Power system Modification

Progress/Final Report

Participants

Aziz ur rehman (E&I Foreman)


Rizwan Ilyas(E&I Technician)
Tahir saleem (E&I Technician)
Zain ul Abideen (E&I Technician)
Arsalan Ashraf (E&I Technician)
Sadaam Hussian (E&I Technician)

Final completion and commissioning date


15-11-2020
Power system Modification

Plant Previous scenario:

There are 3 energy sources at our plant.


 Wapda 630kva-------504kw
 Orient rental generator 635kva-------508kw
 Generator house rental generator 200kva------160kw
 Plant total load 625kva-------500kw
Previously we cannot run our whole plant on wapda 630kva at same time so we
modify our system to run our 200kva generator and wapda together to meet our plant
energy requirement.

Plant new scenario/modification:


Modification in LT01 panel split the power MCCB circuit breakers to 200kva generator
to run our whole plant at same time. this modification specially for mafroda kinnow
process for this process we did not need new generator and we can process our
mafroda plant within our resources.
Below is the process of modification.
 Disconnect Q12 in main LT01 bus bar
 Switch off mafroda breaker from busbar and tag out. Q09
 Use spare breaker Q12 as mafroda supply coupler in LT01 LT
panel.
 Make new power loops between Q12 to Q11 for power
incoming.
 Power loop between Q12 with Q09 for power outgoing.

Benefits of this system:


 We can run our whole plant at once on wapda and 200kva separately.
 Extra change over cost saving.
 Generator capacity enhancement cost saving.
 System reliability.
 Mafroda Smooth operation.
 Reduce production downtime.