Single Cell Functional Test Report -

SCFT

Zone / Cluster SL_CL_1

BSC SALT LAKE BSC

MSC SALT LAKE MSC


Drive Test Performed
NETWING TECHNOLIGIES PVT. LTD.
By
Date 15-09-2010
Analysis and Report
Avik pandit
Prepared By
Date 10.1.2011

UNINOR – SCFT 16TH SEP 2010


INTRODUCTION..........................................................................................................................................3

TOOLS USED................................................................................................................................................3

Tool setup and Test process...........................................................................................................................3

Tools used for the drive test are:....................................................................................................................4

Tools used to generate this report are:............................................................................................................4

A brief procedure descriptions.......................................................................................................................4

Drive Test Plot - Basic Essentials..................................................................................................................5

SINGLE CELL FUNCTIONAL TEST CHECKLIST...................................................................................6

RF Design Plots;...........................................................................................................................................10

Clutter Type – Plot (as per RF design) ........................................................................................................10

RF Coverage Prediction – Plot (as per RF des ...........................................................................................11

Drive Test Plots – RX Level Full (Idle Mode) ............................................................................................12

......................................................................................................................................................................12

Drive Test Plots – RX Quality (Long Call) ................................................................................................13

Drive Test Plots – C/I PLOT (Long Call)....................................................................................................15

Drive Test Plots – Statistical Analysis.........................................................................................................16

Short Call......................................................................................................................................................16

Event Statistic...............................................................................................................................................16

Documentation.............................................................................................................................................17

Signature.......................................................................................................................................................17

UNINOR – SCFT 16TH SEP 2010


INTRODUCTION

Site verification aims to guarantee that each cell is performing according to specifications and RF design. It
shall fulfill the design objectives. Both coverage and functionality tests will be performed to evaluate every cell
in the network. At the end of the exercise the RF engineer should be able to:
 Detect the possible causes if the coverage levels are too low against plan.
 Verify correct antenna orientation and fix swapped sectors, if any.
 Ensure that basic cell functionalities are executed properly and systematically.
 Document and compile log files and test sheets for each site tested. These can be useful references,
especially while during cluster tuning.
 Data fill verification.

TOOLS USED

Tool setup and Test process

Upon arrival at the site, Engineer would validate site design information. This information must be checked
against the antenna design plan.
A laptop with drive test software is needed to make test calls and to check cell parameters. Perform test the
following call scenarios in each sector; please refer to “Single Site Test Checklist” for details:
 Verification of Correct Antenna Orientation and correct BCCH on each Sector.
 Verification of Handover and Signal Quality.
 MM (mobile-to-mobile) calls.
 Engineer Should Start in First Sector, perform all Voice Test and proceed to Sector 2 ( record
Handover from Sector 1-2), perform all tests in Sector 2 and finish all 3 sector tests to stop at starting
point.
 The same process should follow in reverse directions from start to stop point.

UNINOR – SCFT 16TH SEP 2010


Tools used for the drive test are:

 Drive Test Car, equipped with drive test facilities, GPS with cord to laptop (COM port) & I/O card for
extra dual COM port.
 Highly Stable DC power distribution system, DC/AC Inverter if required for laptop.
 Test SIM cards.
 And below mentioned tools; (please specify in below table)

GSM Specification / Details


1. Please specify the test mobile model (MS 1) HUAWEI U120E
2. Please specify the test mobile model (MS 2) HUAWEI U120E
3. Please specify the test mobile model (MS 3) HUAWEI U120E
4. Drive Test Software and it’s version HUAWEI GENEX PROBE v1.53
5. GPS Type / Model GARMIN 72
6. Drive Test Analysis Software & Version # HUAWEI GENEX ASSISTANT v1.53

Tools used to generate this report are:

Drive Test Tool / Software Name : HUAWEI GENEX PROBE v1.53


Analysis Tool Name & Version : HUAWEI GENEX ASSISTANT 1.53
MapInfo Version : MAPINFO 8.5

A brief procedure descriptions

The procedure for the drive tests is described below:


SCFT drive tests shall be performed by 3 call scenarios as given below;
MS1 = Idle
MS2 = Long call (MS to MSC Test Number, 10 sec call interval if call drops)
MS3 = Short call (MS to MSC Test Number, 45sec call duration, 10 sec call interval)

UNINOR – SCFT 16TH SEP 2010


Drive Test Plot - Basic Essentials

Rx Level Plot to be presented as below shown thresholds:

Colour Label Definition


0 to -65 0 > x >= -65
-65 to -70 -65 > x >= -70
-70 to -75 -70 > x >= -75
-75 to -85 -75 > x >= -85
-85 to -95 -85 > x >= -95
-95 to -105 =-95 > x >= -105

Rx Quality Plot to be presented as below shown thresholds:

