What We’ll Cover …

Objective: Explain how to get the most out of Report Painter’s


powerful, cross-module WYSIWYG reporting capabilities

• Looking at Report Painter: The basics


• Identifying the proper data source
• Getting the most out of statistical key figures and
variables
• Working with currency translation and authorization
groups
What We’ll Cover …

• Looking at Report Painter: The basics


• Identifying the proper data source
• Getting the most out of statistical key figures and
variables
• Working with currency translation and authorization
groups
Looking at Report Painter
Report Painter In Review

• What is Report Painter?


! An SAP-standard visual report development tool
! Painter can be utilized within all financial submodules
! Painter offers 80%-90% of RW functionality but is 100%
easier to use!
! GUI Interface makes development a snap
• Painter reports can be used in drill-down reporting
! Unlike in drill-down reporting where reports and forms
are separate, in Painter, the report form is the report
Looking at Report Painter
Report Painter In Review

• Report Painter functionality has remained


consistent
! Painter has remained consistent across R/3 versions
! This has allowed the tool to remain a staple for any
reporting strategy
Looking at Report Painter
When Should I Use Report Painter?

• Consider Report Painter before turning to an ABAP


solution
! Consider using it if the data you are looking for can be
sourced within Painter
• Report Painter excels for layout management
! Use Painter instead of Writer when layout management is
critical
! Painter is a GUI-based utility, so it’s easier to control
report appearance

Don't
Forget
Looking at Report Painter
When Should I Use Report Painter? (cont.)

• Use Painter when you don’t need Writer’s full


functionality like
! Report Writer’s eliminations functionality
! Report Writer’s user-defined Key Figure Sets (data sets)
! Complex set matrixes

Don't
Forget
Looking at Report Painter
Example: A Report Painter Report
Looking at Report Painter
For Comparison: A Report Writer Report
Looking at Report Painter
Tips When Choosing Report Painter

• Painter reports can be converted to Writer


! If you need full RW functionality at a later date
• With 4.6c, some Painter terminology changed
! Field –> Characteristic
! Data Set –> Key Figure Set
! Data Field –> Basic Key Figure
• These changes brought consistency across
reporting utilities
! Drill-down reporting
! Summarization hierarchies
! Etc.
What We’ll Cover …

• Looking at Report Painter: The basics


• Identifying the proper data source
• Getting the most out of statistical key figures and
variables
• Working with currency translation and authorization
groups
Identifying the Proper Data Source
What Are Data Sources?

• Where is the data I need housed?


! All reporting data is maintained in one or more reporting
tables
! Of the 17,000 + tables that make up the SAP database,
you will use maybe 5-8 for all your non-ABAP reporting
needs
! Understanding the data flows is critical to building good
reporting
Identifying the Proper Data Source
What Are Data Sources? (cont.)

• Most of CO reporting is sourced from a single


location: CCSS
! CCSS is a central structure
! Contains updates for most CO objects (e.g. internal
orders cost centers)
! Many standard CO Painter reports use CCSS as the
reporting structure

Where
to
FIND it
Identifying the Proper Data Source
Other Source Options for Painter Reporting

• Additional sources include


! KKBC (Product Cost Controlling: Cost Elements)
! COFIT (Cost Element Reporting)
! RPPS (Project Systems)
! GLPCT (Profit Center Accounting)
• These tables have been designed for specific
purposes

Whenever possible, use more specific reporting sources


Identifying the Proper Data Source
Table KKBC

• KKBC – Product Cost Controlling: Cost Elements


! Traditional RW table, but can be used from within Report
Painter
! KKBC is used in SAP-delivered costing reports
• When should I use KKBC?
! Great source for cost element-based product cost reports
! Provides origin-level data that is key in a cost report
Examples: For resource input analysis, like materials
consumed from the BOM, origins are key
! Can be used together with summarization objects like
order groups
! Great for Cost Object Hierarchy (COH) reporting
Identifying the Proper Data Source
KKBC: A Practical Example

• The scenario
! Manufacturing client was converting to Cost Object
Hierarchies and required a new manufacturing activity
report
• The solution
! Leverage KKBC to provide the manufacturing Activity
detail
! Offered a chance to manage by COH

By assigning additional, detail level reports, we


were able to view the activity for this unique
group of cost objects
Identifying the Proper Data Source
KKBC: Tips For Proper Utilization

