TABLE OF CONTENTS
I. INTRODUCTION..........................................................................................................................................2
I. Introduction
Unisys has developed a standard methodology for implementing and
managing the point services comprising our global portfolio – we
utilize our powerful ‘3 Dimensional Visual Enterprise’ (3D-VE)
methodology... The differentiator is enterprise visibility—or linking
holistically across all dimensions of an enterprise. 3D-VE’s power
is traceability. This will allow clients the ability to see the cascading
effects that change has across all layers of a business. This visibility
turns change from an adversary into a competitive advantage–and
lessens risk, empowering clients to transform the way they do
business.
Unisys will use the metrics based tools set and methodology to
transition Application Management services to Unisys that are either
provided by current employees or other service providers. Some of
the benefits of the approach are:
1. Organizational visibility using traceability. (Through
cause and effect analysis)
2. Intellectual property as a competitive differentiator (By
modeling business knowledge)
3. Impact analysis (The ability to understand the impact
that change has on both business processes and IT
applications)
4. Redundancy elimination (Reducing costs and
streamlining processes and applications by eliminating
redundant functions)
5. Agility (The ability to predict and react responsively to
the impacts of change)
A. Pre-Transition
Portfolio Analysis
Unisys Team will study existing documents, conduct interviews,
surveys with business users, IT staff and other stakeholders to gather
information, suggest recommendations, and prepare a plan for the
transition activities. The activities performed during this phase
include:
# Activities
1 Study overall business architecture
2 Identify key stakeholders
3 Determine organization goals
4 Determine current resources for transition
5 Gather and review existing application documentation
6 Interview/survey key customer IT personnel and end users
to get a high level understanding of the existing
applications and the criticality of business processes
7 Create an inventory of the existing applications with
information like size, complexity, stability, support levels,
underlying technologies, number of users, etc.
8 Estimate major costs associated with each application like
software licensing and estimated maintenance effort.
9 Develop an initial set of recommendations based on the
information gathered with respect to the applications as
Application Analysis
The Application Analysis phase follows a three-step process for
transitioning support
# Process Description
1 Complete This consists of analyzing all non-
Application infrastructure aspects of the
Assessment application, including functionality,
programming standards, QA
processes, organizational dynamics
and others.
2 Complete This consists of analyzing all
Infrastructure infrastructure aspects including
Assessment network, hosting, system software,
hardware, multiple environments and
others.
3 Define Transition Provide a detailed plan for the
execution and transitioning of the application to the
SOW offshore team and the Statement of
Work
B. Transition
Effective knowledge transfer is one of the most critical activities in
an offshore outsourcing engagement. This phase is executed onsite
where the knowledge transfer happens from the client/stakeholders
to the Unisys team in four stages. The Transition Manager starts the
transition activities by creating a Transition plan. The various stages
are depicted in the graphic below.
Introduction Phase
The purpose of the Introduction Phase is to give the Unisys team a
basic understanding of the application to be supported and the
infrastructure and communications requirements to move the support
offshore. This phase also optionally includes tasks to address any
deficiencies in the current documentation, regression test bed,
maintenance processes, etc. so that the maintenance can be
effectively transitioned offshore. The major activities of this phase
include:
# Activities
1 Study the current applications and production environment
2 Understand the design, data structures and source code
from a technical perspective
3 Understand the current technical and functional issues, if
any
4 Understand the current support processes and
methodologies; tailor Unisys processes as appropriate
5 Understand the requirements development process,
configuration management, release management, and
production rollout procedures
6 The outcome of this phase will be an initial system
document, which is sent to offshore team to understand the
application.
Hands-on Phase
This activity is carried out primarily at onsite from the client
location. The Unisys team works under the supervision of the client
support staff to perform support-related tasks and obtain exposure to
maintaining the application. The primary responsibility of support
still remains with the client for all the deliverables executed by
Unisys in this phase.
# Activities
1 Client staff to assign and prioritize support activities to
Unisys resources
2 Execute the support activities
3 Ensure project deliverables meet agreed-upon
requirements
4 Interact with client staff to resolve issues
5 Refine the support and maintenance process
Primary Contact
After obtaining hands-on experience in supporting the application,
Unisys will take responsibility for complete support and
maintenance activities from the client location. Members of the
existing support team will continue to participate in supporting the
application, but primarily from a coaching and review perspective.
This activity would also typically include performing some
maintenance work from offshore to test out the offshore
infrastructure and communications set-up.
# Activities
1 Unisys project manager to assign and prioritize support
activities to Unisys staff
2 Execute the support activities
3 Ensure project deliverables meet agreed-upon
requirements
4 Interface with client staff to resolve issues
5 Perform representative support tasks from offshore
6 Refine the support and maintenance process as appropriate
7 Finalize the SOW
# Activities
1 Raise a Service request (ticket) in the problem management tool.
2 Understand the Ticket and collect the relevant diagnostic data
and steps to replicate error
3 Assign the ticket to the appropriate agent
4 Proactive customer follow-ups thru ticket closeout
5 Trouble ticket is routed to the Level 2 staff by the level 1 support
team
6 The Level 2 staff will identify the severity of the request as per
the classification
7 Perform Real-time troubleshooting and provide resolution
8 Identify workaround for the issues reported
9 Provide feedback to user with proper usage information (where
required)
1 If a code change has to be done, then the request is delegated to
0 the Level 3 staff.
1 The level 3 staff includes Software engineers who will go through
1 the SDLC lifecycle to implement the changes.
1 The requests are serviced as per the SLAs; the users are informed
2 as soon as their issue is resolved.
