Chapter I
Summary Report
Units:N-m
STORY DATA
STORY SIMILAR TO HEIGHT ELEVATION
STORY4 None 3.500 15.500
SDEAD 1.0000
STORY FORCES
STORY LOAD P VX VY T MX MY
STORY4 EQX 7.851E-02 -7.048E+05 1.145E-05 6.602E+06 -1.985E-05 -2.467E+06
STORY DRIFTS
STORY DIRECTION LOAD MAX DRIFT
STORY4 X EQX 1/1487
Model’s Input
COORDINATE SYSTEM LOCATION DATA
NAME TYPE X Y ROTATION BUBBLESIZE VISIBLE
STORY DATA
STORY SIMILAR TO HEIGHT ELEVATION
Units:KN-m
DEAD 1.0000
SDEAD 1.0000
TOTAL TOTAL
FRAME SECTION NAME WEIGHT MASS
COL450X450 1848.7238 188.4035
TOP BOT TOP LEFT TOP RIGHT BOT LEFT BOT RIGHT
FRAME SECTION NAME COVER COVER AREA AREA AREA AREA
B300X500 0.0600 0.0600 0.000 0.000 0.000 0.000
Chapter II
Analysis Outputs
ETABS v9.6.0 File:ADIL Units:N-m
LOADING COMBINATIONS
STORY DRIFTS
F E W S U P P O R T R E A C T I O N S (N-m)
COLUMN FORCES
STORY4 C1 SERVICE
0.0000 -219116.67 -45594.18 -28580.52 -158.320 -43551.498 -69161.343
1.5000 -211960.32 -45594.18 -28580.52 -158.320 -680.723 -770.075
3.0000 -204803.97 -45594.18 -28580.52 -158.320 42190.052 67621.193
STORY4 C2 SERVICE
0.0000 -290625.62 -36348.49 4795.01 -158.320 6960.913 -52365.345
1.5000 -283469.27 -36348.49 4795.01 -158.320 -231.607 2157.390
3.0000 -276312.92 -36348.49 4795.01 -158.320 -7424.127 56680.124
STORY4 C3 SERVICE
0.0000 -280839.41 -37216.02 3823.70 -158.320 6289.493 -53755.978
1.5000 -273683.06 -37216.02 3823.70 -158.320 553.939 2068.048
3.0000 -266526.71 -37216.02 3823.70 -158.320 -5181.615 57892.074
STORY4 C4 SERVICE
0.0000 -289496.25 -35878.07 2980.34 -158.320 5821.081 -51664.148
1.5000 -282339.90 -35878.07 2980.34 -158.320 1350.571 2152.959
3.0000 -275183.55 -35878.07 2980.34 -158.320 -3119.938 55970.067
STORY4 C5 SERVICE
0.0000 -221588.55 -44170.13 33600.49 -158.320 51642.683 -66960.241
1.5000 -214432.20 -44170.13 33600.49 -158.320 1241.950 -705.047
3.0000 -207275.85 -44170.13 33600.49 -158.320 -49158.783 65550.147
STORY4 C6 SERVICE
0.0000 -316698.32 -709.78 -27731.49 -158.320 -40186.602 -2685.136
1.5000 -309541.97 -709.78 -27731.49 -158.320 1410.634 -1620.463
3.0000 -302385.62 -709.78 -27731.49 -158.320 43007.871 -555.790
STORY4 C7 SERVICE
0.0000 -308361.85 430.71 1530.36 -158.320 1996.220 68.949
1.7500 -300012.77 430.71 1530.36 -158.320 -681.914 -684.795
3.5000 -291663.70 430.71 1530.36 -158.320 -3360.049 -1438.538
STORY4 C8 SERVICE
0.0000 -307859.31 -339.57 545.25 -158.320 902.018 -985.533
1.7500 -299510.24 -339.57 545.25 -158.320 -52.176 -391.288
3.5000 -291161.16 -339.57 545.25 -158.320 -1006.371 202.958
STORY FORCES
Chapter III
Concrete Column Joint Design - Beam to Column D/C Ratios & Joint Shear Check
Concrete Column Joint Design - Beam to Column D/C Ratios & Joint Shear Check
Story Column Section (6/5)Beam-Column (6/5)Beam-Column Joint Shear Joint Shear
Level Line Name Ratio Major Ratio Minor Ratio Major Ratio Minor
STORY4 C1 COL450X450 0.686 0.613 0.380 0.338
STORY3 C1 COL450X450 0.462 0.449 0.493 0.478
STORY2 C1 COL450X450 0.397 0.411 0.458 0.476
STORY1 C1 COL450X450 0.307 0.318 0.383 0.398
Beam/Column
STORY4 C2 COL450X450 capacity ratio
exceeds limit
STORY3 C2 COL450X450 0.733 0.825
STORY2 C2 COL450X450 0.665 0.836
STORY1 C2 COL450X450 0.571 0.800
Beam/Column
STORY4 C3 COL450X450 capacity ratio
exceeds limit
STORY3 C3 COL450X450 0.750 0.842
STORY2 C3 COL450X450 0.669 0.838
STORY1 C3 COL450X450 0.558 0.777
Beam/Column
STORY4 C4 COL450X450 capacity ratio
exceeds limit
STORY3 C4 COL450X450 0.739 0.832
STORY2 C4 COL450X450 0.665 0.835
STORY1 C4 COL450X450 0.562 0.784
Concrete Column Joint Design - Beam to Column D/C Ratios & Joint Shear Check
Story Column Section (6/5)Beam-Column (6/5)Beam-Column Joint Shear Joint Shear
Level Line Name Ratio Major Ratio Minor Ratio Major Ratio Minor
