 100 AC 1988 MS ED 500 400 500 400 200 120 0 0 SIRDP NO ADB 12 SIWALIK RIVER
BISANARIYADAHA SAP TARI 100 AC 1989 MS ID 44 35 44 35 35 0 0 0 SIRDP NO ADB 12 SIWALIK RIVER
Total of SAP TARI District 11 45532 36425 45532 36425 26345 15345 0 0

KAMALA SIRAHA 100 AC 1984 MS TOTAL 15625 12500 15620 12500 5000 2000 0 0 DOI NO GoN 10 KAMALA
ED 9700
CAD 2800
BELAHIDAHA SIRAHA 100 AC 1989 MS ID 88 70 88 70 70 0 0 0 SIRDP NO ADB 12 SIWALIK RIVER
BETAHA KHOLA SIRAHA 100 AC 1987 MS ED 125 100 125 100 100 0 0 0 SIRDP NO ADB 12 SIWALIK RIVER
BHAWARADAH MIP SIRAHA 100 AC 1989 MS ED 250 200 250 200 100 58 0 0 SIRDP NO ADB 12 SIWALIK RIVER
JARUWA MIP SIRAHA 100 AC 1989 MS ID 25 20 25 20 10 5 0 0 SIRDP NO ADB 12 SIWALIK RIVER
JIRJHIRE SIRAHA 100 AC 1989 MS ED 125 100 125 100 1002 0 0 0 SIRDP NO ADB 12 SIWALIK RIVER
JIWA KHOLA MIP SIRAHA 100 AC 1989 MS ED 500 400 500 400 400 0 0 0 SIRDP NO ADB 12 SIWALIK RIVER
KALYANDEHI SIRAHA 100 AC 1988 MS ED 375 300 375 300 300 0 0 0 SIRDP NO ADB 12 SIWALIK RIVER
KATANYA DHAR SIRAHA 100 AC 1989 MS ID 188 150 188 150 150 0 0 0 SIRDP NO ADB 12 SIWALIK RIVER
KHURAKIYAHI SIRAHA 100 AC 1989 MS ID 125 100 125 100 100 0 0 0 SIRDP NO ADB 12 SIWALIK RIVER
KHUTTI(EASTERN) SIRAHA 100 AC 1987 MS ID 181 145 181 145 145 0 0 0 SIRDP NO AND 12 SIWALIK RIVER
KHUTTI DAM (WESTERN) SIRAHA 100 AC 1988 MS ED 125 100 125 100 100 88 0 0 SIRDP NO ADB 12 SIWALIK RIVER
LOHAJARA KHOLA SIRAHA 100 AC 1989 MS ID 250 200 250 200 200 0 0 0 SIRDP NO ADB 12 SIWALIK RIVER
LOHAJARA UPPER SIRAHA 100 AC 1989 MS ID 125 100 125 100 100 0 0 0 SIRDP NO ADB 12 SIWALIK RIVER
MUTANIDAH MIP SIRAHA 100 AC 1988 MS ED 100 80 100 80 40 23 0 0 SIRDP NO ADB 12 SIWALIK RIVER
SETAPATRE II LALPUR SIRAHA 100 AC 1989 MS ID 63 50 36 50 50 0 0 0 SIRDP NO ADB 12 SIWALIK RIVER
SITUBAHI DAHA SIRAHA 100 AC 1989 MS ID 63 50 63 50 50 0 0 0 SIRDP NO ADB 12 SIWALIK RIVER
BASANTPUR SIRAHA 100 AC 1989 MS ID 188 150 188 150 150 0 0 0 SIRDP NO ADB 12 SIWALIK RIVER

10
TABLE 2
Present Status of DOI Surface Projects
Actual Planned Command Developed Irrigated Command Ongoing

Programme
Percentage

Turn Over
Capability

Developed
Irrigation

Intensity

Number
Funding
Completed Area (ha.) Command Area Area (ha.) Command Area

Basin
Project District (AC) / Planned Basin Name
Completion Gross Net Gross Net Summer Winter Gross Net
(PC) Year
Total of SIRAHA District 18 18521 14815 18489 14815 8067 2174 0 0

SUNSARI-MORANG P-1 SUNSARI 100 AC 1988 YR CAD 12187 9750 12187 9750 9320 2925 0 0 DOI NO IND/IDA 4 KOSHI
SUNSARI-MORANG P-2 SUNSARI 100 AC 1995 YR CAD 20875 16700 20875 16700 16355 4950 0 0 DOI NO IND/IDA 4 KOSHI
SUNSARI-MORANG P-3 SUNSARI 100 AC 1975 YR ED 10062 8050 10062 8050 7396 2000 0 0 DOI NO IND 4 KOSHI
Total of SUNSARI District 3 43124 34500 43124 34500 33071 9875 0 0

Total of EASTERN > Terai 34 156152 127240 156120 127240 90407 32494 0 0

Eastern Development Region Hill Ecological Belt

NERPA KHOTANG 100 AC 1983 MS ED 250 200 250 200 100 50 0 0 DOI NO GoN 4 KOSHI
Total of KHOTANG District 1 250 200 250 200 100 50 0 0

RAMPUR TAR OKHALDHUNGA 100 AC 1983 MS ED 300 240 300 240 240 0 0 0 DOI NO GoN 4 KOSHI
Total of OKHALDHUNGA District 1 300 240 300 240 240 0 0 0

ASARE KULO MIP UDAYAPUR 100 AC 1988 MS ED 63 50 63 50 25 25 0 0 SIRDP NO ADB 4 KOSHI


CHILAUNE KHOLA MIP UDAYAPUR 100 AC 1988 MS ED 94 75 94 75 37 35 0 0 SIRDP NO ADB 4 KOSHI
KALI KHOLA BHUMRA UDAYAPUR 100 AC 1989 MS ID 50 40 50 40 40 0 0 0 SIRDP NO ADB 4 KOSHI
KARAUJE UDAYAPUR 100 AC 1988 MS ID 63 50 63 50 50 0 0 0 SIRDP NO ADB 4 KOSHI
SARAHI KHOLA UDAYAPUR 100 AC 1988 MS ID 94 75 94 75 75 0 0 0 SIRDP NO ADB 4 KOSHI
SARASWOTI KHOLA UDAYAPUR 100 AC 1988 YR ID 63 50 63 50 50 0 0 0 SIRDP NO ADB 4 KOSHI
SWAROP TAR MIP UDAYAPUR 100 AC 1989 MS ED 62 50 62 50 25 25 0 0 SIRDP NO ADB 4 KOSHI
Total of UDAYAPUR District 7 489 390 489 390 302 85 0 0

Total of EASTERN > Hill 9 1039 830 1039 830 642 135 0 0

Total of EASTERN Region 43 157191 128070 157159 128070 91049 32629 0 0

Central Development Region Terai Ecological Belt

SIRSIA-DUDHORA BARA 85 AC MS ED 1275 1020 1275 1020 850 170 0 0 DOI NO MU/USAI 12 SIWALIK RIVER
NARAYANI PHASE-II BARA 100 AC YR CAD 12700 15900 12700 15900 12700 12700 12700 0 0 DOI NO IND/IDA 3 GANDAK
Total of BARA District 2 17175 13720 17175 13720 13550 12870 0 0

PITHUWA CHITWAN 100 AC MS CAD 600 500 600 500 500 100 0 0 DOI NO GoN 3 GANDAK
CHITWAN CHITWAN 100 AC 1988 YR CAD 13400 10400 13400 10400 8300 2000 0 0 DOI NO GoN/ADB 3 GANDAK
Total of CHITWAN District 2 14000 10900 14000 10900 8800 2100 0 0

HARDINATH DHANUSHA 100 AC MS ED 2400 2000 2400 2000 1000 500 0 0 DOI NO GoN/IND 12 SIWALIK RIVER
KAMALA DHANUSHA 100 AC 1984 MS ED 15625 12500 15625 12500 5000 2000 0 0 DOI NO GoN 10 KAMLA
Total of DHANUSHA District 2 18025 14500 18025 14500 6000 2500 0 0

SIRSIA-DUDHORA PARSA 100 AC MS ED 225 180 225 180 150 30 0 0 DOI NO GoN/USAI 12 SIWALIK RIVER

11
TABLE 2
Present Status of DOI Surface Projects
Actual Planned Command Developed Irrigated Command Ongoing

Programme
Percentage

Turn Over
Capability

Developed
Irrigation

Intensity

Number
Funding
Completed Area (ha.) Command Area Area (ha.) Command Area

Basin
Project District (AC) / Planned Basin Name
Completion Gross Net Gross Net Summer Winter Gross Net
(PC) Year
NARAYANI PHASE-I PARSA 100 AC 1981 YR CAD 19875 16000 19875 16000 15297 14835 0 0 DOI NO IND/IDA 3 GANDAK
Total of PARSA District 2 20100 16180 20100 16180 15447 14865 0 0

BAGMATI RAUTAHAT 100 AC MS TOTAL 28450 23000 28450 23600 18838 0 0 0 DOI NO GoN/SAU 12 SIWALIK RIVER
ED 4762
CAD 18838
JHAJ RAUTAHAT 100 AC 1996 MS ED 1875 1500 1875 1500 1500 600 0 0 DOI NO GoN/IND 12 SIWALIK RIVER
NARAYANI PHASE-I RAUTAHAT 100 AC YR ED 10875 8700 10875 8700
Total of RAUTAHAT District 2 41200 33200 41200 33800 20338 600 0 0
1.25
BAGMATI SARLAHI 100 PC 2000 MS TOTAL 28250 22600 29000 23200 10162 0 0 0 DOI NO GoN/SAU 9 BAGMATI
ED 13038
CAD 10162
MANUSMARA SARLAHI 100 AC 1981 YR CAD 6000 5800 6000 5800 5000 1000 0 0 DOI NO GoN/IND 12 SIWALIK RIVER
Total of SARLAHI District 2 34250 28400 35000 29000 15162 1000 0 0

Total of CENTRAL > Terai 12 144750 116900 145500 118100 79297 33935 0 0

Central Development Region Hill Ecological Belt

BIDOUL BHAKTAPUR 100 AC MS ED 81 65 81 65 40 20 0 0 DOI NO GoN 9 BAGMATI


DHUNGE DHARA BHAKTAPUR 100 AC MS ED 338 270 338 270 80 80 0 0 DOI NO GoN 9 BAGMATI
GHATTE KULO BHAKTAPUR 100 AC MS ED 437 350 437 350 150 50 0 0 DOI NO GoN 9 BAGMATI
HANUMANTE BHAKTAPUR 100 AC 1984 MS ED 125 100 125 100 60 60 0 0 DOI NO GoN 9 BAGMATI
KUTUNJE BHAKTAPUR 100 AC MS ED 56 45 56 45 30 10 0 0 DOI NO GoN 9 BAGMATI
MAHADEV KHOLA BHAKTAPUR 100 AC MS ED 468 375 468 375 210 80 0 0 DOI NO GoN/INDI 9 BAGMATI
Total of BHAKTAPUR District 6 1505 1205 1505 1205 570 300 0 0

GAJUI TAR DHADING 100 AC 1973 MS ED 125 100 125 100 100 60 0 0 DOI NO GoN 3 GANDAK
KALLERI TAR DHADING 100 AC 1979 MS ED 250 200 250 200 200 0 0 0 DOI NO GoN 3 GANDAK
PIPAL TAR DHADING 100 AC MS ED 75 60 75 60 30 30 0 0 DOI NO GoN 3 GANDK
Total of DHADING District 3 450 360 450 360 330 90 0 0

BALAJU KATHMANDU 100 AC MS ED 75 60 75 60 50 25 0 0 DOI NO GoN 9 BAGMATI


BALKHU KATHMANDU 100 AC MS ID 30 25 30 25 25 15 0 0 DOI NO GoN 9 BAGMATI
BISHAMBARA KATHMANDU 100 AC MS ED 250 200 250 200 200 120 0 0 DOI NO GoN 9 BAGMATI
BOSAN KATHMANDU 100 AC MS ED 325 260 325 260 100 50 0 0 DOI NO GoN 9 BAGMATI
BUDHANILKANTHA KATHMANDU 100 AC MS ED 250 200 250 200 120 60 0 0 DOI NO GoN 9 BAGMATI
CHITE KULO KATHMANDU 100 AC MS ID 12 10 12 10 10 0 0 0 DOI NO GoN 9 BAGMATI
DAKSHINKALI KATHMANDU 100 AC MS ED 125 100 125 100 70 35 0 0 DOI NO GoN 9 BAGMATI
GOKARNA KATHMANDU 100 AC MS ED 470 375 470 375 150 75 0 0 DOI NO GoN 9 BAGMATI
ICHADOL KATHMANDU 100 AC MS ED 90 70 90 70 55 25 0 0 DOI NO GoN 9 BAGMATI
INDRAYANI KATHMANDU 100 AC MS ED 180 145 180 145 100 50 0 0 DOI NO GoN 9 BAGMATI
KUDALI KULO KATHMANDU 100 AC MS ID 12 10 12 10 10 0 0 0 DOI NO GoN 9 BAGMATI
PASHUPATI KATHMANDU 100 AC MS ED 94 75 94 75 20 20 0 0 DOI NO GoN 9 BAGMATI

12
TABLE 2
Present Status of DOI Surface Projects
Actual Planned Command Developed Irrigated Command Ongoing

Programme
Percentage

Turn Over
Capability

Developed
Irrigation

Intensity

Number
Funding
Completed Area (ha.) Command Area Area (ha.) Command Area

Basin
Project District (AC) / Planned Basin Name
Completion Gross Net Gross Net Summer Winter Gross Net
(PC) Year
PHARPING DHUNGED KATHMANDU 100 AC MS ED 250 200 250 200 100 50 0 0 DOI NO` GoN 9 BAGMATI
SANKHU KATHMANDU 100 AC MS ED 250 200 250 200 100 50 0 0 DOI NO GoN 9 BAGMATI
TOKHA KATHMANDU 100 AC ME ED 250 200 250 200 150 75 0 0 DOI NO GoN 9 BAGMATI
Total of KATHMANDU District 15 2663 2130 2663 2130 1260 650 0 0

BHORLEKULU LALITPUR 100 AC MS ED 62 50 62 50 50 0 0 0 DOI NO GoN 9 BAGMATI


GODAVARI LALITPUR 100 AC MS ED 125 100 125 100 100 100 0 0 DOI NO GoN/INDI 9 BAGMATI
KOTKHU LALITPUR 100 AC MS ED 450 360 450 360 275 140 0 0 DOI NO GoN/INDI 9 BAGMATI
KUMBHEWHWAR LALITPUR 100 AC MS ED 62 50 62 50 30 10 0 0 DOI NO GoN/INDI 9 BAGMATI
LUBHU LALITPUR 100 AC MS ED 188 150 188 150 150 90 0 0 DOI NO GoN 9 BAGMATI
TIKA BHAIRAB-I LALITPUR 100 AC MS ED 500 400 500 400 400 250 0 0 DOI NO GoN/INDI 9 BAGMATI
TIKA BHAIRAB-2 LALITPUR 100 AC 1974 MS ED 375 300 375 300 300 150 0 0 DOI NO GoN/INDI 9 BAGMATI
Total of LALITPUR District 7 1762 1410 1762 1410 1305 740 0 0

BAT TAR LIFT NUWAKOT 100 AC 1979 YR ED 530 424 530 424 424 0 0 0 DOI NO GoN 3 GANDAK
GADKHAR NUWAKOT 100 AC 1982 YR ID 125 100 125 100 100 100 0 0 DOI NO IDA 3 GANDAK
LABDHU-DHIKUREE-S NUWAKOT 100 AC 1982 YR ID 310 248 310 248 180 100 0 0 DOI NO IDA 3 GANDAK
SIMARA NUWAKOT 100 AC 1992 YR ED 500 400 500 400 400 250 0 0 DOI NO IDA 3 GANDAK
Total of NUWAKOT District 4 1465 1172 1465 1172 1104 450 0 0

GWANG KHOLA SINDHULI 100 AC 1976 MS ED 75 60 75 60 60 60 0 0 DOI NO GoN 9 BAGMATI


Total of SINDHULI District 1 75 60 75 60 60 60 0 0

Total of CENTRAL > Hill 36 7920 6337 7920 6337 4629 2290 0 0

GHYANG KHOLA DOLAKHA 100 AC MS ED 200 175 200 175 175 100 0 0 DOI NO GoN 4 KOSHI
Total of DOLAKHA District 1 200 175 200 175 175 100 0 0

Total of CENTRAL > Mountain 1 200 175 200 175 175 100 0 0

Total of CENTRAL Region 49 152870 123412 153620 124612 84101 36325 0 0

Western Development Region Terai Ecological Belt

SURAHI KAPILBASTU 100 AC 1987 MS ED 500 400 500 400 300 0 0 0 DOI NO GoN 12 SIWALIK RIVER
BANGANGA KAPILBASTU 100 AC 1980 MS CAD 8125 6500 8125 6500 6200 1000 0 0 DOI NO GoN/ADB 7 BANGANGA
Total of KAPILBASTU District 2 8625 6900 8625 6900 6500 1000 0 0

BULING TAR NAWALPARASI 100 AC 1987 MS ID 350 280 350 280 280 225 0 0 DOI NO GoN 3 GANDAK
DED GAON TAR NAWALPARASI 100 AC 1976 MS ED 240 150 240 150 150 50 0 0 DOI NO ADB 3 GANDAK
WEST GANDAK NAWALPARASI 100 AC 1983 YR CAD 16300 13400 16300 13400 10300 6180 0 0 DOI NO IND/ADB 3 GANDAK
Total of NAWALPARASI District 3 16890 13830 16890 13830 10730 6455 0 0

SIYARIKAHARIYA RUPANDEHI 100 AC 1991 MS ED 2125 1700 2125 1700 1700 0 0 0 DOI NO GoN 8 TINAU
MARCHAWAR LIFT RUPANDEHI 100 AC 1995 YR TOTAL 7000 5600 7000 5600 2900 1180 0 0 DOI NO UNCDF 8 TNAU

13
TABLE 2
Present Status of DOI Surface Projects
Actual Planned Command Developed Irrigated Command Ongoing

Programme
Percentage

Turn Over
Capability

Developed
Irrigation

Intensity

Number
Funding
Completed Area (ha.) Command Area Area (ha.) Command Area

Basin
Project District (AC) / Planned Basin Name
Completion Gross Net Gross Net Summer Winter Gross Net
(PC) Year
ED 2650
CAD 2950
Total of RUPANDEHI District 2 9125 7300 9125 7300 4600 1180 0 0

Total of WESTERN > Terai 7 34640 28030 34640 28030 21830 8635 0 0

Western Development Region Hill Ecological Belt

ARU TAR GORKHA 100 AC 1989 MS ED 125 100 125 100 100 50 0 0 DOI NO ILO 3 GANDAK
BHIMSEN KULO GORKHA 100 AC 1981 YR ED 94 75 94 75 75 50 0 0 DOI NO GoN 3 GANDAK
CHEPE TAR GORKHA 100 AC 1985 MS ED 75 60 75 60 60 5 0 0 DOI NO USAID 3 GANDAK
CHORKATE TAR GORKHA 100 AC 1985 MS ED 137 110 137 110 60 20 0 0 DOI NO USAID 3 GANDAK
DHUWAKOT GORKHA 100 AC 1985 MS ED 55 44 55 44 44 44 0 0 DOI NO USAID 3 GANDAK
MALLA TAR GORKHA 100 AC 1986 MS ED 125 100 125 100 50 30 0 0 DOI NO USAID 3 GANDAK
Total of GORKHA District 6 611 489 611 489 389 199 0 0

APCHAUR COFFE GULMI 100 AC 1981 YR ID 125 100 125 100 100 50 0 0 DOI NO GoN 3 GANDAK
ARGENTICHAP GULMI 100 AC 1981 MS ED 75 60 75 60 60 30 0 0 DOI NO GoN 3 GANDAK
Total of GULMI District 2 200 160 200 160 160 80 0 0

BEGNAS KASKI 100 AC 1989 YR ED 725 580 725 580 580 580 0 0 DOI YES ADB 3 GANDAK
BIJAYAPUR KASKI 100 AC 1989 MS ID 1600 1280 1600 1280 1000 300 0 0 DOI NO ADB 3 GANDAK
POKHARA KASKI 100 AC 1985 YR ID 1275 1030 1275 1030 1030 300 0 0 DOI NO CHINA 3 GANDAK
HYANKGA KASKI 100 AC 1989 MS ID 412 330 412 330 330 200 0 0 DOI NO ADB 3 GANDAK
PHEWA TAL KASKI 100 AC 1983 YR ED 400 320 400 320 320 100 0 0 DOI NO G/IND/UN 3 GANDAK
SARDU KHOLA PURAN KASKI 100 PC 1997 YR ED 438 350 250 200 200 100 188 150 ILC NO IDA 3 GANDAK
Total of KASKI District 6 4850 3890 4662 3740 3460 1580 188 150

BHORLE TAR LAMJUNG 100 AC 1983 YR ID 250 200 250 200 200 200 0 0 DOI NO ILO 3 GANDAK
HANDE TAR LAMJUNG 100 AC 1977 MS ED 337 270 337 270 220 50 0 0 DOI NO GoN 3 GANDAK
RAMGHA TAR LAMJUNG 100 AC 1977 MS ED 305 244 305 244 100 50 0 0 DOI NO GoN 3 GANDAK`
Total of LAMJUNG District 3 892 714 892 714 520 300 0 0

KACHALPHANT PALPA 100 AC 1991 MS ED 353 282 353 282 282 0 0 0 DOI NO GoN 3 GANDAK
Total of PALPA District 1 353 282 353 282 282 0 0 0

GYANDI PARBAT 100 AC 1978 MS ED 125 100 125 100 60 30 0 0 DOI NO GoN 3 GANDAK
PHALEBAS PARBAT 100 AC 1989 MS ID 406 325 406 325 325 75 0 0 DOI NO ADB 3 GANDAK
Total of PARBAT District 2 531 425 531 425 385 105 0 0

KISAN ADHIGHAT SYANGJA 100 PC 1997 YR ED 312 250 0 0 0 0 312 250 ILC NO IDA 3 GANDAK
Total of SYANGJA District 1 312 250 0 0 0 0 312 250

ATRAULIPUTRAR TANAHU 100 AC 1996 YR ED 563 450 563 450 450 300 0 0 ILC NO IDA 3 GANDAK
SAJHA TAR TANAHU 100 AC 1968 MS ID 50 40 50 40 40 20 0 0 DOI NO GoN 3 GANDAK
SANGHE PATYANI TANAHU 100 AC 1968 MS ED 375 300 375 300 100 50 0 0 DOI NO GoN 3 GANDAK

14
TABLE 2
Present Status of DOI Surface Projects
Actual Planned Command Developed Irrigated Command Ongoing

Programme
Percentage

Turn Over
Capability

Developed
Irrigation

Intensity

Number
Funding
Completed Area (ha.) Command Area Area (ha.) Command Area

Basin
Project District (AC) / Planned Basin Name
Completion Gross Net Gross Net Summer Winter Gross Net
(PC) Year
Total of TANAHU District 3 988 790 988 790 590 370 0 0

Total of WESTERN > Hill 24 8737 7000 8237 6600 5786 2634 500 400

Western Development Region Mountain Ecological Belt

CHHONUP MUSTANG 100 AC 1985 MS ED 64 51 64 51 51 0 0 0 DOI NO GoN 3 GANDAK


Total of MUSTANG District 1 64 51 64 51 51 0 0 0

Total of WESTERN > Mountain 1 64 51 64 51 51 0 0 0

Total of WESTERN Region 32 43441 35081 42941 34681 27667 11269 500 400

Mid-Western Development Region Terai Ecological Belt

DUNDUWA BANKE 100 AC 1968 MS ED 1560 1250 1560 1250 500 100 0 0 DOI NO GoN 6 WEST RAPTI
Total of BANKE District 1 1560 1250 1560 1250 500 100 0 0

BADAIYA TAL BARDIYA 100 AC MS ED 600 480 600 480 480 50 0 0 DOI NO GoN 5 BABAI
CHAPALA TAL BARDIYA 100 AC MS ED 600 480 600 480 480 50 0 0 DOI NO GoN 5 BABAI
BABAI IP BARDIYA 8800
Total of BARDIYA District 2 1200 960 1200 9760 960 100 0 0

BELGHARE DANG 100 AC 1989 MS ED 425 340 425 340 100 0 0 0 RIRDP NO USAID 5 BABAI
DUGHARE DANG 100 AC 1988 MS ED 200 160 200 160 160 100 0 0 DOI NO GoN 5 BABAI
GOBARDIHA DANG 100 AC 1985 MS ED 544 435 544 435 435 0 0 0 RIRDP NO USAID 5 BABAI
GWAR DANG 100 AC 1985 MS ED 1000 800 1000 800 400 100 0 0 DOI NO GoN/ILO 5 BABAI
ARJUN KHOLA DANG 100 AC 1992 YR ED 625 500 625 500 475 200 0 0 DOI NO EEC 5 BABAI
Total of DANG District 5 2794 2235 2794 2235 1570 400 0 0

Total of MID-WESTERN > Terai 8 5554 4445 5554 13245 3030 600 0 0

Mid-Western Development Region Hill Ecological Belt

DHARMABATI PYUTHAN 100 AC 1985 YR ID 425 340 425 340 340 200 0 0 RIRDP NO USAID 6 WEST RAPTI
Total of PYUTHAN District 1 425 340 425 340 340 200 0 0

CHAURJAHARI RUKUM 100 AC 1978 MS ED 750 600 750 600 300 300 0 0 DOI NO GoN 2 KARNALI
Total of RUKUM District 1 750 600 750 600 300 300 0 0

KHORKE KHOLA SURKHET 100 AC 1993 YR ID 163 130 163 130 108 100 0 0 DOI NO GoN 2 KARNALI
KAPRICHOUR SURKHET 100 AC 1991 YR ID 321 257 321 257 257 85 0 0 DOI NO GoN 2 KARNALI
Total of SURKHET District 2 484 387 484 387 365 185 0 0

15
TABLE 2
Present Status of DOI Surface Projects
Actual Planned Command Developed Irrigated Command Ongoing

Programme
Percentage

Turn Over
Capability

Developed
Irrigation

Intensity

Number
Funding
Completed Area (ha.) Command Area Area (ha.) Command Area

Basin
Project District (AC) / Planned Basin Name
Completion Gross Net Gross Net Summer Winter Gross Net
(PC) Year
Total of MID-WESTERN > Hill 4 1659 1327 1659 1327 1005 685 0 0

Total of MID-WESTERN Region 12 7213 5772 7213 14572 4035 1285 0 0

Far-Western Development Region Terai Ecological Belt

KHUTIA PHASE 1 KAILALI 100 AC 1987 MS ED 1875 1500 1875 1500 1500 0 0 0 DOI NO A 2 KARNALI
MOHANA KAILALI 100 AC 1987 YR ED 5670 3500 5670 3500 2000 1200 0 0 DOI NO MG/KORE 2 KARNALI
PATHRAIYA KAILALI 100 AC 1974 MS ID 2700 2133 2700 2133 2000 500 0 0 DOI NO GoN 2 KARNALI
Total of KAILALI District 3 10245 7133 10245 7133 5500 1700 0 0

MAHAKALI PHASE-I KANCHANPUR 100 AC 1987 YR CAD 5520 4800 5520 4800 4000 3000 0 0 DOI NO GoN/IDA 1 MAHAKALI
MAHAKALI PHASE-II KANCHANPUR 100 PC 1998 YR TOTAL 8500 6800 8500 6800 5100 3000 0 0 DOI NO IDA 1 MAHAKALI
ED 1700
CAD 5100
Total of KANCHANPUR District 2 14020 11600 14020 11600 9100 6000 0 0

Total of FAR-WESTERN > Terai 5 24265 18733 24265 18733 14600 7700 0 0

Far-Western Development Region Hill Ecological Belt

BABLA ACHHAM 100 AC 1994 YR ID 312 250 312 250 250 250 0 0 SHIP NO ADB 2 KARNALI
CHANDIKA ACHHAM 100 AC 1994 YR ID 94 75 94 75 75 75 0 0 SHIP NO ADB 2 KARNALI
KHAPDAD ACHHAM 100 AC 1994 YR ID 175 140 175 140 140 140 0 0 SHIP NO ADB 2 KARNALI
LUNGRELI PRBELI ACHHAM 100 AC 1994 YR ID 176 141 176 141 141 141 0 0 SHIP NO ADB 2 KARNALI
MAJ GAON ACHHAM 100 AC 1994 YR ED 75 60 75 60 60 60 0 0 SHIP NO ADB 2 KARNALI
SU TAR ACHHAM 100 AC 1994 YR ID 175 140 175 140 140 140 0 0 SHIP NO ADB 2 KARNALI
VARDADEVI ACHHAM 100 AC 1992 YR ID 81 65 81 65 65 65 0 0 SHIP NO ADB 2 KARNALI
Total of ACHHAM District 7 1088 871 1088 871 871 871 0 0

AGADEGAD BAITADI 100 AC 1982 MS ED 75 60 75 60 60 30 0 0 DOI NO GoN 1 MAHAKALI


BANKU BAITADI 100 AC 1985 MS ED 75 60 75 60 60 0 0 0 MIRDP NO IDA 1 MAHAKALI
SHUNGELI BAITADI 100 AC 1986 MS ID 25 20 25 20 20 0 0 0 MIRDP NO IDA 1 MAHAKALI
SERA BAITADI 100 AC 1985 MS ED 75 60 75 60 60 0 0 0 MIRDP NO IDA 1 MAHAKALI
SURNAIYAGAD BAITADI 100 AC 1985 MS ED 244 195 244 195 195 100 0 0 DOI NO GoN 1 MAHAKALI
Total of BAITADI District 5 494 395 494 395 395 130 0 0

BANDURASAIN DOTI 100 AC 1994 YR ID 194 155 194 155 155 100 0 0 SHIP NO ADB 2 KARNALI
DIPAYAL EAST DOTI 100 AC 1994 YR ID 69 55 69 55 55 45 0 0 SHIP NO ADB 2 KARNALI
DIPAYAL WEST DOTI 100 AC 1994 YR ID 56 45 56 45 45 0 0 0 SHIP NO ADB 2 KARNALI
KADAMANDUU DOTI 100 AC 1994 YR ID 175 140 175 140 140 140 0 0 SHIP NO ADB 2 KARNALI
KAPHLESWORI I DOTI 100 AC 1994 YR ID 75 60 75 60 60 60 0 0 SHIP NO ADB 2 KARNALI
KAPHLESWORI II DOTI 100 AC 1994 YR ID 35 28 35 28 28 28 0 0 SHIP NO ADB 2 KARNALI
LATAMANDU DOTI 100 AC 1994 YR ID 150 120 150 120 120 120 0 0 SHIP NO ADB 2 KARNALI
Total of DOTI District 7 754 603 754 603 603 493 0 0

16
TABLE 2
Present Status of DOI Surface Projects
Actual Planned Command Developed Irrigated Command Ongoing

Programme
Percentage

Turn Over
Capability

Developed
Irrigation

Intensity

Number
Funding
Completed Area (ha.) Command Area Area (ha.) Command Area

Basin
Project District (AC) / Planned Basin Name
Completion Gross Net Gross Net Summer Winter Gross Net
(PC) Year
Total of FAR-WESTERN > Hill 19 2336 1869 2336 1869 1869 1494 0 0

Far-Western Development Region Mountain Ecological Belt

BISKET BAJHANG 100 AC 1992 YR ID 111 89 111 89 89 89 0 0 SHIP NO ADB 2 KARNALI


DEURA BAJHANG 100 AC 1990 YR ID 43 34 43 34 34 34 0 0 SHIP NO ADB 2 KARNALI
SUNGRI JUIL SYSTEM BAJHANG 100 AC 1990 YR ID 31 25 31 25 25 25 0 0 SHIP NO ADB 2 KARNALI
GAIRASELA BAJHANG 100 AC 1989 YR ID 55 44 55 44 44 44 0 0 SHIP NO ADB 2 KARNALI
JUIL EAST BAJHANG 100 AC 1994 YR ID 95 76 95 76 76 76 0 0 SHIP NO ADB 2 KARNALI
JUIL WEST BAJHANG 100 AC 1994 YR ID 120 96 120 96 96 96 0 0 SHIP NO ADB 2 KARNALI
KHEIRA BAJHANG 100 AC 1994 YR ID 88 70 88 70 70 70 0 0 SHIP NO ADB 2 KARNALI
KUCH BAJHANG 100 AC 1989 YR ID 85 68 85 68 68 68 0 0 SHIP NO ADB 2 KARNALI
MAJHI GAON BAJHANG 100 AC 1989 YR ID 213 170 213 170 170 170 0 0 SHIP NO ADB 2 KARNALI
PIKHET BAJHANG 100 AC 1994 YR ID 194 155 194 155 155 155 0 0 SHIP NO ADB 2 KARNALI
PUJARIKOT BAJHANG 100 AC 1994 YR ID 51 41 51 41 41 41 0 0 SHIP NO ADB 2 KARNALI
RITHAPATA SUBEDI BAJHANG 100 AC 1989 YR ID 156 125 156 125 125 125 0 0 SHIP NO ADB 2 KARNALI
RUINA BAGAR BAJHANG 100 AC 1994 YR ID 43 34 43 34 34 34 0 0 SHIP NO ADB 2 KARNALI
TALKOT DANTOLI BAJHANG 100 AC 1994 YR ID 215 172 215 172 172 172 0 0 SHIP NO ADB 2 KARNALI
THAPA GAON BAJHANG 100 AC 1994 YR ID 194 155 194 155 155 155 0 0 SHIP NO ADB 2 KARNALI
Total of BAJHANG District 15 1694 1354 1694 1354 1354 1354 0 0

BANDHU BAJURA 100 AC 1990 YR ID 63 50 63 50 50 50 0 0 SHIP NO ADB 2 KARNALI


GOTHI BAJURA 100 AC 1994 YR ID 100 80 100 80 80 80 0 0 SHIP NO ADB 2 KARNALI
KOLTI BAJURA 100 AC 1994 YR ID 188 150 188 150 150 150 0 0 SHIP NO ADB 2 KARNALI
Total of BAJURA District 3 351 280 351 280 280 280 0 0

Total of FAR-WESTERN > Mountain 18 2045 1634 2045 1634 1634 1634 0 0

Total of FAR-WESTERN Region 42 28646 22236 28646 22236 18103 10828 0 0

Total of Nepal 178 389361 314571 389579 324171 224955 92336 500 400

17
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
ADB/N>JHAPA>NEW
BAGDORA 100 JHAPA AC 1993 ID 46 37 46 37 37 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
BHUTLUNG 100 JHAPA AC 1996 ED 422 338 422 338 200 100 0 0 0 ADB/N YES ADB/N 12 SIWALIK RIVER
DURGAVITTAPATH 100 JHAPA AC 1992 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
GEURIYA KHOLA 100 JHAPA AC 1996 ID 170 136 170 136 136 80 40 0 0 ADB/N YES ADB/N 12 SIWALIK RIVER
LAFADI KHOLA 100 JHAPA AC 1994 ID 212 170 212 170 170 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
SOMBARE PAINI 100 JHAPA AC 1992 ID 36 29 36 29 29 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
SUNMAYA BISAL PAINI 100 JHAPA AC 1992 ID 55 44 55 44 44 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
TOTAL of ADB/N > JHAPA > NEW 7 972 779 972 779 641 180 40 0 0

ADB/N>JHAPA>REHABILITATION
BETANI KHOLA 100 JHAPA AC 1992 ID 46 37 46 37 37 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
BHALU KHOLA 100 JHAPA AC 1990 ID 53 42 53 42 42 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
BHALU KHOLA DAMAKA 100 JHAPA AC 1993 ID 96 77 96 77 77 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
BHARATI KULO 100 JHAPA AC 1993 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
BHUTRE KHOLA 100 JHAPA AC 1992 ID 40 32 40 32 32 32 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
BHUTULUNG 100 JHAPA AC 1990 ID 108 86 108 86 86 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
CHHATIWAINI 100 JHAPA AC 1996 ID 90 72 90 72 72 43 20 0 0 ADB/N YES ADB/N 12 SIWALIK RIVER
DHAKRE GAUDA 100 JHAPA AC 1995 ID 291 233 291 233 233 140 70 0 0 ADB/N YES ADB/N 12 SIWALIK RIVER
DHANGRI 100 JHAPA AC 1992 ID 84 67 84 67 67 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
DHANSINGH BANDH 100 JHAPA AC 1992 ID 51 41 51 41 41 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
DIPENI PANI 100 JHAPA AC 1192 ID 34 72 34 27 27 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
GAURIYA BANDH 100 JHAPA AC 1993 ID 70 56 70 56 56 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
JALAKANYA 100 JHAPA AC 1994 ID 88 70 88 70 70 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
JHAMBUJHAR 100 JHAPA AC 1990 ID 35 28 35 28 28 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
KATTELBHALU KHOLA 100 JHAPA AC 1992 ID 54 43 54 43 43 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
KRISHI BIKAS KV 100 JHAPA AC 1990 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
LILIYA KHOLA 100 JHAPA AC 1992 ID 125 100 125 100 100 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
NINDA DHOBI KHOLA 100 JHAPA AC 1993 ED 393 314 393 314 314 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
PALIYA KHOLA 100 JHAPA AC 1994 ID 329 263 329 263 263 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
SANWA KHOLA 100 JHAPA AC 1992 ED 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
SATI JHOLA 100 JHAPA AC 1992 ID 59 47 59 47 47 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
SHARDA KULO 100 JHAPA AC 1990 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
SUKUNE PAINI 100 JHAPA AC 1995 ID 128 102 128 102 102 61 30 0 0 ADB/N YES ADB/N 12 SIWALIK RIVER
SUNAMAIBISHAL PAINI 100 JHAPA AC 1993 ID 100 80 100 80 80 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
TUKRE PAINI 100 JHAPA AC 1991 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
BHARATI BANDH 100 JHAPA AC 1991 ID 33 26 33 26 26 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
TOTAL of ADB/N > JHAPA > REHABILITATION 26 2462 2013 2462 1968 1968 276 120 0 0

TOTAL of JHAPA District 33 3434 2792 3434 2747 2609 456 160 0 0

ADB/N>MORANG>NEW
BOHARA BANDH 100 MORANG AC 1992 ID 108 86 108 86 86 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER

18
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
CHARIGUWADHULAKI 100 MORANG AC 1992 ID 76 61 76 61 61 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
JHALJHALI KHOLA 100 MORANG AC 1995 ID 63 50 63 50 50 30 15 0 0 ADB/N YES ADB/N 12 SIWALIK RIVER
PELTIMARI 100 MORANG AC 1994 ID 221 177 221 177 177 0 0 0 0 ADB/N YES ADB/N 12 SIWALIKRIVER
TOTAL of ADB/N > MORANG > NEW 4 468 374 468 374 374 30 15 0 0

ADB/N>MORANG>REHABILITATION
ALTAI KHOLA 100 MORANG AC 1990 ID 124 99 124 99 99 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
BETAUNA BEL BARI8 100 MORANG AC 1992 ID 44 35 44 35 35 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
BHORJANA 2 100 MORANG AC 1989 ID 150 120 150 120 120 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
BHUWA KHOLA 100 MORANG AC 1989 ID 115 92 115 92 92 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
BHUWA KHOLA 100 MORANG AC 1990 ID 331 265 331 265 265 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
BIRTA PAINI 100 MORANG AC 1995 ID 50 40 50 40 40 24 12 0 0 ADB/N YES ADB/N 12 SIWALIK RIVER
BISNPURHOKLABAR 100 MORANG AC 1993 ID 334 267 334 267 267 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
CHANDRANAR-9 100 MORANG AC 1992 ID 60 48 60 48 48 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
DHUDHAPAINEBAHU 100 MORANG AC 1993 ID 175 140 175 140 140 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
DOVANKHOLA 100 MORANG AC 1996 ID 213 170 213 170 170 100 50 0 0 ADB/N YES ADB/N 12 SIWALIK RIVER
JANASAHAYOG 100 MORANG AC 1991 ID 166 133 166 133 133 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
KAIR KHOLA 7 100 MORANG AC 1991 ID 60 48 60 48 48 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
KAIR KHOLA -2 100 MORANG AC 1991 ED 33 26 33 26 26 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
KAJALA KHOLA 100 MORANG AC 1993 ID 308 246 304 246 246 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
KARIWANA4 100 MORANG AC 1993 ID 93 74 93 74 74 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
KATANU KHOLA 100 MORANG AC 1995 ID 213 170 213 170 170 0 0 0 0 ADB/N YES ADB/N 12 SIWALIK RIVER
KATNU KHOLA 100 MORANG AC 1991 ED 159 127 159 127 127 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
KHAIR KHOLA -5 100 MORANG AC 1993 ED 68 54 68 54 54 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
KHHADO KHOLA 6,7,8 100 MORANG AC 1992 ED 129 103 129 103 103 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
KISTI PAINI 100 MORANG AC 1995 ID 83 66 83 66 66 40 20 0 0 ADB/N YES ADB/N 12 SIWALIK RIVER
KUIRE KHOLA 100 MORANG AC 1996 ID 244 195 244 195 195 117 50 0 0 ADB/N YES ADB/N 12 SIWALIK RIVER
KUMAR GAONHARAICHA 100 MORANG AC 1995 ID 38 30 38 30 30 18 9 0 0 ADB/N YES ADB/N 12 SIWALIK RIVER
LATIHOLIPATHARI 100 MORANG AC 1993 ID 101 87 101 87 87 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
MAJUWA2 100 MORANG AC 1991 ID 113 90 113 90 90 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
PATHARGHATTA-8 100 MORANG AC 1991 ID 35 28 35 28 28 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
PATRAWA 100 MORANG AC 1994 ID 45 36 45 36 36 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
SETUMARI,HARAICHA 100 MORANG AC 1996 ID 59 47 59 47 47 28 12 0 0 ADB/N YES ADB/N 12 SIWALIK RIVER
BHORJANA 3 100 MORANG AC 1994 ID 34 27 34 27 27 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
TOTAL of ADB/N > MORANG > REHABILITATION 28 3577 2863 3573 2863 2863 327 153 0 0

TOTAL of MORANG District 32 4045 3237 4041 3237 3237 357 168 0 0

ADB/N>SUNSARI>REHABILITATION
AMAHA KHOLA 100 SUNSARI AC 1993 ED 625 500 625 500 500 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
SANKARBELI 100 SUNSARI AC 1994 ID 166 133 166 133 133 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
TOTAL of ADB/N > SUNSARI > REHABILITATION 2 791 633 791 633 633 0 0 0 0

TOTAL of SUNSARI District 2 791 633 791 633 633 0 0 0 0

ADB/N>SIRAHA>REHABILITATION

19
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
SITAPUR 100 SIRAHA AC 1992 MS ID 71 57 71 57 57 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
TOTAL of ADB/N > SIRAHA > REHABILITATION 1 71 57 71 57 57 0 0 0 0

TOTAL of SIRAHA District 1 71 57 71 57 57 0 0 0 0

TOTAL of EASTERN > Terai 68 8341 6719 8337 6674 6536 813 328 0 0

ADB/N>DHANKUTA>REHABILITATION
JALLAD KHOLA 100 DHANKUTA AC 1995 ID 219 175 219 175 175 100 50 0 0 ADB/N YES ADB/N 4 KOSHI
TOTAL of ADB/N > DHANKUTA > REHABILITATION 1 219 175 219 175 175 100 50 0 0

TOTAL of DHANKUTA District 1 219 175 219 175 175 100 50 0 0

ADB/N>ILAM>NEW
JAU BARI KHOLA 100 ILAM AC 1995 ID 14 11 14 11 11 6 3 0 0 ADB/N YES ADB/N 11 KANKAI
JIL KHOLA 100 ILAM AC 1995 ID 19 15 19 15 15 9 4 0 0 ADB/N YES ADB/N 11 KANKAI
TOTAL of ADB/N > ILAM > NEW 2 33 26 33 26 26 15 7 0 0

ADB/N>ILAM>REHABILITATION
DHUNGRE KHOLA 100 ILAM AC 1995 ID 5 4 5 4 4 2 1 0 0 ADB/N YES ADB/N 11 KANKAI
TOTAL of ADB/N > ILAM > REHABILITATION 1 5 4 5 4 4 2 1 0 0

TOTAL of ILAM District 3 38 30 38 30 30 17 8 0 0

ADB/N>KHOTANG>NEW
SIMLEK HOLA 100 KHOTANG AC 1995 ID 19 15 19 15 15 10 4 0 0 ADB/N YES ADB/N 4 KOSHI
TOTAL of ADB/N > KHOTANG > NEW 1 19 15 19 15 15 10 4 0 0

TOTAL of KHOTANG District 1 19 15 19 15 15 10 4 0 0

ADB/N>OKHALDHUNGA>NEW
BIMIRE KHOLA TAL-6 100 OKHALDHUNGA AC 1992 ID 6 5 6 5 5 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
BIMIRE KHOLA TALUWA-7 100 OKHALDHUNGA AC 1992 ID 11 9 11 9 9 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
DAMATI KHOLA 100 OKHALDHUNGA AC 1995 ID 13 10 13 10 10 6 3 0 0 ADB/N YES ADB/N 4 KOSHI
JOR PANI 100 OKHALDHUNGA AC 1994 ID 94 75 94 75 75 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
JOR PANIKESHARI 100 OKHALDHUNGA AC 1995 ID 50 40 50 40 40 24 6 0 0 ADB/N YES ADB/N 4 KOSHI
KETUKI KHOLA 100 OKHALDHUNGA AC 1994 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
MAHURI KHOLA 100 OKHALDHUNGA AC 1992 ID 6 5 6 5 5 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
TOTAL of ADB/N > OKHALDHUNGA > NEW 7 211 169 211 169 169 30 9 0 0

ADB/N>OKHALDHUNGA>REHABILITATION
AMBOTE KUWA KHOLA 100 OKHALDHUNGA AC 1993 ID 8 6 8 6 6 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
GHATE KHOLA 100 OKHALDHUNGA AC 1990 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
MUNA KHOLA 100 OKHALDHUNGA AC 1995 ID 41 33 41 33 33 19 9 0 0 ADB/N YES 4 KOSHI
SAJHAGARA THULO CHOUR 100 OKHALDHUNGA AC 1992 ID 10 8 10 8 8 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
TOTAL of ADB/N > OKHALDHUNGA > REHABILITATION 4 72 57 72 57 57 19 9 0 0

20
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

TOTAL of OKHALDHUNGA District 11 283 226 283 226 226 49 18 0 0

ADB/N>PANCHTHAR>NEW
RATAMATE 100 PANCHTHAR AC 1995 ID 23 18 23 18 18 10 5 0 0 ADB/N YES ADB/N 4 KOSHI
TOTAL of ADB/N > PANCHTHAR > NEW 1 23 18 23 18 18 10 5 0 0

ADB/N>PANCHTHAR>REHABILITATION
LOKHARUMBA 100 PANCHTHAR AC 1994 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
SAWA KHOLA 100 PANCHTHAR AC 1994 ID 20 16 20 16 16 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
TOTAL of ADB/N > PANCHTHAR > REHABILITATION 2 39 31 39 31 31 0 0 0 0

TOTAL of PANCHTHAR District 3 62 49 62 49 49 10 5 0 0

ADB/N>UDAYPUR>NEW
BHSRSUWA KHOLA 100 UDAYPUR AC 1992 ID 18 14 18 14 14 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
TOTAL of ADB/N > UDAYPUR > NEW 1 18 14 18 14 14 0 0 0 0

ADB/N>UDAYPUR>REHABILITATION
AANP TAR 100 UDAYPUR AC 1992 ID 11 9 11 9 9 0 0 0 0 ADB/N NO ADB 4 KOSHI
BAIJANATH KULO 100 UDAYPUR AC 1993 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
BHU TAR KHOLA 100 UDAYPUR AC 1993 ID 14 11 14 11 11 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
BRINDAVAN 100 UDAYPUR AC 1993 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
TOTAL of ADB/N > UDAYPUR > REHABILITATION 4 51 40 51 40 40 0 0 0 0

TOTAL of UDAYPUR District 5 69 54 69 54 54 0 0 0 0

ADB/N>SANKHUWASABHA>NEW
KAGUNE KHOLA 100 SANKHUWASABHA AC 1995 ID 38 30 38 30 30 18 9 0 0 ADB/N YES ADB/N 4 KOSHI
TOTAL of ADB/N > SANKHUWASABHA > NEW 1 38 30 38 30 30 18 9 0 0

ADB/N>SANKHUWASABHA>REHABILITATION
KHE KUWA KHOLA 100 SANKHUWASABHA AC 1991 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
MALTA KULO 100 SANKHUWASABHA AC 1992 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
SUBYUN 100 SANKHUWASABHA AC 1994 ID 41 33 41 33 33 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
TOTAL of ADB/N > SANKHUWASABHA > REHABILITATION 3 79 63 79 63 63 0 0 0 0

TOTAL of SANKHUWASABHA District 4 117 93 117 93 93 18 9 0 0

TOTAL of EASTERN > Hill 28 807 642 807 642 642 204 94 0 0

TOTAL of EASTERN Region 96 9148 7361 9144 7316 7178 1017 422 0 0

ADB/N>CHITWAN>NEW
BURIRAPTI-III 100 CHITWAN AC 1995 ID 330 264 330 264 264 158 70 0 0 ADB/N YES ADB/N 3 GANDAK
TOTAL of ADB/N > CHITWAN > NEW 1 330 264 330 264 264 158 70 0 0

21
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

ADB/N>CHITWAN>REHABILITATION
KHUMJOR1V 100 CHITWAN AC 1992 ID 85 68 85 68 68 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
MEGHALU 100 CHITWAN AC 1992 ID 80 64 80 64 64 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
PAMPHA KHOLA 100 CHITWAN AC 1992 ID 87 70 87 70 70 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
TOTAL of ADB/N > CHITWAN > REHABILITATION 3 252 202 252 202 202 0 0 0 0

TOTAL of CHITWAN District 4 582 466 582 466 466 158 70 0 0

ADB/N>DHANUSHA>REHABILITATION
BASNIYA KHOLA 100 DHANUSHA AC 1993 ID 75 60 75 60 60 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
RATU KHOLA 100 DHANUSHA AC 1989 ID 88 70 88 70 70 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
TOTAL of ADB/N > DHANUSHA > REHABILITATION 2 163 130 163 130 130 0 0 0 0

TOTAL of DHANUSHA District 2 163 130 163 130 130 0 0 0 0

ADB/N>PARSA>NEW
BULBULE KHOLA 100 PARSA AC 1994 ID 53 42 53 42 42 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
TOTAL of ADB/N > PARSA > NEW 1 53 42 53 42 42 0 0 0 0

ADB/N>PARSA>REHABILITATION
CHORMI KHOLA 100 PARSA AC 1990 ID 228 182 228 182 182 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
THULO CHOUR 100 PARSA AC 1889 ID 33 26 33 26 26 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
TOTAL of ADB/N > PARSA > REHABILITATION 2 261 208 261 208 208 0 0 0 0

TOTAL of PARSA District 3 314 250 314 250 250 0 0 0 0

ADB/N>SARLAHI>REHABILITATION
BHAWARI KHOLA 100 SARLAHI AC 1992 ID 78 62 78 62 62 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
GODIYA KHOLA 100 SARLAHI AC 1993 ID 98 78 98 78 78 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
KALIGOR 100 SARLAHI AC 1990 ED 500 400 500 400 400 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
LAXMANPUR 100 SARLAHI AC 1989 ID 250 200 250 200 200 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
TOTAL of ADB/N > SARLAHI > REHABILITATION 4 926 740 926 740 740 0 0 0 0

TOTAL of SARLAHI District 4 926 740 926 740 740 0 0 0 0

TOTAL of CENTRAL>Terai 13 1985 1586 1985 1586 1586 158 70 0 0

ADB/N>DHADING>NEW
ASRULI TAR 100 DHADING AC 1994 ID 8 6 8 6 6 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
BAGUWA KHOLA 100 DHADING AC 1994 ID 9 7 9 7 7 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
BAJ KHET 100 DHADING AC 1994 ID 6 5 6 5 5 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
BAR KHOLA 100 DHADING AC 1992 ID 18 14 18 14 14 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
BEAKHU KHOLA 100 DHADING AC 1996 ID 25 20 25 20 25 12 6 0 0 ADB/N NO ADB/N 3 GANDAK
BHAJRDIP 100 DHADING AC 1992 ID 10 8 10 8 8 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
BHALU KHOLA 100 DHADING AC 1992 ID 8 6 8 6 6 0 0 0 0 ADB/N NO ADB/N 3 GANDAK

22
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
BHAMANGPIDA 100 DHADING AC 1995 ID 14 11 14 11 11 7 3 0 0 ADB/N YES ADB/N 3 GANDAK
CHANAUTE PHANT 100 DHADING AC 1994 ID 14 11 14 11 11 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
CHURAMANI 100 DHADING AC 1995 ID 8 6 8 6 6 3 1 0 0 ADB/N YES ADB/N 3 GANDAK
DANAGADE 100 DHADING AC 1996 ID 9 7 9 7 7 4 2 0 0 ADB/N YES ADB/N 3 GANDAK
GADARE KHOLA 100 DHADING AC 1994 ID 14 11 14 11 11 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
HAS TAR 100 DHADING AC 1996 ID 9 7 9 7 7 4 2 0 0 ADB/N YES ADB/N 3 GANDAK
HUGDI KHOLA 100 DHADING AC 1995 ID 23 18 23 18 18 10 5 0 0 ADB/N YES ADB/N 3 GANDAK
KHAIRENI KHOLA 100 DHADING AC 1994 ID 9 7 9 7 7 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
MAHADEV BESI 100 DHADING AC 1995 ID 38 30 38 30 30 18 9 0 0 ADB/N YES ADB/N 3 GANDAK
MALEKHU KHOLA 100 DHADING AC 1994 ID 18 14 18 14 14 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
MANE GAON 100 DHADING AC 1995 ID 44 35 44 35 35 21 10 0 0 ADB/N YES ADB/N 3 GANDAK
MUL KHOLA 100 DHADING AC 1992 ID 63 50 63 50 50 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
PACHASE KHOLA 100 DHADING AC 1992 ID 14 11 14 11 11 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
SADI KHOLA 100 DHADING AC 1992 ID 16 13 16 13 13 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
SAUNE KHOLA 100 DHADING AC 1995 ID 13 10 13 10 10 6 3 0 0 ADB/N YES ADB/N 3 GANDAK
SETI PAKHA 100 DHADING AC 1994 ID 5 4 5 4 4 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
SHANKAR KHOLA 100 DHADING AC 1996 ID 9 7 9 7 7 4 2 0 0 ADB/N YES ADB/N 3 GANDAK
THARPU DHARA 100 DHADING AC 1994 ID 10 8 10 8 8 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
TOTAL of ADB/N > DHADING > NEW 25 414 326 414 326 331 89 43 0 0

ADB/N>DHADING>REHABILITATION
AHALE KHOLA 100 DHADING AC 1994 ID 16 13 16 13 13 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
AHALI GAON 100 DHADING AC 1990 ID 6 5 6 5 5 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
ANP TARINIKAANTHA 100 DHADING AC 1994 ID 24 19 24 19 19 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
BEL TAR,GAJURI-4 100 DHADING AC 1996 ID 31 25 31 25 25 15 7 0 0 ADB/N YES ADB/N 3 GANDAK
BIKHYAKHRT 100 DHADING AC 1995 ID 16 13 16 13 13 7 3 0 0 ADB/N YES ADB/N 3 GANDAK
BIRKHE TAR 100 DHADING AC 1994 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
CHA KHOLA 100 DHADING AC 1993 ID 38 30 38 30 30 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
CHAKRA KHOLA 100 DHADING AC 1992 ID 30 24 30 24 24 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
DANDA TALE 100 DHADING AC 1994 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
DANGDUNGE KHOLA 100 DHADING AC 1993 ID 55 44 55 44 44 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
DANSINGKHARKA 100 DHADING AC 1994 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
DHODENI KHOLA 100 DHADING AC 1990 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
DHONEHISOKAS-3 100 DHADING AC 1993 ID 16 13 16 13 13 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
FEDI KHOLA 100 DHADING PC 1993 ID 8 6 8 6 6 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
GARANG 100 DHADING AC 1994 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
GARDUWA KHOLA 100 DHADING AC 1993 ID 10 8 10 8 8 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
GHATTE KHOLA 100 DHADING AC 1994 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
GHUMTI KHOLA 100 DHADING AC 1994 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
GUMDI-3 100 DHADING AC 1991 ID 6 5 6 5 5 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
JAMU TARBELKHU 100 DHADING AC 1993 ID 113 90 113 90 90 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
JOGI TAR 100 DHADING AC 1994 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
JORGAHATTE,PIDA 100 DHADING AC 1995 ID 15 12 15 12 12 7 3 0 0 ADB/N YES ADB/N 3 GANDAK
KADAM KHOLA 100 DHADING AC 1992 ID 23 18 23 18 18 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
KALI TAR 100 DHADING AC 1993 ID 26 21 26 21 21 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
KARELITHIMKA 100 DHADING AC 1993 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 3 GANDAK

23
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
KARKI DANDA 100 DHADING AC 1990 ID 20 16 20 16 16 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
KARTIKE TAR 100 DHADING AC 1994 ID 18 14 18 14 14 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
KHAR BARI 100 DHADING AC 1992 ID 10 8 10 8 8 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
KUPA KHOLA 100 DHADING AC 1990 ID 10 8 10 8 8 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
MAHESHKHALA-8 100 DHADING AC 1993 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
MAHES TARKALLERI-3 100 DHADING AC 1992 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
MULKHARKA 100 DHADING AC 1994 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
ODARE KHOLA 100 DHADING AC 1992 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
PAKHURE,PIDA 100 DHADING AC 1995 ID 15 12 15 12 12 7 3 0 0 ADB/N YES ADB/N 3 GANDAK
PALAKHU KHOLA 100 DHADING AC 1990 ID 8 6 8 6 6 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
PANCHAKANYA 100 DHADING AC 1994 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
RIST TAR 100 DHADING AC 1994 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
SANYASI TAR 100 DHADING AC 1995 ID 33 26 33 26 26 15 7 0 0 ADB/N YES ADB/N 3 GANDAK
SIMLANA KHET 100 DHADING AC 1994 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
SIMLE TARKHARI-7 100 DHADING AC 1992 ID 56 45 56 45 45 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
THULO KHOLA 100 DHADING AC 1994 ID 9 7 9 7 7 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
THULO PHANT 100 DHADING AC 1994 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
WANGRANG 100 DHADING AC 1994 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
TOTAL of ADB/N > DHADING > REHABILITATION 43 978 778 978 778 778 51 23 0 0

TOTAL of DHADING District 68 1392 1104 1392 1104 1109 140 66 0 0

ADB/N>KATHMANDU>NEW
PANCHAPAL 100 KATHMANDU AC 1992 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 9 BAGMATI
TOTAL of ADB/N > KATHMANDU > NEW 1 31 25 31 25 25 0 0 0 0

ADB/N>KATHMANDU>REHABILITATION
DHAKAL GAON 100 KATHMANDU AC 1992 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 9 BAGMATI
TOTAL of ADB/N > KATHMANDU > REHABILITATION 1 25 20 25 20 20 0 0 0 0

TOTAL of KATHMANDU District 2 56 45 56 45 45 0 0 0 0

ADB/N>KAVRE>NEW
JANAJAGRITI 100 KAVRE AC 1992 ID 88 70 88 70 70 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
ROSI-1 100 KAVRE AC 1995 ID 18 14 18 14 14 8 4 0 0 ADB/N YES ADB/N 4 KOSHI
TOTAL of ADB/N > KAVRE > NEW 2 106 84 106 84 84 8 4 0 0

ADB/N>KAVRE>REHABILITATION
BHASME KHOLA 100 KAVRE AC 1995 ID 29 23 29 23 23 13 6 0 0 ADB/N YES ADB/N 4 KOSHI
CHA KHOLA 100 KAVRE AC 1989 ID 156 125 156 125 125 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
CHHANGE KHOLA 100 KAVRE AC 1996 ID 25 20 25 20 20 12 6 0 0 ADB/N YES ADB/N 4 KOSHI
JAMUNEY KHOLA 100 KAVRE AC 1990 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
POTA KHOLA 100 KAVRE AC 1995 ID 19 15 19 15 15 9 4 0 0 ADB/N YES ADB/N 4 KOSHI
ROSHI-II 100 KAVRE AC 1995 ID 10 8 10 8 8 4 2 0 0 ADB/N YES ADB/N 4 KOSHI
TOTAL of ADB/N > KAVRE > REHABILITATION 6 270 216 270 216 216 38 18 0 0

24
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of KAVRE District 8 376 300 376 300 300 46 22 0 0

ADB/N>MAKAWANPUR>REHABILITATION
RAJAIYA 100 MAKAWANPUR AC 1989 ID 32 25 32 25 25 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
TOTAL of ADB/N > MAKAWANPUR > REHABILITATION 1 32 25 32 25 25 0 0 0 0

TOTAL of MAKAWANPUR District 1 32 25 32 25 25 0 0 0 0

ADB/N>NUWAKOT>NEW
KAMERA KHOLA 100 NUWAKOT AC 1995 ID 6 5 6 5 5 3 1 0 0 ADB/N YES ADB/N 3 GANDAK
TOTAL of ADB/N > NUWAKOT > NEW 1 6 5 6 5 5 3 1 0 0

ADB/N>NUWAKOT>REHABILITATION
ADHRI KHOLA 100 NUWAKOT AC 1990 ID 88 70 88 70 70 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
AHALE KHOLA 100 NUWAKOT AC 1992 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
BALKUMARI 100 NUWAKOT AC 1991 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
BIRMAN TAR 100 NUWAKOT AC 1990 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
JHANKRI KHOLA 100 NUWAKOT AC 1992 ID 44 35 44 35 35 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
KARANG KHOLA 100 NUWAKOT AC 1991 ID 38 30 38 30 30 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
LACHI KHOLA 100 NUWAKOT AC 1992 ID 69 55 69 55 55 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
MAN DADA 100 NUWAKOT AC 1990 ID 44 35 44 35 35 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
PANCHAKANYA 100 NUWAKOT AC 1991 ID 88 70 88 70 70 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
SANO BHORLE 100 NUWAKOT AC 1989 ID 32 25 32 25 25 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
THAPREK 100 NUWAKOT AC 1991 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
THULO CHOUR 100 NUWAKOT AC 1989 ID 33 26 33 26 26 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
KARTIKE KHLOA 100 NUWAKOT AC 1991 ID 44 35 44 35 35 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
TOTAL of ADB/N > NUWAKOT > REHABILITATION 13 586 466 586 466 466 0 0 0 0

TOTAL of NUWAKOT District 14 592 471 592 471 471 3 1 0 0

ADB/N>RAMECHAP>NEW
SURKE KHOLA 100 RAMECHAP AC 1995 ID 113 90 113 90 90 54 27 0 0 ADB/N YES ADB/N 4 KOSHI
TOTAL of ADB/N > RAMECHAP > NEW 1 113 90 113 90 90 54 27 0 0

ADB/N>RAMECHAP>REHABILITATION
CHHANGE KHOLA 100 RAMECHAP AC 1995 ID 31 25 31 25 25 15 7 0 0 ADB/N YES ADB/N 4 KOSHI
DHARA PANI POKHARA 100 RAMECHAP AC 1993 ID 6 5 6 5 5 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
DHARAPANI 100 RAMECHAP AC 1994 ID 7 6 7 6 6 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
DORAMBA 100 RAMECHAP AC 1992 ID 7 6 7 6 6 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
JHARINI KHOLA 100 RAMECHAP AC 1993 ID 38 30 38 30 30 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
TOTAL of ADB/N > RAMECHAP > REHABILITATION 5 89 72 89 72 72 15 7 0 0

TOTAL of RAMECHAP District 6 202 162 202 162 162 69 34 0 0

ADB/N>SINDHULI>NEW
CHANDRA KHOLA 100 SINDHULI AC 1994 ID 41 33 41 33 33 0 0 0 0 ADB/N NO ADB/N 9 BAGMATI

25
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
DURANDER 100 SINDHULI AC 1994 ID 44 35 44 35 35 0 0 0 0 ADB/N NO ADB/N 9 BAGMATI
TOTAL of ADB/N > SINDHULI > NEW 2 85 68 85 68 68 0 0 0 0

ADB/N>SINDHULI>REHABILITATION
JARU TARDEBREKH 100 SINDHULI AC 1992 ID 31 25 31 25 25 0 0 0 0 ADB/N NO ADB/N 9 BAGMATI
TOTAL of ADB/N > SINDHULI > REHABILITATION 1 31 25 31 25 25 0 0 0 0

TOTAL of SINDHULI District 3 116 93 116 93 93 0 0 0 0

ADB/N>DOLAKHA>REHABILITATION
ADHERI KHOLA AWALE 100 DOLAKHA AC 1993 ID 30 24 30 24 24 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
ADHERI KHOLA SAWANE 100 DOLAKHA AC 1993 125 100 125 100 100 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
FADKE KHOLA 100 DOLAKHA AC 1992 ID 14 11 14 11 14 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
GHAYANG KHOLA 100 DOLAKHA AC 1995 ID 94 75 94 75 75 45 20 0 0 ADB/N YES ADB/N 4 KOSHI
LOHARE KHOLA 100 DOLAKHA AC 1996 ID 94 75 94 75 75 45 20 0 0 ADB/N YES ADB/N 4 KOSHI
LORARE KHOLA 100 DOLAKHA AC 1993 ID 94 75 94 75 75 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
ODARE KHOLA 100 DOLAKHA AC 1993 ID 15 12 15 12 12 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
TOTAL of ADB/N > DOLAKHA > REHABILITATION 7 466 372 466 372 375 90 40 0 0

TOTAL of DOLAKHA District 7 466 372 466 372 375 90 40 0 0

ADB/N>SINDHUPALCHOWK>NEW
BARAMCHI KHOLA 100 SINDHUPALCHOWK AC 1995 ID 25 20 25 20 20 12 6 0 0 ADB/N YES ADB/N 4 KOSHI
GADARE KHOLA 100 SINDHUPALCHOWK AC 1995 ID 25 20 25 20 20 12 6 0 0 ADB/N YES ADB/N 4 KOSHI
KEURENI KHOLA -1 100 SINDHUPALCHOWK AC 1995 ID 6 5 6 5 5 3 1 0 0 ADB/N YES ADB/N 4 KOSHI
KEURENI KHOLA -2 100 SINDHUPALCHOWK AC 1995 ID 5 4 5 4 4 2 1 0 0 ADB/N YES ADB/N 4 KOSHI
TOTAL of ADB/N > SINDHUPALCHOWK > NEW 4 61 49 61 49 49 29 14 0 0

ADB/N>SINDHUPALCHOWK>REHABILITATION
CHEPE KHOLA 100 SINDHUPALCHOWK AC 1994 ID 15 12 15 12 12 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
GHATTE KHOLA 100 SINDHUPALCHOWK AC 1989 ID 38 30 38 30 30 0 0 0 0 ADB/N NO ADB/N 4 KOSHI
TOTAL of ADB/N > SINDHUPALCHOWK > REHABILITATION 2 53 42 53 42 42 0 0 0 0

TOTAL of SINDHUPALCHOWK District 6 114 91 114 91 91 29 14 0 0

TOTAL of CENTRAL>Hill 115 3346 2663 3346 2663 2671 377 177 0 0

TOTAL of CENTRAL Region 128 5331 4249 5331 4249 4257 535 247 0 0

ADB/N>KAPILVASTU>NEW
BHORLABASE,KOTIE 100 KAPILVASTU AC 1992 ID 134 107 134 107 107 0 0 0 0 ADB/N NO ADB/N 12 SIWALIK RIVER
KACHUWA KHOLA 100 KAPILVASTU AC 1995 ID 100 80 100 80 80 48 24 0 0 ADB/N YES ADB/N 12 SIWALIK RIVER
TOTAL of ADB/N > KAPILVASTU > NEW 2 234 187 234 187 187 48 24 0 0

TOTAL of KAPILVASTU District 2 234 187 234 187 187 48 24 0 0

26
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
ADB/N>NAWALPARASI>NEW
CHIURI KHOLA 100 NAWALPARASI AC 1992 ID 10 8 10 8 8 0 0 0 0 ADB/N YES ADB/N 3 GANDAK
DANGRAI KHOLA 100 NAWALPARASI AC 1996 ID 104 83 104 83 83 50 20 0 0 ADB/N YES ADB/N 3 GANDAK
TOTAL of ADB/N > NAWALPARASI > NEW 2 114 91 114 91 91 50 20 0 0

ADB/N>NAWALPARASI>REHABILITATION
AMAL TARI 100 NAWALPARASI AC 1992 ID 125 100 125 100 100 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
AMARASAGANGOLI 100 NAWALPARASI AC 1992 ID 43 34 43 34 34 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
BARA KHOLA 100 NAWALPARASI AC 1991 ID 209 167 209 167 137 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
GAIDAKOT 100 NAWALPARASI AC 1993 ID 73 58 73 58 58 0 0 0 0 ADB/N YES ADB/N 3 GANDAK
GANGARANI 100 NAWALPARASI AC 1994 ID 38 30 38 30 30 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
JAYSSHREE KHOLA 100 NAWALPARASI AC 1995 ID 38 30 38 30 30 18 9 0 0 ADB/N YES ADB/N 3 GANDAK
JHARI KHOLA 100 NAWALPARASI AC 1993 ID 84 67 84 67 67 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
ULTI KHOLA 100 NAWALPARASI AC 1994 ID 85 68 85 68 68 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
TOTAL of ADB/N > NAWALPARASI > REHABILITATION 8 695 554 695 554 524 18 9 0 0

TOTAL of NAWALPARASI District 10 809 645 809 645 615 68 29 0 0

ADB/N>RUPANDEHI>NEW
BARUWA KHOLA 100 RUPANDEHI AC 1994 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 8 TINAU
TOTAL of ADB/N > RUPANDEHI > NEW 1 19 15 19 15 15 0 0 0 0

ADB/N>RUPANDEHI>REHABILITATION
BARCHAWA KHOLA 100 RUPANDEHI AC 1994 ID 94 75 94 75 94 0 0 0 0 ADB/N NO ADB/N 8 TINAU
GAURI BANDH 100 RUPANDEHI AC 1989 ID 265 212 265 212 212 0 0 0 0 ADB/N NO ADB/N 8 TINAU
KANCHAN KHOLA PAN BARI 100 RUPANDEHI AC 1995 ID 50 40 50 40 40 20 10 0 0 ADB/N YES ADB/N 8 TINAU
PAHELA KHOLA 100 RUPANDEHI AC 1992 ID 23 18 23 18 23 0 0 0 0 ADB/N NO ADB/N 8 TINAU
SUNKAUDA 100 RUPANDEHI AC 1991 ID 21 17 21 17 17 0 0 0 0 ADB/N NO ADB/N 8 TINAU
KANCHAN KHOLA JHIMJIME 100 RUPANDEHI AC 1995 ED 375 300 375 300 180 90 0 0 0 ADB/N YES ADB/N 8 TINAU
TOTAL of ADB/N > RUPANDEHI > REHABILITATION 6 828 662 828 662 566 110 10 0 0

TOTAL of RUPANDEHI District 7 847 677 847 677 581 110 10 0 0

TOTAL of WESTERN>Terai 19 1890 1509 1890 1509 1383 226 63 0 0

ADB/N>ARGHAKHANCHI>NEW
DUNGESERA 100 ARGHAKHANCHI AC 1995 ID 44 35 44 35 35 21 10 0 0 ADB/N YES ADB/N 6 WEST RAPTI
SIMAL PANI 100 ARGHAKHANCHI AC 1992 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 6 WEST RAPTI
TOTAL of ADB/N > ARGHAKHANCHI > NEW 2 63 50 63 50 50 21 10 0 0

ADB/N>ARGHAKHANCHI>REHABILITATION
BANGANASITAPUR 100 ARGHAKHANCHI AC 1990 ID 16 13 16 13 13 0 0 0 0 ADB/N NO ADB/N 6 WEST RAPTI
TOTAL of ADB/N > ARGHAKHANCHI > REHABILITATION 1 16 13 16 13 13 0 0 0 0

TOTAL of ARGHAKHANCHI District 3 79 63 79 63 63 21 10 0 0

27
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
ADB/N>BAGLUNG>NEW
SAR KUWA 100 BAGLUNG AC 1996 ID 11 9 11 9 9 5 2 0 0 ADB/N YES ADB/N 3 GANDAK
TOTAL of ADB/N > BAGLUNG > NEW 1 11 9 11 9 9 5 2 0 0

ADB/N>BAGLUNG>REHABILITATION
BANDRE.MALLIKA 100 BAGLUNG AC 1995 ID 13 10 13 10 10 6 3 0 0 ADB/N YES ADB/N 3 GANDAK
TAKIL KHOLA 100 BAGLUNG AC 1990 ID 29 23 29 23 23 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
TOTAL of ADB/N > BAGLUNG > REHABILITATION 2 42 33 42 33 33 6 3 0 0

TOTAL of BAGLUNG District 3 53 42 53 42 42 11 5 0 0

ADB/N>GORKHA>NEW
BHANDARTHOWK 100 GORKHA AC 1996 ID 125 100 125 100 100 60 30 0 0 ADB/N YES ADB/N 3 GANDAK
JUGDI TAR 100 GORKHA AC 1996 ID 20 16 20 16 16 9 4 0 0 ADB/N YES ADB/N 3 GANDAK
SATBISE PHANT 100 GORKHA AC 1994 ID 18 14 18 14 14 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
SILLING TAR 100 GORKHA AC 1995 ID 6 5 6 5 5 3 1 0 0 ADB/N YES ADB/N 3 GANDAK
ULTER TAR 100 GORKHA AC 1996 ID 15 12 15 12 12 7 3 0 0 ADB/N YES ADB/N 3 GANDAK
TOTAL of ADB/N > GORKHA > NEW 5 184 147 184 147 147 79 38 0 0

ADB/N>GORKHA>REHABILITATION
GAHIRE GAON 100 GORKHA AC 1993 ID 50 40 50 40 0 0 0 0 0 ADB/N YES ADB/N 3 GANDAK
GANAKHU 100 GORKHA AC 1995 ID 50 40 50 40 40 24 10 0 0 ADB/N YES ADB/N 3 GANDAK
JUDI KHOLA 100 GORKHA AC 1991 ID 21 17 21 17 17 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
PANDURE 100 GORKHA AC 1992 ID 20 16 20 16 16 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
SIMAL TAR BHORLE 100 GORKHA AC 1992 ID 6 5 6 5 5 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
TILARAM KHOLA 100 GORKHA AC 1990 ED 24 19 24 19 19 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
TOTAL of ADB/N > GORKHA > REHABILITATION 6 171 137 171 137 97 24 10 0 0

TOTAL of GORKHA District 11 355 284 355 284 244 103 48 0 0

ADB/N>GULMI>NEW
ANTHAUNA KULO 100 GULMI AC 1992 ID 11 9 11 9 9 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
BHARSE KHOLA JUN 100 GULMI AC 1992 ID 54 43 54 43 43 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
JIMDI KHOLA 100 GULMI AC 1992 ID 6 5 6 5 5 0 0 0 0 ADB/N YES ADB/N 3 GANDAK
SAYAMURI 100 GULMI AC 1992 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
TOTAL of ADB/N > GULMI > NEW 4 84 67 84 67 67 0 0 0 0

ADB/N>GULMI>REHABILITATION
DUMRE KHARKA 100 GULMI AC 1992 ID 16 13 16 13 13 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
JUMDI KHOLA 100 GULMI AC 1990 ID 30 24 30 24 24 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
TOTAL of ADB/N > GULMI > REHABILITATION 2 46 37 46 37 37 0 0 0 0

TOTAL of GULMI District 6 130 104 130 104 104 0 0 0 0

ADB/N>KASKI>NEW
ARUKHARKA 100 KASKI AC 1994 ID 7 6 7 6 6 0 0 0 0 ADB/N NO ADB/N 3 GANDAK

28
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
DOBILA 100 KASKI AC 1996 ID 25 20 25 20 20 12 6 0 0 ADB/N YES ADB/N 3 GANDAK
TOR KHOLA 100 KASKI AC 1995 ID 13 10 13 10 10 6 3 0 0 ADB/N YES ADB/N 3 GANDAK
TOTAL of ADB/N > KASKI > NEW 3 45 36 45 36 36 18 9 0 0

ADB/N>KASKI>REHABILITATION
BISAUNA 100 KASKI AC 1992 ID 10 8 10 8 8 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
DHABKUNA 100 KASKI AC 1996 ID 15 12 15 12 12 7 3 0 0 ADB/N YES ADB/N 3 GANDAK
GYAPUMAJUWAI 100 KASKI AC 1993 ID 9 7 9 7 7 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
MAUJA-3,KAVRE 100 KASKI AC 1992 ID 7 6 7 6 6 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
MAUJA-7BISAUNA 100 KASKI AC 1991 ID 9 7 9 7 7 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
TOTAL of ADB/N > KASKI > REHABILITATION 5 50 40 50 40 40 7 3 0 0

TOTAL of KASKI District 8 95 76 95 76 76 25 12 0 0

ADB/N>LAMJUNG>REHABILITATION
DHODSING 100 LAMJUNG AC 1990 ID 19 15 19 15 15 0 0 0 0 ADB/N YES ADB/N 3 GANDAK
TOTAL of ADB/N > LAMJUNG > REHABILITATION 1 19 15 19 15 15 0 0 0 0

TOTAL of LAMJUNG District 1 19 15 19 15 15 0 0 0 0

ADB/N>MYAGDI>REHABILITATION
HANIYAJHAR 100 MYAGDI AC 1990 ID 16 13 16 13 13 0 0 0 0 ADB/N NO ADB/N 3 GADDAK
TOTAL of ADB/N > MYAGDI > REHABILITATION 1 16 13 16 13 13 0 0 0 0

TOTAL of MYAGDI District 1 16 13 16 13 13 0 0 0 0

ADB/N>PALPA>REHABILITATION
CHIS TARI 100 PALPA AC 1992 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
KARANDHI KHOLA 100 PALPA AC 1992 ID 18 14 18 14 14 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
KUKHUREDHAP 100 PALPA AC 1990 ID 33 26 33 26 26 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
SIMTADI KULO 100 PALPA AC 1995 ID 5 4 5 4 4 2 1 0 0 ADB/N YES ADB/N 3 GANDAK
SISNE KHOLA 100 PALPA AC 1992 ID 7 6 7 6 6 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
SISNE KHOLA DOVAN 100 PALPA AC 1993 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
TOTAL of ADB/N > PALPA > REHABILITATION 6 101 80 101 80 80 2 1 0 0

TOTAL of PALPA District 6 101 80 101 80 80 2 1 0 0

ADB/N>PARBAT>REHABILITATION
BAJUNG,BEDA KHET 100 PARBAT AC 1995 ID 20 16 20 16 16 10 5 0 0 ADB/N YES ADB/N 3 GANDAK
LUNGDI KHOLA 100 PARBAT AC 1995 ID 48 38 48 38 38 22 10 0 0 ADB/N YES ADB/N 3 GANDAK
TOTAL of ADB/N > PARBAT > REHABILITATION 2 68 54 68 54 54 32 15 0 0

TOTAL of PARBAT District 2 68 54 68 54 54 32 15 0 0

ADB/N>SYANGJA>NEW
MAJHUWA 100 SYANGJA AC 1996 ID 9 7 9 7 7 4 2 0 0 ADB/N YES ADB/N 3 GANDAK

29
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of ADB/N > SYANGJA > NEW 1 9 7 9 7 7 4 2 0 0

ADB/N>SYANGJA>REHABILITATION
AMBOTECHHINNEBAS 100 SYANGJA AC 1996 ID 20 16 20 16 16 9 4 0 0 ADB/N YES ADB/N 3 GANDAK
KHORDI, CHANDIBHANJYAG 100 SYANGJA AC 1995 ID 11 9 11 9 9 5 2 0 0 ADB/N YES ADB/N 3 GANDAK
MAJUWA 100 SYANGJA AC 1994 ID 23 18 23 18 18 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
THULAKHEL 100 SYANGJA AC 1996 ID 11 9 11 9 9 5 2 0 0 ADB/N YES ADB/N 3 GANDAK
TOTAL of ADB/N > SYANGJA > REHABILITATION 4 65 52 65 52 52 19 8 0 0

TOTAL of SYANGJA District 5 74 59 74 59 59 23 10 0 0

ADB/N>TANAHU>NEW
SIUDENLANBU 100 TANAHU AC 1995 ID 19 15 19 15 15 9 4 0 0 ADB/N YES ADB/N 3 GANDAK
THULADHUNGE PLANT 100 TANAHU AC 1995 ID 6 5 6 5 5 3 1 0 0 ADB/N YES ADB/N 3 GANDAK
TOTAL of ADB/N > TANAHU > NEW 2 25 20 25 20 20 12 5 0 0

ADB/N>TANAHU>REHABILITATION
BABGE KHOLA 100 TANAHU AC 1993 ID 11 9 11 9 9 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
BARAHA KHOLA 100 TANAHU AC 1993 ID 11 9 11 9 9 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
BARBANJYANG 100 TANAHU AC 1992 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 3 GANDAK
TOTAL of ADB/N > TANAHU > REHABILITATION 3 35 28 35 28 28 0 0 0 0

TOTAL of TANAHU District 5 60 48 60 48 48 12 5 0 0

TOTAL of WESTERN >Hill 51 1050 838 1050 838 798 229 106 0 0

ADB/N>MUSTANG>REHABILITATION
MARPHA 100 MUSTANG AC 1996 ID 26 21 26 21 21 12 6 0 0 ADB/N YES ADB/N 3 GANDAK
TOTAL of ADB/N > MUSTANG > REHABILITATION 1 26 21 26 21 21 12 6 0 0

TOTAL of MUSTANG District 1 26 21 26 21 21 12 6 0 0

TOTAL of WESTERN >Mountain 1 26 21 26 21 21 12 6 0 0

TOTAL of WESTERN Region 71 2966 2368 2966 2368 2202 467 175 0 0

ADB/N>BARDIYA>REHABILITATION
KALIGAUDI 100 BARDIYA AC 1992 ID 266 213 266 213 213 0 0 0 0 ADB/N NO ADB/N 5 BABAI
TOTAL of ADB/N > BARDIYA > REHABILITATION 1 266 213 266 213 213 0 0 0 0

TOTAL of BARDIYA District 1 266 213 266 213 213 0 0 0 0

ADB/N>DANG>NEW
GANGDI 100 DANG AC 1995 ID 190 152 190 152 152 90 45 0 0 ADB/N YES ADB/N 5 BABAI
RAMPURRSIMAL TAR 100 DANG AC 1995 ID 50 40 50 40 40 24 12 0 0 ADB/N YES ADB/N 5 BABAI
TOTAL of ADB/N > DANG > NEW 2 240 192 240 192 192 114 57 0 0

