MOISTU NO.
MONTH NO OF LOT MIC MAT LENGTH UI SF STR ELG RD *b trash MOISTU RE at Neps SCN SFCn Sfw UQL(W) 5% L(N) IFC Trcnt TrAr TrID AMT OF.BALE
RE at B/R
Ginning S
OCT 15 4.35 0.86 29.33 83.9 5.58 32.08 6.16 76.41 8.34 3.96 8.11 8.14 54.5 12.0 22.9 7.8 29.1 33.1 5.6 39.3 0.9 4.8 617 130
NOV 30 4.41 0.86 28.96 83.7 6.36 31.70 6.42 75.97 8.05 4.15 8.03 9.33 54.2 11.4 23.1 8.0 28.6 32.5 5.6 43.4 0.7 4.9 557 130
DEC 35 4.60 0.87 30.53 83.2 6.94 32.11 6.27 76.55 8.04 3.16 7.75 8.00 58.8 14.9 22.9 7.8 29.7 33.9 5.4 28.6 0.5 3.7 530 130
JAN 40 4.30 0.86 30.96 83.6 6.65 31.60 6.92 77.14 8.25 3.12 8.99 9.30 70.0 13.2 24.8 8.4 30.4 34.4 5.9 25.8 0.5 3.4 553 145
FEB 42 4.17 0.85 31.04 83.8 6.54 31.19 7.30 77.36 8.35 3.36 9.05 8.91 64.6 11.7 24.7 8.3 28.8 34.9 6.2 28.8 0.4 3.5 567 145
MAR 42 4.14 0.85 31.12 83.6 6.67 31.08 7.12 77.03 8.56 3.77 - 8.99 97.1 14.5 26.2 8.9 30.9 34.9 6.4 29.4 0.5 3.6 576 145
APRIL 33 4.35 0.86 31.07 83.5 6.41 31.66 7.01 76.65 8.72 3.82 5.51 8.85 98.5 13.7 25.2 8.5 30.7 34.8 5.7 28.6 0.5 4.0 584 145
MAY 23 4.38 0.86 31.44 83.8 6.22 31.68 7.13 77.13 8.14 3.17 - - 84.4 12.8 25.0 8.2 31.1 35.1 5.7 26.6 0.5 3.7 576 145
JUNE 28 4.34 0.85 30.87 83.5 6.31 30.66 7.64 76.97 9.24 3.31 7.16 7.53 89.2 13.0 24.2 8.1 31.1 35.0 5.4 28.5 0.4 4.0 583 145
JULY 44 4.46 0.86 30.50 83.58 6.23 31.11 6.62 76.82 8.67 3.07 7.54 8.41 107.4 18.2 24.1 8.1 30.7 34.6 5.2 26.1 0.5 3.5 595 145
AUG 54 4.31 0.85 30.04 83.12 6.29 30.77 6.39 76.69 8.22 3.11 7.74 8.19 123.0 22.9 25.4 8.7 30.6 34.5 5.3 25.8 0.4 3.3 595 147
SEP 41 4.31 0.86 30.18 83.25 6.40 31.18 5.89 75.54 9.48 3.26 8.49 9.29 110.4 21.9 24.4 8.3 30.6 34.4 5.4 31.8 0.5 3.9 586 147
OCT 33 4.25 0.86 30.50 83.61 6.45 30.70 6.11 75.92 9.64 2.93 8.12 9.13 113.8 17.8 25.6 8.8 30.8 34.4 5.5 28.0 0.5 3.6 586 147
OCT NEW 34 4.72 0.88 30.46 83.24 6.05 31.56 5.38 76.21 8.68 2.54 8.51 9.52 97.7 19.5 24.4 8.5 31.0 35.6 5.0 19.9 0.3 3.0 559 147
NOV 50 4.69 0.88 30.22 83.13 6.00 31.44 5.47 76.52 8.62 2.79 7.81 9.16 85.1 19.7 22.7 7.5 30.6 35.0 5.0 15.7 0.3 2.8 565 138
DEC 62 4.54 0.87 30.21 82.97 6.04 31.49 5.75 75.83 8.39 2.93 6.97 8.46 86.3 20.7 22.7 7.6 30.1 34.4 5.3 16.2 0.4 3.0 588 138
JAN'21 62 4.54 0.87 30.21 82.97 6.04 31.49 5.75 75.83 8.39 2.93 6.97 8.46 86.3 20.7 22.7 7.6 30.1 34.4 5.3 16.2 0.4 3.0 588 138
FEB'21 34 4.41 0.87 29.68 82.94 6.42 31.29 6.23 75.72 8.32 3.07 7.01 8.35 104.2 21.3 22.4 7.7 29.8 34.2 5.5 13.6 0.5 3.5 557 138
ABS MARCH'2021 MIXING ISSUE UNIT-1
TOTAL
MOISTU Total Bales
UP TO MOISTU RE at Total No of Lot
MIX NO. Mar-21 MIC MAT LENGTH UI SF STR ELG RD *b trash RE at B/R Ginning Neps SCN SFCn SfCw UQL(W) 5% L(N) IFC CGRD Trcnt TrAr TrID AMT SCI bales added lot
DATE Lots add added
issued %
%
141 1 01.03.21 4.36 0.86 29.80 83.0 6.39 31.35 6.53 75.70 8.47 3.26 7.22 8.35 107.5 23.0 23.2 7.93 29.87 34.17 5.7 0.0 18.7 0.5 3.6 550 139 130 54 1.53% 2 3.70
142 2 02.03.21 4.36 0.86 29.81 83.0 6.39 31.35 6.51 75.68 8.49 3.25 7.25 8.35 107.2 23.0 23.3 7.94 29.87 34.16 5.7 0.0 18.8 0.5 3.6 550 139 130 55 1.53% 2 3.64 BZ ID
143 3 03.03.21 4.36 0.86 29.86 83.0 6.37 31.34 6.51 75.72 8.51 3.34 7.28 8.35 107.2 22.9 23.2 7.91 29.94 34.23 5.6 0.0 18.5 0.5 3.6 551 139 130 55 0.77% 1 1.82 100
144 4 03.03.21(2) 4.36 0.86 29.86 83.1 6.37 31.35 6.51 75.72 8.52 3.34 7.31 8.36 107.0 22.9 23.2 7.92 29.94 34.23 5.7 0.0 18.6 0.5 3.6 551 139 130 55 0.77% 1 1.82 #DIV/0! #DIV/0!
145 5 04.03.21 4.36 0.86 29.88 83.1 6.36 31.33 6.57 75.78 8.52 3.39 7.31 8.37 107.1 23.1 23.3 7.95 29.97 34.27 5.6 0.0 19.7 0.5 3.6 551 139 130 55 0.77% 1 1.82 #DIV/0! #DIV/0!
146 6 05.03.21 4.36 0.86 29.90 83.1 6.34 31.37 6.61 75.82 8.53 3.39 7.31 8.37 107.7 23.3 23.4 7.98 29.97 34.26 5.7 0.0 20.4 0.5 3.5 551 140 130 55 0.77% 1 1.82 #DIV/0! #DIV/0!
147 7 06.03.21 4.36 0.86 29.93 83.1 6.33 31.44 6.64 75.88 8.54 3.39 7.32 8.37 108.5 23.6 23.5 8.01 30.01 34.30 5.7 0.0 20.9 0.5 3.4 550 140 130 55 1.53% 2 3.64
148 8 07.03.21 4.36 0.86 29.95 83.2 6.32 31.48 6.65 75.90 8.57 3.40 7.35 8.38 109.0 23.8 23.5 8.02 30.08 34.37 5.7 0.0 20.9 0.4 3.4 549 140 130 55 0.77% 1 1.82
149 9 07.03.21(2) 4.36 0.86 29.98 83.2 6.32 31.52 6.67 75.91 8.59 3.42 7.33 8.37 109.3 23.8 23.6 8.04 30.14 34.44 5.7 0.0 21.4 0.4 3.5 549 141 130 55 1.53% 2 3.64
150 10 08.03.21 4.36 0.86 30.03 83.3 6.28 31.62 6.73 75.97 8.63 3.42 7.30 8.38 109.2 23.5 23.6 8.03 30.26 34.57 5.8 0.0 22.4 0.4 3.5 547 142 130 55 0.77% 1 1.82
151 11 09.03.21 4.35 0.86 30.07 83.3 6.28 31.69 6.73 76.02 8.65 3.42 7.35 8.39 109.2 23.7 23.7 8.06 30.30 34.62 5.8 0.0 22.4 0.4 3.4 545 142 130 55 0.77% 1 1.82
152 12 10.03.21 4.35 0.86 30.09 83.3 6.29 31.70 6.76 76.01 8.68 3.41 7.34 8.37 108.7 23.7 23.8 8.06 30.35 34.68 5.8 0.0 22.9 0.4 3.5 543 142 130 55 1.53% 2 3.64
153 13 11.03.21 4.35 0.86 30.10 83.3 6.30 31.68 6.78 75.95 8.71 3.39 7.35 8.37 108.3 23.6 23.8 8.09 30.35 34.67 5.9 0.0 22.8 0.4 3.5 543 142 130 55 0.77% 1 1.82
154 14 12.03.21 4.34 0.86 30.11 83.3 6.29 31.76 6.85 76.01 8.73 3.39 7.42 8.37 106.4 23.2 24.0 8.15 30.35 34.75 5.9 0.0 23.8 0.4 3.5 543 143 130 55 0.77% 1 1.82
155 15 12.03.21(2) 4.34 0.86 30.12 83.3 6.28 31.77 6.85 76.03 8.76 3.38 7.38 8.38 106.1 23.1 24.0 8.15 30.38 34.80 5.9 0.0 24.6 0.4 3.5 543 143 130 55 1.53% 2 3.64
156 16 13.03.21 4.34 0.86 30.13 83.3 6.27 31.76 6.83 75.99 8.77 3.32 7.40 8.39 105.2 22.8 24.0 8.18 30.36 34.79 5.9 0.0 24.9 0.4 3.5 544 143 130 55 2.30% 2 3.64
157 17 14.03.21 4.33 0.86 30.14 83.3 6.27 31.77 6.85 76.01 8.78 3.29 7.41 8.40 104.8 22.9 24.0 8.18 30.40 34.83 5.9 0.0 25.3 0.4 3.4 544 143 130 55 0.77% 1 1.82
158 18 15.03.21 4.33 0.86 30.17 83.3 6.27 31.76 6.89 76.05 8.78 3.29 7.43 8.42 104.2 23.3 24.0 8.14 30.50 34.92 5.9 0.0 25.6 0.4 3.4 543 143 130 55 0.77% 1 1.82
159 19 16.03.21 4.33 0.86 30.22 83.3 6.26 31.76 6.91 76.14 8.80 3.23 7.47 8.44 104.7 23.6 24.0 8.11 30.59 35.03 5.9 0.0 25.6 0.4 3.4 544 143 130 55 0.77% 1 1.82
160 20 17.03.21 4.33 0.86 30.23 83.3 6.24 31.75 6.94 76.16 8.80 3.17 7.50 8.45 105.1 23.9 24.0 8.10 30.60 35.04 5.9 0.0 25.4 0.4 3.4 544 143 130 55 2.30% 2 3.64
161 21 18.03.21 4.33 0.86 30.22 83.3 6.25 31.73 6.93 76.17 8.81 3.13 7.49 8.46 105.7 24.0 24.0 8.10 30.60 35.03 5.9 0.0 25.3 0.4 3.3 545 143 130 55 2.30% 2 3.64
162 22 19.03.21 4.33 0.86 30.22 83.3 6.25 31.73 6.93 76.17 8.81 3.13 7.49 8.46 105.7 24.0 24.0 8.10 30.60 35.03 5.9 0.0 25.3 0.4 3.3 545 143 130 55 0.00% 0 0.00
163 23 20.03.21 4.33 0.86 30.23 83.3 6.25 31.78 6.88 76.20 8.82 3.12 7.50 8.47 104.7 23.8 24.0 8.08 30.63 35.05 5.9 0.0 25.7 0.4 3.3 545 143 130 55 0.00% 0 0.00
164 24 20.03.21(2) 4.33 0.86 30.25 83.3 6.24 31.79 6.85 76.21 8.83 3.10 7.49 8.48 104.0 23.6 24.0 8.08 30.66 35.07 6.0 0.0 25.9 0.4 3.3 544 143 130 55 0.77% 1 1.82
165 25 21.03.21 4.33 0.86 30.28 83.3 6.23 31.81 6.87 76.20 8.84 3.08 7.49 8.50 103.4 23.7 24.0 8.08 30.66 35.06 5.9 0.0 26.1 0.4 3.3 542 143 130 55 0.77% 1 1.82
166 26 22.03.21 4.33 0.86 30.29 83.3 6.21 31.81 6.88 76.20 8.85 3.06 7.48 8.50 103.2 24.0 24.0 8.09 30.65 35.05 6.0 0.0 26.0 0.4 3.3 541 143 130 55 0.77% 1 1.82
167 #DIV/0!
168 #DIV/0!
169 #DIV/0!
170 #DIV/0!
171 #DIV/0!
172 #DIV/0!
AVG 4.34 0.86 30.07 83.23 6.29 31.62 6.76 75.98 8.68 3.29 7.38 8.40 106.5 23.5 23.7 8.06 30.31 34.67 5.83 0.00 23.0 0.44 3.44 546 142 130 55.0 0.0 1 #DIV/0!
MAX 4.36 0.86 30.29 83.34 6.39 31.81 6.94 76.21 8.85 3.42 7.50 8.50 109.3 24.0 24.0 8.18 30.7 35.07 5.95 0.00 26.1 0.48 3.64 551 143 130 55.0 0.0 2 #DIV/0!
MIN 4.33 0.86 29.80 83.04 6.21 31.33 6.51 75.68 8.47 3.06 7.22 8.35 103.2 22.8 23.2 7.91 29.9 34.16 5.65 0.00 18.5 0.41 3.28 541 139 130 54.0 0.0 0 #DIV/0!
RANGE 0.04 0.00 0.49 0.29 0.18 0.48 0.43 0.53 0.38 0.36 0.28 0.15 6.08 1.2 0.8 0.27 0.8 0.91 0.30 0.00 7.56 0.07 0.36 9 4.28 0.00 1.0 0.0 2 #DIV/0!
STDEV 0.01 0.00 0.16 0.11 0.05 0.18 0.15 0.17 0.13 0.12 0.09 0.05 1.91 0.39 0.3 0.08 0.28 0.33 0.12 0.00 2.70 0.02 0.10 3.23 1.57 0.00 0.2 0.0 1 #DIV/0!
CV 0.31 0.14 0.52 0.13 0.81 0.57 2.18 0.22 1.49 3.73 1.16 0.58 1.79 1.67 1.30 0.98 0.91 0.96 2.04 0.00 11.73 4.50 3.03 0.59 1.11 0.00 0.4 57.8 48 #DIV/0!
