-nergy is a basic requirement for economic development. -very sector of Indian


economy agriculture, industry, transport, commercial, and domestic ± needs inputs of
energy. The economic development plans implemented since independence have
necessarily required increasing amounts of energy. As a result, consumption of energy
in all forms has been steadily rising all over the country.

This growing consumption of energy has also resulted in the country becoming
increasingly dependent on fossil fuels such as coal and oil and gas. Rising prices of oil
and gas and potential shortages in future lead to concerns about the security of energy
supply needed to sustain
our economic growth. Increased use of fossil fuels also causes environmental problems
both locally and globally.

Against this background, the country urgently needs to develop a sustainable path of
energy development. Promotion of energy conservation and increased use of
renewable energy sources are the twin planks of a sustainable energy supply.

Fortunately, India is blessed with a variety of renewable energy sources, the main ones
being biomass, biogas, the sun, wind, and small hydro power. (Large hydro power is
also renewable in nature, but has been utilized all over the world for many decades, and
is generally not included in the term µnew and renewable sources of energy¶.) Municipal
and industrial
Wastes can also be useful sources of energy, but are basically different forms of
biomass.

The Ministry of Non-Conventional -nergy Sources has been implementing


comprehensive programmers for the development and utilization of various renewable
energy sources in the country. As a result of efforts made during the past quarter
century, a number of technologies and devices have been developed and have become
commercially available. These include biogas plants, improved wood stoves, solar water
heaters, solar cookers, solar lanterns, street lights, pumps, wind electric generators,
water-pumping wind mills, biomass gasifies, and small hydro-electric generators.
-nergy technologies for the future such as hydrogen, fuel cells, and bio-fuels are being
actively developed.

India is implementing one of the world¶s largest programmers in renewable energy. The
country ranks second in the world in biogas utilization and fifth in wind power and
photovoltaic production. Renewable sources already contribute to about 5% of the total
power generating capacity in the country. The major renewable energy sources and
devices in use in India are listed in Table 1 along with their potential and present status
in terms of the number of installations or total capacity.

¦  

Wind energy has been utilized by mankind for sailing, grinding, and other mechanical
applications for centuries. In the recent past, wind energy has emerged as a viable
renewable energy option with
Increased application in water pumping, battery charging, and large power generation. It
is environmentally benign and does not emit greenhouse gases (GHG).

 
   

Generation of electricity has emerged as the most important application of wind energy
world-wide. The concept is simple: flowing wind rotates the blades of a turbine, and
causes electricity to be produced in generator unit. The blades and generator (housed
in a unit called µnacelle¶) are mounted at the top of a tower.

cccccccccccccccccccccccccccccccccccccccccccc c
c
  
Wind turbines generally have three rotor blades, which rotate with wind flow and are
coupled to a generator either directly or through a gear box. The rotor blades rotate
around a horizontal hub connected to a generator, which is located inside the nacelle.
The nacelle also houses other electrical components and the yaw mechanism, which
turns the turbine so that it faces the wind. Sensors are used to monitor wind direction
and the tower head is turned to line up with the wind. The power produced by the
generator is controlled automatically as wind speeds vary. The rotor diameters vary
from 30 metres (m) to
about 90 m, whereas the towers on which the wind electric generators (W-Gs) are
mounted, range in height from 25 to 80 m.
The power generated by wind turbines is conditioned properly so as to feed the local
grid. The unit capacities of W-Gs presently range from 225 kilowatt (kW) to 2 megawatt
(MW), and they can operate in wind speeds ranging between 2.5 m/s (metres per
second) and 25 m/s.

Wind speed data of potential locations is compiled for a period of one to two years, to
identify suitable sites for the installation of W-Gs. Thereafter, W-Gs are installed on the
sites with appropriate distances
between them to ensure minimum disturbance to one another. After the identification of
sites, wind turbines generally take two to three months for installation. The equipment is
tested and certified by agencies to ensure that it conforms to the laid-down standards,
specifications, and performance parameters. The machines are maintained by the
respective manufacturers after installation.

 
 
  ¦ 

India¶s wind power potential has been assessed at 45 000 MW. The current technical
potential is estimated at about 13 000 MW, assuming 20% grid penetration, which
would increase with the augmentation of grid capacity in potential states.
c

      ¦ 

The next section will try to examine the policies and measure that were implemented, as
well as other reasons that have allowed India to move so quickly in terms of wind
energy deployment. It will look at the government policies, economic incentives, some
technical and social factors, and lastly the infrastructural factors, that allowed wind
energy to take off with such a boom.