30
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

ADB/N>DANG>REHABILITATION
AMBAPUR-1 100 DANG AC 1995 ID 81 65 81 65 65 39 19 0 0 ADB/N YES ADB/N 5 BABAI
ANIPUR 100 DANG AC 1994 ID 21 17 21 17 17 0 0 0 0 ADB/N NO ADB/N 5 BABAI
BALIM KHOLA 100 DANG AC 1989 ID 316 253 316 253 253 0 0 0 0 ADB/N NO ADB/N 5 BABAI
BHITTORIYA 100 DANG AC 1989 ID 100 80 100 80 80 0 0 0 0 ADB/N NO ADB/N 5 BABAI
BULBULE 100 DANG AC 1989 ID 113 90 113 90 90 0 0 0 0 ADB/N NO ADB/N 5 BABAI
GHORNETI 100 DANG AC 1994 ID 38 30 38 30 30 0 0 0 0 ADB/N NO ADB/N 5 BABAI
GUMNAHA 100 DANG AC 1993 ID 125 100 125 100 100 0 0 0 0 ADB/N NO ADB/N 5 BABAI
GWAR,RANIGAR KHOLA 100 DANG AC 1993 ED 484 387 484 387 387 0 0 0 0 ADB/N NO ADB/N 5 BABAI
KANJUWAR 100 DANG AC 1989 ID 100 80 100 80 90 0 0 0 0 ADB/N NO ADB/N 5 BABAI
KUMALGARHI 100 DANG AC 1989 ID 66 53 66 53 53 0 0 0 0 ADB/N NO ADB/N 5 BABAI
MANIPUR11 100 DANG AC 1994 ID 75 60 75 60 60 0 0 0 0 ADB/N NO ADB/N 5 BABAI
PARSADUWA 100 DANG AC 1995 ID 234 187 234 187 187 112 50 0 0 ADB/N YES ADB/N 5 BABAI
SALIWAN 100 DANG AC 1994 ID 26 21 26 21 26 0 0 0 0 ADB/N NO ADB/N 5 BABAI
SONPURNARTI 100 DANG AC 1994 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 5 BABAI
UNERIA KHOLA 100 DANG AC 1995 ID 209 167 209 167 167 100 50 0 0 ADB/N YES ADB/N 5 BABAI
TOTAL of ADB/N > DANG > REHABILITATION 15 2013 1610 2013 1610 1625 251 119 0 0

TOTAL of DANG District 17 2253 1802 2253 1802 1817 365 176 0 0

TOTAL of MID-WESTERN >Terai 18 2519 2015 2519 2015 2030 365 176 0 0

ADB/N>JAJARKOT>REHABILITATION
CHHAYACHHATRA 100 JAJARKOT AC 1993 ID 6 5 6 5 5 0 0 0 0 ADB/N NO ADB/N 2 KARNALI
GIME 100 JAJARKOT AC 1992 ID 44 35 44 35 35 0 0 0 0 ADB/N NO ADB/N 2 KARNALI
TOTAL of ADB/N > JAJARKOT > REHABILITATION 2 50 40 50 40 40 0 0 0 0

TOTAL of JAJARKOT District 2 50 40 50 40 40 0 0 0 0

ADB/N>PYUTHAN>REHABILITATION
DARBAN 100 PYUTHAN AC 1994 ID 100 80 100 80 80 0 0 0 0 ADB/N NO ADB/N 6 WEST RAPTI
JARI KHOLA 100 PYUTHAN AC 1989 ID 125 100 125 100 100 0 0 0 0 ADB/N NO ADB/N 6 WEST RAPTI
JHILIBANG 100 PYUTHAN AC 1991 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 6 WEST RAPTI
KWEDI 100 PYUTHAN AC 1995 ID 81 65 81 65 65 39 18 0 0 ADB/N YES ADB/N 6 WEST RAPTI
TOTAL of ADB/N > PYUTHAN > REHABILITATION 4 319 255 319 255 255 39 18 0 0

TOTAL of PYUTHAN District 4 319 255 319 255 255 39 18 0 0

ADB/N>ROLPA>REHABILITATION
CHENETA 100 ROLPA AC 1992 ID 73 58 73 58 58 0 0 0 0 ADB/N NO ADB/N 6 WEST RAPTI
TOTAL of ADB/N > ROLPA > REHABILITATION 1 73 58 73 58 58 0 0 0 0

TOTAL of ROLPA District 1 73 58 73 58 58 0 0 0 0

ADB/N>SALYAN>REHABILITATION

31
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
GHODAMARE 100 SALYAN AC 1989 ID 32 25 32 25 25 0 0 0 0 ADB/N NO ADB/N 5 BABAI
LAMAJULA 100 SALYAN AC 1995 ID 15 12 15 12 12 7 3 0 0 ADB/N YES ADB/N 5 BABAI
PHALABANG 100 SALYAN AC 1995 ID 19 15 19 15 15 9 4 0 0 ADB/N YES ADB/N 5 BABAI
TARI KULO 100 SALYAN AC 1995 ID 8 6 8 6 6 3 1 0 0 ADB/N YES ADB/N 5 BABAI
TATAKEBUDA 100 SALYAN AC 1995 ID 24 19 24 19 19 11 5 0 0 ADB/N YES ADB/N 5 BABAI
TRABENITAULERAHA 100 SALYAN AC 1995 ID 15 12 15 12 12 7 3 0 0 ADB/N YES ADB/N 5 BABAI
TRIBENI DADALUHAN 100 SALYAN AC 1995 ID 38 30 38 30 30 18 9 0 0 ADB/N YES ADB/N 5 BABAI
TOTAL of ADB/N > SALYAN > REHABILITATION 7 151 119 151 119 119 55 25 0 0

TOTAL of SALYAN District 7 151 119 151 119 119 55 25 0 0

ADB/N>SURKHET>NEW
LUKAIGHORETO 100 SURKHET AC 1996 ID 11 9 11 9 9 5 2 0 0 ADB/N YES ADB/N 2 KARNALI
MEL PANI 100 SURKHET AC 1996 ID 13 10 13 10 10 6 3 3 0 ADB/N YES ADB/N 2 KARNALI
TOTAL of ADB/N > SURKHET > NEW 2 24 19 24 19 19 11 5 3 0

ADB/N>SURKHET>REHABILITATION
GOCHE KHOLA 100 SURKHET AC 1992 ID 14 11 14 11 11 0 0 0 0 ADB/N NO ADB/N 2 KARNALI
MALARANI 100 SURKHET AC 1994 ID 19 15 19 15 15 0 0 0 0 ADB/N NO ADB/N 2 KARNALI
SIDHHAPUR 100 SURKHET AC 1996 ID 19 15 19 15 15 9 4 0 0 ADB/N YES ADB/N 2 KARNALI
TOTAL of ADB/N > SURKHET > REHABILITATION 3 52 41 52 41 41 9 4 0 0

TOTAL of SURKHET District 5 76 60 76 60 60 20 9 3 0

TOTAL of MID-WESTERN >Hill 19 669 532 669 532 532 114 52 3 0

TOTAL of MID-WESTERN Region 37 3188 2547 3188 2547 2562 479 228 3 0

ADB/N>KAILALI>REHABILITATION
JARUWA 100 KAILALI AC 1990 ID 50 40 50 40 40 0 0 0 0 ADB/N NO ADB/N 2 KARNALI
KALI NALA 100 KAILALI AC 1992 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 2 KARNALI
TOTAL of ADB/N > KAILALI > REHABILITATION 2 75 60 75 60 60 0 0 0 0

TOTAL of KAILALI District 2 75 60 75 60 60 0 0 0 0

ADB/N>KANCHANPUR>NEW
ADB/N>KANCHANPUR>NEW 100 KANCHANPUR AC 1992 ID 79 63 79 63 63 0 0 0 0 ADB/N NO ADB/N 1 MAHAKALI
TATO PANI 100 KANCHANPUR AC 1992 ID 50 40 50 40 40 0 0 0 0 ADB/N NO ADB/N 1 MAHAKALI
TOTAL of ADB/N > KANCHANPUR > NEW 2 129 103 129 103 103 0 0 0 0

ADB/N>KANCHANPUR>REHABILITATION
SIDHINATH 100 KANCHANPUR AC 1993 ID 44 35 44 35 35 0 0 0 0 ADB/N NO ADB/N 1 MAHAKALI
TOTAL of ADB/N > KANCHANPUR > REHABILITATION 1 44 35 44 35 35 0 0 0 0

TOTAL of KANCHANPUR District 3 173 138 173 138 138 0 0 0 0

32
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of FAR-WESTERN >Terai 5 248 198 248 198 198 0 0 0 0

ADB/N>ACHHAM>NEW
AGALI KHOLA 100 ACHHAM AC 1995 ID 13 10 13 10 10 6 3 0 0 ADB/N YES ADB/N 2 KARNALI
HATIKOT 100 ACHHAM AC 1994 ID 8 6 8 6 6 0 0 0 0 ADB/N NO ADB/N 2 KANALI
JANALIMUNGRA 100 ACHHAM AC 1994 ID 25 20 25 20 20 0 0 0 0 ADB/N NO ADB/N 2 KARNALI
KABADI KHOLA 100 ACHHAM AC 1995 ID 94 75 94 75 75 45 22 0 0 ADB/N YES ADB/N 2 KARNALI
PAIRA KHOLA 100 ACHHAM AC 1996 ID 9 7 9 7 7 4 4 0 0 ADB/N YES ADB/N 2 KARNALI
SIMTOLA 100 ACHHAM AC 1996 ID 19 15 19 15 15 9 4 0 0 ADB/N YES ADB/N 2 KARNALI
TOTAL of ADB/N > ACHHAM > NEW 6 168 133 168 133 133 64 33 0 0

TOTAL of ACHHAM District 6 168 133 168 133 133 64 33 0 0

ADB/N>BAITADI>NEW
HATRANGA 100 BAITADI AC 1996 ID 38 30 38 30 30 18 9 0 0 ADB/N YES ADB/N 1 MAHAKALI
TOTAL of ADB/N > BAITADI > NEW 1 38 30 38 30 30 18 9 0 0

ADB/N>BAITADI>REHABILITATION
SANTOSHI KULO 100 BAITADI AC 1994 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 1 MAHAKALI
SORADI CHOUR 100 BAITADI AC 1994 ID 6 5 6 5 5 0 0 0 0 ADB/N NO ADB/N 1 MAHAKALI
UPALLOBATULLA 100 BAITADI AC 1994 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 1 MAHAKALI
TOTAL of ADB/N > BAITADI > REHABILITATION 3 32 25 32 25 25 0 0 0 0

TOTAL of BAITADI District 4 70 55 70 55 55 18 9 0 0

ADB/N>DADELDHURA>NEW
NAWADURGA 100 DADELDHURA AC 1996 ID 9 7 9 7 7 4 2 0 0 ADB/N YES ADB/N 1 MAHAKALI
TOTAL of ADB/N > DADELDHURA > NEW 1 9 7 9 7 7 4 2 0 0

ADB/N>DADELDHURA>REHABILITATION
GHATIGARD 100 DADELDHURA AC 1996 ID 9 7 9 7 7 4 2 0 0 ADB/N YES ADB/N 1 MAHAKALI
NAWADURGA 100 DADELDHURA AC 1993 ID 13 10 13 10 10 0 0 0 0 ADB/N NO ADB/N 1 MAHAKALI
TOTAL of ADB/N > DADELDHURA > REHABILITATION 2 22 17 22 17 17 4 2 0 0

TOTAL of DADELDHURA District 3 31 24 31 24 24 8 4 0 0

TOTAL of FAR-WESTERN >Hill 13 269 212 269 212 212 90 46 0 0

ADB/N>DARCHULA>NEW
FARSHI KHOLA 100 DARCHULA AC 1995 ID 15 12 15 12 12 7 3 0 0 ADB/N YES ADB/N 1 MAHAKALI
PATAPALI 100 DARCHULA AC 1995 ID 13 10 13 10 10 6 3 0 0 ADB/N YES ADB/N 1 MAHAKALI
TOTAL of ADB/N > DARCHULA > NEW 2 28 22 28 22 22 13 6 0 0

TOTAL of DARCHULA District 2 28 22 28 22 22 13 6 0 0

TOTAL of FAR-WESTERN >Mountain 2 28 22 28 22 22 13 6 0 0

33
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

TOTAL of FAR-WESTERN Region 20 545 432 545 432 432 103 52 0 0

TOTAL of ADB/N 352 21178 16957 21174 16912 16631 2601 1124 3 0

AGRIL>MORANG>REHABILITATION
CHIRADHAR 100 MORANG AC 125 100 125 100 100 0 0 0 0 AGRIL NO GoN 12 SIWALIK RIVER
KAJALA 100 MORANG AC 288 230 288 230 230 0 0 0 0 AGRIL NO GoN 12 SIWALIK RIVER
TOTAL of AGRIL > MORANG > REHABILITATION 2 413 330 413 330 330 0 0 0 0

TOTAL of MORANG District 2 413 330 413 330 330 0 0 0 0

AGRIL>SUNSARI>REHABILITATION
BAJH GADHA 100 SUNSARI AC 187 150 187 150 150 0 0 0 0 AGRIL NO GoN 12 SIWALIK RIVER
TOTAL of AGRIL > SUNSARI > REHABILITATION 1 187 150 187 150 150 0 0 0 0

TOTAL of SUNSARI District 1 187 150 187 150 150 0 0 0 0

TOTAL of EASTERN > Terai 3 600 480 600 480 480 0 0 0 0

TOTAL of EASTERN Region 3 600 480 600 480 480 0 0 0 0

AGRIL>LAMJUNG>REHABILITATION
SATRASAI KULO 100 LAMJUNG AC 75 60 75 60 60 0 0 0 0 AGRIL NO GoN 3 GANDAK
TOTAL of AGRIL > LAMJUNG > REHABILITATION 1 75 60 75 60 60 0 0 0 0

TOTAL of LAMJUNG District 1 75 60 75 60 60 0 0 0 0

TOTAL of WESTERN >Hill 1 75 60 75 60 60 0 0 0 0

TOTAL of WESTERN Region 1 75 60 75 60 60 0 0 0 0

AGRIL>PYUTHAN>REHABILITATION
BIJULI BIRAULLA 100 PYUTHAN AC 75 60 75 60 60 0 0 0 0 AGRIL NO GoN 6 WEST RAPTI
TOTAL of AGRIL > PYUTHAN > REHABILITATION 1 75 60 75 60 60 0 0 0 0

TOTAL of PYUTHAN District 1 75 60 75 60 60 0 0 0 0

TOTAL of MID WESTERN >Hill 1 75 60 75 60 60 0 0 0 0

TOTAL of MID WESTERN Region 1 75 60 75 60 60 0 0 0 0

TOTAL of AGRIL 5 750 600 750 600 600 0 0 0 0

DIDP>BAGLUNG>NEW
CHISTI 100 BAGLUNG AC 1996 YR ID 63 50 63 50 50 50 25 0 0 DIDP NO DANIDA 3 GANDAK

34
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
HARI CHAUR 100 BAGLUNG AC 1996 YR ID 81 65 81 65 65 65 30 0 0 DIDP NO DANIDA 3 GANDAK
LEKHANI 100 BAGLUNG AC 1996 YR ID 82 69 82 69 69 69 30 0 0 DIDP YES DANIDA 3 GANDAK
MASALGAUN 100 BAGLUNG PC 1997 YR ID 50 40 50 40 40 30 20 0 0 DIDP NO DANIDA 3 GANDAK
TOTAL of DIDP > BAGLUNG > NEW 4 276 224 276 224 224 214 105 0 0

DIDP>BAGLUNG>REHABILITATION
AMALCHUR 100 BAGLUNG AC 1993 YR ID 44 35 44 35 35 30 0 0 0 DIDP NO DANIDA 3 GANDAK
ARDJEWA 100 BAGLUNG AC 1994 YR ID 25 20 25 20 20 20 0 0 0 DIDP NO DANIDA 3 GANDAK
BHINGITHE 100 BAGLUNG AC 1994 YR ID 40 32 40 32 32 32 0 0 0 DIDP NO DANIDA 3 GANDAK
BIHU 100 BAGLUNG AC 1996 YR ID 13 10 13 10 10 10 5 0 0 DIDP NO DANIDA 3 GANDAK
BUDHATHOK 100 BAGLUNG AC 1996 YR ID 25 20 25 20 20 20 15 0 0 DIDP NO DANIDA 3 GANDAK
GWALI CHAUR 100 BAGLUNG AC 1994 YR ID 56 45 56 45 45 45 0 0 0 DIDP NO DANIDA 3 GANDAK
HARAPATA 100 BAGLUNG AC 1995 YR ID 13 10 13 10 10 10 5 0 0 DIDP YES DANIDA 3 GANDAK
HUGDISIR 100 BAGLUNG AC 1993 YR ID 11 9 11 9 9 9 0 0 0 DIDP NO DANIDA 3 GANDAK
KUDLEPANGRA KHOLA 100 BAGLUNG AC 1996 YR ID 19 15 19 15 15 15 10 0 0 DIDP NO DANIDA 3 GANDAK
KUIDANGTANK 100 BAGLUNG AC 1993 YR ID 14 11 14 11 11 11 0 0 0 DIDP NO DANIDA 3 GANDAK
KUSI GAON 100 BAGLUNG AC 1994 YR ID 10 8 10 8 8 6 0 0 0 DIDP NO DANIDA 3 GANDAK
KUSMISERA 100 BAGLUNG AC 1994 YR ID 37 30 37 30 30 30 0 0 0 DIDP NO DANIDA 3 GANDAK
NARAYANSTHA 100 BAGLUNG AC 1993 YR ID 25 20 25 20 20 16 0 0 0 DIDP NO DANIDA 3 GANDAK
HULUWA 100 BAGLUNG AC 1995 YR ID 21 17 21 17 17 17 10 0 0 DIDP YES DANIDA 3 GANDAK
TOTAL of DIDP > BAGLUNG > REHABILITATION 14 353 282 353 282 282 271 45 0 0

TOTAL of BAGLUNG District 18 629 506 629 506 506 485 150 0 0

DIDP>MYAGDI>NEW
ARMAN 100 MYAGDI AC 1996 YR ID 59 47 59 47 47 47 30 0 0 DIDP NO DANIDA 3 GANDAK
BAGAR PHANT 100 MYAGDI AC 1993 YR ID 31 25 31 25 25 15 0 0 0 DIDP NO DANIDA 3 GANDAK
BHEDOKHOR 100 MYAGDI AC 1995 YR ID 50 40 50 40 40 40 20 0 0 DIDP YES DANIDA 3 GANDAK
PAKHU 100 MYAGDI AC 1994 YR ID 32 25 32 25 25 10 0 0 0 DIDP NO DANIDA 3 GANDAK
POKA PHANT 100 MYAGDI AC 1995 YR ID 29 23 29 23 23 23 10 0 0 DIDP YES DANIDA 3 GANDAK
TOTAL of DIDP > MYAGDI > NEW 5 201 160 201 160 160 135 60 0 0

DIDP>MYAGDI>REHABILITATION
BABIYR CHAUR 100 MYAGDI AC 1992 YR ID 31 25 31 25 25 25 0 0 0 DIDP NO DANIDA 3 GANDAK
CHHISWANG 100 MYAGDI AC 1993 YR ID 24 19 24 19 19 19 0 0 0 DIDP NO DANIDA 3 GANDAK
KASKERI 100 MYAGDI AC 1993 YR ID 29 23 29 23 23 23 0 0 0 DIDP NO DANIDA 3 GANDAK
KAWETETUSARE PANI 100 MYAGDI AC 1994 YR ID 50 40 50 40 40 40 0 0 0 DIDP NO DANIDA 3 GANDAK
KHAR PANI 100 MYAGDI AC 1993 YR ID 18 14 18 14 14 14 0 0 0 DIDP NO DANIDA 3 GANDAK
PIPALBOT 100 MYAGDI AC 1993 YR ID 39 31 39 31 31 31 0 0 0 DIDP NO DANIDA 3 GANDAK
RANBANG 100 MYAGDI AC 1992 YR ID 75 60 75 60 60 60 0 0 0 DIDP NO DANIDA 3 GANDAK
RATNE CHAUR KULO 100 MYAGDI AC 1996 YR ID 31 25 31 25 25 25 10 0 0 DIDP NO DANIDA 3 GANDAK
RATNE CHOUR KULO 100 MYAGDI AC 1996 YR ID 31 25 31 25 25 25 10 0 0 DIDP NO DANIDA 3 GANDAK
SERA PHAT 100 MYAGDI AC 1992 YR ID 19 15 19 15 15 15 0 0 0 DIDP NO DANIDA 3 GANDAK
TATO PANI 100 MYAGDI AC 1894 YR ID 35 28 35 28 28 28 0 0 0 DIDP NO DANIDA 3 GANDAK
TOTAL of DIDP > MYAGDI > REHABILITATION 11 382 305 382 305 305 305 20 0 0

35
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of MYAGDI District 16 583 465 583 465 465 440 80 0 0

DIDP>PARBAT>NEW
ANYA CHAUR 100 PARBAT AC 1993 YR ID 13 10 13 10 10 10 0 0 0 DIDP NO DANIDA 3 GANDAK
CHARKANG 100 PARBAT AC 1996 YR ID 50 40 50 40 40 40 20 0 0 DIDP NO DANIDA 3 GANDAK
MARANGSING 100 PARBAT AC 1994 YR ID 32 18 32 18 18 18 0 0 0 DIDP NO DANIDA 3 GANDAK
RATOCHAUKA 100 PARBAT AC 1994 YR ID 15 12 15 12 12 10 0 0 0 DIDP NO DANIDA 3 GANDAK
TOTAL of DIDP > PARBAT > NEW 4 110 80 110 80 80 78 20 0 0

DIDP>PARBAT>REHABILITATION
BACHHA KHOLA 100 PARBAT AC 1994 YR ID 63 50 63 50 50 50 0 0 0 DIDP NO DANIDA 3 GANDAK
BHURTULA 100 PARBAT AC 1993 YR ID 13 10 13 10 10 10 0 0 0 DIDP NO DANIDA 3 GANDAK
DANABAGAR 100 PARBAT AC 1995 YR ID 13 10 13 10 10 10 5 0 0 DIDP YES DANIDA 3 GANDAK
DHAIRING 100 PARBAT PC 1997 YR ID 53 42 0 0 0 0 0 53 42 DIDP NO DANIDA 3 GANDAK
JAHARE 100 PARBAT AC 1992 YR ID 75 60 75 60 60 60 0 0 0 DIDP NO DANIDA 3 GANDAK
KARNASPANGARANG 100 PARBAT AC 1994 YR ID 41 33 41 33 33 33 0 0 0 DIDP NO DANIDA 3 GANDAK
KHURKOTPANG 100 PARBAT AC 1995 YR ID 125 100 125 100 100 100 60 0 0 DIDP YES DANIDA 3 GANDAK
KURGHA 100 PARBAT AC 1993 YR ID 100 80 100 80 80 40 0 0 0 DIDP NO DANIDA 3 GANDAK
LAMAPATA 100 PARBAT AC 1993 YR ID 38 30 38 30 30 20 0 0 0 DIDP NO DANIDA 3 GANDAK
PARAL KHOLA 100 PARBAT AC 1996 YR ID 44 35 44 35 35 35 20 0 0 DIDP NO DANIDA 3 GANDAK
PIPAL TARI 100 PARBAT AC 1996 YR ID 25 20 25 20 20 20 10 0 0 DIDP NO DANIDA 3 GANDAK
SETO PHAT 100 PARBAT AC 1993 YR ID 25 20 25 20 20 20 0 0 0 DIDP NO DANIDA 3 GANDAK
SIUDI KULO 100 PARBAT AC 1996 YR ID 25 20 25 20 20 20 10 0 0 DIDP NO DANIDA 3 GANDAK
SUN TARI 100 PARBAT AC 1992 YR ID 10 8 10 8 8 4 0 0 0 DIDP NO DANIDA 3 GANDAK
TOTAL of DIDP > PARBAT > REHABILITATION 14 650 518 597 476 476 422 105 53 42

TOTAL of PARBAT District 18 760 598 707 556 556 500 125 53 42

TOTAL of WESTERN >Hill 52 1972 1569 1919 1527 1527 1425 355 53 42

DIDP>MUSTANG>NEW
NAURIKOT 100 MUSTANG AC 1992 YR ID 69 55 69 55 55 0 0 0 0 DIDP NO DANIDA 3 GANDAK
TOTAL of DIDP > MUSTANG > NEW 1 69 55 69 55 55 0 0 0 0

DIDP>MUSTANG>REHABILITATION
CHARANG 100 MUSTANG AC 1996 YR ID 94 75 94 75 75 0 0 0 0 DIDP NO DANIDA 3 GANDAK
CHHAIRO 100 MUSTANG AC 1993 YR ID 20 16 20 16 16 0 0 0 0 DIDP NO DANIDA 3 GANDAK
DHAKMAR 100 MUSTANG AC 1996 YR ID 88 70 88 70 70 0 0 0 0 DIDP NO DANIDA 3 GANDAK
GHAMI 100 MUSTANG AC 1995 YR ID 100 80 100 80 80 0 0 0 0 DIDP YES DANIDA 3 GANDAK
HELKU DHITAP 100 MUSTANG AC 1993 YR ID 62 45 62 45 45 0 0 0 0 DIDP NO DANIDA 3 GANDAK
LOMANGHTHANG 100 MUSTANG AC 1995 YR ID 88 70 88 70 70 0 0 0 0 DIDP YES DANIDA 3 GANDAK
MARANG 100 MUSTANG AC 1994 YR ID 100 80 100 80 80 0 0 0 0 DIDP NO DANIDA 3 GANDAK
PHUWA 100 MUSTANG AC 1996 YR ID 25 20 25 20 20 0 0 0 0 DIDP NO DANIDA 3 GANDAK
SAURU PHANT 100 MUSTANG AC 1995 YR ID 23 18 23 18 18 0 0 0 0 DIDP YES DANIDA 3 GANDAK
SYANG 100 MUSTANG AC 1993 YR ID 88 70 88 70 70 0 0 0 0 DIDP NO DANIDA 3 GANDAK
THIMINI 100 MUSTANG AC 1993 YR ID 52 42 52 42 42 0 0 0 0 DIDP NO DANIDA 3 GANDAK

36
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TIRI 100 MUSTANG AC 1993 YR ID 14 11 14 11 11 0 0 0 0 DIDP NO DANIDA 3 GANDAK
TOTAL of DIDP > MUSTANG > REHABILITATION 12 754 597 754 597 597 0 0 0 0

TOTAL of MUSTANG District 13 823 652 823 652 652 0 0 0 0

TOTAL of WESTERN >Mountain 13 823 652 823 652 652 0 0 0 0

TOTAL of WESTERN Region 65 2795 2221 2742 2179 2179 1425 355 53 42

TOTAL of DIDP 65 2795 2221 2742 2179 2179 1425 355 53 42

DOI>JHAPA>REHABILITATION
GHAGARA 100 JHAPA AC 1993 MS ID 94 75 94 75 75 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
TELIA KHOLA DHARAMPUR 100 JHAPA AC 1989 YR ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
TOTAL of DOI > JHAPA > REHABILITATION 2 157 125 157 125 125 0 0 0 0

TOTAL of JHAPA District 2 157 125 157 125 125 0 0 0 0

DOI>MORANG>REHABILITATION
DAMEHAT 100 MORANG AC 1990 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
DANS KHOLA 100 MORANG AC 1992 MS ID 75 60 75 60 60 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
DANYA 100 MORANG AC 1990 MS ID 94 75 94 75 75 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
KARONG 100 MORANG AC 1990 MS ID 200 160 200 160 160 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
KHADERALLADIYA 100 MORANG AC 1989 MS ID 125 100 125 100 125 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
KHADOM KHOLA 100 MORANG AC 1990 MS ID 255 204 255 204 204 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
KHANDAM KHOLA 100 MORANG AC 1989 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
RAT BANDH 100 MORANG AC 1990 MS ID 150 120 150 120 120 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
SAKRAKATHAHARII 100 MORANG AC 1990 MS ID 88 70 88 70 70 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
TATANARIYA 100 MORANG AC 1990 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
TELI KHOLA 100 MORANG AC 1992 MS ID 138 110 138 110 110 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
TOTAL of DOI > MORANG > REHABILITATION 11 1500 1199 1500 1199 1224 0 0 0 0

TOTAL of MORANG District 11 1500 1199 1500 1199 1224 0 0 0 0

DOI>SAPTARI>REHABILITATION
KHURARIYA 100 SAPTARI AC 1992 MS DOI 200 160 200 160 160 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
TOTAL of DOI > SAPTARI > REHABILITATION 1 200 160 200 160 160 0 0 0 0

TOTAL of SAPTARI District 1 200 160 200 160 160 0 0 0 0

DOI>SUNSARI>REHABILITATION
GARUN KHOLA 100 SUNSARI AC 1989 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
PHATAUDHERA KHOLA 100 SUNSARI AC 1989 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
TOTAL of DOI > SUNSARI > REHABILITATION 2 250 200 250 200 200 0 0 0 0

TOTAL of SUNSARI District 2 250 200 250 200 200 0 0 0 0

37
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

TOTAL of EASTERN > Terai 16 2107 1684 2107 1684 1709 0 0 0 0

DOI>BHOJPUR>REHABILITATION
ARUNODAYA KULO 100 BHOJPUR AC 1993 MS ID 150 120 150 120 120 0 0 0 0 DOI NO GoN 4 KOSHI
CHAUKI DADA 100 BHOJPUR AC 1990 MS ID 44 35 44 35 44 0 0 0 0 DOI NO GoN 4 KOSHI
DOSADE KHOLA 100 BHOJPUR AC 1989 YR ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 4 KOSHI
KISHAN KULO 100 BHOJPUR AC 1990 MS ID 18 15 18 15 15 0 0 0 0 DOI NO GoN 4 KOSHI
SINDRANG 100 BHOJPUR AC 1990 MS ID 50 40 50 40 40 0 0 0 0 DOI NO GoN 4 KOSHI
YAKU KULO 100 BHOJPUR AC 1993 MS ID 75 60 75 60 60 0 0 0 0 DOI NO GoN 4 KOSHI
YANGTANG 100 BHOJPUR AC 1989 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 4 KOSHI
ARUNODAYA KULO 100 BHOJPUR AC 1989 MS ID 19 15 19 15 15 0 0 0 0 DOI NO GoN 4 KOSHI
TOTAL of DOI > BHOJPUR > REHABILITATION 8 482 385 482 385 394 0 0 0 0

TOTAL of BHOJPUR District 8 482 385 482 385 394 0 0 0 0

DOI>DHANKUTA>REHABILITATION
AMBOTE 100 DHANKUTA AC 1991 MS ID 21 17 21 17 17 0 0 0 0 DOI NO GoN 4 KOSHI
BITENDRA 100 DHANKUTA AC 1990 MS ID 4 3 4 3 3 0 0 0 0 DOI NO GoN 4 KOSHI
BODHE 100 DHANKUTA AC 1991 MS ID 26 21 26 21 21 0 0 0 0 DOI NO GoN 4 KOSHI
CHHARUWAFARM 100 DHANKUTA AC 1989 MS ID 88 70 88 70 70 0 0 0 0 DOI NO GoN 4 KOSHI
DENJ 100 DHANKUTA AC 1990 MS ID 31 25 31 25 25 0 0 0 0 DOI NO GoN 4 KOSHI
HANSAMORANG 100 DHANKUTA AC 1992 MS ID 25 20 25 20 20 0 0 0 0 DOI NO GoN 4 KOSHI
KEWA KHOLA 100 DHANKUTA AC 1991 MS ID 89 71 89 71 71 0 0 0 0 DOI NO GoN 4 KOSHI
LAMI TAR 100 DHANKUTA AC 1993 MS ID 23 18 23 18 18 0 0 0 0 DOI NO GoN 4 KOSHI
LEGUWA 100 DHANKUTA AC 1990 MS ID 30 24 30 24 24 0 0 0 0 DOI NO GoN 4 KOSHI
LEWATI KHOLA 100 DHANKUTA AC 1990 MS ID 31 25 31 25 25 0 0 0 0 DOI NO GoN 4 KOSHI
MADIPUNG 100 DHANKUTA AC 1989 YR ID 19 15 19 15 15 0 0 0 0 DOI NO GoN 4 KOSHI
MASIM TAR 100 DHANKUTA AC 1990 MS ID 31 25 31 25 25 0 0 0 0 DOI NO GoN 4 KOSHI
NIBUWAKHOLE 100 DHANKUTA AC 1989 YR ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 4 KOSHI
PHALAME TAR 100 DHANKUTA AC 1989 YR ID 19 15 19 15 15 0 0 0 0 DOI NO GoN 4 KOSHI
PHALM TAR 100 DHANKUTA AC 1990 MS ID 25 20 25 20 20 0 0 0 0 DOI NO GoN 4 KOSHI
PIPALE 100 DHANKUTA AC 1989 YR ID 189 150 189 150 150 0 0 0 0 DOI NO GoN 4 KOSHI
RAJAIYA 100 DHANKUTA AC 1992 MS ID 44 35 44 35 35 0 0 0 0 DOI NO GoN 4 KOSHI
TATO PANI TAR 100 DHANKUTA AC 1991 MS ID 106 85 106 85 85 0 0 0 0 DOI NO GoN 4 KOSHI
TOTAL of DOI > DHANKUTA > REHABILITATION 18 864 689 864 689 689 0 0 0 0

TOTAL of DHANKUTA District 18 864 689 864 689 689 0 0 0 0

DOI>ILAM>REHABILITATION
GODAKSETI BESI1.2.3 100 ILAM AC 1989 MS ID 100 80 100 80 80 0 0 0 0 DOI NO GoN 11 KOSHI
HILEE KHOLA 100 ILAM AC 1993 MS ID 156 125 156 125 125 0 0 0 0 DOI NO GoN 11 KOSHI
TOTAL of DOI > ILAM > REHABILITATION 2 256 205 256 205 205 0 0 0 0

TOTAL of ILAM District 2 256 205 256 205 205 0 0 0 0

38
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
DOI>KHOTANG>REHABILITATION
CHHORAMBU KULO 100 KHOTANG AC 1989 YR ID 94 75 94 75 75 0 0 0 0 DOI NO GoN 4 KOSHI
DARPAFARM 100 KHOTANG AC 1989 YR ID 100 80 100 80 80 0 0 0 0 DOI NO GoN 4 KOSHI
KAMTILIFARM 100 KHOTANG AC 1989 YR ID 38 30 38 30 30 0 0 0 0 DOI NO GoN 4 KOSHI
REKAR KHET 100 KHOTANG AC 1989 YR ID 38 30 38 30 30 0 0 0 0 DOI NO GoN 4 KOSHI
SAWAKATAHARE KULO 100 KHOTANG AC 1989 YR ID 100 80 100 80 80 0 0 0 0 DOI NO GoN 4 KOSHI
TABA KHOLA 100 KHOTANG AC 1989 YR ID 25 20 25 20 20 0 0 0 0 DOI NO GoN 4 KOSHI
THI KUWA KHOLA 100 KHOTANG AC 1989 YR ID 25 20 25 20 20 0 0 0 0 DOI NO GoN 4 KOSHI
TOTAL of DOI > KHOTANG > REHABILITATION 7 420 335 420 335 335 0 0 0 0

TOTAL of KHOTANG District 7 420 335 420 335 335 0 0 0 0

DOI>OKHALDHUNGA>REHABILITATION
DEVT TAR 100 OKHALDHUNGA AC 1989 MS ID 21 17 21 17 17 0 0 0 0 DOI NO GoN 4 KOSHI
GAMNANG TAR 100 OKHALDHUNGA AC 1989 MS ID 100 80 100 80 80 0 0 0 0 DOI NO GoN 4 KOSHI
GHARTI GAONKAPHALBOTE 100 OKHALDHUNGA AC 1990 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 4 KOSHI
MANIKHA 100 OKHALDHUNGA AC 1991 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 4 KOSHI
PHEDIGUT 100 OKHALDHUNGA AC 1989 MS ID 68 54 68 54 54 0 0 0 0 DOI NO GoN 4 KOSHI
RAGANI KULO 100 OKHALDHUNGA AC 1989 MS ID 38 30 38 30 30 0 0 0 0 DOI NO GoN 4 KOSHI
RANGADIP 100 OKHALDHUNGA AC 1992 MS ID 31 25 31 25 25 0 0 0 0 DOI NO GoN 4 KOSHI
SRI CHAUR 100 OKHALDHUNGA AC 1992 MS ID 100 80 100 80 80 0 0 0 0 DOI NO GoN 4 KOSHI
TOTAL of DOI > OKHALDHUNGA > REHABILITATION 8 484 386 484 386 386 0 0 0 0

TOTAL of OKHALDHUNGA District 8 484 386 484 386 386 0 0 0 0

DOI>PANCHTHAR>REHABILITATION
LIMBA 100 PANCHTHAR AC 1989 MS ID 38 30 38 30 30 0 0 0 0 DOI NO GoN 4 KOSHI
SABASERO KULO 100 PANCHTHAR AC 1989 MD ID 25 20 25 20 20 0 0 0 0 DOI NO GoN 4 KOSHI
TOTAL of DOI > PANCHTHAR > REHABILITATION 2 63 50 63 50 50 0 0 0 0

TOTAL of PANCHTHAR District 2 63 50 63 50 50 0 0 0 0

DOI>TERATHUM>REHABILITATION
HIGUWA 100 TERATHUM AC 1990 YR ID 96 71 96 71 71 0 0 0 0 DOI NO GoN 4 KOSHI
PHUGUWA KHOLA 100 TERATHUM AC 1992 YR ED 125 100 125 100 100 38 0 0 0 DOI NO GoN 4 KOSHI
TOTAL of DOI > TERATHUM > REHABILITATION 2 221 171 221 171 171 38 0 0 0

TOTAL of TERATHUM District 2 221 171 221 171 171 38 0 0 0

DOI>UDAYPUR>REHABILITATION
BAN KHOLA 100 UDAYPUR AC 1989 YR ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 4 KOSHI
BHARLE KHOLA 100 UDAYPUR AC 1989 YR ID 13 10 13 10 10 0 0 0 0 DOI NO GoN 4 KOSHI
CHHORANGA 100 UDAYPUR AC 1989 MS ID 24 19 24 19 19 0 0 0 0 DOI NO GoN 4 KOSHI
GAL TAR 100 UDAYPUR AC 1989 YR ID 13 10 13 10 10 0 0 0 0 DOI NO GoN 4 KOSHI
GHORAUNA 100 UDAYPUR AC 1992 MS ID 24 19 24 19 19 0 0 0 0 DOI NO GoN 4 KOSHI
KA TARIFARM 100 UDAYPUR AC 1989 YR ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 4 KOSHI

39
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
KATERI 100 UDAYPUR AC 1990 MS ID 31 31 31 31 31 0 0 0 0 DOI NO GoN 4 KOSHI
RU PANI KHOLA 100 UDAYPUR AC 1992 MS ID 31 25 31 25 25 0 0 0 0 DOI NO GoN 4 KOSHI
SUKHASUNDARI 100 UDAYPUR AC 1992 MS ID 31 25 31 25 25 0 0 0 0 DOI NO GoN 4 KOSHI
TAWAKHOLE 100 UDAYPUR AC 1989 YR ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 4 KOSHI
MURKUMCHI 100 UDAYPUR AC 1989 YR ID 63 50 63 50 50 12 0 0 0 DOI NO GoN 4 KOSHI
TOTAL of DOI > UDAYPUR > REHABILITATION 11 481 389 481 389 389 12 0 0 0

TOTAL of UDAYPUR District 11 481 389 481 389 389 12 0 0 0

TOTAL of EASTERN > Hill 58 3271 2610 3271 2610 2619 50 0 0 0

DOI>SANKHUWASABHA>REHABILITATION
AKHIBHUE 100 SANKHUWASABHA AC 1990 MS ID 13 10 13 10 10 0 0 0 0 DOI NO GoN 4 KOSHI
DHUPA 100 SANKHUWASABHA AC 1990 MS ID 38 30 38 30 30 0 0 0 0 DOI NO GoN 4 KOSHI
LAHACHUG 100 SANKHUWASABHA AC 1989 YR ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 4 KOSHI
MADIMULKHARKA 100 SANKHUWASABHA AC 1990 MS ID 38 30 38 30 30 0 0 0 0 DOI NO GoN 4 KOSHI
MADIRAMBENI 100 SANKHUWASABHA AC 1990 MS ID 14 11 14 11 11 0 0 0 0 DOI NO GoN 4 KOSHI
MAWADIN 100 SANKHUWASABHA AC 1990 MS ID 156 125 156 125 125 0 0 0 0 DOI NO GoN 4 KOSHI
NEWMADIMULKHARKA 100 SANKHUWASABHA AC 1990 MS ED 13 10 13 10 10 0 0 0 0 DOI NO GoN 4 KOSHI
NUNDHALI 100 SANKHUWASABHA AC 1989 YR ID 19 15 19 15 15 0 0 0 0 DOI NO GoN 4 KOSHI
PAGMARAJ KULO 100 SANKHUWASABHA AC 1991 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 4 KOSHI
SIDHAKALI 100 SANKHUWASABHA AC 1992 MS ID 33 26 33 26 26 0 0 0 0 DOI NO GoN 4 KOSHI
SYALE BESI 100 SANKHUWASABHA AC 1989 YR ID 38 30 38 30 30 0 0 0 0 DOI NO GoN 4 KOSHI
SYAMUN 100 SANKHUWASABHA AC 1990 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 4 KOSHI
TOTAL of DOI > SANKHUWASABHA > REHABILITATION 12 675 537 675 537 537 0 0 0 0

TOTAL of SANKHUWASABHA District 12 675 537 675 537 537 0 0 0 0

DOI>SOLUKHUMBU>REHABILITATION
BHUNBHUWA 100 SOLUKHUMBU AC 1990 MS ID 106 85 106 85 85 0 0 0 0 DOI NO GoN 4 KOSHI
KHAHARE KHOLA 100 SOLUKHUMBU AC 1992 MS ID 144 115 144 115 115 0 0 0 0 DOI NO GoN 4 KOSHI
SIKU KHOLA 100 SOLUKHUMBU AC 1991 YR ID 150 120 150 120 120 0 0 0 0 DOI NO GoN 4 KOSHI
TOTAL of DOI > SOLUKHUMBU > REHABILITATION 3 400 320 400 320 320 0 0 0 0

TOTAL of SOLUKHUMBU District 3 400 320 400 320 320 0 0 0 0

TOTAL of EASTERN > Mountain 15 1075 857 1075 857 857 0 0 0 0

TOTAL of EASTERN Region 89 6453 5151 6453 5151 5185 50 0 0 0

DOI>BARA>REHABILITATION
BALARAMPUR 100 BARA PC 1990 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
BANJARIA 100 BARA AC 1990 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
BARIYARPURULO 100 BARA AC 1989 MS ED 875 700 875 700 700 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
BHABUBAN 100 BARA AC 1990 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
CHUTAHA 100 BARA AC 1990 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER

40
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
ENARAWANAL KULO 100 BARA AC 1989 MS ED 750 600 750 600 600 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
TOTAL of DOI > BARA > REHABILITATION 6 2063 1650 2063 1650 1650 0 0 0 0

TOTAL of BARA District 6 2063 1650 2063 1650 1650 0 0 0 0

DOI>CHITWAN>REHABILITATION
BHANDARA 100 CHITWAN AC 1990 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 3 GANDAK
KALYANPURMADI 100 CHITWAN AC 1990 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 3 GANDAK
KHAIRANIJAMAUL 100 CHITWAN AC 1989 YR ID 188 150 188 150 150 60 0 0 0 DOI NO GoN 3 GANDAK
PATIHANIPARSA 100 CHITWAN AC 1989 YR ED 500 400 500 400 400 150 0 0 0 DOI NO GoN 3 GANDAK
RADI GAONJINELI 100 CHITWAN AC 1991 MS ID 250 200 250 200 200 0 0 0 0 DOI NO GoN 3 GANDAK
ROYAGANGSHINAGA 100 CHITWAN AC 1991 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 3 GANDAK
SUKRANAGAR 100 CHITWAN AC 1990 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 3 GANDAK
TOTAL of DOI > CHITWAN > REHABILITATION 7 1376 1100 1376 1100 1100 210 0 0 0

TOTAL of CHITWAN District 7 1376 1100 1376 1100 1100 210 0 0 0

DOI>DHANUSHA>NEW
KAGIPAIN 100 DHANUSHA AC 188 150 188 150 150 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
KAGIPAIN YAMBA BHARI 100 DHANUSHA AC 281 225 281 225 225 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
TOTAL of DOI > DHANUSHA > NEW 2 469 375 469 375 375 0 0 0 0

TOTAL of DHANUSHA District 2 469 375 469 375 375 0 0 0 0

DOI>MAHOTTARI>REHABILITATION
ANKUSE 100 MAHOTTARI AC 1990 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
BIJALPUR 100 MAHOTTARI AC 1990 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
KUTUMESWORI 100 MAHOTTARI AC 1996 MS ED 500 400 500 400 400 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
TOTAL of DOI > MAHOTTARI > REHABILITATION 3 626 500 626 500 500 0 0 0 0

TOTAL of MAHOTTARI District 3 626 500 626 500 500 0 0 0 0

DOI>PARSA>REHABILITATION
CHAMRI NANDI 100 PARSA AC 1989 YR ED 500 400 500 400 400 400 0 0 0 DOI NO GoN 12 SIWALIK RIVER
THUTE KHOLA 100 PARSA AC 1992 YR ID 38 30 38 30 30 20 0 0 0 DOI NO GoN 12 SIWALIK RIVER
TOTAL of DOI > PARSA > REHABILITATION 2 538 430 538 430 430 420 0 0 0

TOTAL of PARSA District 2 538 430 538 430 430 420 0 0 0

DOI>RAUTAHAT>REHABILITATION
GAURAHI GUTHI 100 RAUTAHAT AC 1990 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
TOTAL of DOI > RAUTAHAT > REHABILITATION 1 63 50 63 50 50 0 0 0 0

TOTAL of RAUTAHAT District 1 63 50 63 50 50 0 0 0 0

41
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
DOI>SARLAHI>REHABILITATION
MANPUR 100 SARLAHI AC 1989 YR ID 250 200 250 200 200 20 0 0 0 DOI NO GoN 12 SIWALIK RIVER
MAUKELAWA 100 SARLAHI AC 1990 MS ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
PHIRHIRRYA 100 SARLAHI AC 1989 YR ID 63 50 63 50 50 20 0 0 0 DOI NO GoN 12 SIWALIK RIVER
TOTAL of DOI > SARLAHI > REHABILITATION 3 438 350 438 350 350 40 0 0 0

TOTAL of SARLAHI District 3 438 350 438 350 350 40 0 0 0

TOTAL of CENTRAL > Terai 24 5573 4455 5573 4455 4455 670 0 0 0

DOI>BHAKTAPUR>REHABILITATION
SUTTI KHOLA 100 BHAKTAPUR AC 1991 YR ID 31 25 31 25 20 20 0 0 0 DOI NO GoN 9 BAGMATI
TOTAL of DOI > BHAKTAPUR > REHABILITATION 1 31 25 31 25 20 20 0 0 0

TOTAL of BHAKTAPUR District 1 31 25 31 25 20 20 0 0 0

DOI>DHADING>REHABILITATION
BHIRKOT 100 DHADING AC 1989 MS ID 25 20 25 20 20 0 0 0 0 DOI NO GoN 3 GANDAK
TOTAL of DOI > DHADING > REHABILITATION 1 25 20 25 20 20 0 0 0 0

TOTAL of DHADING District 1 25 20 25 20 20 0 0 0 0

DOI>KATHMANDU>REHABILITATION
BALUWA 100 KATHMANDU AC 1991 YR ID 31 25 31 25 25 10 0 0 0 DOI NO GoN 9 BAGMATI
BISHNUDEVI 100 KATHMANDU AC 1991 YR ID 38 30 38 30 30 12 0 0 0 DOI NO GoN 9 BAGMATI
DALLU KHOLA 100 KATHMANDU AC 1989 MS ID 13 10 13 10 10 0 0 0 0 DOI NO GoN 9 BAGMATI
ETAKOT KHOLA 100 KATHMANDU AC 1989 MS ID 4 3 4 3 3 0 0 0 0 DOI NO GoN 9 BAGMATI
LUPANG KHOLA 100 KATHMANDU AC 1989 YR ID 6 5 6 5 5 2 0 0 0 DOI NO GoN 9 BAGMATI
SALINADI 100 KATHMANDU AC 1989 YR ID 188 150 188 150 150 60 0 0 0 DOI NO GoN 9 BAGMATI
SUNDARIJAL7,8 100 KATHMANDU AC 1990 ED 25 20 25 20 20 0 0 0 0 DOI NO GoN 9 BAGMATI
TOTAL of DOI > KATHMANDU > REHABILITATION 7 305 243 305 243 243 84 0 0 0

TOTAL of KATHMANDU District 7 305 243 305 243 243 84 0 0 0

DOI>KAVRE>REHABILITATION
DHADAURE TAR 100 KAVRE AC 1989 YR ID 10 8 10 8 8 4 0 0 0 DOI NO GoN 4 KOSHI
KHAHAREPANGU,7,9 100 KAVRE AC 1989 YR ID 15 12 15 12 12 6 0 0 0 DOI NO GoN 4 KOSHI
LAPCHE 100 KAVRE AC 1989 YR ID 15 12 15 12 12 6 0 0 0 DOI NO GoN 4 KOSHI
POKHARI NARAYANS 100 KAVRE AC 1992 MS ID 44 35 44 35 35 0 0 0 0 DOI NO GoN 4 KOSHI
TOTAL of DOI > KAVRE > REHABILITATION 4 84 67 84 67 67 16 0 0 0

TOTAL of KAVRE District 4 84 67 84 67 67 16 0 0 0

DOI>LALITPUR>REHABILITATION
GIMIDI 100 LALITPUR AC 1989 YR ID 25 20 25 20 20 8 0 0 0 DOI NO GoN 9 BAGMATI
KHOKANA KULO 100 LALITPUR AC 1991 YR ID 30 24 30 24 24 24 0 0 0 DOI NO GoN 9 BAGMATI

42
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
LUKUMIBEBI 100 LALITPUR AC 1989 YR ID 13 10 13 10 10 5 0 0 0 DOI NO GoN 9 BAGMATI
MANIKHEL 100 LALITPUR AC 1990 MS ID 5 4 5 4 4 0 0 0 0 DOI NO GoN 9 BAGMATI
PYU TAR 100 LALITPUR AC 1990 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 9 BAGMATI
SAIBU KULO 100 LALITPUR AC 1989 YR ID 125 100 125 100 100 50 0 0 0 DOI NO GoN 9 BAGMATI
THAIBAKULI 100 LALITPUR AC 1991 YR ED 38 30 38 30 30 30 0 0 0 DOI NO GoN 9 BAGMATI
TOTAL of DOI > LALITPUR > REHABILITATION 7 261 208 261 208 208 127 0 0 0

TOTAL of LALITPUR District 7 261 208 261 208 208 127 0 0 0

DOI>MAKAWANPUR>NEW
NAM TAR 100 MAKAWANPUR AC 63 50 63 50 50 0 0 0 0 DOI NO GoN 3 GANDAK
TOTAL of DOI > MAKAWANPUR > NEW 1 63 50 63 50 50 0 0 0 0

DOI>MAKAWANPUR>REHABILITATION
HADI KHOLA 100 MAKAWANPUR AC 1992 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 3 GANDAK
NIBUWA TAR 100 MAKAWANPUR AC 1992 MS ID 13 10 13 10 10 10 0 0 0 DOI NO GoN 3 GANDAK
RAJ GAON 100 MAKAWANPUR AC 1989 YR ID 75 60 75 60 60 24 0 0 0 DOI NO GoN 3 GANDAK
SISNERI 100 MAKAWANPUR AC 1992 YR ID 25 20 25 20 20 8 0 0 0 DOI NO GoN 3 GANDAK
SISNERIMUL KHOLA 100 MAKAWANPUR AC 1989 MS ID 69 55 69 55 55 0 0 0 0 DOI NO GoN 3 GANDAK
TOTAL of DOI > MAKAWANPUR > REHABILITATION 5 207 165 207 165 165 52 0 0 0

TOTAL of MAKAWANPUR District 6 270 215 270 215 215 52 0 0 0

DOI>NUWAKOT>REHABILITATION
BELKOT 100 NUWAKOT AC 1990 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 3 GANDAK
CHAU TARADIHI 100 NUWAKOT AC 1991 MS ID 69 55 69 55 55 0 0 0 0 DOI NO GoN 3 GANDAK
PHAGATE BANDH 100 NUWAKOT AC 1990 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 3 GANDAK
SAMARI 100 NUWAKOT AC 1990 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 3 GANDAK
SUKHARI 100 NUWAKOT AC 1991 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 3 GANDAK
TOTAL of DOI > NUWAKOT > REHABILITATION 5 207 165 207 165 165 30 0 0 0

TOTAL of NUWAKOT District 5 207 165 207 165 165 30 0 0 0

DOI>RAMECHAP>REHABILITATION
AKASEMANTHALI 100 RAMECHAP AC 1990 YR ID 44 35 44 35 35 15 0 0 0 DOI NO GoN 4 KOSHI
BAGAMATI 100 RAMECHAP AC 1990 YR ID 25 20 25 20 25 8 0 0 0 DOI NO GoN 4 KOSHI
BAI TALI 100 RAMECHAP AC 1990 YR ID 28 22 28 22 22 10 0 0 0 DOI NO GoN 4 KOSHI
BRAMHABISNU 100 RAMECHAP AC 1990 YR ID 19 15 19 15 15 6 0 0 0 DOI NO GoN 4 KOSHI
HILEDEVI 100 RAMECHAP AC 1990 YR ID 63 50 63 50 50 201 0 0 0 DOI NO GoN 4 KOSHI
MUGI TAR 100 RAMECHAP AC 1990 YR ID 25 20 25 20 20 8 0 0 0 DOI NO GoN 4 KOSHI
PHARPU 100 RAMECHAP AC 1991 YR ID 44 35 44 35 35 12 0 0 0 DOI NO GoN 4 KOSHI
TOTAL of DOI > RAMECHAP > REHABILITATION 7 248 197 248 197 202 260 0 0 0

TOTAL of RAMECHAP District 7 248 197 248 197 202 260 0 0 0

43
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
DOI>SINDHULI>REHABILITATION
KAPILAKOT 100 SINDHULI AC 1992 YR ED 688 550 688 550 225 180 0 0 0 DOI NO GoN 9 BAGMATI
SOKAN 100 SINDHULI AC 1990 YR ID 75 60 75 60 60 20 0 0 0 DOI NO GoN 9 BAGMATI
TOTAL of DOI > SINDHULI > REHABILITATION 2 763 610 763 610 285 200 0 0 0

TOTAL of SINDHULI District 2 763 610 763 610 285 200 0 0 0

TOTAL of CENTRAL > Hill 40 2194 1750 2194 1750 1425 789 0 0 0

DOI>DOLAKHA>REHABILITATION
BADUR KHOLA 100 DOLAKHA AC 1991 MS ID 38 30 38 30 30 0 0 0 0 DOI NO GoN 4 KOSHI
JHAKERE KHOLA 100 DOLAKHA AC 1989 MS ID 188 150 188 150 150 0 0 0 0 DOI NO GoN 4 KOSHI
SAMSAPIPAL KULO 100 DOLAKHA AC 1989 YR ID 13 10 13 10 10 0 0 0 0 DOI NO GoN 4 KOSHI
THULO KHOLA 100 DOLAKHA AC 1991 MS ED 63 50 63 50 50 0 0 0 0 DOI NO GoN 4 KOSHI
TOTAL of DOI > DOLAKHA > REHABILITATION 4 302 240 302 240 240 0 0 0 0

TOTAL of DOLAKHA District 4 302 240 302 240 240 0 0 0 0

TOTAL of CENTRAL > Mountain 4 302 240 302 240 240 0 0 0 0

DOI>SINDHUPALCHOWK>REHABILITATION
BASKHARKA 100 SINDHUPALCHOWK AC 1990 YR ID 63 50 63 50 50 20 0 0 0 DOI NO GoN 4 KOSHI
BHIM TAR 100 SINDHUPALCHOWK AC 1990 YR ID 13 10 13 10 10 4 0 0 0 DOI NO GoN 4 KOSHI
DHUSKOT 100 SINDHUPALCHOWK AC 1990 YR ID 25 20 25 20 20 8 0 0 0 DOI NO GoN 4 KOSHI
DHUSKOT TAR 100 SINDHUPALCHOWK AC 187 150 187 150 150 0 0 0 0 DOI NO GoN 4 KOSHI
GHATTE KHOLA 100 SINDHUPALCHOWK AC 1990 YR ID 25 20 25 20 20 8 0 0 0 DOI NO GoN 4 KOSHI
GHORTHALI 100 SINDHUPALCHOWK AC 1990 YR ID 13 10 13 10 10 4 0 0 0 DOI NO GoN 4 KOSHI
HADI KHOLA 100 SINDHUPALCHOWK AC 1990 YR ID 25 20 25 20 20 8 0 0 0 DOI NO GoN 4 KOSHI
LAGARCHE 100 SINDHUPALCHOWK AC 1990 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 4 KOSHI
RAMCHE 100 SINDHUPALCHOWK AC 1990 YR ID 63 50 63 50 50 20 0 0 0 DOI NO GoN 4 KOSHI
SELANG 100 SINDHUPALCHOWK AC 1990 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 4 KOSHI
SIPA POKHARI 100 SINDHUPALCHOWK AC 1990 YR ID 13 10 13 10 10 5 0 0 0 DOI NO GoN 4 KOSHI
THAGALDHAP 100 SINDHUPALCHOWK AC 1990 YR ID 25 20 25 20 20 8 0 0 0 DOI NO GoN 4 KOSHI
THOKARPA 100 SINDHUPALCHOWK AC 1992 YR ID 219 175 219 175 175 70 0 0 0 DOI NO HGM 4 KOSHI
TOTAL of DOI > SINDHUPALCHOWK > REHABILITATION 13 721 575 721 575 575 175 0 0 0

TOTAL of SINDHUPALCHOWK District 13 721 575 721 575 575 175 0 0 0

TOTAL of CENTRAL > Hill 13 721 575 721 575 575 175 0 0 0

TOTAL of CENTRAL Region 81 8790 7020 8790 7020 6695 1634 0 0 0

DOI>KAPILVASTU>NEW
KARMA 100 KAPILVASTU AC 1992 YR ID 188 150 188 150 150 50 0 0 0 DOI NO GoN 12 SIWALIK RIVER
TOTAL of DOI > KAPILVASTU > NEW 1 188 150 188 150 150 50 0 0 0

44
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
DOI>KAPILVASTU>REHABILITATION
KANCHANIYA 100 KAPILVASTU AC 1992 YR ID 375 300 375 300 300 150 0 0 0 DOI NO GoN 12 SIWALIK RIVER
SAKUNIYA TAL 100 KAPILVASTU AC 1991 MS ED 188 150 188 150 150 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
SHANKARPUR 100 KAPILVASTU AC 1989 MS ID 56 46 56 46 37 0 0 0 0 DOI NO GoN 12 SIWALIK RIVER
TOTAL of DOI > KAPILVASTU > REHABILITATION 3 619 496 619 496 487 150 0 0 0

TOTAL of KAPILVASTU District 4 807 646 807 646 637 200 0 0 0

DOI>NAWALPARASI>REHABILITATION
BHUTAHA 100 NAWALPARASI AC 1990 MS ID 38 30 38 30 30 0 0 0 0 DOI NO GoN 3 GANDAK
MUKUNDAPUR 100 NAWALPARASI AC 1990 MS ID 50 40 50 40 40 0 0 0 0 DOI NO GoN 3 GANDAK
POKHARAPALHI 100 NAWALPARASI AC 1990 MS ID 288 230 288 230 230 0 0 0 0 DOI NO GoN 3 GANDAK
TORKETGHAT 100 NAWALPARASI AC 1990 MS ID 7 5 7 5 5 0 0 0 0 DOI NO GoN 3 GANDAK
TOTAL of DOI > NAWALPARASI > REHABILITATION 4 383 305 383 305 305 0 0 0 0

TOTAL of NAWALPARASI District 4 383 305 383 305 305 0 0 0 0

DOI>RUPANDEHI>REHABILITATION
KUNJALAPUR 100 RUPANDEHI AC 1991 YR ID 163 130 163 130 130 15 0 0 0 DOI NO GoN 8 TINAU
PARAUHA 100 RUPANDEHI AC 1990 YR ID 625 500 625 500 500 500 100 0 0 DOI NO GoN 8 TINAU
TARKULAWA 100 RUPANDEHI AC 1991 MS ID 375 300 375 300 300 150 0 0 0 DOI NO GoN 8 TINAU
TENUHAWA 100 RUPANDEHI AC 1992 YR ID 1000 800 1000 800 800 300 0 0 0 DOI NO GoN 8 TINAU
TOTAL of DOI > RUPANDEHI > REHABILITATION 4 2163 1730 2163 1730 1730 965 100 0 0

TOTAL of RUPANDEHI District 4 2163 1730 2163 1730 1730 965 100 0 0

TOTAL of WESTERN > Terai 12 3353 2681 3353 2681 2672 1165 100 0 0

DOI>ARGHAKHANCHI>REHABILITATION
BEL TARI 100 ARGHAKHANCHI AC 1989 YR ID 6 4 6 4 4 4 0 0 0 DOI NO HGM 6 WEST RAPTI
PAWAMABIR 100 ARGHAKHANCHI AC 1991 YR ID 63 50 63 50 50 50 0 0 0 DOI NO GoN 6 WEST RAPTI
PAWARA TAR 100 ARGHAKHANCHI AC 1989 YR ID 63 50 63 50 50 50 0 0 0 DOI NO GoN 6 WEST RAPTI
TARIKE TAR 100 ARGHAKHANCHI AC 1989 YR ID 13 10 13 10 10 10 0 0 0 DOI YES GoN 6 WEST RAPTI
TOTAL of DOI > ARGHAKHANCHI > REHABILITATION 4 145 114 145 114 114 114 0 0 0

TOTAL of ARGHAKHANCHI District 4 145 114 145 114 114 114 0 0 0

DOI>BAGLUNG>REHABILITATION
BAS KHOLA 100 BAGLUNG AC 1989 YR ID 18 15 18 15 15 15 0 0 0 DOI NO GoN 3 GANDAK
CHHUSANG 100 BAGLUNG AC 1989 YR ID 32 25 32 25 15 10 0 0 0 DOI NO GoN 3 GANDAK
DHUNGE KHOLA 100 BAGLUNG AC 1989 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 3 GANDAK
MALMA 100 BAGLUNG AC 1990 MS ID 44 35 44 35 35 0 0 0 0 DOI NO GoN 3 GANDAK
NISHI 100 BAGLUNG AC 1990 MS ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 3 GANDAK
SAR KUWA 100 BAGLUNG AC 1989 YR ID 18 15 18 15 5 0 0 0 0 DOI NO GoN 3 GANDAK
TIRKE 100 BAGLUNG AC 1989 YR ID 10 8 10 8 8 8 0 0 0 DOI NO GoN 3 GANDAK
YARA 100 BAGLUNG AC 1989 YR ID 23 18 23 18 10 10 0 0 0 DOI NO GoN 3 GANDAK

45
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of DOI > BAGLUNG > REHABILITATION 8 271 216 271 216 188 43 0 0 0

TOTAL of BAGLUNG District 8 271 216 271 216 188 43 0 0 0

DOI>GULMI>REHABILITATION
ARBENITHUMKIJETHIKA 100 GULMI AC 1989 YR ID 38 30 38 30 30 30 0 0 0 DOI NO GoN 3 GANDAK
CHALDH KHOLA 100 GULMI AC 1991 YR ID 71 57 71 57 37 37 0 0 0 DOI NO GoN 3 GANDAK
RABENIKHULO 100 GULMI AC 1992 YR ID 70 56 70 56 56 0 0 0 0 DOI NO GoN 3 GANDAK
TOTAL of DOI > GULMI > REHABILITATION 3 179 143 179 143 123 67 0 0 0

TOTAL of GULMI District 3 179 143 179 143 123 67 0 0 0

DOI>KASKI>REHABILITATION
GHANDRUK 100 KASKI AC 1991 YR ID 63 50 63 50 50 0 0 0 0 DOI NO GoN 3 GANDAK
LAHACHOKJOGI CHOUR 100 KASKI AC 1989 YR ID 10 8 10 8 8 4 0 0 0 DOI NO GoN 3 GANDAK
PARCHE 100 KASKI AC 1990 YR ID 40 32 40 32 32 15 0 0 0 DOI NO GoN 3 GANDAK
RIVAN 100 KASKI AC 1992 MS ID 28 22 28 22 22 0 0 0 0 DOI NO GoN 3 GANDAK
SHISUWA 100 KASKI AC 1990 YR ID 125 100 125 100 50 25 0 0 0 DOI NO GoN 3 GANDAK
UPALLOLAHOCKOK 100 KASKI AC 1989 YR ID 57 45 57 45 45 25 0 0 0 DOI NO GoN 3 GANDAK
TOTAL of DOI > KASKI > REHABILITATION 6 323 257 323 257 207 69 0 0 0

TOTAL of KASKI District 6 323 257 323 257 207 69 0 0 0

DOI>LAMJUNG>REHABILITATION
DITHA VILLAGE PANCHA 100 LAMJUNG AC 62 50 62 50 50 0 0 0 0 DOI NO GoN 3 GANDAK
JITA 100 LAMJUNG AC 1992 YR ID 63 50 63 50 50 25 25 0 0 DOI NO GoN 3 GANDAK
PARAJULI BESI 100 LAMJUNG AC 125 100 125 100 100 0 0 0 0 DOI NO GoN 3 GANDAK
TOTAL of DOI > LAMJUNG > REHABILITATION 3 250 200 250 200 200 25 25 0 0

TOTAL of LAMJUNG District 3 250 200 250 200 200 25 25 0 0

DOI>MYAGDI>REHABILITATION
ADHERI KHOLA 100 MYAGDI AC 1990 YR ID 31 25 31 25 25 10 0 0 0 DOI NO GoN 3 GANDAK
ASHKARE 100 MYAGDI AC 75 60 75 60 60 0 0 0 0 DOI NO GoN 3 GANDAK
CHHARI KHOLA FAR 100 MYAGDI AC 1990 YR ID 50 40 50 40 40 10 0 0 0 DOI NO GoN 3 GANDAK
DHUKU KHOLA 100 MYAGDI AC 1991 YR ID 32 25 32 25 25 5 0 0 0 DOI NO GoN 3 GANDAK
RAKHUBHAGABATI 100 MYAGDI AC 1989 MS ID 14 11 14 11 11 0 0 0 0 DOI NO GoN 3 GANDAK
RATNE CHOUR 100 MYAGDI AC 1990 YR ID 25 20 25 20 10 10 0 0 0 DOI NO GoN 3 GANDAK
SATMULE 100 MYAGDI AC 1990 YR ID 84 65 84 65 65 40 5 0 0 DOI NO GoN 3 GANDAK
SISNERI DANUBASE 100 MYAGDI AC 1990 YR ID 25 20 25 20 20 5 0 0 0 DOI NO GoN 3 GANDAK
SISNERI GIDUMOR 100 MYAGDI AC 1989 MS ID 38 30 38 30 30 30 0 0 0 DOI NO GoN 3 GANDAK
TURIA 100 MYAGDI AC 250 200 250 200 200 0 0 0 0 DOI NO GoN 3 GANDAK
TOTAL of DOI > MYAGDI > REHABILITATION 10 624 496 624 496 486 110 5 0 0

TOTAL of MYAGDI District 10 624 496 624 496 486 110 5 0 0

46
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
DOI>PALPA>REHABILITATION
CHAMRINANDI 100 PALPA AC 1989 MS ID 500 400 500 400 400 0 0 0 0 DOI NO GoN 3 GANDAK
GEJAHEKLANG 100 PALPA AC 1991 MS ID 50 40 50 40 20 0 0 0 0 DOI NO GoN 3 GANDAK
SALIBANYAKLE TAR 100 PALPA AC 1991 MS ID 63 50 63 50 10 0 0 0 0 DOI NO GoN 3 GANDAK
TOTAL of DOI > PALPA > REHABILITATION 3 613 490 613 490 430 0 0 0 0

TOTAL of PALPA District 3 613 490 613 490 430 0 0 0 0

DOI>PARBAT>REHABILITATION
BHARUWA KHOLA 100 PARBAT AC 1989 YR ID 57 45 57 45 45 45 0 0 0 DOI NO GoN 3 GANDAK
CHALISELULO 100 PARBAT AC 1989 YR ID 63 50 63 50 50 50 0 0 0 DOI NO GoN 3 GANDAK
DURLUNG 100 PARBAT AC 1989 YR ID 7 5 7 5 5 5 0 0 0 DOI NO GoN 3 GANDAK
GHORNI KHOLA 100 PARBAT AC 1989 YR ID 3 2 3 2 2 2 0 0 0 DOI NO GoN 3 GANDAK
OKHADI KULO 100 PARBAT AC 1990 YR ID 81 65 81 65 65 30 0 0 0 DOI NO GoN 3 GANDAK
PATI KHOLA 100 PARBAT AC 1990 MS ID 25 20 25 20 110 0 0 0 0 DOI NO GoN 3 GANDAK
TOTAL of DOI > PARBAT > REHABILITATION 6 236 187 236 187 277 132 0 0 0

TOTAL of PARBAT District 6 236 187 236 187 277 132 0 0 0

DOI>TANAHU>REHABILITATION
PYUDHAR TAR 100 TANAHU AC 1991 YR ID 64 51 64 51 51 50 0 0 0 DOI NO GoN 3 GANDAK
TOTAL of DOI > TANAHU > REHABILITATION 1 64 51 64 51 51 50 0 0 0

TOTAL of TANAHU District 1 64 51 64 51 51 50 0 0 0

TOTAL of WESTERN > Hill 44 2705 2154 2705 2154 2076 610 30 0 0

DOI>MANANG>REHABILITATION
DABAL 100 MANANG AC 1989 YR ID 16 12 16 12 12 12 0 0 0 DOI NO GoN 3 GANDAK
DHUNGE KHOLA 100 MANANG AC 1989 YR ID 63 50 63 50 50 50 0 0 0 DOI NO GoN 3 GANDAK
NAR 100 MANANG AC 1989 YR ID 32 25 32 25 25 25 0 0 0 DOI NO GoN 3 GANDAK
TOTAL of DOI > MANANG > REHABILITATION 3 111 87 111 87 87 87 0 0 0

TOTAL of MANANG District 3 111 87 111 87 87 87 0 0 0

DOI>MUSTANG>REHABILITATION
CHHUSANG 100 MUSTANG AC 1990 YR ED 31 25 31 25 25 25 0 0 0 DOI NO GoN 3 GANDAK
DHIIRRIGATION 100 MUSTANG AC 1990 YR ID 35 28 35 28 28 28 0 0 0 DOI NO GoN 3 GANDAK
SOPI 100 MUSTANG AC 1991 YR ID 25 20 25 20 20 20 0 0 0 DOI NO GoN 3 GANDAK
TOTAL of DOI > MUSTANG > REHABILITATION 3 91 73 91 73 73 73 0 0 0

TOTAL of MUSTANG District 3 91 73 91 73 73 73 0 0 0

TOTAL of WESTERN > Mountain 6 202 160 202 160 160 160 0 0 0

TOTAL of WESTERN Region 62 6260 4995 6260 4995 4908 1935 130 0 0

47
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

DOI>BANKE>REHABILITATION
TI TARIYA 100 BANKE AC 1990 MS ID 25 20 25 20 20 0 0 0 0 DOI NO GoN 6 WEST RAPTI
TOTAL of DOI > BANKE > REHABILITATION 1 25 20 25 20 20 0 0 0 0

TOTAL of BANKE District 1 25 20 25 20 20 0 0 0 0

DOI>BARDIYA>REHABILITATION
BABAI IP 100 BARDIYA PC 1999 YR ED 16500 13200 8750 7000 7000 40000 0 7750 6200 DOI NO] GoN 5 BABAI
BUDHI KULO 100 BARDIYA AC 1989 YR ID 625 500 625 500 500 500 0 0 0 DOI NO GoN 5 BABAI
KAIYAN NALA 100 BARDIYA AC 1989 MS ID 250 200 250 200 200 0 0 0 0 DOI NO GoN 5 BABAI
MADIRAJDULO 100 BARDIYA AC 1989 YR ID 250 200 250 200 200 100 0 0 0 DOI NO GoN 5 BABAI
MANAU KULO 100 BARDIYA AC 1989 YR ED 375 300 375 300 300 150 0 0 0 DOI NO GoN 5 BABAI
RAJAPUR IP 100 BARDIYA PC 1999 YR ED 15790 13000 15790 13000 0 0 0 0 0 DOI NO ADB 5 BABAI
TAPARAMAMPUR KULO 100 BARDIYA AC 1989 YR ED 1000 800 1000 800 800 600 0 0 0 DOI NO GoN 5 BABAI
TARA TAL 100 BARDIYA AC 1990 YR ID 25 20 25 20 20 20 0 0 0 DOI NO GoN 5 BABAI
TI TARIYA BANDH 100 BARDIYA AC 1989 MS ID 188 150 188 150 150 0 0 0 0 DOI NO GoN 5 BABAI
TOTAL of DOI > BARDIYA > REHABILITATION 9 35003 28370 27253 22170 9170 41370 0 7750 6200

TOTAL of BARDIYA District 9 35003 28370 27253 22170 9170 41370 0 7750 6200

DOI>DANG>REHABILITATION
DHANAURI 100 DANG AC 1989 YR ID 125 100 125 100 100 0 0 0 0 DOI NO GoN 5 BABAI
GHORAHAMAMPUR 100 DANG AC 1989 YR ED 1125 900 1125 900 900 400 0 0 0 DOI NO GoN 5 BABAI
HALWAR 100 DANG AC 1989 YR ID 63 50 63 50 50 30 0 0 0 DOI NO GoN 5 BABAI
HALWAR 100 DANG AC 1989 YR ID 125 100 125 100 100 24 0 0 0 DOI NO GoN 5 BABAI
KODIYASOTA 100 DANG AC 1989 YR ED 625 500 625 500 500 0 0 0 0 DOI NO GoN 5 BABAI
LOHATIYA 100 DANG AC 1989 MS ED 38 30 38 30 30 0 0 0 0 DOI NO GoN 5 BABAI
MAWA 100 DANG AC 1989 MS ED 5 4 5 4 4 0 0 0 0 DOI NO GoN 5 BABAI
PHALKAPUR 100 DANG AC 1989 YR ED 286 229 286 229 229 80 0 0 0 DOI NO GoN 5 BABAI
PARGANA KULO IP 100 DANG AC 2006 YR ID 6800 5800 6800 5800 5800 4000 2000 0 0 DOI NO KUBAIT 6 WEST RAPTI
SUDI KULO 100 DANG AC 1989 YR ED 125 100 125 100 100 50 0 0 0 DOI NO GoN 5 BABAI
TOTAL of DOI > DANG > REHABILITATION 10 9317 7813 9317 7813 7813 4584 2000 0 0

TOTAL of DANG District 10 9317 7813 9317 7813 7813 4584 2000 0 0

TOTAL of MID-WESTERN > Terai 20 44345 36203 36595 30003 17003 45954 2000 7750 6200

DOI>DAILEKH>NEW
HANETA 100 DAILEKH AC 1994 YR ID 16 13 16 13 13 6 0 0 0 DOI NO GoN 2 KARNALI
MAPHUWA 100 DAILEKH AC 1994 YR ID 19 13 19 13 13 8 0 0 0 DOI NO GoN 2 KARNALI
CHAMUNDA 100 DAILEKH AC 1994 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 2 KARNALI
TOTAL of DOI > DAILEKH > NEW 3 60 46 60 46 46 24 0 0 0

DOI>DAILEKH>REHABILITATION
BHAR TALE 100 DAILEKH AC 1995 YR ID 19 15 19 15 15 15 0 0 0 DOI YES GoN 2 KARNALI

48
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
BHERIKALIKATHAN 100 DAILEKH AC 1990 YR ID 19 15 19 15 15 10 0 0 0 DOI NO GoN 2 KARNALI
CHAMUNDA 100 DAILEKH AC 1995 YR ID 38 30 38 30 30 30 0 0 0 DOI YES GoN 2 KARNALI
KHARIGAIRA 100 DAILEKH AC 1990 YR ID 19 15 19 15 15 8 0 0 0 DOI NO GoN 2 KARNALI
LAKURI 100 DAILEKH AC 1990 YR ID 15 12 15 12 12 6 0 0 0 DOI NO GoN 2 KARNALI
LOHA TAR 100 DAILEKH AC 1989 YR ID 38 30 38 30 30 15 0 0 0 DOI NO GoN 2 KARNALI
MAPHUWA 100 DAILEKH AC 1995 YR ID 16 13 16 13 13 13 0 0 0 DOI YES GoN 2 KARNALI
TOTAL of DOI > DAILEKH > REHABILITATION 7 164 130 164 130 130 97 0 0 0

TOTAL of DAILEKH District 10 224 176 224 176 176 121 0 0 0

DOI>JAJARKOT>REHABILITATION
HOLU KHOLA 100 JAJARKOT AC 1993 YR ID 59 47 59 47 47 25 0 0 0 DOI NO GoN 2 KARNALI
KRISAK KULO 100 JAJARKOT AC 1989 YR ID 75 60 75 60 60 30 0 0 0 DOI NO GoN 2 KARNALI
MOLU KHOLA 100 JAJARKOT AC 1989 YR ID 69 55 69 55 55 30 0 0 0 DOI NO GoN 2 KARNALI
PARIMAIDI 100 JAJARKOT AC 1990 YR ID 15 12 15 12 12 6 0 0 0 DOI NO GoN 2 KARNALI
RAWAT GAON 100 JAJARKOT AC 1992 YR ID 65 20 65 20 20 10 0 0 0 DOI NO GoN 2 KARNALI
RAWAT KHOLA 100 JAJARKOT AC 1993 YR ID 31 25 31 25 25 12 0 0 0 DOI NO GoN 2 KARNALI
TOTAL of DOI > JAJARKOT > REHABILITATION 6 314 219 314 219 219 113 0 0 0

TOTAL of JAJARKOT District 6 314 219 314 219 219 113 0 0 0

DOI>PYUTHAN>REHABILITATION
KOTGACNMADHICHAUN 100 PYUTHAN AC 1989 YR ED 9 7 9 7 7 0 0 0 0 DOI NO GoN 6 WEST RAPTI
MAWA 100 PYUTHAN AC 1989 YR ID 5 4 5 4 4 4 0 0 0 DOI NO SNV 6 WEST RAPTI
TOTAL of DOI > PYUTHAN > REHABILITATION 2 14 11 14 11 11 4 0 0 0

TOTAL of PYUTHAN District 2 14 11 14 11 11 4 0 0 0

DOI>ROLPA>REHABILITATION
DHAWANGCHAPNA 100 ROLPA AC 1990 ID 36 29 36 29 29 10 0 0 0 DOI NO GoN 6 WEST RAPTI
GHABANGSNA 100 ROLPA AC 1990 YR ID 1 1 1 1 1 1 0 0 0 DOI NO GoN 6 WEST RAPTI
MADHI CHAUR 100 ROLPA AC 1993 YR ID 48 39 48 39 27 27 0 0 0 DOI NO GoN 6 WEST RAPTI
MANGHAT 100 ROLPA AC 1989 YR ID 47 37 47 37 47 47 7 0 0 DOI NO GoN 6 WEST RAPTI
MIRTANG 100 ROLPA AC 1990 MS ID 10 8 10 8 8 8 0 0 0 DOI NO GoN 6 WEST RAPTI
THULOKUNG KHOLA 100 ROLPA AC 1993 YR ID 144 115 144 115 85 40 0 0 0 DOI NO GoN 6 WEST RAPTI
TOTAL of DOI > ROLPA > REHABILITATION 6 286 229 286 229 197 133 7 0 0

TOTAL of ROLPA District 6 286 229 286 229 197 133 7 0 0

DOI>RUKUM>REHABILITATION
BALUWA CHAUR 100 RUKUM AC 1989 YR ID 25 20 25 20 20 5 0 0 0 DOI NO GoN 2 KARNALI
JANGAKHAWA 100 RUKUM AC 1989 YR ID 25 20 25 20 20 5 0 0 0 DOI NO GoN 2 KARNALI
MAGARRAJ KULO 100 RUKUM AC 1989 YR ID 25 20 25 20 20 5 0 0 0 DOI NO GoN 2 KARNALI
NATHIGAD 100 RUKUM AC 1990 YR ID 63 50 63 50 50 35 0 0 0 DOI NO GoN 2 KARNALI
SMA 100 RUKUM AC 1990 MS ID 19 15 19 15 15 0 0 0 0 DOI NO GoN 2 KARNALI
TOTAL of DOI > RUKUM > REHABILITATION 5 157 125 157 125 125 50 0 0 0

49
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

TOTAL of RUKUM District 5 157 125 157 125 125 50 0 0 0

DOI>SALYAN>REHABILITATION
KALA KHET 100 SALYAN AC 1989 MS ID 23 18 23 18 18 0 0 0 0 DOI NO GoN 5 BABAI
SAMSAPIPAL KULO 100 SALYAN AC 1989 MS ID 13 10 13 10 10 0 0 0 0 DOI NO GoN 5 BABAI
TATKE KULO 100 SALYAN AC 1989 MS ID 59 47 59 47 47 0 0 0 0 DOI NO GoN 5 BABAI
TOTAL of DOI > SALYAN > REHABILITATION 3 95 75 95 75 75 0 0 0 0

TOTAL of SALYAN District 3 95 75 95 75 75 0 0 0 0

DOI>SURKHET>REHABILITATION
DASARATHPUR 100 SURKHET AC 1989 YR ID 143 114 143 114 114 0 0 0 0 DOI NO GoN 2 KARNALI
GAM KHOLA 100 SURKHET AC 1991 MS ID 88 70 88 70 70 0 0 0 0 DOI NO GoN 2 KARNALI
MEHALKUMA 100 SURKHET AC 1989 YR ID 69 55 69 55 55 0 0 0 0 DOI NO GoN 2 KARNALI
SALKHANI 100 SURKHET AC 1991 MS ID 19 15 19 15 15 15 0 0 0 DOI NO GoN 2 KARNALI
TOTAL of DOI > SURKHET > REHABILITATION 4 319 254 319 254 254 15 0 0 0

TOTAL of SURKHET District 4 319 254 319 254 254 15 0 0 0

TOTAL of MID-WESTERN > Hill 36 1409 1089 1409 1089 1057 436 7 0 0

DOI>DOLPA>NEW
CHUGAD 100 DOLPA AC 1994 YR ID 88 70 88 70 70 35 0 0 0 DOI NO GoN 6 WEST RAPTI
TOTAL of DOI > DOLPA > NEW 1 88 70 88 70 70 35 0 0 0