UNIT:1
DATE-20.03.2021(2) ( INDIAN 2021-2022) MIXING NO -24 Moisture
NO OF Moisture
SR NO OPENING CLOSING BALE GRADE LOTNO MIC MAT LENGTH UI SF STR ELG RD +b trash at B/R at neps/gm SCN SFC(n) SFC(w) UQL(W) 5% L(N) IFC CGrd Trcnt TrAr
1 66 63 3 OL-B 1439 4.25 0.86 31.04 82.60 5.70 32.00 6.2 74.7 9.6 2.69 7.0 Ginning
8.8 96 33 20.5 6.5 31.8 36.4 4.6 32-1 44 0.58
2 18 17 1 OL-B 1454 4.41 0.86 29.30 82.60 6.30 30.90 6.6 74.0 8.7 2.77 8.0 9.0 165 30 24.6 8.2 30.0 34.1 5.5 41-3 32 0.50
3 16 15 1 OL-B 1478 4.23 0.86 30.17 83.60 6.50 32.80 6.4 77.2 9.2 3.53 7.6 8.1 158 32 22.3 7.2 31.0 35.3 5.6 31-3 28 0.34
4 69 68 1 OL-B 1479 4.21 0.86 28.79 82.60 6.80 30.20 6.6 76.2 9.5 4.20 7.5 8.0 189 27 27.8 10.3 28.8 32.9 5.9 31-3 30 0.24
5 4 1 3 OL-B 1489 4.29 0.86 29.63 83.50 6.80 29.80 6.4 77.4 9.1 3.21 6.4 8.0 129 17 24.7 8.5 31.2 35.6 6.0 31-3 29 0.38
6 10 7 3 OL-B 1496 4.20 0.86 30.17 84.10 6.50 31.90 5.8 76.1 8.0 4.57 7.0 8.0 110 8 25.1 8.8 29.1 33.4 5.7 41-1 36 0.57
7 12 9 3 OL-B 1499 4.21 0.87 29.35 83.70 6.30 31.60 5.6 75.3 9.0 3.59 8.5 8.3 120 21 20.9 6.8 31.2 35.6 5.3 31-4 31 0.42
8 1 0 1 OL-B 1501 4.18 0.86 29.90 83.10 6.30 31.20 5.6 76.2 8.8 3.74 8.6 8.6 116 19 24.4 8.4 29.7 34.3 5.9 31-3 30 0.43
9 45 43 2 OL-B 1503 4.31 0.87 29.47 83.70 6.10 30.80 5.4 76.0 9.5 2.78 7.6 8.1 121 27 25.3 9.2 28.5 32.3 7.2 31-3 34 0.63
10 77 75 2 OL-B 1511 4.31 0.86 30.17 82.30 5.70 31.40 7.4 74.6 9.8 3.54 6.9 8.0 89 19 22.6 7.4 31.4 35.5 5.0 32-1 35 0.61
11 57 55 2 OL-B 1512 4.38 0.85 31.08 84.40 6.00 29.20 8.9 76.3 9.5 3.82 8.0 8.2 124 28 23.2 8.1 29.8 34.6 5.5 31-3 25 0.39
12 77 75 2 OL-B 1513 4.24 0.84 29.70 84.20 6.40 28.00 9.1 73.9 9.7 3.74 8.5 8.0 93 24 24.5 8.1 32.0 36.5 6.4 32-1 45 0.52
13 18 15 3 OL-B 1520 4.36 0.85 30.74 83.90 6.50 31.40 8.1 75.6 9.5 3.28 6.5 8.2 78 25 23.5 7.6 31.1 35.6 6.2 31-3 33 0.30
14 95 94 1 OL-B 1522 4.34 0.84 30.28 83.40 6.30 30.00 9.6 76.3 9.6 3.28 7.5 9.0 99 30 25.5 8.4 30.8 35.0 5.6 32-1 28 0.36
15 20 17 3 OL-B 1528 4.37 0.85 30.65 83.20 5.80 32.70 8.0 77.0 8.4 3.07 7.5 8.1 83 21 24.8 8.0 29.9 33.8 5.9 31-1 36 0.45
16 21 18 3 OL-B 1529 4.34 0.85 31.06 83.70 5.80 32.50 8.6 76.2 8.8 2.86 7.9 8.7 82 32 24.7 7.9 29.7 33.9 6.7 31-3 35 0.57
17 21 18 3 OL-A 1532 4.20 0.85 30.22 84.10 5.60 31.10 8.0 76.8 8.7 2.48 8.5 8.3 109 24 22.7 7.5 30.6 34.9 5.7 31-1 29 0.42
18 36 34 2 OL-B 1533 4.31 0.85 30.69 84.10 5.50 32.00 7.9 77.2 8.6 2.73 7.5 8.0 112 22 25.6 8.7 29.5 33.6 6.5 31-1 33 0.49
19 23 20 3 OL-B 1534 4.28 0.85 31.45 84.60 5.40 31.80 7.8 78.1 8.5 3.12 6.9 8.0 106 24 24.2 7.7 30.5 34.7 6.3 31-1 25 0.42
20 52 49 3 OL-B 1543 4.38 0.87 30.59 82.60 6.50 32.40 5.7 76.6 8.0 2.96 7.5 8.5 103 18 22.6 7.5 31.5 36.8 6.1 31-2 26 0.30
21 35 32 3 OL-A 1544 4.33 0.85 31.48 82.40 6.50 32.20 7.5 77.0 8.2 2.98 7.4 8.7 96 11 22.3 7.5 31.7 36.4 5.6 31-2 28 0.42
22 50 48 2 OL-B 1546 4.16 0.85 30.03 82.80 6.30 33.50 8.0 76.4 9.4 3.24 7.0 8.5 127 41 23.4 8.4 30.0 34.8 5.7 31-3 40 0.81
23 51 48 3 OL-B 1549 4.61 0.88 30.99 82.00 6.30 32.80 5.2 77.2 8.8 2.50 6.9 8.6 118 38 24.7 8.2 31.3 35.9 5.0 31-1 25 0.25
24 40 37 3 OL-B 1550 4.70 0.87 30.62 83.20 6.80 32.00 7.0 78.0 8.8 2.26 7.0 8.5 108 35 24.0 7.9 31.2 35.7 6.3 31-1 18 0.12
25 42 39 3 OL-B 1563 4.69 0.86 30.11 83.30 6.20 33.10 7.5 75.8 9.0 4.01 7.5 8.6 110 17 25.8 9.0 30.1 34.5 5.7 31-3 33 0.40
26 51 48 3 OL-B 1564 4.18 0.86 29.84 84.00 5.90 32.80 6.8 76.8 8.9 3.58 7.8 8.6 104 17 24.4 8.7 29.6 33.9 5.8 31-1 34 0.42
27 49 46 3 OL-A 1568 4.35 0.86 29.95 83.00 7.00 31.00 7.0 76.9 8.4 3.23 6.9 8.8 111 29 23.6 8.2 30.7 35.4 5.1 31-1 26 0.39
28 55 52 3 OL-B 1569 4.42 0.86 30.43 83.20 6.50 32.20 7.3 77.6 8.3 3.14 7.5 8.2 102 19 24.0 8.7 28.8 32.7 6.1 31-1 22 0.39
29 57 54 3 OL-B 1574 4.36 0.86 30.57 83.50 6.20 32.70 7.3 76.8 8.8 2.97 7.5 8.7 94 26 24.8 8.4 30.6 35.8 6.1 31-1 28 0.29
30 59 56 3 OL-B 1576 4.74 0.87 30.45 83.50 6.20 32.20 7.4 77.5 8.2 2.98 7.9 8.2 88 12 25.8 8.7 31.5 36.1 5.7 31-1 31 0.44
31 56 53 3 OL-A 1578 4.33 0.85 30.53 84.70 5.60 33.20 7.9 76.7 9.0 3.15 8.0 9.0 109 18 23.5 7.8 31.1 35.5 5.8 31-3 26 0.44
32 71 69 2 OL-B 1579 4.41 0.86 29.86 83.90 6.10 33.80 7.9 75.6 9.5 3.14 6.9 8.4 116 27 23.0 8.1 29.8 34.2 6.4 31-3 30 0.41
33 57 54 3 OL-A 1585 4.29 0.86 30.76 83.70 6.40 33.20 6.8 76.9 8.0 3.12 7.0 8.5 92 19 21.7 6.7 32.8 36.9 6.7 31-2 32 0.34
34 68 65 3 OL-B 1586 4.49 0.87 31.91 85.70 5.30 31.90 5.6 75.8 9.1 2.95 6.9 8.9 104 27 24.3 8.0 33.2 37.5 5.4 31-3 25 0.45
35 65 62 3 OL-B 1587 4.47 0.86 30.55 83.00 6.00 31.30 6.8 77.8 8.4 3.16 7.6 8.7 72 15 23.6 7.9 32.1 36.9 5.6 31-1 31 0.28
36 75 73 2 OL-B 1588 4.25 0.86 29.56 83.40 5.90 33.00 6.6 75.6 9.3 2.35 7.9 8.5 112 35 22.1 7.2 30.2 34.4 6.4 31-3 19 0.50
37 75 72 3 OL-B 1591 4.29 0.84 30.19 83.70 5.70 30.10 9.6 76.2 8.9 2.34 8.5 8.5 65 19 25.0 8.7 30.9 35.7 6.1 31-3 22 0.27
38 79 76 3 OL-A 1592 4.18 0.84 30.14 83.30 6.20 31.30 8.6 76.4 8.9 3.19 8.9 8.8 86 17 22.8 7.5 31.2 35.9 5.6 31-3 32 0.37
39 84 82 2 OL-B 1595 4.17 0.84 29.98 82.90 6.90 30.70 8.8 75.2 9.3 2.54 7.9 8.7 118 33 25.3 8.6 30.5 34.9 6.7 31-3 26 0.29
40 100 99 1 OL-B 1598 4.47 0.88 31.96 82.90 6.30 31.00 4.6 74.8 8.8 3.05 8.0 8.5 86 13 26.4 8.7 31.6 36.0 5.2 31-4 33 0.55
41 92 91 1 OL-B 1600 4.24 0.86 30.39 84.70 5.10 31.20 6.1 76.2 9.4 2.39 8.0 8.5 128 19 26.7 9.0 29.8 34.3 6.4 31-3 27 0.46
42 84 81 3 OL-B 1608 4.19 0.87 30.03 82.60 6.60 31.20 5.1 74.4 9.3 2.38 8.5 9.0 97 17 24.0 8.4 30.4 34.8 6.9 32-2 37 0.41
43 87 84 3 OL-B 1609 4.24 0.87 29.54 83.20 6.40 30.50 5.5 77.0 9.0 2.05 6.9 8.9 87 27 24.2 8.1 30.4 34.5 6.0 31-3 22 0.37
44 89 87 2 OL-B 1610 4.25 0.87 29.83 82.90 6.50 29.80 5.6 77.2 8.9 2.45 7.5 8.4 110 45 23.1 7.9 30.4 34.4 5.9 31-1 20 0.20
45 95 92 3 OL-A 1612 4.18 0.87 29.91 83.00 6.40 32.20 4.8 75.2 9.2 2.18 8.0 9.0 76 20 21.6 6.9 30.9 35.0 6.2 31-3 26 0.38
46 96 95 1 OL-B 1626 4.58 0.88 29.23 83.30 6.30 33.00 4.9 76.8 8.9 2.72 6.5 8.5 85 20 21.6 7.3 30.0 34.0 5.9 31-1 22 0.27
47 97 96 1 OL-B 1651 4.16 0.87 29.30 82.50 7.20 29.70 4.9 76.2 9.0 2.83 7.0 8.5 130 20 24.6 8.3 30.6 34.5 7.2 31-3 28 0.33
48 96 95 1 OL-B 1652 4.14 0.87 30.29 84.30 5.60 30.70 5.3 76.3 8.9 2.57 6.9 8.5 114 40 25.1 8.5 31.1 35.2 5.6 31-3 30 0.33
49 8 6 2 OL-B 285 4.35 0.87 29.37 82.20 7.00 32.60 6.1 75.1 8.4 2.36 7.0 8.6 156 37 26.5 9.4 28.6 32.5 6.0 41-1 31 0.40
50 21 19 2 OL-B 351 4.16 0.86 29.45 82.70 7.10 28.50 5.3 74.8 8.2 3.49 6.6 8.5 126 31 25.1 8.2 30.5 34.3 5.5 41-1 41 0.50
51 7 4 3 OL-B 358 4.21 0.86 29.51 81.60 6.70 31.80 5.8 74.9 8.6 3.80 7.5 8.3 82 16 24.2 8.1 31.2 35.9 5.7 31.4 34 0.51
52 18 15 3 OL-B 359 4.35 0.87 29.67 82.20 6.30 35.20 5.2 75.0 8.4 4.37 6.9 8.4 99 20 25.2 8.3 31.0 35.3 6.2 41-1 34 0.48
53 45 43 2 OL-B 363 4.45 0.85 29.01 82.70 6.60 29.80 9.0 74.4 8.0 4.25 7.0 8.3 130 28 26.4 9.6 29.3 34.2 5.9 41-1 32 0.53
54 34 32 2 OL-B 364 4.30 0.87 30.60 82.00 7.00 34.20 5.8 76.2 8.8 3.09 7.5 8.5 104 24 25.8 8.8 29.8 35.0 8.8 31-3 24 0.45
55 57 55 2 OL-B 367 4.14 0.86 29.62 82.80 6.30 33.40 5.8 74.2 9.2 4.06 7.8 8.5 111 28 23.2 7.8 30.2 34.3 5.4 32-2 32 0.59
TOTAL 2883 2753 130 AB 101.62 4.33 0.86 30.25 83.30 6.24 31.79 6.85 76.21 8.83 3.10 7.49 8.48 103.97 23.65 23.99 8.08 30.66 35.07 5.95 0.00 25.91 0.41
Grade BALE % LOT'S SD 0.14 0.01 0.69 0.80 0.47 1.41 1.35 1.06 0.48 0.59 0.61 0.30 23.26 8.06 1.53 0.72 0.99 1.13 0.66 #DIV/0! 5.83 0.12
AP 0 0.00 0 MIN 4.14 0.84 28.79 81.60 5.10 28.00 4.60 73.90 8.00 2.05 6.40 8.00 65.00 8.00 20.90 6.70 28.50 32.30 5.00 0.00 18.00 0.12
OL-A 21 16.15 7 MAX 4.74 0.88 31.96 85.70 7.20 35.20 9.60 78.10 9.80 4.57 8.90 9.00 189.00 45.00 27.80 10.30 33.20 37.50 8.80 0.00 45.00 0.81
OL-B 109 83.85 48 RANGE 0.60 0.04 3.17 4.10 2.10 7.20 5.00 4.20 1.80 2.52 2.50 1.00 124.00 37.00 6.90 3.60 4.70 5.20 3.80 0.00 27.00 0.69
RE 0 0.00 0 CV 3.3 1.2 2.3 1.0 7.6 4.4 19.7 1.4 5.4 19.2 8.1 3.5 22.4 34.1 6.4 9.0 3.2 3.2 11.0 #DIV/0! 22.5 29.0
MGMT 0 0.00 0 STD 8% cv 2mm range 5% cv 8% cv 8.5
TOTAL C 0 0.00 0 Previous 4.33 0.86 30.23 83.30 6.25 31.78 6.88 76.20 8.82 3.12 7.45 8.47 104.75 23.77 23.97 8.08 30.63 35.05 5.95 0.00 25.66 0.4
AB 130 100 55 DIFF 0.00 -0.02 0.00 0.00 -0.01 0.78 0.12 -0.02
STD between mixing 0.1 0.50 0.5% 5% CV 0.2
Q.OFFICER QM D.G.M
LOTS LOT% BALES%
OUT SIDE 48 87
VL 7 13
LLP 0 0
TOTAL 55 100
TrID AMT SCI
4 416 142
4 592 133
3 535 149
2 548 134
3 607 138
4 598 148
3 552 145
3 566 141
5 530 141
4 566 137
3 521 142
4 474 135
3 566 146
3 502 139
4 577 146
4 492 149
3 580 147
4 536 149
3 581 153
3 585 142
3 563 143
5 547 147
2 510 139
1 568 142
3 562 143
3 576 151
3 531 139
3 537 144
3 503 147
4 573 143
4 541 155
3 606 150
3 513 151
4 547 156
3 469 141
4 495 146
2 576 140
3 581 143
3 573 139
4 488 140
4 579 150
3 549 138
3 531 139
2 601 136
3 541 143
2 493 143
3 552 133
3 578 147
3 624 138
4 592 130
4 486 135
4 532 138
4 440 130
4 474 145
4 550 145
3.29 544.00 143.13
0.77 44.02 5.95
1.00 440.00 130.00
5.00 624.00 156.00
4.00 184.00 26.00
23.3 8.1 4.2
8% cv
3.3 545 143
M.D
344
UNIT -1 CUTS & CLASSIMATE REPORT MARCH
26CCH 26CCH 26CCH 26CCH
M/C NO. Aug'20 Sep'20 Oct'20 Nov'20 DEC'20 JAN'21 FEB'21 AVG AVG 15 16 17 18 19 20 21 AVG 22 23 24
AVG AVG AVG AVG AVG AVG AVG
YF ### ### 74 74 74
N ### ### 9 10 9
s ### ### 30 29 29
l ### ### 14 14 14
t ### ### 1 1 1
cp ### ### 0.3 0.3 0.3
cm ### ### 0.7 0.6 0.6
ccp ### ### 0.8 1.0 0.9
ccm ### ### 0.5 0.4 0.4
pf ### ### 0.0 0.0 0.0
jp ### ### 1.2 1.2 1.2
JM ### ### 0.5 0.5 0.5
FD ### ### 12.8 12 12
pp ### ### 6.9 8 7
M/C NO. Aug'20 Sep'20 Oct'20 Nov'20 DEC'20 JAN'21 FEB'21 AVG AVG 15 16 17 18 19 20 21 AVG 22 23 24
AVG AVG AVG AVG AVG AVG AVG
YF 84 79 76 74 83 88 83 78 70 62 64 57 67 66 66 64
N 8 10 9 9 14 14 12 11 10 9 9 9 11 11 11 10
s 26 23 23 24 35 35 29 27 23 20 21 18 22 22 23 21
l 14 14 14 12 8 9 11 11 9 7 6 6 7 7 6 7
t 2 3 3 3 4 4 4 3 3 2 2 2 2 2 2 2
cp 0.3 0.3 0.3 0.2 0.2 0.4 0.5 0.5 0.4 0.2 0.2 0.2 0.4 0.5 0.4 0.3
cm 0.7 0.6 0.5 0.4 0.4 0.7 0.8 1.0 0.8 0.5 0.5 0.7 1.0 0.7 0.8 0.7
ccp 1.9 1.3 1.5 1.0 1.0 1.1 1.4 1.3 1.5 1.1 0.9 1.0 1.2 1.6 1.2 1.2
ccm 0.4 0.7 0.4 0.4 0.4 0.6 0.6 0.5 0.5 0.3 0.3 0.4 0.4 0.3 0.8 0.4
pf 0.4 0.4 0.5 0.1 0.2 0.4 0.7 0.4 0.1 0.0 0.2 0.0 0.0 0.0 0.0 0.0
jp 1.2 1.2 1.1 1.0 1.1 1.1 1.0 1.2 1.3 1.0 0.8 0.8 0.8 1.2 0.9 0.9
JM 0.6 0.7 0.7 0.5 0.6 0.6 0.5 0.4 0.4 0.4 0.5 0.3 0.3 0.3 0.4 0.4
FD 16 12 13 13 10 13 14 13 14 15 15 13.3 13 13 13 14
pp 15 14 10 10 10 9 10 9 7 7 8 6.7 9 7 8 8
A1 257 206 193 260 274 258 252 237 263 237 261 208 217 229 232 231
A2 52 43 40 51 68 66 60 56 56 49 51 44 51 55 55 51
A3 9 8 7 2 3 3 3 3 2.5 2 2 2 3 3 3 2.5
A4 2.0 1.8 1.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
B1 39 30 35 39 56 55 51 47 45 39 39 32.8 36.7 39.7 40 38
B2 16 13 14 11 19 18 16 15 13 11 11 10.1 12.0 12.8 13 12
B3 5.0 4.6 4.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
B4 1.7 1.7 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