             

The most relevant and powerful fiscal incentives did not come about on their own. It was
government policy that gave the private sector a really strong motivation to set up wind
turbines and get into the renewable energy business. These were,


100% accelerated depreciation on investment on the capital equipment in the
first year of installation itself.

Five year tax holiday on Income from sale of power generated by wind energy.

Industry status, entitling to capital subsidy in certain states.

Banking and Wheeling facility.

Buy back of power generation by State -lectricity Board at a remunerative price.

Third party sale of power generation in certain states.
The 100% accelerated depreciation rule had the greatest effect in stimulating industry
interest. What it meant was that if a company¶s taxable income (outside the wind power
project) for the financial year was, for instance, Rs. 10,000, the company could show
investments on W-G to the tune of Rs. 10,000 and get away by paying no tax at all.

This meant that some of India¶s most prosperous businesses and industries, looking for
tax breaks queued up in front of the MN-S in order to sign installation contracts. The
huge capital cost of wind-farm installation did not attract smaller entrepreneurs. This
was a deliberate move by the Ministry to heavily reward installation and capital cost
acquisition, a barrier which usually prevents industries such as that of wind energy from
taking off, and succeed it did.

Also, recognizing the limitations of conventional banks to shoulder large installation


costs, the MN-S created the IR- A (Indian Renewable -nergy evelopment Agency)
in 1987 in order to finance renewable energy technologies. By 1997, IR- A gave out
loans amounting to RS 676 million (US $16.2 M) which enabled the development of
over 267 MW of wind power projects. This first confident move by the government
spurred other groups to come forward to sponsor wind projects, such as the Gujarat
Industrial evelopment Corporation Limited, the Industrial evelopment bank of India,
and the Industrial Credit Investment Corporation of India.

Furthermore, the MN-S streamlined the recognition and handling of wind-power plant
financing by national and state-banks by drawing up ³Guidelines for Clearance of Wind-
Power Projects´ in July 1995. It became mandatory for all State electricity boards and
nodal agencies (which constitute the State bodies implementing wind-power
development) to comply with conditions such as:-


eclare the schedule of envisaged capacity additions based on the power
evacuation facilities at identifies windy sites every six months, and ensure grid
compatibility.

Seek etailed Project Reports ( PR¶s) from independent consultants for
(capacities above 1 MW) and verify project capital cost and generation against
certified wind turbine power curves and wind data at the site before granting
approval for projects.

Other financially related aspects that are relevant are


Power cuts (due to load shedding) during the summer months were a handicap
for industries, especially in regions such as Tamil Nadu. Incidentally the wind
generation during the summer months was at a peak and this incentivized both
the TN-B and the local industries.

The industries that invested heavily in wind energy came from the textiles and
cement industry, which had earned huge profits and were eager to adopt wind
energy to earn the 100% depreciation.

   

On the technical side, India has been fortunate in two ways. Firstly, they have
discovered a good number of windy sites (recall that MN-S identified 160 potential sites
and 20, 000MW total available). Secondly, though they may not have previously been
too familiar with wind technology, there are a large number of highly trained engineers
and technicians who are graduates of institutions such as the IIT¶s (Indian Institute of
Technology). These provide the technical expertise that has allowed adaptation of
foreign wind turbines for local use and their deployment in different parts of the country.

Wind -nergy adoption has had almost no social or environmentally charged backlash,
as far as can be told from the wealth of information on the subject. Unlike the United
States or -urope, neither the problem of noise nor avian death, have been significant
obstacles that needed to be overcome. There has been widespread acceptance of the
technology from the Indian public and environmental groups and this has undoubtedly
been a factor enabling the rapid proliferation of wind turbine use.

¦ 

A number of infrastructural situations have also spurred wind energy use. For this
particular instance we shall look at the state of Tamil Nadu and analyze some of the
characteristics that made it the leader among Indian states in installed capacity. Among
these are:-


The windy sites were close to towns for accessibility in bringing labor and
providing accommodation for the personnel involved in the projects.

The sites were well interlinked with highways.

Grid network by Tamil Nadu -lectricity board (TN-B) was well connected and
mainly passing through the sites.

Most of the wind turbine manufacturers/suppliers were located in Tamil Nadu and
so gave investors confidence in the supply of machines and after-sales service of
the machines.

Chennai port of Tamil Nadu has excellent facilities for import of heavy machinery
of the turbine components and this facilitated inter-state and international
transportation.
   


