BLDG. PERMIT: ____________


PLAN REVIEW: _____________
FIRE MARSHAL: ______________
FM PLAN REV: _____________
TOTAL FEE: _____________
______________________

BUILDING PERMIT APPLICATION PERMIT NO.___________________


Application is hereby made according to the laws and ordinances of The City of Morrow for a permit to erect, alter, and/or use a structure as
described herein or shown accompanying plans and specifications, to be located as shown on plot plan and, if granted, will conform to
___________________(Business License No.) all laws and ordinances regulating same.
RESIDENTIAL [ ] COMMERCIAL [ ] DEMO [ ] Application Date: ___/ ___/ ___
Property Information:
ADDRESS: BUSINESS NAME/PROJECT:

ZONIN LL: LOT: BLOCK: LOT DIMENSIONS: ACRES:


G:
SQ FT: NO.STORIES: NO. ROOMS/BEDROOMS: EXTERIOR FINISH MATERIAL (S): SEWAGE: COOLING: HEATING: FIREPLACE:
__ PUBLIC __GAS __GAS __PREFAB
__SEPTIC __ELECTRIC __ELECTRIC __MASONRY

Contractor Information:
COMPANY NAME: CONTRACTOR͛S LICENSE #: EXPIRATION DATE:

ADDRESS: CONTACT PERSON :

PHONE #: ALTERNATE #: PURPOSE OF PERMIT:


____NEW ____REMODEL ____ADDITION ____ALTERATION/REPAIR ____SIGN ____OTHER:

Owner Information:
NAME: ADDRESS:

CONTACT PERSON: EMAIL:

PHONE #: ALTERNATE #:

Tenant Information:
NAME CONTACT PERSON:

PHONE #: ALTERNATE #:

Est. Construction Cost: $____________________ ^ 


   
  MINIMUM FEE IS $80
_____ I hereby certify that the above permitted structure shall be built in accordance with the 1995 Georgia State Energy Code of Buildings.
Initial
This code regulates the design, erection, construction, alteration and renovation of buildings. Compliance is mandatory. I herby certify that I have read
and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be
compiled with whether specified herein or not. The granting of permit does not presume to give authority to violate or cancel the provisions of any
state or local law regulating construction or the performance of construction.

Date:_____________ Printed Name:_______________________________________ Signature:_____________________________________________


NOTICE: Separate permits are required for electrical, plumbing, heating, ventilation, air conditioning or prefab fireplaces and signs. This permit becomes
null and void if work authorized is not commenced with six (6) months or if work is suspended or abandoned for a period of six (6) months at any time
after it͛s begun. Proper permits must be obtained before work is begun or fees shall be doubled.

INTERNAL USE: ^
   
   

ACCEPTED BY:_________________________________________________________ DATE: ____________________________________________


c 
„  
  

COMMERCIAL RESIDENTIAL SUBCONTRACTOR


BUILDING PERMIT CHECKLIST BUILDING BUILDING PERMIT
PERMIT PERMIT
____Approved by Planning and Zoning Department N/A

___ Site Development Review : (6 sets)    N/A


____Erosion & Sediment Control
____Water
____Sewer
____Storm water
____Clayton Co. Traffic Engineer
*For ground up construction, a site plan, topo, parking
diagram, storm water control, method of site control
during construction, landscape design detailing type/size
shrubbery, trees, plants, etc.

____Site Plan Approval


^
 

Completed Application Form:
___Commercial Building Permit ____Plumbing
____Residential Building Permit ____Mechanical
____Demo ____Electrical
____Temp Electrical
____Low Voltage
____Sprinkler
____Sign (s)
Construction Plan Requirements: N/A
____three (3) sets of plans
____one (1) CD containing a PDF of the plan
*Plans to include architectural, mechanical, plumbing,
electrical, sprinkler, alarm, sign (s) and other applicable
trades. Plans must beat the seal of a Georgia
Registration Architect or Engineer.

___Building Official Plan Review ^    N/A


(Allow up to 2 weeks for the review)
____Plan review fee

*If plans are not approved during the review process,


the contractor or company will be notified to make any
necessary changes.

___Fire Marshall Plan Review ^    N/A


(Allow up to 2 weeks for the review)
____Plan review fee

*If plans are not approved during the review process,


the contractor or company will be notified to make any
necessary changes.

____Approved Plans (Building Official and Fire Marshall)


____Permit Fee
____Permit Issuance
____Construction Dumpsters ^ 


 

____All necessary inspections completed


*inspections to called into the building official at
appropriate stages of construction. Fire Marshall must
also be notified for proper inspections.

____Certificate of Completion (Issued to


contractor/company)
____ Business License (for new business)
____ Certificate of Occupancy (tenant only)