C1 10.2 7.8 8.7 6.5 7.5 8.3 9.0 8.5 7.3 6.5 6.4 5.8 5.8 6.4 6.6 6.3
C2 4.3 3.4 3.4 0.5 0.5 0.6 0.9 0.9 0.7 0.6 0.5 0.5 0.6 0.7 0.6 0.6
C3 2.4 2.0 1.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
C4 1.1 1.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
D1 1.5 1.4 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
D2 0.7 0.6 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
D3 0.7 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
D4 0.4 0.4 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
E 3.5 3.4 3.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
F 4.2 3.4 3.5 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
G 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
H1 0.2 0.2 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
H2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
I1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
I2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL 411 333 322 370 427 410 393 367 388 346 371 304 326 347 350 341
CMT 91 74 72 82 95 91 87 81 86 77 82 67 73 77 78 76
TOTAL IPI 51 41 45 50 54 55 57 51 54 49 54 48 48 45 45 48
M/C NO. Aug'20 Sep'20 Oct'20 Nov'20 DEC'20 JAN'21 FEB'21 AVG AVG 15 16 17 18 19 20 21 AVG 22 23 24
AVG AVG AVG AVG AVG AVG AVG
YF 81 101 ### ### ###
N 12 18 ### ### ###
s 26 36 ### ### ###
l 9 11 ### ### ###
t 3 4 ### ### ###
cp 0.6 1.0 ### ### ###
cm 0.9 1.3 ### ### ###
ccp 1.2 1.6 ### ### ###
ccm 0.7 1.2 ### ### ###
pf 0.0 0.0 ### ### ###
jp 1.4 1.2 ### ### ###
JM 0.3 0.5 ### ### ###
FD 13 12 ### ### ###
pp 16 16 ### ### ###
M/C NO. Aug'20 Sep'20 Oct'20 Nov'20 DEC'20 JAN'21 FEB'21 AVG AVG 15 16 17 18 19 20 21 AVG 22 23 24
AVG AVG AVG AVG AVG AVG AVG
YF 82 79 77 68 70 83 81 82 86 86 86 76 80 74 78 80
N 9 10 9 10 10 12 11 12 13 13 13 11 13 12 13 12
s 27 27 26 23 24 28 26 27 32 28 27 24 25 24 25 26
l 9 8 8 8 7 7 8 8 9 9 9 7 8 7 7 8
t 2 2 2 2 6 7 5 5 4 5 4 4 4 3 3 4
cp 0.3 0.4 0.4 0.3 0.3 0.5 0.6 0.6 0.6 0.6 0.6 0.5 0.7 0.5 0.5 0.6
cm 0.7 0.6 0.5 0.4 0.4 0.6 0.6 0.7 1.0 0.8 0.7 0.7 0.8 0.8 0.7 0.8
ccp 2.5 2.2 1.6 1.5 1.5 1.6 2.1 2.4 2.7 2.2 2.0 1.9 2.1 1.7 1.6 1.9
ccm 1.2 0.7 0.5 0.5 1.0 0.6 0.6 0.5 0.7 0.7 0.6 0.6 0.5 0.5 0.5 0.6
pf 1.0 1.2 0.5 0.2 0.5 0.9 0.7 0.9 0.4 0.2 1.0 0.3 0.3 0.4 0.2 0.4
jp 1.1 1.2 1.1 1.0 0.9 1.0 1.2 1.4 1.2 1.5 1.3 1.2 1.3 1.1 1.1 1.2
JM 0.4 0.5 0.4 0.4 0.7 0.8 0.5 0.6 0.5 0.6 0.5 0.5 0.5 0.3 0.4 0.5
FD 17 14 17 12 10 12 13 13 15 15.5 16.4 13.7 14 13 13.1 14
pp 13 12 11 10 10 12 13 13 13 11.4 11.5 11.4 12 11 12.1 12
A1 388 315 369 415 346 343 318 327 368 362 350 334 356 337 343 347
A2 72 61 67 74 63 67 61 61 66 67 65 61 67 64 66 65
A3 10 10 9 3 3 3 2 2 2 2 2 1 2 2 2 2
A4 2.0 2.1 1.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
B1 41 35 37 40 40 46 48 47 45 43.9 40.9 39.0 39.1 38.1 38.7 40
B2 16 14 14 11 11 13 12 10 10 10.0 9.4 9.0 9.4 9.0 9.4 9
B3 4.9 4.6 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
B4 1.7 1.7 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
C1 9.6 8.5 7.8 6.0 6.3 7.6 7.9 7.5 7.1 7.1 6.5 6.1 5.9 5.1 5.2 6.0
C2 4.0 3.6 3.1 0.4 0.4 0.5 0.4 0.3 0.2 0.3 0.2 0.2 0.2 0.1 0.2 0.2
C3 2.3 2.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
C4 1.0 0.9 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
D1 1.3 1.3 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
D2 0.6 0.6 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
D3 0.6 0.5 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
D4 0.4 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
E 3.3 3.1 2.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
F 3.7 3.4 2.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
G 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
H1 0.2 0.3 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
H2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
I1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
I2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL 563 469 527 549 470 480 449 455 499 492 474 451 479 454 464 469
CMT 125 104 117 122 104 107 100 101 111 109 105 100 106 101 103 104
TOTAL IPI 71 57 74 69 68 72 73 71 74 68 70 65 68 60 63 66
M/C NO. Aug'20 Sep'20 Oct'20 Nov'20 DEC'20 JAN'21 FEB'21 AVG AVG 15 16 17 18 19 20 21 AVG 22 23 24
AVG AVG AVG AVG AVG AVG AVG
YF 90 86 87 73 57 77 77 89 100 84 81 88 82 84
N 11 10 10 11 8 10 9 10 9 12 12 11 13 12
s 31 29 32 23 16 21 21 27 32 28 27 29 27 28
l 11 12 12 11 8 10 10 16 23 11 10 15 11 12
t 4 4 5 3 3 5 4 5 5 3 3 3 3 3
cp 0.3 0.3 0.4 0.2 0.3 0.8 0.9 1.3 1.7 0.8 0.6 1.1 0.8 0.8
cm 0.7 0.5 0.5 0.4 0.3 0.6 0.7 1.0 0.9 0.5 0.5 0.6 0.5 0.5
ccp 1.7 1.2 2.0 1.1 1.4 1.0 1.1 2.0 3.0 0.9 1.1 1.7 1.0 1.2
ccm 0.6 0.3 0.6 0.2 0.2 0.4 0.4 0.5 0.5 0.2 0.4 0.4 0.3 0.3
pf 0.4 0.7 0.4 0.1 0.4 1.6 1.0 0.8 0.5 1.3 1.7 1.2 0.9 1.3
jp 1.6 1.7 2.7 1.4 1.2 1.2 1.3 1.5 1.6 1.4 1.4 1.5 1.4 1.4
JM 0.5 0.7 0.6 0.4 0.3 0.6 0.6 0.5 0.4 0.4 0.5 0.4 0.4 0.4
FD 18 14 12 12 9 12 14 13 13 16 15 15 13 15
pp 11 14 12 10 10 14 14 13 11 11 10 11 11 11
A1 641 466 543 597 466 519 458 468 429 528 555 504 514 525
A2 121 87 97 118 76 86 76 79 73 96 101 89.9 96.4 96
A3 13 11 9 5 3 3 3 3 3 4 4 3.5 3.8 4
A4 2.4 2.4 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
B1 42 34 38 35 23 32 31 36 36 40 39 38.2 40.3 39
B2 15 13 12 9 5 7 8 9 8 10 10 9.5 10.2 10
B3 4.6 4.3 3.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
B4 1.9 1.9 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
C1 8.6 7.8 6.7 3.2 3.6 5.0 5.1 6.6 7.5 6.5 6.0 6.7 6.3 6.3
C2 3.7 3.4 2.5 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
C3 2.1 1.8 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
C4 1.0 1.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
D1 1.6 1.3 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
D2 0.6 0.5 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
D3 0.5 0.4 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
D4 0.3 0.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
E 3.9 3.6 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
F 3.2 2.8 2.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
G 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
H1 0.3 0.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
H2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
I1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
I2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL 866 643 722 768 576 653 556 602 557 685 715 652 671 680
CMT 193 143 160 171 128 145 123 134 124 152 159 145 149 151
TOTAL IPI 89 67 88 75 69 84 81 80 78 92 85 81 85 86
OBSERVATIONS - 1ST WEEK
CCI COTTON LOTS BEING INCREASED
TO MAINTAIN STD WASTE FOLLWING ACTION TAKEN.
1 IN TC 05 CARDS FLATS SPEED FROM 410 TO 380 MM & TC10 400 TO 380 MM TO RE
2 ACTUAL COLLECTED WASTE IN LD 4.90 & FLAT 5.70, TOTAL 10.6 % AGAINST 9.5 %
3 IN 30& 34 CCH PROCESS COMBER NOIL MAINTEDE 17.50% AND 40 PROCESS 18.50 %
OBSERVATIONS - 2ND WEEK
1 CCI COTTON LOTS BEING INCREASED UP TO 80 % OF OVERALL MXG.
2 IPI & CMT MAINTED CONSISTANT LEVEL ALL COUNTS
3 RF 11 COUNT CHANGED FROM 30'S TO 34 CCH, AFTER CHANGED COUNT BOTH IPI &
IDENTIFIED 17 ROUGH SPLS AND BEING ATTD
4 RF 03 COUNT CHANGED FROM 30'S TO 34 CCH, AFTER CHANGED COUNT CMT FOUN
RF BEING ATTD
5 IN 40 PROCESS LONG THICK FAULTS ARE NOTICED HIGHER UP TO 23 FAULTS, 1. DRG
TO 40/44 2. SMX TPI CHANGED TO 1.30 FROM 1.34 NO IMPROVEMENT NOTICED 4.
CHANGED TO 1.16 FROM 1.12 AND NOTICED TO STD LEVEL AROUND 10
MONTH
25 26 27 28 29 30 31 AVG AVG
#DIV/0! 74
#DIV/0! 9
#DIV/0! 29
#DIV/0! 14
#DIV/0! 1
#DIV/0! 0.3
#DIV/0! 0.6
#DIV/0! 0.9
#DIV/0! 0.4
#DIV/0! 0.0
#DIV/0! 1.2
#DIV/0! 0.5
#DIV/0! 12
#DIV/0! 7
#DIV/0! 137
#DIV/0! 36
#DIV/0! 1.6
#DIV/0! 0.0
#DIV/0! 32
#DIV/0! 7
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 3.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 216
#DIV/0! 48
#DIV/0! 29
MONTH
25 26 27 28 29 30 31 AVG AVG
#DIV/0! 71
#DIV/0! 11
#DIV/0! 24
#DIV/0! 9
#DIV/0! 3
#DIV/0! 0.4
#DIV/0! 0.9
#DIV/0! 1.3
#DIV/0! 0.5
#DIV/0! 0.2
#DIV/0! 1.2
#DIV/0! 0.4
#DIV/0! 14
#DIV/0! 8
#DIV/0! 244
#DIV/0! 55
#DIV/0! 2.6
#DIV/0! 0.0
#DIV/0! 44
#DIV/0! 13
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 7.4
#DIV/0! 0.7
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 366
#DIV/0! 81
#DIV/0! 51
MONTH
25 26 27 28 29 30 31 AVG AVG
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
MONTH
25 26 27 28 29 30 31 AVG AVG
#DIV/0! 83
#DIV/0! 12
#DIV/0! 28
#DIV/0! 8
#DIV/0! 4
#DIV/0! 0.6
#DIV/0! 0.8
#DIV/0! 2.4
#DIV/0! 0.6
#DIV/0! 0.5
#DIV/0! 1.3
#DIV/0! 0.5
#DIV/0! 14
#DIV/0! 12
#DIV/0! 347
#DIV/0! 64
#DIV/0! 2
#DIV/0! 0.0
#DIV/0! 44
#DIV/0! 10
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 6.9
#DIV/0! 0.2
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 475
#DIV/0! 105
#DIV/0! 70
MONTH
25 26 27 28 29 30 31 AVG AVG
#DIV/0! 78
#DIV/0! 9
#DIV/0! 27
#DIV/0! 13
#DIV/0! 2
#DIV/0! 0.7
#DIV/0! 0.7
#DIV/0! 1.4
#DIV/0! 0.4
#DIV/0! 0.7
#DIV/0! 1.2
#DIV/0! 0.3
#DIV/0! 13
#DIV/0! 9
#DIV/0! 356
#DIV/0! 63
#DIV/0! 3
#DIV/0! 0.0
#DIV/0! 33
#DIV/0! 8
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 5.5
#DIV/0! 0.1
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 468
#DIV/0! 104
#DIV/0! 65
MONTH
25 26 27 28 29 30 31 AVG AVG
#DIV/0! 90
#DIV/0! 10
#DIV/0! 28
#DIV/0! 17
#DIV/0! 4
#DIV/0! 1.3
#DIV/0! 0.8
#DIV/0! 2.0
#DIV/0! 0.4
#DIV/0! 0.9
#DIV/0! 1.5
#DIV/0! 0.5
#DIV/0! 13.4
#DIV/0! 12.1
#DIV/0! 476
#DIV/0! 83
#DIV/0! 3
#DIV/0! 0.0
#DIV/0! 37
#DIV/0! 9
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 6.7
#DIV/0! 0.1
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 0.0
#DIV/0! 614.9
#DIV/0! 136.6
#DIV/0! 81.2
M TO REDUCE FLAT WASTE .
9.5 %
18.50 % .
TH IPI & CMT FOUNDHIGH(AVG CMT:- 144 & AVG IPI:- 99)
SL.NO DATE COUNT M/C NO COUNT CV% STR CV% CSP ID U% CVb -50% +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
15 15.03.21 30CCH 5,6 30.22 1.10 97.21 3.61 2937 8.96 2.6 0.2 13 46 60 510 16 149 234 399 5.18 1.19
16 16.03.21 30CCH 7 29.85 1.20 108.4 3.32 3235 8.95 2.3 0.3 17 45 62 489 13 155 236 404 4.89 1.16
17 17.03.21 30CCH 4 29.88 0.70 92.9 5.59 2774 3083 8.94 2.4 0.0 13 38 51 511 13 163 223 398 5.27 1.23 25200
18 18.03.21 30CCH 6 29.87 1.06 103.55 5.01 3093 3104 8.93 1.7 0.0 14 34 48 478 14 144 195 353 4.96 1.17 25230
19 19.03.21 30CCH 6 29.71 0.76 104.4 2.37 3101 3135 9.06 3.2 0.3 13 44 58 537 11 156 216 383 5.04 1.18 25241
20 20.03.21 30CCH 5,6 29.88 0.96 102.3 3.50 3057 8.91 3.5 0.0 11 39 50 472 10 131 206 347 5.12 1.16
21
3rd week AVG 30CCH 29.90 0.96 101.4 3.90 3033 8.96 2.6 0.1 14 41 55 500 13 150 218 381 5.08 1.18
SL.NO DATE COUNT M/C NO COUNT CV% STR CV% CSP ID U% CVb -50% +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
22
23
24
25
26
27
28
30CCH #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! ### #DIV/0! #DIV/0! ### ### #DIV/0! #DIV/0! #DIV/0! #DIV/0!