1 Generate status reports that have been discussed and agreed
3 with the customer.
1 Review the project progress and take corrective actions at
4 periodic intervals.
1 During the steady state, the Unisys support team continuously
5 updates the application documentation, which forms the
knowledge base that can be re-used to train new resources from
Unisys and Customer’s side. This documentation can be used as
the Functional specification for the applications.
Introduction Phase
During the introduction phase following is the information, which is
collected by the transition team:
# Category Information
1 IT Roadmap Understanding the applications to be
Knowledge, supported.
through: Time since go live
Modules implemented and the user
base knowledge
2 Business Process Business blueprint documentation
knowledge, Process flow charts
through: Configuration documents
Business Process Procedures
Test scripts for executing
transactions.
Inventory of all the relevant processes
for a site
3 Technical Inventory of all RICE (Reports,
Knowledge, Interfaces, Conversions and
through: Enhancements, forms) objects
Technical specifications, Functional
specifications, test plans for all RICE
objects.
Details of the third party interfaces
Hands-On Phase
During the Hands-on phase Unisys transition team goes to each and
every individual item identified in the introduction phase, and
studies them in detail to understand the building blocks of
applications to be supported. Clear deliverables have been identified
for each and every phase and the client evaluates effectiveness of
each of these deliverables.
During this phase Unisys transition team will also understand the
processes/applications, which have not been mapped completely, or
are currently work in progress. Unisys support team will understand
the roadmap of these processes/applications to production and
transition to support.
Ownership Phase
At the end of the Primary Contact Phase, Unisys would assume full
responsibility for support of the applications in scope as per the
predetermined SLAs. Application Support team will ensure that all
the documentation generated during the transition study is kept
current and up to date.
# Domain Description
7 Project Management Clear Points of Contact – Joint
Governance Model in place
8 Project Management Effective Co-ordination between on-
site/offshore/near shore and recording
of changes
9 Decision making Decision making metrics
information
1 Decision making Decision to operational transparency
0 information • Predefined review milestones,
reports & acceptance criteria
1 Decision making Proactive Decision making
1 information • Service standardization with
associated effort, costs,
dependency & constraints
13
B. Interface Details Matrix
Interface Partner
Export Interface 24X7 AfterHours Afterhours SAP
Interface Application Partner error System SAPBusiness
Description Control Critical support contact contact(3rd Source Direction Destination Frequency Processing
number Area System severity ticketing Analyst
Data? Timings/Days required? (business) Party) Schedule
level process
SAP toXYZToday's ABC
Master
INF300XX Shipments +2weeks OM No 1 Mon- Fri. Y 000-111-5782. N/A N/A SAP Outbound WSC Daily/Nightly XXXXXX
Data
(PSSHIP)
C. Form Details
Form Print Program Sapscript Optio DCL FileName Output Type SAP Transaction
Purchase Order YSCR_FRMxxxx3 YSC_FRMxxx03 Non Optio Form NEU ME22N
Invoice P1 YOMR_FRMxxxx2 YOM_FRMxxx02 Non Optio Form ZXYZ VF02
Packing List Tag XXXXX
YOMR_FRMxxx26 YOM_FRMxxx26 Non Optio Form ZAWS VL02N / VL71
P1
Production form
YAFR_FRMxxxx039 FRMXXX1_rdui.dcl ZWEW IW32
XXXXXXX P1
Packing List P3 YOMR_FRMxxxx47 FRMXXX2_rdui.dcl ZPL2 VT02N / VT70
Pick List P3 YAFR_FRMxxxx031 FRMXXX3_rdui.dcl Z204 IW32 / IW3D
Work Order BOM P3 YAFR_FRMxxxx043 FRMXXX4_rdui.dcl Z502 IW32 / IW3D
Master Bill of Lading P4 YAFR_FRMxxxx046 FRMXXX5_rdui.dcl ZF15 VT02N / VT70
AAAAAAAAA Labels P2 YOMR_FRMxxxx045 YOM_FRM00045 Non Optio Form ZS2K, ZS2L, ZS2M VL02N / VL71
D. Interface FMEA
14
INFXXXXX_XXXXXXX_OUTBOUND_YYYYYYYY_FMEA
PreparedBy: Mr. AAA BBB PartnerContact: XYZAAA PartnerSystem: Speck2K
Date: 1/31/2005 Business JohnDoe Middleware: EDI
PowerUser: Direction: Outbound
MiddlewareContact:
External Support:
Potential
Potential Potential ExistingControls Plans /
FailureMode PreventiveActions
FailureEffects Causes (Whatarethe existing CorrectiveActions Responsibility
(Whatcango Recommended
Process Step/Input (What is (Whatis the impacton (What are theroot controls that preventor Recommended (Whatis the target
wrongwiththe (Howtoprevent the
theprocess step/input?) the customer (output causereasons for the detect either thecause or (Howto identifyand completiondate
process occurrenceof the
variables) or internal process step/inputto the FMprior to leavingthe resolve issue?) andwho is
step/input?) potential cause?)
requirements?) go wrong?) INPUTS process step?) responsible?)
OUTPUTS
Notifythe Business
Change or create Invoice Checkwhether o/ptypeis process owner and
O/ptype (ZCIN) not Monintor theo/ptype
throughVF01,VF02witho/ptype maintainedor notthrough maintaino/ptype SAP HelpDesk
maintained availability
ZCIN Invoice is not VV33 througVV31with
created/Change Invoiceis not Postedto the approval of BPO
d Partner System
15