This was perhaps the strongest initiator in promoting wind power adoption and
investment. The policies adopted allowed all the other factors to flow together in a way
that made wind energy very attractive to businesses and investors. Apart from the
ongoing efforts of the MN-S, which first of all instilled confidence in the technical and
commercial viability of wind energy by performing the emonstration Program,
monitoring the entire country for windy sites, and putting the tax incentives in place, a
few other policy initiatives by the State government of Tamil Nadu are also to be noted.
These are:-


Active promotional steps were taken by TN-B and the Tamil Nadu evelopment
Agency (T- A). For example TN- took the first steps in setting up wind farms
at sites like Muppandal, Kayathar and Kethanur to prove the viability of wind
farms.

TN-B extended all facilities for private entrepreneurs like consultancy services,
processing of the application for issuance of No Objection Certificate (NOC), and
other clearances, extending grid connections to wind farms and executing new
dedicated sub-stations.

TN-B established an effective system for registering the energy generation by
each turbine and so enabled turbine owners to adjust their energy bill in
accordance, or effect payment to those who sold to TN-B.

G   
 
 
c
The Wind Power Programme in India was initiated towards the end of the Sixth Plan, in
1983±84. The programme aims at survey and assessment of wind resources, setting up
demonstration projects, and provision of incentives to make wind electricity competitive.
As a result, wind electricity has emerged as an option for grid-quality power generation.
The costs in respect of wind monitoring stations are shared between the Ministry of
Non-Conventional -nergy Sources (MN-S) and the state nodal agencies in the ratio of
80:20 (90:10 for north-eastern states). With 2980 MW of installed wind power capacity,
India now ranks fifth in the world after Germany, USA, Spain, and enmark. Most of the
capacity addition has been achieved through commercial projects by private investors.
c
     
 
c
The Wind Resource Assessment Programme is being implemented by C-W-T (Centre
for Wind -nergy Technology) in coordination with state nodal agencies. An annual
mean wind power density greater than 200 W/m2 (watts per square metre) at 50-metre
height has been recorded at 211 wind monitoring stations, covering 13 states and union
territories, namely Andaman and Nicobar Islands, Andhra Pradesh, Gujarat, Karnataka,
Kerala, Lakshadweep, Madhya Pradesh, Maharashtra, Orissa, Rajasthan, Tamil Nadu,
Uttaranchal, and West Bengal. Handbooks titled Ô  
    
have been published covering the wind data already generated.

  

Master plans are available for 97 potential sites for wind power in Andhra Pradesh, Gujarat,
Karnataka, Kerala, Madhya Pradesh, Maharashtra, Orissa, Rajasthan, Tamil Nadu, and West
Bengal. The master plans provide information on the availability of wind, land, grid availability,
and accessibility to the site, which enables project promoters and state nodal agencies to
undertake proper planning and implementation of the projects. The master plans have been
provided to the state nodal agencies and are made available to project promoters, developers,
and consultants through C-W-T at a nominal cost.

  
 
 
c
The cost of wind power generation varies between Rs 4 and 5 crores per MW, depending upon
state characteristics. The machines can be maintained at a cost of Rs 0.25 to 0.60/kWh. The
projects are estimated to have a pay-back period of five to eight years.

 ¦   


Wind power projects have been set up through private investment. The promotional incentives
available are listed below.


80% accelerated depreciation in the first year.

Concessional import duty of 5% on five specified wind turbine components and their
parts.

Favorable tariffs and policies in several states.

       


Wind turbines are produced in the country by about a dozen manufacturers, mainly through joint
ventures or under licensed production agreements. A few foreign companies have also set up
their subsidiaries in India. A few Indian companies are manufacturing W-Gs without any foreign
collaboration. A list of manufacturers of wind turbine models possessing valid approvals, along
with their foreign collaborators, is given in Table 2 (A and B). Indian-made wind turbines are
also being exported to some countries.

 
      ¦ 
To a large extent, wind energy in India can be said to be as much of a failure as a success.
There are many more problems that are being encountered with the implementation of the
technology than there have been successes. We shall now take a scrutinizing look at some of
the reasons for the failures.