4th week AVG
MARCH-2021 ABSTRACT REPORT UNIT-1
32CCH IPI & CSP
SL.NO DATE COUNT M/C NO COUNT CV% STR CV% CSP ID U% CVb -50% +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
1 32CCH 0
2 32CCH
3 32CCH
4 32CCH
5 32CCH
6 32CCH
7 32CCH
1st week AVG 32CCH #DIV/0! #DIV/0! #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0 #DIV/0! ### #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
MARCH-2021 ABSTRACT REPORT UNIT-1
34CCH IPI & CSP
SL.NO DATE COUNT M/C NO COUNT CV% STR CV% CSP ID U% CVb -0.5 +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
1 01.03.21 34CCH 9 34.06 1.14 79.55 4.96 2708 2804 9.42 2.0 0.3 18 59 77 712 19 225 355 599 4.64 1.10 24961
2 02.03.21 34CCH 10 33.85 0.94 83.18 4.50 2815 2823 9.40 2.3 0.0 19 53 72 707 20 208 326 554 4.71 1.15 24998
3 04.03.21 34CCH 10 34.12 1.11 79.56 4.30 2714 2854 9.35 2.1 0.3 19 52 71 682 23 213 330 566 4.70 1.12 25001
4 05.03.21 34CCH
5 06.03.21 34CCH 9 34.03 0.74 80.47 4.61 2739 2900 9.52 1.9 0.0 17 60 77 771 26 250 356 632 4.64 1.12 25042
6 07.03.21 34CCH 10 34.09 1.21 81.23 4.57 2769 2904 9.34 2.1 0.0 18 54 72 709 25 217 312 554 4.66 1.11 25050
7 34CCH
1st week
AVG INDIAN 34CCH 34.03 1.03 80.80 4.59 2749 9.41 2.1 0.1 18 56 74 716 23 222 336 581 4.67 1.12
SL.NO DATE COUNT M/C NO COUNT CV% STR CV% CSP ID U% CVb -0.5 +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
8 08.03.21 34CCH 1 33.75 0.89 86.21 4.40 2909 2917 9.24 2.4 0.0 18 54 71 599 18 179 291 488 4.77 1.12 25077
9 09.03.21 34CCH 2,9 34.02 0.75 81.45 4.93 2779 9.29 2.4 0.2 19 58 77 622 18 201 319 539 4.84 1.15
10 10.03.21 34CCH 1,10 33.98 0.77 83.60 5.57 2840 9.21 2.3 0.0 15 56 71 597 18 182 306 507 4.77 1.14
11 11.03.21 34CCH 11,3 34.15 0.71 82.56 3.94 2819 9.16 1.3 0.0 16 61 77 585 94 189 318 601 4.73 1.12
12 12.03.21 34CCH 1,2 34.39 1.07 82.54 5.67 2838 9.28 2.6 0.2 15 59 75 637 21 187 312 520 4.79 1.13
13 13.03.21 34CCH 8,10 34.21 1.18 83.60 3.57 2860 9.15 1.6 0.0 14 54 69 552 14 186 285 486 4.53 1.09
14 14.03.21 34CCH 1,2 34.36 0.84 81.27 5.21 2795 9.30 2.3 0.3 14 55 69 615 20 179 321 519 4.93 1.15
2nd week
AVG INDIAN 34CCH 34.12 0.89 83.03 4.75 2834 9.23 2.1 0.1 16 57 73 601 29 186 307 523 4.76 1.13
SL.NO DATE COUNT M/C NO COUNT CV% STR CV% CSP ID U% CVb -0.5 +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
15 15.03.21 34CCH 3,8 33.77 0.73 87.76 4.88 2964 9.30 2.2 0.3 19 60 79 634 20 210 321 551 4.62 1.13
16 16.03.21 34CCH 2,10 34.34 1.35 86.75 4.50 2978 9.19 2.8 0.4 17 58 75 565 13 168 307 487 4.70 1.11
17 17.03.21 34CCH 1,7 34.06 0.88 87.16 4.81 2967 9.20 2.5 0.0 15 55 69 610 14 169 297 480 4.79 1.11
18 18.03.21 34CCH 1 34.13 1.14 87.58 4.16 2989 3109 9.29 2.1 0.3 14 65 80 611 19 183 309 511 4.94 1.16 25231
19 19.03.21 34CCH 3,7 33.79 0.83 90.81 3.06 3069 9.10 2.8 0.2 15 60 76 572 15 174 303 492 4.63 1.11
20 20.03.21 34CCH 9 33.89 1.03 86.81 5.00 2951 3147 9.32 1.9 0.3 15 60 75 673 23 209 296 527 4.63 1.07 25252
21 34CCH
3rd week
AVG INDIAN 32CCH 34.00 0.99 87.81 4.40 2986 9.23 2.4 0.2 16 60 76 611 17 185 305 508 4.72 1.11
SL.NO DATE COUNT M/C NO COUNT CV% STR CV% CSP ID U% CVb -0.5 +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
22 34CCH
24 34CCH
25 34CCH
26 34CCH
27 34CCH
28 34CCH
4TH week
AVG INDIAN 34CCH #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
MARCH-2021 ABSTRACT REPORT UNIT-1
36CCH IPI & CSP
SL.NO DATE COUNT M/C NO COUNT CV% STR CV% CSP ID U% CVb -0.5 +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
10 10.03.21 36CCH 14 9.06 2.0 0.0 13 59 71 571 15 146 312 472 4.42 1.04 25098
11 11.03.21 36CCH 12,13 35.75 0.89 79.87 5.02 2855 8.87 2.2 0.0 11 46 57 484 14 132 261 407 4.41 1.02
12 12.03.21 36CCH 13,14 36.04 0.88 78.40 5.47 2825 8.79 2.7 0.3 8 44 53 475 14 111 247 372 4.42 1.02
13 13.03.21 36CCH 12,14 35.93 1.26 83.56 5.00 3001 8.82 2.0 0.2 11 47 59 458 13 118 241 372 4.20 1.01
14 14.03.21 36CCH 12,13 35.93 0.98 79.89 4.70 2870 8.57 2.0 0.0 11 48 59 445 9 120 262 392 4.33 0.99
2nd week
INDIAN 36CCH 35.91 1.00 80.43 5.05 2888 8.82 2.2 0.1 11 49 60 487 13 125 265 403 4.35 1.02
AVG
SL.NO DATE COUNT M/C NO COUNT CV% STR CV% CSP ID U% CVb -0.5 +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
15 15.03.21 36CCH 13,14 36.07 0.96 77.87 5.31 2808 8.77 1.7 0.0 11 50 61 448 10 118 260 387 4.35 1.01
16
17
18
19 19.03.21 36CCH 11 35.66 0.66 80.35 5.33 2865 3151.00 8.57 2.8 0.3 9.8 49 59 393 8 107 245 360 4.31 0.99 25253
20 20.03.21 36CCH 12,13 35.65 1.16 82.08 5.88 2926 8.76 3.7 0.2 12 48 60 418 9 125 251 386 4.31 1.01
21
3rd week
INDIAN 36CCH 35.79 0.93 80.10 5.51 2866 8.70 2.7 0.2 11 49 60 420 9 117 252 377 4.32 1.00
AVG
SL.NO DATE COUNT M/C NO COUNT CV% STR CV% CSP ID U% CVb -0.5 +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
22
24
25
26
27
28
4TH week
AVG INDIAN 36CCH #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
MARCH-2021 ABSTRACT REPORT UNIT-1
26CCH IPI & CSP
SL.NO DATE COUNT M/C NO COUNT CV% STR CV% CSP ID U% CVb -0.5 +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
1
2
3
4
5
6
7
1st week
AVG INDIAN 26CCH #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
SL.NO DATE COUNT M/C NO COUNT CV% STR CV% CSP ID U% CVb -0.5 +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
8
9
10
11
12
13
14
2nd week
AVG INDIAN 26CCH #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
SL.NO DATE COUNT M/C NO COUNT CV% STR CV% CSP ID U% CVb -0.5 +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
15
16
17
18 18.03.21 26CCH 4 25.95 0.90 112.29 4.32 2919 8.22 2.7 0.0 9 16 25 234 4 88 96 188 5.62 1.27 25228
19 19.03.21 26CCH 5 26.19 1.19 114.51 5.96 2998 8.11 2.0 0.0 6.5 18 24 197 4 65 78 146 5.28 1.18 25229
20
21
3rd week
AVG INDIAN 26CCH 26.07 1.04 113.40 5.14 2958 8.17 2.4 0.0 8 17 24 216 4 76 87 167 5.45 1.23
SL.NO DATE COUNT M/C NO COUNT CV% STR CV% CSP ID U% CVb -0.5 +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
22
24
25
26
27
28
4TH week
AVG INDIAN 26CCH #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
MARCH-2021 ABSTRACT REPORT UNIT-1
40CCH IPI & CSP
SL.NO DATE COUNT M/C NO COUNT CV% STR CV% CSP ID U% CVb -0.5 +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
1 01.03.21 40CCH 13,14 39.77 0.99 70.45 5.98 2800 9.27 2.6 0.2 15 69 84 695 26 189 369 584 4.05 0.97
2 02.03.21 40CCH 11,12 39.76 1.07 68.86 5.30 2723 9.26 1.6 0.2 15 65 81 711 25 178 352 555 4.10 0.95
3 03.03.21 40CCH 13,14 39.71 0.74 74.06 5.66 2876 9.10 1.9 0.2 14 64 81 608 19 162 345 555 4.07 0.97
4 04.03.21 40CCH 11 39.82 0.91 72.91 4.38 2902 9.14 2.2 0.0 11 63 74 617 27 145 344 515 4.17 0.98
5 05.03.21 40CCH 14 39.61 0.77 75.55 3.47 2993 9.31 1.3 0.5 16 78 94 696 24 195 396 615 4.14 0.98
6 06.03.21 40CCH 13,14 40.07 1.01 72.79 4.36 2902 9.40 1.6 0.0 17 70 87 773 34 203 368 605 4.15 0.99
7 07.03.21 40CCH 13,14 40.05 0.99 68.42 5.83 2565 9.33 3.5 0.7 19 64 83 813 36 202 349 587 4.19 1.02
1st week
AVG INDIAN 40CCH 39.83 0.93 71.86 5.00 2823 9.26 2.1 0.2 15 68 83 702 27 182 360 574 4.12 0.98
SL.NO DATE COUNT M/C NO COUNT CV% STR CV% CSP ID U% CVb -0.5 +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
8 08.03.21 40CCH 12,14 39.78 0.86 70.73 5.53 2793 9.29 1.6 0.2 18 61 75 704 26 176 320 522 4.11 0.97
9 09.03.21 40CCH 13 39.76 1.18 75.73 4.52 3012 2939 9.25 2.1 0.0 14 57 71 727 27 165 304 496 4.04 0.96 25075
10 10.03.21 40CCH 14 9.36 1.5 1.0 15 74 90 769 30 184 350 564 4.18 0.99 25089
2nd week
AVG INDIAN 40CCH 39.77 1.02 73.23 5.03 2903 9.30 1.7 0.4 16 64 79 733 27 175 325 527 4.11 0.97
SL.NO DATE COUNT M/C NO COUNT CV% STR CV% CSP ID U% CVb -0.5 +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
16 16.03.21 40CCH 12 39.58 0.95 74.94 3.02 2967 3089 9.00 2.3 0.0 13 57 69 571 16 150 310 476 4.19 0.97 25195
17 17.03.21 40CCH 13,14 39.75 1.27 74.50 3.66 2961 8.96 2.8 0.4 14 65 79 585 21 152 311 484 4.11 0.97
18 18.03.21 40CCH 12,14 39.74 1.11 68.89 5.00 2738 9.16 2.4 0.1 14 60 74 636 22 165 329 516 4.18 0.98
19 40CCH
20 40CCH
21 40CCH
3TH week
AVG INDIAN 40CCH 39.69 1.11 72.78 3.89 2889 9.04 2.5 0.2 13 60 74 597 20 156 317 492 4.16 0.97
SL.NO DATE COUNT M/C NO COUNT CV% STR CV% CSP ID U% CVb -0.5 +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
22 40CCH
23 40CCH
24 40CCH
25 40CCH
26 40CCH
27 40 CCH
28 40CCH
4TH week
AVG INDIAN 40CCH #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
QUALITY ASSURANCE DEPARTMENT (INDIAN COTTON)
VAIBHAV LAXMI UNIT -I
BLOW ROOM AFIS CONSALIDATION
LINE-1
17.11.20
Process PROCESS PARAMETERS
NEPS SIZE SFC(W) UQL(W) SFC(n) 5%L(N)Neps Increasing
FIBRE REPTURE%
MIXING 110 802 8.3 29.7 25.0 34.2
BLENDOMAT 1450/12/3.0 106 878 7.7 30.3 23.5 34.8 -4 2.0
CLP 568/3.0/3.0 124 718 7.2 29.2 21.7 33.7 17 -3.6
MPM 800 RPM 127 795 8.5 30.5 25.7 35.0 2 4.5
CLU 500/60/30 173 749 7.3 30.6 22.4 34.8 36 0.3
CONDENSER 192 751 7.9 29.4 24.2 33.8 11 -3.9
CHUTE 720 RPM(DFK) 221 727 8.5 29.1 24.8 33.6 15 -1.0
UP TO B/R NGE 75 -1.0
101 -2.0
STD REPTURE: >4.0
17.11.20 LINE-2
Process PROCESS PARAMETERS
NEPS SIZE SFC(W) UQL(W) SFC(n) 5%L(N)Neps Increasing
FIBRE REPTURE%
MIXING 110 802 8.3 29.7 25.0 34.2
BLENDOMAT 1450/12/3.0 106 878 7.7 30.3 23.5 34.8 -4 2.0
CLP 568/3.0/3.0 122 762 7.2 30.2 22.0 34.6 15 -0.3
MPM 800 RPM 145 719 8.3 29.1 24.4 33.2 19 -3.6
CLU 505/60/30 188 748 7.7 29.7 23.3 34.3 30 2.1
DXU 175 750 8.3 28.8 24.1 33.1 -7 -3.0
CHUTE 720 RPM(DFK) 190 724 9.2 28.7 26.7 33.2 9 -0.3
UP TO B/R NGE 59 -3.0
73 -3.4
STD RUPTURE: >4.0
04.11.20 LINE-2
Process PROCESS PARAMETERS
NEPS SIZE SFC(W) UQL(W) SFC(n) 5%L(N)Neps Increasing
FIBRE REPTURE%
MIXING 137 747 9.2 28.0 26.0 32.1
BLENDOMAT 1450/12/3.0 97 797 8.5 29.4 25.5 33.6 -29 5.0
CLP 561/3.0/3.0 167 728 7.5 28.9 22.8 33.1 72 -1.7
MPM 800 RPM 131 718 8.8 30 25.8 34.4 -22 3.8
CLU 550/50/25 177 725 8.6 29.7 25.0 34.4 35 -1.0
DXU 191 781 9.9 28.9 28.4 33.3 8 -2.7
CHUTE 720 RPM(DFK) 267 709 9.5 28.7 27.6 33.0 40 -0.7
UP TO B/R NGE 39 3.2
95 2.5
STD RUPTURE: >4.0
QUALITY ASSURANCE DEPARTMENT (INDIAN COTTON)
VAIBHAVLAXMI UNIT -I
BLOW ROOM AFIS CONSALIDATION
LINE-1
03.11.20
Process PROCESS PARAMETERS
NEPS SIZE SFC(W) UQL(W) SFC(n) 5%L(N)Neps Increasing
FIBRE REPTURE%
MIXING 116 797 8.5 29.2 24.5 33.9
BLENDOMAT 1450/12/3.0 117 840 8.0 30.0 24.0 34.1 1 2.7
CLP 552/3.0/3.0 126 691 7.6 30.8 23.9 35.0 8 2.7
MPM 800 RPM 151 751 8.3 30.4 24.9 35.1 20 -1.3
CLU 550/70/30 161 727 8.8 28.9 25.5 33.7 7 -4.9
CONDENSER 213 734 8.5 29.2 24.9 33.4 32 1.0
CHUTE 720 RPM(DFK) 207 715 8.4 28.9 24.3 33.5 -3 -1.0
UP TO B/R NGE 84 0.0
78 -1.0
STD REPTURE: >4.0
03.11.20 LINE-2
Process PROCESS PARAMETERS
NEPS SIZE SFC(W) UQL(W) SFC(n) 5%L(N)Neps Increasing
FIBRE REPTURE%
MIXING 116 797 8.5 29.2 24.5 33.9
BLENDOMAT 1450/12/3.0 117 840 8.0 30.0 24.0 34.1 1 2.7
CLP 561/3.0/3.0 186 737 8.7 29.0 24.6 34.0 59 -3.3
MPM 800 RPM 208 772 7.7 29.5 23.0 33.8 12 1.7
CLU 553/60/25 189 752 8.2 29.1 24.1 33.6 -9 -1.4
DXU 205 699 9.1 29.3 26.4 33.9 8 0.7
CHUTE 720 RPM(DFK) 244 748 9.0 29.2 26.1 33.5 19 -0.3
UP TO B/R NGE 77 0.3
110 0.0
STD RUPTURE: >4.0
QUALITY ASSURANCE DEPARTMENT (INDIAN COTTON)
VAIBHAVLAXMI UNIT -I
BLOW ROOM AFIS CONSALIDATION
LINE-1
02.10.20
Process PROCESS PARAMETERS
NEPS SIZE SFC(W) UQL(W) SFC(n) 5%L(N)Neps Increasing
FIBRE REPTURE%
MIXING 129 749 8.6 30.1 24.3 34.3
BLENDOMAT 1450/12/3.0 127 719 9.8 31.1 28.6 35.5 -2 3.3
CLP 587/3.0/3.0 215 715 9.4 29.5 26.2 34.3 69 -5.1
MPM 800 RPM 243 724 11.1 28.8 29.6 33.3 13 -2.4
CLU 550/75/37 276 747 9.9 29.6 27.8 34.2 14 2.8
CONDENSER 270 700 8.8 30.2 25.8 34.9 -2 2.0
CHUTE 720 RPM(DFK) 298 706 9.2 30.0 26.7 34.3 10 -0.7
UP TO B/R NGE 109 0.3
131 -0.3
STD REPTURE: >4.0
02.10.20 LINE-2
Process PROCESS PARAMETERS
NEPS SIZE SFC(W) UQL(W) SFC(n) 5%L(N)Neps Increasing
FIBRE REPTURE%
MIXING 129 749 8.6 30.1 24.3 34.3
BLENDOMAT 1450/12/3.0 127 719 9.8 31.1 28.6 35.5 -2 3.3
CLP 565/3.0/3.0 171 719 9.5 30.5 26.6 34.7 35 -1.9
MPM 800 RPM 187 749 9.5 28.4 25.9 32.9 9 -6.9
CLU 553/65/35 241 691 9.3 29.7 26.3 34.3 29 4.6
DXU 261 731 12.1 29.3 32.2 33.8 8 -1.3
CHUTE 720 RPM(DFK) 304 704 10.9 29.7 30.2 34.1 16 1.4
UP TO B/R NGE 102 -2.7
136 -1.3
STD RUPTURE: >4.0
QUALITY ASSURANCE DEPARTMENT (INDIAN COTTON)
VAIBHAVLAXMI UNIT -I
BLOW ROOM AFIS CONSALIDATION
LINE-1
16.10.20 NEW CROP MIXING
Process PROCESS PARAMETERS
NEPS SIZE SFC(W) UQL(W) SFC(n) 5%L(N)Neps Increasing
FIBRE REPTURE%
MIXING 112 781 8.6 30.6 25.5 35.0
BLENDOMAT 1450/12/3.0 104 787 8.2 30.8 25.0 35.3 -7 0.7
CLP 568/3.0/3.0 139 738 9.4 29.7 27.1 34.5 34 -3.6
MPM 800 RPM 168 776 10.6 29.7 29.3 34.4 21 0.0
CLU 550/60/37 190 736 8.6 30.6 25.8 35.2 13 3.0
CONDENSER 205 704 9.9 30.3 28.9 35.1 8 -1.0
CHUTE 720 RPM(DFK) 204 722 10.4 30.3 30.3 34.8 0 0.0
UP TO B/R NGE 83 -1.0
82 -1.0
STD REPTURE: >4.0
16.10.20 LINE-2
Process PROCESS PARAMETERS
NEPS SIZE SFC(W) UQL(W) SFC(n) 5%L(N)Neps Increasing
FIBRE REPTURE%
MIXING 112 781 8.6 30.6 25.5 35.0
BLENDOMAT 1450/12/3.0 104 787 8.2 30.8 25.0 35.3 -7 0.7
CLP 578/3.0/3.0 165 709 8.5 30.2 26.4 34.4 59 -1.9
MPM 800 RPM 146 754 7.9 31.3 24.1 36.2 -12 3.6
CLU 553/50/35 186 763 9.3 30.5 27.9 34.9 27 -2.6
DXU 220 751 8.7 29.8 25.8 34.4 18 -2.3
CHUTE 720 RPM(DFK) 248 723 9.2 30.3 27.2 35.4 13 1.7
UP TO B/R NGE 96 -2.6
121 -1.0
STD RUPTURE: >4.0
QUALITY ASSURANCE DEPARTMENT (INDIAN COTTON)
VAIBHAVLAXMI UNIT -I
BLOW ROOM AFIS CONSALIDATION
LINE-1
20.09.20
Process PROCESS PARAMETERS
NEPS SIZE SFC(W) UQL(W) SFC(n) 5%L(N)Neps Increasing
FIBRE REPTURE%
MIXING 151 691 10 29.8 28.5 34.5
BLENDOMAT 1450/12/3.0 153 705 8.9 29.7 25.5 34.3 1 -0.3
CLP 588/3.0/3.0 148 720 7.8 31.1 23.4 35.6 -3 4.7
MPM 800 RPM 172 717 8.2 29.8 24.4 34.5 16 -4.2
CLU 550/75/37 267 710 9.0 29.9 25.3 34.1 55 0.3
CONDENSER 204 717 9.9 29.9 27.4 34.3 -24 0.0
CHUTE 720 RPM(DFK) 276 714 8.4 30.4 25.2 34.8 35 1.7
UP TO B/R NGE 35 0.3
83 2.0
STD REPTURE: >4.0
DEPT:-BLOW ROOM
MARCH'2021
BR WASTE STUDY
AUG'20 AVG 0.00 2.06 -- 0.33 2.39 0.00 0.00 0.00
SEP'20 AVG 0.00 0.63 -- 0.21 0.84 1.27 0.00 0.34
OCT'20 AVG -- 1.96 -- 0.12 2.07 2.59 -- --
NOV'20 AVG -- 1.31 0.08 0.19 1.58 1.12 0.46 0.17
DEC'20 AVG -- 1.46 -- 0.43 1.89 0.82 -- 0.11
JAN'21 AVG 0.09 1.22 0.03 0.54 1.79 1.06 0.03 0.47
FEB'21 AVG 0.09 2.46 0.03 0.43 3.01 2.02 0.02 0.51
MAR'21 AVG 0.03 2.44 0.03 0.63 3.12 1.72 0.13 0.63
MIN 0.02 2.33 0.02 0.63 1.26 0.11 0.63
MAX 0.03 2.55 0.03 0.63 2.18 0.15 0.63
MACHINE NO 1 Total 2
DATE BDT CLP ASTA CLU CLP ASTA CLU
1 0.00
2 0.00
3 2.33 0.63 2.96 2.18 0.63
4 0.00
5 0.00
6 0.00
7 0.00
8 0.00
9 0.03 0.03 0.06 0.11
16 0.02 0.02 0.04 0.15
17 0.00
18 2.55 2.55 1.26
19 0.00
20 0.00
21 0.00
22 0.00
23 0.00
24 0.00
25 0.00
26 0.00
27 0.00
28 0.00
29 0.00
30 0.00
31
0.00
1.61
2.59
1.75
0.93
1.56
2.54
2.48
Total
0.00
0.00
2.81
0.00
0.00
0.00
0.00 `
0.00
0.11
0.15
0.00
1.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
DEPT:- BLOW ROOM
MARCH'2021
SPFPU EJECTION STUDY
AUG'20 AVG 93% 100% 99% 20% 87% 97% 100%
SEP'20 AVG 92% 100% 100% 40% 94% 96% 98%
OCT'20 AVG 90% 90% 100% 33% 84% 92% 100%
NOV'20 AVG 96% 97% 99% 35% 98% 98% 97%
DEC'20 AVG 91% 100% 100% 40% 86% 96% 99%
JAN'21 AVG 91% 98% 97% 60% 94% 94% 95%
FEB'21 AVG 89% 95% 98% 73% 90% 95% 94%
MAR'21 AVG 92% 96% 100% 80% 98% 100% 96%
MIN 92% 96% 100% 80% 98% 100% 96%
MAX 92% 96% 100% 80% 98% 100% 96%
MACHINE NO 1 2
DATE SMALL MEDIUM LARGE PP SMALL MEDIUM LARGE
1
2
3
4 92% 96% 100% 80%
11 98% 100% 96%
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
20% 77%
40% 83%
53% 80%
83% 81%
66% 90%
80% 89%
87% 92%
93% #DIV/0!