DOI>DOLPA>REHABILITATION
CHU GAON 100 DOLPA AC 1995 YR ID 55 44 55 44 44 44 0 0 0 DOI NO GoN 6 WEST RAPTI
DHUPIJULA 100 DOLPA AC 1989 YR ID 38 30 38 30 30 25 0 0 0 DOI NO GoN 6 WEST RAPTI
JUPHAL TAR 100 DOLPA AC 1992 YR ID 46 38 46 38 38 20 0 0 0 DOI NO GoN 6 WEST RAPTI
JUPHAL TAR 2 100 DOLPA AC 1993 YR ID 88 70 88 70 70 35 0 0 0 DOI NO GoN 6 WEST RAPTI
KONASIP 100 DOLPA AC 1995 YR ID 56 45 56 45 45 45 0 0 0 DOI NO GoN 6 WEST RAPTI
MAJ PHANT 100 DOLPA AC 1990 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 6 WEST RAPTI
PALCHA KHOLA 100 DOLPA AC 1995 YR ID 13 10 13 10 10 10 0 0 0 DOI NO GoN 6 WEST RAPTI
PALUNGA 100 DOLPA AC 1995 YR ID 25 20 25 20 20 20 0 0 0 DOI NO GoN 6 WEST RAPTI
RALLE 100 DOLPA AC 1992 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 6 WEST RAPTI
TOTAL of DOI > DOLPA > REHABILITATION 9 371 297 371 297 297 219 0 0 0

TOTAL of DOLPA District 10 459 367 459 367 367 254 0 0 0

DOI>HUMLA>REHABILITATION
MELCHAM 100 HUMLA AC 1993 YR ID 51 41 51 41 41 41 0 0 0 DOI NO GoN 2 KARNALI
YANCHU 100 HUMLA AC 1993 YR ID 56 45 56 45 45 45 0 0 0 DOI NO GoN 2 KARNALI
TOTAL of DOI > HUMLA > REHABILITATION 2 107 86 107 86 86 86 0 0 0

TOTAL of HUMLA District 2 107 86 107 86 86 86 0 0 0

50
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

DOI>JUMLA>REHABILITATION
LUM KHOLA 100 JUMLA AC 1995 YR ID 6 5 6 5 5 5 0 0 0 DOI NO GoN 2 KARNALI
TALIUMIP 100 JUMLA AC 1995 YR ID 38 30 38 30 30 30 0 0 0 DOI NO GoN 2 KARNALI
TOTAL of DOI > JUMLA > REHABILITATION 2 44 35 44 35 35 35 0 0 0

TOTAL of JUMLA District 2 44 35 44 35 35 35 0 0 0

DOI>KALIKOT>REHABILITATION
RAKU 100 KALIKOT AC 1994 YR ID 130 104 130 104 104 104 0 0 0 DOI NO GoN 2 KARNALI
SUKATTIYA 100 KALIKOT AC 1994 YR ID 61 49 61 49 49 49 0 0 0 DOI NO GoN 2 KARNALI
TOTAL of DOI > KALIKOT > REHABILITATION 2 191 153 191 153 153 153 0 0 0

TOTAL of KALIKOT District 2 191 153 191 153 153 153 0 0 0

DOI>MUGU>REHABILITATION
KHANAYA 100 MUGU AC 1989 YR ID 25 20 25 20 20 20 0 0 0 DOI NO GoN 2 KARNALI
LATE KHOLA 100 MUGU AC 1990 YR ID 6 5 6 5 5 5 0 0 0 DOI NO GoN 2 KARNALI
TOTAL of DOI > MUGU > REHABILITATION 2 31 25 31 25 25 25 0 0 0

TOTAL of MUGU District 2 31 25 31 25 25 25 0 0 0

TOTAL of MID-WESTERN > Mountain 18 832 666 832 666 666 553 0 0 0

TOTAL of MID-WESTERN Region 74 46586 37958 38836 31758 18726 46943 2007 7750 6200

DOI>KAILALI>REHABILITATION
BAGDAULI 100 KAILALI AC 1992 YR ID 250 200 250 200 200 100 0 0 0 DOI NO GoN 2 KARNALI
NAIJALI 100 KAILALI AC 1989 YR ID 188 150 188 150 150 75 0 0 0 DOI NO GoN 2 KARNALI
RANIJAMARA 100 KAILALI AC 1991 YR ED 3125 2500 3125 2500 2500 1600 0 0 0 DOI NO GoN 2 KARNALI
TOTAL of DOI > KAILALI > REHABILITATION 3 3563 2850 3563 2850 2850 1775 0 0 0

TOTAL of KAILALI District 3 3563 2850 3563 2850 2850 1775 0 0 0

TOTAL of FAR-WESTERN > Terai 3 3563 2850 3563 2850 2850 1775 0 0 0

DOI>ACHHAM>REHABILITATION
BHAGESWORI 100 ACHHAM AC 1989 YR ID 38 30 38 30 30 15 0 0 0 DOI NO GoN 2 KARNALI
MOTELA 100 ACHHAM AC 1989 YR ID 19 15 19 15 15 15 0 0 0 DOI NO GoN 2 KARNALI
NANDEGADA 100 ACHHAM AC 1989 YR ID 38 30 38 30 30 10 0 0 0 DOI NO GoN 2 KARNALI
PRANOLI 100 ACHHAM AC 1989 YR ID 25 20 25 20 20 0 0 0 0 DOI NO GoN 2 KARNALI
TOTAL of DOI > ACHHAM > REHABILITATION 4 120 95 120 95 95 40 0 0 0

TOTAL of ACHHAM District 4 120 95 120 95 95 40 0 0 0

51
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
DOI>BAITADI>REHABILITATION
BIKULIMONAULI 100 BAITADI AC 1989 YR ID 7 5 7 5 5 4 0 0 0 DOI NO GoN 1 MAHAKALI
GANTHALI KULO 100 BAITADI AC 1989 YR ID 7 5 7 5 5 4 0 0 0 DOI NO GoN 1 MAHAKALI
JAIJALI 100 BAITADI AC 1990 YR ID 63 50 63 50 50 15 0 0 0 DOI NO GoN 1 MAHAKALI
RAULAGAD KULO 100 BAITADI AC 1989 YR ID 13 10 13 10 10 5 0 0 0 DOI NO GoN 1 MAHAKALI
SANENA 100 BAITADI AC 1989 YR ID 38 30 38 30 15 10 0 0 0 DOI NO GoN 1 MAHAKALI
SIMA TAL 100 BAITADI AC 1990 YR ID 13 10 13 10 10 4 0 0 0 DOI NO GoN 1 MAHAKALI
THULO KHOLA 100 BAITADI AC 1989 YR ID 63 50 63 50 50 25 0 0 0 DOI NO GoN 1 MAHAKALI
TOTAL of DOI > BAITADI > REHABILITATION 7 204 160 204 160 145 67 0 0 0

TOTAL of BAITADI District 7 204 160 204 160 145 67 0 0 0

DOI>DOTI>REHABILITATION
BAJKADENI 100 DOTI AC 1989 YR ID 19 15 19 15 15 8 0 0 0 DOI NO GoN 2 KARNALI
DHOLTADA 100 DOTI AC 1989 YR ID 38 30 38 30 30 55 0 0 0 DOI NO GoN 2 KARNALI
SAL GAON 100 DOTI AC 1989 YR ID 19 15 19 15 15 8 0 0 0 DOI NO GoN 2 KARNALI
TOTAL of DOI > DOTI > REHABILITATION 3 76 60 76 60 60 71 0 0 0

TOTAL of DOTI District 3 76 60 76 60 60 71 0 0 0

TOTAL of FAR-WESTERN > Hill 14 400 315 400 315 300 178 0 0 0

DOI>DARCHULA>REHABILITATION
BASKOTGOKULESWOR 100 DARCHULA AC 1989 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 1 MAHAKALI
DINSI 100 DARCHULA AC 1989 YR ID 19 15 19 15 15 8 0 0 0 DOI NO GoN 1 MAHAKALI
HUTI GAON 100 DARCHULA AC 1989 YR ID 19 15 19 15 15 8 0 0 0 DOI NO GoN 1 MAHAKALI
JAK KULO 100 DARCHULA AC 1989 YR ID 13 10 13 10 10 5 0 0 0 DOI NO GoN 1 MAHAKALI
KHETIGAD 100 DARCHULA AC 1989 YR ID 19 15 19 15 15 8 0 0 0 DOI NO GoN 1 MAHAKALI
NAYALGOKULESWORN 100 DARCHULA AC 1989 YR ID 25 20 25 20 20 10 0 0 0 DOI NO GoN 1 MAHAKALI
TOTAL of DOI > DARCHULA > REHABILITATION 6 120 95 120 95 95 49 0 0 0

TOTAL of DARCHULA District 6 120 95 120 95 95 49 0 0 0

TOTAL of FAR-WESTERN > Mountain 6 120 95 120 95 95 49 0 0 0

TOTAL of FAR-WESTERN Region 23 4083 3260 4083 3260 3245 2002 0 0 0

TOTAL of DOI 329 72172 58384 64422 52184 38759 52564 2137 7750 6200

ERIP>CHITWAN>REHABILITATION
AITEBAGAR KULO 100 CHITWAN AC 1995 YR ID 63 50 63 50 50 38 38 0 0 ERIP NO ADB 3 GANDAK
AMILIYAGHOLE KULO 100 CHITWAN AC 1996 YR ED 110 88 110 88 0 0 0 110 88 ERIP NO ADB 3 GANDAK
AMIRIT KULO 100 CHITWAN AC 1995 YR ID 94 75 94 75 75 56 56 0 0 ERIP NO ADB 3 GANDAK
BACHHYALI KULO 100 CHITWAN AC 1994 YR ID 328 262 328 262 262 262 0 0 0 ERIP NO ADB 3 GANDAK
BADGAUR KULO 100 CHITWAN AC 1996 YR ED 228 182 228 182 0 0 0 228 182 ERIP NO ADB 3 GANDAK
BAGARBELIDIYA KULO 100 CHITWAN AC 1996 YR ED 16 13 16 13 0 0 0 16 13 ERIP NO ADB 3 GANDAK

52
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
BAHERA KULO 100 CHITWAN AC 1996 YR ED 19 15 19 15 0 0 0 19 15 ERIP NO ADB 3 GANDAK
BAIREN KULO 100 CHITWAN AC 1996 YR ED 133 106 133 106 0 0 0 133 106 ERIP NO ADB 3 GANDAK
BAKULAHAR KULO 100 CHITWAN AC 1996 YR ID 78 62 78 62 0 0 0 78 62 ERIP NO ADB 3 GANDAK
BASYAULI KULO 100 CHITWAN AC 1996 YR ED 49 39 49 39 0 0 0 49 39 ERIP NO ADB 3 GANDAK
BEIDIYABAGAR 100 CHITWAN AC 1994 YR ID 19 15 19 15 15 15 0 0 0 ERIP NO ADB 3 GANDAK
BELIDOHA KULO 100 CHITWAN AC 1994 YR ID 94 75 94 75 75 75 0 0 0 ERIP NO ADB 3 GANDAK
BELUWA KULO 100 CHITWAN AC 1996 YR ED 73 58 73 58 0 0 0 73 58 ERIP NO ADB 3 GANDAK
BELUWA KULO 100 CHITWAN AC 1996 YR ED 11 9 11 9 0 0 0 11 9 ERIP NO ADB 3 GANDAK
BHUTAHA KULO 100 CHITWAN AC 1996 YR ED 135 108 135 108 0 0 0 135 108 ERIP NO ADB 3 GANDAK
BUDHI KULO 100 CHITWAN AC 1996 YR ED 43 34 43 34 0 0 0 43 34 ERIP NO ADB 3 GANDAK
BUDHIRAPTI KULO 100 CHITWAN AC 1994 YR ID 144 115 144 115 115 115 0 0 0 ERIP NO ADB 3 GANDAK
CHA TARA KULO 100 CHITWAN AC 1996 YR ED 28 22 28 22 0 0 0 28 22 ERIP NO ADB 3 GANDAK
CHHATIWAN GAIDACHHAP 100 CHITWAN AC 1995 YR ID 118 94 118 94 94 45 30 0 0 ERIP NO ADB 3 GANDAK
CHIPLETI KULO 100 CHITWAN PC 1996 YR ID 181 145 50 40 40 20 0 131 105 ERIP NO ADB 3 GANDAK
CHURIGHOL KULO 100 CHITWAN PC 1997 YR ID 63 50 13 10 10 0 0 50 40 ERIP NO ADB 3 GANDAK
DAITYA KULO 100 CHITWAN PC 1997 YR ID 75 60 63 50 50 0 0 12 10 ERIP NO ADB 3 GANDAK
DEBAOULI KULO 100 CHITWAN AC 1996 YR ED 33 26 33 26 0 0 0 33 26 ERIP NO ADB 3 GANDAK
DHARAMPUR KULO 100 CHITWAN AC 1996 YR ED 149 119 149 119 0 0 0 149 119 ERIP NO ADB 3 GANDAK
DHUDHKOSHI KULO 100 CHITWAN AC 1996 YR ED 58 46 58 46 0 0 0 58 46 ERIP NO ADB 3 GANDAK
DHUNGRE PARSA KULO 100 CHITWAN AC 1996 YR ED 13 10 13 10 0 0 0 13 10 ERIP NO ADB 3 GANDAK
DORANGI KULO 100 CHITWAN PC 1996 YR ED 118 94 118 94 0 0 0 118 94 ERIP NO ADB 3 GANDAK
EAST BAHARI KULO 100 CHITWAN AC 1996 YR ED 38 30 38 30 0 0 0 38 30 ERIP NO ADB 3 GANDAK
GAIDA DHAP KULO 100 CHITWAN AC 1996 YR ED 20 16 20 16 0 0 0 20 16 ERIP NO ADB 3 GANDAK
GAUCHAR KULO 100 CHITWAN AC 1996 YR ED 3 2 3 2 0 0 0 3 2 ERIP NO ADB 3 GANDAK
GODHAP KULO 100 CHITWAN AC 1996 YR ED 9 7 9 7 0 0 0 9 7 ERIP NO ADB 3 GANDAK
HARDI KULO 100 CHITWAN AC 1994 YR ID 115 92 115 92 92 92 0 0 0 ERIP NO ADB 3 GANDAK
HAZIPURBAHERI KULO 100 CHITWAN AC 1996 YR ED 139 111 139 111 0 0 0 139 111 ERIP NO ADB 3 GANDAK
JANAKALYANKHA 100 CHITWAN AC 1994 YR ID 148 118 148 118 118 118 0 0 0 ERIP NO ADB 3 GANDAK
JANAKPUR KULO 100 CHITWAN AC 1994 YR ID 288 230 288 230 230 230 0 0 0 ERIP NO ADB 3 GANDAK
JANKALYANGA KULO 100 CHITWAN AC 1994 YR ID 63 50 63 50 50 50 0 0 0 ERIP NO ADB 3 GANDAK
JAPKAULI KULO 100 CHITWAN AC 1996 YR ED 99 79 99 79 0 0 0 99 79 ERIP NO ADB 3 GANDAK
JARUWA 1 KULO 100 CHITWAN AC 1995 YR ID 38 30 38 30 30 15 15 0 0 ERIP NO ADB 3 GANDAK
JARUWA 2 KULO 100 CHITWAN AC 1995 YR ID 38 30 38 30 30 15 15 0 0 ERIP NO ADB 3 GANDAK
JHUBANI KULO 100 CHITWAN AC 1994 YR ID 220 176 220 176 176 176 0 0 0 ERIP NO ADB 3 GANDAK
JHURJHUE KULO 100 CHITWAN AC 1996 YR ED 60 48 60 48 0 0 0 60 48 ERIP NO ADB 3 GANDAK
JIVANPUR KULO 100 CHITWAN AC 1994 YR ID 51 41 51 41 41 41 0 0 0 ERIP NO ADB 3 GANDAK
JYAMIRE KULO 100 CHITWAN AC 1996 YR ED 51 41 51 41 0 0 0 51 41 ERIP NO ADB 3 GANDAK
KANKALI KULO 100 CHITWAN PC 1997 YR ED 460 368 423 338 338 0 0 37 30 ERIP NO ADB 3 GANDAK
KAPIYA KULO 100 CHITWAN AC 1995 YR ID 100 80 100 80 80 60 60 0 0 ERIP NO ADB 3 GANDAK
KARIYA KULO 100 CHITWAN AC 1996 YR ED 28 22 28 22 0 0 0 28 22 ERIP NO ADB 3 GANDAK
KASHI GAON KULO 100 CHITWAN AC 1995 YR ID 115 92 115 92 92 45 30 0 0 ERIP NO ADB 3 GANDAK
KATHAR&GOTHAULI KULO 100 CHITWAN AC 1996 YR ED 75 60 75 60 0 0 0 75 60 ERIP NO ADB 3 GANDAK
KATHAR KULO 100 CHITWAN AC 1996 YR ED 131 105 131 105 0 0 0 131 105 ERIP NO ADB 3 GANDAK
KATHAR KULO 100 CHITWAN AC 1996 YR ED 229 183 229 183 0 0 0 229 183 ERIP NO ADB 3 GANDAK
KATHAR PAINI KULO 100 CHITWAN AC 1994 YR ID 254 203 254 203 203 203 0 0 0 ERIP NO ADB 3 GANDAK
KHARKHUTTEKHULO 100 CHITWAN PC 1997 YR ID 94 75 38 30 30 30 30 56 45 ERIP NO ADB 3 GANDAK

53
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
KHARKHUTTELOWERKUL 100 CHITWAN AC 1994 YR ID 59 47 59 47 47 47 0 0 0 ERIP NO ADB 3 GANDAK
KHARKHUTTEUPPER KULO 100 CHITWAN AC 1994 YR ID 71 57 71 57 57 57 0 0 0 ERIP NO ADB 3 GANDAK
KHARTHUTTE-1 100 CHITWAN AC 1996 YR ED 86 69 86 69 0 0 0 86 69 ERIP NO ADB 3 GANDAK
KYAMPA KULO 100 CHITWAN AC 1996 YR ID 113 90 113 90 90 45 30 0 0 ERIP NO ADB 3 GANDAK
LA BARIPATENI KULO 100 CHITWAN PC 1997 YR ID 63 50 38 30 30 0 0 25 20 ERIP NO ADB 3 GANDAK
LAMAI KULO 100 CHITWAN PC 1997 YR ID 113 90 100 80 80 50 0 13 10 ERIP NO ADB 3 GANDAK
LAUROGHOL KULO 100 CHITWAN AC 1995 YR ID 94 75 94 75 75 40 30 0 0 ERIP NO ADB 3 GANDAK
MAHADEV KULO 100 CHITWAN AC 1995 YR ID 113 90 113 90 90 68 68 0 0 ERIP NO ADB 3 GANDAK
MAINAHA KULO 100 CHITWAN AC 1996 YR ED 31 25 31 25 0 0 0 31 25 ERIP NO ADB 3 GANDAK
MAJHUE KULO 100 CHITWAN PC 1997 YR ID 250 200 164 131 131 98 98 86 69 ERIP NO ADB 3 GANDAK
MANGIYACHUHADI 100 CHITWAN AC 1996 YR ED 130 104 130 104 0 0 0 130 104 ERIP NO ADB 3 GANDAK
MUDAVIR KULO 100 CHITWAN AC 1994 YR ID 181 145 181 145 145 145 0 0 0 ERIP NO ADB 3 GANDAK
NAUBIGHE KULO 100 CHITWAN AC 1996 YR ED 23 18 23 18 0 0 0 23 18 ERIP NO ADB 3 GANDAK
OHARMARIBERIYA 100 CHITWAN AC 1994 YR ED 435 348 435 348 348 348 0 0 0 ERIP NO ADB 3 GANDAK
PADARIYA KULO 100 CHITWAN AC 1994 YR ID 174 139 174 139 139 139 0 0 0 ERIP NO ADB 3 GANDAK
PAMPA KULO 100 CHITWAN AC 1996 YR ID 100 80 100 80 80 40 30 0 0 ERIP NO ADB 3 GANDAK
PANISARADHAP KULO 100 CHITWAN PC 1995 YR ID 38 30 38 30 30 15 15 0 0 ERIP NO ADB 3 GANDAK
PARAJULI KULO 100 CHITWAN AC 1994 YR ID 6 5 6 5 5 5 0 0 0 ERIP NO ADB 3 GANDAK
PARSA KULO 100 CHITWAN PC 1997 YR ID 198 158 60 48 48 30 0 138 110 ERIP NO ADB 3 GAMDAK
PARSAUNI KULO 100 CHITWAN AC 1996 YR ED 123 98 123 98 0 0 0 123 98 ERIP NO ADB 3 GANDAK
PHESERNAPHESERNI KULO 100 CHITWAN AC 1996 YR ID 71 57 71 57 0 0 0 71 57 ERIP NO ADB 3 GANDAK
PIPARABHD GAON 100 CHITWAN AC 1994 YR ID 253 202 253 202 202 202 0 0 0 ERIP NO ADB 3 GANDAK
PITHUWA KULO 100 CHITWAN PC 1997 YR ID 750 600 313 250 250 100 0 437 350 ERIP NO ADB 3 GANDAK
PRATAPPURBAGAR 100 CHITWAN AC 1996 YR ED 23 18 23 18 0 0 0 23 18 ERIP NO ADB 3 GANDAK
PRATAPPUR KULO 100 CHITWAN AC 1994 YR ID 329 263 329 263 263 263 0 0 0 ERIP NO ADB 3 GANDAK
PUCHH BARIMAJOEE KULO 100 CHITWAN AC 1996 YR ED 78 62 78 62 0 0 0 78 62 ERIP NO ADB 3 GANDAK
PUR BARI KULO 100 CHITWAN AC 1994 YR ID 33 26 33 26 26 26 0 0 0 ERIP NO ADB 3 GANDAK
PURBSRIBAGAR KULO 100 CHITWAN AC 1996 YR ED 16 13 16 13 0 0 0 16 13 ERIP NO ADB 3 GANDAK
SANTANA KULO 100 CHITWAN AC 1996 YR ED 283 226 283 226 0 0 0 283 226 ERIP NO ADB 3 GANDAK
SATHIBIGHE KULO 100 CHITWAN AC 1996 YR ED 60 48 60 48 0 0 0 60 48 ERIP NO ADB 3 GANDAK
SAUNPUR KULO 100 CHITWAN AC 1996 YR ED 96 77 96 77 0 0 0 96 77 ERIP NO ADB 3 GANDAK
SHANTICHOWK KULO 100 CHITWAN AC 1996 YR ED 26 21 26 21 0 0 0 26 21 ERIP NO ADB 3 GANDAK
SHUDHI KULO 100 CHITWAN AC 1996 YR ED 244 195 244 195 0 0 0 244 195 ERIP NO ADB 3 GANDAK
SHUKHA1 KULO 100 CHITWAN AC 1996 YR ID 44 35 44 35 35 20 15 0 0 ERIP NO ADB 3 GANDAK
SHUKHA2 KULO 100 CHITWAN AC 1996 YR ID 33 26 33 26 26 15 10 0 0 ERIP NO ADB 3 GANDAK
SISABAS KULO 100 CHITWAN AC 1994 YR ID 134 107 134 107 107 107 0 0 0 ERIP NO ADB 3 GANDAK
SISANGADI KULO 100 CHITWAN AC 1994 YR ID 26 21 26 21 21 21 0 0 0 ERIP NO ADB 3 GANDAK
SISUWARI KULO 100 CHITWAN AC 1996 YR ED 40 32 40 32 0 0 0 40 32 ERIP NO ADB 3 GANDAK
SI TAL PANI KULO 100 CHITWAN AC 1995 YR ID 38 30 38 30 30 15 10 0 0 ERIP NO ADB 3 GANDAK
SUKAMBASHI KULO 100 CHITWAN AC 1996 YR ED 23 18 23 18 0 0 0 23 18 ERIP NO ADB 3 GANDAK
SUKHA KHOLA KULO 100 CHITWAN AC 1996 YR ED 59 47 59 47 0 0 0 59 47 ERIP NO ADB 3 GANDAK
SURTANA KULO 100 CHITWAN AC 1995 YR ID 231 185 231 185 185 139 139 0 0 ERIP NO ADB 3 GANDAK
TADAULI KULO 100 CHITWAN AC 1994 YR ID 96 77 96 77 77 77 0 0 0 ERIP NO ADB 3 GANDAK
THANBUNGKALI KULO 100 CHITWAN PC 1997 YR ID 495 396 295 236 236 200 100 200 160 ERIP NO ADB 3 GANDAK
TUGDUDHKOSHI KULO 100 CHITWAN AC 1995 YR ID 25 20 25 20 20 10 10 0 0 ERIP NO ADB 3 GANDAK
TULSIPUR KULO 100 CHITWAN AC 1996 YR ED 44 35 44 35 0 0 0 44 35 ERIP NO ADB 3 GANDAK

54
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
UNANTOLEDHUSENI KULO 100 CHITWAN AC 1996 YR ED 15 12 15 12 0 0 0 15 12 ERIP NO ADB 3 GANDAK
WESTBAHARI KULO 100 CHITWAN AC 1996 YR ED 95 76 95 76 0 0 0 95 76 ERIP NO ADB 3 GANDAK
TOTAL of ERIP > CHITWAN > REHABILITATION 100 11400 9104 10215 8155 5169 4023 829 4927 3935

TOTAL of CHITWAN District 100 11400 9104 10215 8155 5169 4023 829 4927 3935

TOTAL of CENTRAL > Terai 100 11400 9104 10215 8155 5169 4023 829 4927 3935

TOTAL of Central Region 100 11400 9104 10215 8155 5169 4023 829 4927 3935

TOTAL of > ERIP 100 11400 9104 10215 8155 5169 4023 829 4927 3935

FIWUD>JHAPA>REHABILITATION
DHAIJAN 100 JHAPA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
REKHA PAINI 100 JHAPA AC 100 80 100 80 80 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
TOTAL of FIWUD > JHAPA > REHABILITATION 2 225 180 225 180 180 0 0 0 0

TOTAL of JHAPA District 2 225 180 225 180 180 0 0 0 0

FIWUD>SIRAHA>REHABILITATION
GAGAN KHOLA 100 SIRAHA AC 375 300 375 300 300 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
KAMAL PANI 100 SIRAHA AC 375 300 375 300 300 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
TOTAL of FIWUD > SIRAHA > REHABILITATION 2 750 600 750 600 600 0 0 0 0

TOTAL of SIRAHA District 2 750 600 750 600 600 0 0 0 0

FIWUD>SUNSARI>REHABILITATION
BAKLAURI 100 SUNSARI AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
SUKUMARI 100 SUNSARI AC 625 500 625 500 500 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
TOTAL of FIWUD > SUNSARI > REHABILITATION 2 750 600 750 600 600 0 0 0 0

TOTAL of SUNSARI District 2 750 600 750 600 600 0 0 0 0

TOTAL of EASTERN > Terai 6 1725 1380 1725 1380 1380 0 0 0 0

FIWUD>BHOJPUR>NEW
CHAMPE 100 BHOJPUR AC 250 200 250 200 200 0 0 0 0 FIWUD NO GoN 4 KOSHI
TOTAL of FIWUD > BHOJPUR > NEW 1 250 200 250 200 200 0 0 0 0

TOTAL of BHOJPUR District 1 250 200 250 200 200 0 0 0 0

FIWUD>DHANKUTA>NEW
GUTHI TAR POND 100 DHANKUTA AC 6 5 6 5 5 0 0 0 0 FIWUD NO GoN 4 KOSHI
KAVRE 100 DHANKUTA AC 38 30 38 30 30 0 0 0 0 FIWUD NO GoN 4 KOSHI
MULGHAT 100 DHANKUTA AC 44 35 44 35 35 0 0 0 0 FIWUD NO GoN 4 KOSHI
TOTAL of FIWUD > DHANKUTA > NEW 3 88 70 88 70 70 0 0 0 0

55
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

TOTAL of DHANKUTA District 3 88 70 88 70 70 0 0 0 0

FIWUD>KHOTANG>NEW
BULKU 100 KHOTANG AC 19 15 19 15 15 0 0 0 0 FIWUD NO GoN 4 KOSHI
CHYAN DANDA 100 KHOTANG AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 4 KOSHI
DORPA 100 KHOTANG AC 313 250 313 250 250 0 0 0 0 FIWUD NO GoN 4 KOSHI
EKCHHANGE 100 KHOTANG AC 250 200 250 200 200 0 0 0 0 FIWUD NO GoN 4 KOSHI
MAKSHING TAR 100 KHOTANG AC 4 3 4 3 3 0 0 0 0 FIWUD NO GoN 4 KOSHI
TOTAL of FIWUD > KHOTANG > NEW 5 649 518 649 518 518 0 0 0 0

TOTAL of KHOTANG District 5 649 518 649 518 518 0 0 0 0

FIWUD>OKHALDHUNGA>NEW
KHATA 100 OKHALDHUNGA AC 4 3 4 3 3 0 0 0 0 FIWUD NO GoN 4 KOSHI
KUTUNJE 100 OKHALDHUNGA AC 26 21 26 21 21 0 0 0 0 FIWUD NO GoN 4 KOSHI
MAMKHA 100 OKHALDHUNGA AC 7 5 7 5 5 0 0 0 0 FIWUD NO GoN 4 KOSHI
TOTAL of FIWUD > OKHALDHUNGA > NEW 3 37 29 37 29 29 0 0 0 0

TOTAL of OKHALDHUNGA District 3 37 29 37 29 29 0 0 0 0

FIWUD>PANCHTHAR>NEW
KAFALBOTE 100 PANCHTHAR AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 4 KOSHI
TOTAL of FIWUD > PANCHTHAR > NEW 1 188 150 188 150 150 0 0 0 0

TOTAL of PANCHTHAR District 1 188 150 188 150 150 0 0 0 0

FIWUD>TERATHUM>NEW
HALCHOK 100 TERATHUM AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 4 KOSHI
TELIYA KHOLA 100 TERATHUM AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 4 KOSHI
UWA KHOLA 100 TERATHUM AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 4 KOSHI
TOTAL of FIWUD > TERATHUM > NEW 3 281 225 281 225 225 0 0 0 0

FIWUD>TERATHUM>REHABILITATION
HATTIHAL 100 TERATHUM AC 38 30 38 30 30 0 0 0 0 FIWUD NO GoN 4 KOSHI
JIRIKHIMTI 100 TERATHUM AC 375 300 375 300 300 0 0 0 0 FIWUD NO GoN 4 KOSHI
LOHATOPA 100 TERATHUM AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 4 KOSHI
TOTAL of FIWUD > TERATHUM > REHABILITATION 3 538 430 538 430 430 0 0 0 0

TOTAL of TERATHUM District 6 819 655 819 655 655 0 0 0 0

FIWUD>UDAYPUR>REHABILITATION
BASHA 100 UDAYPUR AC 69 55 69 55 55 0 0 0 0 FIWUD NO GoN 4 KOSHI
TOTAL of FIWUD > UDAYPUR > REHABILITATION 1 69 55 69 55 55 0 0 0 0

TOTAL of UDAYPUR District 1 69 55 69 55 55 0 0 0 0

56
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

TOTAL of EASTERN > Hill 20 2100 1677 2100 1677 1677 0 0 0 0

TOTAL of EASTERN Region 26 3825 3057 3825 3057 3057 0 0 0 0

FIWUD>CHITWAN>REHABILITATION
BAD GAON 100 CHITWAN AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 3 GANDAK
BIRENDRA NAGAR 100 CHITWAN AC YR ID 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 3 GANDAK
DUNGE KHOLA 100 CHITWAN AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 3 GANDAK
JAGATPUR 100 CHITWAN AC 250 200 250 200 200 0 0 0 0 FIWUD NO GoN 3 GANDAK
JUNPUR 100 CHITWAN AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 3 GANDAK
KAHIRANI 100 CHITWAN AC 250 200 250 200 200 0 0 0 0 FIWUD NO GoN 3 GANDAK
KAPIYA KUMROJ 100 CHITWAN AC 250 200 250 200 200 0 0 0 0 FIWUD NO GoN 3 GANDAK
KATHARA(A) 100 CHITWAN AC 500 400 500 400 400 0 0 0 0 FIWUD NO GoN 3 GANDAK
LADARI 100 CHITWAN AC 75 60 75 60 60 0 0 0 0 FIWUD NO GoN 3 GANDAK
MAJHUI 100 CHITWAN AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 3 GANDAK
TANAHI 100 CHITWAN AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 3 GANDAK
TOTAL of FIWUD > CHITWAN > REHABILITATION 11 2140 1710 2140 1710 1710 0 0 0 0

TOTAL of CHITWAN District 11 2140 1710 2140 1710 1710 0 0 0 0

FIWUD>DHANUSHA>NEW
BALHA KATHAL 100 DHANUSHA AC 100 80 100 80 80 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
BIGHI 100 DHANUSHA AC 150 120 150 120 120 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
DALDALE GHIGH 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
GALAIYA 100 DHANUSHA AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
LI TARA 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
MARUWAHI 100 DHANUSHA AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
PAIN BI BI 100 DHANUSHA AC 94 75 94 75 75 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
SINUJODA 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
TOTAL of FIWUD > DHANUSHA > NEW 8 938 750 938 750 750 0 0 0 0

FIWUD>DHANUSHA>REHABILITATION
AGANGIR 100 DHANUSHA AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
AMARI 100 DHANUSHA AC 250 200 250 200 200 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
AUMARA 100 DHANUSHA AC 28 22 28 22 22 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
BACHARAJA 100 DHANUSHA AC 156 125 156 125 125 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
BAGDI MOGALIYA 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
BAIGAPIPARADI 100 DHANUSHA AC 94 75 94 75 75 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
BAKCHURA 100 DHANUSHA AC 94 75 94 75 75 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
BANGUHAI 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
BASAHI 100 DHANUSHA AC 13 10 13 10 10 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
BIDHI 100 DHANUSHA AC 625 500 625 500 500 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
BIRTA KULO 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
BU JA NADI 100 DHANUSHA AC 156 125 156 125 125 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
CHAUBAHI 100 DHANUSHA AC 94 75 94 75 75 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER

57
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
DA BARI 100 DHANUSHA AC 13 10 13 10 10 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
DHADAR KULO 100 DHANUSHA AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
DUCHAMATI 100 DHANUSHA AC 250 200 250 200 200 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
GAGATIYA BANDH 100 DHANUSHA AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
GAGDAR KHOLA 100 DHANUSHA AC 94 75 94 75 75 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
GANESHPUR 100 DHANUSHA AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
JALLAD 100 DHANUSHA AC 313 250 313 250 250 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
JHOJHHI KATAIYA 100 DHANUSHA AC 69 55 69 55 55 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
KAGI BANDH 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
KAMALA SAWNPUR 100 DHANUSHA AC 106 85 106 85 85 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
LOHAN 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
LOHARA KHOLA 100 DHANUSHA AC 88 70 88 70 70 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
MADHUBASA 100 DHANUSHA AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
MAGALHAIYA 100 DHANUSHA AC 94 75 94 75 75 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
MECHI KULO 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
MITHILAYSHWAR 100 DHANUSHA AC 313 250 313 250 250 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
PUJAGARI 100 DHANUSHA AC 10 8 10 8 8 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
PURANO JALLADHA 100 DHANUSHA AC 313 250 313 250 250 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
SATOKHAR 100 DHANUSHA AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
SIDHIPAI 100 DHANUSHA AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
SILAMI 100 DHANUSHA AC 25 20 25 20 20 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
SIMA 100 DHANUSHA AC 15 12 15 12 12 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
SUGRAHAI 100 DHANUSHA AC 16 13 16 13 13 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
THUMCHUNA 100 DHANUSHA AC 156 125 156 125 125 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
TILCHO 100 DHANUSHA AC 94 75 94 75 75 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
VAS KHOLA 100 DHANUSHA AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
VUGALIYA 100 DHANUSHA AC 94 75 94 75 75 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
TOTAL of FIWUD > DHANUSHA > REHABILITATION 40 5389 4305 5389 4305 4305 0 0 0 0

TOTAL of DHANUSHA District 48 6327 5055 6327 5055 5055 0 0 0 0

FIWUD>MAHOTTARI>NEW
JUDO 100 MAHOTTARI AC 113 90 113 90 90 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
TOTAL of FIWUD > MAHOTTARI > NEW 1 113 90 113 90 90 0 0 0 0

TOTAL of MAHOTTARI District 1 113 90 113 90 90 0 0 0 0

FIWUD>PARSA>NEW
ANARA 100 PARSA AC 10 8 10 8 8 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
TOTAL of FIWUD > PARSA > NEW 1 10 8 10 8 8 0 0 0 0

TOTAL of PARSA District 1 10 8 10 8 8 0 0 0 0

FIWUD>RAUTAHAT>NEW
LAL BAKIA 100 RAUTAHAT AC 3125 2500 3125 2500 2500 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
TOTAL of FIWUD > RAUTAHAT > NEW 1 3125 2500 3125 2500 2500 0 0 0 0

58
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

TOTAL of RAUTAHAT District 1 3125 2500 3125 2500 2500 0 0 0 0

TOTAL of CENTRAL > Terai 62 11715 9363 11715 9363 9363 0 0 0 0

FIWUD>BHAKTAPUR>NEW
DHUNGE KHOLA 100 BHAKTAPUR AC 4 3 4 3 3 0 0 0 0 FIWUD NO GoN 9 BAGMATI
NARAYANTHALI 100 BHAKTAPUR AC 38 30 38 30 30 0 0 0 0 FIWUD NO GoN 9 BAGMATI
TOTAL of FIWUD > BHAKTAPUR > NEW 2 42 33 42 33 33 0 0 0 0

TOTAL of BHAKTAPUR District 2 42 33 42 33 33 0 0 0 0

FIWUD>DHADING>REHABILITATION
TABAL BESI 100 DHADING AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 3 GANDAK
TOTAL of FIWUD > DHADING > REHABILITATION 1 125 100 125 100 100 0 0 0 0

TOTAL of DHADING District 1 125 100 125 100 100 0 0 0 0

FIWUD>KATHMANDU>NEW
BAGMATI 100 KATHMANDU AC 313 250 313 250 250 0 0 0 0 FIWUD NO GoN 9 BAGMATI
TOTAL of FIWUD > KATHMANDU > NEW 1 313 250 313 250 250 0 0 0 0

TOTAL of KATHMANDU District 1 313 250 313 250 250 0 0 0 0

FIWUD>KAVRE>NEW
BALTHALI 100 KAVRE AC 69 55 69 55 55 0 0 0 0 FIWUD NO GoN 4 KOSHI
BHYAGURE KHOLA 100 KAVRE AC 100 80 100 80 80 0 0 0 0 FIWUD NO GoN 4 KOSHI
TOTAL of FIWUD > KAVRE > NEW 2 169 135 169 135 135 0 0 0 0

TOTAL of KAVRE District 2 169 135 169 135 135 0 0 0 0

FIWUD>NUWAKOT>NEW
BETINI KHOLA 100 NUWAKOT AC 88 70 88 70 70 0 0 0 0 FIWUD NO GoN 3 GANDAK
BHANJYANG BHURUNG 100 NUWAKOT AC 88 70 88 70 70 0 0 0 0 FIWUD NO GoN 3 GANDAK
CHHUPANG KHOLA 100 NUWAKOT AC 313 250 313 250 250 0 0 0 0 FIWUD NO GoN 3 GANDAK
CHHYANG KHOLA 100 NUWAKOT AC 250 200 250 200 200 0 0 0 0 FIWUD NO GoN 3 GANDAK
DUICHHANGE 100 NUWAKOT AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 3 GANDAK
GOMATI KHOLA 100 NUWAKOT AC 38 30 38 30 30 0 0 0 0 FIWUD NO GoN 3 GANDAK
MAJHUWA 100 NUWAKOT AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 3 GANDAK
TOTAL of FIWUD > NUWAKOT > NEW 7 1153 920 1153 920 920 0 0 0 0

TOTAL of NUWAKOT District 7 1153 920 1153 920 920 0 0 0 0

FIWUD>RAMECHAP>NEW
BHATAULI KHOLA 100 RAMECHAP AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 4 KOSHI
BIRE KHOLA 100 RAMECHAP AC 3 2 3 2 2 0 0 0 0 FIWUD NO GoN 4 KOSHI

59
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
BOHORA KHOLA 100 RAMECHAP AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 4 KOSHI
HALUWA KHOLA 100 RAMECHAP AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 4 KOSHI
JUNGA GHORANG 100 RAMECHAP AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 4 KOSHI
KARARE KHOLA 100 RAMECHAP AC 25 20 25 20 20 0 0 0 0 FIWUD NO GoN 4 KOSHI
KARKI TAR 100 RAMECHAP AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 4 KOSHI
MAJUWA 100 RAMECHAP AC 3 2 3 2 2 0 0 0 0 FIWUD NO GoN 4 KOSHI
WALING KHOLA 100 RAMECHAP AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 4 KOSHI
TOTAL of FIWUD > RAMECHAP > NEW 9 531 424 531 424 424 0 0 0 0

FIWUD>RAMECHAP>REHABILITATION
BABIYA KHARKA 100 RAMECHAP AC 1 1 1 1 1 0 0 0 0 FIWUD NO GoN 4 KOSHI
BATHARE KHOLA 100 RAMECHAP AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 4 KOSHI
BHYAGURE KHOLA 100 RAMECHAP AC 29 23 29 23 23 0 0 0 0 FIWUD NO GoN 4 KOSHI
UTISE 100 RAMECHAP AC 6 5 6 5 5 0 0 0 0 FIWUD NO GoN 4 KOSHI
TOTAL of FIWUD > RAMECHAP > REHABILITATION 4 67 54 67 54 54 0 0 0 0

TOTAL of RAMECHAP District 13 598 478 598 478 478 0 0 0 0

FIWUD>SINDHULI>NEW
ANDHERI KHOLA 100 SINDHULI AC 206 165 206 165 165 0 0 0 0 FIWUD NO GoN 9 BAGMATI
BARAHA PALASE 100 SINDHULI AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 9 BAGMATI
DHAMI DUMARIA 100 SINDHULI AC 49 39 49 39 39 0 0 0 0 FIWUD NO GoN 9 BAGMATI
THULO KHOLA 100 SINDHULI AC 75 60 75 60 60 0 0 0 0 FIWUD NO GoN 9 BAGMATI
TOTAL of FIWUD > SINDHULI > NEW 4 518 414 518 414 414 0 0 0 0

FIWUD>SINDHULI>REHABILITATION
BARDEU TAR 100 SINDHULI AC 8 6 8 6 6 0 0 0 0 FIWUD NO GoN 9 BAGMATI
BATONIGALE 100 SINDHULI AC 19 15 19 15 15 0 0 0 0 FIWUD NO GoN 9 BAGMATI
CHAURAHI KHOLA 100 SINDHULI AC 43 34 43 34 34 0 0 0 0 FIWUD NO GoN 9 BAGMATI
GAIRI KHET 100 SINDHULI AC 13 10 13 10 10 0 0 0 0 FIWUD NO GoN 9 BAGMATI
KAMALA 100 SINDHULI AC 49 39 49 39 39 0 0 0 0 FIWUD NO GoN 9 BAGMATI
KHAT TAR 100 SINDHULI AC 20 16 20 16 16 0 0 0 0 FIWUD NO GoN 9 BAGMATI
KHOPI KHARA 100 SINDHULI AC 24 19 24 19 19 0 0 0 0 FIWUD NO GoN 9 BAGMATI
KHURKOT 100 SINDHULI AC 96 77 96 77 77 0 0 0 0 FIWUD NO GoN 9 BAGMATI
LAMU KULO 100 SINDHULI AC 10 8 10 8 8 0 0 0 0 FIWUD NO GoN 9 BAGMATI
NIGALE 100 SINDHULI AC 3 2 3 2 2 0 0 0 0 FIWUD NO GoN 9 BAGMATI
POKHARI KHET 100 SINDHULI AC 6 5 6 5 5 0 0 0 0 FIWUD NO GoN 9 BAGMATI
SINDHULI 100 SINDHULI AC 6 5 6 5 5 0 0 0 0 FIWUD NO GoN 9 BAGMATI
TOTAL of FIWUD > SINDHULI > REHABILITATION 12 297 236 297 236 236 0 0 0 0

TOTAL of SINDHULI District 16 815 650 815 650 650 0 0 0 0

TOTAL of CENTRAL > Hill 42 3215 2566 3215 2566 2566 0 0 0 0

FIWUD>DOLAKHA>REHABILITATION
DOLTI KHOLA 100 DOLAKHA AC 25 20 25 20 20 0 0 0 0 FIWUD NO GoN 4 KOSHI

60
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of FIWUD > DOLAKHA > REHABILITATION 1 25 20 25 20 20 0 0 0 0

TOTAL of DOLAKHA District 1 25 20 25 20 20 0 0 0 0

FIWUD>RASUWA>NEW
PHALAKHU KHOLA 100 RASUWA AC 38 30 38 30 30 0 0 0 0 FIWUD NO GoN 3 GANDAK
TOTAL of FIWUD > RASUWA > NEW 1 38 30 38 30 30 0 0 0 0

TOTAL of RASUWA District 1 38 30 38 30 30 0 0 0 0

TOTAL of CENTRAL > Mountain 2 63 50 63 50 50 0 0 0 0

FIWUD>SINDHUPALCHOWK>NEW
HOSTE KHOLA 100 SINDHUPALCHOWK AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 4 KOSHI
TOTAL of FIWUD > SINDHUPALCHOWK > NEW 1 125 100 125 100 100 0 0 0 0

TOTAL of SINDHUPALCHOWK District 1 125 100 125 100 100 0 0 0 0

TOTAL of CENTRAL > Hill 1 125 100 125 100 100 0 0 0 0

TOTAL of CENTRAL Region 107 15118 12079 15118 12079 12079 0 0 0 0

FIWUD>KAPILVASTU>REHABILITATION
MAURMA(150 HA) 100 KAPILVASTU AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 12 SIWALIK RIVER
TOTAL of FIWUD > KAPILVASTU > REHABILITATION 1 188 150 188 150 150 0 0 0 0

TOTAL of KAPILVASTU District 1 188 150 188 150 150 0 0 0 0

FIWUD>NAWALPARASI>NEW
MISRAULI BHALUWA 100 NAWALPARASI AC 125 100 125 100 100 0 0 0 0 FIWUD NO GoN 3 GANDAK
TOTAL of FIWUD > NAWALPARASI > NEW 1 125 100 125 100 100 0 0 0 0

TOTAL of NAWALPARASI District 1 125 100 125 100 100 0 0 0 0

FIWUD>RUPANDEHI>REHABILITATION
HAGANI KHOLA 100 RUPANDEHI AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 8 TINAU
MUDIYARI KHOLA 100 RUPANDEHI AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 8 TINAU
SOTA JHARANA 100 RUPANDEHI AC 150 120 150 120 120 0 0 0 0 FIWUD NO GoN 8 TINAU
TOTAL of FIWUD > RUPANDEHI > REHABILITATION 3 276 220 276 220 220 0 0 0 0

TOTAL of RUPANDEHI District 3 276 220 276 220 220 0 0 0 0

TOTAL of WESTERN>Terai 5 589 470 589 470 470 0 0 0 0

FIWUD>ARGHAKHANCHI>REHABILITATION
CHORIKA SOLATRA 100 ARGHAKHANCHI AC 10 8 10 8 8 0 0 0 0 FIWUD NO GoN 6 WEST RAPTI

61
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
MANDRE KHOLA 100 ARGHAKHANCHI AC 94 75 94 75 75 0 0 0 0 FIWUD NO GoN 6 WEST RAPTI
SICHKHOK 100 ARGHAKHANCHI AC 29 23 29 23 23 0 0 0 0 FIWUD NO GoN 6 WEST RAPTI
TOTAL of FIWUD > ARGHAKHANCHI > REHABILITATION 3 133 106 133 106 106 0 0 0 0

TOTAL of ARGHAKHANCHI District 3 133 106 133 106 106 0 0 0 0

FIWUD>BAGLUNG>NEW
GHUDI KHOLA 100 BAGLUNG AC 75 60 75 60 60 0 0 0 0 FIWUD NO GoN 3 GANDAK
TOTAL of FIWUD > BAGLUNG > NEW 1 75 60 75 60 60 0 0 0 0

FIWUD>BAGLUNG>REHABILITATION
DHAPA KHOLA 100 BAGLUNG AC 81 65 81 65 65 0 0 0 0 FIWUD NO GoN 3 GANDAK
LUBHUWA KHOLA 100 BAGLUNG AC 25 20 25 20 20 0 0 0 0 FIWUD NO GoN 3 GANDAK
TOTAL of FIWUD > BAGLUNG > REHABILITATION 2 106 85 106 85 85 0 0 0 0

TOTAL of BAGLUNG District 3 181 145 181 145 145 0 0 0 0

FIWUD>GULMI>NEW
HILE KHOLA 100 GULMI AC 55 44 55 44 44 0 0 0 0 FIWUD NO GoN 3 GANDAK
TOTAL of FIWUD > GULMI > NEW 1 55 44 55 44 44 0 0 0 0

TOTAL of GULMI District 1 55 44 55 44 44 0 0 0 0

FIWUD>MYAGDI>NEW
PHAURE KHOLA 100 MYAGDI AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 3 GANDAK
TOTAL of FIWUD > MYAGDI > NEW 1 31 25 31 25 25 0 0 0 0

FIWUD>MYAGDI>REHABILITATION
NILDAHA 100 MYAGDI AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 3 GANDAK
THULO KHOLA 100 MYAGDI AC 156 125 156 125 125 0 0 0 0 FIWUD NO GoN 3 GANDAK
TOTAL of FIWUD > MYAGDI > REHABILITATION 2 187 150 187 150 150 0 0 0 0

TOTAL of MYAGDI District 3 218 175 218 175 175 0 0 0 0

FIWUD>PALPA>NEW
GALCHA PHANT 100 PALPA AC 13 10 13 10 10 0 0 0 0 FIWUD NO GoN 3 GANDAK
GIJAN CHOUR PANCHE 100 PALPA AC 5 4 5 4 4 0 0 0 0 FIWUD NO GoN 3 GANDAK
TOTAL of FIWUD > PALPA > NEW 2 18 14 18 14 14 0 0 0 0

FIWUD>PALPA>REHABILITATION
SERA DANDA 100 PALPA AC 19 15 19 15 15 0 0 0 0 FIWUD NO GoN 3 GANDAK
TOTAL of FIWUD > PALPA > REHABILITATION 1 19 15 19 15 15 0 0 0 0

TOTAL of PALPA District 3 37 29 37 29 29 0 0 0 0

62
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
FIWUD>PARBAT>NEW
BARAUTE-SYAL 100 PARBAT AC 25 20 25 20 20 0 0 0 0 FIWUD NO GoN 3 GANDAK
GADE KHOLA 100 PARBAT AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 3 GANDAK
KHANDULA 100 PARBAT AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 3 GANDAK
SIRU BARI 100 PARBAT AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 3 GANDAK
TOTAL of FIWUD > PARBAT > NEW 4 150 120 150 120 120 0 0 0 0

FIWUD>PARBAT>REHABILITATION
ARTHAR DANDAKHARK 100 PARBAT AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 3 GANDAK
CHINNE KHOLA 100 PARBAT AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 3 GANDAK
DHAIRING LOUGDI 100 PARBAT AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 3 GANDAK
GAHARE KHOLA 100 PARBAT AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 3 GANDAK
JHARUWA 100 PARBAT AC 25 20 25 20 20 0 0 0 0 FIWUD NO GoN 3 GANDAK
JHYAPLE KHOLA 100 PARBAT AC 10 8 10 8 8 0 0 0 0 FIWUD NO GoN 3 GANDAK
LASTI KHOLA 100 PARBAT AC 56 45 56 45 45 0 0 0 0 FIWUD NO GoN 3 GANDAK
SUNDARE KHOLA 100 PARBAT AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 3 GANDAK
KHAHARE KHOLA 100 PARBAT AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 3 GANDAK
RAYOU 100 PARBAT AC 63 50 63 50 50 0 0 0 0 FIWUD NO GoN 3 GANDAK
TOTAL of FIWUD > PARBAT > REHABILITATION 10 372 298 372 298 298 0 0 0 0

TOTAL of PARBAT District 14 522 418 522 418 418 0 0 0 0

TOTAL of WESTERN> Hill 27 1146 917 1146 917 917 0 0 0 0

TOTAL of WESTERN Region 32 1735 1387 1735 1387 1387 0 0 0 0

FIWUD>BANKE>REHABILITATION
NIBUWA CHAPPARGADI 100 BANKE AC 75 60 75 60 60 0 0 0 0 FIWUD NO GoN 6 WEST RAPTI
TOTAL of FIWUD > BANKE > REHABILITATION 1 75 60 75 60 60 0 0 0 0

TOTAL of BANKE District 1 75 60 75 60 60 0 0 0 0

TOTAL ofMID-WESTERN> Terai 1 75 60 75 60 60 0 0 0 0

FIWUD>JAJARKOT>NEW
CHOKHA 100 JAJARKOT AC 19 15 19 15 15 0 0 0 0 FIWUD NO GoN 2 KARNALI
MATELA 100 JAJARKOT AC 50 40 50 40 40 0 0 0 0 FIWUD NO GoN 2 KARNALI
NABALGAR 100 JAJARKOT AC 75 60 75 60 60 0 0 0 0 FIWUD NO GoN 2 KARNALI
TAL CHHAHARA 100 JAJARKOT AC 44 35 44 35 35 0 0 0 0 FIWUD NO GoN 2 KARNALI
TOTAL of FIWUD > JAJARKOT > NEW 4 188 150 188 150 150 0 0 0 0

TOTAL of JAJARKOT District 4 188 150 188 150 150 0 0 0 0

FIWUD>ROLPA>REHABILITATION
JAWAL KHOLA 100 ROLPA AC 75 60 75 60 60 0 0 0 0 FIWUD NO GoN 6 WEST RAPTI
TOTAL of FIWUD > ROLPA > REHABILITATION 1 75 60 75 60 60 0 0 0 0

63
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

TOTAL of ROLPA District 1 75 60 75 60 60 0 0 0 0

FIWUD>RUKUM>NEW
CHANDRIWANG 100 RUKUM AC 19 15 19 15 15 0 0 0 0 FIWUD NO GoN 2 KARNALI
TOTAL of FIWUD > RUKUM > NEW 1 19 15 19 15 15 0 0 0 0

FIWUD>RUKUM>REHABILITATION
RIJEGAD 100 RUKUM AC 50 40 50 40 40 0 0 0 0 FIWUD NO GoN 2 KARNALI
TOTAL of FIWUD > RUKUM > REHABILITATION 1 50 40 50 40 40 0 0 0 0

TOTAL of RUKUM District 2 69 55 69 55 55 0 0 0 0

FIWUD>SALYAN>REHABILITATION
GOTH KHOLA 100 SALYAN AC 48 38 48 38 38 0 0 0 0 FIWUD NO GoN 5 BABAI
PHARULA CHAUR 100 SALYAN AC 54 43 54 43 43 0 0 0 0 FIWUD NO GoN 5 BABAI
TOTAL of FIWUD > SALYAN > REHABILITATION 2 102 81 102 81 81 0 0 0 0

TOTAL of SALYAN District 2 102 81 102 81 81 0 0 0 0

TOTAL of MID-WESTERN> Hill 9 434 346 434 346 346 0 0 0 0

FIWUD>DOLPA>NEW
SHANTI CHHETRA HORTI 100 DOLPA AC 9 7 9 7 7 0 0 0 0 FIWUD NO GoN 6 WEST RAPTI
TOTAL of FIWUD > DOLPA > NEW 1 9 7 9 7 7 0 0 0 0

TOTAL of DOLPA District 1 9 7 9 7 7 0 0 0 0

FIWUD>KALIKOT>REHABILITATION
CHHATI 100 KALIKOT AC 194 155 194 155 155 0 0 0 0 FIWUD NO GoN 2 KARNALI
KHOLA KHARKA 100 KALIKOT AC 625 500 625 500 500 0 0 0 0 FIWUD NO GoN 2 KARNALI
TOTAL of FIWUD > KALIKOT > REHABILITATION 2 819 655 819 655 655 0 0 0 0

TOTAL of KALIKOT District 2 819 655 819 655 655 0 0 0 0

TOTAL of MID-WESTERN> Mountain 3 828 662 828 662 662 0 0 0 0

TOTAL of MID-WESTERN Region 13 1337 1068 1337 1068 1068 0 0 0 0

FIWUD>KAILALI>REHABILITATION
KULDIYO 100 KAILALI AC 156 125 156 125 125 0 0 0 0 FIWUD NO GoN 2 KARNALI
PRATAPPUR CHAWRAHI 100 KAILALI AC 156 125 156 125 125 0 0 0 0 FIWUD NO GoN 2 KARNALI
TOTAL of FIWUD > KAILALI > REHABILITATION 2 312 250 312 250 250 0 0 0 0

TOTAL of KAILALI District 2 312 250 312 250 250 0 0 0 0

64
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of FAR-WESTERN> Terai 2 312 250 312 250 250 0 0 0 0

FIWUD>ACHHAM>REHABILITATION
DARTA 100 ACHHAM AC 38 30 38 30 30 0 0 0 0 FIWUD NO GoN 2 KARNALI
TAUSI 100 ACHHAM AC 123 98 123 98 98 0 0 0 0 FIWUD NO GoN 2 KARNALI
TOTAL of FIWUD > ACHHAM > REHABILITATION 2 161 128 161 128 128 0 0 0 0

TOTAL of ACHHAM District 2 161 128 161 128 128 0 0 0 0

FIWUD>BAITADI>REHABILITATION
BANGAMLA 100 BAITADI AC 188 150 188 150 150 0 0 0 0 FIWUD NO GoN 1 MAHAKALI
DADELA 100 BAITADI AC 75 60 75 60 60 0 0 0 0 FIWUD NO GoN 1 MAHAKALI
TOTAL of FIWUD > BAITADI > REHABILITATION 2 263 210 263 210 210 0 0 0 0

TOTAL of BAITADI District 2 263 210 263 210 210 0 0 0 0

FIWUD>DOTI>REHABILITATION
BALASEN 100 DOTI AC 1 1 1 1 1 0 0 0 0 FIWUD NO GoN 2 KARNALI
BHAGETADA & MUDETH 100 DOTI AC 6 5 6 5 5 0 0 0 0 FIWUD NO GoN 2 KARNALI
CHINITUYANI 100 DOTI AC 38 30 38 30 30 0 0 0 0 FIWUD NO GoN 2 KARNALI
GANDI GAD 100 DOTI AC 13 10 13 10 10 0 0 0 0 FIWUD NO GoN 2 KARNALI
GHOL TADA 100 DOTI AC 50 40 50 40 40 0 0 0 0 FIWUD NO GoN 2 KARNALI
JHINGABASTI 100 DOTI AC 50 40 50 40 40 0 0 0 0 FIWUD NO GoN 2 KARNALI
KALAGAD 100 DOTI AC 13 10 13 10 10 0 0 0 0 FIWUD NO GoN 2 KARNALI
KOTI GAON 100 DOTI AC 19 15 19 15 15 0 0 0 0 FIWUD NO GoN 2 KARNALI
LAMONTE 100 DOTI AC 25 20 25 20 20 0 0 0 0 FIWUD NO GoN 2 KARNALI
PUNNA 100 DOTI AC 38 30 38 30 30 0 0 0 0 FIWUD NO GoN 2 KARNALI
SAMAR KHAL 100 100 DOTI AC 30 24 30 24 24 0 0 0 0 FIWUD NO GoN 2 KARNALI
TIJALI 100 DOTI AC 25 20 25 20 20 0 0 0 0 FIWUD NO GoN 2 KARNALI
TOTAL of FIWUD > DOTI > REHABILITATION 12 308 245 308 245 245 0 0 0 0

TOTAL of DOTI District 12 308 245 308 245 245 0 0 0 0

TOTAL of FAR-WESTERN>Hill 16 732 583 732 583 583 0 0 0 0

FIWUD>BAJHANG>REHABILITATION
CHAINPUR 100 BAJHANG AC 31 25 31 25 25 0 0 0 0 FIWUD NO GoN 2 KARNALI
TOTAL of FIWUD > BAJHANG > REHABILITATION 1 31 25 31 25 25 0 0 0 0

TOTAL of BAJHANG District 1 31 25 31 25 25 0 0 0 0

TOTAL of FAR-WESTERN>Mountain 1 31 25 31 25 25 0 0 0 0

TOTAL of FAR-WESTERN Region 19 1075 858 1075 858 858 0 0 0 0

TOTAL of > FIWUD 197 23090 18449 23090 18449 18449 0 0 0 0

65
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

GADP>LAMJUNG>NEW
DOVANLIFT 100 LAMJUNG AC MS CAD 2 1 2 1 1 0 0 0 0 GADP NO GTZ 3 GANDAK
SWREESWARA 100 LAMJUNG AC MS ID 5 4 5 4 4 0 0 0 0 GADP NO GTZ 3 GANDAK
TAKSAR HEAD REG 100 LAMJUNG AC MS ID 50 40 50 40 40 0 0 0 0 GADP NO GTZ 3 GANDAK
PHIRDI LIFT 100 LAMJUNG AC MS ED 62 50 62 50 50 0 0 0 0 GADP NO GTZ 3 GANDAK
TOTAL of GADP > LAMJUNG > NEW 4 119 95 119 95 95 0 0 0 0

TOTAL of LAMJUNG District 4 119 95 119 95 95 0 0 0 0

GADP>SYANGJA>NEW
KARED DANDA 100 SYANGJA AC MS ID 19 15 19 15 15 0 0 0 0 GADP NO GTZ 3 GANDAK
TOTAL of GADP > SYANGJA > NEW 1 19 15 19 15 15 0 0 0 0

TOTAL of SYANGJA District 1 19 15 19 15 15 0 0 0 0

GADP>TANAHU>REHABILITATION
BAISJAGAR 100 TANAHU AC MS ID 12 10 12 10 10 0 0 0 0 GADP NO GTZ 3 GANDAK
TOTAL of GADP > TANAHU > REHABILITATION 1 12 10 12 10 10 0 0 0 0

TOTAL of TANAHU District 1 12 10 12 10 10 0 0 0 0

TOTAL of WESTERN>Hill 6 150 120 150 120 120 0 0 0 0

TOTAL of WESTERN Region 6 150 120 150 120 120 0 0 0 0

TOTAL of GADP 6 150 120 150 120 120 0 0 0 0

GTZ>DHADING>NEW
KARKI DADA 100 DHADING AC 231 185 231 185 185 0 0 0 0 GTZ NO GTZ 3 GANDAK
TOTAL of GTZ > DHADING > NEW 1 231 185 231 185 185 0 0 0 0

TOTAL of DHADING District 1 231 185 231 185 185 0 0 0 0

TOTAL of CENTRAL >Hill 1 231 185 231 185 185 0 0 0 0

TOTAL of CENTRAL Region 1 231 185 231 185 185 0 0 0 0

TOTAL of > GTZ 1 231 185 231 185 185 0 0 0 0

HFP>GORKHA>REHABILITATION
ANDHERI KHOLA 100 GORKHA AC YR 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAK
BENI KHOLA 100 GORKHA AC ED 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAK
BLANG KHOLA 100 GORKHA AC 16 13 16 13 13 0 0 0 0 HFP NO IDA 3 GANDAK
DARAUDI KHOLA 100 GORKHA AC YR 13 10 13 10 10 0 0 0 0 HFP NO IDA 3 GANDAK
DHAKDE KHOLA 100 GORKHA AC YR 144 115 144 115 115 0 0 0 0 HFP NO IDA 3 GANDAK

66
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
MULAPENG KHOLA 100 GORKHA AC YR 13 10 13 10 10 0 0 0 0 HFP NO IDA 3 GANDAK
RAUDI KHOLA 100 GORKHA AC YR 25 20 25 20 20 0 0 0 0 HFP NO IDA 3 GANDAK
SIRDI KHOLA 100 GORKHA AC YR 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAK
TAUDI KHOLA 100 GORKHA AC MS 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAK
TOTAL of HFP > GORKHA > REHABILITATION 9 463 368 463 368 368 0 0 0 0

TOTAL of GORKHA District 9 463 368 463 368 368 0 0 0 0

HFP>LAMJUNG>REHABILITATION
BHIDIM KHOLA 100 LAMJUNG AC YR 125 100 125 100 100 0 0 0 0 HFP NO IDA 3 GANDAK
BISEDI KHOLA 100 LAMJUNG AC YR 25 20 25 20 20 0 0 0 0 HFP NO IDA 3 GANDAK
DHAD KHOLA 100 LAMJUNG AC YR 81 65 81 65 65 0 0 0 0 HFP NO IDA 3 GANDAK
DHUWA KHOLA 100 LAMJUNG AC YR 31 25 31 25 25 0 0 0 0 HFP NO IDA 3 GANDAK
JYAMITRE KHOLA 100 LAMJUNG AC YR 75 60 75 60 60 0 0 0 0 HFP NO IDA 3 GANDAK
KHAHARE KHOLA 100 LAMJUNG AC YR 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAK
KHALI MARANG 100 LAMJUNG AC YR 88 70 88 70 70 0 0 0 0 HFP NO IDA 3 GANDAK
PAUDI KHOLA 100 LAMJUNG AC YR 19 15 19 15 15 0 0 0 0 HFP NO IDA 3 GANDAK
ROPLE KHOLA 100 LAMJUNG AC YR 44 35 44 35 35 0 0 0 0 HFP NO IDA 3 GANDAK
RUMATAKO KHOLA 100 LAMJUNG AC YR 50 40 50 40 40 0 0 0 0 HFP NO IDA 3 GANDAK
SISUERI KHOLA 100 LAMJUNG AC 19 15 19 15 15 0 0 0 0 HFP NO IDA 3 GANDAK
TARDO KHOLA 100 LAMJUNG AC 23 18 23 18 18 0 0 0 0 HFP NO IDA 3 GANDAK
TOTAL of HFP > LAMJUNG > REHABILITATION 12 643 513 643 513 513 0 0 0 0

TOTAL of LAMJUNG District 12 643 513 643 513 513 0 0 0 0

HFP>SYANGJA>REHABILITATION
ANDHI KHOLA 100 SYANGJA AC YR 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAK
BATANG KHOLA 100 SYANGJA AC YR 34 27 34 27 27 0 0 0 0 HFP NO IDA 3 GANDAK
BODI KHOLA 100 SYANGJA AC 38 30 38 30 30 0 0 0 0 HFP NO IDA 3 GANDAK
CHHORE KHOLA 100 SYANGJA AC YR 50 40 50 40 40 0 0 0 0 HFP NO IDA 3 GANDAK
CHITI KHOLA 100 SYANGJA AC MS 125 100 125 100 100 0 0 0 0 HFP NO IDA 3 GANDAK
DOLCHE KHOLA 100 SYANGJA AC 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAK
GUDI KHOLA 100 SYANGJA AC YR 31 25 31 25 25 0 0 0 0 HFP NO IDA 3 GANDAK
JARE KHOLA 100 SYANGJA AC YR 38 30 38 30 30 0 0 0 0 HFP NO IDA 3 GANDAK
JYAGDI KHOLA 100 SYANGJA AC MS 88 70 88 70 70 0 0 0 0 HFP NO IDA 3 GANDAK
KEBARE KHOLA 100 SYANGJA AC 40 32 40 32 32 0 0 0 0 HFP NO IDA 3 GANDAK
LABDI KHOLA 100 SYANGJA AC 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAK
MIRDI KHOLA 100 SYANGJA AC YR 31 25 31 25 25 0 0 0 0 HFP NO IDA 3 GANDAK
MULUNG KHOLA 100 SYANGJA AC YR 38 30 38 30 30 0 0 0 0 HFP NO IDA 3 GANDAK
THULO TAL 100 SYANGJA AC 25 20 25 20 20 0 0 0 0 HFP NO IDA 3 GANDAK
TOTAL of HFP > SYANGJA > REHABILITATION 14 727 579 727 579 579 0 0 0 0

TOTAL of SYANGJA District 14 727 579 727 579 579 0 0 0 0

HFP>TANAHU>REHABILITATION
BANDE KHOLA 100 TANAHU AC YR 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAK

67
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
BYANDI KHOLA 100 TANAHU AC YR 38 30 38 30 30 0 0 0 0 HFP NO IDA 3 GANDAK
CHUNDI K (BASANTPUR) 100 TANAHU AC 63 50 63 50 50 0 0 0 0 HFP NO IDA 3 GANDAK
CHUNDI KHOLA (CHITTI) 100 TANAHU AC YR 38 30 38 30 30 0 0 0 0 HFP NO IDA 3 GANDAK
DAUDI KHOLA 100 TANAHU AC YR 38 30 38 30 30 0 0 0 0 HFP NO IDA 3 GANDAK
DHALESTI KHOLA 100 TANAHU AC 39 31 39 31 31 0 0 0 0 HFP NO IDA 3 GANDAK
KULANG KHOLA 100 TANAHU AC 38 30 38 30 30 0 0 0 0 HFP NO IDA 3 GANDAK
THASAM KANDI KHOLA 100 TANAHU AC 38 30 38 30 30 0 0 0 0 HFP NO IDA 3 GANDAK
TOTAL of HFP > TANAHU > REHABILITATION 8 355 281 355 281 281 0 0 0 0

TOTAL of TANAHU District 8 355 281 355 281 281 0 0 0 0

TOTAL of WESTERN >Hill 43 2188 1741 2188 1741 1741 0 0 0 0

TOTAL of WESTERN Region 43 2188 1741 2188 1741 1741 0 0 0 0

TOTAL of > HFP 43 2188 1741 2188 1741 1741 0 0 0 0

IDP>BANKE>REHABILITATION
PROJECT 100 BANKE PC 2004 YR ID 3035 2580 3035 2580 0 0 0 0 0 IDP NO EU 6 WEST RAPTI
TOTAL of IDP > BANKE > REHABILITATION 1 3035 2580 3035 2580 0 0 0 0 0

TOTAL of BANKE District 1 3035 2580 3035 2580 0 0 0 0 0

TOTAL of MID- WESTERN > Terai 1 3035 2580 3035 2580 0 0 0 0 0

IDP>DAILEKH>REHABILITATION
KULO 100 DAILEKH PC 2003 YR ID 82 70 82 70 0 0 0 0 0 IDP NO EU 2 KARNALI
BELPATA 100 DAILEKH PC 2003 YR ID 56 48 56 48 0 0 0 0 0 IDP NO EU 2 KARNALI
KAL BHAIRAB 100 DAILEKH PC 2003 YR ID 24 20 24 20 0 0 0 0 0 IDP NO EU 2 KARNALI
SHERI & CHUNDI KULO 100 DAILEKH PC 2003 YR ID 53 45 53 45 0 0 0 0 0 IDP NO EU 2 KARNALI
TARA CHAUR 100 DAILEKH PC 2003 YR ID 104 88 104 88 0 0 0 0 0 IDP NO EU 2 KARNALI
TOTAL of IDP > DAILEKH > REHABILITATION 5 319 271 319 271 0 0 0 0 0

TOTAL of DAILEKH District 5 319 271 319 271 0 0 0 0 0

IDP>SURKHET>REHABILITATION
BARAINCHE (GHATTE KULO) 100 SURKHET PC 2003 YR ID 120 102 120 102 0 0 0 0 0 IDP NO EU 2 KARNALI
DANG KHOLA 100 SURKHET PC 2003 YR ID 124 105 124 105 0 0 0 0 0 IDP NO EU 2 KARNALI
DULALTHAI 100 SURKHET PC 2003 YR ID 94 80 94 80 0 0 0 0 0 IDP NO EU 2 KARNALI
SALKOT 100 SURKHET PC 2003 YR ID 71 60 71 60 0 0 0 0 0 IDP NO EU 2 KARNALI
TOTAL of IDP > SURKHET > REHABILITATION 4 409 347 409 347 0 0 0 0 0

TOTAL of SURKHET District 4 409 347 409 347 0 0 0 0 0

TOTAL of MID- WESTERN > Hill 9 728 618 728 618 0 0 0 0 0

68
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
IDP>KALIKOT>REHABILITATION
BAIDUNGA 100 KALIKOT PC 2003 YR ID 94 80 94 80 0 0 0 0 0 IDP NO EU 2 KARNALI
CHILKHAYA 100 KALIKOT PC 2003 YR ID 182 155 182 155 0 0 0 0 0 IDP NO EU 2 KARNALI
DHIMNIYA 100 KALIKOT PC 2003 YR ID 88 75 88 75 0 0 0 0 0 IDP NO EU 2 KARNALI
NAGMAGAD 100 KALIKOT PC 2003 YR ID 88 75 88 75 0 0 0 0 0 IDP NO EU 2 KARNALI
THULO KULO 100 KALIKOT PC 2003 YR ID 118 100 118 100 0 0 0 0 0 IDP NO EU 2 KARNALI
TOTAL of IDP > KALIKOT > REHABILITATION 5 570 485 570 485 0 0 0 0 0

TOTAL of KALIKOT District 5 570 485 570 485 0 0 0 0 0

TOTAL of MID- WESTERN > Mountain 5 570 485 570 485 0 0 0 0 0

TOTAL of MID- WESTERN Region 15 4333 3683 4333 3683 0 0 0 0 0

TOTAL of IDP 15 4333 3683 4333 3683 0 0 0 0 0

ILC>KAPILVASTU>REHABILITATION
DOHANI 100 KAPILVASTU AC 1996 YR ID 353 300 353 300 300 0 0 0 0 ILC YES IDA 12 SIWALIK RIVER
HUDERHAWA 100 KAPILVASTU AC 1997 YR ID 412 350 412 350 0 0 0 0 0 ILC NO ADB 12 SIWALIKRIVER
JABAI SAKUNI 100 KAPILVASTU AC 1996 YR ED 823 700 823 700 700 0 0 0 0 ILC NO IDA 12 SIWALIK RIVER
JAHADI 100 KAPILVASTU AC 1996 YR ID 588 500 588 500 500 0 0 0 0 ILC YES IDA 12 SIWALIK RIVER
PHULIK 100 KAPILVASTU AC 1996 YR ED 1176 1000 1176 1000 1000 0 0 0 0 ILC NO IDA 12 SIWALIK RIVER
BHADEHAR 100 KAPILVASTU AC 1996 YR ED 1059 900 1059 900 900 0 0 0 0 ILC NO IDA 12 SIWALIK RIVER
TOTAL of ILC > KAPILVASTU > REHABILITATION 6 4411 3750 4411 3750 3400 0 0 0 0

TOTAL of KAPILVASTU District 6 4411 3750 4411 3750 3400 0 0 0 0

ILC>NAWALPARASI>REHABILITATION
DANGOR KHOLA 100 NAWALPARASI AC 1996 MS ID 125 100 125 100 100 0 0 0 0 ILC NO IDA 3 GANDAK
DANTE 100 NAWALPARASI AC 1996 MS ID 63 50 63 50 50 0 0 0 0 ILC NO IDA 3 GANDAK
DEDGAUN TAR 100 NAWALPARASI AC 1996 YR ID 265 225 265 225 225 0 0 0 0 ILC YES IDA 3 GANDAK
DUMKIBAS 100 NAWALPARASI AC 1996 YR ID 58 50 58 50 50 0 0 0 0 ILC NO IDA 3 GANDAK
JALUKE GHUMURE 100 NAWALPARASI AC 1996 MS ID 185 148 185 148 148 0 0 0 0 ILC NO IDA 3 GANDAK
MATHAR 100 NAWALPARASI AC 1991 YR ID 15 12 15 12 12 0 0 0 0 ILC NO IDA 3 GANDAK
PATAWARI 100 NAWALPARASI AC 1991 MS ID 131 105 131 105 105 0 0 0 0 ILC NO IDA 3 GANDAK
RAMUEAPUR 100 NAWALPARASI AC 1996 MS ID 123 98 123 98 98 0 0 0 0 ILC NO IDA 3 GANDAK
SUKHAURA 100 NAWALPARASI AC 1996 MS ID 75 60 75 60 60 0 0 0 0 ILC NO IDA 3 GANDAK
BHUTAHA 100 NAWALPARASI AC 1996 MS ID 63 50 63 50 50 0 0 0 0 ILC NO IDA 3 GANDAK
PUSAHA 100 NAWALPARASI AC 1996 MS ID 750 600 750 600 600 0 0 0 0 ILC NO IDA 3 GANDAK
ALHAWAL 100 NAWALPARASI AC 1996 MS ID 250 200 250 200 200 0 0 0 0 ILC NO IDA 3 GANDAK
DHURSARI 100 NAWALPARASI AC 1996 MS ID 38 30 38 30 30 0 0 0 0 ILC NO IDA 3 GANDAK
ARUN KHOLA 100 NAWALPARASI AC 1996 YR ID 250 200 250 200 200 80 0 0 0 ILC NO IDA 3 GANDAK
JAYASHREE KHOLA 100 NAWALPARASI AC 1996 YR ID 250 258 250 258 258 100 50 0 0 ILC NO IDA 3 GANDAK
TOTAL of ILC > NAWALPARASI > REHABILITATION 15 2641 2186 2641 2186 2186 180 50 0 0

TOTAL of NAWALPARASI District 15 2641 2186 2641 2186 2186 180 50 0 0

69
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

ILC>RUPANDEHI>REHABILITATION
INGURIYA 100 RUPANDEHI AC 1996 YR ID 117 100 117 100 100 0 0 0 0 ILC NO IDA 8 TINAU
LAPSI KHOLA 100 RUPANDEHI AC 1996 YR ID 250 200 250 200 200 200 0 0 0 ILC NO IDA 8 TINAU
GOTHWA BHUHKA 100 RUPANDEHI AC 1996 YR ID 500 400 500 400 400 400 0 0 0 ILC NO IDA 8 TINAU
DANDA 100 RUPANDEHI AC 1996 YR ED 1063 850 1063 850 850 175 500 0 0 ILC NO IDA 8 TINAU
TOTAL of ILC > RUPANDEHI > REHABILITATION 4 1930 1550 1930 1550 1550 775 500 0 0

TOTAL of RUPANDEHI District 4 1930 1550 1930 1550 1550 775 500 0 0

TOTAL of WESTERN > Terai 25 8982 7486 8982 7486 7136 955 550 0 0

ILC>ARGHAKHANCHI>REHABILITATION
ARCHAL 100 ARGHAKHANCHI AC 1996 YR ID 64 51 64 51 51 30 15 0 0 ILC NO IDA 6 WEST RAPTI
CHIDIKA 100 ARGHAKHANCHI AC 1996 YR ID 90 77 90 77 77 77 0 0 0 ILC NO IDA 6 WEST RAPTI
DAMJING TAR T 100 ARGHAKHANCHI AC 1996 YR ID 21 18 21 18 18 0 0 0 0 ILC YES IDA 6 WEST RAPTI
GARNAYA TARI 100 ARGHAKHANCHI AC 1996 YR ID 56 45 56 45 45 45 0 0 0 ILC NO IDA 6 WEST RAPTI
GORKHE KULO 100 ARGHAKHANCHI AC 1997 YR ID 45 38 45 38 0 0 0 0 0 ILC NO ADB 6 WEST RAPTI
GOTHIBANG 100 ARGHAKHANCHI AC 1996 YR ID 81 65 81 65 65 30 20 0 0 ILC NO IDA 6 WEST RAPTI
JALUKE 100 ARGHAKHANCHI AC 1996 YR ID 94 75 94 75 75 25 20 0 0 ILC NO IDA 6 WEST RAPTI
JARE KHOLA 100 ARGHAKHANCHI AC 1997 YR ID 26 22 26 22 0 0 0 0 0 ILC NO ADB 6 WEST RAPTI
KALLERI 100 ARGHAKHANCHI AC 1996 YR ID 89 71 89 71 71 71 0 0 0 ILC NO IDA 6 WEST RAPTI
POWER TART 100 ARGHAKHANCHI AC 1996 YR ID 76 65 76 65 65 0 0 0 0 ILC YES IDA 6 WEST RAPTI
RIGDIBALEBANG 100 ARGHAKHANCHI AC 1997 YR ID 107 91 107 91 0 0 0 0 0 ILC NO ADB 6 WEST RAPTI
SIT KHOLA 100 ARGHAKHANCHI AC 1996 YR ID 125 100 125 100 100 100 0 0 0 ILC NO IDA 6 WEST RAPTI
BAGI KHOLA 100 ARGHAKHANCHI AC 1996 YR ID 45 36 45 36 36 36 0 0 0 ILC NO IDA 6 WESTRAPTI
PHARASAWA 1100 ARGHAKHANCHI AC 1996 MS ID 19 15 19 15 15 0 0 0 0 ILC NO IDA 6 WESTRAPTI
DURGA PHANT 100 ARGHAKHANCHI AC 1996 YR ID 94 75 94 75 75 75 0 0 0 ILC NO IDA 6 WESTRAPTI
PHUDABANG 100 ARGHAKHANCHI AC 1996 YR ID 75 60 75 60 60 35 18 0 0 ILC NO IDA 6 WESTRAPTI
HARISINGKHOR 100 ARGHAKHANCHI PC 1996 YR ID 25 20 25 20 20 10 0 0 0 ILC NO IDA 6 WESTRAPTI
TOTAL of ILC > ARGHAKHANCHI > REHABILITATION 17 1132 924 1132 924 773 534 73 0 0

TOTAL of ARGHAKHANCHI District 17 1132 924 1132 924 773 534 73 0 0

ILC>GORKHA>REHABILITATION
AARU TAR 100 GORKHA AC 1996 YR ID 118 100 118 100 100 0 0 0 0 ILC YES IDA 3 GANDAK
ANP TARI 100 GORKHA AC 1996 YR ID 19 15 19 15 15 10 5 0 0 ILC NO IDA 3 GANDAK
APRIK BHOGTENI 100 GORKHA AC 1996 YR ID 75 60 75 60 60 35 15 0 0 ILC NO IDA 3 GANDAK
BANGHARI 100 GORKHA AC 1996 YR ID 5 4 5 4 4 4 0 0 0 ILC NO IDA 3 GANDAK
BASPUR TAR 100 GORKHA AC 1991 YR ID 50 40 50 40 40 40 40 0 0 ILC NO IDA 3 GANDAK
BHIMSEN KULO 100 GORKHA AC 1996 YR ID 88 75 88 75 75 0 0 0 0 ILC YES IDA 3 GANDAK
BIRTA KHOLA 100 GORKHA AC 1996 YR ID 71 60 71 60 60 0 0 0 0 ILC NO IDA 3 GANDAK
BUDDHI KULO 100 GORKHA AC 1996 YR ID 194 165 194 165 165 0 0 0 0 ILC NO IDA 3 GANDAK
CHHEPE TAR 100 GORKHA AC 1996 YR ID 71 60 71 60 60 0 0 0 0 ILC YES IDA 3 GANDAK
CHORKATE TAR 100 GORKHA AC 1996 YR ID 130 110 130 110 130 130 0 0 0 ILC NO IDA 3 GANDAK
DHUNDURE 100 GORKHA AC 1996 YR ID 59 50 59 50 50 0 0 0 0 ILC NO IDA 3 GANDAK