  

One of the first things that are pointed to for being responsible for the slump in wind energy use
is the introduction of the Minimum Alternate Tax (MAT). This was a new tax of 12.9% in the
1996/1997 budget for companies going for ³zero-tax planning´ and also reduction in the
marginal corporate tariff tax to 35% from 46%. Companies that had used wind turbine
installation as a tax-shelter were affected because MAT forced companies that had been going
for this zero-tax planning to pay at least 12.9% corporation tax on their book profits. And so
MAT made it slightly less financially beneficial to invest in wind. Another reason for failure has
been dire lack of financing institutions to back the huge capital cost investment that wind farms
require. The wind power plant sector is still predominantly debt-based for 60-75% of the project
cost. IR- A and the handful of other banks were not enough to meet the installation needs and
so in many states, wind energy did not even take off.

However probably the most damaging factor for the wind industry was the very thing that really
started the boom, namely the 100% accelerated depreciation. This rule had a number of
negative impacts. Among these are:-


-nabled large-company finance officers to make hasty decisions around the time of tax-
filings to install wind plants. These hasty decisions often led to bad siting of machines
and consequent low performance.

The rule relies on the ability of promoters of the technology to absorb the tax benefits -
this restricted the number of potential entrepreneurs to companies with huge profits,
such as the textile and cement industries, which were actually big investors in the
technology. Smaller entrepreneurs were not incentivized.

Led to an increase in capital cost of locally made wind turbines, as they were ³gold-
plated´. For example the rise in cost/MW in 96/97 over 92/93 was 27.5% with the rupee
depreciating by 15.45 against the dollar. However the price of anish machines for
example has been falling and so import of machines is encouraged even though these
may not be the optimal designs for Indian terrain.

The worst impact this rule has had is that it placed no reward on the actual performance
of wind turbines. Since this was not a part of the package that was rewarded by tax
breaks, simply installation of wind turbines, whether they were well sited, efficient or not,
was the only thing that counted. This led to very poor performance of the machines
themselves.

  
 


Poor design of turbines (either local or foreign) led to rotor blade failures

isregard for the earthing regulations and lightning protection led to damage by lightning
strike and unduly large breakdown of control systems resulting in expensive repairs and
long ³off-line´ periods.

Foreign cooperation sometimes led to a mismatch between locally manufactured
components and imported parts, weakening the reliability of the entire system.
¦   


Grid problems: Wind turbines draw in a lot of power when starting up and so this
sometimes caused the grids they were connected to experience voltage fluctuations ±
reducing power quality and having an undesirable effect on customer¶s appliances.
These fluctuations weaken a grid and have a negative feedback on the wind turbines
themselves. In 1996 grid abnormalities induced a 20% loss in potential revenue due to
µdirect generation loss¶ (inability of wind plants to operate when the wind is blowing). Half
of all these losses are due to weak grids in the region.

There is a lack of servicing and maintenance expertise to handle wind farm upkeep.

Utilities are suffering the burden of having wind farms connected to their grids. With the
notable exceptions of the usual suspects Tamil Nadu, Andhra Pradesh and Gujarat, the
other states view wind farms more as a nuisance than a benefit, due to the low reliability
and non-dispatch ability. Government policy has placed them in the position where they
have to pay higher prices for wind-generated electricity. This has caused them
significant financial hardship and has not heightened their enthusiasm and support of the
technology.

    


Government policy also has a few barriers to overcome.


There are extensive bureaucratic procedures that discourage entrance into the sector.
The Central government requires 22 clearances for wind power plant installation.

There are no qualifying benchmarks for power plant entrepreneurs to meet. The only
requirement that the MN-S has stipulated is a wind speed of at least 5 m/s. This is not a
factory speed for a wind turbine to be economical.

There is a lack of standardization among wind turbine design and features. A large
number of foreign and local manufacturers have made for difficulty in maintenance of
wind turbines.

With the exceptions of a few States, again, there has been a lack of active support for
wind power development by the State nodal agencies and the State electricity boards.

The biggest policy problem has been the lack of institutional infrastructure to support the
booming wind industry. It is possible that the sector grew much faster than expected
hence the institutional gap. This gap refers to the absence of authorities that are in
charge of monitoring wind farms, certifying turbines, setting standards for designs and
locations, research and development, funding institutions and so on.

    
 
 
Comprehensive guidelines for wind power projects have been issued by the MN-S from time to
time. These guidelines relate to preparation of detailed project reports ( PRs), micro-siting,
selection of wind
turbine equipment, operation and maintenance, performance evaluation, etc. Users of these
guidelines include the state electricity boards (S-Bs), state nodal agencies, manufacturers,
developers, and investors. The certification requirement for wind turbines was reintroduced with
a time-bound provision for self-certification. C-W-T issues a list of manufacturers of certified
wind turbine machines on a quarterly basis.

  
c
A few examples of successful wind farms are briefly described below.