93% #DIV/0!
93% #DIV/0!
AVG
PP
92%
93% 97%
UNIT-1 (INDIAN COTT
BLOW ROOM TRASH REPORT
DATE:-07.03.21
LINE-1
PROCESS
SPEEDS LINT TRASH CLG EFF
94.10 3.76
1500/12.0/3.0 94.22 3.33 11.4
600/3.0/2.5 96.91 2.41 27.6
800 RPM 98.01 2.56 -6.2
500/40/60 97.05 2.09 18.4
97.71 1.99 4.8
UP TO BLOW ROOM 47.1
97.71 2.19 41.8
(INDIAN COTTON)
REPORT
1
LINE-2
94.28 3.75
1500/12.0/3.0 96.56 3.38 9.9
600/3.0/2.5 96.10 2.43 28.1
800 RPM 94.05 2.55 -4.9
495/50/40 97.48 1.87 26.7
97.50 2.18 -16.6
UP TO BLOW ROOM 41.9
100.0
(INDIAN COTTON)
REPORT
1
LINE-2
95.20 3.03
1500/12.0/3.0 95.12 2.42 20.1
600/3.0/2.5 97.29 2.32 4.1
800 RPM 96.62 2.22 4.3
495/50/40 95.21 1.89 14.9
95.21 1.89 0.0
UP TO BLOW ROOM 37.6
95.19 2.15 29.0
(INDIAN COTTON)
REPORT
1
LINE-2
96.85 2.75
1500/12.0/3.0 95.37 2.70 1.8
561/3.0/3.0 96.75 2.46 8.9
800 RPM 96.92 2.50 -1.6
450/60/30 97.25 2.40 4.0
97.67 2.26 5.8
UP TO BLOW ROOM 17.8
97.28 2.20 20.0
REPORT
0
LINE-2
95.44 2.71
1500/12.0/3.0 97.51 2.44 10.0
561/3.0/3.0 98.14 1.52 37.7
800 RPM 98.15 1.70 -11.8
450/60/30 98.21 1.28 24.7
98.53 1.46 -14.1
UP TO BLOW ROOM 46.1
98.07 1.66 38.7
(INDIAN COTTON)
REPORT
0
LINE-2
96.03 3.05
1500/12.0/3.0 97.31 2.34 23.3
561/2.5/3.0 97.26 1.82 22.2
800 RPM 97.72 1.76 3.3
450/60/30 98.37 1.62 8.0
98.01 1.90 -17.3
UP TO BLOW ROOM 37.7
97.93 1.84 39.7
(INDIAN COTTON)
REPORT
0
LINE-2
97.04 3.25
1500/12.0/3.0 97.03 2.16 33.5
576/3.0/3.0 97.51 2.30 -6.5
800 97.53 1.72 25.2
554/60/30 97.95 1.84 -7.0
97.42 1.80 2.2
UP TO BLOW ROOM 44.6
100.0
(INDIAN COTTON)
REPORT
0
LINE-2
95.99 3.20
1500/12.0/3.0 97.04 2.88 10.0
576/3.0/3.0 95.78 2.16 25.0
800 97.93 1.90 12.0
554/50/25 95.43 2.10 -10.5
95.22 1.78 15.2
UP TO BLOW ROOM 44.4
97.63 1.66 48.1
(INDIAN COTTON)
ROP MIXING)
LINE-2
95.03 3.38
96.52 2.90 14.2
98.11 1.36 53.10
98.32 1.44 -5.88
98.13 1.50 -4.2
UP TO BLOW ROOM 55.6
98.41 1.50 55.6
(INDIAN COTTON)
RT
LINE-2
94.47 3.13
96.69 3.08 1.6
93.38 3.00 2.60
96.88 2.92 2.67
97.41 2.30 21.2
UP TO BLOW ROOM 26.5
97.54 1.56 50.2
(INDIAN COTTON)
RT
LINE-2
94.40 3.47
93.04 3.54 -2.0
93.99 2.48 29.9
90.54 2.29 7.7
93.76 2.03 11.4
UP TO BLOW ROOM 41.5
95.19 1.92 44.7
(INDIAN COTTON)
RT
LINE-2
95.77 3.50
96.65 2.38 32.0
97.04 2.08 12.6
97.15 2.02 2.9
97.35 2.08 -3.0
UP TO BLOW ROOM 40.6
97.38 1.85 47.1
(INDIAN COTTON)
RT
LINE-2
95.74 3.06
95.93 2.58 15.7
97.52 2.04 20.9
95.38 2.58 -26.5
97.12 2.16 16.3
UP TO BLOW ROOM 29.4
97.71 1.80 41.2
(INDIAN COTTON)
RT
LINE-2
96.50 3.76
96.18 2.76 26.6
97.75 2.20 20.3
96.99 2.60 -18.2
96.24 2.96 -13.8
96.65 2.30 38.8
(INDIAN COTTON)
RT
LINE-2
LINT TRASH CLG EFF
95.55 3.90
94.44 3.48 10.8
96.27 2.07 40.5
96.05 2.21 -6.8
96.95 1.87 15.4
96.24 2.32 40.5
(INDIAN COTTON)
RT
LINE-2
95.55 4.32
94.44 3.48 19.4
96.09 3.90 -12.1
94.99 2.20 43.6
96.82 2.24 -1.8
96.24 2.62 39.4
(INDIAN COTTON)
RT
LINE-2
92.90 4.53
94.44 4.04 10.8
97.32 2.19 45.8
97.49 1.10 49.8
97.62 2.34 -112.7
96.24 2.62 42.2
(INDIAN COTTON)
RT
LINE-2
92.90 4.53
94.62 3.23 28.7
97.32 2.19 32.2
96.09 2.34 -6.8
97.21 2.00 14.5
96.24 2.62 42.2
(INDIAN COTTON)
RT
LINE-2
TRASH CLG EFF
4.13
4.22 -2.2
2.09 50.5
2.00 4.3
2.14 -7.0
1.96 52.5
(INDIAN COTTON)
RT
LINE-2
TRASH CLG EFF
3.25
2.04 37.2
1.81 11.3
1.83 -1.1
1.76 3.8
1.62 50.2
(INDIAN COTTON)
RT
LINE-2
TRASH CLG EFF
3.45
2.93 15.1
1.23 58.0
1.29 -4.9
0.97 24.8
71.9
2.03 41.2
DEPT CARDING MONTH
MARCH'20
CARDING CV% in DISPLAY
NATURE OF WORK
228 1 2 297 2 8 296 2 3 270 2 3 255 2 1 250 7 7 286 2 13 256 4 3 319 3 9 323 2 6 295 2 18
183 0 0 249 0 0 228 0 0 245 0 0 220 0 0 220 0 0 266 0 0 231 0 0 271 0 0 223 0 0 275 0 0
250 4 31 357 7 18 398 8 10 299 7 30 292 9 3 272 16 39 301 13 71 295 14 25 349 10 70 396 6 51 334 6 90
12 13 14 15 16 17 18 19 20 21 22 BKG AVG
DFK BKG T1 DFK BKG T1 DFK BKG T1 DFK BKG T1 DFK BKG T1 DFK BKG T1 DFK BKG T1 DFK BKG T1 DFK BKG T1 DFK BKG T1 DFK BKG T1
0.00
248 1 0 268 3 2 231 7 0 276 3 0 247 3 1 240 3 1 293 9 35 265 14 4 336 8 41 280 1 0 275 1 2 3.95
238 0 0 260 0 18 316 1 1 256 3 1 236 3 1 264 7 4 278 1 0 263 2 0 335 2 1 338 3 12 299 4 47 3.14
238 0 0 277 0 18 398 4 10 270 0 0 238 1 1 243 3 0 301 0 2 255 2 0 337 1 4 360 3 0 298 6 2 1.91
239 0 0 264 2 3 323 2 10 253 0 0 220 1 2 220 4 0 281 4 2 246 1 25 325 2 0 315 2 0 295 4 0 5.05
234 0 0 265 0 17 331 1 10 272 0 2 255 5 2 272 9 4 266 1 29 255 3 0 334 5 1 332 0 0 293 1 53 2.05
240 0 5 279 1 16 312 1 0 251 3 0 254 9 0 267 16 13 269 13 15 286 11 0 349 10 0 322 1 0 294 0 7 5.95
234 1 1 258 7 13 327 1 5 277 3 0 246 0 0 268 8 5 279 0 71 246 1 4 347 2 70 325 1 0 299 0 0 2.95
250 3 0 261 7 14 319 2 0 267 1 30 257 2 2 256 15 4 281 1 13 240 2 0 305 0 29 223 1 1 300 1 1 2.45
234 3 31 249 7 2 307 3 1 253 7 2 243 4 0 257 10 3 288 2 4 245 6 0 313 6 0 309 3 1 287 3 1 5.36
241 1 0 265 1 2 321 0 5 266 0 0 252 4 1 259 16 1 282 2 8 260 11 1 318 3 0 303 1 1 3.95
242 0 0 287 4 3 331 0 2 269 0 0 248 5 1 245 6 14 299 3 1 251 5 0 329 4 0 347 2 37 283 1 90 2.68
208 1 0 356 3 4 275 2 0 280 2 0 255 0 0 256 5 2 297 1 4 249 0 2 335 1 0 360 6 4 291 1 10 2.23
216 2 2 357 3 11 276 2 1 292 3 1 244 1 1 241 1 8 283 0 0 231 0 4 271 0 32 310 1 0 302 3 18 2.41
209 4 0 345 4 4 260 1 2 294 3 0 262 2 0 241 3 2 295 2 1 253 1 0 280 2 0 396 3 51 293 3 44 3.77
183 2 0 340 2 0 243 8 0 252 1 2 263 1 1 240 3 2 271 1 3 250 1 2 312 4 0 328 2 0 278 0 8 2.73
199 1 0 352 0 0 228 1 1 267 0 11 290 0 0 243 0 3 289 0 16 252 0 0 297 2 0 343 0 0 280 0 4 0.73
214 1 0 337 2 0 259 1 2 299 1 0 275 1 0 260 8 16 293 0 3 295 6 0 301 1 0 338 2 3 302 1 14 2.32
246 0 0 269 0 17 245 1 2 292 0 3 232 7 13 301 0 2 254 4 0 321 2 0 305 1 1 1.18
222 1 0 354 0 0 262 1 2 297 1 6 277 1 0 255 9 39 295 2 33 263 1 8 316 2 1 281 0 2 334 2 17 1.41
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
DEPT CARDING MONTH:-)MARCH
NEPS PER GRAM IN SLIVER
NATURE OF WORK
AUG'20 AVG 110 116.1 111.8 105.2 113.4 83 83 102.8 73 114.2 101 111 99 77 107 105 111 114 96 100 113 83 96 101
SEP'20 AVG 106 92 94 86 94 73 77 94 69 83 87 92 86 80 100 93 87 91 92 87 80 79 92 89
OCT'20 AVG 72 77 80 71 82 75 69 78 67 77 75 85 72 69 86 76 80 80 70 78 88 73 79 79
NOV'20 AVG 86 79 86 73 88 85 74 77 66 75 79 86 86 74 83 84 80 77 69 63 93 72 81 79
DEC'20 AVG 67 66 61 69 53 66 73 67 74 81 68 64 60 66 54 65 76 66 56 63 66 74 67 65
JAN'21 AVG 95 104 86 96 82 98 94 78 80 93 91 86 81 80 78 92 90 111 83 99 75 95 95 89
FEB'21 AVG 90 91 77 99 69 87 92 80 87 103 87 86 78 88 72 83 93 94 78 77 90 102 98 86
MAR'21 AVG 89 88 80 90 68 83 92 83 92 101 87 83 78 85 69 83 97 84 70 79 83 92 82 82
MIN 78 84 74 82 62 80 90 78 87 95 81 68 75 80 62 76 88 79 69 74 79 90 76 76
MAX 96 94 85 96 76 86 94 86 94 104 91 97 83 93 75 90 108 88 71 81 90 95 91 89
MACHINE NO 1 2 3 4 5 16 17 18 19 20 AVG MAX MIN 6 7 8 9 10 11 12 13 14 15 21 22 AVG MAX MIN
DATE
7 94 85 85 96 62 86 94 86 94 103 89 103 62 97 75 81 75 90 108 88 70 81 79 90 91 85 108 70
14 96 84 82 92 67 80 91 78 87 95 85 96 67 85 83 80 62 76 88 85 69 74 79 95 79 80 95 62
20 78 94 74 82 76 83 90 85 94 104 86 104 74 68 76 93 71 82 96 79 71 81 90 91 76 81 96 68
21
22
23
24 ### ### ### ### 0 0
25
26 ### ### ### ### 0 0
27 ### ### ### ### 0 0
28 ### ### ### ### 0 0
29
30
31
UNIT-1 CARD WASTE%
FLATS SPEED:380 MM/MIN
JAN'21 AVG 71 76 68 71 76 68
FEB'21 AVG 81 88 77 85 92 80
MAR'21 AVG 84 83 81 83 90 79
MIN 74 80 72 77 84 72
MAX 101 86 87 91 101 86
MACHINE NO 1 2 3 AVG MAX MIN
DATE
DEPT UNILAP AFIS MONTH MAR'2021
UNILAP AFIS
UNILAP AFIS
AVG'20 AVG 103 101 102 106 98
SEP'20 AVG 89 92 90 94 86
OCT'20 AVG 76 79 78 80 75
NOV'20 AVG 77 76 77 81 72
DEC'20 AVG 71 66 69 71 66
JAN'21 AVG 71 66 69 71 66
FEB'21 AVG 84 86 85 89 81
MAR'21 AVG 84 85 84 89 80
MIN 79 74 77 79 74
MAX 88 100 94 100 88
MACHINE NO 1 2 AVG MAX MIN
DATE
5 83 74 79 83 74
13 85 92 89 92 85
16 79 74 77 79 74
20 88 100 94 100 88
21
22
23
24
25
26
27
28
29
30
31
DEPT COMBER MONTH Mar-21
NEPS/GRAM IN SLIVER
NATURE OF WORK
AUG'20 AVG 27 25 24 28 29 25 27 25 25 28 28 27 25 23 26 32 21
SEP'20 AVG 24 23 25 24 24 24 24 23 22 25 24 24 23 24 24 28 19
OCT'20 AVG 20 23 22 22 21 19 20 19 20 21 22 18 20 19 20 26 14
NOV'20 AVG 19 19 18 19 21 18 20 17 18 19 19 20 20 19 19 24 14
DEC'20 AVG 19 17 21 17 19 22 20 21 19 18 22 21 19 20 21 23 19
JAN'21 AVG 22 20 22 19 22 21 23 24 25 22 25 22 18 23 21 25 15
FEB'21 AVG 20 22 24 24 23 24 22 25 25 25 24 22 25 25 24 29 18
MAR'21 AVG 20 21 20 20 21 20 21 22 23 22 20 20 22 22 21 24 17
MIN 18 18 17 17 19 18 18 20 21 21 18 16 21 21 20 24 16
MAX 22 23 22 22 24 22 23 24 25 23 22 22 22 24 21 25 18
MACHINE NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 AVG MAX MIN
DATE
7 21 18 17 21 19 22 22 20 25 21 18 16 22 24 20 25 16
14 22 22 22 22 21 20 18 24 23 21 19 22 22 22 21 24 18
20 18 23 20 17 24 18 23 22 21 23 22 21 21 21 21 24 17
21
22
23
24
25
26
27
28
29
30
31
DEPT DRAWING MONTH Mar-21
RSB AFIS
AUG'20 AVG 28 29 28 28 28 27 28 30 25
SEP'20 AVG 26 25 25 26 26 26 26 28 23
OCT'20 AVG 22 24 25 27 23 24 24 28 19
NOV'20 AVG 26 20 23 20 20 18 21 27 16
DEC'20 AVG 21 25 26 20 22 19 22 27 17
JAN'21 AVG 20 20 20 23 25 18 20 23 20
FEB'21 AVG 24 23 25 23 19 26 23 26 23
MAR'21 AVG 23 23 22 22 22 24 22 24 22
MIN 22 22 20 21 21 23 22 23 22
MAX 23 23 22 22 22 24 22 24 22
MACHINE NO 1 2 3 4 5 6 AVG MAX MIN
DATE
14 22 22 20 22 21 23 22 23 22
20 23 23 23 21 23 25 23 25 23
21
22
23
24
25
26
27
28
29
30
31
DEPT SB22 MONTH MAR'2021
SB22 U %
AUG'20 AVG 2.6 2.6 2.7 2.8 2.9 2.7 2.7
SEP'20 AVG 2.6 2.6 2.6 2.8 2.9 3.0 2.8
OCT'20 AVG 2.6 2.6 2.6 2.6 2.7 2.7 2.6
NOV'20 AVG 2.6 2.6 2.7 2.6 2.7 2.5 2.6
DEC'20 AVG 2.7 2.6 2.8 2.8 2.7 2.9 2.8
JAN'21 AVG 2.7 2.6 2.7 2.8 2.9 3.0 2.8
FEB'21 AVG 2.7 2.7 2.7 2.6 2.8 2.9 2.7
MAR'21 AVG 2.7 2.7 2.6 2.6 2.9 2.9 2.7
MIN 2.6 2.6 2.5 2.6 2.9 2.9 2.6
MAX 2.8 2.8 2.7 2.7 3.0 2.9 2.9
MACHINE NO 1RHS 1 LHS 2RHS 2 LHS 3RHS 3 LHS AVG
DATE
1 2.83 2.8 2.46 2.67 2.98 2.89 2.77