• KKBC can be tricky to use


! If you are not fully aware of how your product costing
system has been configured, KKBC can be tricky to use
• Some common areas you should revisit when using
KKBC
! Do you use order-based or period-based costing?
! Which variance categories are active in your system?
! Which cost elements and posting rules are you using for
WIP and Variance updates?
! What target cost versions do you have active within the
system, and how do they differ?
Identifying the Proper Data Source
Choosing and Using Info Structures

• Info structures are files of special statistical data


! Different than standard reporting tables
• Made up of three kinds of information
! Characteristics (e.g., Plan, Material, Vendor)
! Key Figures (e.g., Sales Volume, Order Quantity,
Execution Time)
! Period Units ( e.g., Day, Week, Month, Period)
• SAP delivers standard info structures including...
! S001 – SIS: Customer
! S021 – SFIS: Production Order
! S032 – Inventory: Stocks
You can create your own to capture specific data of interest
Note
Identifying the Proper Data Source
Choosing and Using Info Structures (cont.)

• Using info structures for Painter reports can be


tricky
! Not a common source for Painter reporting
• Common problems include
! Not being broad enough during design in the areas of
Characteristic and Key Figure inclusion
! Identifying the proper update events for your structure
Proper timing will lead to accurate reporting data
• Overcome these problems by not trying to cover too
many reporting needs at once
It will be easier to tackle your reporting needs if
you have a strategy and stick to it
Identifying the Proper Data Source
Info Structures: A Practical Example

• The scenario
! Client wished to have a report that provided price and
valuation information for its top 50 materials
! They wanted to quickly see material price changes from
period to period
! The difficulty was in finding a utility that would allow me
to customize the layout to meet the client’s request
• The solution
! Leverage an info structure, S012 in this case, to provide
the material price detail needed
! Build the report using Painter to meet the report’s layout
requirements
Solution
Identifying the Proper Data Source
Info Structures: A Practical Example (cont.)

• Painter example
! Data would not have been available to Painter through
standard reporting tables
Identifying the Proper Data Source
Data Extracts as an Alternate Data Source

• Data Extracts can be useful for controlling what info


is available
! Can be saved automatically during execution
! Provide the benefit of “freezing” the report data for an
unlimited amount of time
! Great way to control “point-in-time” reporting
• Benefits include…
! Easy to create and delete
! Standardization of data sources for statutory reporting
! Additional level of authorization control
Identifying the Proper Data Source
Data Extracts as an Alternate Data Source (cont.)

• When exiting the report, SAP can be designed to


prompt you to create an extract
! Select the “Create Extract” field
! Be sure to provide a unique naming convention
Identifying the Proper Data Source
Data Extracts as an Alternate Data Source (cont.)

• Begin by entering the proper characteristic values


for the reporting data in question
• Next, select the “Data Source” button in the header
Identifying the Proper Data Source
Data Extracts as an Alternate Data Source (cont.)

• A list of available extracts that match your criteria


will appear
! You now see why proper naming is important
• Once selected, the system will return to the
reporting screen and you can execute
Identifying the Proper Data Source
Data Extracts as an Alternate Data Source (cont.)

• To review the Extract Id


selection log for
your report, use
the menu path:
! Extras>Selection
Log

No Extract
Used
What We’ll Cover …

• Looking at Report Painter: The basics


• Identifying the proper data source
• Getting the most out of statistical key figures and
variables
• Working with currency translation and authorization
groups
Statistical Key Figures and Variables
Feature #1 - Statistical Key Figure Link with LIS

• What is a Statistical Key Figure (SKF)?


! Statistical object within the CO/PCA modules that can
be used to hold statistical quantitative data
! The SKF can be used to enhance both plan/actual
allocations and reporting
Statistical Key Figures and Variables
Feature #1 – Posting to a Statistical Key Figure

• Data can be posted to a key figure in one of two


ways
! Manually, through an entry transaction
KB31N – CO Object like Cost Center/Internal
Order/WBS Element
9KE5 – PCA
! Automatically, through a link to an LIS information
structure
This is what we’ll cover!
Statistical Key Figures and Variables
1 - Statistical Key Figure Link with LIS (cont.)

