Vous êtes sur la page 1sur 8

Pit 2 Baru (IPD) Pit 3 Selatan CU1(1) Pit 3 Utara BU(2) Pit 3 Bu Lama(3)

1-Mar-16 -66.527 -82.794 -82.186 -83.867


2-Mar-16 -66.685 -83.289 -82.193 -83.966
3-Mar-16 -66.957 -83.137 -82.193 -84.141
4-Mar-16 -67.000 -83.288 -82.197 -84.683
5-Mar-16 -66.718 -83.264 -82.209 -84.342
6-Mar-16 -66.649 -83.274 -82.207 -84.066
7-Mar-16 -66.767 -83.298 -82.206 -84.157
8-Mar-16 -66.610 -83.282 -82.216 -84.527
9-Mar-16 -66.711 -83.665 -82.210 -84.827
10-Mar-16 -66.711 -83.925 -82.259 -85.023
11-Mar-16 -66.936 -83.929 -82.250 -85.530
12-Mar-16 -67.173 -83.933 -82.242 -86.017
13-Mar-16 -66.863 -83.853 -82.198 -86.111
14-Mar-16 -66.417 -83.713 -82.087 -86.360
15-Mar-16 -66.844 -83.716 -82.092 -86.876
16-Mar-16 -67.209 -83.657 -82.093 -87.603
17-Mar-16 -67.605 -83.638 -82.073 -87.437
18-Mar-16 -68.016 -83.625 -82.082 -87.220
19-Mar-16 -68.324 -83.610 -82.077 -87.540
20-Mar-16 -68.624 -83.612 -82.082 -88.138
21-Mar-16 -68.872 -83.581 -82.091 -88.025
22-Mar-16 -69.177 -83.575 -82.084 -87.903
23-Mar-16 -69.558 -83.558 -82.069 -87.620
24-Mar-16 -69.873 -83.560 -82.154 -88.032
25-Mar-16 -70.272 -83.525 -82.077 -87.961
26-Mar-16 -70.703 -83.563 -82.172 -87.936
27-Mar-16 -71.120 -83.489 -82.804 -88.088
28-Mar-16
29-Mar-16
30-Mar-16
31-Mar-16
LEVEL
Pit 3 Selatan BU(4) Pit 3 Back Loading BU(5) Pit 3 Timur Pit 4 Barat Pit 4 Cu2 Pit 4 Timur Pit 5
-83.867 -63.590 -53.831 -53.481 -25.150
-83.966 -63.590 -53.900 -53.326 -25.070
-84.141 -63.590 -53.740 -53.000 -25.060
-84.683 -63.590 -53.830 -53.040 -25.060
-84.342 -63.590 -53.640 -52.583 -25.050
-84.066 -63.590 -53.520 -52.100 -25.050
-84.157 -63.590 -53.650 -52.110 -24.870
-84.527 -63.590 -53.600 -51.920 -24.800
-84.827 -63.590 -53.528 -51.880 -24.900
-85.023 -63.590 -53.520 -51.800 -24.800
-85.530 -63.590 -53.570 -51.780 -24.780
-86.017 -63.590 -53.300 -51.700 -24.780
-86.111 -63.590 -53.100 -51.870 -24.680
-86.360 -64.741 -52.970 -51.710 -24.600
-86.876 -64.741 -52.860 -51.420 -24.580
-87.603 -64.741 -52.810 -51.520 -24.580
-87.437 -64.741 -52.810 -51.520 -24.580
-87.220 -64.741 -53.040 -51.618 -24.562
-87.540 -64.741 -52.968 -51.400 -24.562
-88.138 -64.741 -52.968 -51.400 -24.562
-88.025 -64.741 -52.968 -51.400 -24.562
-87.903 -64.741 -52.968 -51.400 -24.562
-87.620 -92.128 -68.191 -52.997 -51.430 -24.562
-88.032 -90.053 -68.191 -52.963 -51.421 -24.562
-87.961 -91.043 -68.191 -53.310 -51.660 -24.562
-87.936 -91.320 -68.191 -53.330 -51.660 -24.562
-88.088 -91.821 -68.191 -53.330 -51.660 -24.562
Pit 7 Pit 8 Pit 9 Pit 10 Pit 11 Pit 2 Baru (IPD) Pit 3 Selatan CU1(1)
38.693 38.280 34.680 18.022 33.840 512,700.57 11,873.20
38.693 38.280 34.680 18.022 33.840 503,320.61 9,299.68
38.693 38.340 34.680 18.022 33.840 489,374.96 10,017.08
38.693 38.340 34.680 18.022 33.840 487,186.06 9,304.25
38.693 38.450 34.680 18.022 33.840 501,619.22 9,414.52
38.693 38.45 34.680 18.022 33.840 505,179.58 9,368.47
38.693 38.430 34.680 18.022 33.840 499,097.96 9,258.58
38.693 38.450 34.680 18.022 33.840 507197.134 9331.725
38.693 38.350 34.680 18.022 33.840 507,197.13 7,692.67
38.693 38.350 34.680 18.022 33.840 507,197.13 6,574.76
38.693 38.100 34.680 18.022 33.840 490,445.51 6,574.76
38.693 38.280 34.680 18.022 33.840 478420.980 6516.988
38.693 38.310 34.680 18.022 33.840 494,174.76 6,972.06
38.693 38.360 34.680 18.022 33.840 517237.693 7498.417
38.693 38.370 34.680 18.022 33.840 495,147.41 7,486.82
38.693 38.370 34.680 18.022 33.840 476,369.55 7,334.41
38.693 38.440 34.680 17.951 33.800 456579.677 7394.614
38.200 38.300 34.050 17.950 33.800 436040.000 7435.020
38.200 38.300 34.050 17.952 33.800 421,411.87 7,482.31
38.200 38.300 34.050 17.952 33.800 407,005.42 7,475.95
38.200 38.300 34.050 17.952 33.800 395,208.95 7,574.83