12 2.55 2.61 2.58
13 2.74 2.56 2.65
14
15 2.90 2.87 2.89
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
2.8 2.6
2.9 2.7
2.9 2.6
2.7 2.5
2.9 2.6
3.1 2.6
2.8 2.7
2.8 2.6
2.6 2.5
3.0 2.9
MAX MIN
2.98 2.46
2.61 2.55
2.74 2.56
2.90 2.87
DEPT COMBER
NATURE OF WOR
AUG'20 AVG 3.3 2.9 3.3 3.0 3.0 2.8 2.7
SEP'20 AVG 2.7 2.7 2.9 3.2 3.0 2.5 2.8
OCT'20 AVG 2.6 2.6 3.6 3.0 2.9 2.6 2.9
NOV'20 AVG 3.1 3.1 3.2 3.1 2.8 2.7 3.1
DEC'20 AVG 2.6 2.8 3.1 3.0 2.8 2.8 2.9
JAN'21 AVG 2.8 2.8 3.1 3.1 3.0 2.8 3.4
FEB'21 AVG 3.0 3.0 3.0 3.1 3.0 2.9 3.1
MAR'21 AVG 2.9 3.0 3.1 3.1 2.9 2.6 3.1
MIN 2.7 2.9 3.0 3.0 2.7 2.4 2.9
MAX 3.0 3.1 3.1 3.3 3.1 2.6 3.2
MACHINE NO 1 2 3 4 5 6 7
DATE
1 3.03 2.93 3.01
2 3.27 2.98 2.64 3.17
5
8 2.87 3.11
9 3.11 3.23 3.09
10 2.95 3.00 3.07 2.61 3.20
16 2.73 2.89
17 3.13 3.04 2.70 2.40
18 2.88
19
20
21
22
23
24
25
26
27
28
29
30
31
MONTH MAR'21
U%
NATURE OF WORK
2.7 3.1 3.3 2.7 2.6 2.7 3.0 2.9 3.2
2.9 2.8 2.9 2.6 2.3 2.6 3.1 2.8 1.9
2.4 2.8 2.7 2.5 2.0 2.6 2.9 2.7 2.3
2.5 2.8 2.8 3.0 2.1 2.7 2.6 2.8 3.1
2.7 2.9 2.9 2.9 2.4 2.8 2.8 2.8 3.0
2.9 2.9 2.9 2.9 2.5 3.1 3.0 2.9 3.1
2.9 3.0 3.0 2.8 2.4 2.9 2.9 2.9 3.1
2.7 3.0 2.9 3.0 2.4 2.9 3.0 2.9 2.0
2.6 2.9 2.8 2.7 2.4 2.7 2.9 #DIV/0! 0.0
2.8 3.1 3.0 3.3 2.5 3.1 3.1 #DIV/0! 3.3
8 9 10 11 12 13 14 AVG MAX
2.82 3.13
2.64 2.87 2.80 2.88
2.90 3.25 2.53 2.89 3.25
3.16 3.16 3.16
#DIV/0! 0.00
#DIV/0! 0.00
#DIV/0! 0.00
#DIV/0! 0.00
#DIV/0! 0.00
2.6
1.6
1.8
2.5
2.7
2.7
2.8
1.7
0.0
3.2
MIN
2.42
2.83
2.87
3.09
2.36
2.40
2.64
2.53
3.16
0.00
0.00
0.00
0.00
0.00
DEPT DRAWING MONTH MAR'2021
U%
NATURE OF WORK
AVG'20 AVG 1.8 1.8 1.6 1.7 1.7 1.8 1.7 1.8 1.6
SEP'20 AVG 1.7 1.7 1.7 1.6 1.6 1.7 1.7 1.8 1.5
OCT'20 AVG 1.9 1.7 1.7 1.7 1.6 1.7 1.7 1.9 1.6
NOV'20 AVG 1.8 1.8 1.6 1.7 1.6 1.7 1.7 1.9 1.6
DEC'20 AVG 1.8 1.8 1.7 1.7 1.7 1.8 1.8 1.8 1.6
JAN'21 AVG 1.9 1.8 1.8 1.8 1.7 1.8 1.8 2.0 1.8
FEB'21 AVG 1.9 1.8 1.8 1.8 1.8 1.7 1.8 1.9 1.8
MAR'21 AVG 1.72 1.72 1.65 1.76 1.84 1.72 #DIV/0! 1.4 #DIV/0!
MIN 1.6 1.4 1.4 1.6 1.6 1.6 #DIV/0! 0.0 #DIV/0!
MAX 1.7 1.7 1.6 1.8 1.8 1.7 #DIV/0! 1.4 #DIV/0!
MACHINE NO 1 2 3 4 5 6 AVG MAX MIN
DATE
1 1.70 1.74 1.74 1.74 1.92 1.60 1.74 1.92 1.74
2 1.85 1.81 1.78 1.82 1.85 1.74 1.81 1.85 1.81
3 1.62 1.71 1.61 1.60 1.78 1.55 1.65 1.78 1.65
4 1.87 1.85 1.65 1.70 1.86 1.67 1.77 1.87 1.77
5 1.75 1.80 1.71 1.79 1.96 1.97 1.83 1.97 1.83
6 1.77 1.69 1.83 1.65 1.83 1.68 1.74 1.83 1.74
7 1.70 1.76 1.85 1.72 1.75 1.75 1.76 1.85 1.76
8 1.69 1.64 1.73 1.82 1.86 1.68 1.74 1.86 1.74
9 1.84 1.91 1.65 1.84 1.72 1.76 1.79 1.91 1.79
10 1.87 1.87 1.72 1.71 1.76 1.77 1.78 1.87 1.78
11 1.80 1.80 1.56 1.82 2.10 1.64 1.79 2.10 1.79
12 1.68 1.40 1.61 1.82 1.87 1.68 1.68 1.87 1.68
13 1.72 1.57 1.70 1.71 1.57 1.84 1.69 1.84 1.69
14 1.59 1.72 1.61 1.81 1.89 1.76 1.73 1.89 1.73
15 1.66 1.72 1.61 1.67 1.76 1.64 1.68 1.76 1.68
16 1.68 1.72 1.56 1.71 1.78 1.82 1.71 1.82 1.71
17 1.66 1.69 1.43 1.80 1.98 1.68 1.71 1.98 1.71
18 1.6 1.66 1.54 1.68 1.79 1.63 1.65 1.79 1.65
19 1.55 1.67 1.60 1.86 1.91 1.74 1.72 1.91 1.72
20 1.74 1.62 1.48 1.90 1.89 1.74 1.73 1.90 1.73
21 #DIV/0! 0.00 #DIV/0!
22 #DIV/0! 0.00 #DIV/0!
23 #DIV/0! 0.00 #DIV/0!
24 #DIV/0! 0.00 #DIV/0!
25 #DIV/0! 0.00 #DIV/0!
26 #DIV/0! 0.00 #DIV/0!
27 #DIV/0! 0.00 #DIV/0!
DEPT UNILAP MONTH
NATURE OF WORK
AVG'20 AVG 72.8 73.4 73.0
SEP'20 AVG 72.5 73.0 72.7
OCT'20 AVG 74.5 74.8 74.6
NOV'20 AVG 74.3 74.4 74.3
DEC'20 AVG 73.1 72.7 72.5
JAN'21 AVG 73.5 73.7 73.6
FEB'21 AVG 74.5 74.2 74.4
MAR'21 AVG 73.1 73.0 73.1
MIN 71.2 71.2 71.2
MAX 74.2 74.0 74.1
MACHINE NO 1 2 AVG
DATE
1
2 73.69 72.48 73.09
3
4 72.34 73.58 72.96
5 73.91 73.91
6
7 73.24 73.98 73.61
8
9 74.17 73.97 74.07
13 73.09 73.10 73.10
14 71.17 71.16 71.17 AFTER WHEEL CHANGED G-89.85,H-69.20 DRAFT-1.429
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
85,H-69.20 DRAFT-1.429
DEPT COMBER MONTH MAR'21
COMBER NOILS %
NATURE OF WORK
AUG'20 AVG 17.7 18.4 18.3 18.0 17.4 18.2 17.9 18.4 18.2 17.8 18.1 19.0 18.8 19.1 18.0 10.9 10.2
SEP'20 AVG 16.8 17.1 16.9 16.9 16.6 17.7 17.7 18.0 17.4 16.9 16.9 16.6 17.2 16.7 18.0 18.2 16.6
OCT'20 AVG 17.3 17.0 17.2 16.8 17.0 17.8 17.3 18.1 17.5 17.3 16.7 17.2 16.8 17.2 17.3 18.1 16.7
NOV'20 AVG 17.4 17.5 17.4 15.8 16.5 17.4 17.3 17.1 16.4 17.1 16.6 16.0 16.6 16.2 17.2 17.8 16.7
DEC'20 AVG 17.0 17.1 17.2 15.6 16.3 16.7 16.3 16.2 16.4 15.9 16.5 16.1 16.7 16.5 16.3 16.7 15.9
JAN'21 AVG 17.8 17.8 17.6 16.6 16.8 16.9 16.7 17.2 16.7 16.7 16.6 17.0 16.7 17.2 17.0 17.5 16.5
FEB'21 AVG 18.5 18.4 18.4 17.7 16.9 16.7 17.2 17.3 17.1 17.2 16.8 17.1 17.1 17.3 17.2 18.0 16.4
MAR'21 AVG 18.1 18.2 18.3 18.1 17.4 17.2 17.8 17.7 17.6 17.6 17.3 17.7 17.4 17.2 17.8 18.3 17.2
MIN 17.8 18.1 18.2 17.8 16.6 16.4 17.5 17.4 17.4 17.1 16.8 17.3 17.2 17.0 17.6 17.8 16.4
MAX 18.5 18.4 18.5 18.8 17.9 17.8 18.0 17.8 17.7 18.1 17.8 17.9 17.7 17.4 18.1 18.8 18.1
RANGE 0.7 0.4 0.3 1.0 1.4 1.5 0.6 0.4 0.3 1.0 1.0 0.6 0.5 0.5 0.5 1.0 1.7
MACHINE NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 AVG MAX MIN
DATE
4 18.54 18.44 18.21 17.91 17.94 16.35 17.46 17.82 17.71 18.07 17.78 17.88 17.24 16.95 17.74 18.44 16.35
6 17.78 17.78 17.78 17.78
9 18.07 18.07 18.07 18.07
12 17.81 18.05 18.15 18.80 17.44 17.80 17.97 17.40 17.65 17.76 17.25 17.87 17.26 17.42 17.76 18.80 17.25
13
14 17.91 18.20 18.46 17.81 16.56 17.54 18.04 17.83 17.39 17.11 16.82 17.33 17.72 17.37 17.58 18.46 16.56
15
16
17
18
19
23
24
26
27
28
29
30
31
DEPT COM MONTHMAR'21
COMBER WEB QUALITY
HEAD NUMBER WITH POOR WEB QUALITY
MACHINE NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 TOTAL
DATE
1 7 1
2 8 1
3 3 1
4 0
5 5 1
6 3 2 8 3
7 0
8 1 1
9 0
10 0
11 1 1
12 1 1 1 3
13 1 1
14 1 1
15 7 1
16 0
17 0
18 1 1
19 0
20 0
21
22
23
24
25
26
27
28
29
30
31
TOTAL 2 2 1 2 4 2 1 1 16
RSB ONLINE REPORT MARCH'21
M/C NO:-)01
DATE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 COUNT
RQM A% 4 4 1 1 2 1 1 4 3 2 1 3 2 13
RQM CV% 0
RQM SPECTROGRAM 0
M/C NO:-)02
DATE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 COUNT
RQM A% 1 1 1 1 1 2 1 1 1 1 1 2 3 1 5 15
RQM CV% 3 1
RQM SPECTROGRAM 0
M/C NO:-)03
DATE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 COUNT
RQM A% 1 1 1 1 1 2 3 1 3 1 10
RQM CV% 0
RQM SPECTROGRAM 0
RQM THICK PLACE 1 1 2 1 9 1 1 7
M/C NO:-)04
DATE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 COUNT
RQM A% 6 2 2 2 5 1 1 7
RQM CV% 1 2 4 7 7 12 6
RQM SPECTROGRAM 19 1
RQM THICK PLACE 1 1 1 1 4
M/C NO:-)05
DATE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 COUNT
RQM A% 1 1 3 3 8 4 2 1 2 1 10
RQM CV% 1 1
RQM SPECTROGRAM 0
M/C NO:-)06
DATE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 COUNT
RQM A% 4 1 2 1 2 8 4 1 8
RQM CV% 0
RQM SPECTROGRAM 0
NATURE OF WORK
AUG'20 AVG 0.57 0.55 0.57 0.72 0.64 0.54 0.59
SEP'20 AVG 0.59 0.46 0.62 0.45 0.47 0.50 0.51
OCT'20 AVG 0.38 0.39 0.47 0.48 0.31 0.52 0.46
NOV'20 AVG 0.44 0.33 0.44 0.32 0.31 0.37 0.37
DEC'20 AVG 0.63 0.88 1.12 1.50 1.57 2.23 0.33
JAN'21 AVG 0.32 0.41 0.43 0.34 0.32 0.32 0.34
FEB'21 AVG 0.74 0.98 1.30 1.59 1.89 2.25 0.41
MAR'21 AVG 0.41 0.34 0.42 0.35 0.37 0.35 0.38
MIN 0.35 0.32 0.42 0.34 0.32 0.33 0.38
MAX 0.48 0.36 0.42 0.36 0.43 0.36 0.38
MACHINE NO 1 2 3 4 5 6 AVG
1 0.41
2 0.42 0.35 0.36 0.38
3
4 0.32 0.43 0.38
17 0.48 0.36 0.42 0.34 0.37 0.33 0.38
18
19 0.35 0.34 0.42
20 0.36 0.32
21
22
23
24
25
26
27
28
29
30
31
MAR'21
0.65 0.54
0.58 0.43
0.49 0.43
0.47 0.27
0.37 0.28
0.44 0.34
0.49 0.41
0.44 0.38
0.42 0.38
0.48 0.38
MAX MIN
0.42 0.38
0.43 0.38
0.48 0.38
DEPT DRAWING MONTH MAR'21
RSB A%
MACHINE NO 1 2 3 4 5 6
DATE
1 0.28 -0.12 0.42 0.30 -0.013 -0.19
2
3
4
5
6
7
8
9
10 -0.03
15 0.22 0.05 0.38 -0.03
17 0.12 -0.21 -0.27
18
19 -0.09 -0.14 0.09
20 0.07 0.036 -0.09
21
22
23
24
25
26
27
28
29
30
31
DEPT SIMPLEX MONTH MAR'21
2.28 2.08
2.49 1.81
1.69 1.69
0.59 0.59
2.50 1.07
2.50 1.07
DEPT SIMPLEX MONTH MAR'21
SIMPLEX 5 YARD CV
AUG'20 AVG 0.64 0.82 0.76 1.03 0.84 1.07 0.76 0.80 0.71
SEP'20 AVG 0.78 0.66 0.86 0.61 0.81 1.10 0.71 0.79 0.65
OCT'20 AVG 0.48 0.37 0.53 0.63 0.56 0.49 0.51 0.60 0.43
NOV'20 AVG 0.46 0.55 0.41 0.45 0.58 0.34 0.45 0.49 0.41
DEC'20 AVG 0.70 0.92 1.31 1.59 2.70 3.29 0.44 0.45 0.42
JAN'21 AVG 0.68 0.62 0.44 0.53 0.56 0.53 0.55 0.60 0.55
FEB'21 AVG 0.45 0.60 0.66 0.46 0.60 0.66 0.57 0.63 0.55
MAR'21 AVG 0.45 0.60 0.66 0.46 0.60 0.66 0.57 0.63 0.55
MIN 0.40 0.58 0.66 0.44 0.58 0.66 0.51 0.58 0.48
MAX 0.45 0.60 0.66 0.46 0.60 0.66 0.66 0.66 0.66
MACHINE NO 1 2 3 4 5 6 AVG MAX MIN
DATE
1 0.48 0.61 0.66 0.58 0.66 0.48
4 0.50 0.58 0.54 0.58 0.54
10 0.66 0.66 0.66 0.66
11 0.4 0.61 0.44 0.58 0.51 0.61 0.51
12
13
14
15
16
17
18
19
20
21
22
24
25
26
27
28
29
30
31
31
DEPT SIMPLEX MONTH MAR'21
STRETCH %
NATURE OF WORK
AUG'20 AVG -0.45 -0.28 -0.09 -0.51 -0.50 -- -0.47
SEP'20 AVG -0.42 -0.28 -0.50 -0.43 0.05 0.46 -0.12
OCT'20 AVG -0.30 -0.38 -0.55 -0.40 -0.33 -- -0.39
NOV'20 AVG -0.04 0.16 -0.30 -0.16 -0.19 -0.21 -0.15
DEC'20 AVG 0.18 0.59 0.97 1.24 1.33 2.95 -0.19
JAN'21 AVG -0.24 -0.07 -0.19 -0.23 -0.29 #DIV/0! -0.23
FEB'21 AVG -0.22 -0.02 -0.30 -0.08 0.34 -0.43 -0.08
MAR'21 AVG -0.22 -0.02 -0.30 -0.08 0.34 -0.43 -0.08
MIN -0.23 -0.12 -0.38 -0.31 0.34 -0.43 -0.43
MAX -0.22 -0.02 -0.30 -0.08 0.34 -0.43 0.34
MACHINE NO 1 2 3 4 5 6 AVG
DATE
1 -0.21 0.08 -0.38 -0.30 -0.20
5 0.34 0.34
10 -0.23 -0.23 -0.23
11 -0.12 0.37 0.12
12 -0.43 -0.43
18 -0.31
19
20
21
22
23
24
25
26
27
28
29
30
31
-0.42 -0.53
0.07 -0.27
-0.31 -0.48
-0.08 -0.22
-0.19 -0.19
-0.19 -0.23
0.03 -0.16
0.03 -0.16
-0.43 -0.43
0.37 0.34
MAX MIN
0.08 -0.38
0.34 0.34
-0.23 -0.23
0.37 -0.12
-0.43 -0.43
DEPT SIMPLEX MONTH MAR'21
100.52 74.05
101.16 73.06
VAIBHAV LAXMI SPINNING MILLS
QUALITY ASSURANCE DEPARTMENT
SIMPLEX U% TESTING REPORT MAR'21
SMX NO. DATE SPINDLE NO. U%. cvm 1 MAX. MIN. +20% SPI. DEFECTIVE SPI NO. RECHECKED RESULTS 10 CM REMARKS.