70
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
DRABYA SHAH KULO 100 GORKHA AC 1992 YR ID 31 25 31 25 25 5 0 0 0 ILC NO IDA 3 GANDAK
KHAR KHOLA 100 GORKHA AC 1996 MS ID 63 50 63 50 50 45 0 0 0 ILC NO IDA 3 GANDAK
MUGE PHANT 100 GORKHA AC 1996 YR ID 19 15 19 15 15 15 5 0 0 ILC NO IDA 3 GANDAK
NIMEL PHANT 100 GORKHA AC 1991 YR ID 94 75 94 75 75 60 0 0 0 ILC NO IDA 3 GANDAK
PAM KHOLA 100 GORKHA AC 1991 YR ID 78 62 78 62 60 60 0 0 0 ILC NO IDA 3 GANDAK
PASUPATI TAR 100 GORKHA AC 1996 MS ID 33 26 33 26 26 0 0 0 0 ILC NO IDA 3 GANDAK
POKHARA TAR 100 GORKHA AC 1996 YR ID 88 75 88 75 75 75 0 0 0 ILC NO IDA 3 GANDAK
RUDUM PHALIM 100 GORKHA AC 1996 YR ID 31 25 31 25 25 5 0 0 0 ILC NO IDA 3 GANDAK
KAL TARI 100 GORKHA AC 1996 YR ID 70 60 70 60 60 0 0 0 0 ILC NO IDA 3 GANDAK
THAPA TAR 100 GORKHA AC 1996 MS ID 55 44 55 44 44 0 0 0 0 ILC NO IDA 3 GANDAK
JAU BARI 100 GORKHA AC 1996 YR ID 63 50 63 50 30 30 15 0 0 ILC NO IDA 3 GANDAK
RAMCHEDIHI TAR 100 GORKHA AC 1996 YR ID 81 65 81 65 65 40 20 0 0 ILC NO IDA 3 GANDAK
CHHOTE TAR 100 GORKHA AC 1997 YR ID 35 30 35 30 0 0 0 0 0 ILC NO ADB 3 GANDAK
TOTAL of ILC > GORKHA > REHABILITATION 24 1621 1341 1621 1341 1309 554 100 0 0

TOTAL of GORKHA District 24 1621 1341 1621 1341 1309 554 100 0 0

ILC>GULMI>REHABILITATION
ARBENI 100 GULMI AC 1996 YR ID 71 57 71 57 57 30 15 0 0 ILC NO IDA 3 GANDAK
CHHALDI 100 GULMI AC 1996 YR ID 35 30 35 30 30 0 0 0 0 ILC YES IDA 3 GANDAK
DAMAI GHAT 100 GULMI AC 1997 YR ID 45 38 45 38 0 0 0 0 0 ILC NO ADB 3 GANDAK
JAMUNE TARI 100 GULMI AC 1996 YR ID 19 15 19 15 15 15 0 0 0 ILC NO IDA 3 GANDAK
JHERDI KHOLA 100 GULMI AC 1996 YR ID 63 50 63 50 50 30 0 0 0 ILC NO IDA 3 GANDAK
LASAHA 100 GULMI AC 1996 YR ID 25 22 25 22 22 0 0 0 0 ILC NO IDA 3 GANDAK
NINTHARA 100 GULMI AC 1996 YR ID 9 7 9 7 7 25 0 0 0 ILC NO IDA 3 GANDAK
RUPAKOT 100 GULMI AC 1996 MS ID 75 60 75 60 60 6 0 0 0 ILC NO IDA 3 GANDAK
TARDI KHOLA 100 GULMI AC 1996 YR ID 75 60 75 60 60 30 0 0 0 ILC NO IDA 3 GANDAK
TURANG 100 GULMI AC 1997 YR ID 106 90 106 90 0 0 0 0 0 ILC NO ADB 3 GANDAK
MISIKOT 100 GULMI AC 1996 YR ID 29 25 29 25 25 0 0 0 0 ILC NO ADB 3 GANDAK
CHILLI DAMAI 100 GULMI AC 1996 MS ID 69 55 69 55 55 0 0 0 0 ILC NO IDA 3 GANDAK
DHUMKA PHANT 100 GULMI AC 1996 YR ID 125 100 125 100 100 60 30 0 0 ILC NO IDA 3 GANDAK
BESIKA CHAUR 100 GULMI AC 1996 MS ID 33 26 33 26 26 0 0 0 0 ILC NO IDA 3 GANDAK
SOTA PHANT 100 GULMI AC 1996 YR ID 44 35 44 35 35 18 10 0 0 ILC NO IDA 3 GANDAK
GAN TARI 100 GULMI AC 1996 YR ID 38 31 38 31 25 10 0 7 5 ILC NO IDA 3 GANDAK
BUWA PHANT 100 GULMI AC 1996 YR ID 31 25 31 25 25 25 12 0 0 ILC NO IDA 3 GANDAK
TOTAL of ILC > GULMI > REHABILITATION 17 892 726 892 726 592 249 67 7 5

TOTAL of GULMI District 17 892 726 892 726 592 249 67 7 5

ILC>KASKI>REHABILITATION
BHAIMAL PHANT 100 KASKI AC 1997 YR ID 173 147 173 147 0 0 0 0 0 ILC NO ADB 3 GANDAK
CHIMRO PHANT 100 KASKI AC 1993 YR ID 75 60 75 60 50 30 0 0 0 ILC NO IDA 3 GANDAK
DHI TAL 100 KASKI AC 1991 YR ID 30 24 30 24 24 20 0 0 0 ILC NO IDA 3 GANDAK
IDI KHOLA 100 KASKI AC 1996 YR ID 81 65 81 65 65 60 0 0 0 ILC NO IDA 3 GANDAK
JHOBANG 100 KASKI AC 1996 YR ID 38 30 38 30 30 25 20 0 0 ILC NO IDA 3 GANDAK
JOGI CHAUR 100 KASKI AC 1991 YR ID 175 140 175 140 140 70 0 0 0 ILC NO IDA 3 GANDAK

71
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
LUMLE 100 KASKI AC 1996 YR ID 46 37 46 37 37 37 0 0 0 ILC NO IDA 3 GANDAK
SANDHI KHET 100 KASKI AC 1993 YR ID 38 30 38 30 25 15 0 0 0 ILC NO IDA 3 GANDAK
TALLO LAHACHOK 100 KASKI AC 1996 YR ID 106 90 106 90 90 40 20 0 0 ILC NO IDA 3 GANDAK
TAUNISWARA 100 KASKI AC 1996 YR ID 176 150 176 150 150 0 0 0 0 ILC NO IDA 3 GANDAK
AISELU CHAUR 100 KASKI AC 1996 YR ID 69 55 69 55 55 45 0 0 0 ILC NO IDA 3 GANDAK
GADUWA 100 KASKI AC 1996 YR ID 63 50 63 50 50 40 0 0 0 ILC NO IDA 3 GANDAK
KIM BESI 100 KASKI AC 1996 YR ID 63 50 63 50 40 30 20 0 0 ILC NO IDA 3 GANDAK
GHACHOK 100 KASKI AC 1991 YR ID 250 200 250 200 150 100 0 0 0 ILC NO IDA 3 GANDAK
TOTAL of ILC > KASKI > REHABILITATION 14 1383 1128 1383 1128 906 512 60 0 0

TOTAL of KASKI District 14 1383 1128 1383 1128 906 512 60 0 0

ILC>LAMJUNG>REHABILITATION
BAHRA BESI 100 LAMJUNG AC 1996 YR ID 19 15 19 15 15 10 0 0 0 ILC NO IDA 3 GANDAK
BANJH KHET 100 LAMJUNG AC 1996 MS ID 10 8 10 8 8 8 0 0 0 ILC NO IDA 3 GANDAK
BARBOTE 100 LAMJUNG AC 1996 YR ID 44 35 44 35 35 35 0 0 0 ILC NO IDA 3 GANDAK
BETINI 100 LAMJUNG AC 1996 YR ID 53 45 53 45 45 0 0 0 0 ILC NO IDA 3 GANDAK
BHORLE TAR 100 LAMJUNG AC 1996 YR ID 259 220 259 220 220 0 0 0 0 ILC YES IDA 3 GANDAK
BHUJUNG RAMCHE 100 LAMJUNG AC 1996 MS ID 30 25 30 25 25 0 0 0 0 ILC NO IDA 3 GANDAK
BOHARA GAUN 100 LAMJUNG AC 1990 MS ID 55 44 55 44 44 0 0 0 0 ILC NO IDA 3 GANDAK
DHAND BESI 100 LAMJUNG AC 1996 YR ID 19 15 19 15 15 10 5 0 0 ILC NO IDA 3 GANDAK
DUMAN 100 LAMJUNG AC 1996 YR ID 88 75 88 75 75 30 20 0 0 ILC NO IDA 3 GANDAK
GAIRI GATERI 100 LAMJUNG AC 1997 YR ID 71 60 71 60 0 0 0 0 0 ILC NO ADB 3 GANDAK
GHOPTE KHOLA 100 LAMJUNG AC 1996 MS ID 45 40 45 40 40 0 0 0 0 ILC NO IDA 3 GANDAK
HANDE TAR 100 LAMJUNG AC 1996 YR ID 294 250 294 250 250 0 0 0 0 ILC YES IDA 3 GANDAK
KYARANO 100 LAMJUNG AC 1996 YR ID 31 25 31 25 25 10 5 0 0 ILC NO IDA 3 GANDAK
MASHAR KO KULO 100 LAMJUNG AC 1990 YR ID 23 18 23 18 18 15 2 0 0 ILC NO IDA 3 GANDAK
NAUBISE ( BHAKUNDE R) 100 LAMJUNG AC 1996 MS ID 35 30 35 30 30 0 0 0 0 ILC NO IDA 3 GANDAK
PAINSI KHOLA 100 LAMJUNG AC 1996 YR ID 63 50 63 50 50 25 10 0 0 ILC NO IDA 3 GANDAK
RAMGHA TAR 100 LAMJUNG AC 1996 YR ID 259 220 259 220 220 0 0 0 0 ILC YES IDA 3 GANDAK
SAIL PHEDI 100 LAMJUNG AC 1996 MS ID 31 25 31 25 25 0 0 0 0 ILC NO IDA 3 GANDAK
SHERA PHANT 100 LAMJUNG AC 1996 MS ID 17 15 17 15 15 0 0 ILC NO IDA 3 GANDAK
SIRU PANI 100 LAMJUNG AC 1996 MS ID 25 20 25 20 20 0 0 0 0 ILC NO IDA 3 GANDAK
THAR CHAUR 100 LAMJUNG AC 1996 MS ID 40 35 40 35 35 0 0 0 0 ILC NO IDA 3 GANDAK
KAMALI KHORIA 100 LAMJUNG AC 1991 YR ID 61 49 61 49 49 49 20 0 0 ILC NO IDA 3 GANDAK
KARAPUR TAR 100 LAMJUNG AC 1996 YR ID 118 100 118 100 100 0 0 0 0 ILC NO IDA 0 GANDAK
KALYAN MAJUWA 100 LAMJUNG AC 1992 YR ID 156 125 156 125 125 0 0 0 0 ILC NO IDA 3 GANDAK
CHUROTE 100 LAMJUNG AC 1996 MS ID 19 15 19 15 15 0 0 0 0 ILC NO IDA 3 GANDAK
TOTAL of ILC > LAMJUNG > REHABILITATION 25 1865 1559 1865 1559 1499 192 62 0 0

TOTAL of LAMJUNG District 25 1865 1559 1865 1559 1499 192 62 0 0

ILC>PALPA>REHABILITATION
BANS TARI 100 PALPA AC 1996 YR ID 13 10 13 10 10 10 0 0 0 ILC NO IDA 3 GANDAK
CHHERLUNG KULO 100 PALPA AC 1996 YR ID 133 106 133 106 106 50 25 0 0 ILC NO IDA 3 GANDAK
GHURCHIS PHANT 100 PALPA AC 1996 YR ID 63 50 63 50 40 40 0 0 0 ILC NO IDA 3 GANDAK

72
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
HARIJOL KHOLA 100 PALPA AC 1996 YR ID 34 37 34 37 30 30 0 0 0 ILC NO IDA 3 GANDAK
HEKLANG CHHANGLING 100 PALPA AC 1996 YR ID 44 35 44 35 35 30 0 0 0 ILC NO IDA 3 GANDAK
JHUMSA KHET 100 PALPA AC 1996 YR ID 35 30 35 30 35 0 0 0 100 ILC NO IDA 3 GANDAK
KHURSANE 100 PALPA AC 1996 YR ID 10 8 10 8 8 8 0 0 0 ILC NO IDA 3 GANDAK
LAGHUWA PHANT 100 PALPA AC 1996 YR ID 25 20 25 20 20 20 0 0 0 ILC NO IDA 3 GANDAK
LAMGTANG KHOLA 100 PALPA AC 1996 YR ID 16 13 16 13 13 13 0 0 0 ILC NO IDA 3 GANDAK
MAHILI KULO 100 PALPA AC 1997 YR ID 49 42 49 42 0 0 0 0 0 ILC NO ADB 3 GANDAK
MAJH KO KULO 100 PALPA AC 1996 YR ID 15 13 15 13 0 0 0 0 0 ILC NO IDA 3 GANDAK
SAINJU KULO 100 PALPA AC 1992 YR ID 38 30 38 30 30 25 0 0 0 ILC NO IDA 3 GANDAK
TAMLOK 100 PALPA AC 1997 YR ID 9 8 9 8 0 0 0 0 0 ILC NO ADB 3 GANDAK
WAIREGHAT 100 PALPA AC 1997 YR ID 18 15 18 15 0 0 0 0 0 ILC NO ADB 3 GANDAK
CHEWA PHANT 100 PALPA AC 1996 MS ID 31 25 31 25 25 20 0 0 0 ILC NO IDA 3 GANDAK
NIKI CHAUR 100 PALPA AC 1996 YR ID 38 30 38 30 30 30 0 0 0 ILC NO IDA 3 GANDAK
RAJ KULO JETHI 100 PALPA AC 1996 YR ID 75 60 75 60 60 60 0 0 0 ILC NO IDA 3 GANDAK
CHHERLUNG (LOWER) 100 PALPA AC 1996 YR ID 66 56 66 56 50 0 0 0 0 ILC NO IDA 3 GANDAK
BEJAD 100 PALPA AC 1996 MS ID 63 50 63 50 50 0 0 0 0 ILC NO IDA 3 GANDAK
CHHEDUWA KULO 100 PALPA AC 1994 YR ID 54 43 54 43 43 20 0 0 0 ILC NO IDA 3 GANDAK
ULTEY KHOLA 100 PALPA AC 1996 YR ID 23 18 23 18 18 12 0 0 0 ILC NO IDA 3 GANDAK
TOTAL of ILC > PALPA > REHABILITATION 21 852 699 852 699 603 368 25 0 100

TOTAL of PALPA District 21 852 699 852 699 603 368 25 0 100

ILC>SYANGJA>REHABILITATION
ANDHI KHALTA 100 SYANGJA AC 1996 YR ID 38 30 38 30 30 30 5 0 0 ILC NO IDA 3 GANDAK
ASHIV MAGHANE 100 SYANGJA AC 1990 YR ID 28 22 28 22 22 5 1 0 0 ILC NO IDA 3 GANDAK
BADA CHAUR 100 SYANGJA AC 1991 YR ID 25 20 25 20 20 20 5 0 0 ILC NO IDA 3 GANDAK
BAGAR KHET 100 SYANGJA AC 1990 YR ID 44 35 44 35 25 18 5 0 0 ILC NO IDA 3 GANDAK
CHAULANE PHANT 100 SYANGJA AC 1996 YR ID 23 20 25 20 20 0 0 0 0 ILC NO IDA 3 GANDAK
CHHAHARE BANSKOT 100 SYANGJA AC 1996 YR ID 8 7 10 7 7 0 0 0 0 ILC NO IDA 3 GANDAK
CHILAUNEBAS 100 SYANGJA AC 1996 YR ID 59 50 59 50 50 0 0 0 0 ILC NO IDA 3 GANDAK
DHANGLING 100 SYANGJA AC 1996 YR ID 38 32 38 32 32 0 0 0 0 ILC NO IDA 3 GANDAK
DHANUBASE 100 SYANGJA AC 1996 YR ID 18 15 18 15 15 0 0 0 0 ILC NO IDA 3 GANDAK
DHAPUK SIMAL 100 SYANGJA AC 1996 YR ID 59 50 59 50 50 0 0 0 0 ILC NO IDA 3 GANDAK
FIRFIRE BARAHAR 100 SYANGJA AC 1996 YR ID 47 40 45 40 40 0 0 0 0 ILC NO IDA 3 GANDAK
GAIRE BARI 100 SYANGJA AC 1996 YR ID 12 11 14 11 11 11 0 0 0 ILC NO IDA 3 GANDAK
HILAMARANG 100 SYANGJA AC 1996 YR ID 47 40 50 40 40 35 6 0 0 ILC NO IDA 3 GANDAK
JAYASHARA 100 SYANGJA AC 1996 YR ID 108 16 20 16 16 10 0 0 0 ILC NO IDA 3 GANDAK
JYAGDI BARABISE 100 SYANGJA AC 1996 YR ID 50 40 50 40 40 40 15 0 0 ILC NO IDA 3 GANDAK
KHALTE KHOLA 100 SYANGJA AC 1996 YR ID 11 10 15 10 10 0 0 0 0 ILC NO IDA 3 GANDAK
LABSIBOT MAJUWA 100 SYANGJA AC 1996 YR ID 25 20 25 20 20 20 0 0 0 ILC NO IDA 3 GANDAK
LAMANGE PHANT 100 SYANGJA AC 1990 YR ID 93 74 93 74 74 70 25 0 0 ILC NO IDA 3 GANDAK
NAULO KULO 100 SYANGJA AC 1996 YR ID 31 25 31 25 25 25 0 0 0 ILC NO IDA 3 GANDAK
PAREWA 100 SYANGJA AC 1990 YR ID 38 30 38 30 18 18 8 0 0 ILC NO IDA 3 GANDAK
PAUWA LABSIBOT 100 SYANGJA AC 1996 YR ID 15 12 15 12 12 12 5 0 0 ILC NO IDA 3 GANDAK
PIPAL TARI 100 SYANGJA AC 1997 YR ID 47 40 47 40 0 0 0 0 0 ILC NO ADB 3 GANDAK
SHANKHAR PHANT 100 SYANGJA AC 1996 YR ID 70 60 65 60 60 0 0 0 0 ILC NO IDA 3 GANDAK

73
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
SIMAL CHAUR 100 SYANGJA AC 1996 YR ID 43 37 42 37 37 0 0 0 0 ILC NO IDA 3 GANDAK
STHAN CHAUR 100 SYANGJA AC 1996 YR ID 28 22 28 22 22 22 5 0 0 ILC NO IDA 3 GANDAK
TAMA PANI KEWARE 100 SYANGJA AC 1996 YR ED 46 37 46 37 37 18 0 0 0 ILC NO IDA 3 GANDAK
UTTAK PHANT 100 SYANGJA AC 1990 YR ID 38 30 38 30 30 30 5 0 0 ILC NO IDA 3 GANDAK
NIBUWA KHARKA 100 SYANGJA AC 1990 YR ID 38 30 38 30 30 10 10 0 0 ILC NO IDA 3 GANDAK
BANGSING 100 SYANGJA AC 1990 YR ID 150 120 150 120 120 100 25 0 0 ILC NO IDA 3 GANDAK
TIKAJA TALLO PHANT 100 SYANGJA AC 1996 YR ID 35 28 35 28 28 28 14 0 0 ILC NO IDA 3 GANDAK
THULI BESI 100 SYANGJA AC 1996 YR ED 306 245 306 245 245 0 0 0 0 ILC NO IDA 3 GANDAK
SURANDI 100 SYANGJA AC 1996 YR ID 56 45 46 45 45 30 0 10 8 ILC NO IDA 3 GANDAK
TOTAL of ILC > SYANGJA > REHABILITATION 32 1674 1293 1581 1293 1231 552 134 10 8

TOTAL of SYANGJA District 32 1674 1293 1581 1293 1231 552 134 10 8

ILC>TANAHU>REHABILITATION
ANP TARI 100 TANAHU AC 1996 YR ID 50 40 50 40 40 20 5 0 0 ILC NO IDA 3 GANDAK
BACHYANGDI PHANT 100 TANAHU AC 1996 YR ID 33 26 33 26 26 26 0 0 0 ILC NO IDA 3 GANDAK
BARAH KULO 100 TANAHU AC 1996 YR ID 35 30 35 30 30 0 0 0 0 ILC NO IDA 3 GANDAK
BUDUWA 100 TANAHU AC 1996 YR ID 56 45 56 45 45 20 5 0 0 ILC NO IDA 3 GANDAK
DURGE TARI 100 TANAHU AC 1996 YR ID 50 40 50 40 40 20 10 0 0 ILC NO IDA 3 GANDAK
GAIRI BAGUWA 100 TANAHU AC 1996 YR ID 68 54 68 54 54 25 6 0 0 ILC NO IDA 3 GANDAK
KALESTI 100 TANAHU AC 1996 YR ID 45 36 45 36 36 15 5 0 0 ILC NO IDA 3 GANDAK
KANDELE KULO 100 TANAHU AC 1996 YR ID 24 19 24 19 19 5 0 0 0 ILC NO IDA 3 GANDAK
KANDER TARI 100 TANAHU AC 1996 YR ID 29 25 29 25 25 0 0 0 0 ILC NO IDA 3 GANDAK
KA TARI 100 TANAHU AC 1996 YR ID 50 40 50 40 40 20 5 0 0 ILC NO IDA 3 GANDAK
MARYAN GHAT 100 TANAHU AC 1990 YR ID 50 40 50 40 40 40 0 0 0 ILC NO IDA 3 GANDAK
NAYA TAR 100 TANAHU AC 1991 YR ID 113 90 113 90 90 30 0 0 0 ILC NO IDA 3 GANDAK
PATLE BARAHBISHE 100 TANAHU AC 1996 YR ID 56 45 56 45 45 20 6 0 0 ILC NO IDA 3 GANDAK
PAYER PHAT 100 TANAHU AC 1996 YR ID 41 33 41 33 33 10 0 0 0 ILC NO IDA 3 GANDAK
PHEDI KHOLA 100 TANAHU AC 1996 YR ID 44 35 44 35 35 20 5 0 0 ILC NO IDA 3 GANDAK
PIPAL TARI 100 TANAHU AC 1996 YR ID 56 45 56 45 45 25 10 0 0 ILC NO IDA 3 GANDAK
POKHAREL PHANT 100 TANAHU AC 1996 YR ID 44 35 44 35 35 35 0 0 0 ILC NO IDA 3 GANDAK
SAJHA TAR 100 TANAHU AC 1996 YR ID 71 60 71 60 60 0 0 0 0 ILC YES IDA 3 GANDAK
SATRA SAYA KYAMIN 100 TANAHU AC 1996 YR ID 41 35 41 35 35 20 15 0 0 ILC NO IDA 3 GANDAK
SATRA SAYA PHANT 100 TANAHU AC 1996 YR ID 71 60 71 60 60 0 0 0 0 ILC NO IDA 3 GANDAK
SERA PACHPANNE 100 TANAHU AC 1996 YR ID 38 30 38 30 30 30 0 0 0 ILC NO IDA 3 GANDAK
SERA KHET 100 TANAHU AC 1996 YR ID 23 18 23 18 18 18 0 0 0 ILC NO IDA 3 GANDAK
SHERA PHANT 100 TANAHU AC 1997 YR ID 41 35 41 35 0 0 0 0 0 ILC NO ADB 3 GANDAK
SUMAL TARI 100 TANAHU AC 1996 YR ID 25 20 25 20 20 20 0 0 0 ILC NO IDA 3 GANDAK
THULO TAR 100 TANAHU AC 1997 YR ID 53 45 53 45 0 0 0 0 0 ILC NO ADB 3 GANDAK
SANGRALE PHAT 100 TANAHU AC 1990 YR ID 19 15 19 15 15 4 0 0 0 ILC NO IDA 3 GANDAK
GADHI JHAURI 100 TANAHU AC 1996 YR ID 63 50 63 50 50 50 0 0 0 ILC NO IDA 3 GANDAK
BULDI BIRTA 100 TANAHU AC 1996 YR ID 23 18 23 18 18 18 0 0 0 ILC NO IDA 3 GANDAK
KAFLE AMRENI PHANT 100 TANAHU AC 1996 YR ID 43 34 43 34 34 34 0 0 0 ILC NO IDA 3 GANDAK
TOTAL of ILC > TANAHU > REHABILITATION 29 1355 1098 1355 1098 1018 525 72 0 0

TOTAL of TANAHU District 29 1355 1098 1355 1098 1018 525 72 0 0

74
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

TOTAL of WESTERN > Hill 179 10774 8768 10681 8768 7931 3486 593 17 113

ILC>MANANG>REHABILITATION
GENZANO 100 MANANG AC 1997 YR ID 82 70 82 70 0 0 0 0 0 ILC NO ADB 3 GANDAK
JIKRE 100 MANANG AC 1996 YR ID 31 25 31 25 25 25 15 0 0 ILC NO IDA 3 GANDAK
KYANG 100 MANANG AC 1996 YR ID 19 15 19 15 15 15 0 0 0 ILC NO IDA 3 GANDAK
TILICHE 100 MANANG AC 1996 YR ID 38 30 38 30 30 30 20 0 0 ILC NO IDA 3 GANDAK
TOTAL of ILC > MANANG > REHABILITATION 4 170 140 170 140 70 70 35 0 0

TOTAL of MANANG District 4 170 140 170 140 70 70 35 0 0

TOTAL of WESTERN > Mountain 4 170 140 170 140 70 70 35 0 0

TOTAL of WESTERN Region 208 19926 16394 19833 16394 15137 4511 1178 17 113

ILC>BANKE>REHABILITATION
CHISHA PANI-NAUBASTA 100 BANKE AC 1996 YR ID 353 300 353 300 300 0 0 0 0 ILC NO IDA 6 WEST RAPTI
DHUMIYA IRRIGATION PROJECT 100 BANKE AC 1996 YR ID 259 220 259 220 220 0 0 0 0 ILC NO IDA 6 WEST RAPTI
KIRAN NALA 100 BANKE AC 1997 YR ID 194 165 194 165 0 0 0 0 0 ILC NO ADB 6 WEST RAPTI
NEBUWA FARM 100 BANKE AC 1997 YR ID 176 150 176 150 0 0 0 0 0 ILC NO ADB 6 WEST RAPTI
PARUWA IP 100 BANKE AC 1996 YR ID 118 100 118 100 100 0 0 0 0 ILC NO IDA 6 WEST RAPTI
TOTAL of ILC > BANKE > REHABILITATION 5 1100 935 1100 935 620 0 0 0 0

TOTAL of BANKE District 5 1100 935 1100 935 620 0 0 0 0

ILC>BARDIYA>REHABILITATION
SURYA PATUWA 100 BARDIYA AC 1997 YR ID 1529 1300 1529 1300 0 0 0 0 0 ILC NO ADB 5 BABAI
TOTAL of ILC > BARDIYA > REHABILITATION 1 1529 1300 1529 1300 0 0 0 0 0

TOTAL of BARDIYA District 1 1529 1300 1529 1300 0 0 0 0 0

ILC>DANG>REHABILITATION
CHILIYA 100 DANG AC 1996 YR ID 118 100 118 100 100 0 0 0 0 ILC NO IDA 5 BABAI
GOBARDIHA BADKAPATH 100 DANG AC 1997 YR ID 535 455 535 455 0 0 0 0 0 ILC NO ADB 5 BABAI
KACHELA KACHILI 100 DANG AC 1996 YR ID 235 200 235 200 200 0 0 0 0 ILC NO IDA 5 BABAI
KATUWA KHOLA 100 DANG AC 1996 YR ID 391 332 391 332 332 0 0 0 0 ILC NO IDA 5 BABAI
RANIGAD 100 DANG AC 1996 YR ID 260 221 260 221 221 0 0 0 0 ILC NO IDA 5 BABAI
RATANPUR 100 DANG AC 1997 YR ID 147 125 147 125 0 0 0 0 0 ILC NO ADB 5 BABAI
SAPAILA PARASPUR 100 DANG AC 1996 YR ID 236 201 236 201 201 0 0 0 0 ILC NO IDA 5 BABAI
CHAUWA KHOLA 100 DANG AC 1996 YR ID 529 450 529 450 450 0 0 0 0 ILC NO IDA 5 BABAI
TOTAL of ILC > DANG > REHABILITATION 8 2451 2084 2451 2084 1504 0 0 0 0

TOTAL of DANG District 8 2451 2084 2451 2084 1504 0 0 0 0

TOTAL of MID-WESTERN > Terai 14 5080 4319 5080 4319 2124 0 0 0 0

75
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

ILC>DAILEKH>REHABILITATION
BESIKHADA PAL CHAUR 100 DAILEKH AC 1997 YR ID 94 80 94 80 0 0 0 0 0 ILC NO ADB 5 BABAI
TOTAL of ILC > DAILEKH > REHABILITATION 1 94 80 94 80 0 0 0 0 0

TOTAL of DAILEKH District 1 94 80 94 80 0 0 0 0 0

ILC>JAJARKOT>REHABILITATION
GHATTE KHOLA 100 JAJARKOT AC 1996 YR ID 35 30 35 30 30 0 0 0 0 ILC NO IDA 2 KARNALI
HOLU KHOLA 100 JAJARKOT AC 1997 YR ID 65 55 65 55 0 0 0 0 0 ILC NO ADB 2 KARNALI
JHUPRA KHOLA 100 JAJARKOT AC 1996 YR ID 29 25 29 25 25 0 0 0 0 ILC NO IDA 2 KARNALI
RAWATGAUN 100 JAJARKOT AC 1997 YR ID 29 25 29 25 0 0 0 0 0 ILC NO ADB 2 KARNALI
SIR CHAUR 100 JAJARKOT AC 1996 YR ID 59 50 59 50 50 0 0 0 0 ILC NO IDA 2 KARNALI
SIRUGAR MONAGAR 100 JAJARKOT AC 1996 YR ID 47 40 47 40 40 0 0 0 0 ILC NO IDA 2 KARNALI
TOTAL of ILC > JAJARKOT > REHABILITATION 6 264 225 264 225 145 0 0 0 0

TOTAL of JAJARKOT District 6 264 225 264 225 145 0 0 0 0

ILC>PYUTHAN>REHABILITATION
BADAHARA SARIWANG 100 PYUTHAN AC 1996 YR ID 41 35 41 35 35 0 0 0 0 ILC NO IDA 6 WEST RAPTI
DAWANGWANG 100 PYUTHAN AC 1996 YR ID 94 80 90 80 80 0 0 0 0 ILC NO IDA 6 WEST RAPTI
RANI KULO 100 PYUTHAN AC 1996 YR ID 224 190 224 190 190 0 0 0 0 ILC NO IDA 6 WEST RAPTI
SAMUNDRA PHANT 100 PYUTHAN AC 1996 YR ID 106 90 106 90 90 0 0 0 0 ILC NO IDA 6 WEST RAPTI
TOTAL of ILC > PYUTHAN > REHABILITATION 4 465 395 461 395 395 0 0 0 0

TOTAL of PYUTHAN District 4 465 395 461 395 395 0 0 0 0

ILC>ROLPA>REHABILITATION
CHHAPNETA 100 ROLPA AC 1996 YR ID 24 20 24 20 20 0 0 0 0 ILC NO IDA 6 WEST RAPTI
GHODA KHOLA 100 ROLPA AC 1996 YR ID 147 125 147 125 125 0 0 0 0 ILC NO IDA 6 WEST RAPTI
SAIWANG 100 ROLPA AC 1996 YR ID 153 130 153 130 130 0 0 0 0 ILC NO IDA 6 WEST RAPTI
TOTAL of ILC > ROLPA > REHABILITATION 3 324 275 324 275 275 0 0 0 0

TOTAL of ROLPA District 3 324 275 324 275 275 0 0 0 0

ILC>RUKUM>REHABILITATION
SIMLI 100 RUKUM AC 1996 YR ID 47 40 47 40 40 0 0 0 0 ILC NO IDA 2 KARNALI
MAGMA 100 RUKUM AC 1996 YR ID 82 70 82 70 70 0 0 0 0 ILC NO IDA 2 KARNALI
TOTAL of ILC > RUKUM > REHABILITATION 2 129 110 129 110 110 0 0 0 0

TOTAL of RUKUM District 2 129 110 129 110 110 0 0 0 0

ILC>SALYAN>REHABILITATION
GARIJIULA 100 SALYAN AC 1996 YR ID 147 125 147 125 125 0 0 0 0 ILC NO IDA 5 BABAI
LAHAGHAT 100 SALYAN AC 1996 YR ID 59 50 59 50 50 0 0 0 0 ILC NO IDA 5 BABAI
SI TALPATI 100 SALYAN AC 1996 YR ID 60 51 60 51 51 0 0 0 0 ILC NO IDA 5 BABAI

76
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of ILC > SALYAN > REHABILITATION 3 266 226 266 226 226 0 0 0 0

TOTAL of SALYAN District 3 266 226 266 226 226 0 0 0 0

ILC>SURKHET>REHABILITATION
BETANI KHOLA 100 SURKHET AC 1996 YR ID 118 100 118 100 100 0 0 0 0 ILC NO IDA 2 KARNALI
BHAPRA KHOLA 100 SURKHET AC 1997 YR ID 82 70 82 70 0 0 0 0 0 ILC NO ADB 2 KARNALI
GHUM KHAHARE 100 SURKHET AC 1996 YR ID 115 98 115 98 98 0 0 0 0 ILC NO IDA 2 KARNALI
KARE KHOLA 100 SURKHET AC 1997 YR ID 35 30 35 30 0 0 0 0 0 ILC NO ADB 2 KARNALI
LEKPHARSA 100 SURKHET AC 1996 YR ID 129 110 129 110 110 0 0 0 0 ILC NO IDA 2 KARNALI
PAGAMA 100 SURKHET AC 1996 YR ID 124 105 124 105 105 0 0 0 0 ILC NO IDA 2 KARNALI
SALKOT 100 SURKHET AC 1996 YR ID 588 500 588 500 500 0 0 0 0 ILC NO IDA 2 KARNALI
TOTAL of ILC > SURKHET > REHABILITATION 7 1191 1013 1191 1013 913 0 0 0 0

TOTAL of SURKHET District 7 1191 1013 1191 1013 913 0 0 0 0

TOTAL of MID-WESTERN > Hill 26 2733 2324 2729 2324 2064 0 0 0 0

ILC>DOLPA>REHABILITATION
PHULCHUNG 100 DOLPA PC 1997 YR ID 38 30 28 22 22 22 15 10 8 ILC NO IDA 6 WEST RAPTI
TOTAL of ILC > DOLPA > REHABILITATION 1 38 30 28 22 22 22 15 10 8

TOTAL of DOLPA District 1 38 30 28 22 22 22 15 10 8

ILC>HUMLA>REHABILITATION
HUNEGAD 100 HUMLA AC 1996 YR ID 24 20 24 20 20 0 0 0 0 ILC NO IDA 2 KARNALI
TOTAL of ILC > HUMLA > REHABILITATION 1 24 20 24 20 20 0 0 0 0

TOTAL of HUMLA District 1 24 20 24 20 20 0 0 0 0

ILC>MUGU>REHABILITATION
GULM 100 MUGU AC 1997 YR ID 71 60 71 60 0 0 0 0 0 ILC NO ADB 3 GANDAK
TOTAL of ILC > MUGU > REHABILITATION 1 71 60 71 60 0 0 0 0 0

TOTAL of MUGU District 1 71 60 71 60 0 0 0 0 0

TOTAL of MID-WESTERN > Mountain 3 133 110 123 102 42 22 15 10 8

TOTAL of MID-WESTERN Region 43 7946 6753 7932 6745 4230 22 15 10 8


6723
ILC>KAILALI>REHABILITATION
BHAJANI 100 KAILALI AC 1996 YR ID 824 700 824 700 700 0 0 0 0 ILC NO IDA 2 KARNALI
KHURKHURIA 100 KAILALI AC 1996 YR ID 765 650 765 650 650 0 0 0 0 ILC NO IDA 2 KARNALI
MACHHELI 100 KAILALI AC 1996 YR ID 47 40 47 40 40 0 0 0 0 ILC NO IDA 2 KARNALI
MUNUWA 100 KAILALI AC 1996 YR ID 529 450 529 450 450 0 0 0 0 ILC NO IDA 2 KARNALI
TEDI 100 KAILALI AC 1996 YR ID 1765 1500 1765 1500 1500 0 0 0 0 ILC NO IDA 2 KARNALI

77
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of ILC > KAILALI > REHABILITATION 5 3930 3340 3930 3340 3340 0 0 0 0

TOTAL of KAILALI District 5 3930 3340 3930 3340 3340 0 0 0 0

ILC>KANCHANPUR>REHABILITATION
BACHHELA 100 KANCHANPUR AC 1996 YR ID 176 150 176 150 150 0 0 0 0 ILC NO IDA 1 MAHAKALI
BAGUN 100 KANCHANPUR AC 1996 YR ID 176 150 176 150 150 0 0 0 0 ILC NO IDA 1 MAHAKALI
BRAHMADEO 100 KANCHANPUR AC 1996 YR ID 235 200 235 200 200 0 0 0 0 ILC NO IDA 1 MAHAKALI
TOTAL of ILC > KANCHANPUR > REHABILITATION 3 587 500 587 500 500 0 0 0 0

TOTAL of KANCHANPUR District 3 587 500 587 500 500 0 0 0 0

TOTAL of FAR-WESTERN >Terai 8 4517 3840 4517 3840 3840 0 0 0 0

ILC>ACHHAM>REHABILITATION
BARDADEVI 100 ACHHAM AC 1996 YR ID 76 65 76 65 65 0 0 0 0 ILC YES IDA 2 KARNALI
KHAPTAD 100 ACHHAM AC 1996 YR ID 165 140 165 140 140 0 0 0 0 ILC YES IDA 2 KARNALI
MAUAGON 100 ACHHAM AC 1996 YR ID 71 60 71 60 60 0 0 0 0 ILC YES IDA 2 KARNALI
SUT TAR 100 ACHHAM AC 1996 YR ID 165 140 165 140 140 0 0 0 0 ILC YES IDA 2 KARNALI
TANE KUNA 100 ACHHAM AC 2000 YR ID 47 40 47 40 0 0 0 0 0 ILC NO ADB 2 KARNALI
TOTAL of ILC > ACHHAM > REHABILITATION 5 524 445 524 445 405 0 0 0 0

TOTAL of ACHHAM District 5 524 445 524 445 405 0 0 0 0

ILC>BAITADI>REHABILITATION
NANGAUN 100 BAITADI AC 1999 YR ID 29 25 29 25 0 0 0 0 0 ILC NO ADB 1 MAHAKALI
SATGAD 100 BAITADI AC 1996 YR ID 176 150 176 150 150 0 0 0 0 ILC NO IDA 1 MAHAKALI
SURNAYAGED 100 BAITADI AC 2001 YR ID 118 100 118 100 0 0 0 0 0 ILC YES ADB 1 MAHAKALI
TOTAL of ILC > BAITADI > REHABILITATION 3 323 275 323 275 150 0 0 0 0

TOTAL of BAITADI District 3 323 275 323 275 150 0 0 0 0

ILC>DADELDHURA>REHABILITATION
KAKRIGHAT 100 DADELDHURA AC 1996 YR ID 35 30 35 30 30 0 0 0 0 ILC NO IDA 1 MAHAKALI
PARIGAUN 100 DADELDHURA AC 1996 YR ID 235 200 235 200 200 0 0 0 0 ILC NO IDA 1 MAHAKALI
RANA GAON 100 DADELDHURA AC 1996 YR ID 100 85 100 85 85 0 0 0 0 ILC NO IDA 1 MAHAKALI
SADANI 100 DADELDHURA AC 1998 YR ID 212 180 212 180 0 0 0 0 0 ILC NO ADB 1 MAHAKALI
SELTUNA 100 DADELDHURA AC 1996 YR ID 129 110 129 110 110 0 0 0 0 ILC NO IDA 1 MAHAKALI
TOTAL of ILC > DADELDHURA > REHABILITATION 5 711 605 711 605 425 0 0 0 0

TOTAL of DADELDHURA District 5 711 605 711 605 425 0 0 0 0

TOTAL of FAR-WESTERN > Hill 13 1558 1325 1558 1325 980 0 0 0 0

ILC>BAJHANG>REHABILITATION
DEURA (T) 100 BAJHANG AC 1996 YR ID 40 34 40 34 34 0 0 0 0 ILC YES IDA 2 KARNALI

78
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
KHAIRA T 100 BAJHANG AC 1996 YR ID 82 70 82 70 70 0 0 0 0 ILC YES IDA 2 KARNALI
PI KHET T 100 BAJHANG AC 1996 YR ID 59 50 59 50 50 0 0 0 0 ILC YES IDA 2 KARNALI
TALKOT 100 BAJHANG AC 1996 YR ID 202 172 202 172 172 0 0 0 0 ILC YES IDA 2 KARNALI
TOTAL of ILC > BAJHANG > REHABILITATION 4 383 326 383 326 326 0 0 0 0

TOTAL of BAJHANG District 4 383 326 383 326 326 0 0 0 0

ILC>BAJURA>REHABILITATION
JERA 100 BAJURA AC 1996 YR ID 94 80 94 80 80 0 0 0 0 ILC YES IDA 2 KARNALI
LAMGAUN 100 BAJURA AC 1996 YR ID 59 50 59 50 50 0 0 0 0 ILC YES IDA 2 KARNALI
PUDA BABLA 100 BAJURA AC 1996 YR ID 41 35 41 35 35 0 0 0 0 ILC YES IDA 2 KARNALI
TOTAL of ILC > BAJURA > REHABILITATION 3 194 165 194 165 165 0 0 0 0

TOTAL of BAJURA District 3 194 165 194 165 165 0 0 0 0

ILC>DARCHULA>REHABILITATION
GADPARI 100 DARCHULA AC 1996 YR ID 96 82 96 82 82 0 0 0 0 ILC NO IDA 1 MAHAKALI
POTIBAGER 100 DARCHULA AC 1996 YR ID 312 265 312 265 265 0 0 0 0 ILC NO IDA 1 MAHAKALI
RADAM 100 DARCHULA AC 1996 YR ID 41 35 41 35 35 0 0 0 0 ILC NO IDA 1 MAHAKALI
TOTAL of ILC > DARCHULA > REHABILITATION 3 449 382 449 382 382 0 0 0 0

TOTAL of DARCHULA District 3 449 382 449 382 382 0 0 0 0

TOTAL of FAR-WESTERN > Mountain 10 1026 873 1026 873 873 0 0 0 0

TOTAL of FAR-WESTERN Region 31 7101 6038 7101 6038 5693 0 0 0 0

TOTAL of ILC 282 34973 29185 34866 29177 25060 4533 1193 27 121

ISP>JHAPA>NEW
ADHUWA KHOLA 100 JHAPA PC1997 YR ED 750 600 750 600 600 400 0 750 600 ISP NO ADB 12 SIWALIK RIVER
BETANI 100 JHAPA AC1992 MS ID 165 140 165 140 150 30 0 0 0 ISP NO ADB 12 SIWALIK RIVER
BHUTENI 100 JHAPA AC1994 MS ED 500 400 500 400 400 100 0 0 0 ISP NO ADB 12 SIWALIK RIVER
DUDAMANI KHOLA 100 JHAPA AC1996 YR ID 125 100 125 100 100 40 20 0 0 ISP NO ADB 12 SIWALIK RIVER
HARIYA 100 JHAPA AC1993 MS ED 619 495 619 495 495 375 0 0 0 ISP NO ADB 12 SIWALIK RIVER
MASALE PAINI 100 JHAPA AC1992 MS ID 188 150 188 150 150 90 0 0 0 ISP NO ADB 12 SIWALIK RIVER
RAM CHANDRA KHOLA 100 JHAPA AC1996 YR ID 175 140 175 140 140 40 20 0 0 ISP NO ADB 12 SIWALIK RIVER
TOTAL of ISP > JHAPA > NEW 7 2522 2025 2522 2025 2035 1075 40 750 600

ISP>JHAPA>REHABILITATION
BARBADASHI 100 JHAPA AC1994 MS ID 188 150 188 150 150 75 15 0 0 ISP NO ADB 12 SIWALIK RIVER
BHUTENI SAINIK IP 100 JHAPA AC1996 YR ED 488 350 488 350 350 100 100 0 0 ISP NO ADB 12 SIWALIK RIVER
DEONIYA 100 JHAPA AC1994 MS ID 219 175 219 175 175 100 0 0 0 ISP NO ADB 12 SIWALIK RIVER
DHARDHARE KHOLA 100 JHAPA AC1996 YR ID 188 150 188 150 150 40 0 0 0 ISP NO ADB 12 SIWALIK RIVER
DHYANGRI 100 JHAPA AC1994 MS ID 263 250 263 250 250 50 10 0 0 ISP NO ADB 12 SIWALIK RIVER
GEURIYA 100 JHAPA AC1994 MS ED 235 200 235 200 300 100 0 0 0 ISP NO ADB 12 SIWALIK RIVER

79
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
HARCHANA 100 JHAPA AC1994 MS ID 282 240 282 240 250 100 10 0 0 ISP NO ADB 12 SIWALIK RIVER
KARKIPANI 100 JHAPA PC1997 YR ID 281 225 281 225 0 0 0 281 225 ISP NO ADB 12 SIWALIK RIVER
LAXIMI BIRING 100 JHAPA AC1994 MS ID 125 100 125 100 100 55 15 0 0 ISP NO ADB 12 SIWALIK RIVER
MIYABADDI 100 JHAPA AC1993 MS ID 281 225 281 225 225 100 10 0 0 ISP YES ADB 12 SIWALIK RIVER
RAJPAINI 100 JHAPA PC1997 YR ID 250 200 250 200 0 0 0 250 200 ISP NO ADB 12 SIWALIK RIVER
REKHA BELGACHHI 100 JHAPA AC1996 YR ID 188 150 188 150 150 100 50 0 0 ISP NO ADB 12 SIWALIK RIVER
REKHA KHOLA 100 JHAPA AC1996 YR ID 250 200 250 200 200 100 20 0 0 ISP NO ADB 12 SIWALIK RIVER
SANUMAI 100 JHAPA PC1997 YR ED 750 600 750 600 0 0 0 750 600 ISP NO ADB 12 SIWALIK RIVER
SURUNGA KHOLA 100 JHAPA AC1996 YR ED 750 600 750 600 600 250 50 0 0 ISP NO ADB 12 SIWALIK RIVER
TIMAI 100 JHAPA AC1993 MS ED 375 300 375 300 300 100 20 0 0 ISP YES ADB 12 SIWALIK RIVER
TUDBARI 100 JHAPA AC1994 MS ID 188 150 188 150 150 75 15 0 0 ISP NO ADB 12 SIWALIK RIVER
PUUER TIMAI 100 JHAPA AC1994 MS ID 282 240 282 240 240 144 58 0 0 ISP NO ADB 12 SIWALIK RIVER
TOTAL of ISP > JHAPA > REHABILITATION 18 5583 4505 5583 4505 3590 1489 373 1281 1025

TOTAL of JHAPA District 25 8105 6530 8105 6530 5625 2564 413 2031 1625

ISP>MORANG>NEW
GACHHIYA 100 MORANG AC 1993 MS ED 375 300 375 300 300 0 0 0 0 ISP YES ADB 12 SIWALIK RIVER
TOTAL of ISP > MORANG > NEW 1 375 300 375 300 300 0 0 0 0

ISP>MORANG>REHABILITATION
ADARS 100 MORANG AC1993 MS ID 588 500 308 500 246 0 0 0 0 ISP YES ADB 12 SIWALIK RIVER
BELBARI 100 MORANG AC1993 MS ID 802 682 802 682 47 0 0 0 0 ISP NO ADB 12 SIWALIK RIVER
BHALUWA 100 MORANG AC1995 YR ID 291 233 291 233 233 90 0 0 0 ISP YES ADB 12 SIWALIK RIVER
BIHIBARE 100 MORANG AC1993 MS ED 588 500 588 500 350 0 0 0 0 ISP YES ADB 12 SIWALIK RIVER
CHHADHARE SITA 100 MORANG AC1996 YR ID 176 150 176 150 230 200 0 0 0 ISP YES ADB 12 SIWALIK RIVER
DANS MORANG 100 MORANG AC1996 YR ID 625 500 625 500 500 200 0 0 0 ISP YES ADB 12 SIWALIK RIVER
GARAME JHODA 100 MORANG AC1996 YR ID 400 320 400 320 320 130 0 0 0 ISP YES ADB 12 SIWALIK RIVER
KAIR 100 MORANG AC1995 YR ID 325 260 325 260 260 100 0 0 0 ISP YES ADB 12 SIWALIK RIVER
KALI KHOLA 100 MORANG AC1996 YR ID 188 150 188 150 150 60 0 0 0 ISP YES ADB 12 SIWALIK RIVER
KISTI KHOLA 100 MORANG AC1996 YR ID 250 200 250 200 200 80 0 0 0 ISP YES ADB 12 SIWALIK RIVER
MADHUMALLA 100 MORANG AC1996 YR ED 613 490 613 490 490 200 0 0 0 ISP YES ADB 12 SIWALIK RIVER
MUSARGHATTA 100 MORANG PC1997 YR ED 750 600 750 600 0 0 0 750 600 ISP NO ADB 12 SIWALIK RIVER
SITA DANS KERKHA 100 MORANG AC1996 YR ED 625 500 625 500 500 200 0 0 0 ISP YES ADB 12 SIWALIK RIVER
SUKHANI (THALAHA) 100 MORANG AC1995 YR ID 193 154 193 154 154 60 0 0 0 ISP YES ADB 12 SIWALIK RIVER
TOTAL of ISP > MORANG > REHABILITATION 14 6414 5239 6134 5239 3680 1320 0 750 600

TOTAL of MORANG District 15 6789 5539 6509 5539 3980 1320 0 750 600

ISP>SAPTARI>REHABILITATION
BIRDHANA 100 SAPTARI AC1993 MS ID 250 200 250 200 200 0 0 0 0 ISP NO ADB 12 SIWALIK RIVER
DUMJOR 100 SAPTARI PC1997 YR ID 350 280 350 280 0 0 0 350 280 ISP NO ADB 12 SIWALIK RIVER
KAJARA DHAHA 100 SAPTARI AC1992 MS ID 376 320 376 320 220 0 0 0 0 ISP YES ADB 12 SIWALIK RIVER
KHADAK 100 SAPTARI AC1992 MS ED 353 300 353 300 500 0 0 0 0 ISP YES ADB 12 SIWALIK RIVER
KHANDO 100 SAPTARI AC1996 YR ED 1225 980 1225 980 980 250 0 0 0 ISP YES ADB 12 SIWALIK RIVER
MAHULI 100 SAPTARI AC1996 YR ED 1313 1050 1313 1050 1050 250 0 0 0 ISP YES ADB 12 SIWALIK RIVER

80
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
SUNDARI 100 SAPTARI AC1996 YR ED 1500 1200 1500 1200 1200 300 0 0 0 ISP YES ADB 12 SIWALIK RIVER
TOTAL of ISP > SAPTARI > REHABILITATION 7 5367 4330 5367 4330 4150 800 0 350 280

TOTAL of SAPTARI District 7 5367 4330 5367 4330 4150 800 0 350 280

ISP>SIRAHA>NEW
NIRDHANA 100 SIRAHA AC1995 YR ID 312 250 312 200 250 75 0 0 0 ISP YES ADB 12 SIWALIK RIVER
TOTAL of ISP > SIRAHA > NEW 1 312 250 312 200 250 75 0 0 0

ISP>SIRAHA>REHABILITATION
BANO 100 SIRAHA AC1994 MS ED 555 444 555 444 444 0 0 0 0 ISP NO ADB 12 SIWALIK RIVER
BATAHA 100 SIRAHA AC1996 ID 313 250 313 250 250 60 0 0 0 ISP YES ADB 12 SIWALIK RIVER
JARUWA 100 SIRAHA PC1997 YR ID 156 125 156 125 0 0 0 156 125 ISP NO ADB 12 SIWALIK RIVER
KAMALA UTTARAYANI 100 SIRAHA AC1996 YR ED 675 540 675 540 540 140 0 0 0 ISP YES ADB 12 SIWALIK RIVER
MAINABATE II 100 SIRAHA AC1995 YR ID 188 150 188 150 150 50 0 0 0 ISP YES ADB 12 SIWALIK RIVER
MAINABATI I 100 SIRAHA AC1994 MS ED 529 450 529 450 490 0 0 0 0 ISP NO ADB 12 SIWALIK RIVER
SARASWOTI DHUMUHAN 100 SIRAHA PC1997 YR ED 375 300 375 300 0 0 0 375 300 ISP NO ADB 12 SIWALIK RIVER
TOTAL of ISP > SIRAHA > REHABILITATION 7 2791 2259 2791 2259 1874 250 0 531 425

TOTAL of SIRAHA District 8 3103 2509 3103 2459 2124 325 0 531 425

ISP>SUNSARI>NEW
TENGRATEN GRIBHABA 100 SUNSARI AC1995 YR ID 138 110 138 110 110 50 0 0 0 ISP YES ADB 12 SIWALIK RIVER
TOTAL of ISP > SUNSARI > NEW 1 138 110 138 110 110 50 0 0 0

ISP>SUNSARI>REHABILITATION
BAUKA 100 SUNSARI AC1994 MS ID 265 225 265 225 125 0 0 0 0 ISP NO ADB 12 SIWALIK RIVER
BUDHI PATERWA 100 SUNSARI AC1994 MS ID 176 150 176 150 210 0 0 0 0 ISP NO ADB 12 SIWALIK RIVER
GALPHARIYA 100 SUNSARI AC1994 MS ID 235 200 235 200 180 0 0 0 0 ISP NO ADB 12 SIWALIK RIVER
HARIPUR 100 SUNSARI PC1997 YR ID 750 600 750 600 0 0 0 750 600 ISP NO ADB 12 SIWALIK RIVER
KAJARA 100 SUNSARI AC1995 YR ID 294 250 294 250 204 80 0 0 0 ISP YES ADB 12 SIWALIK RIVER
KHARSALA 100 SUNSARI AC1994 MS ID 250 200 250 200 200 0 0 0 0 ISP NO ADB 12 SIWALIK RIVER
MADHUWAN 100 SUNSARI AC1994 MS ID 250 200 250 200 200 0 0 0 0 ISP NO ADB 12 SIWALIK RIVER
DUMRAHA PATUDHAR 100 SUNSARI AC1995 YR ED 524 445 524 445 400 160 0 0 0 ISP YES ADB 12 SIWALIK RIVER
SERA 100 SUNSARI AC1995 YR ED 500 400 500 400 400 160 0 0 0 ISP YES ADB 12 SIWALIK RIVER
TENGRA 100 SUNSARI AC1993 MS ID 359 305 359 305 266 0 0 0 0 ISP NO ADB 12 SIWALIK RIVER
WEST KUSHAHA 100 SUNSARI AC1993 MS ID 559 475 559 475 475 285 114 0 0 ISP NO ADB 12 SIWALIK RIVER
TOTAL of ISP > SUNSARI > REHABILITATION 11 4162 3450 4162 3450 2660 685 114 750 600

TOTAL of SUNSARI District 12 4300 3560 4300 3560 2770 735 114 750 600

TOTAL of EASTERN > Terai 67 27664 22468 27384 22418 18649 5744 527 4412 3530

ISP>BHOJPUR>NEW
AMTEK 100 BHOJPUR PC1997 YR ID 288 230 230 230 230 200 0 288 230 ISP NO ADB 4 KOSHI

81
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
HOMTANG 100 BHOJPUR PC1997 YR ID 38 30 38 30 30 20 0 38 30 ISP NO ADB 4 KOSHI
TOTAL of ISP > BHOJPUR > NEW 2 326 260 268 260 260 220 0 326 260

ISP>BHOJPUR>REHABILITATION
HAJARE BESHI 100 BHOJPUR AC1996 ID 250 200 250 200 200 150 100 0 0 ISP NO ADB 4 KOSHI
TOTAL of ISP > BHOJPUR > REHABILITATION 1 250 200 250 200 200 150 100 0 0

TOTAL of BHOJPUR District 3 576 460 518 460 460 370 100 326 260

ISP>DHANKUTA>NEW
AKHWUTAR 100 DHANKUTA AC1993 MS ID 38 30 38 30 30 0 0 0 0 ISP YES ADB 4 KOSHI
MALBASE 100 DHANKUTA PC1997 YR ID 70 56 70 56 56 40 0 70 56 ISP NO ADB 4 KOSHI
PURAMTIM 100 DHANKUTA PC1997 YR ID 200 150 200 150 150 120 0 200 160 ISP NO ADB 4 KOSHI
SURALE 100 DHANKUTA AC1995 YR ID 25 20 25 20 20 10 10 0 0 ISP YES ADB 4 KOSHI
TOTAL of ISP > DHANKUTA > NEW 4 333 256 333 256 256 170 10 270 216

ISP>DHANKUTA>REHABILITATION
KHAIRENI 100 DHANKUTA AC1993 MS ID 75 60 75 60 60 0 0 0 0 ISP NO ADB 4 KOSHI
KHARDEP 100 DHANKUTA AC1992 MS ID 141 113 141 113 111 0 0 0 0 ISP YES ADB 4 KOSHI
KUSE TAR 100 DHANKUTA AC1993 MS ID 40 32 40 32 30 0 0 0 0 ISP YES ADB 4 KOSHI
LAXMI KULO 100 DHANKUTA AC1995 YR ID 75 60 75 60 60 40 20 0 0 ISP YES ADB 4 KOSHI
PHAPRE 100 DHANKUTA AC1992 MS ID 94 75 94 75 73 0 0 0 0 ISP YES ADB 4 KOSHI
TOTAL of ISP > DHANKUTA > REHABILITATION 5 425 340 425 340 334 40 20 0 0

TOTAL of DHANKUTA District 9 758 596 758 596 590 210 30 270 216

ISP>ILAM>NEW
BHULKE KHOLA 100 ILAM AC1995 YR ID 75 60 75 60 60 40 20 0 0 ISP YES ADB 11 KANKAI
KOCHE KHOLA 100 ILAM AC1996 YR ID 125 100 125 100 100 50 25 0 0 ISP YES ADB 11 KANKAI
LAMADUWALI 100 ILAM AC1992 MS ID 94 80 94 80 80 0 0 0 0 ISP YES ADB 11 KANKAI
NUNSARI 100 ILAM AC1994 YR ID 69 55 69 55 43 0 0 0 0 ISP NO ADB 11 KANKAI
SOYANG 100 ILAM AC1993 MS ID 59 50 59 50 80 0 0 0 0 ISP YES ADB 11 KANKAI
THULO PUWA 100 ILAM AC1993 MS ID 206 175 206 175 200 175 0 0 0 ISP YES ADB 11 KANKAI
DEUMAI KHOLA 100 ILAM AC1993 MS ID 147 125 147 125 125 75 30 0 0 ISP NO ADB 11 KANKAI
TOTAL of ISP > ILAM > NEW 7 775 645 775 645 688 340 75 0 0

ISP>ILAM>REHABILITATION
ASHEWA 100 ILAM AC1995 YR ID 156 125 156 125 125 70 40 0 0 ISP YES ADB 11 KANKAI
CHHANGE 100 ILAM AC1994 MS ID 81 65 81 65 65 0 0 0 0 ISP YES ADB 11 KANKAI
CHITRE KHOLA 100 ILAM AC1995 YR ID 163 130 163 130 130 80 20 0 0 ISP YES ADB 11 KANKAI
DHUWAN 100 ILAM AC1994 MS ID 250 200 250 200 200 0 0 0 0 ISP NO ADB 11 KANKAI
GHATTE KHOLA 100 ILAM AC1995 YR ID 118 100 118 100 110 70 30 0 0 ISP YES ADB 11 KANKAI
LEWA KHOLA 100 ILAM AC1995 YR ID 125 100 125 100 100 60 40 0 0 ISP YES ADB 11 KANKAI
SEWA 100 ILAM AC1994 MS ED 100 80 100 80 80 0 0 0 0 ISP NO ADB 11 KANKAI
SOYANG KHOLA 100 ILAM AC1993 MS ID 188 150 188 150 150 0 0 0 0 ISP NO ADB 11 KANKAI
SURKESYANBU 100 ILAM AC1995 YR ID 143 114 143 114 114 70 40 0 0 ISP YES ADB 11 KANKAI

82
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of ISP > ILAM > REHABILITATION 9 1324 1064 1324 1064 1074 350 170 0 0

TOTAL of ILAM District 16 2099 1709 2099 1709 1762 690 245 0 0

ISP>KHOTANG>NEW
JORLAPSI 100 KHOTANG AC1996 YR ID 294 235 294 235 235 100 0 0 0 ISP YES ADB 4 KOSHI
MEWA KHOLA 100 KHOTANG PC1997 YR ID 63 50 63 50 0 0 0 63 50 ISP NO ADB 4 KOSHI
TOTAL of ISP > KHOTANG > NEW 2 357 285 357 285 235 100 0 63 50

ISP>KHOTANG>REHABILITATION
HAWARNAMCHIM 100 KHOTANG PC1997 YR ID 219 175 219 175 0 0 0 219 175 ISP NO ADB 4 KOSHI
KHARUWA 100 KHOTANG AC1993 MS ID 166 133 166 133 133 0 0 0 0 ISP NO ADB 4 KOSHI
NIRMALI DADA 100 KHOTANG AC1993 MS ID 87 74 87 74 100 0 0 0 0 ISP NO ADB 4 KOSHI
SAWA 100 KHOTANG AC1995 YR ID 165 132 165 132 132 100 50 0 0 ISP NO ADB 4 KOSHI
TAWA KHOLA 100 KHOTANG AC1996 YR ID 219 175 219 175 175 175 100 0 0 ISP YES ADB 4 KOSHI
RAWA 100 KHOTANG AC1996 YR ID 141 120 141 120 120 72 29 0 0 ISP NO ADB 4 KOSHI
TOTAL of ISP > KHOTANG > REHABILITATION 6 997 809 997 809 660 347 179 219 175

TOTAL of KHOTANG District 8 1354 1094 1354 1094 895 447 179 282 225

ISP>OKHALDHUNGA>NEW
MOLI KHOLA 100 OKHALDHUNGA PC1997 YR ID 69 55 0 55 0 0 0 69 55 ISP NO ADB 4 KOSHI
TOTAL of ISP > OKHALDHUNGA > NEW 1 69 55 0 55 0 0 0 69 55

ISP>OKHALDHUNGA>REHABILITATION
JUKE KHOLA 100 OKHALDHUNGA AC1994 MS ID 50 40 50 40 40 0 0 0 0 ISP NO ADB 4 KOSHI
KUL KHOLA 100 OKHALDHUNGA PC1997 YR ID 50 40 50 40 0 0 0 50 40 ISP NO ADB 4 KOSHI
PHULBARI 100 OKHALDHUNGA AC1994 MS ID 78 55 78 55 55 0 0 0 0 ISP NO ADB 4 KOSHI
RIYALE TAR 100 OKHALDHUNGA AC1993 MS ID 153 122 153 122 122 0 0 0 0 ISP NO ADB 4 KOSHI
SALPU KHOLA 100 OKHALDHUNGA AC1995 YR ID 118 100 118 100 135 100 50 0 0 ISP YES ADB 4 KOSHI
TARKERA BARI 100 OKHALDHUNGA AC1993 MS ID 38 32 38 32 36 0 0 0 0 ISP NO ADB 4 KOSHI
TOTAL of ISP > OKHALDHUNGA > REHABILITATION 6 487 389 487 389 388 100 50 50 40

TOTAL of OKHALDHUNGA District 7 556 444 487 444 388 100 50 119 95

ISP>PANCHTHAR>NEW
CHOKMAGU 100 PANCHTHAR PC1997 YR ID 100 80 100 80 0 0 0 100 80 ISP NO ADB 4 KOSHI
DHUWAN 100 PANCHTHAR AC1993 YR ID 113 90 113 90 90 50 0 0 0 ISP YES ADB 4 KOSHI
THADO KHOLA 100 PANCHTHAR AC1995 YR ID 75 60 75 60 60 36 20 0 0 ISP YES ADB 4 KOSHI
TOTAL of ISP > PANCHTHAR > NEW 3 288 230 288 230 150 86 20 100 80

ISP>PANCHTHAR>REHABILITATION
ARUBOTE 100 PANCHTHAR AC1993 YR ID 134 107 134 107 107 20 0 0 0 ISP YES ADB 4 KOSHI
CHYAN THAPU 100 PANCHTHAR AC1995 YR ID 138 110 138 110 110 70 20 0 0 ISP YES ADB 4 KOSHI
KERABARI 100 PANCHTHAR AC1994 YR ID 40 32 40 32 32 10 0 0 0 ISP NO ADB 4 KOSHI
LANKHUWA 100 PANCHTHAR PC1997 YR ID 50 40 50 40 0 0 0 50 40 ISP NO ADB 4 KOSHI

83
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
MABEWA 100 PANCHTHAR AC1996 YR ID 144 115 144 115 115 55 40 0 0 ISP YES ADB 4 KOSHI
SHERMA 100 PANCHTHAR AC1994 YR ID 71 60 71 60 67 20 0 0 0 ISP YES ADB 4 KOSHI
SUBHANG 100 PANCHTHAR AC1995 YR ID 313 250 313 250 250 150 110 0 0 ISP YES ADB 4 KOSHI
TOTAL of ISP > PANCHTHAR > REHABILITATION 7 890 714 890 714 681 325 170 50 40

TOTAL of PANCHTHAR District 10 1178 944 1178 944 831 411 190 150 120

ISP>TERATHUM>NEW
JORGURAS 100 TERATHUM AC1995 YR ID 75 60 60 60 60 40 20 15 0 ISP YES ADB 4 KOSHI
SAPHEK 100 TERATHUM AC1996 YR ID 47 40 47 40 30 30 30 0 0 ISP YES ADB 4 KOSHI
SOLMA MEGHA 100 TERATHUM AC1996 YR ID 188 150 150 150 150 100 80 38 0 ISP YES ADB 4 KOSHI
TELIYA 100 TERATHUM PC1997 YR ID 88 70 88 70 0 0 0 88 70 ISP NO ADB 4 KOSHI
TOTAL of ISP > TERATHUM > NEW 4 398 320 345 320 240 170 130 141 70

ISP>TERATHUM>REHABILITATION
HUIDE 100 TERATHUM AC1994 YR ID 116 93 116 93 93 0 0 0 0 ISP YES ADB 4 KOSHI
IWA 100 TERATHUM AC1992 YR ID 168 143 168 143 70 0 0 0 0 ISP YES ADB 4 KOSHI
KHORUNGE 100 TERATHUM AC1994 MS ID 125 100 125 100 100 0 0 0 0 ISP YES ADB 4 KOSHI
TOTAL of ISP > TERATHUM > REHABILITATION 3 409 336 409 336 263 0 0 0 0

TOTAL of TERATHUM District 7 807 656 754 656 503 170 130 141 70

ISP>UDAYAPUR>NEW
ASARE BHUSUNE 100 UDAYAPUR PC1997 YR ID 180 144 180 144 0 0 0 180 144 ISP NO ADB 4 KOSHI
KANG KHOLA YAP UDAYAPUR AC1996 YR ID 125 100 125 100 100 80 50 0 0 ISP YES ADB 4 KOSHI
KHAMBU 100 UDAYAPUR AC1994 MS ID 75 60 75 60 60 0 0 0 0 ISP NO ADB 4 KOSHI
NEPAL TAR 100 UDAYAPUR AC1994 MS ID 49 39 49 39 39 0 0 0 0 ISP NO ADB 4 KOSHI
TAPESWORI 100 UDAYAPUR AC1996 YR ID 268 214 268 214 214 200 150 0 0 ISP YES ADB 4 KOSHI
TAPRANG 100 UDAYAPUR AC1996 YR ID 59 50 59 50 70 60 50 0 0 ISP YES ADB 4 KOSHI
TOTAL of ISP > UDAYAPUR > NEW 6 756 607 756 607 483 340 250 180 144

ISP>UDAYAPUR>REHABILITATION
BARUWA 100 UDAYAPUR AC1992 MS ID 176 150 176 150 70 0 0 0 0 ISP YES ADB 4 KOSHI
MALI KHOLA 100 UDAYAPUR AC1994 MS ID 125 100 125 100 100 0 0 0 0 ISP NO ADB 4 KOSHI
LAMA KHOLA BASAHA 8,9 100 UDAYAPUR AC1994 MS ID 235 200 235 200 115 0 0 0 0 ISP NO ADB 4 KOSHI
SIWAI KHOLA 100 UDAYAPUR AC1994 MS ID 88 70 88 70 70 0 0 0 0 ISP NO ADB 4 KOSHI
TOTAL of ISP > UDAYAPUR > REHABILITATION 4 624 520 624 520 355 0 0 0 0

TOTAL of UDAYAPUR District 10 1380 1127 1380 1127 838 340 250 180 144

TOTAL of EASTERN > Hill 70 8708 7030 8528 7030 6267 2738 1174 1468 1130

ISP>SANKHUWASABHA>NEW
PANGMA 100 SANKHUWASABHA AC1994 MS ID 60 48 60 48 48 0 0 0 0 ISP NO ADB 4 KOSHI
SISUWA TAR 100 SANKHUWASABHA AC1994 MS ID 51 43 51 43 40 0 0 0 0 ISP NO ADB 4 KOSHI
TOTAL of ISP > SANKHUWASABHA > NEW 2 111 91 111 91 88 0 0 0 0

84
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

ISP>SANKHUWASABHA>REHABILITATION
BAGHA 100 SANKHUWASABHA AC1993 MS ID 152 129 152 129 100 0 0 0 0 ISP NO ADB 4 KOSHI
MALTA 100 SANKHUWASABHA AC1993 MS ID 81 65 81 65 65 0 0 0 0 ISP NO ADB 4 KOSHI
MALTA KHOLA 100 SANKHUWASABHA AC1994 MS ID 158 134 158 134 120 0 0 0 0 ISP NO ADB 4 KOSHI
RAJ KULO 100 SANKHUWASABHA AC1995 ID 325 260 325 260 260 200 100 0 0 ISP YES ADB 4 KOSHI
TOTAL of ISP > SANKHUWASABHA > REHABILITATION 4 716 588 716 588 545 200 100 0 0

TOTAL of SANKHUWASABHA District 6 827 679 827 679 633 200 100 0 0

ISP>SOLUKHUMBU>NEW
MUKLI 100 SOLUKHUMBU AC1994 MS ID 50 40 50 40 40 0 0 0 0 ISP NO ADB 4 KOSHI
TOTAL of ISP > SOLUKHUMBU > NEW 1 50 40 50 40 40 0 0 0 0

ISP>SOLUKHUMBU>REHABILITATION
KANGEL 100 SOLUKHUMBU AC1993 MS ID 67 57 39 57 55 0 0 0 0 ISP NO ADB 4 KOSHI
BARAKHU 100 SOLUKHUMBU AC1995 YR ID 125 100 125 100 100 80 50 0 0 ISP YES ADB 4 KOSHI
MUDHE KHOLA 100 SOLUKHUMBU PC1997 YR ID 200 160 200 160 0 0 0 200 160 ISP NO ADB 4 KOSHI
PURANA GAON 100 SOLUKHUMBU AC1994 MS ID 75 60 75 60 60 0 0 0 0 ISP NO ADB 4 KOSHI
SALYAN 100 SOLUKHUMBU AC1992 MS ID 63 35 63 35 50 0 0 0 0 ISP NO ADB 4 KOSHI
TADI KHALPA 100 SOLUKHUMBU AC1996 YR ID 69 55 69 55 55 30 20 0 0 ISP NO ADB 4 KOSHI
KHISULU 100 SOLUKHUMBU AC1996 YR ID 65 55 65 55 55 33 13 0 0 ISP NO ADB 4 KOSHI
TOTAL of ISP > SOLUKHUMBU > REHABILITATION 7 664 522 636 522 375 143 83 200 160

TOTAL of SOLUKHUMBU District 8 714 562 686 562 415 143 83 200 160

ISP>TAPLEJUNG>NEW
AGRI 100 TAPLEJUNG AC1996 YR ID 75 60 75 60 60 35 15 0 0 ISP NO ADB 4 KOSHI
KANUWA 100 TAPLEJUNG AC1994 YR ID 125 100 125 100 100 30 0 0 0 ISP NO ADB 4 KOSHI'
KHOKLING 100 TAPLEJUNG AC1994 YR ID 178 150 178 150 150 25 0 0 0 ISP YES ADCB 4 KOSHI
MAWA 100 TAPLEJUNG AC1996 YR ID 75 60 75 60 60 25 10 0 0 ISP NO ADB 4 KOSHI
TOTAL of ISP > TAPLEJUNG > NEW 4 453 370 453 370 370 115 25 0 0

ISP>TAPLEJUNG>REHABILITATION
HEREWA 100 TAPLEJUNG AC1995 YR ID 75 60 75 60 60 40 20 0 0 ISP YES ADB 4 KOSHI
JAWA KHOLA 100 TAPLEJUNG AC1994 YR ID 250 200 250 200 200 50 0 0 0 ISP NO ADB 4 KOSHI
NAREWA 100 TAPLEJUNG AC1996 YR ID 125 100 125 100 100 30 15 0 0 ISP YES ADB 4 KOSHI
TOTAL of ISP > TAPLEJUNG > REHABILITATION 3 450 360 450 360 360 120 35 0 0

TOTAL of TAPLEJUNG District 7 903 730 903 730 730 235 60 0 0

TOTAL of EASTERN > Mountain 21 2444 1971 2416 1971 1778 578 243 200 160

TOTAL of EASTERN Region 158 38816 31469 38328 31419 26694 9060 1944 6080 4820

ISP>BARA>REHABILITATION

85
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
IMRITI 100 BARA AC1993 YR ID 1625 1300 1625 1300 1300 0 0 0 0 ISP NO ADB 12 SIWALIK RIVER
MAJHANA 100 BARA PC1997 YR ID 219 175 219 175 0 0 0 219 175 ISP NO ADB 12 SIWALIK RIVER
THALAHI 100 BARA AC1996 YR ED 936 796 936 796 800 200 10 0 0 ISP YES ADB 12 SIWALIK RIVER
TOTAL of ISP > BARA > REHABILITATION 3 2780 2271 2780 2271 2100 200 10 219 175

TOTAL of BARA District 3 2780 2271 2780 2271 2100 200 10 219 175

ISP>CHITWAN>NEW
MAROTH 100 CHITWAN AC1995 YR ED 312 265 312 265 300 270 130 0 0 ISP YES ADB 3 GANDAK
TOTAL of ISP > CHITWAN > NEW 1 312 265 312 265 300 270 130 0 0

ISP>CHITWAN>REHABILITATION
ANJANA TAL 100 CHITWAN AC1996 YR ED 688 550 688 550 550 270 100 0 0 ISP NO ADB 3 GANDAK
GANGA NAGAR 100 CHITWAN AC1993 MS ID 275 220 275 220 220 220 0 0 0 ISP YES ADB 3 GANDAK
GOPAL NAGAR 100 CHITWAN AC1996 YR ID 158 134 158 134 162 100 50 0 0 ISP NO ADB 3 GANDAK
JAMAKALYAN 100 CHITWAN AC1993 YR ID 188 150 188 150 150 100 0 0 0 ISP NO ADB 3 GANDAK
MADUVAR 100 CHITWAN AC1991 MS ID 141 113 141 113 75 0 0 0 0 ISP YES ADB 3 GANDAK
PATIHANI PARSA 100 CHITWAN AC1996 YR ED 831 665 831 665 665 400 200 0 0 ISP NO ADB 3 GANDAK
SISABAS 100 CHITWAN AC1991 YR ID 145 123 145 123 113 100 0 0 0 ISP YES ADB 3 GANDAK
UPALLORIHU 100 CHITWAN AC1996 YR ID 191 162 191 162 100 100 50 0 0 ISP NO ADB 3 GANDAK
LAGUTA PARSA 100 CHITWAN AC1996 YR ID 120 102 120 102 102 61 24 0 0 ISP NO ADB 3 GANDAK
TOTAL of ISP > CHITWAN > REHABILITATION 9 2737 2219 2737 2219 2137 1351 424 0 0

TOTAL of CHITWAN District 10 3049 2484 3049 2484 2437 1621 554 0 0

ISP>DHANUSHA>NEW
CHARNATHA 100 DHANUSHA AC1994 YR ID 500 400 500 400 300 150 0 0 0 ISP NO ADB 12 SIWALIK RIVR
TOTAL of ISP > DHANUSHA > NEW 1 500 400 500 400 300 150 0 0 0

ISP>DHANUSHA>REHABILITATION
BALAGANGA 100 DHANUSHA AC1995 YR ED 500 400 500 400 400 100 0 0 0 ISP YES ADB 12 SIWALIK RIVER
TOTAL of ISP > DHANUSHA > REHABILITATION 1 500 400 500 400 400 100 0 0 0

TOTAL of DHANUSHA District 2 1000 800 1000 800 700 250 0 0 0

ISP>MAHOTTARI>REHABILITATION
BANKE(JIJHA GULARIA) 100 MAHOTTARI AC1994 MS ED 235 200 235 200 412 0 0 0 0 ISP NO ADB 12 SIWALIK RIVER
KUTUMESWORI 100 MAHOTTARI AC1995 YR ID 250 200 250 200 200 10 0 0 0 ISP YS ADB 12 SIWALIK RIVER
LARKAWA 100 MAHOTTARI AC1993 MS ED 375 300 375 300 300 0 0 0 0 ISP NO ADB 12 SIWALIK RIVER
MARAHA 100 MAHOTTARI AC1995 YR ED 500 400 500 400 400 120 0 0 0 ISP YES ADB 12 SIWALIK RIVER
RUPAMI NADI 100 MAHOTTARI AC1993 MS ID 231 185 231 185 185 0 0 0 0 ISP NO ADB 12 SIWALIK RIVER
TOTAL of ISP > MAHOTTARI > REHABILITATION 5 1591 1285 1591 1285 1497 130 0 0 0

TOTAL of MAHOTTARI District 5 1591 1285 1591 1285 1497 130 0 0 0

86
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
ISP>PARSA>NEW
PHOKAHA 100 PARSA AC1995 YR ID 188 150 188 150 150 100 50 0 0 ISP NO ADB 12 SIWLAIK RIVER
TOTAL of ISP > PARSA > NEW 1 188 150 188 150 150 100 50 0 0

ISP>PARSA>REHABILITATION
BAHURWA PHANTI 100 PARSA AC1994 MS ID 325 260 325 260 260 0 0 0 0 ISP NO ADB 12 SIWALIK RIVER
BASDILWA 100 PARSA AC1994 YR ID 163 130 163 130 100 20 0 0 0 ISP NO ADB 12 SIWALIK RIVER
BAUGI 100 PARSA AC1994 YR ID 208 166 208 166 166 30 0 0 0 ISP YES ADB 12 SIWALIK RIVER
CHARKHAWA 100 PARSA AC1995 YR ED 438 350 438 350 350 150 0 0 0 ISP NO ADB 12 SIWALIK RIVER
DODA 100 PARSA AC1993 YR ID 125 100 125 100 100 10 0 0 0 ISP NO ADB 12 SIWALIK RIVER
JAGNAHA 100 PARSA AC1992 YR ID 201 161 201 161 161 5 0 0 0 ISP YES ADB 12 SIWALIK RIVER
LAXMIPUR 100 PARSA AC1995 YR ID 169 135 169 135 135 100 25 0 0 ISP NO ADB 12 SIWALIK RIVER
NAURANGIYA BANTH 100 PARSA AC1995 YR ID 369 295 369 295 295 150 100 0 0 ISP YES ADB 12 SIWALIK RIVER
PATHARAIYA 100 PARSA AC1995 YR ID 64 51 64 51 51 25 20 0 0 ISP YES ADB 12 SIWALIK RIVER
SUBARNAPUR BASATPUR 100 PARSA AC1996 YR ED 620 495 620 495 496 150 100 0 0 ISP NO ADB 12 SIWLIK RIVER
TOTAL of ISP > PARSA > REHABILITATION 10 2682 2143 2682 2143 2114 640 245 0 0

TOTAL of PARSA District 11 2870 2293 2870 2293 2264 740 295 0 0

ISP>RAUTAHAT>REHABILITATION
ARUWA KHOLA 100 RAUTAHAT AC1993 MS ID 313 250 313 250 250 0 0 0 0 ISP NO ADB 12 SIWALIK RIVER
CHANDI 100 RAUTAHAT AC1991 MS ID 313 250 313 250 250 0 0 0 0 ISP NO ADB 12 SIWALIK RIVER
GUJARA KHOLA 100 RAUTAHAT AC1996 YR ID 250 200 250 200 200 50 0 0 0 ISP YES ADB 12 SIWALIK RIVER
HARIHARPUR 100 RAUTAHAT AC1994 MS ID 313 250 313 250 250 0 0 0 0 ISP NO ADB 12 SIWALIK RIVER
KAMDEHI 100 RAUTAHAT AC1993 MS ID 250 200 250 200 200 0 0 0 0 ISP YES ADB 12 SIWALIK RIVER
LOHIMIYA BANDTH 100 RAUTAHAT AC1993 MS ED 583 466 583 466 466 0 0 0 0 ISP NO ADB 12 SIWALIK RIVER
PATHARABUDHARA 100 RAUTAHAT AC1996 YR ED 540 432 540 432 432 150 0 0 0 ISP YES ADB 12 SIWALIK RIVER
SIMRA BHAWANIPUR 100 RAUTAHAT AC1996 YR ED 473 402 473 402 530 200 250 0 0 ISP YES ADB 12 SIWALIK RIVER
KHOTHIYAR 100 RAUTAHAT AC1996 YR ED 138 117 138 117 117 70 28 0 0 ISP NO ADB 12 SIWALIK RIVER
TOTAL of ISP > RAUTAHAT > REHABILITATION 9 3173 2567 3173 2567 2695 470 278 0 0