• Benefits of the SKF link to LIS


! Automatic updates make month end processing easier
! Increased accuracy in the numbers, because the actual
data is coming directly from the transactional source
! Nice integration back to the LIS structure for
reconciliation
Statistical Key Figures and Variables
1 – SKF Lint to LIS: The Process

• Three steps to completing the process


1. Create the SKF – KK01
2. Maintain the Assignment and Variant – KVA2
3. Perform Period End Closing transfer of the LIS value –
KVA5
• The following example will link an SKF used to
capture confirmed hours with the appropriate
LIS key figure
Statistical Key Figures and Variables
Step 1 – Create the SKF-LIS Link

• SKF Example
! Standard Key Figure
! Notice the section at the
bottom of the screen
titled “LIS Data”
! This indicates the origin
of the update; the info
structure/set accessed,
and the LIS key figure
linked
Statistical Key Figures and Variables
Step 1 – Create the SKF-LIS Link (cont.)

• Be sure to choose the proper info structure


• Info Sets are used predominantly to capture sales
related data
Statistical Key Figures and Variables
Step 1 – Create the SKF-LIS Link (cont.)

• SKF Link screens


! With this example, we
are linking to an Info
Structure
! Select the proper
application you wish
to link your key figure
to
Statistical Key Figures and Variables
Step 1 – Create the SKF-LIS Link (cont.)

• Here we’ve selected the


Shop Floor Control
selection
• Our next selection brings
us closer by now
choosing the proper Info
Structure
Statistical Key Figures and Variables
Step 1 – Create the SKF-LIS Link (cont.)

• And finally, we
choose the key
figure
• This will be the
last selection in
linking our
statistical key
figure with the LIS
key figure
Statistical Key Figures and Variables
Step 2 – Maintain the Assignment and Variant

• SKF-CCA assignment
! You must make the proper assignment if the key figures
are going to transfer from LIS
! Enter the Cost Center of your choosing and hit enter

T-code
KVA2
Statistical Key Figures and Variables
Step 2 – Maintain the Assignment and Variant

• Select the SKF and


the corresponding
Variant you want
updated
• At this point you
may not have
maintained a
variant
! Do so by using the
menu path:
Variant>Create
Variant
Statistical Key Figures and Variables
Step 2 – Maintain the Assignment and Variant

• Depending on the key figure being linked, the data


on the variant screen will change
• This example shows LIS key figure for actual hours
executed
Statistical Key Figures and Variables
Step 3 – Transfer the LIS Key Figure Values

• SKF-LIS Transfer
! Actual Key
Figure transfer
program
! Remember to
maintain the LIS
Reference data
! LIS Reference
data provides the
transaction with
the planning
version and T-code
fiscal year KVA5
Statistical Key Figures and Variables
LIS Key Figure Use in Reporting

• SKF use in report


! Remember to select the proper key figure when defining
the row/column in your report
! You may have to activate the key figure in your library
Statistical Key Figures and Variables
Feature #2 – Report Painter Variables

• Like sets, variable use is key to adding usability


to a complex report
! Think of a variable as a placeholder
! When the report is executed, the system will replace
the value of the variable with either:
One entered by the user, or
One that is interpreted by the system
Statistical Key Figures and Variables
Feature #2 – Report Painter Variables

• Types of variables in Painter


! Value
Single field; values individually assigned
! Formula
For a level of complexity, formulas can be used to
automatically determine the variable replacement
! Set
Variable that assists in finding the value of a set
Can be either manual or automatic
Statistical Key Figures and Variables
Report Painter Variables: Value Variable Example

• Consider this a basic single value entry variable


• Value can later be used by Formula variables

Important settings
for controlling how
variable data can be
determined.
Statistical Key Figures and Variables
Report Painter Variables: Value Variables

• Value Variables are the most basic of the three


variable types
• However, the complexity and level of importance
can be elevated when they are used as the basis for
more complex Formula Variables
! The data entered in the value variable becomes a
component in the Formula variables algorithm
Statistical Key Figures and Variables
Report Painter Variables: Value Variables (cont.)