01.03.21 91-120' 3.24 2.10 5.25 2.84 3.888 115-120 RC DEFECTIVE SPDL ,WILL BE ATTEND.
09.03.21 101-140 3.32 2.05 3.62 2.97 3.984 138 RC DEFECTIVE SPDL ,WILL BE ATTEND.
2 18.03.21 01-30' 3.20 2.10 4.65 2.81 3.840 15-28-30 -- RC DEFECTIVE SPDL ,WILL BE ATTEND.
3-5-6-10-11-12-13-14-16-17-20-21-23-29- 3.10-3.21-3.10-3.29-3.82-3.25-3.23-3.77-3.79-3.34-
05.03.21 01-50' 3.57 2.00 4.88 2.85 4.284
32-33-34-35-36-37-38-40-44-47 3.51-3.11-3.30-2.98-3.49
DEFECTIVE SPDL RC WILL BE ATTEND
H 4.48 4.18
CV 6.1 4.8
Sh 1.04 1.03
CUTS PER 100 KM
YF 87.1 85.2 174 132.4
YJ 129.2 116.3 172.2 163
N 10 5.2 19.3 8.5
S 25.6 26.3 45.1 48.9
L 7 21.9 34.7 16.9
T 1.3 3.5 7.7 9.2
NSLT CUTS TOTAL 43.9 56.9 106.8 83.5
ALARMS COP'S NIL NIL NIL NIL
CLASSES
A1 205 300 571 288
A2 41.9 59.5 115 51.9
A3 11.5 7.2 18.1 5.9
A4 0.8 0.3 4.5 2.2
TOTAL 259.2 367 708.6 348
B1 43 29 47 49
B2 19 12 20 16
B3 6.3 3.2 5.3 7.4
B4 2 1.4 4.5 2.6
TOTAL 70.3 45.6 76.8 75
C1 11 10 14 12
C2 3.8 3.5 5.6 10
C3 28 1.7 3.3 4.8
C4 0.5 1.2 1.2 2.2
TOTAL 43.3 16.4 1.2 29
D1 0.8 1.4 3.9 1.8
D2 0.5 0.6 1.5 1.1
D3 0.8 0.3 0.3 2.9
D4 0 0 0 0.4
TOTAL 2.1 2.3 5.7 6.2
E 1.52 5.5 1.5 7.4
F 4 5.2 6.5 4.8
G 0 0.3 0.0 0
L.THICK 5.52 11 8.0 12.2
H1 0 0 1.2 0.4
H2 0 0 0.0. 0
I1 0 0 0.3 0
I2 0 0 0 0
L.THIN 0 0 1.5 0.4
OVER ALL 380.42 442.3 801.8 470.8
0
0
0.0
0
0
0.00
0
DEPT SIMPLEX MONTH MAR''21
SPG COMPACT SUCTION
SPG COMPACT SUCT
AUG'20 AVG 2.8 2.9 2.9 2.8 3.0 2.9 3.1
SEP'20 AVG 2.7 2.9 2.8 2.9 3.0 2.9 3.1
OCT'20 AVG 2.5 0.7 2.6 2.9 2.9 2.9 3.0
NOV'20 AVG 2.6 2.8 2.8 2.8 2.6 2.7 2.9
DEC'20 AVG 2.9 -- -- -- 2.7 -- 3.0
JAN'21 AVG 3.1 2.8 2.8 2.9 2.7 3.0 2.9
FEB'21 AVG 2.7 2.6 2.8 2.7 2.7 2.8 2.7
MAR'21 AVG #DIV/0! 2.5 2.5 2.8 2.7 2.8 2.8
MIN 0.00 2.50 2.50 2.80 2.70 2.80 2.80
MAX 0.00 2.50 2.50 2.80 2.70 2.80 2.80
MACHINE NO 1 2 3 4 5 6 7
DATE
9 2.8
11
12
13 2.5 2.5 2.8 2.7 2.80 2.80
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
SPG COMPACT SUCTION
2.7 2.8 2.6 2.5 2.2 2.7 2.8 2.7 2.9
2.6 2.5 2.6 2.6 2.3 2.7 2.7 2.7 2.1
3.5 2.5 2.6 2.7 2.1 3.2 2.4 2.6 2.9
3.4 2.6 2.9 2.6 2.2 2.7 2.7 2.7 2.9
2.9 2.6 2.8 2.8 2.9 2.7 2.8 2.8 2.9
2.9 2.7 3.0 2.7 2.9 2.7 2.4 2.8 3.0
2.9 2.8 2.6 2.8 2.9 2.8 2.7 2.7 2.8
2.8 2.7 2.5 2.9 2.9 2.7 2.6 2.8 2.9
2.70 2.70 2.50 2.90 2.80 2.60 2.60 2.80 2.90
2.80 2.70 2.50 2.90 2.90 2.70 2.60 2.80 2.90
8 9 10 11 12 13 14 AVG MAX
2.80
VAIBHAV LAXMI SPINNING MILLS VAIBHAV LAXMI SPINNING MILLS
QUALITY ASSURANCE DEPARTMENT QUALITY ASSURANCE DEPARTMENT
USTER QUANTUM 3 COMPARASION REPORT MARCH'2021 USTER QUANTUM 3 COMPARASION REPORT FEBRUARY'2021
COUNT:-)34CCH COUNT:-)30CCH COUNT:-)34CCH COUNT:-)34CCH COUNT:-)34CCH COUNT:-)34CCH COUNT:-)40CCH COUNT:-)40CCH
DATE-20.03.21 RF - 07 DATE- RF - 08 DATE- RF - 09 DATE-02.03.21 RF - 10 DATE-12.03.21 RF - 11 DATE-11.03.21 RF - 12 DATE-04.03.21 RF - 13 DATE-03.03.21 RF - 14
RF - 1 R1 R2 L1 L2 R1 R2 L1 L2 R1 R2 L1 L2 R1 R2 L1 L2 R1 R2 L1 L2 R1 R2 L1 L2 R1 R2 L1 L2 R1 R2 L1 L2
LENGTH 1569KM 639KM 1484KM 695KM 1420KM 705KM 1442KM 614KM 1529KM 832KM 1476KM 743KM 1386KM 718KM 1470KM 795KM 1649KM 955KM 1639KM 823KM 1718KM 815KM 1729KM 720KM
YF 81.7 75.5 88.7 82.1 71.6 67.5 75.8 97.7 108.8 113.9 104.9 95.9 85.2 85.9 87.2 87.9 125.9 101.4 96.1 96.6 84.4 82.4 78.6 85.6
N 10.5 13.9 9.6 13.8 8.7 7.5 8.0 11.5 21.2 21.1 18.8 19.2 8.6 6.8 9.7 10.3 11.3 13.3 9.8 13.1 7 11.3 11.6 13.1
s 22.2 23.6 25.9 27.9 22.3 19.3 22.2 38.7 38.7 40.7 38.9 35.1 30.7 30.5 31.8 34.4 29.6 32.9 29.2 31.4 23.3 27.1 22.7 26.1
l 5.7 6.1 8.0 4.9 7 7.7 10.2 13.5 10.7 15.8 11.4 10.8 13.6 13.8 14.5 13.1 20 21.8 19.4 18.6 15.2 14.3 13.3 17.5
t 5.1 5 4.0 1.4 5.2 4.8 4.9 4.6 8.4 7.3 4.9 5.6 2.8 4.2 2.7 4.1 4.2 2.5 4.2 4.9 5.5 3.6 2.8 1.9
NSLT 43.5 48.6 47.5 48.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 43.2 39.3 45.3 68.3 79.0 84.9 74.0 70.7 55.7 55.3 58.7 61.9 65.1 70.5 62.6 68.0 51.0 56.3 50.4 58.6
cp 0.4 3 1.4 0.7 0.2 0.3 0.2 0.0 0.8 1 0.5 0.3 0.9 0.3 1.1 0.9 0.8 1.2 0.7 1.7 0.3 0.6 0.5 0.8
cm 4.5 1.4 1.7 0.0 0.6 0.4 0.4 0.2 1.4 0.4 0.6 0.5 1.1 0.6 1.1 0.6 1 0.5 0.9 0.6 1.2 0.1 0.3 0.6
ccp 0.8 1.3 0.6 0.4 2 1 1.2 1.3 1.1 1.7 1.8 1.2 2.7 3.1 2.4 3.4 1.9 2.1 2.1 1.6 1.3 1.1 0.8 2.1
ccm 0.7 0.2 0.9 0.3 0.8 0 0.6 1.1 0.8 0.8 1.2 0.3 0.6 0.1 0.2 1.0 1 0.6 0.6 0.0 0.9 0 0.3 0.0
pf 0.1 0.6 0.1 0.0 0.3 0.1 1.6 1.1 2 2.6 1.5 1.2 2.1 1.8 1.2 0.5 1.9 2.2 1.7 1.9 1.6 1.3 0.6 0.8
JM 0 0 0.0 0.0 1.2 0.1 0.3 0.7 0.4 0.5 0.9 0.1 0.2 0 0.3 0.3 0.5 0.9 0.5 0.4 0.5 0.9 0.6 0.6
FD 12 11.4 14.8 14.1 12.7 14.6 14.9 14.6 14.8 14.6 13.8 11.4 13.8 15.2 13.1 11.2 12.4 14.6 13.8 10.7 13.8 12.3 13.0 10.4
pp 19.9 9.7 21.8 18.6 11.8 11.8 11.4 11.1 10.4 7.9 12.3 10.6 8.2 9.6 9.6 8.3 13.2 10.9 14.9 12.7 15.4 11.5 12.8 13.2
ONLINE CMT
A1 295 370 296.0 359.0 323 338 330.0 337.0 472 523 483.0 505.0 340 373 313.0 331.0 460 498 459.0 476.0 490 532 544.0 465.0
A2 58.7 74.1 57.7 72.1 52.2 54.6 56.1 59.3 103 106 103.0 94.5 60.2 61.7 60.7 60.5 84.9 93.6 79.7 88.7 80.9 90.7 90.0 91.4
A3 9.1 13.3 8.6 12.4 1.2 1.3 0.6 1.1 19 19.7 16.8 17.3 9.7 7.7 11.4 9.6 11.1 12.8 10.3 14.0 8.5 10.7 11.6 13.7
A4 1.0 0.8 0.7 0.7 0.0 0 0.0 0.0 2.9 3.2 2.2 3.2 2.2 1.7 2.2 3.1 1.8 4.1 2.0 1.9 1.5 3.1 3.2 2.3
B1 40 46 45 54 13 47 42 43 61 61 69 60 3.3 36 33 31 43 46 36 42 34 35 35 31
B2 13 15 19.0 19 7.5 9.9 9.7 9 26 26 26.0 23 13 16 3.9 14 16 15 15.0 14 12 13 13.0 13
B3 5.4 5.6 4.7 7.0 0 0 0.0 0.0 7.8 9.6 7.8 8.7 4.3 3.2 1.2 1.5 4.7 4.8 4.9 6.6 4.1 3.3 3.1 5.4
B4 1.1 2.2 1.6 1.9 0 0 0.0 0.0 2.9 3 1.8 2.4 1.6 1 1.1 11.0 1.9 2.3 1.8 1.9 2.6 1.7 1.9 0.8
C1 7.1 7.8 6.5 7.6 5.8 7.2 5.9 7.5 12.0 9.8 11.0 9.9 8.8 1.9 3.9 5.7 9.3 11 8.4 9.8 9.4 7.1 7.5 9.0
C2 2.9 2.8 3.2 2.9 0.2 0.1 0.3 0.0 4.8 4.1 4.9 4.7 2.2 3.1 1.6 2.8 3.2 5.1 3.8 3.4 2.2 3.8 2.9 2.9
C3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
C4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
D1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
D2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
D3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
D4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
E 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
F 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
G 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
H1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
H2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
I1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
I2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL FAULTS 433.3 537.6 443.0 536.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 402.9 458.1 444.6 456.7 711.4 765.4 725.5 728.7 445.3 505.3 432.0 470.2 635.9 692.7 620.9 658.3 645.2 700.4 712.2 634.5
CMT 96.3 119.5 98.4 119.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 89.5 101.8 98.8 101.5 158.1 170.1 161.2 161.9 99.0 112.3 96.0 104.5 141.3 153.9 138.0 146.3 143.4 155.6 158.3 141.0
ALARMS COP'S 1.0 1.0 1.0 NIL NIL NIL NIL NIL NIL NIL NIL 1.0 NIL NIL 2.0 NIL NIL NIL NIL NIL NIL NIL NIL NIL 2.0 NIL 1.0 NIL NIL NIL 4.0 NIL
FD CMT
A1 134.0 107 152.0 139.0 135.0 162 140.0 148.0 122.0 124 120 135.0 105.0 97.9 95.3 92.2 117.0 120 124.0 114.0 136.0 162 131.0 132.0
A2 2.2 2.8 3.6 2.6 2.7 2.8 1.8 2.9 3.1 3 3.5 3.0 2.2 3.1 2.9 1.6 2.2 4 2.2 2.4 1.9 3.1 2.4 2.5
A3 0 0 0.0 0.0 0 0 0.0 0.0 0 0 0.0 0.0 0 0 0.1 0.0 0 0 0.0 0.0 0 0 0.1 0.0
B1 32 32 36.0 36.0 38 40 35.0 40.0 36 35 36.0 37.0 34 31 33.0 32.0 40 40 38.0 37.0 4.5 44 4.1 37.0
B2 1.7 0.9 1.9 1.7 1.3 1.3 1.0 0.8 2.2 17 1.9 1.7 2.2 2.2 2.0 1.6 2.2 2.9 2.7 1.7 2.4 2 1.9 1.7
B3 0.1 0 0.1 0.0 0 0 0.0 0.0 0.1 0.4 0.2 0.1 0.1 0.1 0.0 0.1 0.1 0.3 0.2 0.4 0.1 0 0.2 0.0
C1 19 18 24.0 20.0 18 17 18.0 17.0 24 29 2.5 21.0 24 26 23.0 22.0 25 25 25.0 2.4 2.7 29 22.0 22.0
C2 2.4 1.6 3 2.7 0 0 0 0.0 2.2 2.4 2.4 2.2 1.9 2.1 1.7 2.0 1.9 2.1 2 1.8 2.2 1.8 2 1.5
C3 0.1 0 0 0.1 0 0 0 0.0 0.1 0.2 0 0.0 0.1 0.1 0.0 0.0 0 0 0 0.4 0 0 0 0.2
D1 5.2 6.3 4.9 4.6 2.3 3.1 2.6 2.3 5.6 6.5 4.3 5.2 4.7 6.1 4.0 3.3 4.4 4.8 5.1 3.5 3.6 4.3 4.3 4.0
D2 0.9 0.9 1.0 0.4 0 0 0.0 0.0 0.7 0.2 0.6 0.8 0.5 0.6 0.4 0.8 0.5 1 0.2 0.2 0.6 0 1.0 0.6
E1 2.0 1.7 2.4 2.7 0.4 0.9 0.2 1.3 2.2 2.8 2.0 1.7 2.7 1.7 2.9 1.6 1.3 1.2 2.1 0.8 2.4 1.6 2.0 1.3
E2 0.4 0.5 0 0.3 0 0 0 0.0 0.5 0.4 0.4 0.3 0.1 0.3 0.3 0.1 0.2 0.5 0.4 0.4 0.3 0.1 0 0.2
F1 0.2 0.5 0.3 0.7 0 0 0.0 0.2 0.5 0.1 0.5 0.0 0.2 0.6 0.4 0.4 0.3 0 0.1 0.4 0.2 0.2 0 0.0
F2 0 0 0 0.0 0 0 0 0.0 0 0 0 0.0 0 0 0.1 0.0 0 0 0 0.0 0 0 0 0.0
TOTAL FD FAULTS 19.0 18.0 24.0 20.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 18.0 17.0 18.0 17.0 24.0 29.0 2.5 21.0 24.0 26.0 23.0 22.0 25.0 25.0 25.0 2.4 2.7 29.0 22.0 22.0
FD CMT 9.5 9.0 12.0 10.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9.0 8.5 9.0 8.5 12.0 14.5 1.3 10.5 12.0 13.0 11.5 11.0 12.5 12.5 12.5 1.2 1.4 14.5 11.0 11.0
ONLINE NSLT
ONLINE FD
ONLINE IPI 59 67 61 66 72 75 73 74 85 105 86 97 69 79 62 61 72 83 72 77 83 107 87 74
ONLINE CVM 11.08% 11.04% 11.28% 11.08% 11.24% 11.34% 11.23% 11.16% 11.30% 11.52% 11.25% 11.31% 10.80% 10.99% 10.84% 10.96% 11.10% 11.16% 11.12% 11.15% 11.30% 11.45% 11.30% 11.05%
DEPT RF MONTH MAR'21
COPS IPI
COPS IPI 26CCH
AUG'20 AVG
SEP'20 AVG
OCT'20 AVG
NOV'20 AVG
DEC'20 AVG 26CCH
JAN'21 AVG
FEB'21 AVG
MAR'21 AVG 8.2 2.0 0.0 10 17 26 227 3 82 67 152 4.41 0.95