TOTAL of RAUTAHAT District 9 3173 2567 3173 2567 2695 470 278 0 0

ISP>SARLAHI>REHABILITATION
BHAKTIPUR 100 SARLAHI AC1994 YR ID 188 150 188 150 150 30 0 0 0 ISP NO ADB 12 SIWALIK RIVER
FARAHADAWA 100 SARLAHI AC1993 YR ED 375 300 375 300 300 60 0 0 0 ISP NO ADB 12 SIWALIK RIVER
HARIPURWA 100 SARLAHI AC1996 YR ED 744 595 744 595 595 300 100 0 0 ISP YES ADB 12 SIWALIK RIVER
JINGARWA 100 SARLAHI AC1994 YR ED 470 376 470 376 376 70 0 0 0 ISP NO ADB 12 SIWALIK RIVER
KISHANPUR 100 SARLAHI AC1993 YR ID 413 330 413 330 330 30 0 0 0 ISP NO ADB 12 SIWALIK RIVER
TOTAL of ISP > SARLAHI > REHABILITATION 5 2190 1751 2190 1751 1751 490 100 0 0

TOTAL of SARLAHI District 5 2190 1751 2190 1751 1751 490 100 0 0

TOTAL of CENTRAL> Terai 45 16653 13451 16653 13451 13444 3901 1237 219 175

87
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
ISP>BHAKTAPUR>REHABILITATION
BARSHIK KHOLA 100 BHAKTAPUR AC1995 YR ID 71 60 71 60 85 24 16 0 0 ISP YES ADB 9 BAGMATI
BHINGALI 100 BHAKTAPUR AC1994 YR ID 45 36 45 36 36 20 0 0 0 ISP NO ADB 9 BAGMATI
BRAMIMAYANI 100 BHAKTAPUR AC1995 YR ID 38 30 38 32 30 9 6 0 0 ISP YES ADB 9 BAGMATI
CHAKHKHU KHOLA 100 BHAKTAPUR AC1992 YR ID 74 59 74 59 59 40 0 0 0 ISP NO ADB 9 BAGMATI
DHAUKHA DOL 100 BHAKTAPUR AC1996 YR ID 75 60 75 52 60 24 15 0 0 ISP NO ADB 9 BAGMATI
DHUMBU KULO 100 BHAKTAPUR AC1996 YR ID 163 130 163 90 130 50 30 0 0 ISP NO ADB 9 BAGMATI
DHUNGE I 100 BHAKTAPUR AC1996 YR ID 69 55 69 55 55 21 15 0 0 ISP NO ADB 9 BAGMATI
DHUNGRE II 100 BHAKTAPUR AC1995 YR ID 40 32 40 32 32 9 6 0 0 ISP YES ADB 9 BAGMATI
DHUSI PHANT 100 BHAKTAPUR AC1994 YR ID 40 32 40 32 32 25 0 0 0 ISP NO ADB 9 BAGMATI
DOKE KHOLA I 100 BHAKTAPUR AC1992 YR ID 36 29 36 29 29 20 0 0 0 ISP NO ADB 9 BAGMATI
DOKE KHOLA II 100 BHAKTAPUR AC1993 YR ID 45 36 45 38 36 20 0 0 0 ISP NO ADB 9 BAGMATI
DOVAN KHOLA 100 BHAKTAPUR AC1993 YR ID 69 55 69 55 55 30 0 0 0 ISP NO ADB 9 BAGMATI
GHATTE KHOLA 100 BHAKTAPUR AC1993 YR ID 38 30 38 30 30 20 0 0 0 ISP NO ADB 9 BAGMATI
HARMANCHA 100 BHAKTAPUR AC1993 YR ID 63 50 63 50 50 38 0 0 0 ISP NO ADB 9 BAGMATI
KHASYANG KUSUNG 100 BHAKTAPUR AC1993 YR ID 50 40 50 40 40 10 0 0 0 ISP NO ADB 9 BAGMATI
MULSHAGHU 100 BHAKTAPUR AC1996 YR ID 69 55 69 55 55 22 15 0 0 ISP NO ADB 9 BAGMATI
NANABU 100 BHAKTAPUR AC1993 YR ID 98 78 98 78 78 40 0 0 0 ISP NO ADB 9 BAGMATI
RANIKOT KULO 100 BHAKTAPUR AC1996 YR ID 63 50 63 50 50 20 15 0 0 ISP NO ADB 9 BAGMATI
SUITI KHOLA KALI 100 BHAKTAPUR AC1991 YR ID 29 23 29 23 23 20 0 0 0 ISP NO ADB 9 BAGMATI
AMDOL 100 BHAKTAPUR AC1991 YR ID 14 12 14 12 12 7 3 0 0 ISP NO ADB 9 BAGMATI
TOTAL of ISP > BHAKTAPUR > REHABILITATION 20 1189 952 1189 908 977 469 121 0 0

TOTAL of BHAKTAPUR District 20 1189 952 1189 908 977 469 121 0 0

ISP>DHADING>NEW
BAHUNSTHAN 100 DHADING AC1996 YR ID 88 70 88 70 70 35 35 0 0 ISP NO ADB 3 GANDAK
BISAL TAR 100 DHADING AC1996 YR ID 88 70 88 70 70 35 35 0 0 ISP NO ADB 3 GANDAK
RICHOK TAR 100 DHADING PC1997 YR ID 188 150 0 150 0 0 0 188 150 ISP NO ADB 3 GANDAK
TOTAL of ISP > DHADING > NEW 3 364 290 176 290 140 70 70 188 150

ISP>DHADING>REHABILITATION
GOMATI 100 DHADING AC1992 YR ID 56 48 56 48 48 48 48 0 0 ISP NO ADB 3 GANDAK
KHAIRENI TAR 100 DHADING AC1993 YR ID 31 25 31 25 25 20 10 0 0 ISP NO ADB 3 GANDAK
KUDULE TAR 100 DHADING AC1996 YR ID 44 30 44 30 35 20 20 0 0 ISP NO ADB 3 GANDAK
MAJHITAR KAMPUTAR 100 DHADING AC1996 YR ID 39 31 39 31 31 15 15 0 0 ISP NO ADB 3 GANDAK
MAJI TAR 100 DHADING AC1991 YR ID 60 48 60 48 48 48 17 0 0 ISP NO ADB 3 GANDAK
ULTI TAR 100 DHADING AC1994 YR ID 38 30 38 30 30 30 30 0 0 ISP NO ADB 3 GANDAK
PAREWA TAR 100 DHADING AC1994 YR ID 118 100 118 100 100 60 24 0 0 ISP NO ADB 3 GANDAK
TOTAL of ISP > DHADING > REHABILITATION 7 386 312 386 312 317 241 164 0 0

TOTAL of DHADING District 10 750 602 562 602 457 311 234 188 150

ISP>KATHMANDU>NEW
BHARE 100 KATHMANDU AC1994 YR ID 125 100 125 100 100 40 0 0 0 ISP NO ADB 9 BGMATI
LAMABAGAR 100 KATHMANDU AC1991 YR ID 45 36 45 36 36 14 0 0 0 ISP YES ADB 9 BAGMATI

88
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
SATGHATTE 100 KATHMANDU PC1998 YR ID 156 125 156 125 0 0 0 156 125 ISP NO ADB 9 BAGMATI
BAGAMTAR SUNDARIJAL 100 KATHMANDU AC1996 YR ID 188 150 188 150 150 105 45 0 0 ISP NO ADB 9 BAGMATI
TAUDAH BOSAN 100 KATHMANDU AC1993 YR ID 63 50 63 50 50 20 0 0 0 ISP NO ADB 9 BAGMATI
TOTAL of ISP > KATHMANDU > NEW 5 577 461 577 461 336 179 45 156 125

ISP>KATHMANDU>REHABILITATION
BALAMBU 100 KATHMANDU AC1992 YR ID 63 50 63 50 50 20 0 0 0 ISP NO ADB 9 BAGMATI
CHUNIKHEL 100 KATHMANDU AC1993 YR ID 69 55 69 55 55 22 0 0 0 ISP NO ADB 9 BAGMATI
DHULOPURO 100 KATHMANDU AC1992 YR ID 38 30 38 30 30 12 0 0 0 ISP NO ADB 9 BAGMATI
DHUNGANAABEST 100 KATHMANDU AC1994 YR ID 100 80 100 80 80 32 0 0 0 ISP NO ADB 9 BAGMATI
NARAYAN KHOLA 100 KATHMANDU AC1992 YR ID 65 52 65 52 52 210 0 0 0 ISP NO ADB 9 BAGMATI
PANCHWANE 100 KATHMANDU AC1992 YR ID 26 21 26 21 21 8 0 0 0 ISP YES ADB 9 BAGMATI
PATI CHOUR 100 KATHMANDU AC1990 MS ID 62 50 62 50 50 0 0 0 0 ISP YES ADB 9 BAGMATI
SALEPAKHURE 100 KATHMANDU AC1994 YR ID 64 52 64 52 52 20 0 0 0 ISP NO ADB 9 BAGMATI
SESMANI 100 KATHMANDU AC1996 YR ID 69 55 69 55 55 38 27 0 0 ISP NO ADB 9 BAGMATI
SETI DEVI 100 KATHMANDU AC1994 YR ID 40 32 40 32 32 13 0 0 0 ISP NO ADB 9 BAGMATI
SHESNARAYAN 100 KATHMANDU AC1996 YR ID 88 70 88 70 70 49 21 0 0 ISP NO ADB 9 BAGMATI
SWET BARAHI 100 KATHMANDU AC1993 YR ID 125 100 125 100 100 40 0 0 0 ISP YES ADB 9 BAGMATI
TAUKHEL 100 KATHMANDU AC1993 YR ID 38 30 38 30 30 12 0 0 0 ISP YES ADB 9 BAGMATI
THADO KULO 100 KATHMANDU AC1994 YR ID 100 80 100 80 80 32 0 0 0 ISP NO ADB 9 BAGMATI
BAIRE 100 KATHMANDU AC1994 YR ID 47 40 47 40 40 24 10 0 0 ISP NO ADB 9 BAGMATI
TOTAL of ISP > KATHMANDU > REHABILITATION 15 994 797 994 797 797 532 58 0 0

TOTAL of KATHMANDU District 20 1571 1258 1571 1258 1133 711 103 156 125

ISP>KAVRE>NEW
GHATTE 100 KAVRE PC1998 YR ID 138 110 0 33 0 0 0 138 110 ISP NO ADB 4 KOSHI
NARAYAN TAR 100 KAVRE AC1994 YR ID 94 75 94 75 75 20 0 0 0 ISP NO ADB 4 KOSHI
PIPAL TAR 100 KAVRE AC1996 YR ID 100 85 100 85 40 16 5 0 0 ISP NO ADB 4 KOSHI
SALLERI 100 KAVRE AC1994 YR ID 75 60 75 60 60 30 0 0 0 ISP NO ADB 4 KOSHI
TOTAL of ISP > KAVRE > NEW 4 407 330 269 253 175 66 5 138 110

ISP>KAVRE>REHABILITATION
ARUBOTE 100 KAVRE AC1990 YR ID 30 24 30 24 24 24 0 0 0 ISP YES ADB 4 KOSHI
BALTHALI 100 KAVRE AC1994 YR ID 100 80 100 80 80 40 0 0 0 ISP NO ADB 4 KOSHI
CHITEDOBAN 100 KAVRE AC1993 YR ID 209 167 209 167 167 100 0 0 0 ISP YES ADB 4 KOSHI
DADCHA BESI 100 KAVRE AC1992 YR ID 71 57 71 57 57 57 0 0 0 ISP NO ADB 4 KOSHI
DEVHUNI TAR 100 KAVRE AC1991 YR ID 41 33 41 33 33 33 0 0 0 ISP NO ADB 4 KOSHI
INARABAHAN 100 KAVRE AC1993 YR ID 90 72 90 72 72 30 0 0 0 ISP YES ADB 4 KOSHI
JOL KHOLA 100 KAVRE AC1995 YR ID 65 55 65 55 70 35 30 0 0 ISP YES ADB 4 KOSHI
KENDRA KULO 100 KAVRE AC1995 YR ID 18 14 18 14 14 7 7 0 0 ISP YES ADB 4 KOSHI
NYASILA JELAPATI 100 KAVRE AC1996 YR ID 45 36 45 36 36 16 5 0 0 ISP NO ADB 4 KOSHI
SALLERIIL 100 KAVRE PC197 YR ID 44 35 44 35 0 0 0 44 35 ISP NO ADB 4 KOSHI
SIMLE MAJHUWA 100 KAVRE AC1995 YR ID 59 50 59 50 45 22 15 0 0 ISP YES ADB 4 KOSHI
SINGE CHAINPUR 100 KAVRE AC1996 YR ID 120 96 120 96 96 40 10 0 0 ISP NO ADB 4 KOSHI

89
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TARKE TAR 100 KAVRE AC1996 YR ID 61 52 61 52 42 16 5 0 0 ISP YES ADB 4 KOSHI
TOTAL of ISP > KAVRE > REHABILITATION 13 953 771 953 771 736 420 72 44 35

TOTAL of KAVRE District 17 1360 1101 1222 1024 911 486 77 182 145

ISP>LALITPUR>REHABILITATION
AASHRANG 100 LALITPUR AC1996 YR ID 69 55 69 55 55 30 10 0 0 ISP NO ADB 9 BAGMATI
BUGMATI 100 LALITPUR AC1992 YR ID 79 63 79 63 63 63 0 0 0 ISP NO ADB 9 BAGMATI
BUMOUDI 100 LALITPUR AC1992 YR ID 94 75 94 75 75 25 15 0 0 ISP YES ADB 9 BAGMATI
CHHAMPI 100 LALITPUR AC1992 MS ID 156 125 156 125 125 115 5 0 0 ISP NO ADB 9 BAGMATI
DHANABU 100 LALITPUR AC1996 YR ID 31 25 31 25 25 20 5 0 0 ISP NO ADB 9 BAGMATI
HARISHIDDHI 100 LALITPUR AC1996 YR ID 100 80 100 80 80 40 20 0 0 ISP NO ADB 9 BAGMATI
KHAKDOOL 100 LALITPUR AC1994 YR ID 31 25 31 25 25 25 0 0 0 ISP NO ADB 9 BAGMATI
LABADOL 100 LALITPUR AC1996 YR ID 44 35 44 35 35 20 10 0 0 ISP NO ADB 9 BAGMATI
MAJHA KHOLA 100 LALITPUR AC1993 YR ID 125 100 125 100 100 90 3 0 0 ISP NO ADB 9 BAGMATI
MAKAL 100 LALITPUR AC1994 YR ID 112 90 112 90 90 90 2 0 0 ISP NO ADBN 9 BAGMATI
MOTIRAJ KULO 100 LALITPUR AC1993 YR ID 81 65 81 65 65 55 0 0 0 ISP NO ADBN 9 BAGMATI
MULPANI 100 LALITPUR AC1993 YR ID 75 60 75 60 60 45 0 0 0 ISP NO ADBN 9 BAGMATI
NAGDHAHA 100 LALITPUR AC1994 YR ID 38 30 38 30 30 25 0 0 0 ISP NO ADBN 9 BAGMATI
PIPALEDHOL 100 LALITPUR AC1996 YR ID 113 90 113 90 90 50 25 0 0 ISP NO ADBN 9 BAGMATI
PYUTAR 100 LALITPUR AC1996 YR ID 63 50 63 50 50 25 10 0 0 ISP YES AFBN 9 BAGMATI
SIDHIPUR 100 LALITPUR AC1993 YR ID 188 150 188 150 150 135 5 0 0 ISP NO ADBN 9 BAGMATI
SIRKHA D0L 100 LALITPUR AC1993 YR ID 156 125 156 125 125 52 0 0 0 ISP NO ADBN 9 BAGMATI
TIKABHAIRAB 100 LALITPUR AC1993 YR ID 353 300 353 300 300 180 72 0 0 ISP NO ADB 9 BAGMATI
TOTAL of ISP > LALITPUR > REHABILITATION 18 1908 1543 1908 1543 1543 1085 182 0 0

TOTAL of LALITPUR District 18 1908 1543 1908 1543 1543 1085 182 0 0

ISP>MAKAWANPUR>NEW
CHYAUCHYAU 100 MAKAWANPUR AC1996 YR ID 124 99 124 99 99 50 25 0 0 ISP NO ADBN 3 GANDAK
DOOBO 100 MAKAWANPUR AC1996 YR ID 63 50 63 50 50 25 12 0 0 ISP NO ADBN 3 GANDAK
KALIKA TAR 100 MAKAWANPUR AC1996 YR ID 100 80 100 80 80 40 20 0 0 ISP YES ADBN 3 GANDAK
KARMACHULI 100 MAKAWANPUR AC1994 YR ID 112 90 112 90 90 40 0 0 0 ISP NO ADBN 3 GANDAK
RAPTINAWALPUR11 100 MAKAWANPUR AC1995 YR ID 63 50 63 50 50 30 20 0 0 ISP YES ADBN 3 GANDAK
TOTAL of ISP > MAKAWANPUR > NEW 5 462 369 462 369 369 185 77 0 0

ISP>MAKAWANPUR>REHABILITATION
DARDARA 100 MAKAWANPUR AC1993 YR ID 131 105 131 105 105 0 0 0 0 ISP NO ADBM 3 GANDAK
GHATTEDAMAR 100 MAKAWANPUR AC1993 YR ID 71 60 71 60 65 30 0 0 0 ISP NO ADBN 3 GANDAK
GURUBIRTA 100 MAKAWANPUR AC1995 YR ID 134 107 134 107 107 65 50 0 0 ISP YES ADBN 3 GANDAK
JUINA 100 MAKAWANPUR AC1996 YR ID 33 28 33 28 25 12 6 0 0 ISP NO ADBN 3 GANDAK
JYAMIRE 100 MAKAWANPUR AC1993 YR ID 156 125 156 125 125 60 0 0 0 ISP NO ADBN 3 GANDAK
KALIDAMAR 100 MAKAWANPUR AC1993 YR ID 40 32 40 32 32 16 0 0 0 ISP NO ADBN 3 GANDAK
LAMKHET 100 MAKAWANPUR AC1993 YR ID 75 60 75 60 60 25 0 0 0 ISP NO ADBN 3 GANDAK
PALDAMAR 100 MAKAWANPUR AC1993 YR ID 38 30 38 30 30 12 0 0 0 ISP NO ADBN 3 GANDAK
PAWASVOLLRY 100 MAKAWANPUR AC1994 YR ID 106 85 106 85 85 40 0 0 0 ISP NO ADBN 3 GANDAK

90
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
RAPTI NAWALPUR 100 MAKAWANPUR AC1993 YR ID 125 100 125 100 100 0 0 0 0 ISP YES ADBN 3 GANDAK
KUDULE 100 MAKAWANPUR AC1993 YR ID 41 35 41 35 35 21 8 0 0 ISP NO ADB 3 GANDAK
TOTAL of ISP > MAKAWANPUR > REHABILITATION 11 950 767 950 767 769 281 64 0 0

TOTAL of MAKAWANPUR District 16 1412 1136 1412 1136 1138 466 141 0 0

ISP>NUWAKOT>NEW
DHORKU KHOLA 100 NUWAKOT AC 1996 YR ID 182 155 182 155 120 120 120 0 0 ISP NO ADB 3 GANDAK
DUMRE CHOUR 100 NUWAKOT AC 1995 YR ID 200 160 200 160 160 100 80 0 0 ISP NO ADB 3 GANDAK
KANLEPACHISI 100 NUWAKOT AC 1994 YR ID 59 47 59 47 47 20 0 0 0 ISP NO ADB 3 GANDAK
SUNKHANI 100 NUWAKOT AC 1996 YR ID 75 60 75 60 60 60 60 0 0 ISP NO ADB 3 GANDAK
WANKAL 100 NUWAKOT AC 1994 YR ID 60 48 60 48 48 30 12 0 0 ISP NO ADB 3 GANDAK
TOTAL of ISP > NUWAKOT > NEW 5 576 470 576 470 435 330 272 0 0

ISP>NUWAKOT>REHABILITATION
ANGUTAR 100 NUWAKOT AC 1993 YR ID 100 80 100 80 80 40 0 0 0 ISP YES ADB 3 GANDAK
ARCHALE PHANT 100 NUWAKOT AC 1994 YR ID 75 60 75 60 60 30 0 0 0 ISP NO ADB 3 GANDAK
BASPANI 100 NUWAKOT AC 1993 YR ID 35 28 35 28 28 14 0 0 0 ISP NO ADB 3 GANDAK
BASUKOT 100 NUWAKOT AC 1994 YR ID 250 200 250 200 200 100 0 0 0 ISP YES ADB 3 GANDAK
DARSHANTAR 100 NUWAKOT AC1994 YR ID 75 60 75 60 60 30 0 0 0 ISP NO ADBN 3 GANDAK
SINKESTIN 100 NUWAKOT AC1994 YR ID 13 11 13 11 11 7 3 0 0 ISP NO ADB 3 GANDAK
SIMARA 100 NUWAKOT AC1994 YR ID 471 400 471 400 400 240 96 0 0 ISP NO ADB 3 GANDAK
TOTAL of ISP > NUWAKOT > REHABILITATION 7 1019 839 1019 839 839 461 99 0 0

TOTAL of NUWAKOT District 12 1595 1309 1595 1309 1274 791 371 0 0

ISP>RAMECHHAP>NEW
BAMAUTI 100 RAMECHHAP AC1996 YR ED 375 300 375 300 300 300 300 0 0 ISP NO ADBN 4 KOSHI
P 100 RAMECHHAP AC1995 YR ID 100 80 100 80 80 80 80 0 0 ISP YES ADBN 4 KOSHI
DIPALETODKE 100 RAMECHHAP AC1995 YR ID 63 50 63 50 50 50 50 0 0 ISP YES ADBN 4 KOSHI
PHALATE 100 RAMECHHAP AC1996 YR ID 63 50 63 50 50 50 50 0 0 ISP NO ADB 4 KOSHI
TOTAL of ISP > RAMECHHAP > NEW 4 601 480 601 480 480 480 480 0 0

ISP>RAMECHHAP>REHABILITATION
ADHERI KHOLA 100 RAMECHHAP AC1993 YR ID 38 30 38 30 30 15 0 0 0 ISP NO HMG 4 KOSHI
BETALI 100 RAMECHHAP AC1994 YR ID 150 120 150 120 120 50 0 0 0 ISP NO ADB 4 KOSHI
BITILTAR 100 RAMECHHAP AC1994 YR ID 26 21 26 21 21 8 0 0 0 ISP NO ADB 4 KOSHI
CHIADI SINDURETAR 100 RAMECHHAP AC1994 YR ID 76 61 76 61 61 24 0 0 0 ISP NO ADB 4 KOSHI
DOVANK HOLA 100 RAMECHHAP AC1994 YR ID 80 64 80 64 64 32 0 0 0 ISP NO ADB 4 KOSHI
GAGALT TAR 100 RAMECHHAP AC1994 YR ID 144 115 144 115 115 56 0 0 0 ISP NO ADB 4 KOSHI
KHALPU KHOLA 100 RAMECHHAP AC1994 YR ID 231 185 231 185 185 70 0 0 0 ISP NO ADB 4 KOSHI
KHIMTI 100 RAMECHHAP AC1994 YR ID 71 57 71 57 57 25 0 0 0 ISP NO ADB 4 KOSHI
LARKU KHOLA 100 RAMECHHAP AC1993 YR ID 43 34 43 34 34 15 0 0 0 ISP NO ADB 4 KOSHI
NILAKANTHESWOR 100 RAMECHHAP AC1995 YR ID 25 20 25 20 20 20 20 0 0 ISP YES ADB 4 KOSHI
TAMAKOSHI 100 RAMECHHAP AC1994 YR ID 58 43 58 43 43 16 0 0 0 ISP NO ADB 4 KOSHI
TILPUNG KHOLA 100 RAMECHHAP AC1993 YR ID 41 33 41 33 33 12 0 0 0 ISP NO ADB 4 KOSHI

91
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
PHEDI 100 RAMECHHAP AC1993 YR ID 35 30 35 30 30 18 7 0 0 ISP NO ADB 4 KOSHI
TOTAL of ISP > RAMECHHAP > REHABILITATION 13 1018 813 1018 813 813 361 27 0 0

TOTAL of RAMECHHAP District 17 1619 1293 1619 1293 1293 841 507 0 0

ISP>SINDHULI>NEW
DHAMILE 100 SINDHULI AC1993 YR ID 75 60 75 60 60 24 0 0 0 ISP YES ADB 9 BAGMATI
KAMALAMAISTHAN 100 SINDHULI AC1993 YR ID 80 70 80 70 70 30 0 0 0 ISP NO ADB 9 BAGMATI
PHALATE KHOLA 100 SINDHULI AC1996 YR ID 125 100 125 100 100 50 0 0 0 ISP YES ADB 9 BAGMATI
PIPALABADHI 100 SINDHULI AC1996 YR ID 100 80 100 80 80 40 0 0 0 ISP YES ADB 9 BAGMATI
HARSAHI 100 SINDHULI AC 1995 YR ED 375 300 375 300 300 180 100 0 0 ISP YES ADB 9 BAGMATI
TOTAL of ISP > SINDHULI > NEW 5 755 610 755 610 610 324 100 0 0

ISP>SINDHULI>REHABILITATION
BHALU KHOLA 100 SINDHULI AC1993 YR ID 125 100 125 100 100 40 0 0 0 ISP YES ADB 9 BAGMATI
GAUDALI KHOLA 100 SINDHULI AC1993 YR ID 100 80 100 80 80 30 0 0 0 ISP YES ADB 9 BAGAMATI
PANSAYAMAJHI TAR 100 SINDHULI AC1993 YR ID 50 40 50 40 40 15 0 0 0 ISP YES ADB 9 BAGAMATI
BHOHARI TAR 100 SINDHULI AC1993 YR ID 59 50 59 50 50 30 12 0 0 ISP NO ADB 9 BAGMATI
TOTAL of ISP > SINDHULI > REHABILITATION 4 334 270 334 270 270 115 12 0 0

TOTAL of SINDHULI District 9 1089 880 1089 880 880 439 112 0 0

TOTAL of CENTRAL> Hill 139 12493 10074 12167 9953 9606 5599 1848 526 420

ISP>DOLAKHA>NEW
ADHERI KHOLA 100 DOLAKHA AC1993 YR ID 559 355 559 355 447 0 0 0 0 ISP NO ADB 4 KOSHI
GHATTE 100 DOLAKHA AC1996 YR ID 59 50 59 50 250 125 0 0 0 ISP NO ADB 4 KOSHI
JILU KHOLA 100 DOLAKHA AC1996 YR ID 63 50 63 50 50 25 0 0 0 ISP NO ADB 4 KOSHI
KAIJALE KHOLA 100 DOLAKHA AC1995 YR ID 88 70 88 70 70 28 15 0 0 ISP NO ADB 4 KOSHI
KHANI KHOLA 100 DOLAKHA AC1996 YR ID 273 218 273 218 218 109 0 0 0 ISP NO ADB 4 KOSHI
PHATKE KHOLA 100 DOLAKHA AC1995 YR ID 188 150 188 150 150 60 30 0 0 ISP YES ADB 4 KOSHI
SAHARE TAR 100 DOLAKHA AC1993 YR ID 38 30 38 30 30 20 0 0 0 ISP NO ADB 4 KOSHI
TOTAL of ISP > DOLAKHA > NEW 7 1268 923 1268 923 1215 367 45 0 0

ISP>DOLAKHA>REHABILITATION
DOLI KHOLA 100 DOLAKHA AC1996 YR ID 163 130 163 130 130 65 0 0 0 ISP NO ADB 4 KOSHI
GOPI KHOLA 100 DOLAKHA AC1993 YR ID 100 80 100 80 80 40 0 0 0 ISP NO ADB 4 KOSHI
KHANAKIGYANG 100 DOLAKHA AC1994 MS ID 63 50 63 50 50 0 0 0 0 ISP NO ADB 4 KOSHI
MARING KHOLA 100 DOLAKHA AC1994 YR ID 63 50 63 50 50 25 0 0 0 ISP YES ADB 4 KOSHI
GHATTE 100 DOLAKHA AC1993 YR ID 241 205 241 205 205 123 49 0 0 ISP NO ADB 4 KOSHI
TOTAL of ISP > DOLAKHA > REHABILITATION 5 630 515 630 515 515 253 49 0 0

TOTAL of DOLAKHA District 12 1898 1438 1898 1438 1730 620 94 0 0

ISP>RASUWA>NEW
DUNESWARA 100 RASUWA AC1995 YR ID 44 35 44 35 35 35 35 0 0 ISP YES ADB 3 GANDAK

92
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
MACHET KHOLA 100 RASUWA AC1996 YR ID 47 40 47 40 80 80 40 0 0 ISP NO ADB 3 GANDAK
SANGLE KHOLA 100 RASUWA AC1994 YR ID 131 105 131 105 105 40 0 0 0 ISP NO ADB 3 GANDAK
SIPCHONG 100 RASUWA AC1994 YR ID 142 114 142 114 114 45 0 0 0 ISP NO ADB 3 GANDAK
TOTAL of ISP > RASUWA > NEW 4 364 294 364 294 334 200 75 0 0

ISP>RASUWA>REHABILITATION
BETAGAUDA 100 RASUWA AC1993 YR ID 125 100 125 100 100 40 0 0 0 ISP NO ADB 3 GANDAK
RUPSE PHANT 100 RASUWA AC1994 YR ID 75 60 75 60 60 30 0 0 0 ISP NO ADB 3 GANDAK
TOTAL of ISP > RASUWA > REHABILITATION 2 200 160 200 160 160 70 0 0 0

TOTAL of RASUWA District 6 564 454 564 454 494 270 75 0 0

ISP>SINDHUPALCHOWK>NEW
DAHA POKHARI 100 SINDHUPALCHOWK AC1995 YR ID 50 40 50 40 40 20 15 0 0 ISP YES ADB 4 KOSHI
GHICHHE KHOLA 100 SINDHUPALCHOWK AC1995 YR ID 71 60 71 60 60 30 20 0 0 ISP YES ADB 4 KOSHI
HADI KHOLA 100 SINDHUPALCHOWK AC1996 YR ID 96 82 96 82 90 90 90 0 0 ISP YES ADB 4 KOSHI
JYAMIRE 100 SINDHUPALCHOWK AC1995 YR ID 75 60 75 60 60 45 20 0 0 ISP YES ADB 4 KOSHI
LAPSITHUME 100 SINDHUPALCHOWK AC1994 YR ID 44 35 44 35 35 17 0 0 0 ISP NO ADB 4 KOSHI
BHOTENAMLANG 100 SINDHUPALCHOWK AC1996 YR ID 106 85 106 85 85 50 35 0 0 ISP YES ADB 4 KOSHI
PHALATA 100 SINDHUPALCHOWK AC1996 YR ID 38 30 38 30 30 20 10 0 0 ISP YES ADB 4 KOSHI
THULOPHAKAR 100 SINDHUPALCHOWK AC1994 YR ID 75 60 75 60 60 30 0 0 0 ISP NO ADB 4 KOSHI
TOTAL of ISP > SINDHUPALCHOWK > NEW 8 555 452 555 452 460 302 190 0 0

ISP>SINDHUPALCHOWK>REHABILITATION
CHILAUNEKHET 100 SINDHUPALCHOWK AC1996 YR ID 44 35 44 35 35 30 30 0 0 ISP YES ADB 4 KOSHI
DHARMEMGURE 100 SINDHUPALCHOWK AC1994 YR ID 94 75 94 75 75 35 0 0 0 ISP YES ADB 4 KOSHI
KYAMUNEMOHAN 100 SINDHUPALCHOWK AC1993 YR ID 75 60 75 60 60 30 0 0 0 ISP YES ADB 4 KOSHI
MUL KULO 100 SINDHUPALCHOWK AC1991 YR ID 50 40 50 40 40 16 0 0 0 ISP YES ADB 4 KOSHI
PANGTANG 100 SINDHUPALCHOWK AC1993 YR ID 71 60 71 60 45 20 0 0 0 ISP YES ADB 4 KOSHI
SIMPANI 100 SINDHUPALCHOWK AC1995 YR ID 75 60 75 60 60 45 40 0 0 ISP YES ADB 4 KOSHI
TARKET PHANT 100 SINDHUPALCHOWK AC1993 YR ID 31 25 31 25 25 10 0 0 0 ISP YES ADB 4 KOSHI
THULO KULO 100 SINDHUPALCHOWK 71 60 71 60 60 36 14 0 0 ISP NO ADB 4 KOSHI
TOTAL of ISP > SINDHUPALCHOWK > REHABILITATION 8 511 415 511 415 400 222 84 0 0

TOTAL of SINDHUPALCHOWK District 16 1066 867 1066 867 860 524 274 0 0

TOTAL of CENTRAL > Mountain 34 3528 2759 3528 2759 3084 1414 443 0 0

TOTAL of CENTRAL Region 218 32674 26284 32348 26163 26134 10914 3528 745 595

TOTAL of ISP 376 71490 57753 70676 57582 52828 19974 5472 6825 5415

K-BIRD>DAILEKH>NEW
VEHRI KAHLIKATHUM 100 DAILEKH AC 1994 YR ID 19 15 19 15 15 8 0 0 0 K-BIRD NO A 2 KARNALI
TOTAL of K-BIRD > DAILEKH > NEW 1 19 15 19 15 15 8 0 0 0

93
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
K-BIRD>DAILEKH>REHABILITATION
BADA BHAIRAB 100 DAILEKH AC 1993 YR ID 31 25 31 25 25 15 0 0 0 K-BIRD NO A 2 KARNALI
GAURI 100 DAILEKH AC 1994 YR ID 11 9 11 9 9 4 0 0 0 K-BIRD NO A 2 KARNALI
JANAK KHOLA 100 DAILEKH AC 1993 YR ID 31 25 31 25 25 12 0 0 0 K-BIRD NO A 2 KARNALI
LAKURI POKHARI 100 DAILEKH AC 1993 YR ID 25 20 25 20 20 10 0 0 0 K-BIRD NO A 2 KARNALI
NANETA 100 DAILEKH AC 1993 YR ID 31 25 31 25 25 12 0 0 0 K-BIRD NO A 2 KARNALI
TOTAL of K-BIRD > DAILEKH > REHABILITATION 5 129 104 129 104 104 53 0 0 0

TOTAL of DAILEKH District 6 148 119 148 119 119 61 0 0 0

K-BIRD>SURKHET>NEW
GHALGHALE 100 SURKHET AC 1994 YR ID 212 170 212 170 170 70 0 0 0 K-BIRD NO A 2 KARNALI
KALYAN LABNA(NYABAL) 100 SURKHET AC 1994 MS ID 155 124 155 124 124 100 0 0 0 K-BIRD NO A 2 KARNALI
TALLO BHOKRENI 100 SURKHET AC 1994 YR ID 250 200 250 200 200 150 0 0 0 K-BIRD NO A 2 KARNALI
TOTAL of K-BIRD > SURKHET > NEW 3 617 494 617 494 494 320 0 0 0

K-BIRD>SURKHET>REHABILITATION
KATA KUWA 100 SURKHET AC 1992 MS ID 56 45 56 45 45 0 0 0 0 K-BIRD NO A 2 KARNALI
MATHILLO BHOKRNJ 100 SURKHET AC 1992 MS ID 250 200 250 200 200 0 0 0 0 K-BIRD NO A 2 KARNALI
SAHARE 100 SURKHET AC 1992 MS ID 325 260 325 260 260 0 0 0 0 K-BIRD NO A 2 KARNALI
SATAKANE CHAURASE 100 SURKHET AC 1994 YR ID 138 110 138 110 110 110 0 0 0 K-BIRD NO A 2 KARNALI
TOTAL of K-BIRD > SURKHET > REHABILITATION 4 769 615 769 615 615 110 0 0 0

TOTAL of SURKHET District 7 1386 1109 1386 1109 1109 430 0 0 0

TOTAL of MID-WESTERN > Hill 13 1534 1228 1534 1228 1228 491 0 0 0

K-BIRD>JUMLA>REHABILITATION
BIRATRAJ KULO 100 JUMLA AC 1992 YR ID 188 150 188 150 150 150 0 0 0 K-BIRD NO A 2 KARNALI
BODKI 100 JUMLA AC 1992 YR ID 19 15 19 15 15 15 0 0 0 K-BIRD NO A 2 KARNALI
CHANDAN NATH 100 JUMLA AC 1992 YR ID 13 10 13 10 10 10 0 0 0 K-BIRD NO A 2 KARNALI
TOTAL of K-BIRD > JUMLA > REHABILITATION 3 220 175 220 175 175 175 0 0 0

TOTAL of JUMLA District 3 220 175 220 175 175 175 0 0 0

TOTAL of MID-WESTERN > Mountain 3 220 175 220 175 175 175 0 0 0

TOTAL of MID-WESTERN Region 16 1754 1403 1754 1403 1403 666 0 0 0

TOTAL of K-BIRD 16 1754 1403 1754 1403 1403 666 0 0 0

KHILL>BHOJPUR>REHABILITATION
BOYA 100 BHOJPUR AC 125 100 125 100 100 0 0 0 0 KHILL NO BRITISH 4 KOSHI
BUKULA 100 BHOJPUR AC 25 20 25 20 20 0 0 0 0 KHILL NO BRITISH 4 KOSHI
DEWANG TAR 100 BHOJPUR AC 25 20 25 20 20 0 0 0 0 KHILL NO BRITISH 4 KOSHI
MAJUWA TAR 100 BHOJPUR AC 50 40 50 40 40 0 0 0 0 KHILL NO BRITISH 4 KOSHI

94
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
MANEBHANJHANG 100 BHOJPUR AC 31 25 31 25 25 0 0 0 0 KHILL NO BRITISH 4 KOSHI
PANCHKANYA 100 BHOJPUR AC 94 75 94 75 75 0 0 0 0 KHILL NO BRITISH 4 KOSHI
TOTAL of KHILL > BHOJPUR > REHABILITATION 6 350 280 350 280 280 0 0 0 0

TOTAL of BHOJPUR District 6 350 280 350 280 280 0 0 0 0

KHILL>DHANKUTA>NEW
BHAISE 100 DHANKUTA AC 43 34 43 34 34 0 0 0 0 KHILL NO BRITISH 4 KOSHI
HATHI KHARKA 100 DHANKUTA AC 31 25 31 25 25 0 0 0 0 KHILL NO BRITISH 4 KOSHI
SANO 100 DHANKUTA AC 44 35 44 35 35 0 0 0 0 KHILL NO BRITISH 4 KOSHI
TOTAL of KHILL > DHANKUTA > NEW 3 118 94 118 94 94 0 0 0 0

KHILL>DHANKUTA>REHABILITATION
BELHARA BESI 100 DHANKUTA AC 50 40 50 40 40 0 0 0 0 KHILL NO BRITISH 4 KOSHI
CHUNGMANG 100 DHANKUTA AC 38 30 38 30 30 0 0 0 0 KHILL NO BRITISH 4 KOSHI
DANDA GAON 100 DHANKUTA AC 75 60 75 60 60 0 0 0 0 KHILL NO BRITISH 4 KOSHI
DHARA PANI 100 DHANKUTA AC 25 20 25 20 20 0 0 0 0 KHILL NO BRITISH 4 KOSHI
DILUNGA TAR 100 DHANKUTA AC 11 9 11 9 9 0 0 0 0 KHILL NO BRITISH 4 KOSHI
HATHI TAR 100 DHANKUTA AC 13 10 13 10 10 0 0 0 0 KHILL NO BRITISH 4 KOSHI
JITPUR 100 DHANKUTA AC 56 45 56 45 45 0 0 0 0 KHILL NO BRITISH 4 KOSHI
PILIYA TAR 100 DHANKUTA AC 19 15 19 15 15 0 0 0 0 KHILL NO BRITISH 4 KOSHI
TOTAL of KHILL > DHANKUTA > REHABILITATION 8 287 229 287 229 229 0 0 0 0

TOTAL of DHANKUTA District 11 405 323 405 323 323 0 0 0 0

KHILL>TEHRATHUM>NEW
BASANTAPUR 100 TEHRATHUM AC 50 40 50 40 40 0 0 0 0 KHILL NO BRITISH 4 KOSHI
TOTAL of KHILL > TEHRATHUM > NEW 1 50 40 50 40 40 0 0 0 0

KHILL>TEHRATHUM>REHABILITATION
HATTISAR 100 TEHRATHUM AC 44 35 44 35 35 0 0 0 0 KHILL NO BRITISH 4 KOSHI
MORHANG 100 TEHRATHUM AC 63 50 63 50 50 0 0 0 0 KHILL NO BRITISH 4 KOSHI
PIGUWA 100 TEHRATHUM AC 188 150 188 150 150 0 0 0 0 KHILL NO BRITISH 4 KOSHI
SAMDU 100 TEHRATHUM AC 125 100 125 100 100 0 0 0 0 KHILL NO BRITISH 4 KOSHI
SUNGNAM 100 TEHRATHUM AC 31 25 31 25 25 0 0 0 0 KHILL NO BRITISH 4 KOSHI
TOTAL of KHILL > TEHRATHUM > REHABILITATION 5 451 360 451 360 360 0 0 0 0

TOTAL of TEHRATHUM District 6 501 400 501 400 400 0 0 0 0

TOTAL of EASTERN > Hill 23 1256 1003 1256 1003 1003 0 0 0 0

KHILL>SANKHUWASABHA>NEW
KURKUSANI 100 SANKHUWASABHA AC 38 30 38 30 30 0 0 0 0 KHILL NO BRITISH 4 KOSHI
MALIMULKHARK 100 SANKHUWASABHA AC 38 30 38 30 30 0 0 0 0 KHILL NO BRITISH 4 KOSHI
TOTAL of KHILL > SANKHUWASABHA > NEW 2 76 60 76 60 60 0 0 0 0

95
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
KHILL>SANKHUWASABHA>REHABILITATION
BARDEO 100 SANKHUWASABHA AC 19 15 19 15 15 0 0 0 0 KHILL NO BRITISH 4 KOSHI
HIDANGMA 100 SANKHUWASABHA AC 94 75 94 75 75 0 0 0 0 KHILL NO BRITISH 4 KOSHI
MALINGA 100 SANKHUWASABHA AC 63 50 63 50 50 0 0 0 0 KHILL NO BRITISH 4 KOSHI
MBHUWA 100 SANKHUWASABHA AC 56 45 56 45 45 0 0 0 0 KHILL NO BRITISH 4 KOSHI
M TALPATI 100 SANKHUWASABHA AC 69 55 69 55 55 0 0 0 0 KHILL NO BRITISH 4 KOSHI
NUBHA 100 SANKHUWASABHA AC 50 40 50 40 40 0 0 0 0 KHILL NO BRITISH 4 KOSHI
PAIRAINI 100 SANKHUWASABHA AC 13 10 13 10 10 0 0 0 0 KHILL NO BRITISH 4 KOSHI
RAMA PHOK 100 SANKHUWASABHA AC 63 50 63 50 50 0 0 0 0 KHILL NO BRITISH 4 KOSHI
TOTAL of KHILL > SANKHUWASABHA > REHABILITATION 8 427 340 427 340 340 0 0 0 0

TOTAL of SANKHUWASABHA District 10 503 400 503 400 400 0 0 0 0

TOTAL of EASTERN > Mountain 10 503 400 503 400 400 0 0 0 0

TOTAL of EASTERN Region 33 1759 1403 1759 1403 1403 0 0 0 0

TOTAL of KHILL 33 1759 1403 1759 1403 1403 0 0 0 0

M/HILL>ILAM>NEW
PHAKPHA 7,9 100 ILAM AC 1994 YR ID 75 60 75 60 60 24 0 0 0 M/HILL NO SNV 11 KANKAI
PUWA MAJHWA -6,9 100 ILAM PC 1997 YR 180 144 0 0 0 0 0 180 144 M/HILL NO SNV 11 KANKAI
TOTAL of M/HILL > ILAM > NEW 2 255 204 75 60 60 24 0 180 144

M/HILL>ILAM>REHABILITATION
AMCHOKE 2,5 100 ILAM AC 1994 YR ID 54 43 54 43 43 16 0 0 0 M/HILL NO SNV 11 KANKAI
CHISA PANI- 5,6,7 100 ILAM AC 1992 YR ID 63 50 63 50 50 5 0 0 0 M/HILL NO SNV 11 KANKAI
EKATAPPA 8,9 100 ILAM AC 1994 YR ID 65 52 65 52 52 20 0 0 0 M/HILL NO SNV 11 KANKAI
GODAK 100 ILAM AC 1992 YR ID 100 80 100 80 80 80 0 0 0 M/HILL NO SNV 11 KANKAI
LAXMIPUR-6 100 ILAM AC 1992 YR ID 44 35 44 35 35 5 0 0 0 M/HILL NO SNV 11 KANKAI
LUMLE 100 ILAM AC 1995 YR ID 38 30 38 30 30 10 5 0 0 M/HILL NO SNV 11 KANKAI
MANGALBARE 1,9 100 ILAM AC 1992 YR ID 125 100 125 100 100 100 0 0 0 M/HILL NO SNV 11 KANKAI
PHUIYATAPPA 3,7,2 100 ILAM AC 1994 YR ID 69 55 69 55 55 22 0 0 0 M/HILL NO SNV 11 KANKAI
PUWA MAJUWA ( TALKHARK) 100 ILAM PC 1997 YR ID 166 133 0 0 0 0 0 166 133 M/HILL NO SNV 11 KANKAI
PUWA MAJUWA6,9 100 ILAM AC 1996 YR ID 188 150 188 150 150 70 30 0 0 M/HILL NO SNV 11 KANKAI
SAKHEJUNG 100 ILAM PC 1997 YR ID 63 50 0 0 0 0 0 63 50 M/HILL NO SNV 11 KANKAI
SAKPHARAN 100 ILAM AC 1995 YR ID 25 20 25 20 20 10 5 0 0 M/HILL NO SNV 11 KANKAI
SANGRUMBA-5,6 100 ILAM AC 1992 YR ID 69 55 69 55 55 55 0 0 0 M/HILL NO SNV 11 KANKAI
SHANTI DANDA-3 100 ILAM AC 1992 MS ID 94 75 94 75 75 75 0 0 0 M/HILL NO SNV 11 KANKAI
SHANTI DANDA-9 100 ILAM AC 1992 YR ID 100 80 100 80 80 40 0 0 0 M/HILL NO SNV 11 KANKAI
SIDHI THUMKA 2 100 ILAM AC 1992 YR ID 25 20 25 20 20 20 0 0 0 M/HILL NO SNV 11 KANKAI
SOYAK 100 ILAM AC 1992 YR ID 31 25 31 25 25 25 0 0 0 M/HILL NO SNV 11 KANKAI
TOTAL of M/HILL > ILAM > REHABILITATION 17 1319 1053 1090 870 870 553 40 229 183

TOTAL of ILAM District 19 1574 1257 1165 930 930 577 40 409 327

96
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
M/HILL>PANCHTHAR>NEW
EKTIN 1,4,5,6 100 PANCHTHAR AC 1994 YR ID 41 33 41 33 33 12 0 0 0 M/HILL NO SNV 4 KOSHI
TOTAL of M/HILL > PANCHTHAR > NEW 1 41 33 41 33 33 12 0 0 0

M/HILL>PANCHTHAR>REHABILITATION
BIMIRE 100 PANCHTHAR PC 1997 YR ID 31 25 0 0 0 0 0 31 25 M/HILL NO SNV 4 KOSHI
EKTIN 1,2,5 100 PANCHTHAR AC 1994 YR ID 34 27 34 27 27 10 0 0 0 M/HILL NO SNV 4 KOSHI
LUNGRUPA 5,6 100 PANCHTHAR AC 1992 YR ID 50 40 50 40 40 40 0 0 0 M/HILL NO SNV 4 KOSHI
MEMENG MATHILLO 100 PANCHTHAR AC 1994 YR ID 44 35 44 35 35 14 0 0 0 M/HILL NO SNV 4 KOSHI
MEMING TALLO 100 PANCHTHAR AC 1994 YR ID 56 45 56 45 45 18 0 0 0 M/HILL NO SNV 4 KOSHI
NAGI-8 100 PANCHTHAR AC 1996 YR ID 31 25 31 25 25 10 5 0 0 M/HILL NO SNV 4 KOSHI
NAGIN 100 PANCHTHAR AC 1992 MS ID 38 30 38 30 30 0 0 0 0 M/HILL NO SNV 4 KOSHI
PAUWA SARTAP 100 PANCHTHAR AC 1991 YR ID 69 55 69 55 55 45 0 0 0 M/HILL NO SNV 4 KOSHI
PHALAICHA-4,6 100 PANCHTHAR AC 1995 YR ID 88 70 88 70 70 30 15 0 0 M/HILL NO SNV 4 KOSHI
PHIDIM 100 PANCHTHAR AC 1991 YR ID 100 80 100 80 80 50 0 0 0 M/HILL NO SNV 4 KOSHI
SALLERI 100 PANCHTHAR AC 1992 YR ID 121 97 121 97 80 75 0 0 0 M/HILL NO SNV 4 KOSHI
THARUP-4,6 100 PANCHTHAR AC 1995 YR ID 125 100 125 100 100 50 25 0 0 M/HILL NO SNV 4 KOSHI
YOYAM-4,5,6 100 PANCHTHAR AC 1996 YR ID 38 30 38 30 30 15 10 0 0 M/HILL NO SNV 4 KOSHI
TOTAL of M/HILL > PANCHTHAR > REHABILITATION 13 825 659 794 634 617 357 55 31 25

TOTAL of PANCHTHAR District 14 866 692 835 667 650 369 55 31 25

TOTAL of EASTERN > Hill 33 2440 1949 2000 1597 1580 946 95 440 352

M/HILL>TAPLEJUNG>REHABILITATION
DHUNGE SANGU 100 TAPLEJUNG AC 1992 YR ID 188 150 188 150 50 0 0 0 0 M/HILL NO SNV 4 KOSHI
DOKHU-3 100 TAPLEJUNG AC 1991 MS ID 26 21 26 21 21 0 0 0 0 M/HILL NO SNV 4 KOSHI
HANGPANG 100 TAPLEJUNG AC 1992 YR ID 63 50 63 50 50 10 0 0 0 M/HILL NO SNV 4 KOSHI
KHEJUNIM 2,3 100 TAPLEJUNG AC 1994 YR ID 94 75 94 75 75 30 0 0 0 M/HILL NO SNV 4 KOSHI
LINSHEP 100 TAPLEJUNG AC 1995 YR ID 88 70 88 70 70 40 20 0 0 M/HILL NO SNV 4 KOSHI
NIGURADIN 100 TAPLEJUNG AC 1992 MS ID 31 25 31 25 25 0 0 0 0 M/HILL NO SNV 4 KOSHI
PHURUMBU 100 TAPLEJUNG AC 1994 YR ID 50 40 50 40 40 16 0 0 0 M/HILL NO SNV 4 KOSHI
PHURUMBU(7) 100 TAPLEJUNG AC 1995 YR ID 100 80 100 80 80 40 20 0 0 M/HILL NO SNV 4 KOSHI
SIWADIN 3,6,8 100 TAPLEJUNG AC 1994 YR ID 125 100 125 100 100 40 0 0 0 M/HILL NO SNV 4 KOSHI
THECHUMBU-6,8 100 TAPLEJUNG AC 1991 MS ID 50 40 50 40 40 0 0 0 0 M/HILL NO SNV 4 KOSHI
THECHUMBU-7 100 TAPLEJUNG AC 1991 MS ID 50 40 50 40 40 0 0 0 0 M/HILL NO SNV 4 KOSHI
THUKIMBA 100 TAPLEJUNG AC 1995 YR ID 241 193 241 193 193 80 40 0 0 M/HILL NO SNV 4 KOSHI
TIRINGE 1,2,3,4,6 100 TAPLEJUNG AC 1991 MS ID 56 45 56 45 45 0 0 0 0 M/HILL NO SNV 4 KOSHI
TOTAL of M/HILL > TAPLEJUNG > REHABILITATION 13 1162 929 1162 929 829 256 80 0 0

TOTAL of TAPLEJUNG District 13 1162 929 1162 929 829 256 80 0 0

TOTAL of EASTERN > Mountain 13 1162 929 1162 929 829 256 80 0 0

TOTAL of EASTERN Region 46 3602 2878 3162 2526 2409 1202 175 440 352

97
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of M/HILL 46 3602 2878 3162 2526 2409 1202 175 440 352

MAIN>JHAPA>REHABILITATION
MAWA KHOLA 100 JHAPA AC 250 200 250 200 200 0 0 0 0 MAIN NO GoN 12 SIWALIK RIVER
TOTAL of MAIN > JHAPA > REHABILITATION 1 250 200 250 200 200 0 0 0 0

TOTAL of JHAPA District 1 250 200 250 200 200 0 0 0 0

TOTAL of EASTERN > Terai 1 250 200 250 200 200 0 0 0 0

MAIN>KHOTANG>REHABILITATION
SAMJU KHOLA 100 KHOTANG AC 62 50 62 50 50 0 0 0 0 MAIN NO GoN 4 KOSHI
TOTAL of MAIN > KHOTANG > REHABILITATION 1 62 50 62 50 50 0 0 0 0

TOTAL of KHOTANG District 1 62 50 62 50 50 0 0 0 0

TOTAL of EASTERN > Hill 1 62 50 62 50 50 0 0 0 0

TOTAL of EASTERN Region 2 312 250 312 250 250 0 0 0 0

MAIN>DHADING>REHABILITATION
DUDURUNG 100 DHADING AC 15 12 15 12 12 0 0 0 0 MAIN NO GoN 3 GANDAK
TOTAL of MAIN > DHADING > REHABILITATION 1 15 12 15 12 12 0 0 0 0

TOTAL of DHADING District 1 15 12 15 12 12 0 0 0 0

MAIN>RAMECHAP>REHABILITATION
MUGI TAR 100 RAMECHAP AC 62 50 62 50 50 0 0 0 0 MAIN NO GoN 4 KOSHI
TOTAL of MAIN > RAMECHAP > REHABILITATION 1 62 50 62 50 50 0 0 0 0

TOTAL of RAMECHAP District 1 62 50 62 50 50 0 0 0 0

TOTAL of CENTRAL> Hill 2 77 62 77 62 62 0 0 0 0

TOTAL of CENTRAL Region 2 77 62 77 62 62 0 0 0 0

MAIN>NAWALPARASI>REHABILITATION
BARTIPUR 100 NAWALPARASI AC 125 100 125 100 100 0 0 0 0 MAIN NO GoN 3 GANDAK
TANG KHOLA 100 NAWALPARASI AC 125 100 125 100 100 0 0 0 0 MAIN NO GoN 3 GANDAK
TOTAL of MAIN > NAWALPARASI > REHABILITATION 2 250 200 250 200 200 0 0 0 0

TOTAL of NAWALPARASI District 2 250 200 250 200 200 0 0 0 0

MAIN>RUPANDEHI>REHABILITATION
PAHELA KHOLA 100 RUPANDEHI AC 250 200 250 200 200 0 0 0 0 MAIN NO GoN 8 TINAU
TOTAL of MAIN > RUPANDEHI > REHABILITATION 1 250 200 250 200 200 0 0 0 0

98
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

TOTAL of RUPANDEHI District 1 250 200 250 200 200 0 0 0 0

TOTAL of WESTERNL> Terai 3 500 400 500 400 400 0 0 0 0

MAIN>GORKHA>REHABILITATION
DHAWA TAR 100 GORKHA AC 63 50 63 50 50 0 0 0 0 MAIN NO GoN 3 GANDAK
TOTAL of MAIN > GORKHA > REHABILITATION 1 63 50 63 50 50 0 0 0 0

TOTAL of GORKHA District 1 63 50 63 50 50 0 0 0 0

MAIN>LAMJUNG>REHABILITATION
BANGRE BESI 100 LAMJUNG AC YR 62 50 62 50 50 0 0 0 0 MAIN NO GoN 3 GANDAK
TOTAL of MAIN > LAMJUNG > REHABILITATION 1 62 50 62 50 50 0 0 0 0

TOTAL of LAMJUNG District 1 62 50 62 50 50 0 0 0 0

MAIN>TANAHU>REHABILITATION
RISHINCH PATAN KUTIA 100 TANAHU AC 37 30 37 30 30 0 0 0 0 MAIN NO GoN 3 GANDAK
TOTAL of MAIN > TANAHU > REHABILITATION 1 37 30 37 30 30 0 0 0 0

TOTAL of TANAHU District 1 37 30 37 30 30 0 0 0 0

TOTAL of WESTERNL> Hill 3 162 130 162 130 130 0 0 0 0

MAIN>MUSTANG>REHABILITATION
CHAILE 100 MUSTANG AC 7 6 7 6 6 0 0 0 0 MAIN NO GoN 3 GANDAK
CHETANG 100 MUSTANG AC 25 20 25 20 20 0 0 0 0 MAIN NO GoN 3 GANDAK
CHUKSANG 100 MUSTANG AC 5 4 5 4 4 0 0 0 0 MAIN NO GoN 3 GANDAK
JHANG 100 MUSTANG AC 25 20 25 20 20 0 0 0 0 MAIN NO GoN 3 GANDAK
TANGWE 100 MUSTANG AC 44 35 44 35 35 0 0 0 0 MAIN NO GoN 3 GANDAK
TOTAL of MAIN > MUSTANG > REHABILITATION 5 106 85 106 85 85 0 0 0 0

TOTAL of MUSTANG District 5 106 85 106 85 85 0 0 0 0

TOTAL of WESTERN> Mountain 5 106 85 106 85 85 0 0 0 0

TOTAL of WESTERN Region 11 768 615 768 615 615 0 0 0 0

MAIN>DANG>REHABILITATION
CHAIME KHOLA 100 DANG AC 1050 840 1050 840 840 0 0 0 0 MAIN NO GoN 5 BABAI
SANKRAM KHOLA 100 DANG AC 250 200 250 200 200 0 0 0 0 MAIN NO GoN 5 BABAI
TOTAL of MAIN > DANG > REHABILITATION 2 1300 1040 1300 1040 1040 0 0 0 0

TOTAL of DANG District 2 1300 1040 1300 1040 1040 0 0 0 0

99
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of MID-WESTERN> Terai 2 1300 1040 1300 1040 1040 0 0 0 0

TOTAL of MID-WESTERN Region 2 1300 1040 1300 1040 1040 0 0 0 0

MAIN>BAITADI>REHABILITATION
BAGARI 100 BAITADI AC 94 75 94 75 75 0 0 0 0 MAIN NO GoN 1 MAHAKALI
TUNGELI 100 BAITADI AC 94 75 94 75 75 0 0 0 0 MAIN NO GoN 1 MAHAKALI
TOTAL of MAIN > BAITADI > REHABILITATION 2 188 150 188 150 150 0 0 0 0

TOTAL of BAITADI District 2 188 150 188 150 150 0 0 0 0

TOTAL of FAR-WESTERN> Hill 2 188 150 188 150 150 0 0 0 0

TOTAL of FAR-WESTERN Region 2 188 150 188 150 150 0 0 0 0

TOTAL of MAIN 19 2645 2117 2645 2117 2117 0 0 0 0

MIN>MORANG>REHABILITATION
BAGHI PROJECT 100 MORANG AC 50 40 50 40 40 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
DARLOKHA DIVERSION 100 MORANG AC 550 440 550 440 440 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
GADHI DIVERSION 100 MORANG AC 50 40 50 40 40 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
GHORJANA REGULATOR 100 MORANG AC 50 40 50 40 40 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
GOURIA 100 MORANG AC 50 40 50 40 40 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
KATHANDU DIVERSION 100 MORANG AC 100 80 100 80 80 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
KOCHANI DIVERSION 100 MORANG AC 50 40 50 40 40 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
MANGALAPUR POKHARI 100 MORANG AC 25 20 25 20 20 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
MARIA 100 MORANG AC 500 400 500 400 400 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
SAGAR 100 MORANG AC 250 200 250 200 200 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
SUKNA PAIN 100 MORANG AC 250 200 250 200 200 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
TOTAL of MIN > MORANG > REHABILITATION 11 1925 1540 1925 1540 1540 0 0 0 0

TOTAL of MORANG District 11 1925 1540 1925 1540 1540 0 0 0 0

MIN>SAPTARI>REHABILITATION
MUTANI 100 SAPTARI AC 500 400 500 400 400 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
PANCHI 100 SAPTARI AC 400 320 400 320 320 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
TOTAL of MIN > SAPTARI > REHABILITATION 2 900 720 900 720 720 0 0 0 0

TOTAL of SAPTARI District 2 900 720 900 720 720 0 0 0 0

MIN>SIRAHA>REHABILITATION
BABURAM KHOLA 100 SIRAHA AC 1250 1000 1250 1000 1000 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
GAGAN NADI 100 SIRAHA AC 1500 1200 1500 1200 1200 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
LOMANIA BANDH 100 SIRAHA AC 500 400 500 400 400 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
RAJOKHAR POKHARI 100 SIRAHA AC 75 60 75 60 60 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
RAMPUR KAMALA WARI 100 SIRAHA AC 25 20 25 20 20 0 0 0 0 MIN NO IND 12 SIWALIK RIVER

100
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of MIN > SIRAHA > REHABILITATION 5 3350 2680 3350 2680 2680 0 0 0 0

TOTAL of SIRAHA District 5 3350 2680 3350 2680 2680 0 0 0 0

MIN>SUNSARI>REHABILITATION
BAJHGATA TUNNEL 100 SUNSARI AC 600 480 600 480 480 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
PADARIA-GARUDA 100 SUNSARI AC 250 200 250 200 200 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
SIGIA DAHA KACHCHAW 100 SUNSARI AC 250 200 250 200 200 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
TOTAL of MIN > SUNSARI > REHABILITATION 3 1100 880 1100 880 880 0 0 0 0

TOTAL of SUNSARI District 3 1100 880 1100 880 880 0 0 0 0

TOTAL of EASTERN > Terai 21 7275 5820 7275 5820 5820 0 0 0 0

TOTAL of EASTERN Region 21 7275 5820 7275 5820 5820 0 0 0 0

MIN>BARA>REHABILITATION
BEHATANI LIFT 100 BARA AC 150 120 150 120 120 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
GADHAL 100 BARA AC 62 50 62 50 50 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
JAMUNI 100 BARA AC 1000 800 1000 800 800 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
PASAHA 100 BARA AC 2000 1600 2000 1600 1600 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
TOTAL of MIN > BARA > REHABILITATION 4 3212 2570 3212 2570 2570 0 0 0 0

TOTAL of BARA District 4 3212 2570 3212 2570 2570 0 0 0 0

MIN>CHITWAN>REHABILITATION
ANANDPUR 100 CHITWAN AC 13 10 13 10 10 0 0 0 0 MIN NO IND 3 GANDAK
KRISHNAPUR 100 CHITWAN AC 200 160 200 160 160 0 0 0 0 MIN NO IND 3 GANDAK
KUSATTA OVERSEAS 100 CHITWAN AC 150 120 150 120 120 0 0 0 0 MIN NO IND 3 GANDAK
LOWER KERUNGA 100 CHITWAN AC 25 20 25 20 20 0 0 0 0 MIN NO IND 3 GANDAK
PUNGI KHOLA 100 CHITWAN AC 75 60 75 60 60 0 0 0 0 MIN NO IND 3 GANDAK
UPPER KERUNGA 100 CHITWAN AC 100 80 100 80 80 0 0 0 0 MIN NO IND 3 GANDAK
TOTAL of MIN > CHITWAN > REHABILITATION 6 563 450 563 450 450 0 0 0 0

TOTAL of CHITWAN District 6 563 450 563 450 450 0 0 0 0

MIN>DHANUSHA>NEW
JAMUNI 100 DHANUSHA AC 250 200 250 200 200 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
TOTAL of MIN > DHANUSHA > NEW 1 250 200 250 200 200 0 0 0 0

TOTAL of DHANUSHA District 1 250 200 250 200 200 0 0 0 0

MIN>PARSA>REHABILITATION
CHAMARI 100 PARSA AC 200 160 200 160 160 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
GANGOLA 100 PARSA AC 12 10 12 10 10 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
ORIA 100 PARSA AC 400 320 400 320 320 0 0 0 0 MIN NO IND 12 SIWALIK RIVER

101
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
PATLAIYA-MOHANA 100 PARSA AC 100 80 100 80 80 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
RAHAT KUWA-BHABHAN 100 PARSA AC 12 10 12 10 10 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
RAHAT- KUWA SUWARNP 100 PARSA AC 13 10 13 10 10 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
THOUDUWA 100 PARSA AC 500 400 500 400 400 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
TILAWE MINOR 100 PARSA AC 100 80 100 80 80 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
TOTAL of MIN > PARSA > REHABILITATION 8 1337 1070 1337 1070 1070 0 0 0 0

TOTAL of PARSA District 8 1337 1070 1337 1070 1070 0 0 0 0

MIN>RAUTAHAT>REHABILITATION
BALUWA JABDI 100 RAUTAHAT AC 1250 1000 1250 1000 1000 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
BHA KUWA 100 RAUTAHAT AC 500 400 500 400 400 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
BHA KUWA DUMARIA 100 RAUTAHAT AC 500 400 500 400 400 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
HATAUNA BRANCH 100 RAUTAHAT AC 250 200 250 200 200 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
JALAIYA BULKAI 100 RAUTAHAT AC 150 120 150 120 120 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
KHARAIYA DAH 100 RAUTAHAT AC 400 320 400 320 320 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
MANUSMARA 100 RAUTAHAT AC 750 600 750 600 600 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
RAMPUR KHOPASI 100 RAUTAHAT AC 20 16 20 16 16 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
TOTAL of MIN > RAUTAHAT > REHABILITATION 8 3820 3056 3820 3056 3056 0 0 0 0

TOTAL of RAUTAHAT District 8 3820 3056 3820 3056 3056 0 0 0 0

MIN>SARLAHI>REHABILITATION
HARIYAI PROJECT 100 SARLAHI AC 50 40 50 40 40 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
TOTAL of MIN > SARLAHI > REHABILITATION 1 50 40 50 40 40 0 0 0 0

TOTAL of SARLAHI District 1 50 40 50 40 40 0 0 0 0

TOTAL of CENTRAL > Terai 28 9232 7386 9232 7386 7386 0 0 0 0

MIN>BHAKTAPUR>REHABILITATION
KATHURAJ KULO 100 BHAKTAPUR AC 500 400 500 400 400 0 0 0 0 MIN NO IND 9 BAGMATI
KYTHUDHAL 100 BHAKTAPUR AC 50 40 50 40 40 0 0 0 0 MIN NO IND 9 BAGMATI
LAPSE TAR 100 BHAKTAPUR AC 75 60 75 60 60 0 0 0 0 MIN NO IND 9 BAGMATI
NALA KULO 100 BHAKTAPUR AC 150 120 150 120 120 0 0 0 0 MIN NO IND 9 BAGMATI
SURYABINAYAK 100 BHAKTAPUR AC 62 50 62 50 50 0 0 0 0 MIN NO IND 9 BAGMATI
THIMI MANOHARA KULO 100 BHAKTAPUR AC 50 40 50 40 40 0 0 0 0 MIN NO IND 9 BAGMATI
WALARKU KULO 100 BHAKTAPUR AC 50 40 50 40 40 0 0 0 0 MIN NO IND 9 BAGMATI
YUG DHARA KULO 100 BHAKTAPUR AC 500 400 500 400 400 0 0 0 0 MIN NO IND 9 BAGMATI
TOTAL of MIN > BHAKTAPUR > REHABILITATION 8 1437 1150 1437 1150 1150 0 0 0 0

TOTAL of BHAKTAPUR District 8 1437 1150 1437 1150 1150 0 0 0 0

MIN>KATHMANDU>REHABILITATION
GAGAL INDRAYANI KUL 100 KATHMANDU AC 162 130 162 130 130 0 0 0 0 MIN NO IND 9 BAGMATI
TUKUCHA RAJ KULO 100 KATHMANDU AC 38 30 38 30 30 0 0 0 0 MIN NO IND 9 BAGMATI

102
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of MIN > KATHMANDU > REHABILITATION 2 200 160 200 160 160 0 0 0 0

TOTAL of KATHMANDU District 2 200 160 200 160 160 0 0 0 0

MIN>LALITPUR>REHABILITATION
APHAL KULO 100 LALITPUR AC 312 250 312 250 250 0 0 0 0 MIN NO IND 9 BAGMATI
IKUD KULO 100 LALITPUR AC 150 120 150 120 120 0 0 0 0 MIN NO IND 9 BAGMATI
KAMBHU KULO 100 LALITPUR AC 62 50 62 50 50 0 0 0 0 MIN NO IND 9 BAGMATI
LELE KULO 100 LALITPUR AC 32 25 32 25 25 0 0 0 0 MIN NO IND 9 BAGMATI
LUBHU KULO 100 LALITPUR AC 575 460 575 460 460 0 0 0 0 MIN NO IND 9 BAGMATI
TOTAL of MIN > LALITPUR > REHABILITATION 5 1131 905 1131 905 905 0 0 0 0

TOTAL of LALITPUR District 5 1131 905 1131 905 905 0 0 0 0

MIN>NUWAKOT>REHABILITATION
ANDHERI KHOLA 100 NUWAKOT AC 300 240 300 240 240 0 0 0 0 MIN NO IND 3 GANDAK
TOTAL of MIN > NUWAKOT > REHABILITATION 1 300 240 300 240 240 0 0 0 0

TOTAL of NUWAKOT District 1 300 240 300 240 240 0 0 0 0

TOTAL of CENTRAL > Hill 16 3068 2455 3068 2455 2455 0 0 0 0

TOTAL of CENTRAL Region 44 12300 9841 12300 9841 9841 0 0 0 0

MIN>KAPILBASTU>REHABILITATION
JAMUAR DIVERSION 100 KAPILBASTU AC 750 600 750 600 600 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
MARTHI PROJECT 100 KAPILBASTU AC 1000 800 1000 800 800 0 0 0 0 MIN NO IND 12 SIWALIK RIVER
TOTAL of MIN > KAPILBASTU > REHABILITATION 2 1750 1400 1750 1400 1400 0 0 0 0

TOTAL of KAPILBASTU District 2 1750 1400 1750 1400 1400 0 0 0 0

MIN>NAWALPARASI>REHABILITATION
GAIDAKOT 100 NAWALPARASI AC 25 20 25 20 20 0 0 0 0 MIN NO IND 3 GANDAK
HULASI DIVERSION 100 NAWALPARASI AC 250 200 250 200 200 0 0 0 0 MIN NO IND 3 GANDAK
POTAHA RESERVOIR 100 NAWALPARASI AC 75 60 75 60 60 0 0 0 0 MIN NO IND 3 GANDAK
TOTAL of MIN > NAWALPARASI > REHABILITATION 3 350 280 350 280 280 0 0 0 0

TOTAL of NAWALPARASI District 3 350 280 350 280 280 0 0 0 0

MIN>RUPANDEHI>REHABILITATION
SOLAH CHATTIS KULO 100 RUPANDEHI AC 7500 6000 7500 6000 6000 0 0 0 0 MIN NO IND 8 TINAU
TELLER NALA 100 RUPANDEHI AC 250 200 250 200 200 0 0 0 0 MIN NO IND 8 TINAU
TOTAL of MIN > RUPANDEHI > REHABILITATION 2 7750 6200 7750 6200 6200 0 0 0 0

TOTAL of RUPANDEHI District 2 7750 6200 7750 6200 6200 0 0 0 0

103
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of WESTERN > Terai 7 9850 7880 9850 7880 7880 0 0 0 0

MIN>BAGLUNG>REHABILITATION
KUDLE AND KATHE KUL 100 BAGLUNG AC 75 60 75 60 60 0 0 0 0 MIN NO IND 3 GANDAK
TOTAL of MIN > BAGLUNG > REHABILITATION 1 75 60 75 60 60 0 0 0 0

TOTAL of BAGLUNG District 1 75 60 75 60 60 0 0 0 0

MIN>LAMJUNG>REHABILITATION
CHISANKHA BESI 100 LAMJUNG AC 150 120 150 120 120 0 0 0 0 MIN NO IND 3 GANDAK
MULMULE 100 LAMJUNG AC YR ID 30 24 30 24 24 0 0 0 0 MIN NO IND 3 GANDAK
TOTAL of MIN > LAMJUNG > REHABILITATION 2 180 144 180 144 144 0 0 0 0

TOTAL of LAMJUNG District 2 180 144 180 144 144 0 0 0 0

MIN>MYGADI>REHABILITATION
BABIA CHOUR 100 MYGADI AC YR ED 25 20 25 20 20 0 0 0 0 MIN NO IND 3 GANDAK
TOTAL of MIN > MYGADI > REHABILITATION 1 25 20 25 20 20 0 0 0 0

TOTAL of MYGADI District 1 25 20 25 20 20 0 0 0 0

TOTAL of WESTERN > Hill 4 280 224 280 224 224 0 0 0 0

TOTAL of WESTERN Region 11 10130 8104 10130 8104 8104 0 0 0 0

MIN>BANKE>REHABILITATION
PURAIYA TAL 100 BANKE AC 300 240 300 240 240 0 0 0 0 MIN NO IND 6 WEST RAPTI
SHURUW(GARWA GAO) 100 BANKE AC 200 160 200 160 160 0 0 0 0 MIN NO IND 6 WEST RAPTI
TOTAL of MIN > BANKE > REHABILITATION 2 500 400 500 400 400 0 0 0 0

TOTAL of BANKE District 2 500 400 500 400 400 0 0 0 0

MIN>BARDIYA>REHABILITATION
GULARIA KULO 100 BARDIYA AC 50 40 50 40 40 0 0 0 0 MIN NO IND 5 BABAI
MANPUR TAPARA 100 BARDIYA AC 50 40 50 40 40 0 0 0 0 MIN NO IND 5 BABAI
TOTAL of MIN > BARDIYA > REHABILITATION 2 100 80 100 80 80 0 0 0 0

TOTAL of BARDIYA District 2 100 80 100 80 80 0 0 0 0

MIN>DANG>REHABILITATION
BELA PROJECT 100 DANG AC 250 200 250 200 200 0 0 0 0 MIN NO IND 5 BABAI
BHOTE DAH 100 DANG AC 50 40 50 40 40 0 0 0 0 MIN NO IND 5 BABAI
CHANDANPUR 100 DANG AC 200 160 200 160 160 0 0 0 0 MIN NO IND 5 BABAI
CHARANGE DAH 100 DANG AC 75 60 75 60 60 0 0 0 0 MIN NO IND 5 BABAI
RAKSE CHOUR 100 DANG AC 50 40 50 40 40 0 0 0 0 MIN NO IND 5 BABAI
TOTAL of MIN > DANG > REHABILITATION 5 625 500 625 500 500 0 0 0 0

104
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

TOTAL of DANG District 5 625 500 625 500 500 0 0 0 0

TOTAL of MID-WESTERN > Terai 9 1225 980 1225 980 980 0 0 0 0

MIN>SALYAN>REHABILITATION
GHATTE KHOLA 100 SALYAN AC 25 20 25 20 20 0 0 0 0 MIN NO IND 5 BABAI
TOTAL of MIN > SALYAN > REHABILITATION 1 25 20 25 20 20 0 0 0 0

TOTAL of SALYAN District 1 25 20 25 20 20 0 0 0 0

TOTAL of MID-WESTERN > Hill 1 25 20 25 20 20 0 0 0 0

TOTAL of MID-WESTERN Region 10 1250 1000 1250 1000 1000 0 0 0 0

MIN>KAILALI>REHABILITATION
GULAR GAPPA PUMP 100 KAILALI AC 225 180 225 180 180 0 0 0 0 MIN NO IND 2 KARNALI
GURGI DIVERSION 100 KAILALI AC 2687 2150 2687 2150 2150 0 0 0 0 MIN NO IND 2 KARNALI
KAILALI NANA 100 KAILALI AC 700 560 700 560 560 0 0 0 0 MIN NO IND 2 KARNALI
KATENI NALA 100 KAILALI AC 1500 1200 1500 1200 1200 0 0 0 0 MIN NO IND 2 KARNALI
KHARETI PUMP 100 KAILALI AC 225 180 225 180 180 0 0 0 0 MIN NO IND 2 KARNALI
PAHALWANPUR PUMP 100 KAILALI AC 225 180 225 180 180 0 0 0 0 MIN NO IND 2 KARNALI
SHUKTI 100 KAILALI AC 250 200 250 200 200 0 0 0 0 MIN NO IND 2 KARNALI
TOTAL of MIN > KAILALI > REHABILITATION 7 5812 4650 5812 4650 4650 0 0 0 0

TOTAL of KAILALI District 7 5812 4650 5812 4650 4650 0 0 0 0

MIN>KANCHANPUR>REHABILITATION
ROUTELI KHOLA 100 KANCHANPUR AC 900 720 900 720 720 0 0 0 0 MIN NO IND 1 MAHAKALI
TOTAL of MIN > KANCHANPUR > REHABILITATION 1 900 720 900 720 720 0 0 0 0

TOTAL of KANCHANPUR District 1 900 720 900 720 720 0 0 0 0

TOTAL of FAR-WESTERN > Terai 8 6712 5370 6712 5370 5370 0 0 0 0

TOTAL of FAR-WESTERN Region 8 6712 5370 6712 5370 5370 0 0 0 0

TOTAL of MIN 94 37667 30135 37667 30135 30135 0 0 0 0

MIP>JHAPA>NEW
MANSAPUR 100 JHAPA PC 2006 YR ID 241 205 241 200 0 0 0 0 0 MIP YES DOI 12 SIWALIK RIVER
TOTAL of MIP > JHAPA > NEW 1 241 205 241 200 0 0 0 0 0

MIP>JHAPA>ON GOING
SIDHI KHOLA 100 JHAPA PC 2006 YR ID 1882 1600 0 0 0 0 0 0 0 MIP NO DOI 12 SIWALIK RIVER
TOTAL of MIP > JHAPA > ON GOING 1 1882 1600 0 0 0 0 0 0 0

105
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

TOTAL of JHAPA District 2 2123 1805 241 200 0 0 0 0 0

MIP>MORANG
BHUWA CHISANG 100 MORANG PC 2006 YR ID 353 300 353 285 0 0 0 0 0 MIP NO DOI 12 SIWALIK RIVER
TOTAL of MIP > MORANG 1 353 300 353 285 0 0 0 0 0

TOTAL of MORANG District 1 353 300 353 285 0 0 0 0 0

MIP>SUNSARI>ON GOING
TEGRA KHOLA 100 SUNSARI PC 2006 YR ID 276 235 0 0 0 0 0 0 0 MIP NO DOI 12 SIWALIK RIVER
TOTAL of MIP > SUNSARI > ON GOING 1 276 235 0 0 0 0 0 0 0

TOTAL of SUNSARI District 1 276 235 0 0 0 0 0 0 0

TOTAL of EASTERN > Terai 4 2752 2340 594 485 0 0 0 0 0

MIP>DHANKUTA
TATO PANI TAR 100 DHANKUTA PC 2006 YR ID 135 115 135 115 0 0 0 0 0 MIP NO DOI 4 KOSHI
TOTAL of MIP > DHANKUTA 1 135 115 135 115 0 0 0 0 0

TOTAL of DHANKUTA District 1 135 115 135 115 0 0 0 0 0

MIP>ILAM>ON GOING
THULO CHAJHO 100 ILAM PC 2006 YR ID 235 200 0 0 0 0 0 0 0 MIP NO DOI 11 KOSHI
TOTAL of MIP > ILAM > ON GOING 1 235 200 0 0 0 0 0 0 0

TOTAL of ILAM District 1 235 200 0 0 0 0 0 0 0

MIP>TEHRATHUM>ON GOING
PAREUWA KHOLA 100 TEHRATHUM PC 2006 YR ID 235 200 0 0 0 0 0 0 0 MIP NO DOI 4 KOSHI
TOTAL of MIP > TEHRATHUM > ON GOING 1 235 200 0 0 0 0 0 0 0

TOTAL of TEHRATHUM District 1 235 200 0 0 0 0 0 0 0

MIP>KHOTANG
KALI KHOLA 100 KHOTANG PC 2006 YR ID 80 70 80 70 0 0 0 0 0 MIP NO DOI 4 KOSHI
TOTAL of MIP > KHOTANG 1 80 70 80 70 0 0 0 0 0

TOTAL of KHOTANG District 1 80 70 80 70 0 0 0 0 0

MIP>UDAYPUR>
U TARITAWA 100 UDAYPUR PC 2006 YR ID 300 250 300 250 0 0 0 0 0 MIP NO DOI 4 KOSHI
TOTAL of MIP > UDAYPUR > 1 300 250 300 250 0 0 0 0 0

TOTAL of UDAYPUR District 1 300 250 300 250 0 0 0 0 0

106
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

TOTAL of EASTERN > Hill 4 905 765 435 435 0 0 0 0 0

TOTAL of EASTERN Region 8 3657 3105 1029 920 0 0 0 0 0

107
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
MIP>BARA>ON GOING
TIYAR 100 BARA PC 2006 YR ID 611 519 0 0 0 0 0 0 0 MIP NO DOI 12 SIWALIK RIVER
TOTAL of MIP > BARA > ON GOING 1 611 519 0 0 0 0 0 0 0

TOTAL of BARA District 1 611 519 0 0 0 0 0 0 0

MIP>PARSA>ON GOING
NAU GHACHI 100 PARSA PC 2006 YR ID 588 500 0 0 0 0 0 0 0 MIP NO DOI 12 SIWALIK RIVER
TOTAL of MIP > PARSA > ON GOING 1 588 500 0 0 0 0 0 0 0

TOTAL of PARSA District 1 588 500 0 0 0 0 0 0 0

MIP>RAUTAHAT>
LALMATIYA 100 RAUTAHAT PC 2006 YR ID 359 305 359 305 0 0 0 0 0 MIP NO DOI 12 SIWALIK RIVER
TOTAL of MIP > RAUTAHAT > 1 359 305 359 305 0 0 0 0 0

TOTAL of RAUTAHAT District 1 359 305 359 305 0 0 0 0 0

TOTAL of CENTRAL > Terai 3 1558 1324 359 305 0 0 0 0 0

MIP>DHADING>ON GOING
AP TAR 100 DHADING PC 2006 YR ID 176 150 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAK
ARCHALEY TAR 100 DHADING PC 2006 YR ID 118 100 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAK
BASHERI LAPDANDA 100 DHADING PC 2006 YR ID 100 60 100 60 0 0 0 0 0 MIP NO DOI 3 GANDAK
GUHALE 100 DHADING PC 2007 YR ID 35 30 35 30
ADAMTAR 101 DHADING PC 2007 YR ID 27 25 27 25
DHUSHA TAR 100 DHADING PC 2006 YR ID 71 60 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAK
MANKHU TAR BEL TAR 100 DHADING PC 2006 YR ID 40 34 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAK
SAMAN TAR 100 DHADING PC 2006 YR ID 42 36 42 36 0 0 0 0 0 MIP NO DOI 3 GANDAK
TALO RAMPUR TAR 100 DHADING PC 2006 YR ID 71 60 71 60 0 0 0 0 0 MIP NO DOI 3 GANDAK
TOTAL of MIP > DHADING > ON GOING 9 680 555 275 211 0 0 0 0 0

TOTAL of DHADING District 9 680 555 275 211 0 0 0 0 0

MIP>LALITPUR>ON GOING
TADHA 100 LALITPUR PC 2006 YR ID 59 50 0 0 0 0 0 0 0 MIP NO DOI 9 BAGMATI
TOTAL of MIP > LALITPUR > ON GOING 1 59 50 0 0 0 0 0 0 0