 !
 "G#

With an aggregate wind power capacity of 450 MW, the Muppandal±Perungudi region
near Kanyakumari in Tamil Nadu has the distinction of having one of the largest clusters
of wind turbines. About Rs 2500 crores has been invested in wind power in this region.

$%  &"#

A wind farm project has been developed at Kavdya onger at Supa, off the Pune±
Ahmednagar highway, about 100 km from Pune. This wind farm has 57 machines of 1-
MW capacity each. Annual capacity utilization of up to 22% has been reported from this
site. The farm is connected through V-sat to project developers as well as promoters for
online performance monitoring.

"#

A conducive policy for private investment in wind power projects has resulted in
significant wind power development in Maharashtra, particularly in the Satara district.
Wind power capacity of about 340 MW has been established at Vankusawade,
Thosegarh, and Chalkewadi in Satara district, with an investment of about Rs 1500
crores.

    
  '(
 
 
c
Water-pumping windmills, aerogenerators (small wind electric generators), and wind±
solar hybrid systems have been found to be useful for meeting water-pumping and
small-power requirements in a decentralized mode in rural and remote windy areas of
the country. The MN-S is implementing a programme on µSmall Wind -nergy and
Hybrid Systems¶ to promote utilization of water-pumping wind mills, aerogenerators, and
wind±solar hybrid systems for water pumping and power generation.

 (   

A water-pumping windmill pumps water from wells, ponds, and bore wells for drinking,
minor irrigation, salt farming, fish farming, etc. Available windmills are of two types,
namely direct drive and gear type. The most commonly used windmill has a horizontal
axis rotor of 3±5.5 m diameter, with 12±24 blades mounted on the top of a 10±20 m
high mild steel tower. The rotor is coupled with a reciprocating pump of 50±150 mm
diameter through a connecting rod.

Such windmills start lifting water when wind speed approaches 8±10 kilometres (km)
per hour. Normally, a windmill is capable of pumping water in the range of 1000 to 8000
litres per hour, depending on the wind speed, the depth of water table, and the type of
windmill. Windmills are capable of pumping water from depths of 60 m. Water-pumping
windmills have an advantage in that no fuel is required for their operation, and thus they
can be installed in remote windy areas where other conventional means of water
pumping are not feasible.

However, water-pumping windmills have limitations too. They can be operated


satisfactorily only in medium wind regimes (12±18 km per hour). Further, special care is
needed at the time of site selection as the sites should be free from obstacles such as
buildings and trees in the surrounding areas. The cost of the system being high, Many
individual users do not find them affordable.



The cost of a water-pumping windmill varies from Rs 45 000 to Rs 150 000, depending
on the type. In addition, Rs 10 000± Rs 20 000 is required for the foundation, storage
tank, and the installation of the windmill. As the system involves moving parts, it
requires frequent maintenance. The repair and maintenance cost of a windmill is about
Rs 2000 per year.

The MN-S provides a subsidy of up to 50% of the ex-works cost of water-pumping


windmills, subject to ceilings of Rs 20 000, Rs 30 000, and Rs 45 000 in the case of
direct drive, gear type, and AV-55 Auroville models, respectively. For non-electrified
islands, subsidy of up to 90% of the ex-works cost is provided for the above types of
windmills, subject to ceilings of Rs 30 000, Rs 45 000, and Rs 80 000, respectively.

  

An aero generator is a small wind electric generator having a capacity of up to 30 kW.


Aero generators are installed either in stand-alone mode or along with solar photovoltaic
(SPV) systems to form a wind± solar hybrid system for decentralized power generation.
An aerogenerator is suitable for power generation in unelectrified areas having
adequate wind speeds. It consists of a rotor of 1±10 m diameter having 2±3 blades,
permanent magnet generator, control devices, yaw mechanism, tower, storage battery,
etc. The aerogenerator rotor starts moving at a wind speed of 9±12 km per hour.
However, it produces optimum power at the rated wind speed of 40±45 km per hour.
The limitation of not being able to provide power as and when it is required is overcome
by storing it in a battery bank.
Aerogenerators cost about Rs 2.00±2.50 lakhs per kW. In addition, the cost of
installation including civil works is estimated at Rs 5000 per kW. The repair and
maintenance cost is about Rs 2000 per kW per annum.

cWind±solar hybrid systems

When an aerogenerator and an SPV system are interfaced, the power generation from
these is mutually supplemented, and the resultant hybrid system offers a reliable and
cost-effective electric supply in a decentralized mode. The wind±solar hybrid system
mainly consists of one or two aerogenerators along with SPV panels of suitable
capacity, connected with charge controller, inverter, battery bank, etc. to supply AC
power. The major advantage of the system is that it meets the basic power
requirements of non-electrified remote areas, where grid power has not yet reached.
The power generated from both wind and solar components is stored in a battery bank
for use whenever required.