STORY4 C5 COL450X450 0.671 0.682 0.372 0.379
STORY3 C5 COL450X450 0.455 0.494 0.486 0.532
STORY2 C5 COL450X450 0.395 0.442 0.457 0.518
STORY1 C5 COL450X450 0.313 0.334 0.393 0.422
Beam/Column
STORY4 C6 COL450X450 capacity ratio
exceeds limit
STORY3 C6 COL450X450 0.695 0.786
STORY2 C6 COL450X450 0.619 0.782
STORY1 C6 COL450X450 0.560 0.794
STORY4 C7 COL450X450
STORY3 C7 COL450X450
STORY2 C7 COL450X450
STORY1 C7 COL450X450
STORY4 C8 COL450X450
STORY3 C8 COL450X450
STORY2 C8 COL450X450
STORY1 C8 COL450X450
STORY4 C9 COL450X450
STORY3 C9 COL450X450
STORY2 C9 COL450X450
STORY1 C9 COL450X450
Beam/Column
STORY4 C10 COL450X450 capacity ratio
exceeds limit
STORY3 C10 COL450X450 0.706 0.802
STORY2 C10 COL450X450 0.635 0.808
STORY1 C10 COL450X450 0.576 0.822
Beam/Column
STORY4 C11 COL450X450 capacity ratio
exceeds limit
STORY3 C11 COL450X450 0.721 0.823
STORY2 C11 COL450X450 0.635 0.811
STORY1 C11 COL450X450 0.560 0.798
STORY4 C12 COL450X450
STORY3 C12 COL450X450
STORY2 C12 COL450X450
STORY1 C12 COL450X450
STORY4 C13 COL450X450
STORY3 C13 COL450X450
STORY2 C13 COL450X450
STORY1 C13 COL450X450
STORY4 C14 COL450X450
STORY3 C14 COL450X450
STORY2 C14 COL450X450
STORY1 C14 COL450X450
Beam/Column
STORY4 C15 COL450X450 capacity ratio
exceeds limit
STORY3 C15 COL450X450 0.715 0.812
STORY2 C15 COL450X450 0.630 0.801
Concrete Column Joint Design - Beam to Column D/C Ratios & Joint Shear Check
Story Column Section (6/5)Beam-Column (6/5)Beam-Column Joint Shear Joint Shear
Level Line Name Ratio Major Ratio Minor Ratio Major Ratio Minor
STORY1 C15 COL450X450 0.552 0.785
Beam/Column
STORY4 C16 COL450X450 capacity ratio
exceeds limit
STORY3 C16 COL450X450 0.766 0.749
STORY2 C16 COL450X450 0.709 0.728
STORY1 C16 COL450X450 0.549 0.605
STORY4 C17 COL450X450
STORY3 C17 COL450X450
STORY2 C17 COL450X450
STORY1 C17 COL450X450
STORY4 C18 COL450X450
STORY3 C18 COL450X450
STORY2 C18 COL450X450
STORY1 C18 COL450X450
STORY4 C19 COL450X450
STORY3 C19 COL450X450
STORY2 C19 COL450X450
STORY1 C19 COL450X450
Beam/Column
STORY4 C20 COL450X450 capacity ratio
exceeds limit
STORY3 C20 COL450X450 0.710 0.813
STORY2 C20 COL450X450 0.636 0.818
STORY1 C20 COL450X450 0.577 0.831
STORY4 C21 COL450X450 0.018 0.012 0.008 0.006
STORY3 C21 COL450X450 0.010 0.010 0.008 0.008
STORY2 C21 COL450X450 0.012 0.016 0.009 0.012
STORY1 C21 COL450X450 0.018 0.021 0.010 0.011
STORY4 C22 COL450X450 0.902 0.473
STORY3 C22 COL450X450 0.684 0.669
STORY2 C22 COL450X450 0.622 0.645
STORY1 C22 COL450X450 0.435 0.486
Beam/Column
STORY4 C23 COL450X450 capacity ratio
exceeds limit
STORY3 C23 COL450X450 0.617 0.682
STORY2 C23 COL450X450 0.552 0.681
STORY1 C23 COL450X450 0.475 0.657
Beam/Column
STORY4 C24 COL450X450 capacity ratio
exceeds limit
STORY3 C24 COL450X450 0.621 0.687
STORY2 C24 COL450X450 0.558 0.690
STORY1 C24 COL450X450 0.480 0.663
STORY4 C25 COL450X450 0.662 0.539 0.368 0.297
STORY3 C25 COL450X450 0.450 0.360 0.482 0.378
STORY2 C25 COL450X450 0.390 0.312 0.455 0.357
STORY1 C25 COL450X450 0.309 0.234 0.392 0.291
Element: C1
L=3.500
B=0.450 D=0.450 dc=0.060
E=2.102E+10 fc=20000000.00 Lt.Wt. Fac.=1.000
fy=420000000 fys=420000000
RLLF=1.000
Column End Design Pu Design Mu2 Design Mu3 Station Loc Controlling Combo
Top 142367.750 67458.296 30656.382 3.000 DCON26
Bottom 152386.640 -69817.671 -31835.477 0.000 DCON26
Element: B8
L=5.600
D=0.500 B=0.300 bf=0.300
ds=0.000 dct=0.060 dcb=0.060
E=2.102E+10 fc=20000000.00 Lt.Wt. Fac.=1.000
fy=420000000 fys=420000000
Torsion Reinforcement
------- Shear --------- ------ Longitudinal -----
Rebar At/s Rebar Al
5.243E-04 6.524E-04
O/S #45 Shear stress due to shear force and torsion together exceeds maximum allowed
Chapter IV
Graphics
Elevation at Grid 1
Slab’s MMax