TOTAL of LALITPUR District 1 59 50 0 0 0 0 0 0 0

MIP>MAKAWANPUR>NEW
KURLEYDHAMAR 100 MAKAWANPUR PC 2006 YR ID 65 55 65 55 0 0 0 0 0 MIP YES DOI 3 GANDAK
TOTAL of MIP > MAKAWANPUR > NEW 1 65 55 65 55 0 0 0 0 0

MIP>MAKAWANPUR>
CHURADHUL RATAMATEY 100 MAKAWANPUR PC 2006 YR ID 118 100 118 100 0 0 0 0 0 MIP NO DOI 3 GANDAK

108
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of MIP > MAKAWANPUR > ON GOING 1 118 100 118 100 0 0 0 0 0

109
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of MAKAWANPUR District 2 183 155 183 155 0 0 0 0 0

MIP>NUWAKOT>ON GOING
KHARANEY SATBHSEY 100 NUWAKOT PC 2006 YR ID 294 250 0 0 0 0 0 0 0 MIP YES DOI 3 GANDAK
TOTAL of MIP > NUWAKOT > ON GOING 1 294 250 0 0 0 0 0 0 0

TOTAL of NUWAKOT District 1 294 250 0 0 0 0 0 0 0

MIP>RAMECHAP>ON GOING
JEYMIREY 100 RAMECHAP PC 2006 YR ID 35 30 0 0 0 0 0 0 0 MIP NO DOI 4 KOSHI
TOTAL of MIP > RAMECHAP > ON GOING 1 35 30 0 0 0 0 0 0 0

TOTAL of RAMECHAP District 1 35 30 0 0 0 0 0 0 0

MIP>SINDHULI>ON GOING
KUDULE 100 SINDHULI PC 2007 YR ID 22 20 22 20
BHEMAN 100 SINDHULI PC 2006 YR ID 353 300 0 0 0 0 0 0 0 MIP NO DOI 9 BAGMATI
TOTAL of MIP > SINDHULI > ON GOING 1 375 320 22 20 0 0 0 0 0

TOTAL of SINDHULI District 1 375 320 22 20 0 0 0 0 0

TOTAL of CENTRAL > Hill 15 1626 1360 480 386 0 0 0 0 0

MIP>DOLAKHA>ON GOING
ADHERI 100 DOLAKHA PC 2006 YR ID 176 150 176 150 0 0 0 0 0 MIP NO DOI 4 KOSHI
DHADEY KHOLA 100 DOLAKHA PC 2006 YR ID 294 250 0 0 0 0 0 0 0 MIP NO DOI 4 KOSHI
TOTAL of MIP > DOLAKHA > ON GOING 2 470 400 176 150 0 0 0 0 0

TOTAL of DOLAKHA District 2 470 400 176 150 0 0 0 0 0

MIP>KAVRE
MALPI LILAWATI 100 KAVRE PC 2007 YR ID 330 300 330 300 0 0 0 0 0 MIP NO DOI 4 KOSHI
CHURI KHARAHE 100 KAVRE PC 2007 YR ID 130 125 130 125 0 0 0 0 0 MIP NO DOI 4 KOSHI
TOTAL of MIP > KAVRE > ON GOING 2 460 425 460 425 0 0 0 0 0

TOTAL of KAVRE District 2 460 425 460 425 0 0 0 0 0

MIP>SINDHUPALCHOWK>ON GOING
BHUSI KHOLA 100 SINDHUPALCHOWK PC 2006 YR ID 235 200 0 0 0 0 0 0 0 MIP NO DOI 4 KOSHI
CHURI KARKHA 100 SINDHUPALCHOWK PC 2006 YR ID 147 125 0 0 0 0 0 0 0 MIP NO DOI 4 KOSHI
TOTAL of MIP > SINDHUPALCHOWK > ON GOING 2 382 325 0 0 0 0 0 0 0

TOTAL of SINDHUPALCHOWK District 2 382 325 0 0 0 0 0 0 0

TOTAL of CENTRAL > Mountain 4 852 725 176 575 0 0 0 0 0

110
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of CENTRAL Region 22 4036 3409 1015 1266 0 0 0 0 0

MIP>KAPILVASTU>ON GOING
SINGREYGHAT 100 KAPILVASTU PC 2006 YR ID 2968 2523 0 0 0 0 0 0 0 MIP NO DOI 12 SIWALIK RIVER
TOTAL of MIP > KAPILVASTU > ON GOING 1 2968 2523 0 0 0 0 0 0 0

TOTAL of KAPILVASTU District 1 2968 2523 0 0 0 0 0 0 0

111
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
MIP>NAWALPARASI>ON GOING
BANSH KHOLA 100 NAWALPARASI PC 2006 YR ID 334 284 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAK
PANBHARA 100 NAWALPARASI PC 2006 YR ID 235 200 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAK
TOTAL of MIP > NAWALPARASI > ON GOING 2 569 484 0 0 0 0 0 0 0

TOTAL of NAWALPARASI District 2 569 484 0 0 0 0 0 0 0

MIP>RUPANDEHI>ON GOING
GAIDHAWA TAL 100 RUPANDEHI PC 2006 YR ID 367 312 367 312 0 0 0 0 0 MIP NO DOI 8 TINAU
DHUNGE BANDH 101 RUPANDEHI PC 2007 YR ID 320 300 320 300
TOTAL of MIP > RUPANDEHI > ON GOING 1 687 612 687 612 0 0 0 0 0

TOTAL of RUPANDEHI District 1 687 612 687 612 0 0 0 0 0

TOTAL of WESTERN > Terai 4 4224 3619 687 612 0 0 0 0 0

MIP>ARGHAKHACHI>ON GOING
LAPEYSAT MAR 100 ARGHAKHACHI PC 2006 YR ID 118 100 0 0 0 0 0 0 0 MIP NO DOI 6 WEST RAPTI
TOTAL of MIP > ARGHAKHACHI > ON GOING 1 118 100 0 0 0 0 0 0 0

TOTAL of ARGHAKHACHI District 1 118 100 0 0 0 0 0 0 0

MIP>GORKHA>ON GOING
KUNDHUR TAR 100 GORKHA PC 2006 YR ID 647 550 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAK
TOTAL of MIP > GORKHA > ON GOING 1 647 550 0 0 0 0 0 0 0

TOTAL of GORKHA District 1 647 550 0 0 0 0 0 0 0

MIP>GULMI>ON GOING
BHAGAWHA 100 GULMI PC 2006 YR ID 118 100 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAK
TOTAL of MIP > GULMI > ON GOING 1 118 100 0 0 0 0 0 0 0

TOTAL of GULMI District 1 118 100 0 0 0 0 0 0 0

MIP>KASKI>ON GOING
KODHI KHOLA 100 KASKI PC 2006 YR ID 182 155 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAK
TOTAL of MIP > KASKI > ON GOING 1 182 155 0 0 0 0 0 0 0

TOTAL of KASKI District 1 182 155 0 0 0 0 0 0 0

MIP>LAMJUNG>ON GOING
PAGREYHARABOT 100 LAMJUNG PC 2006 YR ID 365 310 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAK
TOTAL of MIP > LAMJUNG > ON GOING 1 365 310 0 0 0 0 0 0 0

TOTAL of LAMJUNG District 1 365 310 0 0 0 0 0 0 0

112
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
MIP>MYAGDI>ON GOING
RATO KHOLA 100 MYAGDI PC 2006 YR ID 73 62 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAK
TOTAL of MIP > MYAGDI > ON GOING 1 73 62 0 0 0 0 0 0 0

TOTAL of MYAGDI District 1 73 62 0 0 0 0 0 0 0

MIP>PALPA>ON GOING
BHALAYA TAR 100 PALPA PC 2006 YR ID 412 350 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAK
HEKLANG PHANT 100 PALPA PC 2007 YR ID 160 150 160 150
TOTAL of MIP > PALPA > ON GOING 1 572 500 160 150 0 0 0 0 0

TOTAL of PALPA District 1 572 500 160 150 0 0 0 0 0

MIP>PARBAT>ON GOING
LIMI THANA 100 PARBAT PC 2006 YR ID 124 105 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAK
MALLAJ 100 PARBAT PC 2006 YR ID 494 420 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAK
SILMI 100 PARBAT PC 2006 YR ID 120 105 120 105 0 0 0 0 0 MIP NO DOI 3 GANDAK
TOTAL of MIP > PARBAT > ON GOING 3 738 630 120 105 0 0 0 0 0

TOTAL of PARBAT District 3 738 630 120 105 0 0 0 0 0

MIP>TANAHU>ON GOING
PIPAL TAR 100 TANAHU PC 2006 YR ID 294 250 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAK
TOTAL of MIP > TANAHU > ON GOING 1 294 250 0 0 0 0 0 0 0

TOTAL of TANAHU District 1 294 250 0 0 0 0 0 0 0

TOTAL of WESTERN > Hill 10 2742 2347 280 255 0 0 0 0 0

TOTAL of WESTERN Region 14 6966 5966 967 867 0 0 0 0 0

MIP>DANG>ON GOING
DANG MIP
KARJAHI SATGAYA KULO 100 DANG PC 2006 YR ID 478 406 0 0 0 0 0 0 0 MIP NO DOI 5 BABAI
KHACHAREY KULO 100 DANG PC 2006 YR ID 588 500 588 500 0 0 0 0 0 MIP NO DOI 5 BABAI
TOTAL of MIP > DANG > ON GOING 2 1066 906 588 500 0 0 0 0 0

TOTAL of DANG District 2 1066 906 588 500 0 0 0 0 0

MIP>BARDIYA>ON GOING
DODHARI TARA TAL 100 BARDIYA PC 2006 YR ID 2941 2500 0 0 0 0 0 0 0 MIP NO DOI 5 BABAI
BARDIYA 0 MIP NO DOI 5 BABAI
TOTAL of MIP > BARDIYA > ON GOING 1 2941 2500 0 0 0 0 0 0 0

TOTAL of BARDIYA District 1 2941 2500 0 0 0 0 0 0 0

113
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of MID- WESTERN > Terai 2 1066 3406 588 500 0 0 0 0 0

MIP>RUKUM>ON GOING
RUKUMKOT 100 RUKUM PC 2006 YR ID 353 300 0 0 0 0 0 0 0 MIP NO DOI 2 KARNALI
TOTAL of MIP > RUKUM > ON GOING 1 353 300 0 0 0 0 0 0 0

TOTAL of RUKUM District 1 353 300 0 0 0 0 0 0 0

114
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
MIP>SALYAN>ON GOING
THULAJEWLA 100 SALYAN PC 2006 YR ID 94 80 94 80 0 0 0 0 0 MIP NO DOI 5 BABAI
TOTAL of MIP > SALYAN > ON GOING 1 94 80 94 80 0 0 0 0 0

TOTAL of SALYAN District 1 94 80 94 80 0 0 0 0 0

MIP>SURKHET>REHABILITATION
NAYAGAUN 100 SURKHET PC 2006 YR ID 176 150 176 150 0 0 0 0 0 MIP YES DOI 2 KARNALI
TOTAL of MIP > SURKHET > REHABILITATION 1 176 150 176 150 0 0 0 0 0

MIP>SURKHET>ON GOING
TANGLYNI 100 SURKHET PC 2006 YR ID 588 500 0 0 0 0 0 0 0 MIP NO DOI 2 KARNALI
TOTAL of MIP > SURKHET > ON GOING 1 588 500 0 0 0 0 0 0 0

TOTAL of SURKHET District 2 764 650 176 150 0 0 0 0 0

MIP>PYUTHAN
NAU KULO 100 PYUTHAN PC 2006 YR ID 80 70 80 70 0 0 0 0 0 MIP NO DOI 5 BABAI
TOTAL of MIP > PYUTHAN > ON GOING 1 80 70 80 70 0 0 0 0 0

TOTAL of PYUTHAN District 1 80 70 80 70 0 0 0 0 0

TOTAL of MID- WESTERN > Hill 4 1291 1100 350 300 0 0 0 0 0

MIP>DOLPA>ON GOING
MAJPHALA 100 DOLPA PC 2006 YR ID 346 294 0 0 0 0 0 0 0 MIP NO DOI 6 WEST RAPTI
TOTAL of MIP > DOLPA > ON GOING 1 346 294 0 0 0 0 0 0 0

TOTAL of DOLPA District 1 346 294 0 0 0 0 0 0 0

MIP>HUMLA
THIHE 100 HUMLA PC 2006 YR ID 176 150 0 0 0 0 0 0 0 MIP NO DOI 2 KARNALI
TOTAL of MIP > HUMLA > ON GOING 1 176 150 0 0 0 0 0 0 0

TOTAL of HUMLA District 1 176 150 0 0 0 0 0 0 0

MIP>JUMLA>ON GOING
DHUPIJEWLA 100 JUMLA PC 2006 YR ID 47 35 47 35 0 0 0 0 0 MIP NO DOI 2 KARNALI
THEHE 100 JUMLA PC 2006 YR ID 110 100 110 100 0 0 0 0 0 MIP NO DOI 5 BABAI
TOTAL of MIP > JUMLA > ON GOING 1 157 135 157 135 0 0 0 0 0

TOTAL of JUMLA District 1 157 135 157 135 0 0 0 0 0

TOTAL of MID- WESTERN > Mountain 3 679 579 157 135 0 0 0 0 0

115
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

TOTAL of MID- WESTERN Region 9 3036 5085 1095 935 0 0 0 0 0

MIP>KAILALI>ON GOING
GHURGHI BADH 100 KAILALI PC 2006 YR ID 706 600 0 0 0 0 0 0 0 MIP NO DOI 2 KARNALI
TOTAL of MIP > KAILALI > ON GOING 1 706 600 0 0 0 0 0 0 0

TOTAL of KAILALI District 1 706 600 0 0 0 0 0 0 0

116
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of FAR - WESTERN > Terai 1 706 600 0 0 0 0 0 0 0

MIP>ACHHAM>ON GOING
SISNEY CHOWREY 100 ACHHAM PC 2006 YR ID 47 40 0 0 0 0 0 0 0 MIP NO DOI 2 KARNALI
TOTAL of MIP > ACHHAM > ON GOING 1 47 40 0 0 0 0 0 0 0

TOTAL of ACHHAM District 1 47 40 0 0 0 0 0 0 0

MIP>BAITADI>ON GOING
BARDIYA KHOLA 100 BAITADI PC 2006 YR ID 229 195 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAK
DHUNGHEY BANDH 100 BAITADI PC 2006 YR ID 353 300 0 0 0 0 0 0 0 MIP NO DOI 8 TINAU
KIMUWA KHOLA 100 BAITADI PC 2006 YR ID 171 145 0 0 0 0 0 0 0 MIP NO DOI 2 KARNALI
MALPI LILAWATI 100 BAITADI PC 2006 YR ID 353 300 0 0 0 0 0 0 0 MIP NO DOI 4 KOSHI
PATAN BAGHADI 100 BAITADI PC 2006 YR ID 100 85 100 85 0 0 0 0 0 MIP NO DOI 1 MAHAKALI
RAMCHOKE PHANT 100 BAITADI PC 2006 YR ID 176 150 0 0 0 0 0 0 0 MIP NO DOI 3 GANDAK
UKHU 100 BAITADI PC 2006 YR ID 124 105 0 0 0 0 0 0 0 MIP NO DOI 1 MAHAKALI
TOTAL of MIP > BAITADI > ON GOING 7 1506 1280 100 85 0 0 0 0 0

TOTAL of BAITADI District 7 1506 1280 100 85 0 0 0 0 0

MIP>DADELDHURA>ON GOING
KOIRALA KHOLA 100 DADELDHURA PC 2006 YR ID 118 100 0 0 0 0 0 0 0 MIP NO DOI 1 MAHAKALI
TOTAL of MIP > DADELDHURA > ON GOING 1 118 100 0 0 0 0 0 0 0

TOTAL of DADELDHURA District 1 118 100 0 0 0 0 0 0 0

TOTAL of FAR - WESTERN > Hill 9 1671 1420 100 85 0 0 0 0 0

MIP>BAJHANG>ON GOING
TALKOT DATOLA 100 BAJHANG PC 2006 YR ID 75 64 0 0 0 0 0 0 0 MIP NO DOI 2 KARNALI
TOTAL of MIP > BAJHANG > ON GOING 1 75 64 0 0 0 0 0 0 0

TOTAL of BAJHANG District 1 75 64 0 0 0 0 0 0 0

MIP>DOTI
MATEYLA PRTOLA 100 DOTI PC 2006 YR ID 130 120 130 120 0 0 0 0 0 MIP NO DOI 2 KARNALI
TOTAL of MIP > DOTI > ON GOING 1 130 120 130 120 0 0 0 0 0

TOTAL of DOTI District 1 130 120 130 120 0 0 0 0 0

MIP>DARCHULA
UKU 100 DARCHULA PC 2006 YR ID 115 105 115 105 0 0 0 0 0 MIP NO DOI 2 KARNALI
MIP>DARCHULA 1 115 105 115 105 0 0 0 0 0

TOTAL of DARCHULA District 1 115 105 115 105 0 0 0 0 0

117
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of FAR - WESTERN > Mountain 2 205 184 130 225 0 0 0 0 0

TOTAL of FAR - WESTERN Region 12 2582 2204 230 310 0 0 0 0 0

TOTAL of MIP 65 20277 19769 4336 4298 0 0 0 0 0

118
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
MPLD>ILAM>REHABILITATION
DHUSENI 100 ILAM AC 188 150 188 150 150 0 0 0 0 MPLD NO ILO 11 KANKAI
SHANTIPUR 100 ILAM AC 88 70 88 70 70 0 0 0 0 MPLD NO ILO 11 KANKAI
TOTAL of MPLD > ILAM > REHABILITATION 2 276 220 276 220 220 0 0 0 0

TOTAL of ILAM District 2 276 220 276 220 220 0 0 0 0

MPLD>KHOTANG>REHABILITATION
HAUN CHAUR 100 KHOTANG AC 75 60 75 60 60 0 0 0 0 MPLD NO ILO 4 KOSHI
TOTAL of MPLD > KHOTANG > REHABILITATION 1 75 60 75 60 60 0 0 0 0

TOTAL of KHOTANG District 1 75 60 75 60 60 0 0 0 0

MPLD>OKHALDHUNGA>REHABILITATION
MOLUNG 100 OKHALDHUNGA AC 188 150 188 150 150 0 0 0 0 MPLD NO ILO 4 KOSHI
TOTAL of MPLD > OKHALDHUNGA > REHABILITATION 1 188 150 188 150 150 0 0 0 0

TOTAL of OKHALDHUNGA District 1 188 150 188 150 150 0 0 0 0

TOTAL of EASTERN > Hill 4 539 430 539 430 430 0 0 0 0

TOTAL of EASTERN Region 4 539 430 539 430 430 0 0 0 0

MPLD>DHADING>REHABILITATION
MARPARK I 100 DHADING AC 50 40 50 40 40 0 0 0 0 MPLD NO ILO 3 GANDAK
MARPARK II 100 DHADING AC 75 60 75 60 60 0 0 0 0 MPLD NO ILO 3 GANDAK
SATYADEVI 100 DHADING AC 125 100 125 100 100 0 0 0 0 MPLD NO ILO 3 GANDAK
TOTAL of MPLD > DHADING > REHABILITATION 3 250 200 250 200 200 0 0 0 0

TOTAL of DHADING District 3 250 200 250 200 200 0 0 0 0

MPLD>RAMECHAP>REHABILITATION
DARKHA 100 RAMECHAP AC 50 40 50 40 40 0 0 0 0 MPLD NO ILO 4 KOSHI
TOTAL of MPLD > RAMECHAP > REHABILITATION 1 50 0 50 40 40 0 0 0 0

TOTAL of RAMECHAP District 1 50 40 50 40 40 0 0 0 0

TOTAL of CENTRAL > Hill 4 300 240 300 240 240 0 0 0 0

MPLD>SINDHUPALCHOWK>REHABILITATION
JAELE KHOLA 100 SINDHUPALCHOWK AC 25 20 25 20 20 0 0 0 0 MPLD NO ILO 4 KOSHI
TOTAL of MPLD > SINDHUPALCHOWK > REHABILITATION 1 25 20 25 20 20 0 0 0 0

TOTAL of SINDHUPALCHOWK District 1 25 20 25 20 20 0 0 0 0

TOTAL of CENTRAL > Mountain 1 25 20 25 20 20 0 0 0 0

119
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

TOTAL of CENTRAL > Region 5 325 260 325 260 260 0 0 0 0

MPLD>ARGHAKHANCHI>REHABILITATION
SITAPUR 100 ARGHAKHANCHI AC 25 20 25 20 20 0 0 0 0 MPLD NO ILO 6 WEST RAPTI
WACLA KHOLA 100 ARGHAKHANCHI AC 75 60 75 60 60 0 0 0 0 MPLD NO ILO 6 WEST RAPTI
TOTAL of MPLD > ARGHAKHANCHI > REHABILITATION 2 100 80 100 80 80 0 0 0 0

TOTAL of ARGHAKHANCHI District 2 100 80 100 80 80 0 0 0 0

MPLD>GULMI>REHABILITATION
GWALI CHOUR 100 GULMI AC 125 100 125 100 100 0 0 0 0 MPLD NO ILO 3 GANDAK
KUMAL TARI 100 GULMI AC 113 90 113 90 90 0 0 0 0 MPLD NO ILO 3 GANDAK
TOTAL of MPLD > GULMI > REHABILITATION 2 238 190 238 190 190 0 0 0 0

TOTAL of GULMI District 2 238 190 238 190 190 0 0 0 0

MPLD>KASKI>REHABILITATION
K MAJUWA 100 KASKI AC 75 60 75 60 60 0 0 0 0 MPLD NO ILO 3 GANDAK
LAHACHOWK 100 KASKI AC 125 100 125 100 100 0 0 0 0 MPLD NO ILO 3 GANDAK
TAKANJA TAR 100 KASKI AC 188 150 188 150 150 0 0 0 0 MPLD NO ILO 3 GAMDAK
TOTAL of MPLD > KASKI > REHABILITATION 3 388 310 388 310 310 0 0 0 0

TOTAL of KASKI District 3 388 310 388 310 310 0 0 0 0

MPLD>PALPA>REHABILITATION
BINAPATHE 100 PALPA AC 44 35 44 35 35 0 0 0 0 MPLD NO ILO 3 GANDAK
TOTAL of MPLD > PALPA > REHABILITATION 1 44 35 44 35 35 0 0 0 0

TOTAL of PALPA District 1 44 35 44 35 35 0 0 0 0

MPLD>SYANGJA>REHABILITATION
BAGUWAKAR 100 SYANGJA AC MS 75 60 75 60 60 0 0 0 0 MPLD NO ILO 3 GANDAK
S PHANT 100 SYANGJA AC 75 60 75 60 60 0 0 0 0 MPLD NO ILO 3 GANDAK
TOTAL of MPLD > SYANGJA > REHABILITATION 2 150 120 150 120 120 0 0 0 0

TOTAL of SYANGJA District 2 150 120 150 120 120 0 0 0 0

TOTAL of WESTERN > Hill 10 920 735 920 735 735 0 0 0 0

TOTAL of WESTERN Region 10 920 735 920 735 735 0 0 0 0

MPLD>ACHHAM>REHABILITATION
DIGRENI 100 ACHHAM AC 25 20 25 20 20 0 0 0 0 MPLD NO ILO 2 KARNALI
KOGARSOOT 100 ACHHAM AC 19 15 19 15 15 0 0 0 0 MPLD NO ILO 2 KARNALI
POITORANI 100 ACHHAM AC 25 20 25 20 20 0 0 0 0 MPLD NO ILO 2 KARNALI

120
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TARSKUNA 100 ACHHAM AC 19 15 19 15 15 0 0 0 0 MPLD NO ILO 2 KARNALI
THANTI 100 ACHHAM AC 15 12 15 12 12 0 0 0 0 MPLD NO ILO 2 KARNALI
TOTAL of MPLD > ACHHAM > REHABILITATION 5 103 82 103 82 82 0 0 0 0

TOTAL of ACHHAM District 5 103 82 103 82 82 0 0 0 0

MPLD>BAITADI>REHABILITATION
DHUNGAD(SAJHA) 100 BAITADI AC 25 20 25 20 20 0 0 0 0 MPLD NO ILO 1 MAHAKALI
GURHADI 100 BAITADI AC 50 40 50 40 40 0 0 0 0 MPLD NO ILO 1 MAHAKALI
KUMALIGAD SYADI 100 BAITADI AC 100 80 100 80 80 0 0 0 0 MPLD NO ILO 1 MAHAKALI
LIKHADI 100 BAITADI AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 1 MAHAKALI
LISKELA 100 BAITADI AC 19 15 19 15 15 0 0 0 0 MPLD NO ILO 1 MAHAKALI
SURKAL 100 BAITADI AC 50 40 50 40 40 0 0 0 0 MPLD NO ILO 1 MAHAKALI
TOTAL of MPLD > BAITADI > REHABILITATION 6 257 205 257 205 205 0 0 0 0

TOTAL of BAITADI District 6 257 205 257 205 205 0 0 0 0

MPLD>DADELDHURA>REHABILITATION
ANCHOLI 100 DADELDHURA AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 1 MAHAKALI
CHAUR 100 DADELDHURA AC 75 60 75 60 60 0 0 0 0 MPLD NO ILO 1 MAHAKALI
JORMANA 100 DADELDHURA AC 19 15 19 15 15 0 0 0 0 MPLD NO ILO 1 MAHAKALI
KHAJJAR 100 DADELDHURA AC 1 1 1 1 1 0 0 0 0 MPLD NO ILO 1 MAHAKALI
KORALI 100 DADELDHURA AC 6 5 6 5 5 0 0 0 0 MPLD NO ILO 1 MAHAKALI
LETUM 100 DADELDHURA AC 6 5 6 5 5 0 0 0 0 MPLD NO ILO 1 MAHAKALI
MELMODA 100 DADELDHURA AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 1 MAHAKALI
OKHANI 100 DADELDHURA AC 8 6 8 6 6 0 0 0 0 MPLD NO ILO 1 MAHAKALI
RAND GAON 100 DADELDHURA AC 156 125 156 125 125 0 0 0 0 MPLD NO ILO 1 MAHAKALI
SUNI KHET 100 DADELDHURA AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 1 MAHAKALI
TALAI 100 DADELDHURA AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 1 MAHAKALI
TILETA 100 DADELDHURA AC 25 20 25 20 20 0 0 0 0 MPLD NO ILO 1 MAHAKALI
RADIL 100 DADELDHURA AC 188 150 188 150 150 0 0 0 0 MPLD NO ILO 1 MAHAKALI
TOTAL of MPLD > DADELDHURA > REHABILITATION 13 536 427 536 427 427 0 0 0 0

TOTAL of DADELDHURA District 13 536 427 536 427 427 0 0 0 0

MPLD>DOTI>REHABILITATION
ALRKOT 100 DOTI AC 11 9 11 9 9 0 0 0 0 MPLD NO ILO 2 KARNALI
AMTODA 100 DOTI AC 23 18 23 18 18 0 0 0 0 MPLD NO ILO 2 KARNALI
BOLASAN 100 DOTI AC 3 2 3 2 2 0 0 0 0 MPLD NO ILO 2 KARNALI
CHADAKOT 100 DOTI AC 25 20 25 20 20 0 0 0 0 MPLD NO ILO 2 KARNALI
CHANEESEN 100 DOTI AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 2 KARNALI
DEULIAM 100 DOTI AC 25 20 25 20 20 0 0 0 0 MPLD NO ILO 2 KARNALI
DOGOD 100 DOTI AC 100 80 100 80 80 0 0 0 0 MPLD NO ILO 2 KARNALI
HODRANI 100 DOTI AC 31 25 31 25 25 0 0 0 0 MPLD NO ILO 2 KARNALI
JAKHOLE KULO 100 DOTI AC 5 4 5 4 4 0 0 0 0 MPLD NO ILO 2 KARNALI
KACHADA KULO 100 DOTI AC 23 18 23 18 18 0 0 0 0 MPLD NO ILO 2 KARNALI

121
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
KUNDKO 100 DOTI AC 31 25 31 25 25 0 0 0 0 MPLD NO ILO 2 KARNALI
MAKGEL 100 DOTI AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 2 KARNALI
MALLOAJIT 100 DOTI AC 44 35 44 35 35 0 0 0 0 MPLD NO ILO 2 KARNALI
MA TALKHAT 100 DOTI AC 3 2 3 2 2 0 0 0 0 MPLD NO ILO 2 KARNALI
MULESALA 100 DOTI AC 3 2 3 2 2 0 0 0 0 MPLD NO ILO 2 KARNALI
POKHARI 100 DOTI AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 2 KARNALI
ROI TARA 100 DOTI AC 50 40 50 40 40 0 0 0 0 MPLD NO ILO 2 KARNALI
ROWAKHAT 100 DOTI AC 3 2 3 2 2 0 0 0 0 MPLD NO ILO 2 KARNALI
SALTODA 100 DOTI AC 4 3 4 3 3 0 0 0 0 MPLD NO ILO 2 KARNALI
SAPORI 100 DOTI AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 2 KARNALI
SARA 100 DOTI AC 3 2 3 2 2 0 0 0 0 MPLD NO ILO 2 KARNALI
SERI KULO 100 DOTI AC 50 40 50 40 40 0 0 0 0 MPLD NO ILO 2 KARNALI
TALIKHAT 100 DOTI AC 6 5 6 5 5 0 0 0 0 MPLD NO ILO 2 KARNALI
TALKOT 100 DOTI AC 63 50 63 50 50 0 0 0 0 MPLD NO ILO 2 KARNALI
THADICHOMA 100 DOTI AC 6 5 6 5 5 0 0 0 0 MPLD NO ILO 2 KARNALI
THALI 100 DOTI AC 6 5 6 5 5 0 0 0 0 MPLD NO ILO 2 KARNALI
TULA KHET 100 DOTI AC 6 5 6 5 5 0 0 0 0 MPLD NO ILO 2 KARNALI
SERA KHET 100 DOTI AC 50 40 50 40 40 0 0 0 0 MPLD NO ILO 2 KARNALI
TOTAL of MPLD > DOTI > REHABILITATION 28 626 497 626 497 497 0 0 0 0

TOTAL of DOTI District 28 626 497 626 497 497 0 0 0 0

TOTAL of FAR-WESTERN > Hill 52 1522 1211 1522 1211 1211 0 0 0 0

MPLD>BAJHANG>REHABILITATION
BODDI KULO 100 BAJHANG AC 63 50 63 50 50 0 0 0 0 MPLD NO ILO 2 KARNALI
BYASI 100 BAJHANG AC 56 45 56 45 45 0 0 0 0 MPLD NO ILO 2 KARNALI
DEURA 100 BAJHANG AC 51 41 51 41 41 0 0 0 0 MPLD NO ILO 2 KARNALI
ECHELI 100 BAJHANG AC 6 5 6 5 5 0 0 0 0 MPLD NO ILO 2 KARNALI
MAJ KULO 100 BAJHANG AC 44 35 44 35 35 0 0 0 0 MPLD NO ILO 2 KARNALI
MARAILREGAM 100 BAJHANG AC 9 7 9 7 7 0 0 0 0 MPLD NO ILO 2 KARNALI
MULKADO DEWAL 100 BAJHANG AC 100 80 100 80 80 0 0 0 0 MPLD NO ILO 2 KARNALI
WAD KULO 100 BAJHANG AC 38 30 38 30 30 0 0 0 0 MPLD NO ILO 2 KARNALI
TOTAL of MPLD > BAJHANG > REHABILITATION 8 367 293 367 293 293 0 0 0 0

TOTAL of BAJHANG District 8 367 293 367 293 293 0 0 0 0

MPLD>BAJURA>REHABILITATION
GANKHEL 100 BAJURA AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 2 KARNALI
KAGEBAGAR 100 BAJURA AC 10 8 10 8 8 0 0 0 0 MPLD NO ILO 2 KARNALI
PARIJADANGA 100 BAJURA AC 9 7 9 7 7 0 0 0 0 MPLD NO ILO 2 KARNALI
SERAKHEL 100 BAJURA AC 10 8 10 8 8 0 0 0 0 MPLD NO ILO 2 KARNALI
SIMSERA 100 BAJURA AC 11 9 11 9 9 0 0 0 0 MPLD NO ILO 2 KARNALI
TAPRE 100 BAJURA AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 2 KARNALI
TITRASAN 100 BAJURA AC 8 6 8 6 6 0 0 0 0 MPLD NO ILO 2 KARNALI
WARIJAGoNGA 100 BAJURA AC 9 7 9 7 7 7 0 0 0 MPLD NO ILO 2 KARNALI

122
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of MPLD > BAJURA > REHABILITATION 8 83 65 83 65 65 7 0 0 0

TOTAL of BAJURA District 8 83 65 83 65 65 7 0 0 0

MPLD>DARCHULA>REHABILITATION
BAJH 100 DARCHULA AC 10 8 10 8 8 0 0 0 0 MPLD NO ILO 1 MAHAKALI
BER 100 DARCHULA AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 1 MAHAKALI
JHUSKA 100 DARCHULA AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 1 MAHAKALI
KHARRA 100 DARCHULA AC 13 10 13 10 10 0 0 0 0 MPLD NO ILO 1 MAHAKALI
KHIRKOT 100 DARCHULA AC 6 5 6 5 5 0 0 0 0 MPLD NO ILO 1 MAHAKALI
NAMASKAR 100 DARCHULA AC 6 5 6 5 5 0 0 0 0 MPLD NO ILO 1 MAHAKALI
TIKRAM 100 DARCHULA AC 9 7 9 7 7 0 0 0 0 MPLD NO ILO 1 MAHAKALI
UKU 100 DARCHULA AC 75 60 75 60 60 0 0 0 0 MPLD NO ILO 1 MAHAKALI
TOTAL of MPLD > DARCHULA > REHABILITATION 8 145 115 145 115 115 0 0 0 0

TOTAL of DARCHULA District 8 145 115 145 115 115 0 0 0 0

TOTAL of FAR-WESTERN > Mountain 24 595 473 595 473 473 7 0 0 0

TOTAL of FAR-WESTERN Region 76 2117 1684 2117 1684 1684 7 0 0 0

TOTAL of MPLD 95 3901 3109 3901 3109 3109 7 0 0 0

N CARE>JHAPA>NEW
BAHUNDANGI 100 JHAPA AC 485 388 485 388 388 0 0 0 0 N CARE NO B 12 SIWALIK RIVER
TOTAL of N CARE > JHAPA > NEW 1 485 388 485 388 388 0 0 0 0

TOTAL of JHAPA District 1 485 388 485 388 388 0 0 0 0

N CARE>MORANG>NEW
LETANG 1 100 MORANG AC 115 92 115 92 92 0 0 0 0 N CARE NO B 12 SIWALIK RIVER
SUNERPUR 100 MORANG AC 63 50 63 50 50 0 0 0 0 N CARE NO SAID/ADB 12 SIWALIK RIVER
TOTAL of N CARE > MORANG > NEW 2 178 142 178 142 142 0 0 0 0

N CARE>MORANG>REHABILITATION
LETANG II 100 MORANG AC 265 212 265 212 212 0 0 0 0 N CARE NO B 12 SIWALIK RIVER
LETANG III 100 MORANG AC 134 107 134 107 107 0 0 0 0 N CARE NO B 12 SIWALIK RIVER
SIJUWA 100 MORANG AC 124 99 124 99 99 0 0 0 0 N CARE NO B 12 SIWALIK RIVER
TOTAL of N CARE > MORANG > REHABILITATION 3 523 418 523 418 418 0 0 0 0

TOTAL of MORANG District 5 701 560 701 560 560 0 0 0 0

N CARE>SUNSARI>REHABILITATION
PAKLI 100 SUNSARI AC 209 167 209 167 167 0 0 0 0 N CARE NO B 12 SIWALIK RIVER
TOTAL of N CARE > SUNSARI > REHABILITATION 1 209 167 209 167 167 0 0 0 0

123
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of SUNSARI District 1 209 167 209 167 167 0 0 0 0

TOTAL of EASTERN > Terai 7 1395 1115 1395 1115 1115 0 0 0 0

TOTAL of EASTERN Region 7 1395 1115 1395 1115 1115 0 0 0 0

N CARE>CHITWAN>NEW
KUMROJ D/S 100 CHITWAN AC 488 390 488 390 390 0 0 0 0 N CARE NO B 3 GANDAK
KUMROJ U/S 100 CHITWAN AC 75 60 75 60 60 0 0 0 0 N CARE NO B 3 GANDAK
TOTAL of N CARE > CHITWAN > NEW 2 563 450 563 450 450 0 0 0 0

TOTAL of CHITWAN District 2 563 450 563 450 450 0 0 0 0

N CARE>DHANUSHA>NEW
CHAKKAR 100 DHANUSHA AC 312 250 312 250 250 0 0 0 0 N CARE NO B 12 SIWALIK RIVER
DHANUSHA DHAM 100 DHANUSHA AC 312 250 312 250 250 0 0 0 0 N CARE NO B 12 SIWALIK RIVER
TOTAL of N CARE > DHANUSHA > NEW 2 624 500 624 500 500 0 0 0 0

N CARE>DHANUSHA>REHABILITATION
TULSI 100 DHANUSHA AC 88 70 88 70 70 0 0 0 0 N CARE NO B 12 SIWALIK RIVER
TOTAL of N CARE > DHANUSHA > REHABILITATION 1 88 70 88 70 70 0 0 0 0

TOTAL of DHANUSHA District 3 712 570 712 570 570 0 0 0 0

N CARE>MAHOTTARI>NEW
KHAYARMARA 100 MAHOTTARI AC 173 138 173 138 138 0 0 0 0 N CARE NO B 12 SIWALIK RIVER
TOTAL of N CARE > MAHOTTARI > NEW 1 173 138 173 138 138 0 0 0 0

N CARE>MAHOTTARI>REHABILITATION
DOMAHAV 100 MAHOTTARI AC 1993 ID 206 165 206 165 165 0 0 0 0 N CARE NO CARE 12 SIWALIK RIVER
FLOW DIVIDAR 100 MAHOTTARI AC 1990 ID 31 25 31 25 25 0 0 0 0 N CARE NO CARE 12 SIWALIK RIVER
GERUKA 100 MAHOTTARI AC 1993 ED 500 400 500 400 400 0 0 0 0 N CARE NO CARE 12 SIWALIK RIVER
HATHILET 100 MAHOTTARI AC 1990 ID 125 100 125 100 100 0 0 0 0 N CARE NO CARE 12 SIWALIK RIVER
HATIGAUNDA 100 MAHOTTARI AC 1992 ID 91 73 91 73 73 0 0 0 0 N CARE NO CARE 12 SIWALIK RIVER
PATHARA MADEPURA-4 100 MAHOTTARI AC 993 ID 356 285 356 285 285 0 0 0 0 N CARE NO CARE 12 SIWALIK RIVER
PATHARA SAJA 100 MAHOTTARI AC 1994 ID 250 200 250 200 200 0 0 0 0 N CARE NO CARE 12 SIWALIK RIVER
TOTAL of N CARE > MAHOTTARI > REHABILITATION 7 1559 1248 1559 1248 1248 0 0 0 0

TOTAL of MAHOTTARI District 8 1732 1386 1732 1386 1386 0 0 0 0

N CARE>SARLAHI>REHABILITATION
PARWANIPUR 100 SARLAHI AC 500 400 500 400 400 0 0 0 0 N CARE NO B 12 SIWALIK RIVER
TOTAL of N CARE > SARLAHI > REHABILITATION 1 500 400 500 400 400 0 0 0 0

TOTAL of SARLAHI District 1 500 400 500 400 400 0 0 0 0

124
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of CENTRAL > Terai 14 3507 2806 3507 2806 2806 0 0 0 0

N CARE>KAVRE>NEW
BHUMUL TAR 100 KAVRE AC 25 20 25 20 20 0 0 0 0 N CARE NO B 4 KOSHI
TARAMARANG 100 KAVRE AC 25 20 25 20 20 0 0 0 0 N CARE NO B 4 KOSHI
TOTAL of N CARE > KAVRE > NEW 2 50 40 50 40 40 0 0 0 0

N CARE>KAVRE>REHABILITATION
BALTHAL 100 KAVRE AC 25 20 25 20 20 0 0 0 0 N CARE NO B 4 KOSHI
KHOPASI II 100 KAVRE AC 45 36 45 36 36 0 0 0 0 N CARE NO B 4 KOSHI
NAYA GAON 100 KAVRE AC ID 313 250 313 250 313 0 0 0 0 N CARE NO B 4 KOSHI
TOTAL of N CARE > KAVRE > REHABILITATION 3 383 306 383 306 369 0 0 0 0

TOTAL of KAVRE District 5 433 346 433 346 409 0 0 0 0

N CARE>MAKAWANPUR>NEW
JHILKENI 100 MAKAWANPUR AC 30 24 30 24 24 0 0 0 0 N CARE NO B 3 GANDAK
THADE 100 MAKAWANPUR AC 13 10 13 10 10 0 0 0 0 N CARE NO B 3 GANDAK
TISTUNG 100 MAKAWANPUR AC 35 28 35 28 28 0 0 0 0 N CARE NO B 3 GANDAK
TOTAL of N CARE > MAKAWANPUR > NEW 3 78 62 78 62 62 0 0 0 0

N CARE>MAKAWANPUR>REHABILITATION
BARAY TAR 100 MAKAWANPUR AC 49 39 49 39 39 0 0 0 0 N CARE NO B 3 GANDAK
TOTAL of N CARE > MAKAWANPUR > REHABILITATION 1 49 39 49 39 39 0 0 0 0

TOTAL of MAKAWANPUR District 4 127 101 127 101 101 0 0 0 0

N CARE>NUWAKOT>NEW
BHORLE 100 NUWAKOT ACD 30 25 30 25 25 0 0 0 0 N CARE NO B 3 GANDAK
JILLING 100 NUWAKOT AC 31 25 31 25 25 0 0 0 0 N CARE NO B 3 GANDAK
SAMARI 100 NUWAKOT AC 38 30 38 30 30 0 0 0 0 N CARE NO B 3 GANDAK
SANO BHORLE 100 NUWAKOT AC 31 25 31 25 25 0 0 0 0 N CARE NO B 3 GANDAK
TOTAL of N CARE > NUWAKOT > NEW 4 130 105 130 105 105 0 0 0 0

N CARE>NUWAKOT>REHABILITATION
KHOLA Y GAON 100 NUWAKOT AC 138 110 138 110 110 0 0 0 0 N CARE NO B 3 GANDAK
LECHYANG 100 NUWAKOT AC 48 36 48 36 36 0 0 0 0 N CARE NO B 3 GANDAK
SANDERA DEVI 100 NUWAKOT AC 100 80 100 80 80 0 0 0 0 N CARE NO B 3 GANDAK
TOTAL of N CARE > NUWAKOT > REHABILITATION 3 286 226 286 226 226 0 0 0 0

TOTAL of NUWAKOT District 7 416 331 416 331 331 0 0 0 0

TOTAL of CENTRAL > Hill 16 976 778 976 778 841 0 0 0 0

TOTAL of CENTRAL Region 30 4483 3584 4483 3584 3647 0 0 0 0

125
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
N CARE>GORKHA>REHABILITATION
PYAUDI 100 GORKHA AC 25 20 25 20 20 0 0 0 0 N CARE NO B 3 GANDAK
TAKLUNG 100 GORKHA AC 18 14 18 14 14 0 0 0 0 N CARE NO B 3 GANDAK
THALECHOWK 100 GORKHA AC 1994 ID 75 60 75 60 60 0 0 0 0 N CARE NO CARE 3 GANDAK
TOTAL of N CARE > GORKHA > REHABILITATION 3 118 94 118 94 94 0 0 0 0

TOTAL of GORKHA District 3 118 94 118 94 94 0 0 0 0

N CARE>LAMJUNG>NEW
SUNDER BAZAR 100 LAMJUNG AC 15 12 15 12 12 0 0 0 0 N CARE NO B 3 GANDAK
TOTAL of N CARE > LAMJUNG > NEW 1 15 12 15 12 12 0 0 0 0

TOTAL of LAMJUNG District 1 15 12 15 12 12 0 0 0 0

TOTAL of WESTERN > Hill 4 133 106 133 106 106 0 0 0 0

TOTAL of WESTERN Region 4 133 106 133 106 106 0 0 0 0

TOTAL of N CARE 41 6011 4805 6011 4805 4868 0 0 0 0

NISP>KAPILVASTU>REHABILITATION
KARMA 100 KAPILVASTU PC 1999 YR ID 235 200 235 200 0 0 0 0 0 NISP NO IDA 12 SIWALIK RIVER
GHAGHAWA 100 KAPILVASTU PC 1999 YR ID 440 374 440 374 0 0 0 0 0 NISP NO IDA 3 GANDAK
KANCHANIYA 100 KAPILVASTU PC 2000 YR ID 341 290 341 290 0 0 0 0 0 NISP NO IDA 12 SIWALIK RIVER
PATHERDAIYA 100 KAPILVASTU PC 2002 YR ID 824 700 824 700 0 0 0 0 0 NISP NO IDA 12 SIWALIK RIVER
MAHENDRAKOT 100 KAPILVASTU PC 2003 YR ID 506 430 506 430 0 0 0 0 0 NISP NO IDA 12 SIWALIK RIVER
TOTAL of NISP > KAPILVASTU > REHABILITATION 5 2346 1994 2346 1994 0 0 0 0 0

TOTAL of KAPILVASTU District 5 2346 1994 2346 1994 0 0 0 0 0

NISP>NAWALPARASI>REHABILITATION
KUSUNDE TAR 100 NAWALPARASI PC 1999 YR ID 165 140 165 140 0 0 0 0 0 NISP NO IDA 3 GANDAK
ULTI KHOLA 100 NAWALPARASI PC 1999 YR ID 188 160 188 160 0 0 0 0 0 NISP NO IDA 3 GANDAK
BHALUHI 100 NAWALPARASI PC 1999 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 3 GANDAK
BHUMAHI 100 NAWALPARASI PC 1999 YR ID 294 250 294 250 0 0 0 0 0 NISP NO IDA 3 GANDAK
BAGUBAN 100 NAWALPARASI PC 2000 YR ID 106 90 106 90 0 0 0 0 0 NISP NO IDA 3 GANDAK
BEL TARI 100 NAWALPARASI PC 2000 YR ID 212 180 212 180 0 0 0 0 0 NISP NO IDA 3 GANDAK
RAJAHAR 100 NAWALPARASI PC 2002 YR ID 282 240 282 240 0 0 0 0 0 NISP NO IDA 3 GANDAK
JHYALBAS 100 NAWALPARASI PC 2000 YR ID 99 84 99 84 0 0 0 0 0 NISP NO IDA 3 GANDAK
JANAMUKHI 100 NAWALPARASI PC 2000 YR ID 306 260 306 260 0 0 0 0 0 NISP NO IDA 3 GANDAK
JULPE 100 NAWALPARASI PC 2000 YR ID 424 360 424 360 0 0 0 0 0 NISP NO IDA 3 GANDAK
ADARASA KULO 100 NAWALPARASI PC 2000 YR ID 494 420 494 420 0 0 0 0 0 NISP NO IDA 3 GANDAK
TALLOMUL KULO 100 NAWALPARASI PC 2002 YR ID 62 53 62 53 0 0 0 0 0 NISP NO IDA 3 GANDAK
PRAGATINAGAR 100 NAWALPARASI PC 2002 YR ID 388 330 388 330 0 0 0 0 0 NISP NO IDA 3 GANDAK
TAMASPUR 100 NAWALPARASI PC 2003 YR ID 114 97 114 97 0 0 0 0 0 NISP NO IDA 3 GANDAK
BULING TAR(TO) 100 NAWALPARASI PC 2003 YR ID 329 280 329 280 0 0 0 0 0 NISP YES IDA 3 GANDAK

126
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of NISP > NAWALPARASI > REHABILITATION 15 3581 3044 3581 3044 0 0 0 0 0

TOTAL of NAWALPARASI District 15 3581 3044 3581 3044 0 0 0 0 0

NISP>RUPANDEHI>REHABILITATION
GAIDAHAWA 100 RUPANDEHI PC 1998 YR ID 111 94 111 94 0 0 0 0 0 NISP NO IDA 8 TINAU
KANCHAN KHOLA 100 RUPANDEHI PC 2000 YR ID 200 170 200 170 0 0 0 0 0 NISP NO IDA 8 TINAU
LAUSI KHOLA 100 RUPANDEHI PC 2001 YR ID 353 300 353 300 0 0 0 0 0 NISP NO IDA 8 TINAU
PURNIYA BANDH 100 RUPANDEHI PC 2002 YR ID 124 105 124 105 0 0 0 0 0 NISP NO IDA 8 TINAU
KOTHI 100 RUPANDEHI PC 2002 YR ID 235 200 235 200 0 0 0 0 0 NISP NO IDA 8 TINAU
DUMDAMUWA 100 RUPANDEHI PC 2002 YR ID 194 165 194 165 0 0 0 0 0 NISP NO IDA 8 TINAU
GHAGHRA 100 RUPANDEHI PC 1999 YR ID 2353 2000 2353 2000 0 0 0 0 0 NISP NO IDA 8 TINAU
KHADWA MOTIPUR 100 RUPANDEHI PC 1999 YR ID 1412 1200 1412 1200 0 0 0 0 0 NISP NO IDA 8 TINAU
TOTAL of NISP > RUPANDEHI > REHABILITATION 8 4982 4234 4982 4234 0 0 0 0 0

NISP>RUPANDEHI>ON GOING
SIYARI 100 RUPANDEHI PC 2001 YR ID 941 800 0 0 0 0 0 0 0 NISP NO IDA 8 TANAU
TOTAL of NISP > RUPANDEHI > ON GOING 1 941 800 0 0 0 0 0 0 0

TOTAL of RUPANDEHI District 9 5923 5034 4982 4234 0 0 0 0 0

TOTAL of WESTERN > Terai 29 11850 10072 10909 9272 0 0 0 0 0

NISP>ARGHAKHANCHI>REHABILITATION
JUMLI KULO 100 ARGHAKHANCHI PC 1999 YR ID 89 76 89 76 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
THULA KHARKA 100 ARGHAKHANCHI PC 1999 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
DURGA KA URLAHARI 100 ARGHAKHANCHI PC 1998 YR ID 66 56 66 56 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
KWADI 100 ARGHAKHANCHI PC 2001 YR ID 40 34 40 34 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
CHUWATER 100 ARGHAKHANCHI PC 2003 YR ID 92 78 92 78 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
MAJH KHET 100 ARGHAKHANCHI PC 1998 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
AANP CHAUR 100 ARGHAKHANCHI PC 1998 YR ID 12 10 12 10 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
LAMA TARI 100 ARGHAKHANCHI PC 1999 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
RANUWA TARI 100 ARGHAKHANCHI PC 2000 YR ID 33 28 33 28 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
KHAKA BESI 100 ARGHAKHANCHI PC 2000 YR ID 52 44 52 44 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
DANGE GORKHE 100 ARGHAKHANCHI PC 2000 YR ID 20 17 20 17 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
DAMAR BESI 100 ARGHAKHANCHI PC 2001 YR ID 26 22 26 22 0 0 0 0 0 NISP NO IDA 6 WESTRAPTI
BIKRAMSOTA 100 ARGHAKHANCHI PC 2001 YR ID 71 60 71 60 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
TOTAL of NISP > ARGHAKHANCHI > REHABILITATION 13 584 495 584 495 0 0 0 0 0

TOTAL of ARGHAKHANCHI District 13 584 495 584 495 0 0 0 0 0

NISP>BAGLUNG>REHABILITATION
LASEUNE GAIRI 100 BAGLUNG AC 1999 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 3 GANDAK
NARANG KHOLA 100 BAGLUNG PC 2000 YR ID 53 45 53 45 0 0 0 0 0 NISP NO IDA 3 GANDAK
CHAMUWA 100 BAGLUNG PC 2001 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 3 GANDAK
GHUNDI KHOLA 100 BAGLUNG PC 1999 YR ID 94 80 94 80 0 0 0 0 0 NISP NO IDA 3 GANDAK

127
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
KHOLA KHET 100 BAGLUNG PC 2000 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 3 GANDAK
BAIRABANSE 100 BAGLUNG PC 2000 YR ID 59 50 59 50 0 0 0 0 0 NISP NO IDA 3 GANDAK
KHOLA 100 BAGLUNG PC 2001 YR ID 59 50 59 50 0 0 0 0 0 NISP NO IDA 3 GANDAK
HULUWA 100 BAGLUNG PC 2001 YR ID 33 28 33 28 0 0 0 0 0 NISP NO IDA 3 GANDAK
NAULA KHET KHA BARI 100 BAGLUNG PC 2003 YR ID 86 73 86 73 0 0 0 0 0 NISP NO IDA 3 GANDAK
LOWER SIRSE BAIRANSE 100 BAGLUNG PC 2001 YR ID 68 58 68 58 0 0 0 0 0 NISP NO IDA 3 GANDAK
BHIM POKHARA 100 BAGLUNG PC 2002 YR ID 65 55 65 55 0 0 0 0 0 NISP NO IDA 3 GANDAK
GHATTER BADHE CHAUR 100 BAGLUNG PC 2003 YR ID 21 18 21 18 0 0 0 0 0 NISP NO IDA 3 GANDAK
GADAUNGAD 100 BAGLUNG PC 1999 YR ID 176 150 0 0 0 0 0 NISP NO IDA 2 KARNALI
TOTAL of NISP > BAGLUNG > REHABILITATION 13 819 697 643 547 0 0 0 0 0

TOTAL of BAGLUNG District 13 819 697 643 547 0 0 0 0 0

NISP>GORKHA>REHABILITATION
BUT TAR 100 GORKHA PC 1999 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 3 GANDAK
MANGAL TAR 100 GORKHA PC 2002 YR ID 135 115 135 115 0 0 0 0 0 NISP NO IDA 3 GANDAK
BUDHWA PHANT 100 GORKHA PC 2002 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 3 GANDAK
MUCHOWK TAR 100 GORKHA PC 1999 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAK
PHURBUJE TAR 100 GORKHA PC 2004 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 3 GANDAK
BAKRANG BESI 100 GORKHA PC 2004 YR ID 106 90 106 90 0 0 0 0 0 NISP NO IDA 3 GANDAK
BOHORA BESI 100 GORKHA PC 2001 YR ID 48 41 48 41 0 0 0 0 0 NISP NO IDA 3 GANDAK
KHUDI TAR 100 GORKHA PC 2000 YR ID 31 26 31 26 0 0 0 0 0 NISP NO IDA 3 GANDAK
SUBBHAKODEHI SHERAP ANT 100 GORKHA PC 2002 YR ID 74 63 74 63 0 0 0 0 0 NISP NO IDA 3 GANDAK
TOTAL of NISP > GORKHA > REHABILITATION 9 641 545 641 545 0 0 0 0 0

TOTAL of GORKHA District 9 641 545 641 545 0 0 0 0 0

NISP>GULMI>REHABILITATION
AANP CHAUR 100 GULMI PC 2001 YR ID 82 70 82 70 0 0 0 0 0 NISP NO IDA 3 GANDAK
CHAURASI PHANT 100 GULMI PC 1999 YR ID 106 90 106 90 0 0 0 0 0 NISP NO IDA 3 GANDAK
JUHANG 100 GULMI PC 1999 YR ID 36 31 36 31 0 0 0 0 0 NISP NO IDA 3 GANDAK
CHAUR PHANT 100 GULMI PC 1999 YR ID 65 55 65 55 0 0 0 0 0 NISP NO IDA 3 GANDAK
SHANTIPUR THULO PHANT 100 GULMI PC 1999 YR ID 65 55 65 55 0 0 0 0 0 NISP NO IDA 3 GANDAK
KUMAL TARI 100 GULMI PC 2000 YR ID 48 41 48 41 0 0 0 0 0 NISP NO IDA 3 GANDAK
MACHHAKOT 100 GULMI PC 2000 YR ID 71 60 71 60 0 0 0 0 0 NISP NO IDA 3 GANDAK
AURUNGA PUCHHAR 100 GULMI PC 2000 YR ID 33 28 33 28 0 0 0 0 0 NISP NO IDA 3 GANDAK
BAUSEDI 100 GULMI PC 2001 YR ID 32 27 32 27 0 0 0 0 0 NISP NO IDA 3 GANDAK
RAGHEWA 100 GULMI PC 2002 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAK
ARU CHAUR PANAHA 100 GULMI PC 2001 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAK
CHECHEMI 100 GULMI PC 2001 YR ID 82 70 82 70 0 0 0 0 0 NISP NO IDA 3 GANDAK
BANDIP AANP CHAUR 100 GULMI PC 2003 YR ID 59 50 59 50 0 0 0 0 0 NISP YES IDA 3 GANDAK
TOTAL of NISP > GULMI > REHABILITATION 13 727 617 727 617 0 0 0 0 0

TOTAL of GULMI District 13 727 617 727 617 0 0 0 0 0

128
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
NISP>KASKI>REHABILITATION
SARDI KHOLA PURAN CHAUR 100 KASKI PC 2001 YR ID 353 300 353 300 0 0 0 0 0 NISP NO IDA 3 GANDAK
HYANGIA 100 KASKI PC 2003 YR ID 353 300 353 300 0 0 0 0 0 NISP YES IDA 3 GANDAK
SURAUDI KHOLA 100 KASKI PC 1998 YR ID 29 25 29 25 0 0 0 0 0 NISP YES IDA 3 GANDAK
CHAURASI KULO 100 KASKI PC 2000 YR ID 181 154 181 154 0 0 0 0 0 NISP NO IDA 3 GANDAK
WARDI KHOLA 100 KASKI PC 2000 YR ID 42 36 42 36 0 0 0 0 0 NISP NO IDA 3 GANDAK
PUMDI TAR 100 KASKI PC 2002 YR ID 41 35 41 35 0 0 0 0 0 NISP NO IDA 3 GANDAK
CHHELANG 100 KASKI PC 1998 YR ID 82 70 82 70 0 0 0 0 0 NISP NO IDA 3 GANDAK
SILIBANG 100 KASKI PC 1998 YR ID 141 120 141 120 0 0 0 0 0 NISP NO IDA 3 GANDAK
ARGHAUN BADAHARE 100 KASKI PC 2000 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAK
UPALLOW DABAKI 100 KASKI PC 2001 YR ID 40 34 40 34 0 0 0 0 0 NISP NO IDA 3 GANDAK
RAINCHE KHOLA 100 KASKI PC 2003 YR ID 59 50 59 50 0 0 0 0 0 NISP NO IDA 3 GANDAK
TOTAL of NISP > KASKI > REHABILITATION 11 1345 1144 1345 1144 0 0 0 0 0

TOTAL of KASKI District 11 1345 1144 1345 1144 0 0 0 0 0

NISP>LAMJUNG>REHABILITATION
DHUWA KHOLA 100 LAMJUNG PC 2001 YR ID 38 32 38 32 0 0 0 0 0 NISP NO IDA 3 GANDAK
BATASE 100 LAMJUNG PC 2001 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAK
SIMRO KULO 100 LAMJUNG PC 2002 YR ID 32 27 32 27 0 0 0 0 0 NISP NO IDA 3 GANDAK
TIN TALE 100 LAMJUNG PC 2003 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 3 GANDAK
GUMBA PHANT 100 LAMJUNG PC 2002 YR ID 25 21 25 21 0 0 0 0 0 NISP NO IDA 3 GANDAK
RAINAS TAR(PJM) 100 LAMJUNG PC 2001 YR ID 1000 850 1000 850 0 0 0 0 0 NISP PJM IDA 3 GANDAK
RANJIT KULO 100 LAMJUNG PC 2000 YR ID 56 48 56 48 0 0 0 0 0 NISP NO IDA 3 GANDAK
TINGARE 100 LAMJUNG PC 2000 YR ID 56 48 56 48 0 0 0 0 0 NISP NO IDA 3 GANDAK
BARIGAUN 100 LAMJUNG PC 2001 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 3 GANDAK
KARAPU TAR 100 LAMJUNG PC 2003 YR ID 135 115 135 115 0 0 0 0 0 NISP NO IDA 3 GANDAK
MUNGRE 100 LAMJUNG PC 1998 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAK
MAHABIR 100 LAMJUNG PC 1998 YR ID 94 80 94 80 0 0 0 0 0 NISP NO IDA 3 GANDAK
SATRASAYA PHANT 100 LAMJUNG PC 2000 YR ID 42 36 42 36 0 0 0 0 0 NISP NO IDA 3 GANDAK
MADI BESI 100 LAMJUNG PC 2001 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAK
KHIMCHOWK 100 LAMJUNG PC 2000 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAK
TOTAL of NISP > LAMJUNG > REHABILITATION 15 1701 1447 1701 1447 0 0 0 0 0

NISP>LAMJUNG>ON GOING
ALAINCHE PHANT 100 LAMJUNG PC 1998 YR ID 104 88 0 0 0 0 0 0 0 NISP NO IDA 3 GANDAK
TOTAL of NISP > LAMJUNG > ON GOING 1 104 88 0 0 0 0 0 0 0

TOTAL of LAMJUNG District 16 1805 1535 1701 1447 0 0 0 0 0

NISP>MYAGDI>REHABILITATION
TARI KHET 100 MYAGDI PC 1998 YR ID 34 29 34 29 0 0 0 0 0 NISP NO IDA 3 GANDAK
KASKERI 100 MYAGDI PC 1998 YR ID 12 10 12 10 0 0 0 0 0 NISP NO IDA 3 GANDAK
TARA KHET(BABIYA CHAUR) 100 MYAGDI PC 1998 YR ID 14 12 14 12 0 0 0 0 0 NISP NO IDA 3 GANDAK
SIMAL CHAUR 100 MYAGDI PC 1998 YR ID 26 22 26 22 0 0 0 0 0 NISP NO IDA 3 GANDAK
KOT KHOLA 100 MYAGDI PC 1999 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 3 GANDAK

129
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
HILIBANBG 100 MYAGDI PC 2002 YR ID 31 26 31 26 0 0 0 0 0 NISP NO IDA 3 GANDAK
BHAKUNDE CHAUR 100 MYAGDI PC 2002 YR ID 49 42 49 42 0 0 0 0 0 NISP NO IDA 3 GANDAK
CHAHARI KAMALA 100 MYAGDI PC 2002 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 3 GANDAK
LURBANG 100 MYAGDI PC 2002 YR ID 15 13 15 13 0 0 0 0 0 NISP NO IDA 3 GANDAK
SOLABANG 100 MYAGDI PC 2002 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 3 GANDAK
LAHARI PAHARA 100 MYAGDI PC 2002 YR ID 42 36 42 36 0 0 0 0 0 NISP NO IDA 3 GANDAK
TOTAL of NISP > MYAGDI > REHABILITATION 11 435 370 435 370 0 0 0 0 0

TOTAL of MYAGDI District 11 435 370 435 370 0 0 0 0 0

NISP>PALPA>REHABILITATION
CHAHALA PHANT 100 PALPA PC 2004 YR ID 89 76 89 76 0 0 0 0 0 NISP NO IDA 3 GANDAK
PASKUNDA 100 PALPA PC 1999 YR ID 33 28 33 28 0 0 0 0 0 NISP NO IDA 3 GANDAK
SIMAL TARI 100 PALPA PC 1999 YR ID 18 15 18 15 0 0 0 0 0 NISP NO IDA 3 GANDAK
CHANDAN TARI 100 PALPA PC 1999 YR ID 13 11 13 11 0 0 0 0 0 NISP NO IDA 3 GANDAK
NIKI CHAUR 100 PALPA PC 2001 YR ID 32 27 32 27 0 0 0 0 0 NISP NO IDA 3 GANDAK
SAILI KULO 100 PALPA PC 2000 YR ID 20 17 20 17 0 0 0 0 0 NISP NO IDA 3 GANDAK
ANGHA KHOLOA 100 PALPA PC 2001 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAK
HUNGI PHANT 100 PALPA PC 2002 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAK
SIMLE BANDH 100 PALPA PC 2002 YR ID 28 24 28 24 0 0 0 0 0 NISP NO IDA 3 GANDAK
RAMPUR PHANT 100 PALPA PC 2003 YR ID 888 755 888 755 0 0 0 0 0 NISP PJM IDA 3 GANDAK
THULO TANDI 100 PALPA PC 2002 YR ID 19 16 19 16 0 0 0 0 0 NISP NO IDA 3 GANDAK
RAHABAS 100 PALPA PC 1999 YR ID 94 80 94 80 0 0 0 0 0 NISP NO IDA 3 GANDAK
BARDALE 100 PALPA PC 2002 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 3 GANDAK
DARPUK 100 PALPA PC 1999 YR ID 94 80 94 80 0 0 0 0 0 NISP NO IDA 3 GANDAK
TOTAL of NISP > PALPA > REHABILITATION 14 1505 1279 1505 1279 0 0 0 0 0

TOTAL of PALPA District 14 1505 1279 1505 1279 0 0 0 0 0

NISP>PARBAT>REHABILITATION
ARTHAR 100 PARBAT PC 1999 YR ID 14 12 14 12 0 0 0 0 0 NISP NO IDA 3 GANDAK
PHARSE 100 PARBAT PC 1999 YR ID 39 33 39 33 0 0 0 0 0 NISP NO IDA 3 GANDAK
PATI CHOUR 100 PARBAT PC 1999 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAK
DUMRIDOT 100 PARBAT PC 2000 YR ID 18 15 18 15 0 0 0 0 0 NISP NO IDA 3 GANDAK
SARANGDI 100 PARBAT PC 2001 YR ID 18 15 18 15 0 0 0 0 0 NISP NO IDA 3 GANDAK
SANO BAGAR 100 PARBAT PC 2002 YR ID 33 28 33 28 0 0 0 0 0 NISP NO IDA 3 GANDAK
GYANDI(TO) 100 PARBAT PC 2002 YR ID 118 100 118 100 0 0 0 0 0 NISP YES IDA 3 GANDAK
AGUWA KHOLA 100 PARBAT PC 1999 YR ID 32 27 32 27 0 0 0 0 0 NISP NO IDA 3 GANDAK
RATI KHOLA 100 PARBAT PC 2003 YR ID 141 120 141 120 0 0 0 0 0 NISP NO IDA 3 GANDAK
BARDILANG 100 PARBAT PC 2002 YR ID 42 36 42 36 0 0 0 0 0 NISP NO IDA 3 GANDAK
BUDHI KHOLA 100 PARBAT PC 2003 YR ID 282 240 282 240 0 0 0 0 0 NISP NO IDA 3 GANDAK
TAKLAK TAR 100 PARBAT PC 2003 YR ID 59 50 59 50 0 0 0 0 0 NISP NO IDA 3 GANDAK
TOTAL of NISP > PARBAT > REHABILITATION 12 820 696 820 696 0 0 0 0 0

TOTAL of PARBAT District 12 820 696 820 696 0 0 0 0 0

130
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
NISP>SYANGJA>REHABILITATION
BHAKIMLE 100 SYANGJA PC 1999 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAK
BIRGHA 100 SYANGJA PC 2000 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAK
MAJHIMARANG 100 SYANGJA PC 2000 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAK
KUL BANDH 100 SYANGJA PC 2000 YR ID 19 16 19 16 0 0 0 0 0 NISP NO IDA 3 GANDAK
DHANU BASE 100 SYANGJA PC 2002 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAK
PIPAL BANDH 100 SYANGJA PC 2002 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 3 GANDAK
UDIYA CHAUR 100 SYANGJA PC 2002 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 3 GANDAK
KISSAN ANDHIGHAT 100 SYANGJA PC 2002 YR ID 241 205 241 205 0 0 0 0 0 NISP YES IDA 3 GANDAK
CHAPAKOT(PJM) 100 SYANGJA PC 2002 YR ID 1176 1000 1176 1000 0 0 0 0 0 NISP PJM IDA 3 GANDAK
JYAGDI BAIRENI 100 SYANGJA PC 1999 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAK
GWADI 100 SYANGJA PC 2000 YR ID 32 27 32 27 0 0 0 0 0 NISP NO IDA 3 GANDAK
KAULE 100 SYANGJA PC 2002 YR ID 14 12 14 12 0 0 0 0 0 NISP NO IDA 3 GANDAK
CHHANGCHHANGDI 100 SYANGJA PC 1999 YR ID 294 250 294 250 0 0 0 0 0 NISP NO IDA 3 GANDAK
KUNTIKA 100 SYANGJA PC 1998 YR ID 71 60 71 60 0 0 0 0 0 NISP NO IDA 3 GANDAK
PAKAN PHANT 100 SYANGJA PC 1998 YR ID 147 125 147 125 0 0 0 0 0 NISP NO IDA 3 GANDAK
SATAUN 100 SYANGJA PC 1998 YR ID 71 60 71 60 0 0 0 0 0 NISP NO IDA 3 GANDAK
TOTAL of NISP > SYANGJA > REHABILITATION 16 2287 1945 2287 1945 0 0 0 0 0

TOTAL of SYANGJA District 16 2287 1945 2287 1945 0 0 0 0 0

NISP>TANAHU>REHABILITATION
THULO KHET 100 TANAHU PC 2000 YR ID 12 10 12 10 0 0 0 0 0 NISP NO IDA 3 GANDAK
ATTRAULI PUTTAT(TO) 100 TANAHU PC 2003 YR ID 529 450 529 450 0 0 0 0 0 NISP YES IDA 3 GANDAK
SANGE PATAYANE 100 TANAHU PC 2004 YR ID 235 200 235 200 0 0 0 0 0 NISP YES IDA 3 GANDAK
BARADI 100 TANAHU PC 1999 YR ID 71 60 71 60 0 0 0 0 0 NISP NO IDA 3 GANDAK
BARRABOT 100 TANAHU PC 1999 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 3 GANDAK
BARHABISE 100 TANAHU PC 2001 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 3 GANDAK
SURAUDI GANPATE 100 TANAHU PC 2004 YR ID 294 250 294 250 0 0 0 0 0 NISP NO IDA 3 GANDAK
BHANU SERA 100 TANAHU PC 2001 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 3 GANDAK
KALIKA TAR 100 TANAHU PC 2001 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 3 GANDAK
TOTAL of NISP > TANAHU > REHABILITATION 9 1364 1160 1364 1160 0 0 0 0 0

TOTAL of TANAHU District 9 1364 1160 1364 1160 0 0 0 0 0

TOTAL of WESTERN > Hill 137 12332 10483 12052 10245 0 0 0 0 0

NISP>MANANG>REHABILITATION
BHARAKA 100 MANANG PC 1999 YR ID 19 16 19 16 0 0 0 0 0 NISP NO IDA 3 GANDAK
THANCHOK 100 MANANG PC 2000 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAK
NACHE 100 MANANG PC 2001 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAK
KHANGSAR 100 MANANG PC 2001 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 3 GANDAK
NASO 100 MANANG PC 2000 YR ID 18 15 18 15 0 0 0 0 0 NISP NO IDA 3 GANDAK
TOTAL of NISP > MANANG > REHABILITATION 5 143 121 143 121 0 0 0 0 0

TOTAL of MANANG District 5 143 121 143 121 0 0 0 0 0

131
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

NISP>MUSTANG>REHABILITATION
NHECHUNG 100 MUSTANG PC 1999 YR ID 13 11 13 11 0 0 0 0 0 NISP NO IDA 3 GANDAK
KHAPTE 100 MUSTANG PC 2001 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAK
HELKU DHITAP 100 MUSTANG PC 1999 YR ID 33 28 33 28 0 0 0 0 0 NISP NO IDA 3 GANDAK
ARAKA 100 MUSTANG PC 1999 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 3 GANDAK
SAURU 100 MUSTANG PC 2000 YR ID 14 12 14 12 0 0 0 0 0 NISP NO IDA 3 GANDAK
TETANG 100 MUSTANG PC 2001 YR ID 27 23 27 23 0 0 0 0 0 NISP NO IDA 3 GANDAK
SAMLE 100 MUSTANG PC 2001 YR ID 13 11 13 11 0 0 0 0 0 NISP NO IDA 3 GANDAK
SIJA 100 MUSTANG PC 2001 YR ID 13 11 13 11 0 0 0 0 0 NISP NO IDA 3 GANDAK
KIMLING 100 MUSTANG PC 2001 YR ID 14 12 14 12 0 0 0 0 0 NISP NO IDA 3 GANDAK
DHAKARJUNG 100 MUSTANG PC 2002 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 3 GANDAK
PHALYAK 100 MUSTANG PC 2002 YR ID 42 36 42 36 0 0 0 0 0 NISP NO IDA 3 GANDAK
SYANG 100 MUSTANG PC 2002 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 3 GANDAK
TOTAL of NISP > MUSTANG > REHABILITATION 12 281 239 281 239 0 0 0 0 0

TOTAL of MUSTANG District 12 281 239 281 239 0 0 0 0 0

TOTAL of WESTERN > Mountain 17 424 360 424 360 0 0 0 0 0

TOTAL of WESTERN Region 183 24606 20915 23385 19877 0 0 0 0 0

NISP>BANKE>REHABILITATION
MAIN KHOLA 100 BANKE PC 2002 YR ID 41 35 41 35 0 0 0 0 0 NISP YES IDA 6 WEST RAPTI
GHIYA TAL 100 BANKE PC 2002 YR ID 118 100 118 100 0 0 0 0 0 NISP YES IDA 6 WEST RAPTI
BANIYABHAR 100 BANKE PC 2002 YR ID 118 100 118 100 0 0 0 0 0 NISP YES IDA 6 WEST RAPTI
JHIGARI BANGESAL 100 BANKE PC 1999 YR ID 94 80 94 80 0 0 0 0 0 NISP YES IDA 6 WEST RAPTI
BETAHANI 100 BANKE PC 2001 YR ID 176 150 176 150 0 0 0 0 0 NISP YES IDA 6 WEST RAPTI
TOTAL of NISP > BANKE > REHABILITATION 5 547 465 547 465 0 0 0 0 0

TOTAL of BANKE District 5 547 465 547 465 0 0 0 0 0

NISP>BARDIYA>REHABILITATION
REHU KHOLA 100 BARDIYA PC 2000 YR ID 235 200 235 200 0 0 0 0 0 NISP NO IDA 5 BABAI
BARGADA JANTI 1 100 BARDIYA PC 2000 YR ID 508 432 508 432 0 0 0 0 0 NISP NO IDA 5 BABAI
BARGADA JAMTI 2 100 BARDIYA PC 2001 YR ID 1186 1008 1186 1008 0 0 0 0 0 NISP NO IDA 5 BABAI
BANDH 100 BARDIYA PC 2002 YR ID 271 230 271 230 0 0 0 0 0 NISP NO IDA 5 BABAI
DHODHARI TAR TAL 100 BARDIYA PC 2001 YR ID 4500 3825 4500 3825 0 0 0 0 0 NISP NO IDA 5 BABAI
KUTHURA LAGANIA 100 BARDIYA PC 1998 YR ID 471 400 471 400 0 0 0 0 0 NISP NO IDA 5 BABAI
TOTAL of NISP > BARDIYA > REHABILITATION 6 7171 6095 7171 6095 0 0 0 0 0

TOTAL of BARDIYA District 6 7171 6095 7171 6095 0 0 0 0 0

NISP>DANG>REHABILITATION
GAIRAGAUN 100 DANG PC 1999 YR ID 109 93 109 93 0 0 0 0 0 NISP NO IDA 5 BABAI
MANUKPUR 100 DANG PC 1999 YR ID 88 75 88 75 0 0 0 0 0 NISP NO IDA 5 BABAI

132
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
CHIREGAD 100 DANG PC 2000 YR ID 395 336 395 336 0 0 0 0 0 NISP NO IDA 5 BABAI
HAPUR GURGE 100 DANG PC 2000 YR ID 125 106 125 106 0 0 0 0 0 NISP NO IDA 5 BABAI
LAMKULUWA 100 DANG PC 2001 YR ID 87 74 87 74 0 0 0 0 0 NISP NO IDA 5 BABAI
SERKATTI 100 DANG PC 2001 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 5 BABAI
SATGAULE SIR KULO 100 DANG PC 2001 YR ID 618 525 618 525 0 0 0 0 0 NISP NO IDA 5 BABAI
SALGARI 100 DANG PC 2001 YR ID 235 200 235 200 0 0 0 0 0 NISP NO IDA 5 BABAI
CHANTI KHOLA 100 DANG PC 2002 YR ID 153 130 153 130 0 0 0 0 0 NISP NO IDA 5 BABAI
CHAMAI SATGAIYA 100 DANG PC 2002 YR ID 445 378 445 378 0 0 0 0 0 NISP NO IDA 5 BABAI
BASTI KHOLA 100 DANG PC 2002 YR ID 371 315 371 315 0 0 0 0 0 NISP NO IDA 5 BABAI
BHAISAKURMA 100 DANG PC 2002 YR ID 249 212 249 212 0 0 0 0 0 NISP NO IDA 5 BABAI
BAYALE SIM TARA 100 DANG PC 2002 YR ID 264 224 264 224 0 0 0 0 0 NISP NO IDA 5 BABAI
ARGHARA 100 DANG PC 2002 YR ID 219 186 219 186 0 0 0 0 0 NISP NO IDA 5 BABAI
BARAU KHOLA 100 DANG PC 2002 YR ID 121 103 121 103 0 0 0 0 0 NISP NO IDA 5 BABAI
SIR KULO 100 DANG PC 2002 YR ID 44 37 44 37 0 0 0 0 0 NISP NO IDA 5 BABAI
DUNDURE 100 DANG PC 2001 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 5 BABAI
MAG KULO 3 100 DANG PC 2001 YR ID 54 46 54 46 0 0 0 0 0 NISP NO IDA 5 BABAI
MAH KULO 4 100 DANG PC 2001 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 5 BABAI
CHUKILO PANI 100 DANG PC 2003 YR ID 36 31 36 31 0 0 0 0 0 NISP NO IDA 5 BABAI
BAGAUSHIYA GAU TARIYA 100 DANG PC 2003 YR ID 61 52 61 52 0 0 0 0 0 NISP NO IDA 5 BABAI
DANGALI CHHAP KULO 100 DANG PC 2002 YR ID 1021 868 1021 868 0 0 0 0 0 NISP NO IDA 5 BABAI
THATI KULO 100 DANG PC 2001 YR ID 31 26 31 26 0 0 0 0 0 NISP NO IDA 5 BABAI
TOTAL of NISP > DANG > REHABILITATION 23 4997 4247 4997 4247 0 0 0 0 0

TOTAL of DANG District 23 4997 4247 4997 4247 0 0 0 0 0

TOTAL of MID-WESTERN > Terai 34 12715 10807 12715 10807 0 0 0 0 0

NISP>DAILEKH>REHABILITATION
LESTA CHAUR 100 DAILEKH PC 2003 YR ID 82 70 82 70 0 0 0 0 0 NISP NO IDA 2 KARNALI
KALE KHOLA 100 DAILEKH PC 2000 YR ID 42 36 42 36 0 0 0 0 0 NISP NO IDA 2 KARNALI
BHAWANI 100 DAILEKH PC 2002 YR ID 140 119 140 119 0 0 0 0 0 NISP NO IDA 2 KARNALI
ALA KHOLA 100 DAILEKH PC 2003 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 2 KARNALI
TOTAL of NISP > DAILEKH > REHABILITATION 4 299 255 299 255 0 0 0 0 0

NISP>DAILEKH>ON GOING
SIKARIKARA 100 DAILEKH PC 2000 YR ID 102 87 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALI
TOTAL of NISP > DAILEKH > ON GOING 1 102 87 0 0 0 0 0 0 0

TOTAL of DAILEKH District 5 401 342 299 255 0 0 0 0 0

NISP>JAJARKOT>REHABILITATION
DARIMPATA 100 JAJARKOT PC 2003 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 2 KARNALI
SANI CHAUR 100 JAJARKOT PC 2001 YR ID 18 15 18 15 0 0 0 0 0 NISP NO IDA 2 KARNALI
LAMTI KHOLA 100 JAJARKOT PC 2001 YR ID 20 17 20 17 0 0 0 0 0 NISP NO IDA 2 KARNALI
KABRI KHET 100 JAJARKOT PC 2001 YR ID 66 56 66 56 0 0 0 0 0 NISP NO IDA 2 KARNALI
KANCH TARA 100 JAJARKOT PC 2004 YR ID 16 14 16 14 0 0 0 0 0 NISP NO IDA 2 KARNALI

133
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
NALGAD 100 JAJARKOT PC 1998 YR ID 94 80 94 80 0 0 0 0 0 NISP NO IDA 2 KARNALI
BANDH KO DAHA 100 JAJARKOT PC 1999 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 2 KARNALI
SIRPA GAON 100 JAJARKOT PC 1999 YR ID 53 45 53 45 0 0 0 0 0 NISP NO IDA 2 KARNALI
UPPER SANGTA 100 JAJARKOT PC 2004 YR ID 56 48 56 48 0 0 0 0 0 NISP NO IDA 2 KARNALI
TOTAL of NISP > JAJARKOT > REHABILITATION 9 376 320 376 320 0 0 0 0 0

TOTAL of JAJARKOT District 9 376 320 376 320 0 0 0 0 0

NISP>PYUTHAN>REHABILITATION
GHARI KULO THULO KULO 100 PYUTHAN PC 2002 YR ID 65 55 65 55 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
BARWANG 100 PYUTHAN PC 2002 YR ID 76 65 76 65 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
DHARMAWATI 100 PYUTHAN PC 2002 YR ID 86 73 86 73 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
GORKHE KULO 100 PYUTHAN PC 2001 YR ID 107 91 107 91 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
QUADI KULO 100 PYUTHAN PC 2001 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
RANI KULO 100 PYUTHAN PC 2001 YR ID 61 52 61 52 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
HARNA GHAT 100 PYUTHAN PC 2001 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
TOTAL of NISP > PYUTHAN > REHABILITATION 7 548 466 548 466 0 0 0 0 0

NISP>PYUTHAN>ON GOING
LUGRI MADI 100 PYUTHAN PC 1996 YR ID 471 400 0 0 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
TOTAL of NISP > PYUTHAN > ON GOING 1 471 400 0 0 0 0 0 0 0

TOTAL of PYUTHAN District 8 1019 866 548 466 0 0 0 0 0

NISP>ROLPA>REHABILITATION
DHANUWA GAJULE 100 ROLPA PC 2000 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
BADA CHAUR 100 ROLPA PC 2000 YR ID 53 45 53 45 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
BHAISA CHHAPE 100 ROLPA PC 2001 YR ID 21 18 21 18 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
LARI KHOLA 100 ROLPA PC 2001 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
ARESH KHOLA 100 ROLPA PC 2002 YR ID 94 80 94 80 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
OKHRENI SALGHARI 100 ROLPA PC 2002 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
OT 100 ROLPA PC 2001 YR ID 53 45 53 45 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
LODH CHOUR 100 ROLPA PC 2003 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
TOTAL of NISP > ROLPA > REHABILITATION 8 362 308 362 308 0 0 0 0 0