Colour Label Definition


0 x=0
1 x=1
2 x=2
3 x=3
4 x=4
5 x=5
6 x=6
7 x=7

UNINOR – SCFT 16TH SEP 2010


SINGLE CELL FUNCTIONAL TEST CHECKLIST

RF SINGLE SITE CHECK SHEET


Uninor Site ID / Huawei
UW_KOL_0863 / KO_LKTWN_0794
Site ID Tested by: SUSANTH
Site Name LAKETOWN
Address SETT BHAVAN, 54, S K DEB ROAD, 3RD BY
LANE, KOLKATA 700 048, PH: 9339755696
Cluster ID Date: 16-09-2010
City KOLKATA
Lat / Long 22.60677 / State West Bengal
88.39993
Integration Team NOC Number
PASS PASS PASS
Sector-1 Sector-2 Sector-3 Comments
Antenna Type 65BW 18dBi 65BW 18dBi 65BW 18dBi
Antenna Height (Mt) 16 16 16
Antenna Azimuth from
50 140 240
Design
Confirmed (roughly) Y Y Y
Electrical Tilt 1 2 2
Mechanical Tilt 1 2 3
BCCH (Scanned) 661 665 668
Confirmed from Design Y Y Y
Fill
Call Initiated Y Y Y
Voice (All Scenarios Y Y Y
MOC/MTC etc)
Rx Qual 0 0 0
RX Level (Near Site) dBm -54 -47 -56
Est. Dist. from Cell 100M 140M 90M
Log Files 4 2 6
Draw handovers tested:
Sector 1 to 2 Y Y
Sector 2 to 3 N N
Sector 3 to 1 N N
Sector 1 to 3 Y Y
Sector 3 to 2 Y Y
Sector 2 to 1 Y Y
Handover to 1st order Y Y Y
Neighbor

UNINOR – SCFT 16TH SEP 2010


RF SINGLE SITE CHECK SHEET
The following is to be checked during Single Site Check:

Antenna orientation: Y

Feeder installation (swapped feeders) : N

BCCH Plan (as per design : Y

Voice call set-up : Y

Handover (driving around the site in both directions) : : Y

Analysis, Observations & Recommendations:

• The site is performing well in all respect. There is no handover fail & call drop.

Handover to Tier – 1 Neighbor Cells.

UNINOR – SCFT 16TH SEP 2010


Incoming Outgoing
HO 1-Tier HO 1-Tier
Neighbor
Serving Cell ID Neighbor Cell ID Cell BCCH BCC NCC Remarks
KO_JSORD_0180_
KO_LKTWN_0794_A B 668 6 2 Y Y ATTEMPT
KO_JSORD_0180_
KO_LKTWN_0794_A C 672 6 2 N N
KO_KSRNI_0435_
KO_LKTWN_0794_A B 667 5 1 N N
KO_NWSIT_0615_
KO_LKTWN_0794_A A 662 0 1 N N
KO_LKTWN_0794
KO_LKTWN_0794_A _B 665 1 0 Y Y ATTEMPT
KO_LKTWN_0794
KO_LKTWN_0794_A _C 668 3 4 Y Y ATTEMPT
KO_BNGUR_0033
KO_LKTWN_0794_B _C 670 5 1 N N
KO_LAKTO_0207_
KO_LKTWN_0794_B A 663 7 3 Y Y ATTEMPT
KO_BGRRD_0585
KO_LKTWN_0794_B _B 669 5 3 N N
KO_BGRRD_0585
KO_LKTWN_0794_B _C 665 5 2 N N
KO_LKTWN_0794
KO_LKTWN_0794_B _A 661 3 0 Y Y ATTEMPT
KO_LKTWN_0794
KO_LKTWN_0794_B _C 668 3 4 N N
KO_DASRE_0382
KO_LKTWN_0794_C _A 664 0 1 Y Y ATTEMPT
KO_NWSIT_0615_
KO_LKTWN_0794_C A 662 0 1 Y Y
KO_NWSIT_0615_
KO_LKTWN_0794_C B 670 0 1 N N
KO_LKTWN_0794
KO_LKTWN_0794_C _A 661 3 0 N N
KO_LKTWN_0794
KO_LKTWN_0794_C _B 665 1 0 Y Y ATTEMPT

Incoming Outgoing
HO 1-Tier HO 1-Tier

Remarks

UNINOR – SCFT 16TH SEP 2010


UNINOR – SCFT 16TH SEP 2010
RF Design Plots;
Clutter Type – Plot (as per RF design)

UNINOR – SCFT 16TH SEP


2010
RF Coverage Prediction – Plot (as per RF des

UNINOR – SCFT 16TH SEP


2010
Drive Test Plots – RX Level Full (Idle Mode)

UNINOR – SCFT 16TH SEP 2010


Drive Test Plots – RX Quality (Long Call)

Drive Test Plots – BCCH PLOT (Long Call)

UNINOR – SCFT 16TH SEP 2010


UNINOR – SCFT 16TH SEP 2010
Drive Test Plots – C/I PLOT (Long Call)

UNINOR – SCFT 16TH SEP 2010


Drive Test Plots – Statistical Analysis
Short Call

Event #[No. of samples] % Measurement


Blocked Call 0 0%
Call Attempt 50
Call Setup 50 100%
Dropped Call 0 0%
Call Success 50 100%
TCH Call Drop Rate 0
Call setup Success Rate 100 %

Long Call

Information Element Range % of No. of Samples Total Samples


Meas.
Rx Qual sub <=5 98.10% 5337 5442
Rx Qual sub >=5 1.32% 105 5442
Handover 26
Handover Failure 0
Handover Success 26
Handover Success Rate 100%

Event Statistic

RX Level (Dbm) Sample Percentage (%)


0 to -65 2357 42%
-65 to -70 923 16%
-70 to -75 782 14%
-75 to -85 1432 26%
-85 to -95 105 2%
-95 to -105 0 0%

RX Qual Sample Percentage (%)


0 4316 79%
1 385 7%
2 158 3%
3 205 4%
4 160 3%
5 113 2%
6 84 2%
7 21 0%

UNINOR – SCFT
16TH SEP 2010
Documentation

The following documentation should be attached with this ATMN:

Ref. Test Description Comments


1 Cell Design Data YES
Drive Test Report (SCFT Checklist
2 YES
Completed
3 Drive Test Log Files YES

Signature

Vendor :

Name Signature Date


RF LEAD

Name Signature Date


Project Manager

Uninor:

Name Signature Date


Uninor RF LEAD

Name Signature Date


Uninor Project
Manager

UNINOR – SCFT
16TH SEP 2010