MIN 8.1 1.7 0.0 7 16 22 212 3 67 63 134 4.27 0.91
MAX 8.2 2.2 0.0 13 18 30 242 4 97 71 171 4.54 0.98
DATE COUNT M/C NO U% CVb -0.5 +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
18 26CCH 5 8.23 2.2 0.0 13 18 30 242 3 97 71 171 4.54 0.98 0.3836
19 26CCH 5 8.09 1.7 0.0 7 16 22 212 4 67 63 134 4.27 0.91 0.384
20
21
22
23
24
25
26
27
28
29
30
31
COPS IPI 30CCH
AUG'20 AVG 9.0 1.8 0.0 13 34 47 581 17 165 203 386 4.03 0.93
SEP'20 AVG 8.9 2.3 0.1 14 35 48 515 14 139 190 343 4.19 0.93
OCT'20 AVG 9.0 4.0 0.0 13 43 56 511 12 147 220 379 4.28 0.95
NOV'20 AVG 9.1 2.1 0.1 15 40 56 590 18 160 217 395 4.32 0.97
DEC'20 AVG 30CCH 9.2 2.0 0.1 18 41 60 515 16 187 229 372 4.13 0.94
JAN'21 AVG 9.2 2.2 0.2 19 45 64 580 17 181 242 440 4.09 0.92
FEB'21 AVG 9.1 2.2 0.1 19 44 63 542 15 186 255 456 4.12 0.93
MAR'21 AVG 9.1 2.1 0.1 17 42 59 553 15 170 228 413 4.02 0.91
MIN 8.9 1.2 0.0 13 35 48 458 12 146 177 337 3.81 0.87
MAX 9.4 3.0 0.8 22 49 69 742 23 212 258 484 4.28 0.96
DATE COUNT M/C NO U% CVb -0.5 +50% +200% TOTAL -30% -40% +35% +140% TOTAL H SH ID
1 30CCH 3 9.01 2.7 0.0 17 42 59 534 14 159 234 408 4.28 0.95 3762
2 30CCH 2 9.21 2.0 0.0 17 49 65 599 12 181 244 437 4.20 0.96 3767
3 30CCH 3 8.90 2.1 0.0 18 40 58 458 12 158 219 388 3.93 0.88 3772
4 30CCH 2 9.26 1.5 0.0 18 39 57 618 23 199 225 447 3.90 0.91 3783
6 30CCH 1 9.01 2.5 0.3 16 38 54 531 13 163 210 386 4.03 0.90 3786
8 30CCH 4 9 1.9 0.0 15 42 58 552 12 167 234 414 4.11 0.92 3792
9 30CCH 5 8.97 2.9 0.3 16 45 61 499 12 169 244 425 3.92 0.92 3796
11 30CCH 4 9.23 2.4 0.3 22 47 69 605 19 197 258 473 4.2 0.95 3801
12 30CCH 7 8.92 1.9 0.0 13 44 57 508 15 149 243 407 3.94 0.89 3806
13 30CCH 6 9.06 1.3 0.0 19 46 64 552 19 171 240 430 3.97 0.91 3811
16 30CCH 4 8.96 2.3 0.0 15 39 54 519 13 148 218 378 3.96 0.88 3828
18 30CCH 6 9.00 3.0 0.0 17 42 59 528 15 158 196 368 3.96 0.87 3837
19 30CCH 9 9.37 2.0 0.8 21 44 65 742 21 212 251 484 3.81 0.89 3841
20 30CCH 6 8.94 1.2 0.0 13 35 48 493 13 146 177 337 4.09 0.9 3846
21
22 30CCH
23 30CCH
24 30CCH
25 30CCH
26 30CCH
27 30CCH
28
29
30
31
0.78 0.8 ### ### ### ### ### ### ### ### ### ###
0.78 0.8 0 0 0 0 0 0 0 0 0 0
0.78 0.8 0 0 0 0 0 0 0 0 0 0
9 10 31 32 33 34 35 36 37 38 39 40
78% 80%
### ### 78%
0 0 76%
0 0 79%
41 42 AVG
#DIV/0!
78%
NOV'20 MC NO 1 2 3 4 5 6 7
6 2 0.14 0.16 0.16
8 3 0.12 0.096 0.10
14 12 0.16 0.13
0.12 0.12
0.17 0.14 0.17 0.11 0.13
0.14
0.14
32 33 34 35 36 37 38 39 40 41 42 AVG
0.12 0.13
0.14 0.15
32 33 34 35 36 37 38 39 40 41 42 AVG
0.11
0.11 0.13
0.10 0.12 0.14
0.13 0.15 0.15
32 33 34 35 36 37 38 39 40 41 42 AVG
0.11 0.068
0.12 0.10 0.088 0.13 0.12 0.11
0.14 0.11 0.13 0.074 0.14 0.13
0.099 0.15 0.16 0.11
0.11 0.15 0.14
0.13
0.038 0.039 0.13
0.066 0.094 0.13 0.13
0.049 0.029 0.043 0.040 0.062
32 33 34 35 36 37 38 39 40 41 42 AVG
0.17 0.20 0.18
0.14 0.12 0.11
0.12 0.17 0.16 0.11
0.17 0.19
0.09 0.06
WASTE TRASH REPORT (UNIT-1) 2020-2021
INDIAN INDIAN INDIAN INDIAN INDIAN INDIAN INDIAN INDIAN INDIAN INDIAN INDIAN INDIAN INDIAN INDIAN
DATE 22.01.20 28.02.20 15.03.20 15.04.20 22.05.20 25.06.20 11.07.20 17.08.20 29.09.20 08.10.20 26.11.20 25.12.20 30.01.21 28.02.21
LD LD LD LD LD LD LD LD LD LD LD LD LD LD LD
LINT 46.3 47.01 46.8 44.82 46.00 42.17 47.96 51.89 47.78 48.33 51.56 50.49 48.46 50.66
TRASH 52.8 52.87 53.2 53.82 53.98 56.98 50.22 46.65 49.95 50.45 45.94 47.8 50.79 47.00
INV.LOSS 0.9 0.12 0.15 1.36 0.02 0.85 1.82 1.46 2.17 1.22 2.50 1.50 0.75 2.33
TOTAL 100 100 100 100 100 100 100 100 100 100 100 100 100 100
WASTE REPORT(UNIT-1) 2019-2021
UNIT-1
Indian
25.08.19 12.09.19
COMBER NOIL 22.10.18 19.11.18 18.12.18 29.01.19 12.02.19 09.03.19 28.04.19 16.05.19 10.06.19 15.07.19 cotton (Brazil) (Brazil) 20.10.19 09.11.19 19.12.19 24.01.20 08.02.20 06.03.20 08.04.20 22.05.20 24.06.20 21.07.20 18.08.20 08.09.20 28.10.20 25.11.20 04.12.20 30.01.21 23.02.21 05.03.21
(AVG)
COMBER NOIL
TOTAL CNT 277 558 307 442 396 559 363 326 660 710 460 311 331 193 343 286 418 544 495 345 278 584 588 421 383 328 408 419 498 548 522
FIBER NEP CNT 237 501 272 418 361 518 310 283 596 647 414 303 318 167 317 252 384 633 469 628 247 530 526 651 625 277 346 379 453 496 472
SC NEP CNT 40 57 34 24 35 41 53 43 64 63 45 8 14 25 26 34 34 43 26 41 32 54 62 59 33 51 62 41 45 52 51
L(w) 12.6 11.9 11.5 10.7 11.5 11.6 11.6 11.8 11.5 10.9 11.6 11.1 10.7 11.1 11.1 11 10.1 10.2 10.1 10.9 10.9 10.9 11.9 11 11.2 11.4 10.8 10.5 11.5 10.7 10.8
UQL(W) 16.2 14.8 14.1 13.4 14.2 14.6 14.3 14.7 14.5 13.7 14.5 13.6 13.3 13.7 13.9 13.6 12.6 12.6 12.7 13.4 13.3 13.5 14.8 13.7 13.9 14.1 13.3 13.2 14.4 13.4 13.4
SFC(W) 59.9 62.5 64.9 68.9 64.8 63.3 63.3 63.7 63.6 67.6 64.3 65.8 67.8 66.4 66.4 67.8 72.4 72.0 72.0 67.5 68.1 67.7 64.3 66.4 64.9 64.6 68.2 69.3 63.0 67.9 67.7
L(n) 8.7 8.4 8.4 7.7 8.2 8.2 8.4 8.3 8.2 7.7 8.2 8.3 7.9 8.0 7.8 7.9 2.3 7.4 7.4 7.9 8.0 7.7 8.4 8.0 8.2 8.2 7.9 7.5 8.2 7.9 7.9
SFC(n) 80.9 81.7 82.7 85.7 83.2 82.4 81.6 82.7 82.5 85.2 82.9 82.5 84.2 83.9 84.6 84.9 87.6 87.3 87.1 84.4 84.6 85.1 81.3 83.6 82.6 82.7 84.7 86.0 82.0 84.5 84.6
5%(n) 21.2 19.0 18.2 16.9 18.0 18.3 18.1 18.8 18.3 17.3 18.4 17.2 16.6 17.4 17.7 17.5 15.8 15.9 15.6 16.9 17.0 17.0 18.9 17.0 17.5 17.8 16.9 16.7 18.3 16.8 16.9
IFC 6.0 7.2 7.3 6.9 6.3 6.6 7.3 6.4 7.2 7.7 6.9 7.3 8 7.1 6.1 7.3 7.6 8.1 6.8 5.7 6.0 6.6 6.1 6.3 6.4 5.5 6.4 6.1 6.5 6.8 7.7
VAIBHAV LAXMI SPINING MILLS LTD.
CUSTOMER COMPLAINTS - 2020
SR. No Month Count Customer Lot / Inv. No Nature of Complaints Reasons Corrective Action
DURING THE PRODUCTION PERIOD TIME NO SEMI CLG AND CLG ACTIVITES
4004AA-30 , NOT DONE BY THE MTC DEP. DUE TO THE COVID-19 LOCK DOWN LOCAL MTC
1 "MAY 20" 40sCCH TEXVISTA EXP-Y-014-2020-21 FOREIGN FIBER BLACK KITTIES. TEAM WERE STOPPED. SO THAT WE NOTICED 4-5 FD CUT'S INCREASE IN FD AS NOW AS REGULAR DONE BY CLG & SMI CLG ACTIVITES AS PER OUR SCHEDULES.
WELL AS YARN FAULT'S.
DURING THIS PERIOD IPI LEVEL SEMMS HIGHER. IPI RANGE IS (58-78) PROCESS WILL BE FINETUNE AND MAINTED OUR STD IPI.
3407AA-49 ,
2 "JULY 20" 34sCCH GREEN WAY Y-R- 1) LONG THICK PLACES 2) 0.4%
139,145,151 & 155- WT SHORTAGE.
2020-21 IN WT SHORTAGE, OUR RECORDS TOTAL LOT AVG AT IS 48.016 KG's. FOR SHORTAGE WE WILL INCREASE BOX WT, RANGE IS 48.020 - 48.060 KG's.
WE STOCKED GOODS IN G-03 TOTAL 3 LOT'S. SAME PROBLEM WE FOUND IN WHILE WE DISPTACH GOODS FROM GODOWN. WE WILL STOP LOADING AT 7:00
30sCCH 1 CONTAINER, FOR 2 BOXES. WE REWIND AND LOAD. PM.
4005AA-44 ,
3 "JULY 20" 40sCCH TEXVISTA EXP-Y-042-2020- TERMITE BITE INSIDE THE
BOXES. THIS LOT WAS DISPATCHED BY LATE NIGHT FROM GODOWN. WE WILL CONDUCT & MAINT A SCHEDULE FOR ALL OUR GODOWN.
21
LOAD MEN ATMOST TAKE CARE'S IN ALL LOADING TIME'S.
3407AA55&57 LONG THICK PLACE IN KNITTED THICK SPOTS SEEMS TO BE COARSER COUNT /DOUBLE YARN /COUNT MIXUP, OUR EYC'S ARE WORKING PROPERLY AND EFFICENTLY WHICH WE NOT ALLOW
4 "AUG 20" 34 CCH JRP KNIT FAB EXP-Y- WE FEEL THAT THICK PLACE WAS OCCURRED COARSER YARN PRESENCE SUCH A DEFECT IN THE CONE YARN , BASED ON THE DEFECTIVE CLOTH WE CAN
020/021-2020-21 FABRIC INSIDE THE CONE. TAKE APPROPRIATE CORRECTIVE ACTION IF ANY AT OUR END.
4007AA-52 , ON OUR PRDN PERIOD TIME AVG COUNT IS 40.03,AND CSP IS 2859 POINTS. WE
MITTAL COUNT COARSER IN BUYER TEST REPORT(38.9), WE SUSPECT IN BUYER
4 "AUG 20" 40 CCH EXP-Y-249-2020- COUNT COARSER SUSPECTING BUYER LAB RH CONDITIONS IS MORE, AND WILL INFORM THE BUYER
CLOTTHING 21 REPORT CSP SHOWN 3078 POINTS. IT IS VERY HEIGH CSP. TO BE RECHECK AND COINFRM.
VAIBHAV LAXMI SPINNING MILLS
QUALITY ASSURANCE DEPARTMENT
LOW CSP REPORT
RING FRAME LOW CSP OCCARANCE%
NO OF COPS
M/C NO AUGUST'20 SEPTEMBER'20 OCTOBER'20 NOVEMBER'20 DECEMBER'20 JANUARY'21 FEBRUARY'21
CHECK
1 150 6.0 2.7 7.1 1.8 6.4 0.9 4.2
2 150 4.7 8.0 6.2 6.2 8.2 2.5 3.3
3 150 5.3 3.3 7.7 4.5 5.7 1.8 7.5
4 150 6.0 4.0 6.4 1.5 9.2 8.3 6.9
5 150 2.7 1.3 0.0 1.1 1.8 11.1 6.4
6 150 6.7 2.7 4.3 1.5 2.3 2.3 1.8
7 150 6.7 12.7 9.2 10.0 5.8 6.7 3.0
8 150 6.0 2.7 2.3 0.0 3.6 2.3 0.8
9 150 24.0 8.0 15.4 5.0 7.7 9.2 5.8
10 150 4.7 4.7 0.8 0.8 4.3 1.5 4.6
11 150 19.3 5.3 16.2 13.3 14.6 25.0 0.9
12 150 13.3 11.3 6.9 9.2 24.3 35.0 18.2
13 150 6.7 6.7 8.6 2.2 8.5 4.5 13.3
14 150 6.67 13.33 2.30 6.92 5.71 10.76 23.84
2100 8.48 6.19 6.66 4.58 7.71 8.71 7.18
DEPT RF MONTHMARCH'21
RF LATTICE APRON CHOKING
MACHINE NO 1 2 3 4 5 6 7 8 9 10 11 12 13
DATE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
0 0 0 0 0 0 0 0 0 0 0 0 0
14 TOTAL
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 0
VAIBHAV LAXMI SPINNING MILLS.
QUALITY ASSURANCE DEPARTMENT
YCP GAIN REPORT FROM OCT19 TO SEP 20
JAN_20 FEB_20 MARCH_20 APRIL_20 MAY_20 JUNE_20 JULY_20 AUGUST_20 SEPTEMBER_20 OCTOBER_20 NOVEMMBER_20
L/C PRODN 433961 452204 373411 400080 383003 384096 442241 487053 502464 500271 511290
OPG PKG STOCK 85020 68261 81253 122093 363678 337264 141075 60324 27792 40961 149257
CLG PKG STOCK 68261 81253 122093 363678 337264 141075 60324 27792 40961 149257 181711
DISPATCHES 454207 442954 335570 161212 412090 583495 526574 524004 493264 396602 483051
ACT PKG PRODN 437448 455946 376410 402797 385676 387306 445823 491472 506433 504898 515505
GAIN IN KGS 3487 3742 2999 2717 2673 3210 3582 4419 3969 4627 4215
GAIN % 0.80 0.83 0.80 0.68 0.70 0.84 0.81 0.91 0.79 0.92 0.82