TOTAL of ROLPA District 8 362 308 362 308 0 0 0 0 0

NISP>RUKUM>REHABILITATION
MACHAMI 2 100 RUKUM PC 2002 YR ID 238 202 238 202 0 0 0 0 0 NISP NO IDA 2 KARNALI
RARIJUILA 100 RUKUM PC 2000 YR ID 71 60 71 60 0 0 0 0 0 NISP NO IDA 2 KARNALI
BHERA KHET 100 RUKUM PC 2000 YR ID 53 45 53 45 0 0 0 0 0 NISP NO IDA 2 KARNALI
BHERI KHOLA 100 RUKUM PC 2002 YR ID 59 50 59 50 0 0 0 0 0 NISP NO IDA 2 KARNALI
MACHHAMI 100 RUKUM PC 1998 YR ID 355 302 355 302 0 0 0 0 0 NISP NO IDA 2 WEST RAPTI
ATHBISH DANDA 100 RUKUM PC 1999 YR ID 176 150 176 150 0 0 0 0 0 NISP NO IDA 2 KARNALI
SANI CHAUR 100 RUKUM PC 2004 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 2 KARNALI
FUGURA JYUILA 100 RUKUM PC 1998 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 2 KARNALI

134
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of NISP > RUKUM > REHABILITATION 8 1117 949 1117 949 0 0 0 0 0

NISP>RUKUM>ON GOING
BHAL KHOLA 100 RUKUM PC 1996 YR ID 82 70 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALI
DADURE 100 RUKUM PC 1996 YR ID 94 80 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALI
TOTAL of NISP > RUKUM > ON GOING 2 176 150 0 0 0 0 0 0 0

TOTAL of RUKUM District 10 1293 1099 1117 949 0 0 0 0 0

NISP>SALYAN>REHABILITATION
RAMPUR 100 SALYAN PC 2000 YR ID 141 120 141 120 0 0 0 0 0 NISP NO IDA 5 BABAI
BANSA TARI 100 SALYAN PC 2002 YR ID 79 67 79 67 0 0 0 0 0 NISP NO IDA 5 BABAI
KARAGITHI 100 SALYAN PC 2002 YR ID 51 43 51 43 0 0 0 0 0 NISP NO IDA 5 BABAI
BHUMKA JIULO 100 SALYAN PC 2004 YR ID 129 110 110 110 0 0 0 0 0 NISP NO IDA 5 BABAI
BHANJKANDA 100 SALYAN PC 1998 YR ID 94 80 94 80 0 0 0 0 0 NISP NO IDA 5 BABAI
DAMDWALI 100 SALYAN PC 2002 YR ID 188 160 188 160 0 0 0 0 0 NISP NO IDA 5 BABAI
PANISERA 100 SALYAN PC 1998 YR ID 38 32 38 32 0 0 0 0 0 NISP NO IDA 5 BABAI
CHAIBANIYULA 100 SALYAN PC 2001 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 5 BABAI
PHALLRBAN 100 SALYAN PC 2001 YR ID 13 11 13 11 0 0 0 0 0 NISP NO IDA 5 BABAI
HIM CHAUR 100 SALYAN PC 1999 YR ID 61 52 61 52 0 0 0 0 0 NISP NO IDA 5 BABAI
TOTAL of NISP > SALYAN > REHABILITATION 10 841 715 822 715 0 0 0 0 0

TOTAL of SALYAN District 10 841 715 822 715 0 0 0 0 0

NISP>SURKHET>REHABILITATION
SAHARE 100 SURKHET PC 2000 YR ID 176 150 176 150 0 0 0 0 0 NISP NO IDA 2 KARNALI
KURE KATHEGARI 100 SURKHET PC 1999 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 2 KARNALI
CHHINCHU 100 SURKHET PC 2000 YR ID 159 135 159 135 0 0 0 0 0 NISP NO IDA 2 KARNALI
MAINTADA(exKKBIRD) 100 SURKHET PC 2002 YR ID 280 238 280 238 0 0 0 0 0 NISP NO IDA 2 KARNALI
SAHARE(exKBIRD) 100 SURKHET PC 2000 YR ID 252 214 252 214 0 0 0 0 0 NISP NO IDA 2 KARNALI
GAM KHOLA 100 SURKHET PC 2002 YR ID 201 171 201 171 0 0 0 0 0 NISP NO IDA 2 KARNALI
NYAWAL KHOLA 100 SURKHET PC 2002 YR ID 141 120 141 120 0 0 0 0 0 NISP NO IDA 2 KARNALI
BHASANA BANDH 100 SURKHET PC 2001 YR ID 141 120 141 120 0 0 0 0 0 NISP NO IDA 2 KARNALI
MUL PANI BEL KULO 100 SURKHET PC 2002 YR ID 106 90 106 90 0 0 0 0 0 NISP NO IDA 2 KARNALI
BHATTEGHARI CHANDRAPUR 100 SURKHET PC 2002 YR ID 42 36 42 36 0 0 0 0 0 NISP NO IDA 2 KARNALI
NEWARE 100 SURKHET PC 2002 YR ID 49 42 49 42 0 0 0 0 0 NISP NO IDA 2 KARNALI
LATIDHUNGA KOSHIGHAT 100 SURKHET PC 2002 YR ID 189 161 189 161 0 0 0 0 0 NISP NO IDA 2 KARNALI
KOPCHI 100 SURKHET PC 2003 YR ID 176 150 176 150 0 0 0 0 0 NISP NO IDA 2 SURKHET
MAHALKUNA 100 SURKHET PC 2002 YR ID 353 300 353 300 0 0 0 0 0 NISP NO IDA 2 KARNALI
NAREKO TAPPAR 100 SURKHET PC 2002 YR ID 45 38 45 38 0 0 0 0 0 NISP NO IDA 2 KARNALI
MASINA PA TARE 100 SURKHET PC 1998 YR ID 53 45 53 45 0 0 0 0 0 NISP NO IDA 2 KARNALI
TOTAL of NISP > SURKHET > REHABILITATION 16 2398 2040 2398 2040 0 0 0 0 0

TOTAL of SURKHET District 16 2398 2040 2398 2040 0 0 0 0 0

TOTAL of MID-WESTERN > Hill 66 6690 5690 5922 5053 0 0 0 0 0

135
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

NISP>DOLPA>REHABILITATION
PIMRI 100 DOLPA PC 2000 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
DAN CHAUR 100 DOLPA PC 2000 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
KHOR KHOLA 100 DOLPA PC 2000 YR ID 176 150 176 150 0 0 0 0 0 NISP NO IDA 6 WEST RAPTI
TOTAL of NISP > DOLPA > REHABILITATION 3 252 215 252 215 0 0 0 0 0

NISP>DOLPA>ON GOING
DUNAI VALLEY 100 DOLPA PC 2000 YR ID 29 25 0 0 0 0 0 0 0 NISP NO IDA 6 WESTRAPTI
TOTAL of NISP > DOLPA > ON GOING 1 29 25 0 0 0 0 0 0 0

TOTAL of DOLPA District 4 281 240 252 215 0 0 0 0 0

NISP>HUMLA>REHABILITATION
LAMLESINIYULA 100 HUMLA PC 2001 YR ID 75 64 75 64 0 0 0 0 0 NISP NO IDA 2 KARNALI
PIYUSH LALI 100 HUMLA PC 2002 YR ID 88 75 88 75 0 0 0 0 0 NISP NO IDA 2 KARNALI
CHHIPRA 100 HUMLA PC 2001 YR ID 53 45 53 45 0 0 0 0 0 NISP NO IDA 2 KARNALI
CHARPUNATH 100 HUMLA PC 2002 YR ID 165 140 165 140 0 0 0 0 0 NISP NO IDA 2 KARNALI
KODIMUL LAMPATE(NISP) 100 HUMLA PC 2001 YR ID 15 13 15 13 0 0 0 0 0 NISP NO IDA 2 KARNALI
TOTAL of NISP > HUMLA > REHABILITATION 5 396 337 396 337 0 0 0 0 0

TOTAL of HUMLA District 5 396 337 396 337 0 0 0 0 0

NISP>JUMLA>REHABILITATION
DEPALGAUN 100 JUMLA PC 2001 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 2 KARNALI
DANSANGU 100 JUMLA PC 2002 YR ID 58 49 58 49 0 0 0 0 0 NISP NO IDA 2 KARNALI
CHUKENI 100 JUMLA PC 2002 YR ID 106 90 106 90 0 0 0 0 0 NISP NO IDA 2 KARNALI
TOTAL of NISP > JUMLA > REHABILITATION 3 211 179 211 179 0 0 0 0 0

TOTAL of JUMLA District 3 211 179 211 179 0 0 0 0 0

NISP>KALIKOT>REHABILITATION
SIPKHANA 100 KALIKOT PC 2002 YR ID 188 160 188 160 0 0 0 0 0 NISP NO IDA 2 KARNALI
FAGOTI 100 KALIKOT PC 2002 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 2 KARNALI
TOTAL of NISP > KALIKOT > REHABILITATION 2 223 190 223 190 0 0 0 0 0

NISP>KALIKOT>ON GOING
BALI 100 KALIKOT PC 2003 YR ID 35 30 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALI
KUNI 100 KALIKOT PC 2002 YR ID 188 160 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALI
SUKATIYA 100 KALIKOT PC 2004 YR ID 84 71 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALI
BHARTA 100 KALIKOT PC 2001 YR ID 200 170 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALI
TOTAL of NISP > KALIKOT > ON GOING 4 507 431 0 0 0 0 0 0 0

TOTAL of KALIKOT District 6 730 621 223 190 0 0 0 0 0

136
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
NISP>MUGU>REHABILITATION
BHUNE 100 MUGU PC 1999 YR ID 19 16 19 16 0 0 0 0 0 NISP NO IDA 2 KARNALI
DASAUNDE TO SAINE PIPAL 100 MUGU PC 2000 YR ID 19 16 19 16 0 0 0 0 0 NISP NO IDA 2 KARNALI
MUSEODAR TO SALLEN DADA 100 MUGU PC 2000 YR ID 65 55 65 55 0 0 0 0 0 NISP NO IDA 2 KARNALI
KACHCHE 100 MUGU 1998 YR ID 21 18 21 18 0 0 0 0 0 NISP NO IDA 2 KARNALI
KAWA 100 MUGU PC 1999 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 2 KARNALI
TOTAL of NISP > MUGU > REHABILITATION 5 171 145 171 145 0 0 0 0 0

NISP>MUGU>ON GOING
TARMA 100 MUGU PC 2001 YR ID 35 30 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALI
KOT DADA 100 MUGU PC 2001 YR ID 20 17 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALI
TARMA 100 MUGU PC 2001 YR ID 35 30 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALI
KOT DADA 100 MUGU PC 2001 YR ID 20 17 0 0 0 0 0 0 0 NISP NO IDA 2 KARNALI
TOTAL of NISP > MUGU > ON GOING 4 110 94 0 0 0 0 0 0 0

TOTAL of MUGU District 9 281 239 171 145 0 0 0 0 0

TOTAL of MID-WESTERN > Mountain 27 1899 1616 1253 1066 0 0 0 0 0

TOTAL of MID-WESTERN Region 127 21304 18113 19890 16926 0 0 0 0 0

NISP>KAILALI>REHABILITATION
BANBEHARA 100 KAILALI PC 2001 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 2 KARNALI
PATRENI 100 KAILALI PC 2000 YR ID 28 24 28 24 0 0 0 0 0 NISP NO IDA 2 KARNALI
SONAH AJRAILI 100 KAILALI PC 2001 YR ID 212 180 212 180 0 0 0 0 0 NISP NO IDA 2 KARNALI
BHURSA 100 KAILALI PC 2002 YR ID 571 485 571 485 0 0 0 0 0 NISP NO IDA 2 KARNALI
BIJULIYA BANDHA 100 KAILALI PC 2002 YR ID 112 95 112 95 0 0 0 0 0 NISP NO IDA 2 KARNALI
BUDHIYAM 100 KAILALI PC 2002 YR ID 171 145 171 145 0 0 0 0 0 NISP NO IDA 2 KARNALI
PRATAPPUR 100 KAILALI PC 1998 YR ID 765 650 765 650 0 0 0 0 0 NISP NO IDA 2 KARNALI
RAJBADHUWA 100 KAILALI PC 1999 YR ID 433 368 0 0 0 0 0 NISP NO IDA 2 KARNALI
TOTAL of NISP > KAILALI > REHABILITATION 8 2339 1987 1906 1619 0 0 0 0 0

TOTAL of KAILALI District 8 2339 1987 1906 1619 0 0 0 0 0

NISP>KANCHANPUR>REHABILITATION
BALUWA NALA 100 KANCHANPUR PC 1999 YR ID 191 162 191 162 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
RAUTELA 100 KANCHANPUR PC 1999 YR ID 205 174 205 174 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
UPPER JARAHI 100 KANCHANPUR PC 2004 YR ID 176 150 176 150 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
BELDANDI 100 KANCHANPUR PC 2000 YR ID 88 75 88 75 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
CHUNE PANI MUSE PANI 100 KANCHANPUR PC 2002 YR ID 106 90 106 90 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
BAIJNATH 100 KANCHANPUR PC 2002 YR ID 68 58 68 58 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
SIDHANATH 100 KANCHANPUR PC 2002 YR ID 88 75 88 75 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
HATHITHALA 100 KANCHANPUR PC 1998 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
JARAHI NALA 100 KANCHANPUR PC 1999 YR ID 176 150 176 150 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
KALA PANI 100 KANCHANPUR PC 1998 YR ID 471 400 471 400 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
MALERIYA NALA 100 KANCHANPUR PC 1998 YR ID 706 600 706 600 0 0 0 0 0 NISP NO IDA 1 MAHAKALI

137
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of NISP > KANCHANPUR > REHABILITATION 11 2393 2034 2393 2034 0 0 0 0 0

TOTAL of KANCHANPUR District 11 2393 2034 2393 2034 0 0 0 0 0

TOTAL of FAR-WESTERN >Terai 19 4732 4021 4299 3653 0 0 0 0 0

NISP>ACHHAM>REHABILITATION
PA TALKOT 100 ACHHAM PC 2000 YR ID 59 50 59 50 0 0 0 0 0 NISP YES IDA 2 KARNALI
SALPATA 100 ACHHAM PC 1999 YR ID 28 24 28 24 0 0 0 0 0 NISP YES IDA 2 KARNALI
BASKATTE 100 ACHHAM PC 2003 YR ID 79 67 79 67 0 0 0 0 0 NISP YES IDA 2 KARNALI
BASTIBUDASEN 100 ACHHAM PC 2001 YR ID 29 25 29 25 0 0 0 0 0 NISP YES IDA 2 KARNALI
CHAYATADA 100 ACHHAM PC 2003 YR ID 124 105 124 105 0 0 0 0 0 NISP YES IDA 2 KARNALI
SAMTADA 100 ACHHAM PC 2003 YR ID 29 25 29 25 0 0 0 0 0 NISP YES IDA 2 KARNALI
TASHI GHUNGARKOT 100 ACHHAM PC 2004 YR ID 142 121 142 121 0 0 0 0 0 NISP YES IDA 2 KARNALI
TAPARWA 100 ACHHAM PC 2003 YR ID 59 50 59 50 0 0 0 0 0 NISP YES IDA 2 KARNALI
TOTAL of NISP > ACHHAM > REHABILITATION 8 549 467 549 467 0 0 0 0 0

TOTAL of ACHHAM District 8 549 467 549 467 0 0 0 0 0

NISP>BAITADI>REHABILITATION
SALENA 100 BAITADI PC 2001 YR ID 129 110 129 110 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
BASULING 100 BAITADI PC 1999 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
GANDA GAON 100 BAITADI PC 1999 YR ID 13 11 13 11 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
GANMANAGAD 100 BAITADI PC 2000 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
BATSERA 100 BAITADI PC 2000 YR ID 41 35 41 35 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
KALTADI 100 BAITADI PC 1999 YR ID 41 35 41 35 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
KALAUN 100 BAITADI PC 1999 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
SHIVLING 100 BAITADI PC 1999 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
BARAYAL 100 BAITADI PC 2001 YR ID 59 50 59 50 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
SHIVLING BAGADIGAD 100 BAITADI PC 2001 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
KAFALKOT 100 BAITADI PC 2001 YR ID 27 23 27 23 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
CHACHAR KHOLA 100 BAITADI PC 2001 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
MELGHAT 100 BAITADI PC 2001 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 1 MAHAKALLI
TIKHECHAUDA 100 BAITADI PC 2001 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
SOTEGAD 100 BAITADI PC 2002 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
GADTOLA 100 BAITADI PC 2002 YR ID 52 44 52 44 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
PA TALI 100 BAITADI PC 2002 YR ID 38 32 38 32 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
BHULKATTE 100 BAITADI PC 2002 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
KAILPAL 100 BAITADI PC 2002 YR ID 31 26 31 26 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
NUWAKOT 100 BAITADI 2001 YR ID 176 150 176 150 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
DILESHWORI(TO) 100 BAITADI PC 1998 YR ID 388 330 388 330 0 0 0 0 0 NISP YES IDA 1 MAHAKALI
TOTAL of NISP > BAITADI > REHABILITATION 21 1287 1096 1287 1096 0 0 0 0 0

TOTAL of BAITADI District 21 1287 1096 1287 1096 0 0 0 0 0

138
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
NISP>DADELDHURA>REHABILITATION
UPPER PARI GAON 100 DADELDHURA PC 2003 YR ID 160 136 160 136 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
SELTADA 100 DADELDHURA PC 2000 YR ID 24 20 24 20 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
KATHE BANDHA 100 DADELDHURA PC C2000 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
KURMULLE 100 DADELDHURA PC 2003 YR ID 41 35 41 35 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
ANCHAL 100 DADELDHURA PC 2003 YR ID 59 50 59 50 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
RADIL 100 DADELDHURA PC 2002 YR ID 76 65 76 65 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
SAKAYAL 100 DADELDHURA PC 2000 YR ID 94 80 94 80 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
GALPHAGAD 100 DADELDHURA PC 2002 YR ID 353 300 353 300 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
SIRSE 100 DADELDHURA PC 2004 YR ID 353 300 353 300 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
PANTURA 100 DADELDHURA PC 2003 YR ID 235 200 235 200 0 0 0 0 0 NISP NO IDA 1 MAHAKALI
TOTAL of NISP > DADELDHURA > REHABILITATION 10 1442 1226 1442 1226 0 0 0 0 0

TOTAL of DADELDHURA District 10 1442 1226 1442 1226 0 0 0 0 0

NISP>DOTI>REHABILITATION
GADSERIGAD 100 DOTI PC 2001 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 2 KARNALI
GHOLTADA 100 DOTI PC 2000 YR ID 82 70 82 70 0 0 0 0 0 NISP NO IDA 2 KARNALI
KAPHALEKHI SALENIGAD 100 DOTI PC 2000 YR ID 76 65 76 65 0 0 0 0 0 NISP NO IDA 2 KARNALI
KARNASI 100 DOTI PC 2000 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 2 KARNALI
LASKAR 100 DOTI PC 2000 YR ID 29 25 29 25 0 0 0 0 0 NISP NO IDA 2 KARNALI
DHANARASH KHET 100 DOTI PC 2003 YR ID 53 45 53 45 0 0 0 0 0 NISP NO IDA 2 KARNALI
CHIMCHETHALA PANI 100 DOTI PC 2001 YR ID 26 22 26 22 0 0 0 0 0 NISP NO IDA 2 KARNALI
DEWAN KULO 100 DOTI PC 2002 YR ID 47 40 47 40 0 0 0 0 0 NISP NO IDA 2 KARNALI
RITHA KHET 100 DOTI PC 2003 YR ID 35 30 35 30 0 0 0 0 0 NISP NO IDA 2 KARNALI
GANDIGAD 100 DOTI PC 2001 YR ID 176 150 176 150 0 0 0 0 0 NISP NO IDA 2 KARNALI
GHODELASH 100 DOTI PC 1998 YR ID 59 50 59 50 0 0 0 0 0 NISP NO IDA 2 DOTI
BANDUMRASAIN(TO) 100 DOTI PC 1998 YR ID 182 155 182 155 0 0 0 0 0 NISP YES IDA 2 KARNALI
DIPAYAL EAST(TO) 100 DOTI PC 1998 YR ID 65 55 65 55 0 0 0 0 0 NISP YES IDA 2 KARNALI
KADAMANDU(TO) 100 DOTI PC 1998 YR ID 165 140 165 140 0 0 0 0 0 NISP YES IDA 2 KARNALI
LARAMANDU(TO) 100 DOTI PC 1998 YR ID 141 120 141 120 0 0 0 0 0 NISP YES IDA 2 KARNALI
TOTAL of NISP > DOTI > REHABILITATION 15 1230 1047 1230 1047 0 0 0 0 0

TOTAL of DOTI District 15 1230 1047 1230 1047 0 0 0 0 0

TOTAL of FAR-WESTERN > Hill 54 4508 3836 4508 3836 0 0 0 0 0

NISP>BAJHANG>REHABILITATION
KHUDIWON 100 BAJHANG PC 2001 YR ID 176 150 176 150 0 0 0 0 0 NISP NO IDA 2 KARNALI
SENSU 100 BAJHANG PC 2000 YR ID 53 45 53 45 0 0 0 0 0 NISP NO IDA 2 KARNALI
GALAI 100 BAJHANG PC 2002 YR ID 71 60 71 60 0 0 0 0 0 NISP NO IDA 2 KARNALI
AGRA GAON 100 BAJHANG PC 2000 YR ID 59 50 59 50 0 0 0 0 0 NISP NO IDA 2 KARNALI
YAPKAFLESWORI 100 BAJHANG PC 1997 YR ID 118 100 118 100 0 0 0 0 0 NISP NO IDA 2 KARNALI
TOTAL of NISP > BAJHANG > REHABILITATION 5 477 405 477 405 0 0 0 0 0

TOTAL of BAJHANG District 5 477 405 477 405 0 0 0 0 0

139
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

NISP>BAJURA>REHABILITATION
BHAM 100 BAJURA PC 2001 YR ID 18 15 18 15 0 0 0 0 0 NISP YES IDA 2 KARNALI
JILLY 100 BAJURA PC 2001 YR ID 71 60 71 60 0 0 0 0 0 NISP YES IDA 2 KARNALI
BRAHMATOLA 100 BAJURA PC 2001 YR ID 94 80 94 80 0 0 0 0 0 NISP YES IDA 2 KARNALI
RUDEE 100 BAJURA PC 2003 YR ID 88 75 88 75 0 0 0 0 0 NISP YES IDA 2 KARNALI
JAGRELUTURKE 100 BAJURA PC 2003 YR ID 94 80 94 80 0 0 0 0 0 NISP YES IDA 2 KARNALI
BOLDIK 100 BAJURA PC 2004 YR ID 53 45 53 45 0 0 0 0 0 NISP YES IDA 2 KARNALI
KAPREE 100 BAJURA PC 2003 YR ID 82 70 82 70 0 0 0 0 0 NISP YES IDA 2 KARNALI
TOTAL of NISP > BAJURA > REHABILITATION 7 500 425 500 425 0 0 0 0 0

TOTAL of BAJURA District 7 500 425 500 425 0 0 0 0 0

NISP>DARCHULA>REHABILITATION
DEWAL 100 DARCHULA PC 2001 YR ID 301 256 301 256 0 0 0 0 0 NISP YES IDA 1 MAHAKALI
KIM TARI 100 DARCHULA PC 2000 YR ID 200 170 200 170 0 0 0 0 0 NISP YES IDA 1 MAHAKALI
LUITA 100 DARCHULA PC 2003 YR ID 113 96 113 96 0 0 0 0 0 NISP YES IDA 1 MAHAKALI
NAILA 100 DARCHULA PC 2003 YR ID 96 82 96 82 0 0 0 0 0 NISP YES IDA 1 MAHAKALI
HIKILA 100 DARCHULA PC 2003 YR ID 176 150 176 150 0 0 0 0 0 NISP YES IDA 1 MAHAKALI
NAMASKAR 100 DARCHULA PC 2002 YR ID 49 42 49 42 0 0 0 0 0 NISP YES IDA 1 MAHAKALI
JUDE 100 DARCHULA PC 1998 YR ID 242 206 242 206 0 0 0 0 0 NISP YES IDA 1 MAHAKALI
LALI 100 DARCHULA PC 2001 YR ID 467 379 467 379 0 0 0 0 0 NISP YES IDA 1 MAHAKALI
SIPTI 100 DARCHULA PC 2002 YR ID 235 200 235 200 0 0 0 0 0 NISP YES IDA 1 MAHAKALI
TOTAL of NISP > DARCHULA > REHABILITATION 9 1879 1581 1879 1581 0 0 0 0 0

TOTAL of DARCHULA District 9 1879 1581 1879 1581 0 0 0 0 0

TOTAL of FAR-WESTERN > Hill 21 2856 2411 2856 2411 0 0 0 0 0

TOTAL of FAR-WESTERN Region 94 12096 10268 11663 9900 0 0 0 0 0

TOTAL of NISP 404 58006 49296 54938 46703 0 0 0 0 0

PEOPLE>JHAPA>REHABILITATION
ADUWA KHOLA BIRATPO 100 JHAPA AC 1250 1000 1250 1000 1000 0 0 0 0 PEOPLE NO GoN 12 SIWALIK RIVER
TOTAL of PEOPLE > JHAPA > REHABILITATION 1 1250 1000 1250 1000 1000 0 0 0 0

TOTAL of JHAPA District 1 1250 1000 1250 1000 1000 0 0 0 0

TOTAL of EASTERN > Terai 1 1250 1000 1250 1000 1000 0 0 0 0

PEOPLE>BHOJPUR>REHABILITATION
ADUWA KHOLA PAIYAPA 100 BHOJPUR AC 32 25 32 25 25 0 0 0 0 PEOPLE NO GoN 4 KOSHI
TOTAL of PEOPLE > BHOJPUR > REHABILITATION 1 32 25 32 25 25 0 0 0 0

TOTAL of BHOJPUR District 1 32 25 32 25 25 0 0 0 0

140
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

TOTAL of EASTERN > Hill 1 32 25 32 25 25 0 0 0 0

TOTAL of EASTERN > Hill 2 1282 1025 1282 1025 1025 0 0 0 0

PEOPLE>RUPANDEHI>REHABILITATION
BETANI BAND 100 RUPANDEHI AC 250 200 250 200 200 0 0 0 0 PEOPLE NO GoN 8 TINAU
MOTIPUR KHADWA 100 RUPANDEHI AC 1750 1400 1750 1400 1400 0 0 0 0 PEOPLE NO GoN 8 TINAU
TOTAL of PEOPLE > RUPANDEHI > REHABILITATION 2 2000 1600 2000 1600 1600 0 0 0 0

TOTAL of RUPANDEHI District 2 2000 1600 2000 1600 1600 0 0 0 0

TOTAL of WESTERN > Terai 2 2000 1600 2000 1600 1600 0 0 0 0

PEOPLE>PARBAT>REHABILITATION
DEOPUR KADEWA 100 PARBAT AC 81 65 81 65 65 0 0 0 0 PEOPLE NO GoN 3 GANDAK
DHURKOT 100 PARBAT AC 16 13 16 13 13 0 0 0 0 PEOPLE NO GoN 3 GANDAK
TOTAL of PEOPLE > PARBAT > REHABILITATION 2 97 78 97 78 78 0 0 0 0

TOTAL of PARBAT District 2 97 78 97 78 78 0 0 0 0

TOTAL of WESTERN > Hill 2 97 78 97 78 78 0 0 0 0

TOTAL of WESTERN > Region 4 2097 1678 2097 1678 1678 0 0 0 0

TOTAL of PEOPLE 6 3379 2703 3379 2703 2703 0 0 0 0

SI>BARDIYA>REHABILITATION
BHAISAHI BANDH GANGAN 100 BARDIYA AC 1995 YR ED 2500 2000 2500 2000 2000 1000 0 0 0 SI NO GoN 5 BABAI
RIHU KHOLA BELABA 100 BARDIYA AC 1995 YR ID 75 60 75 60 60 40 0 0 0 SI NO GoN 5 BABAI
TOTAL of SI > BARDIYA > REHABILITATION 2 2575 2060 2575 2060 2060 1040 0 0 0

TOTAL of BARDIYA District 2 2575 2060 2575 2060 2060 1040 0 0 0

SI>DANG>REHABILITATION
HAPUR GUNJE 100 DANG AC 1995 MS ID 133 106 133 106 106 0 0 0 0 SI NO GoN 5 BABAI
KARMATUWA 100 DANG AC 1995 MS ID 75 60 75 60 60 0 0 0 0 SI NO GoN 5 BABAI
TOTAL of SI > DANG > REHABILITATION 2 208 166 208 166 166 0 0 0 0

TOTAL of DANG District 2 208 166 208 166 166 0 0 0 0

TOTAL of MID-WESTERN > Terai 4 2783 2226 2783 2226 2226 1040 0 0 0

SI>SURKHET>REHABILITATION
GAM KHOLA DASARTHPUR 100 SURKHET AC 1995 YR ID 144 115 144 115 115 60 0 0 0 SI NO GoN 2 KARNALI
TOTAL of SI > SURKHET > REHABILITATION 1 144 115 144 115 115 60 0 0 0

141
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

TOTAL of SURKHET District 1 144 115 144 115 115 60 0 0 0

TOTAL of MID-WESTERN > Hill 1 144 115 144 115 115 60 0 0 0

SI>HUMLA>REHABILITATION
LAMABALU GHUEYA 100 HUMLA AC 1995 YR ID 15 12 15 12 12 5 0 0 0 SI NO GoN 2 KARNALI
SHREE NAGAR NANDINI 100 HUMLA AC 1995 YR ID 63 50 63 50 50 25 0 0 0 SI NO GoN 2 KARNALI
TUNICHA CHHATELBADA 100 HUMLA AC 1995 YR ID 88 70 88 70 70 20 0 0 0 SI NO GoN 2 KARNALI
TOTAL of SI > HUMLA > REHABILITATION 3 166 132 166 132 132 50 0 0 0

TOTAL of HUMLA District 3 166 132 166 132 132 50 0 0 0

SI>JUMLA>REHABILITATION
GUHYA IP CHANDAN NATH 100 JUMLA AC 1995 YR ID 63 50 63 50 50 40 0 0 0 SI NO GoN 2 KARNALI
TOTAL of SI > JUMLA > REHABILITATION 1 63 50 63 50 50 40 0 0 0

TOTAL of JUMLA District 1 63 50 63 50 50 40 0 0 0

SI>MUGU>REHABILITATION
GHATTE TO GHAT 100 MUGU AC 1995 YR ID 6 5 6 5 5 5 0 0 0 SI NO GoN 2 KARNALI
TOTAL of SI > MUGU > REHABILITATION 1 6 5 6 5 5 5 0 0 0

TOTAL of MUGU District 1 6 5 6 5 5 5 0 0 0

TOTAL of MID-WESTERN > Mountain 5 235 187 235 187 187 95 0 0 0

TOTAL of MID-WESTERN Region 10 3162 2528 3162 2528 2528 1195 0 0 0

SI>KAILALI>REHABILITATION
RANIJAMARA KULARIYA 100 KAILALI AC 1995 YR ID 50 40 50 40 40 15 0 0 0 SI NO GoN 2 KARNALI
TOTAL of SI > KAILALI > REHABILITATION 1 50 40 50 40 40 15 0 0 0

TOTAL of KAILALI District 1 50 40 50 40 40 15 0 0 0

TOTAL of FAR-WESTERN > Terai 1 50 40 50 40 40 15 0 0 0

TOTAL of FAR-WESTERN Region 1 50 40 50 40 40 15 0 0 0

TOTAL of SI 11 3212 2568 3212 2568 2568 1210 0 0 0

SINKALAMA>KAVRE>REHABILITATION
BASDOL KHOLA 100 KAVRE AC YR ID 107 85 107 85 85 0 0 0 0 SINKALAMA YES GoN 4 KOSHI
DADDHI KHOLA 100 KAVRE AC 95 75 95 75 75 0 0 0 0 SINKALAMA YES ADB 4 KOSHI
PUNYAMATI KHOLA 100 KAVRE AC YR ID 50 40 50 40 40 30 0 0 0 SINKALAMA YES GoN 4 KOSHI
ANDHERI KHOLA SIKHARTA 100 KAVRE AC 1992 YR ID 63 50 63 50 43 26 0 0 0 SINKALAMA YES ADB 4 KOSHI

142
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
ANDHERI KHOLA SIMALE 100 KAVRE AC 1991 YR ID 31 25 31 25 25 15 0 0 0 SINKALAMA YES ADB 4 KOSHI
BHYAKURE KHOLA 100 KAVRE AC 1993 YR ID 63 50 63 50 50 30 0 0 0 SINKALAMA YES ADB 4 KOSHI
CHA K KHOLA MAHADEV 100 KAVRE AC 1989 YR ID 94 75 94 75 75 45 0 0 0 SINKALAMA YES ADB 4 KOSHI
DANGDUNG KHOLA 100 KAVRE AC 1991 YR ID 94 75 94 75 75 45 0 0 0 SINKALAMA YES ADB 4 KOSHI
DUNE KHOLA 100 KAVRE AC 1993 YR ID 63 50 63 50 50 30 0 0 0 SINKALAMA YES ADB 4 KOSHI
DHASING KHOLA 100 KAVRE AC 1989 YR ID 13 10 13 10 10 6 0 0 0 SINKALAMA YES ADB 4 KOSHI
GHANTE KHOLA 100 KAVRE AC 1993 YR ID 25 20 25 20 20 12 0 0 0 SINKALAMA YES ADB 4 KOSHI
GHATTE KHOLA 100 KAVRE AC 1991 YR ID 75 60 75 60 60 36 0 0 0 SINKALAMA YES ADB 4 KOSHI
HWARSA KHOLA 100 KAVRE AC 1991 YR ID 31 25 31 25 25 15 0 0 0 SINKALAMA YES ADB 4 KOSHI
JAMDAR KHOLA 100 KAVRE AC 1992 YR ID 38 30 38 30 12 7 0 0 0 SINKALAMA YES ADB 4 KOSHI
JUKE KHOLA 100 KAVRE AC 1990 YR ID 63 50 63 50 50 30 0 0 0 SINKALAMA YES ADB 4 KOSHI
KEKHAPALI KHOLA 100 KAVRE AC 1993 YR ID 50 40 50 40 40 24 0 0 0 SINKALAMA YES ADB 4 KOSHI
MAJHI TAR KHOLA 100 KAVRE AC 1991 YR ID 38 30 38 30 30 18 0 0 0 SINKALAMA YES ADB 4 KOSHI
NARKE KHOLA 100 KAVRE AC 1991 YR ID 38 30 38 30 30 18 0 0 0 SINKALAMA YES ADB 4 KOSHI
NIGALE KHOLA 100 KAVRE AC 1993 YR ID 63 50 63 50 50 30 0 0 0 SINKALAMA YES ADB 4 KOSHI
PIPAL TAR KHOLA 100 KAVRE AC 1989 YR ID 38 30 38 30 30 18 0 0 0 SINKALAMA YES ADB 4 KOSHI
RAU KHOLA 100 KAVRE AC 1989 YR ID 35 28 35 28 28 17 0 0 0 SINKALAMA YES ADB 4 KOSHI
ROSI KHOLA 100 KAVRE AC 1988 YR ID 63 50 63 50 50 30 0 0 0 SINKALAMA YES ADB 4 KOSHI
TAR KHOLA 100 KAVRE AC 1991 YR ID 38 30 38 30 30 18 0 0 0 SINKALAMA YES ADB 4 KOSHI
THUMKI GHATTE 100 KAVRE AC 1993 YR ID 125 100 125 100 100 60 0 0 0 SINKALAMA YES ADB 4 KOSHI
TIL CHOUR KHOLA 100 KAVRE AC 1992 YR ID 53 42 53 42 21 13 0 0 0 SINKALAMA YES ADB 4 KOSHI
TOTAL of SINKALAMA > KAVRE > REHABILITATION 25 1446 1150 1446 1150 1104 573 0 0 0

TOTAL of KAVRE District 25 1446 1150 1446 1150 1104 573 0 0 0

SINKALAMA>LALITPUR>REHABILITATION
HEL TAR 100 LALITPUR AC 1990 YR ID 38 30 38 30 30 18 0 0 0 SINKALAMA YES ADB 9 BAGMATI
KURMI KHOLA 100 LALITPUR AC 1990 YR ID 31 25 31 25 25 15 0 0 0 SINKALAMA YES ADB 9 BAGMATI
TOTAL of SINKALAMA > LALITPUR > REHABILITATION 2 69 55 69 55 55 33 0 0 0

TOTAL of LALITPUR District 2 69 55 69 55 55 33 0 0 0

SINKALAMA>MAKAWANPUR>REHABILITATION
MASINE KHOLA 100 MAKAWANPUR AC YR ID 63 50 63 50 50 25 0 0 0 SINKALAMA YES ADB 3 GANDAK
NANDE KHOLA 100 MAKAWANPUR AC YR ID 63 50 63 50 50 25 0 0 0 SINKALAMA YES ADB 3 GANDAK
RAPTI KHOLA 100 MAKAWANPUR AC YR ID 157 125 157 125 125 60 0 0 0 SINKALAMA YES ADB 3 GANDAK
DUBO KHOLA 100 MAKAWANPUR AC 1990 YR ID 25 20 25 20 20 12 0 0 0 SINKALAMA YES ADB 3 GANDAK
GADHAN KHOLA 100 MAKAWANPUR AC 1991 YR ID 31 25 31 25 25 15 0 0 0 SINKALAMA YES ADB 3 GANDAK
KHAIITE KHOLA 100 MAKAWANPUR AC 1990 YR ID 125 100 125 100 100 60 0 0 0 SINKALAMA YES ADB 3 GANDAK
LOHAJWAR KHOLA 100 MAKAWANPUR AC 1993 YR ID 125 100 125 100 100 60 0 0 0 SINKALAMA YES ADB 3 GANDAK
MANAHARI KHOLA 100 MAKAWANPUR AC 1989 YR ID 63 50 63 50 35 21 0 0 0 SINKALAMA YES ADB 3 GANDAK
TOTAL of SINKALAMA > MAKAWANPUR > REHABILITATION 8 652 520 652 520 505 278 0 0 0

TOTAL of MAKAWANPUR District 8 652 520 652 520 505 278 0 0 0

TOTAL of CENTRAL > Hill 35 2167 1725 2167 1725 1664 884 0 0 0

143
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

SINKALAMA>SINDHUPALCHOWK>REHABILITATION
ARCHALA KHOLA 100 SINDHUPALCHOWK AC YR ID 75 60 75 60 60 30 0 0 0 SINKALAMA YES ADB 4 KOSHI
CHHETRE KHOLA 100 SINDHUPALCHOWK AC YR ID 10 8 10 8 8 0 0 0 0 SINKALAMA YES GoN 4 KOSHI
AP KHOLA 100 SINDHUPALCHOWK AC 1991 YR ID 19 15 19 15 15 9 0 0 0 SINKALAMA YES ADB 4 KOSHI
BHIM TAR SAGACHOK 100 SINDHUPALCHOWK AC 1989 YR ID 125 100 125 100 100 60 0 0 0 SINKALAMA YES ADB 4 KOSHI
BISINDHAV 100 SINDHUPALCHOWK AC 1989 YR ID 100 80 100 80 80 48 0 0 0 SINKALAMA YES ADB 4 KOSHI
CHHELAPPO KHOLA 100 SINDHUPALCHOWK AC 1992 YR ID 125 100 125 100 88 53 0 0 0 SINKALAMA YES ADB 4 KOSHI
DHAD BESII 100 SINDHUPALCHOWK AC 1990 YR ID 63 50 63 50 50 30 0 0 0 SINKALAMA YES ADB 4 KOSHI
GANA KHOLA 100 SINDHUPALCHOWK AC 1992 YR ID 75 60 75 60 60 36 0 0 0 SINKALAMA YES ADB 4 KOSHI
GOPE KHOLA 100 SINDHUPALCHOWK AC 1993 YR ID 125 100 125 100 70 42 0 0 0 SINKALAMA YES ADB 4 KOSHI
JAISI GAON 100 SINDHUPALCHOWK AC 1992 YR ID 88 70 88 70 36 22 0 0 0 SINKALAMA YES ADB 4 KOSHI
KARKI TAR 100 SINDHUPALCHOWK AC 1989 YR ID 63 50 63 50 50 30 0 0 0 SINKALAMA YES ADB 4 KOSHI
KHAHARE KHOLA 100 SINDHUPALCHOWK AC 1990 YR ID 113 100 113 100 90 54 0 0 0 SINKALAMA YES ADB 4 KOSHI
KHALE KHOLA 100 SINDHUPALCHOWK AC 1990 YR ID 44 35 44 35 35 21 0 0 0 SINKALAMA YES ADB 4 KOSHI
LAPSE KHOLA 100 SINDHUPALCHOWK AC 1992 YR ID 75 60 75 60 48 29 0 0 0 SINKALAMA YES ADB 4 KOSHI
MAJHI GAON 100 SINDHUPALCHOWK AC 1989 YR ID 63 50 63 50 50 30 0 0 0 SINKALAMA YES ADB 4 KOSHI
SINDHU KHOLA 100 SINDHUPALCHOWK AC 1989 YR ID 94 75 94 75 75 45 0 0 0 SINKALAMA YES ADB 4 KOSHI
SIPA TAR KHOLA 100 SINDHUPALCHOWK AC 1991 YR ID 63 50 63 50 14 10 0 0 0 SINKALAMA YES ADB 4 KOSHI
SUKDOL KHOLA 100 SINDHUPALCHOWK AC 1993 YR ID 125 100 125 100 70 42 0 0 0 SINKALAMA YES ADB 4 KOSHI
THAMORANG KHOLA 100 SINDHUPALCHOWK AC 1989 YR ID 56 45 56 45 45 27 0 0 0 SINKALAMA YES ADB 4 KOSHI
THUDO KHOLA 100 SINDHUPALCHOWK AC 1993 YR ID 113 90 113 90 54 32 0 0 0 SINKALAMA YES ADB 4 KOSHI
TOTAL of SINKALAMA > SINDHUPALCHOWK > REHABILITATION 20 1614 1298 1614 1298 1098 650 0 0 0

TOTAL of SINDHUPALCHOWK District 20 1614 1298 1614 1298 1098 650 0 0 0

TOTAL of CENTRAL > Mountain 20 1614 1298 1614 1298 1098 650 0 0 0

TOTAL of CENTRAL Region 55 3781 3023 3781 3023 2762 1534 0 0 0

TOTAL of SINKALAMA 55 3781 3023 3781 3023 2762 1534 0 0 0

SIP>BHOJPUR>REHABILITATION
KHASYANKHU SING 100 BHOJPUR AC 1989 YR ID 25 20 25 20 20 0 0 0 0 SIP NO GoN 4 KOSHI
TOTAL of SIP > BHOJPUR > REHABILITATION 1 25 20 25 20 20 0 0 0 0

TOTAL of BHOJPUR District 1 25 20 25 20 20 0 0 0 0

SIP>DHANKUTA>REHABILITATION
THANKHUWA 100 DHANKUTA AC 1990 MS ID 50 40 50 40 40 0 0 0 0 SIP NO GoN 4 KOSHI
TOTAL of SIP > DHANKUTA > REHABILITATION 1 50 40 50 40 40 0 0 0 0

TOTAL of DHANKUTA District 1 50 40 50 40 40 0 0 0 0

SIP>KHOTANG>REHABILITATION
KATIKE CHOUR 100 KHOTANG AC 1993 YR ID 38 30 38 30 30 0 0 0 0 SIP NO GoN 4 KOSHI

144
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of SIP > KHOTANG > REHABILITATION 1 38 30 38 30 30 0 0 0 0

TOTAL of KHOTANG District 1 38 30 38 30 30 0 0 0 0

TOTAL of EASTERN > Hill 3 113 90 113 90 90 0 0 0 0

TOTAL of EASTERN Region 3 113 90 113 90 90 0 0 0 0

SIP>BARA>REHABILITATION
BAGERINADI 100 BARA AC 1990 MS ED 650 520 650 520 520 0 0 0 0 SIP NO GoN 12 SIWALIK RIVER
TOTAL of SIP > BARA > REHABILITATION 1 650 520 650 520 520 0 0 0 0

TOTAL of BARA District 1 650 520 650 520 520 0 0 0 0

SIP>CHITWAN>REHABILITATION
SURTANA 100 CHITWAN AC 1989 YR ID 125 100 125 100 100 50 0 0 0 SIP NO GoN 3 GANDAK
TOTAL of SIP > CHITWAN > REHABILITATION 1 125 100 125 100 100 50 0 0 0

TOTAL of CHITWAN District 1 125 100 125 100 100 50 0 0 0

SIP>DHANUSHA>REHABILITATION
GAURADAHA 100 DHANUSHA AC 1989 MS ID 100 80 100 80 80 0 0 0 0 SIP NO GoN 12 SIWALIK RIVER
RAMADAIYA 100 DHANUSHA AC 1989 MS ED 91 73 91 73 73 0 0 0 0 SIP NO GoN 12 SIWALIK RIVER
TOTAL of SIP > DHANUSHA > REHABILITATION 2 191 153 191 153 153 0 0 0 0

TOTAL of DHANUSHA District 2 191 153 191 153 153 0 0 0 0

SIP>MAHOTTARI>REHABILITATION
ATAWA 100 MAHOTTARI AC 1989 MS ID 106 85 106 85 85 0 0 0 0 SIP NO GoN 12 SIWALIK RIVER
MAJHAURABISANPUR 100 MAHOTTARI AC 1989 MS ID 100 80 100 80 80 0 0 0 0 SIP NO GoN 12 SIWALIK RIVER
TOTAL of SIP > MAHOTTARI > REHABILITATION 2 206 165 206 165 165 0 0 0 0

TOTAL of MAHOTTARI District 2 206 165 206 165 165 0 0 0 0

SIP>RAUTAHAT>REHABILITATION
AGUWA 100 RAUTAHAT AC 1989 MS ID 113 90 113 90 90 0 TF 0 0 SIP NO GoN 12 SIWALIK RIVER
AGUWACHANDI 100 RAUTAHAT AC 1990 MS ID 63 50 63 50 8 0 0 0 0 SIP NO GoN 12 SIWALIK RIVER
TOTAL of SIP > RAUTAHAT > REHABILITATION 2 176 140 176 140 98 0 0 0 0

TOTAL of RAUTAHAT District 2 176 140 176 140 98 0 0 0 0

SIP>SARLAHI>REHABILITATION
KHOKAMADOL 100 SARLAHI AC 1990 YR ED 125 100 125 100 100 60 0 0 0 SIP NO GoN 12 SIWALIK RIVER
PHARAHADAWA 100 SARLAHI AC 1989 YR ID 250 200 250 200 200 20 0 0 0 SIP NO GoN 12 SIWALIK RIVER
TOTAL of SIP > SARLAHI > REHABILITATION 2 375 300 375 300 300 80 0 0 0

145
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of SARLAHI District 2 375 300 375 300 300 80 0 0 0

TOTAL of CENTRAL > Terai 10 1723 1378 1723 1378 1336 130 0 0 0

SIP>BHAKTAPUR>REHABILITATION
DHUNGRE KHOLA 100 BHAKTAPUR AC 1989 YR ID 29 23 29 23 23 3 2 0 0 SIP NO GoN 9 BAGMATI
TOTAL of SIP > BHAKTAPUR > REHABILITATION 1 29 23 29 23 23 3 2 0 0

TOTAL of BHAKTAPUR District 1 29 23 29 23 23 3 2 0 0

SIP>DHADING>REHABILITATION
RATOMATEMAGHI 100 DHADING AC 1990 MS ID 35 28 35 28 28 0 0 0 0 SIP NO GoN 3 GANDAK
RICHET 100 DHADING AC 1989 YR ID 38 30 38 30 30 8 0 0 0 SIP NO GoN 3 GANDAK
SALANG 100 DHADING AC 1989 MS ID 70 56 70 56 56 0 0 0 0 SIP NO GoN 3 GANDAK
TOTAL of SIP > DHADING > REHABILITATION 3 143 114 143 114 114 8 0 0 0

TOTAL of DHADING District 3 143 114 143 114 114 8 0 0 0

SIP>MAKAWANPUR>REHABILITATION
PADAMPHOKHARI 100 MAKAWANPUR AC 1990 MS ID 250 200 250 200 200 80 0 0 0 SIP NO GoN 3 GANDAK
TOTAL of SIP > MAKAWANPUR > REHABILITATION 1 250 200 250 200 200 80 0 0 0

TOTAL of MAKAWANPUR District 1 250 200 250 200 200 80 0 0 0

SIP>NUWAKOT>REHABILITATION
HATTI KHOLA 100 NUWAKOT AC 1989 MS ID 38 30 38 30 30 0 0 0 0 SIP NO GoN 3 GANDAK
KUMARI GAON 100 NUWAKOT AC 1989 YR ID 81 65 81 65 65 40 0 0 0 SIP NO GoN 3 GANDAK
PURANA GAON 100 NUWAKOT AC 1989 YR ID 125 100 125 100 100 40 0 0 0 SIP NO GoN 3 GANDAK
URLENI 100 NUWAKOT AC 1989 YR ID 125 100 125 100 100 40 0 0 0 SIP NO GoN 3 GANDAK
TOTAL of SIP > NUWAKOT > REHABILITATION 4 369 295 369 295 295 120 0 0 0

TOTAL of NUWAKOT District 4 369 295 369 295 295 120 0 0 0

SIP>RAMECHAP>REHABILITATION
BISKUMEE 100 RAMECHAP AC 1989 YR ID 46 37 46 37 37 20 0 0 0 SIP NO GoN 4 KOSHI
SIMLE KHOLA 100 RAMECHAP AC 1989 YR ID 44 35 44 35 35 12 0 0 0 SIP NO GoN 4 KOSHI
THAN CHAUR 100 RAMECHAP AC 1989 YR ID 44 35 44 35 35 16 0 0 0 SIP NO GoN 4 KOSHI
TOTAL of SIP > RAMECHAP > REHABILITATION 3 134 107 134 107 107 48 0 0 0

TOTAL of RAMECHAP District 3 134 107 134 107 107 48 0 0 0

SIP>SINDHULI>REHABILITATION
TADI 100 SINDHULI AC 1989 YR ED 500 400 500 400 400 40 0 0 0 SIP NO GoN 9 BAGMATI
TOTAL of SIP > SINDHULI > REHABILITATION 1 500 400 500 400 400 40 0 0 0

TOTAL of SINDHULI District 1 500 400 500 400 400 40 0 0 0

146
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

TOTAL of CENTRAL > Hill 13 1425 1139 1425 1139 1139 299 2 0 0

SIP>SINDHUPALCHOWK>REHABILITATION
THULO KULO 100 SINDHUPALCHOWK AC 1993 YR ID 75 60 75 60 60 24 0 0 0 SIP YES GoN 4 KOSHI
TOTAL of SIP > SINDHUPALCHOWK > REHABILITATION 1 75 60 75 60 60 24 0 0 0

TOTAL of SINDHUPALCHOWK District 1 75 60 75 60 60 24 0 0 0

TOTAL of CENTRAL > Mountain 1 75 60 75 60 60 24 0 0 0

TOTAL of CENTRAL Region 24 3223 2577 3223 2577 2535 453 2 0 0

SIP>KAPILBASTU>REHABILITATION
GHIGHUWA NALA 100 KAPILBASTU AC 1989 MS ED 80 63 80 63 50 0 0 0 0 SIP NO GoN 12 SIWALIK RIVER
GHORAHI MAURAMING 100 KAPILBASTU AC 1989 MS ED 118 94 118 94 75 0 0 0 0 SIP NO GoN 12 SIWALIK RIVER
GHORAHIDHANKIULI 100 KAPILBASTU AC 1989 MS ED 56 45 56 45 45 0 0 0 0 SIP NO GoN 12 SIWALIK RIVER
TOTAL of SIP > KAPILBASTU > REHABILITATION 3 254 202 254 202 170 0 0 0 0

TOTAL of KAPILBASTU District 3 254 202 254 202 170 0 0 0 0

SIP>NAWALPARASI>REHABILITATION
BHUTAHA KHOLA 100 NAWALPARASI AC 1989 YR ID 251 201 251 201 201 0 0 0 0 SIP NO GoN 3 GANDAK
TOTAL of SIP > NAWALPARASI > REHABILITATION 1 251 201 251 201 201 0 0 0 0

TOTAL of NAWALPARASI District 1 251 201 251 201 201 0 0 0 0

SIP>RUPANDEHI>REHABILITATION
MANDRNI KHOLA 100 RUPANDEHI AC 1989 MS ID 125 100 125 100 100 0 0 0 0 SIP NO GoN 8 TINAU
TINAU KHOLA 100 RUPANDEHI AC 1989 YR ID 43 34 43 34 34 25 0 0 0 SIP NO GoN 8 TINAU
TOTAL of SIP > RUPANDEHI > REHABILITATION 2 168 134 168 134 134 25 0 0 0

TOTAL of RUPANDEHI District 2 168 134 168 134 134 25 0 0 0

TOTAL of WESTERN > Terai 6 673 537 673 537 505 25 0 0 0

SIP>BAGLUNG>REHABILITATION
ANDHARI KHOLA 100 BAGLUNG AC 1989 YR ID 50 40 50 40 40 0 0 0 0 SIP NO GoN 3 GANDAK
LOHA LHOLA 100 BAGLUNG AC 1989 YR ID 19 15 19 15 15 8 0 0 0 SIP NO GoN 3 GANDAK
TOTAL of SIP > BAGLUNG > REHABILITATION 2 69 55 69 55 55 8 0 0 0

TOTAL of BAGLUNG District 2 69 55 69 55 55 8 0 0 0

SIP>GULMI>REHABILITATION
BARDI KHOLA 100 GULMI AC 1989 YR ID 188 150 188 150 150 60 0 0 0 SIP NO GoN 3 GANDAK
MULKI 100 GULMI AC 1989 YR ID 19 50 19 50 50 0 0 0 0 SIP NO GoN 3 GANDAK

147
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of SIP > GULMI > REHABILITATION 2 207 200 207 200 200 60 0 0 0

TOTAL of GULMI District 2 207 200 207 200 200 60 0 0 0

SIP>PALPA>REHABILITATION
GODEBAS 100 PALPA AC 1989 MS ID 15 12 15 12 12 0 0 0 0 SIP NO GoN 3 GANDAK
KUNHAR KHOLA 100 PALPA AC 1989 YR ID 38 30 38 30 30 15 0 0 0 SIP NO GoN 3 GANDAK
NIMTUNG KULO 100 PALPA AC 1989 YR ID 19 15 19 15 15 0 0 0 0 SIP NO GoN 3 GANDAK
SINU KULO 100 PALPA AC 1989 YR ID 19 15 19 15 15 10 0 0 0 SIP NO GoN 3 GANDAK
THULO KULO 100 PALPA AC 1989 YR ID 19 15 19 15 15 10 0 0 0 SIP NO GoN 3 GANDAK
TOTAL of SIP > PALPA > REHABILITATION 5 110 87 110 87 87 35 0 0 0

TOTAL of PALPA District 5 110 87 110 87 87 35 0 0 0

SIP>PARBAT>REHABILITATION
DHAPA KHOLA 100 PARBAT AC 1989 YR ID 188 150 188 150 150 60 0 0 0 SIP NO GoN 3 GANDAK
TOTAL of SIP > PARBAT > REHABILITATION 1 188 150 188 150 150 60 0 0 0

TOTAL of PARBAT District 1 188 150 188 150 150 60 0 0 0

TOTAL of WESTERN > Hill 10 574 492 574 492 492 163 0 0 0

TOTAL of WESTERN Region 16 1247 1029 1247 1029 997 188 0 0 0

SIP>JAJARKOT>REHABILITATION
BADABHUWA 100 JAJARKOT AC 1989 YR ID 12 10 12 10 10 8 0 0 0 SIP NO GoN 2 KARNALI
BURASE KHOLA 100 JAJARKOT AC 1989 YR ID 13 10 13 10 10 10 0 0 0 SIP NO GoN 2 KARNALI
GAM KHOLA 100 JAJARKOT AC 1989 YR ID 107 85 107 85 85 25 0 0 0 SIP NO GoN 2 KARNALI
NAULI KHET 100 JAJARKOT AC 1989 YR ID 13 10 13 10 10 8 0 0 0 SIP NO GoN 2 KARNALI
NIBUWACHAPHAR 100 JAJARKOT AC 1989 YR ID 38 30 38 30 30 50 0 0 0 SIP NO GoN 2 KARNALI
TOTAL of SIP > JAJARKOT > REHABILITATION 5 183 145 183 145 145 101 0 0 0

TOTAL of JAJARKOT District 5 183 145 183 145 145 101 0 0 0

SIP>ROLPA>REHABILITATION
CHHAPNATA 100 ROLPA AC 1989 YR ID 19 15 19 15 15 5 0 0 0 SIP NO GoN 6 WEST RAPTI
DHABANG 100 ROLPA AC 1989 YR ID 41 33 41 33 33 24 0 0 0 SIP NO GoN 6 WEST RAPTI
SERABANG 100 ROLPA AC 1989 YR ID 44 33 44 33 33 33 0 0 0 SIP NO GoN 6 WEST RAPTI
TOTAL of SIP > ROLPA > REHABILITATION 3 104 81 104 81 81 62 0 0 0

TOTAL of ROLPA District 3 104 81 104 81 81 62 0 0 0

SIP>RUKUM>REHABILITATION
ATHABISA DADA 100 RUKUM AC 1989 YR ID 15 12 15 12 12 0 0 0 0 SIP NO GoN 2 KARNALI
DAUDE DADA 100 RUKUM AC 1989 YR ID 25 20 25 20 20 0 0 0 0 SIP NO GoN 2 KARNALI
KHARABANG 100 RUKUM AC 1989 YR ID 25 20 25 20 20 0 0 0 0 SIP NO GoN 2 KARNALI

148
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
PHALATHE KHOLA 100 RUKUM AC 1989 YR ID 38 30 38 30 30 10 0 0 0 SIP NO GoN 2 KARNALI
SOBHA 100 RUKUM AC 1989 YR ID 16 13 16 13 13 20 0 0 0 SIP NO GoN 2 KARNALI
TARAGAD 100 RUKUM AC 1989 YR ID 32 25 32 25 25 25 0 0 0 SIP NO GoN 2 KARNALI
TOTAL of SIP > RUKUM > REHABILITATION 6 151 120 151 120 120 55 0 0 0

TOTAL of RUKUM District 6 151 120 151 120 120 55 0 0 0

SIP>SALYAN>REHABILITATION
JIMALI 100 SALYAN AC 1990 ID 50 40 50 40 40 0 0 0 0 SIP NO GoN 5 BABAI
TOTAL of SIP > SALYAN > REHABILITATION 1 50 40 50 40 40 0 0 0 0

TOTAL of SALYAN District 1 50 40 50 40 40 0 0 0 0

SIP>SURKHET>REHABILITATION
RAMGHAT 100 SURKHET AC 1989 YR ID 56 45 56 45 45 0 0 0 0 SIP NO GoN 2 KARNALI
TOTAL of SIP > SURKHET > REHABILITATION 1 56 45 56 45 45 0 0 0 0

TOTAL of SURKHET District 1 56 45 56 45 45 0 0 0 0

16 544 431 544 431 431 218 0 0 0

SIP>JUMLA>REHABILITATION
KHA DANDABADA 100 JUMLA AC 1989 YR ID 6 4 6 4 4 2 0 0 0 SIP NO GoN 2 KARNALI
SUNDARGAI 100 JUMLA AC 1989 YR ID 7 5 7 5 5 5 0 0 0 SIP NO GoN 2 KARNALI
THINKE 100 JUMLA AC 1989 YR ID 7 5 7 5 5 5 0 0 0 SIP NO GoN 2 KARNALI
TOTAL of SIP > JUMLA > REHABILITATION 3 20 14 20 14 14 12 0 0 0

TOTAL of JUMLA District 3 20 14 20 14 14 12 0 0 0

TOTAL of MID-WESTERN > Mountain 3 20 14 20 14 14 12 0 0 0

TOTAL of MID-WESTERN Region 19 564 445 564 445 445 230 0 0 0

SIP>KAILALI>REHABILITATION
JAIJALI 100 KAILALI AC 1992 YR ED 375 300 375 300 300 100 0 0 0 SIP NO GoN 2 KARNALI
JARAHI 100 KAILALI AC 1992 YR ID 282 225 282 225 225 100 0 0 0 SIP NO GoN 2 KARNALI
TOTAL of SIP > KAILALI > REHABILITATION 2 657 525 657 525 525 200 0 0 0

TOTAL of KAILALI District 2 657 525 657 525 525 200 0 0 0

SIP>KANCHANPUR>REHABILITATION
MALERIYA NALA 100 KANCHANPUR AC 1992 YR ED 406 325 406 325 325 200 0 0 0 SIP NO GoN 1 MAHAKALI
TOTAL of SIP > KANCHANPUR > REHABILITATION 1 406 325 406 325 325 200 0 0 0

TOTAL of KANCHANPUR District 1 406 325 406 325 325 200 0 0 0

149
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of FAR-WESTERN > Terai 3 1063 850 1063 850 850 400 0 0 0

SIP>ACHHAM>REHABILITATION
MAGESHWOR 100 ACHHAM AC 1989 YR ID 63 50 63 50 50 25 0 0 0 SIP NO GoN 2 KARNALI
TOTAL of SIP > ACHHAM > REHABILITATION 1 63 50 63 50 50 25 0 0 0

TOTAL of ACHHAM District 1 63 50 63 50 50 25 0 0 0

SIP>DADELDHURA>REHABILITATION
UGRA TARA 100 DADELDHURA AC 1992 YR ID 569 455 569 455 455 144 100 0 0 SIP NO GoN 1 MAHAKALI
TOTAL of SIP > DADELDHURA > REHABILITATION 1 569 455 569 455 455 144 100 0 0

TOTAL of DADELDHURA District 1 569 455 569 455 455 144 100 0 0

TOTAL of FAR-WESTERN > Hill 2 632 505 632 505 505 169 100 0 0

TOTAL of FAR-WESTERN Region 5 1695 1355 1695 1355 1355 569 100 0 0

TOTAL of SIP 67 6842 5496 6842 5496 5422 1440 102 0 0

SISP>JHAPA>NEW
LOWER LELIYA KHOLA 100 JHAPA PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
GHAGRA KHOLA 100 JHAPA PC 1997 YR ID 294 250 294 250 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
RATUWA KHOLA 100 JHAPA PC 1997 YR ID 282 240 282 240 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
GAURIYA KHOLA 100 JHAPA PC 1997 YR ID 471 400 471 400 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
LOWER KISNI 100 JHAPA PC 2000 YR ID 1765 1500 0 0 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
TOTAL of SISP > JHAPA > NEW 5 3047 2590 1282 1090 0 0 0 0 0

SISP>JHAPA>REHABILITATION
UPPER LELIYA KHOLA 100 JHAPA PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
TOPGACHHI DHYANG 100 JHAPA PC 1997 YR ID 353 300 353 300 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
SINGHA BAHINI 100 JHAPA PC 1997 YR ID 88 75 88 75 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
TOTAL of SISP > JHAPA > REHABILITATION 3 676 575 676 575 0 0 0 0 0

TOTAL of JHAPA District 8 3723 3165 1958 1665 0 0 0 0 0

SISP>MORANG>NEW
KESHALIYA 100 MORANG PC 1997 YR ID 212 180 212 180 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
TOTAL of SISP > MORANG > NEW 1 212 180 212 180 0 0 0 0 0

SISP>MORANG>REHABILITATION
DAHI SAMUDAYIK 100 MORANG PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
KISTI 100 MORANG PC 1997 YR ID 374 318 374 318 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
MARCHNIYA KHOLA 100 MORANG PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
JANTA BANDH 100 MORANG PC 1997 YR ID 353 300 353 300 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
BETAUNA 100 MORANG PC 1997 YR ID 259 220 259 220 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER

150
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
JANAKALYAN 100 MORANG PC 1997 YR ID 287 244 287 244 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
RATE HOLY 100 MORANG PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
BHULKE MUHAN 100 MORANG PC 1997 YR ID 866 736 866 736 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
GAIL PAINI 100 MORANG PC 1997 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
ALTAI 100 MORANG PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
KOCHENI KHOLA 100 MORANG PC 1997 YR ID 353 300 353 300 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
KAMAL JHODA 100 MORANG PC 1997 YR ID 271 230 271 230 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
HASINA 100 MORANG PC 1997 YR ID 353 300 353 300 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
TOTAL of SISP > MORANG > REHABILITATION 13 4056 3448 4056 3448 0 0 0 0 0

TOTAL of MORANG District 14 4268 3628 4268 3628 0 0 0 0 0

SISP>SAPTARI>NEW
SURUNGADHAR 100 SAPTARI PC 1997 YR ID 247 210 247 210 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
TOTAL of SISP > SAPTARI > NEW 1 247 210 247 210 0 0 0 0 0

SISP>SAPTARI>REHABILITATION
DUDHAILA 100 SAPTARI PC 1997 YR ID 353 300 353 300 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
PAUDA 100 SAPTARI PC 1997 YR ID 182 155 182 155 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
TOTAL of SISP > SAPTARI > REHABILITATION 2 535 455 535 455 0 0 0 0 0

TOTAL of SAPTARI District 3 782 665 782 665 0 0 0 0 0

SISP>SIRAHA>NEW
SAHAJA 100 SIRAHA PC 1997 YR ID 874 743 874 743 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
BABURAM 100 SIRAHA PC 1997 YR ID 165 140 165 140 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
TOTAL of SISP > SIRAHA > NEW 2 1039 883 1039 883 0 0 0 0 0

SISP>SIRAHA>REHABILITATION
JHIRHARI 100 SIRAHA PC 1997 YR ID 652 554 652 554 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
TOTAL of SISP > SIRAHA > REHABILITATION 1 652 554 652 554 0 0 0 0 0

TOTAL of SIRAHA District 3 1691 1437 1691 1437 0 0 0 0 0

SISP>SUNSARI>REHABILITATION
TENGRA KHOLA 100 SUNSARI PC 1997 YR ID 313 266 313 266 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
SERA SEUTI 100 SUNSARI PC 1997 YR ID 471 400 471 400 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
BIRENDRA 100 SUNSARI PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
DATTAKICHHA KHOLA 100 SUNSARI PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
KAJRA KHOLA 100 SUNSARI PC 1997 YR ID 300 255 300 255 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
SUNSARI KHOLA 100 SUNSARI PC 1997 YR ID 412 350 412 350 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
SUKUMARI 100 SUNSARI PC 1997 YR ID 200 170 200 170 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
BAJRAHA KHETI 100 SUNSARI PC 1997 YR ID 294 250 294 250 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
TOTAL of SISP > SUNSARI > REHABILITATION 8 2460 2091 2460 2091 0 0 0 0 0

TOTAL of SUNSARI District 8 2460 2091 2460 2091 0 0 0 0 0

151
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year

TOTAL of EASTERN > Terai 36 12924 10986 11159 9486 0 0 0 0 0

SISP>BHOJPUR>NEW
KRISHI BARSA KULO 100 BHOJPUR PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 4 KOSHI
HINKHUWA KHOLA 100 BHOJPUR PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 4 KOSHI
BALUWA BESE 100 BHOJPUR PC 1997 YR ID 118 100 0 0 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > BHOJPUR > NEW 3 529 450 411 350 0 0 0 0 0

SISP>BHOJPUR>REHABILITATION
MARSE KULO 100 BHOJPUR PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 4 KOSHI
ANKHUWA KHOLA 100 BHOJPUR PC 1997 YR ID 19 16 19 16 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > BHOJPUR > REHABILITATION 2 254 216 254 216 0 0 0 0 0

TOTAL of BHOJPUR District 5 783 666 665 566 0 0 0 0 0

SISP>DHANKUTA>NEW
SAFAI TAR 100 DHANKUTA PC 1997 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 4 KOSHI
PAREWADIN 100 DHANKUTA PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 4 KOSHI
MANGMAYA 100 DHANKUTA PC 1997 YR ID 65 55 65 55 0 0 0 0 0 SISP NO ADB 4 KOSHI
CHHYALUNG TANG 100 DHANKUTA PC 1997 YR ID 147 125 147 125 0 0 0 0 0 SISP NO ADB 4 KOSHI
LEMLEMA 100 DHANKUTA PC 1997 YR ID 29 25 29 25 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > DHANKUTA > NEW 5 476 405 476 405 0 0 0 0 0

SISP>DHANKUTA>REHABILITATION
JANKALYAN 100 DHANKUTA PC 1997 YR ID 153 130 153 130 0 0 0 0 0 SISP NO ADB 4 KOSHI
KHARDEP 100 DHANKUTA PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 4 KOSHI
KARUNJE 100 DHANKUTA PC 1997 YR ID 39 33 39 33 0 0 0 0 0 SISP NO ADB 4 KOSHI
KHALTE BARI 100 DHANKUTA PC 1997 YR ID 100 85 100 85 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > DHANKUTA > REHABILITATION 4 468 398 468 398 0 0 0 0 0

TOTAL of DHANKUTA District 9 944 803 944 803 0 0 0 0 0

SISP>ILAM>NEW
MALUM KHOLA 100 ILAM PC 1997 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 11 KANKAI
BUTE KHOLA 100 ILAM PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 11 KANKAI
RATUWA KHOLA 100 ILAM PC 1997 YR ID 471 400 471 400 0 0 0 0 0 SISP NO ADB 11 KANKAI
TOTAL of SISP > ILAM > NEW 3 765 650 765 650 0 0 0 0 0

SISP>ILAM>REHABILITATION
LAMI TARE KULO 100 ILAM PC 1997 YR ID 71 60 SISP NO ADB 11 KANKAI
SEWA ASEWA 100 ILAM PC 1997 YR ID 373 317 373 317 0 0 0 0 0 SISP NO ADB 11 KANKAI
TANGTING GOYANG 100 ILAM PC 1997 YR ID 162 138 162 138 0 0 0 0 0 SISP NO ADB 11 KANKAI
KAMAL KHOLA 100 ILAM PC 1997 YR ID 294 250 294 250 0 0 0 0 0 SISP NO ADB 11 KANKAI
RUNG SUNG KHOLA 100 ILAM PC 1997 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 11 KANKAI
THOTNE KHOLA 100 ILAM PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 11 KANKAI

152
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of SISP > ILAM > REHABILITATION 6 1006 855 935 795 0 0 0 0 0

TOTAL of ILAM District 9 1771 1505 1700 1445 0 0 0 0 0

SISP>KHOTANG>NEW
CHEREKHE KHOLA 100 KHOTANG PC 1997 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 4 KOSHI
DHI KUWA 100 KHOTANG PC 1997 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 4 KOSHI
MEWA DHODHARE 100 KHOTANG PC 1997 YR ID 82 70 82 70 0 0 0 0 0 SISP NO ADB 4 KOSHI
BARAH POKHARI 100 KHOTANG PC 1997 YR ID 53 45 53 45 0 0 0 0 0 SISP NO ADB 4 KOSHI
NAMUNA 100 KHOTANG PC 1997 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > KHOTANG > NEW 5 371 315 371 315 0 0 0 0 0

SISP>KHOTANG>REHABILITATION
MEWA-NERPA 100 KHOTANG PC 1997 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 4 KOSHI
MANSINGAR 100 KHOTANG PC 1997 YR ID 141 120 141 120 0 0 0 0 0 SISP NO ADB 4 KOSHI
CHHEBE KHOLA 100 KHOTANG PC 1997 YR ID 129 110 129 110 0 0 0 0 0 SISP NO ADB 4 KOSHI
BUNWA KHOLA 100 KHOTANG PC 1997 YR ID 94 80 94 80 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > KHOTANG > REHABILITATION 4 482 410 482 410 0 0 0 0 0

TOTAL of KHOTANG District 9 853 725 853 725 0 0 0 0 0

SISP>OKHALDHUNGA>NEW
BHADAURE 100 OKHALDHUNGA PC 1997 YR ID 226 192 226 192 0 0 0 0 0 SISP NO ADB 4 KOSHI
CHOKTI KHOLA 100 OKHALDHUNGA PC 1997 YR ID 220 187 220 187 0 0 0 0 0 SISP NO ADB 4 KOSHI
HARKAPUR TAR 100 OKHALDHUNGA PC 1997 YR ID 259 220 259 220 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > OKHALDHUNGA > NEW 3 705 599 705 599 0 0 0 0 0

SISP>OKHALDHUNGA>REHABILITATION
CHARKHU 100 OKHALDHUNGA PC 1997 YR ID 118 100 0 0 0 0 0 0 0 SISP NO ADB 4 KOSHI
BIKASE 100 OKHALDHUNGA PC 1997 YR ID 241 205 241 205 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > OKHALDHUNGA > REHABILITATION 2 359 305 241 205 0 0 0 0 0

TOTAL of OKHALDHUNGA District 5 1064 904 946 804 0 0 0 0 0

SISP>PANCHTHAR>NEW
DOORDIMBA 100 PANCHTHAR PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 4 KOSHI
SAIPHUWA KHOLA 100 PANCHTHAR PC 1997 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 4 KOSHI
CHILINGDIN 100 PANCHTHAR PC 1997 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 4 KOSHI
PANCHAMI 100 PANCHTHAR PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 4 KOSHI
PHAKTEP 100 PANCHTHAR PC 1997 YR ID 65 55 65 55 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > PANCHTHAR > NEW 5 618 525 618 525 0 0 0 0 0

SISP>PANCHTHAR>REHABILITATION
SAWA SERA 100 PANCHTHAR PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHI
THAPA TAR 100 PANCHTHAR PC 1997 YR ID 88 75 88 75 0 0 0 0 0 SISP NO ADB 4 KOSHI
DADA KULO 100 PANCHTHAR PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHI

153
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
JHOLUNGE 100 PANCHTHAR PC 1997 YR ID 81 69 81 69 0 0 0 0 0 SISP NO ADB 4 KOSHI
LUWAFU KHOLA 100 PANCHTHAR PC 1997 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > PANCHTHAR > REHABILITATION 5 381 324 381 324 0 0 0 0 0

TOTAL of PANCHTHAR District 10 999 849 999 849 0 0 0 0 0

SISP>TERATHUM>NEW
BAMBOO KHOLA 100 TERATHUM PC 1997 YR ID 106 90 106 90 0 0 0 0 0 SISP NO ADB 4 KOSHI
MUGE KHOLA 100 TERATHUM PC 1997 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 4 KOSHI
PAREWA KHOLA 100 TERATHUM PC 1997 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 4 KOSHI
JAU BARI 100 TERATHUM PC 1997 YR ID 85 72 85 72 0 0 0 0 0 SISP NO ADB 4 KOSHI
SUNGNAM 100 TERATHUM PC 1997 YR ID 235 200 0 0 0 0 0 SISP NO ADB 4 KOSHI
ANDHERI 100 TERATHUM PC 1997 YR ID 76 65 76 65 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > TERATHUM > NEW 6 691 587 456 387 0 0 0 0 0

SISP>TERATHUM>REHABILITATION
MUSE KHOLA 100 TERATHUM PC 1997 YR ID 41 35 41 35 0 0 0 0 0 SISP NO ADB 4 KOSHI
PHUGUWA KHOLA 100 TERATHUM PC 1997 YR ID 190 160 190 160 0 0 0 0 0 SISP NO ADB 4 KOSHI
LIKHUWA 100 TERATHUM PC 1997 YR ID 59 50 0 0 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > TERATHUM > REHABILITATION 3 290 245 231 195 0 0 0 0 0

TOTAL of TERATHUM District 9 981 832 687 582 0 0 0 0 0

SISP>UDAYAPUR>NEW
YARI KHOLA 100 UDAYAPUR PC 1997 YR ID 141 120 141 120 0 0 0 0 0 SISP NO ADB 4 KOSHI
LATI KHOLA 100 UDAYAPUR PC 1997 YR ID 129 110 129 110 0 0 0 0 0 SISP NO ADB 4 KOSHI
GHUMI TAR 100 UDAYAPUR PC 1997 YR ID 41 35 41 35 0 0 0 0 0 SISP NO ADB 4 KOSHI
TAWA KHOLA 100 UDAYAPUR PC 1997 YR ID 294 250 294 250 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > UDAYAPUR > NEW 4 605 515 605 515 0 0 0 0 0

SISP>UDAYAPUR>REHABILITATION
RISKU 100 UDAYAPUR PC 1997 YR ID 188 160 188 160 0 0 0 0 0 SISP NO ADB 4 KOSHI
KUNTE 100 UDAYAPUR PC 1997 YR ID 41 35 41 35 0 0 0 0 0 SISP NO ADB 4 KOSHI
UPPER BARUWA 100 UDAYAPUR PC 1997 YR ID 311 264 311 264 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > UDAYAPUR > REHABILITATION 3 540 459 540 459 0 0 0 0 0

TOTAL of UDAYAPUR District 7 1145 974 1145 974 0 0 0 0 0

TOTAL of EASTERN > Hill 63 8540 7258 7939 6748 0 0 0 0 0

SISP>SANKHUWASABHA>NEW
JHUTRA TUPEWA 100 SANKHUWASABHA PC 1997 YR ID 353 300 0 0 0 0 0 0 0 SISP NO ADB 4 KOSHI
SIKTIM TAR 100 SANKHUWASABHA PC 1997 YR ID 82 70 82 70 0 0 0 0 0 SISP NO ADB 4 KOSHI
RIYALE BESI 100 SANKHUWASABHA PC 1997 YR ID 76 65 76 65 0 0 0 0 0 SISP NO ADB 4 KOSHI
DOVANTAR 100 SANKHUWASABHA PC 1997 YR ID 29 25 0 0 0 0 0 0 0 SISP NO ADB 4 KOSHI
PATHIVAR 100 SANKHUWASABHA PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 4 KOSHI

154
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of SISP > SANKHUWASABHA > NEW 5 716 610 334 285 0 0 0 0 0

SISP>SANKHUWASABHA>REHABILITATION
HANGDUWA KHOLA 100 SANKHUWASABHA PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 4 KOSHI
PANGMA KHOLA 100 SANKHUWASABHA PC 1997 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 4 KOSHI
CHHAHARE KHOLA 100 SANKHUWASABHA PC 1997 YR ID 105 89 105 89 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > SANKHUWASABHA > REHABILITATION 3 411 349 411 349 0 0 0 0 0

TOTAL of SANKHUWASABHA District 8 1127 959 745 634 0 0 0 0 0

SISP>SOLUKHUMBU>NEW
BARKHU KHOLA 100 SOLUKHUMBU PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHI
BHORLENI TAR 100 SOLUKHUMBU PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHI
KANGEL KALI BARI 100 SOLUKHUMBU PC 1997 YR ID 52 44 52 44 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > SOLUKHUMBU > NEW 3 146 124 146 124 0 0 0 0 0

SISP>SOLUKHUMBU>REHABILITATION
MUDE KHOLA 100 SOLUKHUMBU PC 1997 YR ID 112 95 112 95 0 0 0 0 0 SISP NO ADB 4 KOSHI
JUKE PANI 100 SOLUKHUMBU PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > SOLUKHUMBU > REHABILITATION 2 159 135 159 135 0 0 0 0 0

TOTAL of SOLUKHUMBU District 5 305 259 305 259 0 0 0 0 0

SISP>TAPLEJUNG>NEW
NAURANG KHOLA 100 TAPLEJUNG PC 1997 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 4 KOSHI
DANDA GAUN 100 TAPLEJUNG PC 1997 YR ID 82 70 82 70 0 0 0 0 0 SISP NO ADB 4 KOSHI
CHYAMGGMENGMAYA 100 TAPLEJUNG PC 1997 YR ID 485 412 485 412 0 0 0 0 0 SISP NO ADB 4 KOSHI
NEBU KHOLA 100 TAPLEJUNG PC 1997 YR ID 94 80 94 80 0 0 0 0 0 SISP NO ADB 4 KOSHI
KHOKSE NANGKHOLY 100 TAPLEJUNG PC 1997 YR ID 76 65 76 65 0 0 0 0 0 SISP NO ADB 4 KOSHI
NIGURADIN PHUL BARI 100 TAPLEJUNG PC 1997 YR ID 212 180 212 180 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > TAPLEJUNG > NEW 6 1008 857 1008 857 0 0 0 0 0

SISP>TAPLEJUNG>REHABILITATION
HIUNDE KHOLA 100 TAPLEJUNG PC 1997 YR ID 88 75 88 75 0 0 0 0 0 SISP NO ADB 4 KOSHI
MEDIBUNG 100 TAPLEJUNG PC 1997 YR ID 106 90 106 90 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > TAPLEJUNG > REHABILITATION 2 194 165 194 165 0 0 0 0 0

TOTAL of TAPLEJUNG District 8 1202 1022 1202 1022 0 0 0 0 0

TOTAL of EASTERN > Mountain 21 2634 2240 2252 1915 0 0 0 0 0

TOTAL of EASTERN Region 120 24098 20484 21350 18149 0 0 0 0 0

SISP>BARA>REHABILITATION
CHHAUGHAT 100 BARA PC 1998 YR ID 294 250 294 250 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
LAUTAN 100 BARA PC 2001 YR ID 529 450 529 450 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER

155
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
DHANSAR 100 BARA PC 2000 YR ID 429 365 429 365 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
SAPAHI 100 BARA PC 2000 YR ID 182 155 182 155 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
ADUWA-KACHORWA 100 BARA PC 19999 YR ID 1340 1139 1340 1139 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
SHREEPUR 100 BARA PC 1999 YR ID 294 250 294 250 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
BENGAHI 100 BARA PC 19999 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
GERKHAHI 100 BARA PC 2000 YR ID 588 500 0 0 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
TOTAL of SISP > BARA > REHABILITATION 8 3891 3309 3303 2809 0 0 0 0 0

TOTAL of BARA District 8 3891 3309 3303 2809 0 0 0 0 0

SISP>CHITWAN>NEW
YAKRANG 100 CHITWAN PC 1999 YR ID 35 30 35 30 0 0 0 0 0 SISP NO ADB 3 GANDAK
TOTAL of SISP > CHITWAN > NEW 1 35 30 35 30 0 0 0 0 0

SISP>CHITWAN>REHABILITATION
CHANDRE KHOLA 100 CHITWAN PC 2001 YR ID 53 45 53 45 0 0 0 0 0 SISP NO ADB 3 GANDAK
PARIU KHOLA 100 CHITWAN PC 2001 YR ID 109 93 109 93 0 0 0 0 0 SISP NO ADB 3 GANDAK
RIU BAGAI 100 CHITWAN PC 2001 YR ID 129 110 129 110 0 0 0 0 0 SISP NO ADB 3 GANDAK
GHANGHAR 100 CHITWAN PC 1997 YR ID 158 134 158 134 0 0 0 0 0 SISP NO ADB 3 GANDAK
KHAIRE KHOLA 100 CHITWAN PC 1998 YR ID 38 32 38 32 0 0 0 0 0 SISP NO ADB 3 GANDAK
DIHI TAR 100 CHITWAN PC 1998 YR ID 18 15 18 15 0 0 0 0 0 SISP NO ADB 3 GANDAK
TOTAL of SISP > CHITWAN > REHABILITATION 6 505 429 505 429 0 0 0 0 0