38.200 38.300 34.050 17.952 33.800 395,208.95 7,577.47
38.200 38.200 34.050 17.952 33.800 363,102.35 7,648.55
38.200 38.200 34.050 17.952 33.800 348,616.57 7,642.13
38.200 38.180 34.050 17.952 33.800 330,501.26 7,754.89
38.200 38.180 34.050 17.952 33.800 311,250.68 7,632.50
38.200 38.180 34.050 17.952 33.800 293,069.87 7,871.64
VOLUME
Pit 3 Utara BU(2) Pit 3 Bu Lama(3)
Pit 3 Selatan Pit
BU(4)
3Back loading BU(5) Pit 3 Timur Pit 4 Barat
5,441.95 77,007.12 45,261.34 260,768.57
5,428.41 74,810.09 45,261.34 257,685.10
5,428.41 70,988.06 45,261.34 264,851.47
5,572.79 59,806.68 45,261.34 260,813.32
5,397.63 66,708.47 45,261.34 269,356.73
5,444.94 72,605.52 45,261.34 274,785.74
5,417.34 70,642.80 45,261.34 268,905.34
5,397.98 62,902.73 45,261.34 271,163.87
5,395.70 57,102.22 45,261.34 274,423.08
5,289.29 53,599.14 45,261.34 274,785.72
5,319.65 45,402.33 45,261.34 272,520.96
5,333.23 38,569.12 45,261.34 284,793.93
5,402.31 37,308.65 45,261.34 293,952.48
5,636.62 32,348.74 14,139.65 299,936.11
5,893.89 26,327.72 14,139.65 305,018.37
5,543.81 17,973.56 13,093.57 305,982.37
5,560.81 19,231.90 - 305,982.37
5,553.16 20,876.80 301,547.97
5,373.44 19,598.00 - 298,701.68
5,347.04 14,812.33 - 298,701.68
5,376.12 15,668.92 - 298,701.68
5,344.00 16,611.04 - 298,701.68
5,568.25 11,024.68 - 297,369.69
5,284.17 11,104.23 - 298,931.45
5,373.44 11,083.04 - 283,070.33
5,235.44 12,078.53 - 282,161.45
4,397.51 10,956.52 - - 282,161.45
VOLUME
Pit 4 Cu2 Pit 4 Timur Pit 5 Pit 7 Pit 8 Pit 9
832,535.07 911,231.53 562,735.09 1,011,883.70 165,277.13
846,734.50 921,917.17 562,735.09 1,011,883.70 165,277.13
876,923.88 923,255.09 562,735.09 1,014,096.78 165,277.13
874,125.40 923,255.09 562,735.09 1,014,096.78 165,277.13
916,211.11 924,593.44 562,735.09 1,027,705.85 165,277.13
962,615.06 924,593.44 562,735.09 1,027,705.85 165,277.13
961,651.23 948,764.81 562,735.09 1,025,221.67 165,277.13
980,117.98 958,209.97 562,735.09 1,027,705.85 165,277.13
984,019.56 944,724.22 562,735.09 1,015,328.52 165,277.13
991,837.02 958,209.97 562,735.09 1,015,328.52 165,277.13
993,794.41 960,912.59 562,735.09 985,015.46 165,277.13
1,001,635.97 960,912.59 562,735.09 985,015.46 165,277.13
984,995.77 974,452.16 562,735.09 1,010,407.92 165,277.13
1,000,654.74 985,315.73 562,735.09 1,016,561.37 165,277.13
1,029,226.95 988,018.23 562,735.09 1,017,795.37 165,277.13
1,019,259.29 988,018.23 562,735.09 1,017,795.37 165,277.13
1,019,259.29 988,018.23 562,735.09 1,026,463.20 165,277.13
1,009,490.90 997,795.00 562,735.09 1,009,127.00 165,277.13
1,031,132.00 997,795.00 562,735.09 1,009,127.00 208,369.25
1,031,132.00 997,795.00 562,735.09 1,009,127.00 208,369.25
1,031,132.00 997,795.00 562,735.09 1,009,127.00 208,369.25
1,031,132.00 997,795.00 562,735.09 1,009,127.00 208,369.25
1,028,163.50 997,795.00 562,735.09 1,009,127.00 208,369.25
1,029,053.86 997,795.00 562,735.09 1,009,127.00 208,369.25
1,005,481.41 997,795.00 562,735.09 994,537.52 208,369.25
1,005,481.41 997,795.00 562,735.09 994,537.52 208,369.25
1,005,481.41 997,795.00 562,735.09 994,537.52 208,369.25
Pit 10 Pit 11
1,077,853.57 114,121.02
1,077,853.57 114,121.02
1,077,853.57 114,121.02
1,077,853.57 114,121.02
1,077,853.57 114,121.02
1,077,853.57 114,121.02
1,077,853.57 114,121.02
1,077,853.57 114,121.02
1,077,853.57 114,121.02
1,077,853.57 114,121.02
1,077,853.57 114,121.02
1,077,853.57 114,121.02
1,077,853.57 114,121.02
1,077,853.57 114,121.02
1,077,853.57 114,121.02
1,077,853.57 114,121.02
1,081,104.77 124,301.02
1,063,769.10 124,301.02
1,063,769.10 124,301.02
1,063,769.10 124,301.02
1,063,769.10 124,301.02
1,063,769.10 124,301.02
1,063,769.10 124,301.02
1,063,769.10 124,301.02
1,063,769.10 124,301.02
1,063,769.10 124,301.02
1,063,769.10 124,301.02

Vous aimerez peut-être aussi