The cost of the system varies from Rs 2.50 lakhs to Rs 3.50 lakhs per kW depending on
the ratio of wind and solar components. The approximate cost of installation, including
civil works, is about Rs 10 000 per kW. Repair and maintenance cost is about Rs 3000
per kW per annum.

Subsidy of up to 50% of ex-works cost of the system is provided, subject to a maximum


of Rs 1.25 lakhs per kW to individuals, industries, and R& and academic institutions.
The MN-S provides a subsidy for community use and direct use by central/state
government departments and defence and para-military forces of up to 75% of the ex-
works cost of the system subject to a maximum of Rs 2 lakhs per kW. For non-
electrified islands, subsidy of up to 90% of ex-works cost subject to a maximum of Rs
2.4 lakhs per kW is available.

   )  


c
Water-pumping windmills, aero generators, and wind±solar hybrid systems are installed through
state nodal agencies using central subsidy. A manufacturing base has been developed, and a
non-exclusive list of manufacturers. The state nodal agencies are responsible for providing
repair/service facilities through the respective manufacturers.

     
c
Water-pumping windmills require only medium wind regimes. Considering the
availability of required wind speeds and the level of the prevailing water table, potential
exists for installing water-pumping windmills in almost all states, except in hilly and
rocky regions. Aero generators and wind±solar hybrid systems require high wind
speeds and good solar radiation. Potential exists for their installation in Andhra
Pradesh, Gujarat, Karnataka, Kerala, Madhya Pradesh, Maharashtra, Orissa,
Rajasthan, Tamil Nadu, Uttaranchal, Uttar Pradesh, West Bengal, and the windy
regions of Jammu and Kashmir and all northeastern states. So far, about 1000 water-
pumping windmills and 380- kW aggregate capacity of aero generators/wind±solar
hybrid systems have been installed in the country.

    ¦ 


A number of reports have analyzed the situation, most notably those by B. Rajsekhar and A.
Jagadeesh, and the following recommendations were arrived at


Create electricity-production based incentives such that performance and reliability also
receive more attention from the actual wind farm operators.

Take financial burden off the State utilities by subsiding the higher cost of wind energy.
The source of this money could come from bilateral institutions such as the World Bank.
There have also been calls for the establishment of a wind fund, which could serve this
purpose.

Another financial move must be the bringing down of the equipment cost. The ³gold-
plating´ practice must be stopped (by a certifying government body) and local production
must provide affordable machines to entrepreneurs.

The establishment of regional service stations, in proximity to a cluster of wind farms, in
order to provide maintenance and upkeep of the equipment. This is another area that
entrepreneurs may be able to tap into once more incentives are given to actual
performance of the turbines and investors want to ensure the smooth running and
reliability of their machines. In having these stations close to a number of wind farms
there will be significant savings on personnel cost.

A central governing body must be established responsible for certification,
standardization of design and features, monitoring of wind farms and technological R& .
The GOI has already recognized this need in the establishment of C-W-T (Wind -nergy
Center) at Chennai.

üThe promotion of renewable energy sources in the country requires widespread


publicity and greater awareness of the potential of these energy sources and the
products available. The Ministry of Non- Conventional -nergy Sources is expanding
several of its programmes so that these sources can contribute to sustainable
development of the nation. The Ministry will work towards reducing the costs of
renewable energy products and making them easily available to the people. The motto
of the Ministry is ³Akshay urja se desh vikas´ and the ultimate goal is ³Gaon gaon bijli,
ghar ghar prakash´.
'G*+¦'G

ü- cc c
  c c
c

c
 c c  c c
c c
c
cc c cc c  c c
c
 c  
c
c
 c
c c
 c
c c c
c c  c 

cc 
  
c c
 c
c

c
c
c c c c cc c
c cc
c
c
c
c
  c 

ü
c cc
c
c c c c
c c c
 c c  
c
c c
 cc
ccc c
c
c
c

 
c c cc
c c

 c
c  c
c
!
 
c- c
cc 

cc 

c  c
 cc c   c
c c
c
c c

 c 
c c c   c
c
c c

 c
c

Vous aimerez peut-être aussi