TOTAL of CHITWAN District 7 540 459 540 459 0 0 0 0 0

SISP>DHANUSA>REHABILITATION
BALGANGA 100 DHANUSA PC 1997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
BRIJGANGA 100 DHANUSA PC 1999 YR ID 226 192 226 192 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
DUDHMATI,SINGARJO 100 DHANUSA PC 1998 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
DUDHMATI JK-13 100 DHANUSA PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
TOTAL of SISP > DHANUSA > REHABILITATION 4 755 642 755 642 0 0 0 0 0

TOTAL of DHANUSA District 4 755 642 755 642 0 0 0 0 0

SISP>MAHOTTARI>REHABILITATION
PASIJWA 100 MAHOTTARI PC 2002 YR ID 588 500 588 500 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
PACHAIN 100 MAHOTTARI PC 20002 YR ID 588 500 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
SIR KHOLA 100 MAHOTTARI PC 2000 YR ID 124 105 124 105 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
TOTAL of SISP > MAHOTTARI > REHABILITATION 3 1300 1105 712 605 0 0 0 0 0

TOTAL of MAHOTTARI District 3 1300 1105 712 605 0 0 0 0 0

SISP>PARSA>REHABILITATION
AMOA KHOLA 100 PARSA PC 2000 YR ID 159 135 0 0 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
GUL BARIA 100 PARSA PC 1997 YR ID 294 250 294 250 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
NIRMAL BASTI BRAH 100 PARSA PC 2002 YR ID 412 350 0 0 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER

156
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
KIYASOT BAGAMUHI 100 PARSA PC 2000 YR ID 584 496 584 496 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
CHAMARI 100 PARSA PC 1997 YR ID 465 395 465 395 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
TOTAL of SISP > PARSA > REHABILITATION 5 1914 1626 1343 1141 0 0 0 0 0

TOTAL of PARSA District 5 1914 1626 1343 1141 0 0 0 0 0

SISP>RAUTAHAT>REHABILITATION
ARUWA PATEBHARWA 100 RAUTAHAT PC 19997 YR ID 353 300 0 0 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
ARUWA-SANTAPUR 100 RAUTAHAT PC 19997 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
BHA KUWA 100 RAUTAHAT PC 19997 YR ID 465 395 0 0 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
DUDHIYAWA 100 RAUTAHAT PC 2000 YR ID 253 215 0 0 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
TOTAL of SISP > RAUTAHAT > REHABILITATION 4 1306 1110 235 200 0 0 0 0 0

TOTAL of RAUTAHAT District 4 1306 1110 235 200 0 0 0 0 0

SISP>SARLAHI>REHABILITATION
BAGDAHA 100 SARLAHI PC 1997 YR ID 294 250 294 250 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
LAXIMPUT 100 SARLAHI PC 19997 YR ID 82 70 82 70 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
PARSA 100 SARLAHI PC 1998 YR ID 806 685 806 685 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
PATTHHARKOT 100 SARLAHI PC 2000 YR ID 613 521 613 521 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
MYIAKHOR 100 SARLAHI PC 2001 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
LAUKAT-MANUSMARA 100 SARLAHI PC 19998 YR ID 441 375 441 375 0 0 0 0 0 SISP NO ADB 12 SIWALIK RIVER
TOTAL of SISP > SARLAHI > REHABILITATION 6 2354 2001 2354 2001 0 0 0 0 0

TOTAL of SARLAHI District 6 2354 2001 2354 2001 0 0 0 0 0

TOTAL of CENTRAL > Terai 37 12060 10252 9242 7857 0 0 0 0 0

SISP>BHAKTAPUR>NEW
KUSUME KHOLA 100 BHAKTAPUR PC 1997 YR ID 24 20 24 20 0 0 0 0 0 SISP NO ADB 9 BAGMATI
GHYAMPE KHOLA 100 BHAKTAPUR PC 1997 YR ID 35 30 35 30 0 0 0 0 0 SISP NO ADB 9 BAGMATI
SERA PHANT 100 BHAKTAPUR PC 1997 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 9 BAGMATI
THADO KHOLA 100 BHAKTAPUR PC 2001 YR ID 45 38 45 38 0 0 0 0 0 SISP NO ADB 9 BAGMATI
TOTAL of SISP > BHAKTAPUR > NEW 4 175 148 175 148 0 0 0 0 0

SISP>BHAKTAPUR>REHABILITATION
CHHARARE DOKE 100 BHAKTAPUR PC 2000 YR ID 52 44 52 44 0 0 0 0 0 SISP NO ADB 9 BAGMATI
TRIBENI 100 BHAKTAPUR PC 1998 YR ID 46 39 46 39 0 0 0 0 0 SISP NO ADB 9 BAGMATI
KUTUDHAL 100 BHAKTAPUR PC 2000 YR ID 125 106 125 106 0 0 0 0 0 SISP NO ADB 9 BAGMATI
MAHADEV KHOLA 100 BHAKTAPUR PC 1997 YR ID 529 450 529 450 0 0 0 0 0 SISP NO ADB 9 BAGMATI
TAUTHALI PHANT 100 BHAKTAPUR PC 1997 YR ID 41 35 41 35 0 0 0 0 0 SISP NO ADB 9 BAGMATI
KATUNJE 100 BHAKTAPUR PC 1997 YR ID 141 120 141 120 0 0 0 0 0 SISP NO ADB 9 BAGMATI
TOTAL of SISP > BHAKTAPUR > REHABILITATION 6 934 794 934 794 0 0 0 0 0

TOTAL of BHAKTAPUR District 10 1109 942 1109 942 0 0 0 0 0

157
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
SISP>DHADING>NEW
JAYAPURI 100 DHADING PC 1999 YR ID 141 120 141 120 0 0 0 0 0 SISP NO ADB 3 GANDAK
TALLO BESI 100 DHADING PC 1999 YR ID 35 30 35 30 0 0 0 0 0 SISP NO ADB 3 GANDAK
RIMALDIHI 100 DHADING PC 1999 YR ID 80 68 80 68 0 0 0 0 0 SISP NO ADB 3 GANDAK
RAUTE 100 DHADING PC 1999 YR ID 141 120 141 120 0 0 0 0 0 SISP NO ADB 3 GANDAK
MANGPANG SUKAURA 100 DHADING PC 1999 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 3 GANDAK
LITI KHOLA 100 DHADING PC 1999 YR ID 106 90 106 90 0 0 0 0 0 SISP NO ADB 3 GANDAK
JOGE TAR 100 DHADING PC 1999 YR ID 200 170 200 170 0 0 0 0 0 SISP NO ADB 3 GANDAK
PARWANG 100 DHADING PC 1999 YR ID 119 101 119 101 0 0 0 0 0 SISP NO ADB 3 GANDAK
JAMUN TAR 100 DHADING PC 1999 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 3 GANDAK
TOTAL of SISP > DHADING > NEW 9 999 849 999 849 0 0 0 0 0

SISP>DHADING>REHABILITATION
BHAL TAR BANSI TAR 100 DHADING PC 1999 YR ID 95 81 95 81 0 0 0 0 0 SISP NO ADB 3 GANDAK
TALLO MARPAK 100 DHADING PC 1999 YR ID 129 110 129 110 0 0 0 0 0 SISP NO ADB 3 GANDAK
KALLERI TAR 100 DHADING PC 1999 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 3 GANDAK
GAIRA 100 DHADING PC 1999 YR ID 35 30 35 30 0 0 0 0 0 SISP NO ADB 3 GANDAK
SERTUNG 100 DHADING PC 1998 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 3 GANDAK
GAJURI TAR 100 DHADING PC 1998 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 3 GANDAK
TOTAL of SISP > DHADING > REHABILITATION 6 730 621 730 621 0 0 0 0 0

TOTAL of DHADING District 15 1729 1470 1729 1470 0 0 0 0 0

SISP>KATHMANDU>REHABILITATION
LAPSIPHEDI 100 KATHMANDU PC 1998 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 9 BAGMATI
TEUDOL 100 KATHMANDU PC 2000 YR ID 29 25 29 25 0 0 0 0 0 SISP NO ADB 9 BAGMATI
THADO KHOLA 100 KATHMANDU PC 1999 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 9 BAGMATI
KABRE KHOLA 100 KATHMANDU PC 1999 YR ID 42 36 42 36 0 0 0 0 0 SISP NO ADB 9 BAGMATI
BUKI KULO 100 KATHMANDU PC 1999 YR ID 82 70 82 70 0 0 0 0 0 SISP NO ADB 9 BAGMATI
KAVRE GHATTE 100 KATHMANDU PC 1998 YR ID 135 115 135 115 0 0 0 0 0 SISP NO ADB 9 BAGMATI
MATATIRTHA 100 KATHMANDU PC 1998 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 9 BAGMATI
KATUWA BANDH 100 KATHMANDU PC 1998 YR ID 41 35 41 35 0 0 0 0 0 SISP NO ADB 9 BAGMATI
RAJ KULO 100 KATHMANDU PC 1998 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 9 BAGMATI
NAGIN KHOLA 100 KATHMANDU PC 1998 YR ID 76 65 76 65 0 0 0 0 0 SISP NO ADB 9 BAGMATI
TAUTHALI 100 KATHMANDU PC 1999 YR ID 35 30 35 30 0 0 0 0 0 SISP NO ADB 9 BAGMATI
TOTAL of SISP > KATHMANDU > REHABILITATION 11 711 606 711 606 0 0 0 0 0

TOTAL of KATHMANDU District 11 711 606 711 606 0 0 0 0 0

SISP>KAVRE>NEW
SIMTHALI 100 KAVRE PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHI
TUKUCHA 100 KAVRE PC 1998 YR ID 40 34 40 34 0 0 0 0 0 SISP NO ADB 4 KOSHI
NAU BESI PHANT 100 KAVRE PC 2002 YR ID 147 125 0 0 0 0 0 0 0 SISP NO ADB 4 KOSHI
DHUNGKHARKA 100 KAVRE PC 2000 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > KAVRE > NEW 4 293 249 146 124 0 0 0 0 0

158
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
SISP>KAVRE>REHABILITATION
TANAL 100 KAVRE PC 1997 YR ID 18 15 18 15 0 0 0 0 0 SISP NO ADB 4 KOSHI
KALEDICHURETHUMKI 100 KAVRE PC 1999 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 4 KOSHI
RIYALE 100 KAVRE PC 2000 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 4 KOSHI
MAHANKAL 100 KAVRE PC 2002 YR ID 27 23 27 23 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > KAVRE > REHABILITATION 4 234 198 234 198 0 0 0 0 0

TOTAL of KAVRE District 8 527 447 380 322 0 0 0 0 0

SISP>LALITPUR>REHABILITATION
GODAWARI RAJ KULO 100 LALITPUR PC 2001 YR ID 206 175 206 175 0 0 0 0 0 SISP NO ADB 9 BAGMATI
LUBHU RAJ KULO 100 LALITPUR PC 2001 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 9 BAGMATI
APHAL BAGAR 100 LALITPUR PC 1997 YR ID 35 30 35 30 0 0 0 0 0 SISP NO ADB 9 BAGMATI
SERA KULO 100 LALITPUR PC 1997 YR ID 35 30 35 30 0 0 0 0 0 SISP NO ADB 9 BAGMATI
GODAM CHAUR 100 LALITPUR PC 1997 YR ID 15 13 15 13 0 0 0 0 0 SISP NO ADB 9 BAGMATI
PHULINGDAL 100 LALITPUR PC 1997 YR ID 80 68 80 68 0 0 0 0 0 SISP NO ADB 9 BAGMATI
KHOKANA 100 LALITPUR PC 1997 YR ID 294 250 294 250 0 0 0 0 0 SISP NO ADB 9 BAGMATI
HATHIBAN 100 LALITPUR PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 9 BAGMATI
TOTAL of SISP > LALITPUR > REHABILITATION 8 888 756 888 756 0 0 0 0 0

TOTAL of LALITPUR District 8 888 756 888 756 0 0 0 0 0

SISP>MAKWANPUR>NEW
RAI GAON 100 MAKWANPUR PC 1998 YR ID 259 220 259 220 0 0 0 0 0 SISP NO ADB 3 GANDAK
BHORLENI TAR 100 MAKWANPUR PC 1999 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 3 GANDAK
NAM TAR 100 MAKWANPUR PC 1997 YR ID 147 125 147 125 0 0 0 0 0 SISP NO ADB 3 GANDAK
TOTAL of SISP > MAKWANPUR > NEW 3 465 395 465 395 0 0 0 0 0

SISP>MAKWANPUR>REHABILITATION
PHAPAR BARI 100 MAKWANPUR PC 1999 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 3 GANDAK
DILLIPUR 100 MAKWANPUR PC 1998 YR ID 134 114 134 114 0 0 0 0 0 SISP NO ADB 3 GANDAK
PALUNG 100 MAKWANPUR PC 2000 YR ID 74 63 74 63 0 0 0 0 0 SISP NO ADB 3 GANDAK
TOTAL of SISP > MAKWANPUR > REHABILITATION 3 326 277 326 277 0 0 0 0 0

TOTAL of MAKWANPUR District 6 791 672 791 672 0 0 0 0 0

SISP>NUWAKOT>NEW
DEURALI 100 NUWAKOT PC 1999 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 3 GANDAK
HIRAMANI TAR 100 NUWAKOT PC 1996 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 3 GANDAK
SALME 100 NUWAKOT PC 1997 YR ID 84 71 84 71 0 0 0 0 0 SISP NO ADB 3 GANDAK
KATLE DHUNGA 100 NUWAKOT PC 2001 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 3 GANDAK
BALKUMARI BHUMISTA 100 NUWAKOT PC 1997 YR ID 165 140 165 140 0 0 0 0 0 SISP NO ADB 3 GANDAK
TOTAL of SISP > NUWAKOT > NEW 5 414 351 414 351 0 0 0 0 0

SISP>NUWAKOT>REHABILITATION
FALAKHU KH-HARIYAL 100 NUWAKOT PC 2000 YR ID 53 45 53 45 0 0 0 0 0 SISP NO ADB 3 GANDAK

159
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
CHHAHARE ANDARI 100 NUWAKOT PC 1999 YR ID 106 90 106 90 0 0 0 0 0 SISP NO ADB 3 GANDAK
KOLPU TAR 100 NUWAKOT PC 1998 YR ID 53 45 53 45 0 0 0 0 0 SISP NO ADB 3 GANDAK
LABDU DHIKURE SERA 100 NUWAKOT PC 1996 YR ID 424 360 424 360 0 0 0 0 0 SISP NO ADB 3 GANDAK
KAULE BHALCHE 100 NUWAKOT PC 1996 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 3 GANDAK
TOTAL of SISP > NUWAKOT > REHABILITATION 5 871 740 871 740 0 0 0 0 0

TOTAL of NUWAKOT District 10 1285 1091 1285 1091 0 0 0 0 0

SISP>RAMECHHAP>NEW
CHINDE KHOLA 100 RAMECHHAP PC 1998 YR ID 94 80 94 80 0 0 0 0 0 SISP NO ADB 9 BAGMATI
AMPHE KHOLA 100 RAMECHHAP PC 1998 YR ID 106 90 106 90 0 0 0 0 0 SISP NO ADB 9 BAGMATI
GAIRI KHOLA 100 RAMECHHAP PC 2000 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 9 BAGMATI
TILAURI KHOLA 100 RAMECHHAP PC 1998 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 9 BAGMATI
TOTAL of SISP > RAMECHHAP > NEW 4 318 270 318 270 0 0 0 0 0

SISP>RAMECHHAP>REHABILITATION
DIMI MAIRE 100 RAMECHHAP PC 2000 YR ID 88 75 88 75 0 0 0 0 0 SISP NO ADB 9 BAGMATI
DHANDE BESI 100 RAMECHHAP PC 2001 YR ID 41 35 41 35 0 0 0 0 0 SISP NO ADB 9 BAGMATI
RAJMAN TAR 100 RAMECHHAP PC 1998 YR ID 88 75 88 75 0 0 0 0 0 SISP NO ADB 9 BAGMATI
DARKHA KHOLA 100 RAMECHHAP PC 1999 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 9 BAGMATI
GELU KHOLA 100 RAMECHHAP PC 1998 YR ID 35 30 35 30 0 0 0 0 0 SISP NO ADB 9 BAGMATI
KHADKULI DAHA 100 RAMECHHAP PC 1998 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 9 BAGMATI
TOTAL of SISP > RAMECHHAP > REHABILITATION 6 417 355 417 355 0 0 0 0 0

TOTAL of RAMECHHAP District 10 735 625 735 625 0 0 0 0 0

SISP>SINDHULI>NEW
TANDI 100 SINDHULI PC 2002 YR ID 320 272 320 272 0 0 0 0 0 SISP NO ADB 9 BAGMATI
TOTAL of SISP > SINDHULI > NEW 1 320 272 320 272 0 0 0 0 0

SISP>SINDHULI>REHABILITATION
DUDHAULI 100 SINDHULI PC 2002 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 9 BAGMATI
CHANDAHA 100 SINDHULI PC 1998 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 9 BAGMATI
CHANDULI 100 SINDHULI PC 2000 YR ID 235 200 235 200 0 0 0 0 0 SISP NO ADB 9 BAGMATI
DHAP 100 SINDHULI PC 2000 YR ID 82 70 82 70 0 0 0 0 0 SISP NO ADB 9 BAGMATI
BARDEO TAR 100 SINDHULI PC 2000 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 9 BAGMATI
TOTAL of SISP > SINDHULI > REHABILITATION 5 729 620 729 620 0 0 0 0 0

TOTAL of SINDHULI District 6 1049 892 1049 892 0 0 0 0 0

TOTAL of CENTRAL > Hill 84 8824 7501 8677 7376 0 0 0 0 0

SISP>DOLKHA>NEW
BOTE KHOLA 100 DOLKHA PC 1998 YR ID 16 14 16 14 0 0 0 0 0 SISP NO ADB 9 BAGMATI
BULUNG 100 DOLKHA PC 1997 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 9 BAGMATI
MARBO TAR 100 DOLKHA PC 1997 YR ID 106 90 106 90 0 0 0 0 0 SISP NO ADB 9 BAGMATI

160
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TOTAL of SISP > DOLKHA > NEW 3 240 204 240 204 0 0 0 0 0

SISP>DOLKHA>REHABILITATION
NAUSAYA BESI 100 DOLKHA PC 2002 YR ID 196 167 196 167 0 0 0 0 0 SISP NO ADB 9 BAGMATI
TOTAL of SISP > DOLKHA > REHABILITATION 1 196 167 196 167 0 0 0 0 0

TOTAL of DOLKHA District 4 436 371 436 371 0 0 0 0 0

SISP>RASUWA>NEW
PHAMCHET(PUNG) 100 RASUWA PC 1997 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 3 GANDAK
THUMAN 100 RASUWA PC 1998 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 3 GANDAK
THULO BHARKU 100 RASUWA PC 1998 YR ID 41 35 41 35 0 0 0 0 0 SISP NO ADB 3 GANDAK
MAHAGHAR 100 RASUWA PC 2000 YR ID 82 70 82 70 0 0 0 0 0 SISP NO ADB 3 GANDAK
TOTAL of SISP > RASUWA > NEW 4 253 215 253 215 0 0 0 0 0

SISP>RASUWA>REHABILITATION
BHORLEPUCHAR 100 RASUWA PC 1998 YR ID 48 41 48 41 0 0 0 0 0 SISP NO ADB 3 GANDAK
BHORLE SIRAN 100 RASUWA PC 1997 YR ID 76 65 76 65 0 0 0 0 0 SISP NO ADB 3 GANDAK
UPALLO RUPSE PANI 100 RASUWA PC 1998 YR ID 41 35 41 35 0 0 0 0 0 SISP NO ADB 3 GANDAK
KAPTHALI TAR 100 RASUWA PC 1998 YR ID 24 20 24 20 0 0 0 0 0 SISP NO ADB 3 GANDAK
BANUWA 100 RASUWA PC 1998 YR ID 24 20 24 20 0 0 0 0 0 SISP NO ADB 3 GANDAK
GOLJUNG BESI 100 RASUWA PC 1996 YR ID 82 70 82 70 0 0 0 0 0 SISP NO ADB 3 GANDAK
TOTAL of SISP > RASUWA > REHABILITATION 6 295 251 295 251 0 0 0 0 0

TOTAL of RASUWA District 10 548 466 548 466 0 0 0 0 0

SISP>SINDHUPALCHOWK>NEW
KAVRE KHOLA 100 SINDHUPALCHOWK PC 1998 YR ID 88 75 88 75 0 0 0 0 0 SISP NO ADB 4 KOSHI
KHAKDAL KHOLA 100 SINDHUPALCHOWK PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 4 KOSHI
SIURENI 100 SINDHUPALCHOWK PC 1997 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 4 KOSHI
THAMRANG-RANG TAR 100 SINDHUPALCHOWK PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHI
KUNDALE KHOLA 100 SINDHUPALCHOWK PC 1997 YR ID 88 75 88 75 0 0 0 0 0 SISP NO ADB 4 KOSHI
LAMA BISAUNA 100 SINDHUPALCHOWK PC 1998 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHI
GAURING KO GATTA 100 SINDHUPALCHOWK PC 2001 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 4 KOSHI
ANDHERI KHOLA 100 SINDHUPALCHOWK PC 1998 YR ID 88 75 88 75 0 0 0 0 0 SISP NO ADB 4 KOSHI
DHUSLUNG KHOLA 100 SINDHUPALCHOWK PC 1998 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 4 KOSHI
PAKHAR KHOLA 100 SINDHUPALCHOWK PC 2001 YR ID 96 82 96 82 0 0 0 0 0 SISP NO ADB 4 KOSHI
KHOLE KHOLA 100 SINDHUPALCHOWK PC 1997 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 4 KOSHI
MEGATE 100 SINDHUPALCHOWK PC 1997 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 4 KOSHI
MELAMCHI II 100 SINDHUPALCHOWK PC 2000 YR ID 98 83 0 0 0 0 0 0 0 SISP NO ADB 4 KOSHI
MELAMCHI KHOLA 100 SINDHUPALCHOWK PC 1997 YR ID 159 135 159 135 0 0 0 0 0 SISP NO ADB 4 KOSHI
SIYALE BIMERE BESI 100 SINDHUPALCHOWK PC 1997 YR ID 18 15 18 15 0 0 0 0 0 SISP NO ADB 4 KOSHI
CHILAUNE GAIRE KHET 100 SINDHUPALCHOWK PC 1997 YR ID 18 15 18 15 0 0 0 0 0 SISP NO ADB 4 KOSHI
BARUWA 100 SINDHUPALCHOWK PC 1997 YR ID 118 100 118 100 0 0 0 0 0 SISP NO ADB 4 KOSHI
LAPTU KHOLA 100 SINDHUPALCHOWK PC 1997 YR ID 72 61 72 61 0 0 0 0 0 SISP NO ADB 4 KOSHI

161
TABLE 3
Command Area of Surface Farmer’s Managed Irrigation Scheme
Actual Planned Developed

Basin Number
Ongoing Command

Programme
Percentage

Turn Over
Capability
Developed
Irrigation
Completed Command Area Command Area Irrigated Command Area (ha.)

Intensity

Funding
Area (ha.)
(AC) / (ha.) (ha.)
Project District Basin Name
Planned
Completion Gross Net Gross Net Summer Winter Spring Gross Net
(PC)Year
TAUTHALI PANGRA TAR 100 SINDHUPALCHOWK PC 1997 YR ID 176 150 0 0 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > SINDHUPALCHOWK > NEW 19 1726 1466 1452 1233 0 0 0 0 0

SISP>SINDHUPALCHOWK>REHABILITATION
SOTE KHOLA 100 SINDHUPALCHOWK PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHI
PENGAL 100 SINDHUPALCHOWK PC 1997 YR ID 47 40 47 40 0 0 0 0 0 SISP NO ADB 4 KOSHI
BHANSAR KULO 100 SINDHUPALCHOWK PC 1997 YR ID 96 82 96 82 0 0 0 0 0 SISP NO ADB 4 KOSHI
BAGUWA SIRAN 100 SINDHUPALCHOWK PC 1997 YR ID 76 65 76 65 0 0 0 0 0 SISP NO ADB 4 KOSHI
BHIM TAR 100 SINDHUPALCHOWK PC 1997 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 4 KOSHI
DADE TEKANPUR 100 SINDHUPALCHOWK PC 1997 YR ID 59 50 59 50 0 0 0 0 0 SISP NO ADB 4 KOSHI
BHAT TAR BEL TAR 100 SINDHUPALCHOWK PC 1997 YR ID 176 150 176 150 0 0 0 0 0 SISP NO ADB 4 KOSHI
HANDI KHOLA 100 SINDHUPALCHOWK PC 1997 YR ID 82 70 82 70 0 0 0 0 0 SISP NO ADB 4 KOSHI
MAHADEV SUIVI 100 SINDHUPALCHOWK PC 1997 YR ID 71 60 71 60 0 0 0 0 0 SISP NO ADB 4 KOSHI
TOTAL of SISP > SINDHUPALCHOWK > REHABILITATION 9 713 607 713 607 0 0 0 0 0

TOTAL of SINDHUPALCHOWK District 28 2439 2073 2165 1840 0 0 0 0 0

TOTAL of CENTRAL > Mountain 42 3423 2910 3149 2677 0 0 0 0 0

TOTAL of CENTRAL Region 163 24307 20663 21068 17910 0 0 0 0 0

TOTAL of SISP 283 48405 41147 42418 36059 0 0 0 0 0

162
TABLE 4
Summary of total command area of Surface Farmer Managed
SINKA-
District TYPE ADB/N AGRIL DIDP DOI ERIP FIWUD GADP GTZ HFP IDP ILC ISP K-BIRD KHILL M/HILL MAIN MIN MIP MPLD N CARE NISP PEOPLE SI LAMA SIP SISP Total
Eastern Development Region
Eastern Region Terai Ecological Belt
Jhapa N 779 0 0 0 0 0 0 0 0 0 0 2025 0 0 0 0 0 200 0 388 0 0 0 0 0 1090 4482
R 1968 0 0 125 0 180 0 0 0 0 0 4505 0 0 0 200 0 0 0 0 0 1000 0 0 0 575 8553
Morang N 374 0 0 0 0 0 0 0 0 0 0 300 0 0 0 0 0 0 0 142 0 0 0 0 0 180 996
R 2863 330 0 1199 0 0 0 0 0 0 0 5239 0 0 0 0 1540 285 0 418 0 0 0 0 0 3448 15322
Saptari N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 210 210
R 0 0 0 160 0 0 0 0 0 0 0 4330 0 0 0 0 720 0 0 0 0 0 0 0 0 455 5665
Siraha N 0 0 0 0 0 0 0 0 0 0 0 200 0 0 0 0 0 0 0 0 0 0 0 0 0 883 1083
R 57 0 0 0 0 600 0 0 0 0 0 2259 0 0 0 0 2680 0 0 0 0 0 0 0 0 554 6150
Sunsari N 0 0 0 0 0 0 0 0 0 0 0 110 0 0 0 0 0 0 0 0 0 0 0 0 0 0 110
R 633 150 0 200 0 600 0 0 0 0 0 3450 0 0 0 0 880 0 0 167 0 0 0 0 0 2091 8171
Eastern Terai N 1153 0 0 0 0 0 0 0 0 0 0 2635 0 0 0 0 0 200 0 530 0 0 0 0 0 2363 6881
R 5521 480 0 1684 0 1380 0 0 0 0 0 19783 0 0 0 200 5820 285 0 585 0 1000 0 0 0 7123 43861
Eastern Region Hill Ecological Belt

Bhojpur N 0 0 0 0 0 200 0 0 0 0 0 260 0 0 0 0 0 0 0 0 0 0 0 0 0 350 810


R 0 0 0 385 0 0 0 0 0 0 0 200 0 280 0 0 0 0 0 0 0 25 0 0 20 216 1126
Dhankuta N 0 0 0 0 0 70 0 0 0 0 0 256 0 94 0 0 0 0 0 0 0 0 0 0 0 405 825
R 175 0 0 689 0 0 0 0 0 0 0 340 0 229 0 0 0 115 0 0 0 0 0 0 40 398 1986
Ilam N 26 0 0 0 0 0 0 0 0 0 0 645 0 0 60 0 0 0 0 0 0 0 0 0 0 650 1381
R 4 0 0 205 0 0 0 0 0 0 0 1064 0 0 870 0 0 0 220 0 0 0 0 0 0 795 3158
Khotang N 15 0 0 0 0 518 0 0 0 0 0 285 0 0 0 0 0 0 0 0 0 0 0 0 0 315 1133
R 0 0 0 335 0 0 0 0 0 0 0 809 0 0 0 50 0 70 60 0 0 0 0 0 30 410 1764
Okhaldhunga N 169 0 0 0 0 29 0 0 0 0 0 55 0 0 0 0 0 0 0 0 0 0 0 0 0 599 852
R 57 0 0 386 0 0 0 0 0 0 0 389 0 0 0 0 0 0 150 0 0 0 0 0 0 205 1187
Panchthar N 18 0 0 0 0 150 0 0 0 0 0 230 0 0 33 0 0 0 0 0 0 0 0 0 0 525 956
R 31 0 0 50 0 0 0 0 0 0 0 714 0 0 634 0 0 0 0 0 0 0 0 0 0 324 1753
Terathum N 0 0 0 0 0 225 0 0 0 0 0 320 0 40 0 0 0 0 0 0 0 0 0 0 0 387 972
R 0 0 0 171 0 430 0 0 0 0 0 336 0 360 0 0 0 0 0 0 0 0 0 0 0 195 1492
Udaypur N 14 0 0 0 0 0 0 0 0 0 0 607 0 0 0 0 0 0 0 0 0 0 0 0 0 515 1136
R 40 0 0 389 0 55 0 0 0 0 0 520 0 0 0 0 0 250 0 0 0 0 0 0 0 459 1713
Eastern Hill N 242 0 0 0 0 1192 0 0 0 0 0 2658 0 134 93 0 0 0 0 0 0 0 0 0 0 3746 8065
R 307 0 0 2610 0 485 0 0 0 0 0 4372 0 869 1504 50 0 435 430 0 0 25 0 0 90 3002 14179
Eastern Region Mountain Ecological Belt

Sankhuwasabha N 30 0 0 0 0 0 0 0 0 0 0 91 0 60 0 0 0 0 0 0 0 0 0 0 0 285 466


R 63 0 0 537 0 0 0 0 0 0 0 588 0 340 0 0 0 0 0 0 0 0 0 0 0 349 1877
Solukhumbu N 0 0 0 0 0 0 0 0 0 0 0 40 0 0 0 0 0 0 0 0 0 0 0 0 0 124 164
R 0 0 0 320 0 0 0 0 0 0 0 522 0 0 0 0 0 0 0 0 0 0 0 0 0 135 977
Taplejung N 0 0 0 0 0 0 0 0 0 0 0 370 0 0 0 0 0 0 0 0 0 0 0 0 0 857 1227
R 0 0 0 0 0 0 0 0 0 0 0 360 0 0 929 0 0 0 0 0 0 0 0 0 0 165 1454
Eastern Mountain N 30 0 0 0 0 0 0 0 0 0 0 501 0 60 0 0 0 0 0 0 0 0 0 0 0 1266 1857
R 63 0 0 857 0 0 0 0 0 0 0 1470 0 340 929 0 0 0 0 0 0 0 0 0 0 649 4308
Eastern Region N 1425 0 0 0 0 1192 0 0 0 0 0 5794 0 194 93 0 0 200 0 530 0 0 0 0 0 7375 16803
R 5891 480 0 5151 0 1865 0 0 0 0 0 25625 0 1209 2433 250 5820 720 430 585 0 1025 0 0 90 10774 62348

157
TABLE 4
Summary of total command area of Surface Farmer Managed
SINKA-
District TYPE ADB/N AGRIL DIDP DOI ERIP FIWUD GADP GTZ HFP IDP ILC ISP K-BIRD KHILL M/HILL MAIN MIN MIP MPLD N CARE NISP PEOPLE SI LAMA SIP SISP Total
Central Development Region
Central Region Terai Ecological Belt
Bara N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 0 0 0 1650 0 0 0 0 0 0 0 2271 0 0 0 0 2570 0 0 0 0 0 0 0 520 2809 9820
Chitwan N 264 0 0 0 0 0 0 0 0 0 0 265 0 0 0 0 0 0 0 450 0 0 0 0 0 30 1009
R 202 0 0 1100 8155 1710 0 0 0 0 0 2219 0 0 0 0 450 0 0 0 0 0 0 0 100 429 14365
Dhanusha N 0 0 0 375 0 0 0 0 0 0 0 400 0 0 0 0 200 0 0 500 0 0 0 0 0 0 1475
R 130 0 0 0 0 4305 0 0 0 0 0 400 0 0 0 0 0 0 0 70 0 0 0 0 153 642 5700
Mahottari N 0 0 0 0 0 750 0 0 0 0 0 0 0 0 0 0 0 0 0 138 0 0 0 0 0 0 888
R 0 0 0 500 0 0 0 0 0 0 0 1285 0 0 0 0 0 0 0 1248 0 0 0 0 165 605 3803
Parsa N 42 0 0 0 0 90 0 0 0 0 0 150 0 0 0 0 0 0 0 0 0 0 0 0 0 0 282
R 208 0 0 430 0 0 0 0 0 0 0 2143 0 0 0 0 1070 0 0 0 0 0 0 0 0 1141 4992
Rautahat N 0 0 0 0 0 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8
R 0 0 0 50 0 0 0 0 0 0 0 2567 0 0 0 0 3056 305 0 0 0 0 0 0 140 200 6318
Sarlahi N 0 0 0 0 0 2500 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2500
R 740 0 0 350 0 0 0 0 0 0 0 1751 0 0 0 0 40 0 0 400 0 0 0 0 300 2001 5582
Central Terai N 306 0 0 375 0 3348 0 0 0 0 0 815 0 0 0 0 200 0 0 1088 0 0 0 0 0 30 6162
R 1280 0 0 4080 8155 6015 0 0 0 0 0 12636 0 0 0 0 7186 305 0 1718 0 0 0 0 1378 7827 50580
Central Region Hill Ecological Belt

Bhaktapur N 0 0 0 0 0 33 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 148 181


R 0 0 0 25 0 0 0 0 0 0 0 908 0 0 0 0 1150 0 0 0 0 0 0 0 23 794 2900
Dhading N 326 0 0 0 0 0 0 185 0 0 0 290 0 0 0 0 0 186 0 0 0 0 0 0 0 849 1836
R 778 0 0 20 0 100 0 0 0 0 0 312 0 0 0 12 0 25 200 0 0 0 0 0 114 621 2182
Kathmandu N 25 0 0 0 0 250 0 0 0 0 0 461 0 0 0 0 0 0 0 0 0 0 0 0 0 0 736
R 20 0 0 243 0 0 0 0 0 0 0 797 0 0 0 0 160 0 0 0 0 0 0 0 0 606 1826
Kavre N 84 0 0 0 0 135 0 0 0 0 0 253 0 0 0 0 0 300 0 40 0 0 0 0 0 124 936
R 216 0 0 67 0 0 0 0 0 0 0 771 0 0 0 0 0 125 0 306 0 0 0 1150 0 198 2833
Lalitpur N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 0 0 0 208 0 0 0 0 0 0 0 1543 0 0 0 0 905 0 0 0 0 0 0 55 0 756 3467
Makawanpur N 0 0 0 50 0 0 0 0 0 0 0 369 0 0 0 0 0 55 0 62 0 0 0 0 0 395 931
R 25 0 0 165 0 0 0 0 0 0 0 767 0 0 0 0 0 100 0 39 0 0 0 520 200 277 2093
Nuwakot N 5 0 0 0 0 920 0 0 0 0 0 470 0 0 0 0 0 0 0 105 0 0 0 0 0 351 1851
R 466 0 0 165 0 0 0 0 0 0 0 839 0 0 0 0 240 0 0 226 0 0 0 0 295 740 2971
Ramechap N 90 0 0 0 0 424 0 0 0 0 0 480 0 0 0 0 0 0 0 0 0 0 0 0 0 270 1264
R 72 0 0 197 0 54 0 0 0 0 0 813 0 0 0 50 0 0 40 0 0 0 0 0 107 355 1688
Sindhuli N 68 0 0 0 0 414 0 0 0 0 0 610 0 0 0 0 0 0 0 0 0 0 0 0 0 272 1364
R 25 0 0 610 0 236 0 0 0 0 0 270 0 0 0 0 0 20 0 0 0 0 0 0 400 620 2181
Central Hill N 598 0 0 50 0 2176 0 185 0 0 0 2933 0 0 0 0 0 541 0 207 0 0 0 0 0 2409 9099
R 1602 0 0 1700 0 390 0 0 0 0 0 7020 0 0 0 62 2455 270 240 571 0 0 0 1725 1139 4967 22141
Central Region Mountain Ecological Belt

Dolakha N 0 0 0 0 0 0 0 0 0 0 0 923 0 0 0 0 0 0 0 0 0 0 0 0 0 204 1127


R 372 0 0 240 0 20 0 0 0 0 0 515 0 0 0 0 0 150 0 0 0 0 0 0 0 167 1464
Rasuwa N 0 0 0 0 0 30 0 0 0 0 0 294 0 0 0 0 0 0 0 0 0 0 0 0 0 215 539
R 0 0 0 0 0 0 0 0 0 0 0 160 0 0 0 0 0 0 0 0 0 0 0 0 0 251 411

158
TABLE 4
Summary of total command area of Surface Farmer Managed
SINKA-
District TYPE ADB/N AGRIL DIDP DOI ERIP FIWUD GADP GTZ HFP IDP ILC ISP K-BIRD KHILL M/HILL MAIN MIN MIP MPLD N CARE NISP PEOPLE SI LAMA SIP SISP Total
Sindhupalchowk N 49 0 0 0 0 100 0 0 0 0 0 452 0 0 0 0 0 0 0 0 0 0 0 0 0 1233 1834
R 42 0 0 575 0 0 0 0 0 0 0 415 0 0 0 0 0 0 20 0 0 0 0 1298 60 607 3017
Central Mountain N 49 0 0 0 0 130 0 0 0 0 0 1669 0 0 0 0 0 0 0 0 0 0 0 0 0 1652 3500
R 414 0 0 815 0 20 0 0 0 0 0 1090 0 0 0 0 0 150 20 0 0 0 0 1298 60 1025 4892
Central Region N 953 0 0 425 0 5654 0 185 0 0 0 5417 0 0 0 0 200 541 0 1295 0 0 0 0 0 4091 18761
R 3296 0 0 6595 8155 6425 0 0 0 0 0 20746 0 0 0 62 9641 725 260 2289 0 0 0 3023 2577 13819 77613
Western Development Region
Western Region Terai Ecological Belt
Kapilvastu N 187 0 0 150 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 337
R 0 0 0 496 0 150 0 0 0 0 3750 0 0 0 0 0 1400 0 0 0 1994 0 0 0 202 0 7992
Nawalparasi N 91 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 191
R 554 0 0 305 0 0 0 0 0 0 2186 0 0 0 0 200 280 0 0 0 3044 0 0 0 201 0 6770
Rupandehi N 15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15
R 662 0 0 1730 0 220 0 0 0 0 1550 0 0 0 0 200 6200 612 0 0 4234 1600 0 0 134 0 17142
Western Terai N 293 0 0 150 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 543
R 1216 0 0 2531 0 370 0 0 0 0 7486 0 0 0 0 400 7880 612 0 0 9272 1600 0 0 537 0 31904
Western Region Hill Ecological Belt

Arghakhanchi N 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 50
R 13 0 0 114 0 106 0 0 0 0 924 0 0 0 0 0 0 0 80 0 495 0 0 0 0 0 1732
Baglung N 9 0 224 0 0 60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 293
R 33 0 282 216 0 85 0 0 0 0 0 0 0 0 0 0 60 0 0 0 547 0 0 0 55 0 1278
Gorkha N 147 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 147
R 137 0 0 0 0 0 0 0 368 0 1341 0 0 0 0 50 0 0 0 94 545 0 0 0 0 0 2535
Gulmi N 67 0 0 0 0 44 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 111
R 37 0 0 143 0 0 0 0 0 0 726 0 0 0 0 0 0 0 190 0 617 0 0 0 200 0 1913
Kaski N 36 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 36
R 40 0 0 257 0 0 0 0 0 0 1128 0 0 0 0 0 0 0 310 0 1144 0 0 0 0 0 2879
Lamjung N 0 0 0 0 0 0 95 0 0 0 0 0 0 0 0 0 0 0 0 12 0 0 0 0 0 0 107
R 15 60 200 0 0 0 0 513 0 1559 0 0 0 0 50 144 0 0 0 1447 0 0 0 0 0 3988
Myagdi N 0 0 160 0 0 25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 185
R 13 0 305 496 0 150 0 0 0 0 0 0 0 0 0 0 20 0 0 0 370 0 0 0 0 0 1354
Palpa N 0 0 0 0 0 14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14
R 80 0 0 490 0 15 0 0 0 0 0 0 0 0 0 0 0 150 35 0 1279 0 0 0 87 0 2136
Parbat N 0 0 80 0 0 120 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 200
R 54 0 476 187 0 298 0 0 0 0 699 0 0 0 0 0 0 105 0 0 696 78 0 0 150 0 2743
Syangja N 7 0 0 0 0 0 15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22
R 52 0 0 0 0 0 0 0 579 0 1293 0 0 0 0 0 0 0 120 0 1945 0 0 0 0 0 3989
Tanahu N 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20
R 28 0 0 51 0 0 10 0 281 0 1098 0 0 0 0 30 0 0 0 0 1160 0 0 0 0 0 2658
Western Hill N 336 0 464 0 0 263 110 0 0 0 0 0 0 0 0 0 0 0 0 12 0 0 0 0 0 0 1185
R 502 60 1063 2154 0 654 10 0 1741 0 8768 0 0 0 0 130 224 255 735 94 10245 78 0 0 492 0 27205
Western Region Mountain Ecological Belt

Manang N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 0 0 0 87 0 0 0 0 0 0 140 0 0 0 0 0 0 0 0 0 121 0 0 0 0 0 348
Mustang N 0 0 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55
R 21 0 597 73 0 0 0 0 0 0 0 0 0 0 0 85 0 0 0 0 239 0 0 0 0 0 1015
Western Mountain N 0 0 55 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55
R 21 0 597 160 0 0 0 0 0 0 140 0 0 0 0 85 0 0 0 0 360 0 0 0 0 0 1363

159
TABLE 4
Summary of total command area of Surface Farmer Managed
SINKA-
District TYPE ADB/N AGRIL DIDP DOI ERIP FIWUD GADP GTZ HFP IDP ILC ISP K-BIRD KHILL M/HILL MAIN MIN MIP MPLD N CARE NISP PEOPLE SI LAMA SIP SISP Total
Western Region N 629 0 519 150 0 363 110 0 0 0 0 0 0 0 0 0 0 0 0 12 0 0 0 0 0 0 1783
R 1739 60 1660 4845 0 1024 10 0 1741 0 16394 0 0 0 0 615 8104 867 735 94 19877 1678 0 0 1029 0 60472
Mid-Western Development Region
Mid-Western Region Terai Ecological Belt
Banke N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 0 0 0 20 0 60 0 0 0 2580 935 0 0 0 0 0 400 0 0 0 465 0 0 0 0 0 4460
Bardiya N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 213 0 0 22170 0 0 0 0 0 0 1300 0 0 0 0 0 80 0 0 0 6095 0 2060 0 0 0 31918
Dang N 192 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 192
R 1610 0 0 7813 0 0 0 0 0 0 2084 0 0 0 0 1040 500 500 0 0 4247 0 166 0 0 0 17960
Mid-Western Terai N 192 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 192
R 1823 0 0 30003 0 60 0 0 0 2580 4319 0 0 0 0 1040 980 500 0 0 10807 0 2226 0 0 0 54338
Mid-Western Region Hill Ecological Belt

Dailekh N 0 0 0 46 0 0 0 0 0 0 0 0 15 0 0 0 0 0 0 0 0 0 0 0 0 0 61
R 0 0 0 130 0 0 0 0 0 271 80 0 104 0 0 0 0 0 0 0 255 0 0 0 0 0 840
Jajarkot N 0 0 0 0 0 150 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 150
R 40 0 0 219 0 0 0 0 0 0 225 0 0 0 0 0 0 0 0 0 320 0 0 0 145 0 949
Pyuthan N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 255 60 11 0 0 0 0 0 0 395 0 0 0 0 0 0 70 0 0 466 0 0 0 0 0 1257
Rolpa N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 58 0 0 229 0 60 0 0 0 0 275 0 0 0 0 0 0 0 0 0 308 0 0 0 81 0 1011
Rukum N 0 0 0 0 0 15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15
R 0 0 0 125 0 40 0 0 0 0 110 0 0 0 0 0 0 0 0 0 949 0 0 0 120 0 1344
Salyan N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 119 0 0 75 0 81 0 0 0 0 226 0 0 0 0 0 20 80 0 0 715 0 0 0 40 0 1356
Surkhet N 19 0 0 0 0 0 0 0 0 0 0 0 494 0 0 0 0 0 0 0 0 0 0 0 0 0 513
R 41 0 0 254 0 0 0 0 0 347 1013 0 615 0 0 0 0 150 0 0 2040 0 115 0 45 0 4620
Mid-Western Hill N 19 0 0 46 0 165 0 0 0 0 0 0 509 0 0 0 0 0 0 0 0 0 0 0 0 0 739
R 513 60 0 1043 0 181 0 0 0 618 2324 0 719 0 0 0 20 300 0 0 5053 0 115 0 431 0 11377
Mid-Western Region Mountain Ecological Belt

Dolpa N 0 0 0 70 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 77
R 0 0 0 297 0 0 0 0 0 0 22 0 0 0 0 0 0 0 0 0 215 0 0 0 0 0 534
Humla N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 0 0 0 86 0 0 0 0 0 0 20 0 0 0 0 0 0 0 0 0 337 0 132 0 0 0 575
Jumla N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 0 0 0 35 0 0 0 0 0 0 0 0 175 0 0 0 0 135 0 0 179 0 50 0 14 0 588
Kalikot N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 0 0 0 153 0 655 0 0 0 485 0 0 0 0 0 0 0 0 0 0 190 0 0 0 0 0 1483
Mugu N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 0 0 0 25 0 0 0 0 0 0 60 0 0 0 0 0 0 0 0 0 145 0 5 0 0 0 235
Mid-Western Mountain N 0 0 0 70 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 77
R 0 0 0 596 0 655 0 0 0 485 102 0 175 0 0 0 0 135 0 0 1066 0 187 0 14 0 3415
Mid-Western Region N 211 0 0 116 0 172 0 0 0 0 0 0 509 0 0 0 0 0 0 0 0 0 0 0 0 0 1008
R 2336 60 0 31642 0 896 0 0 0 3683 6745 0 894 0 0 1040 1000 935 0 0 16926 0 2528 0 445 0 69130

160
TABLE 4
Summary of total command area of Surface Farmer Managed
SINKA-
District TYPE ADB/N AGRIL DIDP DOI ERIP FIWUD GADP GTZ HFP IDP ILC ISP K-BIRD KHILL M/HILL MAIN MIN MIP MPLD N CARE NISP PEOPLE SI LAMA SIP SISP Total
Far-Western Development Region
Far-Western Region Terai Ecological Belt
Kailali N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 60 0 0 2850 0 250 0 0 0 0 3340 0 0 0 0 0 4650 0 0 0 1619 0 40 0 525 0 13334
Kanchanpur N 103 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 103
R 35 0 0 0 0 0 0 0 0 0 500 0 0 0 0 0 720 0 0 0 2034 0 0 0 325 0 3614
Far-Western Terai N 103 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 103
R 95 0 0 2850 0 250 0 0 0 0 3840 0 0 0 0 0 5370 0 0 0 3653 0 40 0 850 0 16948
Far-Western Region Hill Ecological Belt

Achham N 133 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 133


R 0 0 0 95 0 128 0 0 0 0 445 0 0 0 0 0 0 0 82 0 467 0 0 0 50 0 1267
Baitadi N 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 30
R 25 0 0 160 0 210 0 0 0 0 275 0 0 0 0 150 0 85 205 0 1096 0 0 0 0 0 2206
Dadeldhura N 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7
R 17 0 0 0 0 0 0 0 0 0 605 0 0 0 0 0 0 0 427 0 1226 0 0 0 455 0 2730
Doti N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 0 0 0 60 0 245 0 0 0 0 0 0 0 0 0 0 0 120 497 0 1047 0 0 0 0 0 1969
Far-Western Hill N 170 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 170
R 42 0 0 315 0 583 0 0 0 0 1325 0 0 0 0 150 0 205 1211 0 3836 0 0 0 505 0 8172
Far-Western Region Mountain Ecological Belt

Bajhang N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 0 0 0 0 0 25 0 0 0 0 326 0 0 0 0 0 0 0 293 0 405 0 0 0 0 0 1049
Bajura N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
R 0 0 0 0 0 0 0 0 0 0 165 0 0 0 0 0 0 0 65 0 425 0 0 0 0 0 655
Darchula N 22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22
R 0 0 0 95 0 0 0 0 0 0 382 0 0 0 0 0 0 105 115 0 1581 0 0 0 0 0 2278
Far-Western Mountain N 22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22
R 0 0 0 95 0 25 0 0 0 0 873 0 0 0 0 0 0 105 473 0 2411 0 0 0 0 0 3982
Far-Western Region N 295 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 295
R 137 0 0 3260 0 858 0 0 0 0 6038 0 0 0 0 150 5370 310 1684 0 9900 0 40 0 1355 0 29102
Total N 3513 0 519 691 0 7381 110 185 0 0 0 11211 509 194 93 0 200 741 0 1837 0 0 0 0 0 11466 38650
R 13399 600 1660 51493 8155 11068 10 0 1741 3683 29177 46371 894 1209 2433 2117 29935 3557 3109 2968 46703 2703 2568 3023 5496 24593 298665

161
TABLE 5
Status of Shallow Tubewell in Nepal up-to 2005/06

Baisebichhuwa I.P.(DON)
Tubewell Project (IFAD)

Agricultral Development
Irrigation Line of Credit

APP (SAPL/ADB/GON)
Nepal Irrigation Sector
Tubewell I.P. (USAID)

Sagarmath Integrated

Satbariya I.P. (DON)


Project (ADB/IFAD)

Community Shallow
Kailali Kanchanpur

Rural Development

Mohana I.P. (ADB)

Project, Janakpur
2037 - 2040 BS
CGISP (ADB)

2043 -2044 BS
Project (IDA)
2036-2042 BS

Grand Total
1997 - 2015

2054- 2056

DOI Total
1993-1998

1995-2000

1996-2007
1973-1976

1998-2004

ADBN
(IDA)
District

No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha
Jhapa 253 759 1175 4112.5 1428 4871.5 4268 15923 5696 20794.5
Morang 428 1284 749 2621.5 1177 3905.5 4845 18250 6022 22155.5
Sunsari 139 941 13 39 588 2058 740 3038 4822 18574 5562 21612
Udaypur 130 650 0 0 130 650 8 24 138 674
Saptari 1140 5700 178 1211 111 278 206 721 1635 7910 1349 3477 2984 11387
Siraha 1055 5275 158 1083 279 698 151 528.5 1643 7584.5 1453 5579 3096 13163.5
Dhanusa 162 404 404 1414 566 1818 787 5509 1299 4115 2652 11442
Mahottari 100 250 582 2037 682 2287 545 3815 450 1537 1677 7639
Sarlahi 118 782 156 390 637 2229.5 911 3401.5 1255 8785 1106 3928 3272 16114.5
Rautahat 122 838 304 760 654 2289 1080 3887 2 14 2975 9437 4057 13338
Bara 3 14 294 735 996 3486 1293 4235 5430 17074 6723 21309
Parsa 1 4 128 320 656 2296 785 2620 825 2448 1610 5068
Chitwan 197 493 202 707 399 1200 2 14 604 1799 1005 3013
Nawalparasi 25 150 420 1054 445 1204 1513 4879 1958 6083
Rupandehi 271 678 271 678 4022 14234 4293 14912
Kapilvastu 50 300 2 12 86 215 138 527 646 2269 784 2796
Dang 21 217 8 56 169 378 15 220 213 871 541 1977 754 2848
Banke 175 433 175 433 2553 7740 2728 8173
Bardiya 158 395 158 395 2379 7440 2537 7835
Kailali 50 200 18 180 27 280 290 1220 15 37 400 1917 6109 16807 6509 18724
Kanchanpur 32 128 101 253 25 150 158 531 3476 10388 3634 10919
Makwanpur 0 0 2 14 10 39 12 53
Sindhuli 0 0 1 4 1 4
Tanahu 0 0 1 1 1 1
Total 82 328 2325 11625 114 847 715 4855 41 366 4095 11036 7000 24500 15 220 25 150 15 37 14427 53964 2593 18151 50685 167943 67705 240058

162
TABLE 6
Status of Deep Tubewell in Nepal up-to 2005/06

Narayani Zone Irrigation

Agricultral Development
Irrigation Line of Credit

APP (SAPL/ADB/GON)

Aparesota (Bargadawa)
Irrigation Development

Nepal Irrigation Sector


Ground Water Project
Tubewell I.P. (USAID)

Sagarmath Integrated
Bhairahawa Lumbani

Seti Integrated Rural

Rahat DTW (INDIA)


Development Project
Project (ADB/IFAD)
Kailali Kanchanpur

19976-78 & 1984-89


Develoment Project
Rural Development

Kapilvastu Nalkup
(GoN)

Mahottari Nalkup

Project, Janakpur
(IDA) 1973 - 2000

(ADB) 1986-1996

GoN 2045 - 2049


Project (GoN)

(India & WB)


Project (IDA)
2036-2042 BS

Project (EU)

1997 - 2015
2038 - 2049

2039 - 2045

Total DOI
1993-1998
1973-1976

1998-2004

1998-2004

2003-2008
(IDA)
District

Total

Project
No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha No ha
Jhapa 4 180 2 60 6 240 6 240
Morang 6 270 6 270 6 270
Sunsari 1 40 1 40 1 40
Udaypur 0 0 0 0
Saptari 3 80 3 80 3 80
Siraha 12 470 7 150 19 620 19 620
Dhanusa 0 0 62 2790 62 2790
Mahottari 49 773 6 200 55 973 7 315 62 1288
Sarlahi 3 50 3 50 12 540 15 590
Rautahat 1 40 1 40 1 40
Bara 2 80 1 40 28 500 31 620 31 620
Parsa 2 48 2 48 2 48
Chitwan 7 280 7 280 7 280
Nawalparasi 28 700 16 460 44 1160 44 1160
Rupandehi 169 20309 25 600 194 20909 194 20909
Kapilvastu 3 60 46 1130 11 330 2 80 62 1600 62 1600
Dang 9 385 30 1150 3 70 3 70 45 1675 45 1675
Banke 10 480 17 680 24 940 7 280 58 2380 58 2380
Bardiya 9 360 6 240 15 600 15 600
Kailali 7 140 29 1100 10 400 3 120 2 80 51 1840 51 1840
Kanchanpur 3 70 24 960 27 1030 27 1030
Makwanpur 0 0 0 0
Sindhuli 0 0 0 0
Tanahu 0 0 0 0
Total 10 210 169 20309 15 550 3 60 52 823 29 1100 112 3455 17 680 143 4928 46 1670 28 500 3 100 3 70 630 34455 81 3645 711 38100

163
TABLE 7
Present Level of Irrigation Development
SURFACE FMIS
AGENCIES ASSITED GRONDWATER NON- TOTAL
OVERALL TOTAL DOI TOTAL
DISTRICT NON- TOTAL CONVENT IRRIGATED
TOTAL IRRIGABLE SURFACE SURFACE
ASSITED FMIS IONAL AREA (HA)
NEW REH STW DTW TOTAL

Eastern Development Region


Eastern Region Terai Ecological Belt
Jhapa 109529 109530 4482 8553 46951 59986 8000 67986 20794.5 240 21034.5 1153 90174
Morang 102938 99959 996 15322 17068 33386 33500 66886 22155.5 270 22425.5 440 89752
Saptari 76949 76950 210 5665 1863 7738 36425 44163 11387 80 11467 168 55798
Siraha 77726 77726 1083 6150 3186 10419 14815 25234 13163.5 620 13783.5 89 39107
Sunsari 71757 70629 110 8171 557 8838 34500 43338 21612 40 21652 167 65157
Eastern Terai 438899 434794 6881 43861 69625 120367 127240 247607 89112.5 1250 90362.5 2017 339987
Eastern Region Hill Ecological Belt 0
Bhojpur 34676 6820 810 1126 361 2297 0 2297 0 0 0 210 2507
Dhankuta 26797 7495 825 1986 2228 5039 0 5039 0 0 0 205 5244
Ilam 36405 12742 1381 3158 975 5514 0 5514 0 0 0 1338 6852
Khotang 37950 8859 1133 1764 1750 4647 200 4847 0 0 0 33 4880
Okhaldhunga 24151 4478 852 1187 1311 3350 240 3590 0 0 0 9 3599
Panchthar 32252 7241 956 1753 5337 8046 0 8046 0 0 0 647 8693
Terathum 21662 6282 972 1492 2253 4717 0 4717 0 0 0 215 4932
Udaypur 30773 18408 1136 1713 7969 10818 390 11208 674 0 674 91 11973
Eastern Hill 244666 72325 8065 14179 22184 44428 830 45258 674 0 674 2748 48680
Eastern Region Mountain Ecological Belt 0
Sankhuwasabha 25972 5170 466 1877 3818 6161 0 6161 0 0 0 176 6337
Solukhumbu 17734 2038 164 977 2712 3853 0 3853 0 0 0 29 3882
Taplejung 22102 7443 1227 1454 4586 7267 0 7267 0 0 0 491 7758
Eastern Mountain 65808 14651 1857 4308 11116 17281 0 17281 0 0 0 696 17977
Eastern Region 749373 521770 16803 62348 102925 182076 128070 310146 89786.5 1250 91036.5 5461 406643.5
Central Development Region 0
Central Region Terai Ecological Belt 0
Bara 61766 60390 0 9820 8802 18622 13720 32342 21309 620 21929 54 54325
Chitwan 44537 41963 1009 14365 0 15374 10900 26274 3013 280 3293 56 29623
Dhanusha 72925 72925 1475 5700 8457 15632 14500 30132 11442 2790 14232 707 45071
Mahottari 60649 60633 888 3803 22253 26944 0 26944 7639 1288 8927 781 36652
Parsa 48374 48374 282 4992 2356 7630 16180 23810 5068 48 5116 128 29054
Rautahat 56390 56141 8 6318 1249 7575 33200 40775 13338 40 13378 55 54208
Sarlahi 73710 73521 2500 5582 15478 23560 28400 51960 16114.5 590 16704.5 73 68738
Central Terai 418351 413947 6162 50580 58595 115337 116900 232237 77923.5 5656 83579.5 1854 317671
Central Region Hill Ecological Belt 0
Bhaktapur 7223 6274 181 2900 0 3081 1205 4286 0 0 0 33 4319
Dhading 36190 10839 1836 2182 3006 7024 360 7384 0 0 0 291 7675
Kathmandu 17104 14069 736 1826 0 2562 2130 4692 0 0 0 437 5129
Kavre 29921 7958 936 2833 402 4171 0 4171 0 0 0 207 4378
Lalitpur 11068 7425 0 3467 0 3467 1410 4877 0 0 0 47 4924
Makawanpur 35776 23502 931 2093 222 3246 0 3246 53 0 53 34 3333
Nuwakot 31783 15047 1851 2971 380 5202 1172 6374 0 0 0 33 6407
Ramechap 32276 4248 1264 1688 2434 5386 0 5386 0 0 0 1 5387
Sindhuli 34333 20652 1364 2181 7119 10664 60 10724 4 0 4 0 10728
Central Hill 235674 110014 9099 22141 13563 44803 6337 51140 57 0 57 1083 52280
Central Region Mountain Ecological Belt 0
Dolakha 24042 4911 1127 1464 2311 4902 175 5077 0 0 0 124 5201
Rasuwa 5201 836 539 411 675 1625 0 1625 0 0 0 8 1633
Sindhupalchowk 33820 12276 1834 3017 3069 7920 0 7920 0 0 0 84 8004
Central Mountain 63063 18023 3500 4892 6055 14447 175 14622 0 0 0 216 14838
Central Region 717088 541984 18761 77613 78213 174587 123412 297999 77980.5 5656 83636.5 3153 384788.5
Western Development Region 0
Western Region Terai Ecological Belt 0
Kapilvastu 84785 84453 337 7992 12412 20741 6900 27641 2796 1600 4396 71 32108
Nawalparasi 55238 50690 191 6770 12220 19181 13830 33011 6083 1160 7243 79 40333
Rupandehi 88416 87979 15 17142 18437 35594 7300 42894 14912 20909 35821 173 78888
Western Terai 228439 223122 543 31904 43069 75516 28030 103546 23791 23669 47460 322.88 151329
Western Region Hill Ecological Belt 0
Arghakhanchi 20020 4799 50 1732 654 2436 0 2436 0 0 0 415 2851
Baglung 26522 7780 293 1278 190 1761 0 1761 0 0 0 149 1910
Gorkha 33914 11027 147 2535 711 3393 489 3882 0 0 0 118 4000
Gulmi 25606 4240 111 1913 0 2024 160 2184 0 0 0 370 2554
Kaski 31405 15960 36 2879 4044 6959 3740 10699 0 0 0 89 10788
Lamjung 23848 11937 107 3988 0 4095 714 4809 0 0 0 128 4937
Myagdi 15740 3685 185 1354 98 1637 0 1637 0 0 0 90 1727
Palpa 30354 8857 14 2136 1231 3381 282 3663 0 0 0 333 3996
Parbat 15231 6455 200 2743 118 3061 425 3486 0 0 0 49 3535
Syangja 31018 9848 22 3989 0 4011 0 4011 0 0 0 45 4056
Tanahu 33972 14496 20 2658 0 2678 790 3468 1 1 174 3643
Western Hill 287630 99084 1185 27205 7046 35436 6600 42036 1 0 1 1960.35 43997
Western Region Mountain Ecological Belt 0
Manang 718 121 0 348 0 348 0 348 0 0 0 0 348
Mustang 4221 159 55 1015 263 1333 51 1384 0 0 0 2 1386

164
TABLE 7
Present Level of Irrigation Development
SURFACE FMIS
AGENCIES ASSITED GRONDWATER NON- TOTAL
OVERALL TOTAL DOI TOTAL
DISTRICT NON- TOTAL CONVENT IRRIGATED
TOTAL IRRIGABLE SURFACE SURFACE
ASSITED FMIS IONAL AREA (HA)
NEW REH STW DTW TOTAL

Western Mountain 4939 280 55 1363 263 1681 51 1732 0 0 0 2 1734


Western Region 521008 322486 1783 60472 50378 112633 34681 147314 23792 23669 47461 2285.23 197060.23
Mid-Western Development Region 0
Mid-Western Region Terai Ecological Belt 0
Banke 49525 48550 0 4460 1669 6129 1250 7379 8173 2380 10553 320 18252
Bardiya 52836 52660 0 31918 0 31918 960 32878 7835 600 8435 152 41465
Dang 64522 59505 192 17960 13756 31908 2585 34493 2848 1675 4523 288 39304
Mid-Western Terai 166883 160715 192 54338 15425 69955 4795 74750 18856 4655 23511 760 99021
Mid-Western Region Hill Ecological Belt 0
Dailekh 28373 7075 61 840 1957 2858 0 2858 0 0 0 27 2885
Jajarkot 21114 4143 150 949 350 1449 0 1449 0 0 0 10 1459
Pyuthan 23197 7037 0 1257 2476 3733 340 4073 0 0 0 9 4082
Rolpa 29651 3980 0 1011 0 1011 0 1011 0 0 0 36 1047
Rukum 23592 4170 15 1344 41 1400 600 2000 0 0 0 37 2037
Salyan 28033 5282 0 1356 1440 2796 0 2796 0 0 0 40 2836
Surkhet 31231 19275 513 4620 5242 10375 387 10762 0 0 0 125 10887
Mid-Western Hill 185191 50962 739 11377 11506 23622 1327 24949 0 0 0 283.95 25233
Mid-Western Region Mountain Ecological Belt 0
Dolpa 4996 544 77 534 546 1157 0 1157 0 0 0 21 1178
Humla 4983 969 0 575 0 575 0 575 0 0 0 7 582
Jumla 12642 4765 0 588 1006 1594 0 1594 0 0 0 13 1607
Kalikot 13126 3084 0 1483 240 1723 0 1723 0 0 0 4 1727
Mugu 9616 2030 0 235 735 970 0 970 0 0 0 0 970
Mid-Western Mountain 45363 11392 77 3415 2527 6019 0 6019 0 0 0 45 6064
Mid-Western Region 397437 223069 1008 69130 29458 99596 6122 105718 18856 4655 23511 1088.95 130318
Far-Western Development Region 0
Far-Western Region Terai Ecological Belt 0
Kailali 66723 64112 0 13334 15688 29022 7133 36155 18724 1840 20564 263 56982
Kanchanpur 40970 40891 103 3614 2270 5987 11600 17587 10919 1030 11949 472 30008
Far-Western Terai 107693 105003 103 16948 17958 35009 18733 53742 29643 2870 32513 735 86990
Far-Western Region Hill Ecological Belt 0
Achham 31982 10972 133 1267 1099 2499 871 3370 0 0 0 1 3371
Baitadi 25543 7450 30 2206 0 2236 395 2631 0 0 0 223 2854
Dadeldhura 16032 7266 7 2730 0 2737 0 2737 0 0 0 27 2764
Doti 27562 10468 0 1969 554 2523 603 3126 0 0 0 9 3135
Far-Western Hill 101119 36156 170 8172 1653 9995 1869 11864 0 0 0 259.84 12124
Far-Western Region Mountain Ecological Belt 0
Bajhang 22642 7549 0 1049 643 1692 1354 3046 0 0 0 4 3050
Bajura 12181 3584 0 655 3120 3775 280 4055 0 0 0 0 4055
Darchula 13201 4239 22 2278 0 2300 0 2300 0 0 0 24 2324
Far-Western Mountain 48024 15372 22 3982 3763 7767 1634 9401 0 0 0 28 9429
Far-Western Region 256836 156531 295 29102 23374 52771 22236 75007 29643 2870 32513 1022.84 108542.84
Total 2641742 1765840 38650 298665 284348 621663 314521 936184 240058 38100 278158 13011.02 1227353.02

165
TABLE 8
Non Conventional Projects
ADB/N (upto 1996) DOI Upto LILI- CEAPRED VDRC-MIT
Total
District Sprinkler Artesan Rower (2005/06) Helvetas (2005/06) (2005/06)
Ha.
No. Ha. No. Ha. No. Ha. No. Ha. No. Ha. No. Ha. No. Ha.
Eastern Development Region
Eastern Region Terai Ecological Belt
Jhapa 2 1 0 0 2230 1115 2 37 0 0 0 0 0 0 1153
Morang 111 56 0 0 725 363 1 21 0 0 0 0 0 0 440
Saptari 2 1 1 2 330 165 0 0 0 0 0 0 0 0 168
Siraha 0 0 0 0 178 89 0 0 0 0 0 0 0 0 89
Sunsari 40 20 0 0 254 127 1 20 0 0 0 0 0 0 167
Eastern Terai 155 78 1 2 3717 1859 4 78 0 0 0 0 0 0 2017
Eastern Region Hill Ecological Belt
Bhojpur 391 196 0 0 0 0 1 14 0 0 0 0 0 0 210
Dhankuta 300 150 0 0 0 0 4 55 0 0 0 0 0 0 205
Ilam 2647 1324 0 0 0 0 1 14 0 0 0 0 0 0 1338
Khotang 45 23 0 0 0 0 1 10 0 0 0 0 0 0 33
Okhaldhunga 6 3 0 0 0 0 1 6 0 0 0 0 0 0 9
Panchthar 1286 643 0 0 0 0 1 4 0 0 0 0 0 0 647
Terathum 399 200 0 0 0 0 1 15 0 0 0 0 0 0 215
Udaypur 32 16 0 0 88 44 2 31 0 0 0 0 0 0 91
Eastern Hill 5106 2555 0 0 88 44 12 149 0 0 0 0 0 0 2748
Eastern Region Mountain Ecological Belt
Sankhuwasabha 351 176 0 0 0 0 0 0 0 0 0 0 0 0 176
Solukhumbu 58 29 0 0 0 0 0 0 0 0 0 0 0 0 29
Taplejung 981 491 0 0 0 0 0 0 0 0 0 0 0 0 491
Eastern Mountain 1390 696 0 0 0 0 0 0 0 0 0 0 0 0 696
Eastern Region 6651 3329 1 2 3805 1903 16 227 0 0 0 0 0 0 5461
Central Development Region
Central Region Terai Ecological Belt
Bara 0 0 7 14 79 40 0 0 0 0 0 0 0 0 54
Chitwan 33 17 0 0 45 23 2 16 0 0 0 0 0 0 56
Dhanusha 14 7 289 578 244 122 0 0 0 0 0 0 0 0 707
Mahottari 20 10 350 700 142 71 0 0 0 0 0 0 0 0 781
Parsa 62 31 0 0 193 97 0 0 0 0 0 0 0 0 128
Rautahat 0 0 0 0 60 30 1 25 0 0 0 0 0 0 55
Sarlahi 1 1 2 4 115 58 1 10 0 0 0 0 0 0 73
Central Terai 130 66 648 1296 878 441 4 51 0 0 0 0 0 0 1854
Central Region Hill Ecological Belt
Bhaktapur 17 9 0 0 48 24 0 0 0 0 0 0 0 0 33
Dhading 437 219 0 0 0 0 5 72 0 0 0 0 0 0 291
Kathmandu 18 9 0 0 836 418 1 10 0 0 0 0 0 0 437
Kavre 141 71 0 0 1 1 9 135 0 0 0 0 0 0 207
Lalitpur 66 33 0 0 28 14 0 0 0 0 0 0 0 0 47
Makawanpur 22 11 0 0 2 1 1 22 0 0 0 0 0 0 34
Nuwakot 36 18 0 0 0 0 2 15 0 0 0 0 0 0 33
Ramechap 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1
Sindhuli 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Central Hill 738 371 0 0 915 458 18 254 0 0 0 0 0 0 1083
Central Region Mountain Ecological Belt
Dolakha 32 16 0 0 0 0 8 108 0 0 0 0 0 0 124
Rasuwa 16 8 0 0 0 0 0 0 0 0 0 0 0 0 8
Sindhupalchowk 58 29 0 0 0 0 4 55 0 0 0 0 0 0 84
Central Mountain 106 53 0 0 0 0 12 163 0 0 0 0 0 0 216
Central Region 974 490 648 1296 1793 899 34 468 0 0 0 0 0 0 3153
Western Development Region
Western Region Terai Ecological Belt
Kapilvastu 13 7 4 8 111 56 0 0 0 0 0 0 0 0 71
Nawalparasi 7 4 17 34 66 33 0 0 0 0 0 0 3 7.88 78.88
Rupandehi 2 1 72 144 55 28 0 0 0 0 0 0 0 173
Western Terai 22 12 93 186 232 117 0 0 0 0 0 0 3 7.88 322.9

166
TABLE 8
Non Conventional Projects
ADB/N (upto 1996) DOI Upto LILI- CEAPRED VDRC-MIT
Total
District Sprinkler Artesan Rower (2005/06) Helvetas (2005/06) (2005/06)
Ha.
No. Ha. No. Ha. No. Ha. No. Ha. No. Ha. No. Ha. No. Ha.
Western Region Hill Ecological Belt
Arghakhanchi 830 415 0 0 0 0 0 0 0 0 0 0 0 0 415
Baglung 272 136 0 0 0 0 2 13 0 0 0 0 0 0 149
Gorkha 209 105 0 0 17 9 0 0 0 0 0 0 2 3.95 118
Gulmi 740 370 0 0 0 0 0 0 0 0 0 0 0 0 370
Kaski 155 78 0 0 19 10 0 0 0 0 0 0 2 1.2 89.2
Lamjung 227 114 0 0 1 1 2 13 0 0 0 0 0 0 128
Myagdi 180 90 0 0 0 0 0 0 0 0 0 0 0 0 90
Palpa 634 317 0 0 1 1 2 15 0 0 0 0 0 0 333
Parbat 32 16 0 0 0 0 4 33 0 0 0 0 0 0 49
Syangja 62 31 0 0 1 1 1 13 0 0 0 0 0 0 45
Tanahu 247 124 0 0 12 6 3 36 0 0 0 0 7 8.2 174.2
Western Hill 3588 1796 0 0 51 28 14 123 0 0 0 0 11 13.4 1960
Western Region Mountain Ecological Belt
Manang 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Mustang 4 2 0 0 0 0 0 0 0 0 0 0 0 0 2
Western Mountain 4 2 0 0 0 0 0 0 0 0 0 0 0 0 2
Western Region 3614 1810 93 186 283 145 14 123 0 0 0 0 14 21.2 2285
Mid-Western Development Region
Mid-Western Region Terai Ecological Belt
Banke 2 1 14 28 552 276 1 15 0 0 0 0 0 0 320
Bardiya 98 49 0 0 205 103 0 0 0 0 0 0 0 0 152
Dang 78 39 0 0 498 249 0 0 0 0 0 0 0 0 288
Mid-Western Terai 178 89 14 28 1255 628 1 15 0 0 0 0 0 0 760
Mid-Western Region Hill Ecological Belt
Dailekh 35 18 0 0 0 0 0 0 1 8.5 0 0 0 0 26.5
Jajarkot 20 10 0 0 0 0 0 0 0 0 0 0 0 0 10
Pyuthan 18 9 0 0 0 0 0 0 0 0 0 0 0 0 9
Rolpa 72 36 0 0 0 0 0 0 0 0 0 0 0 0 36
Rukum 74 37 0 0 0 0 0 0 0 0 0 0 0 0 37
Salyan 51 26 0 0 0 0 2 14 0 0 0 0 0 0 40
Surkhet 37 19 0 0 35 18 2 31 3 57.45 0 0 0 0 125.5
Mid-Western Hill 307 155 0 0 35 18 4 45 4 65.95 0 0 0 0 284
Mid-Western Region Mountain Ecological Belt
Dolpa 41 21 0 0 0 0 0 0 0 0 0 0 0 0 21
Humla 0 0 0 0 0 0 2 7 0 0 0 0 0 0 7
Jumla 22 11 0 0 3 2 0 0 0 0 0 0 0 0 13
Kalikot 8 4 0 0 0 0 0 0 0 0 0 0 0 0 4
Mugu 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Mid-Western Mountai 71 36 0 0 3 2 2 7 0 0 0 0 0 0 45
Mid-Western Region 556 280 14 28 1293 648 7 67 4 65.95 0 0 0 0 1089
Far-Western Development Region
Far-Western Region Terai Ecological Belt
Kailali 0 0 0 0 496 248 1 15 0 0 0 0 0 0 263
Kanchanpur 20 10 0 0 853 427 2 35 0 0 0 0 0 0 472
Far-Western Terai 20 10 0 0 1349 675 3 50 0 0 0 0 0 0 735
Far-Western Region Hill Ecological Belt 0
Achham 2 1 0 0 0 1
Baitadi 25 13 0 0 0 0 1 15 0 0 31 194.84 0 0 222.8
Dadeldhura 8 4 0 0 0 0 2 23 0 0 0 0 0 0 27
Doti 17 9 0 0 0 0 0 0 0 0 0 0 0 0 9
Far-Western Hill 52 27 0 0 0 0 3 38 0 0 31 194.84 0 0 259.8
Far-Western Region Mountain Ecological Belt 0
Bajhang 8 4 0 0 0 0 0 0 0 0 0 0 0 0 4
Bajura 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Darchula 6 3 0 0 0 0 2 21 0 0 0 0 0 0 24
Far-Western Mountain 14 7 0 0 0 0 2 21 0 0 0 0 0 0 28
Far-Western Region 86 44 0 0 1349 675 8 109 0 0 31 194.84 0 0 1023
Total 11881 5953 756 1512 8523 4270 79 994 4 65.95 31 194.84 14 21.2 13011

167
TABLE 8.1
Detail of Non Conventional Projects
Program Type District Project Name VDC Type CA Year
LILI-Helvetas Canal Irrigation Dailekh Khamekhola Bansi-5 New 8.5 2006
Surkhet Talbari Chhinchu Reh 34 2006
Surkhet Jhilmile Chhinchu Reh 19.1 2006
Pond irrigation Surkhet Phalate Chhinchu-7 New 4.35 2006
CEAPRED Macro Scheme Baitadi Okhaligaun DCM - 6 13 96/97
Baitadi Kaparta DCM - 4 10 97/98
Baitadi Rampatal DCM - 2 3.6 98/99
Baitadi Tundikanda Durgabhawani - 9 3 98/99
Baitadi Sutegad Dehimandu - 7 12 99/00
Baitadi Jhokali Gurukhola - 2 24 99/00
Micro Scheme Baitadi Thalalgaun Dehimandu - 9 5 97/98
Baitadi Saudali Dehimandu - 9 4.5 97/98
Baitadi Melau Dehimandu - 8 0.5 98/99
Baitadi Mudap Gurukhola - 7 1.22 98/99
Baitadi Dodar Kedar Gurukhola - 9 2 98/99
Baitadi Pali Gurukhola - 9 2.3 98/99
Baitadi Balgad Durgabhawani - 7 2.8 98/99
Baitadi Takgaun Durgabhawani - 6 5 99/00
Baitadi Bagurad Gurukhola - 3 3.5 99/00
Baitadi Barnaula DCM -1 4.5 99/00
Baitadi Dewalhat DCM - 1 0.25 99/00
Baitadi Babet DCM -1 1 99/00
Baitadi Pallachaudali DCM - 4 1.27 99/00
Baitadi Rosera DCM - 6 1.5 99/00
Baitadi Sukutti DCM - 7 3.6 99/00
Baitadi Jukepani Siddheswar - 9 3.5 2000/01
Baitadi Daisili Siddapur - 2 7.5 2000/01
Baitadi Gailekgaun Siddapur - 2 3.4 2000/01
Baitadi Sargadh Dehimandu-3 4.3 2000/01
Baitadi Kumaligad Sprinkle Dehimandu-3 0.5 2000/01
Baitadi Nagadibata Patan - 1 10 2000/01
Baitadi Sillauda Basantpur - 7 3.6 2000/01
Baitadi Gwallek Darshan Gwallek - 7 4.6 2000/01
Baitadi Pujaragaun Durgasthan - 3 42.5 2000/01
Baitadi Taak DCM - 6 10.4 2000/01

Type of Scheme Program District Project Name CA


Water Harvesting Tank VDRC-MIT Tanahu Sandhebagar 3.75

VDRC-MIT Tanahu Ghiring Thok 1


VDRC-MIT Tanahu Dukudanda 0.5
VDRC-MIT Kaski Keoradi 0.6
VDRC-MIT Kaski Dhanubas 0.6
VDRC-MIT Gorkha Plaing 2.55

Motor Pump Scheme VDRC-MIT Tanahu Gauritar 0.1


VDRC-MIT Tanahu Debghat 0.65
VDRC-MIT Tanahu Dhapani 1.1
VDRC-MIT Tanahu Pipaltar (tubewell) 1.1
VDRC-MIT Gorkha Gumlek 1.4

Drip Irrigation Scheme VDRC-MIT Nawalparasi 87 Nos 2.4375

Cemented Tank VDRC-MIT Nawalparasi Ghaderitandi Micro Irrigation 3.6

Pedal Pump VDRC-MIT Nawalparasi Diff. VDCs 1.8

168
TABLE 9
Planned vs Developed Command Area
Planned Developed Command Area Irrigate (ha) Ongoing Area to be developed
Project No of Project Remarks
Gross Net Gross Net Summer Winter Spring Gross Net Gross Net
(A) FMIS
ADB/N 352 21178 16957 21174 16912 16631 2601 1124 3 0 4 45
AGRIL 5 750 600 750 600 600 0 0 0 0 0 0
DIDP 65 2795 2221 2742 2179 2179 1425 355 53 42 53 42
DOI 329 72172 58384 64422 52184 38759 52564 2137 7750 6200 7750 6200 Babai I.P
ERIP 100 11400 9104 10215 8155 5169 4023 829 4927 3935 1185 949
FIWUD 197 23090 18449 23090 18449 18449 0 0 0 0 0 0
GADP 6 150 120 150 120 120 0 0 0 0 0 0
GTZ 1 231 185 231 185 185 0 0 0 0 0 0
HFP 43 2188 1741 2188 1741 1741 0 0 0 0 0 0
IDP 15 4333 3683 4333 3683 0 0 0 0 0 0 0
ILC 282 34973 29185 34866 29177 25060 4533 1193 27 121 107 8
ISP 376 71490 57753 70676 57582 52828 19974 5472 6825 5415 814 171
K-BIRD 16 1754 1403 1754 1403 1403 666 0 0 0 0 0
KHILL 33 1759 1403 1759 1403 1403 0 0 0 0 0 0
M/HILL 46 3602 2878 3162 2526 2409 1202 175 440 352 440 352
MAIN 19 2645 2117 2645 2117 2117 0 0 0 0 0 0
MIN 94 37667 30135 37667 30135 30135 0 0 0 0 0 0
MIP 65 20277 19769 4336 4298 0 0 0 0 0 15941 15471 On-going Project
MPLD 95 3901 3109 3901 3109 3109 7 0 0 0 0 0
N CARE 41 6011 4805 6011 4805 4868 0 0 0 0 0 0
NISP 404 58006 49296 54938 46703 0 0 0 0 0 3068 2593 Carry-over Project
PEOPLE 6 3379 2703 3379 2703 2703 0 0 0 0 0 0
SI 11 3212 2568 3212 2568 2568 1210 0 0 0 0 0
SINKA 55 3781 3023 3781 3023 2762 1534 0 0 0 0 0
SIP 67 6842 5496 6842 5496 5422 1440 102 0 0 0 0
SISP 283 48405 41147 42418 36059 0 0 0 0 0 5987 5088 Carry-over Project
Total of (A) 3006 445991 368234 410642 337315 220620 91179 11387 20025 16065 35349 30919
(B) DOI 178 389361 314571 389579 324171 224955 92336 3600 500 400 -218 -9600
Total of (A) +(B) 3184 835352 682805 800221 661486 445575 183515 14987 20525 16465 35131 21319

169

Vous aimerez peut-être aussi