• Pay attention to the “Entry Fields on Selection


Screen” settings
! Internal Variable:
Activation will remove the capability of the user to
change the default value of the variable during report
execution
The variable will not appear in the selection screen
! Use Parameter ID:
When you want the field replacement to be controlled
by the parameter ID, activate this field
To change the parameter ID, use the menu path
Goto>Parameter ID
Statistical Key Figures and Variables
Report Painter Variables: Parameter ID
Statistical Key Figures and Variables
Report Painter Variables: Formula, No Exit

• Formula variables can make complex value


determinations easy

Key component of
this formula
variable is the value
entered for Z130, a
Value variable.
Statistical Key Figures and Variables
Report Painter Variables: Formula Variables

• Most functional of the three variable types, as you


can automate value determination and replacement
• The formulas rely on Boolean Logic for its logic
control
• Additional value determination control offered
through variable user exits
Statistical Key Figures and Variables
Report Painter Variables: Formula Exit - SAP

• Simple inclusion
of the SAP
delivered Exit ID
on the formula
line is enough to
activate the exit
! All SAP
delivered Exits
begin with the To see a selection
letter “S” of SAP delivered
Exits, select the
Formula Exit
button.
Statistical Key Figures and Variables
Report Painter Variables: Formula Exit - SAP

• To get this selection screen to appear, hit the


“Formula Exit” button
• Twelve selections in all

Choose from one of


the twelve exits
offered. (Only nine
are shown here).
Statistical Key Figures and Variables
Report Painter Variables: Formula Exit - User

• User defined exits


following the
naming pattern
“Uxxx”
• Before including the
exit ID in the
variable, it must
first be defined in Similar to the SAP
the Exit Pool defined exits, the
User defined exits
! The exit pool all begin with “U”.
program ID is
RGSVU000
Statistical Key Figures and Variables
Report Painter Variables: Formula Exits

• Naming convention is important when using


formula user exits
! SAP delivered exits always begin with ‘S”
! User defined exits begin with a “U’
• The User Exit pool for variable exits is RGSVU000
! Your Basis team may have copied the program to a new
program name to protect the integrity of the delivered
program
! See settings in table T80I to see what the program name
assigned to the exits might be
What We’ll Cover …

• Looking at Report Painter: The basics


• Identifying the proper data source
• Getting the most out of statistical key figures and
variables
• Working with currency translation and authorization
groups
Currency Translation and Authorization Groups
Currency Translation in Report Painter

• What is currency translation as it relates to


reporting?
! Standard functionality that allows a single report to be
run and viewed in multiple currencies.
! Allows the user to control the exchange rate during
report execution.
! Requires some set-up
• How do I access this functionality?
! Tied to key figure selection during report development
! No real configuration required
! Basic understanding of how currencies are used within
your system
Currency Translation and Authorization Groups
Currency Translation in Report Painter (cont.)

• Report Painter will manage currency translation as


it relates to the following currencies in CO:
! Controlling Area
! Transaction
! Object
! Target
• Steps to consider prior to report development
! Maintain your reporting libraries
! Maintain the currency exchange rate tables
! Review the currency settings within the FI/CO modules to
determine what is active.
Currency Translation and Authorization Groups
Currency Translation in Report Painter (cont.)

• Maintain the reporting Library


! Requires activating the proper Key Figures
SWZG – Costs in Target Currency
SWKG – Costs in Reporting Currency
! More often than not these key figures are active by
default, but check anyway
• SWZG – Costs in Target Currency
! Target currency will be used by the system as the
translation basis
! The key figure will house the translated currency
Currency Translation and Authorization Groups
Currency Translation in Report Painter (cont.)

• SWKG – Costs in Reporting Currency


! Using reporting currency offers some additional
flexibility for standardization and automation
! More on this later …
Currency Translation and Authorization Groups
Currency Translation-Library Maintenance

• Always be certain
these two key figures,
or a derivative of the
figures, are active in
your report
development library Activate

Activate
Currency Translation and Authorization Groups
Currency Translation in Report Painter

• Maintain the currency exchange rate tables


! If you are already in a multi-currency environment, than
you are already doing this.
! However, it can’t hurt for your report development team
to become familiar with the settings
• Areas to pay attention to:
! Exchange rate type
! Exchange rate dates
Currency Translation and Authorization Groups
Currency Translation-Exchange Rates

• Exchange Rate Type is


the key
• Validity Date controls
Exchange
whether the setting will Rate Type

be accessed during
report execution

Validity
Date
Currency Translation and Authorization Groups
Currency Translation in Report Painter

• All that’s left is to build the report


! SAP offers a number of standard reports that you
provide currency translation functionality
! Use these as a point of reference if necessary
Currency Translation and Authorization Groups
Currency Translation-Report Development

• Remember
to use key
figure SWZG
as your Key Figure
SWZG
translation
column/row
• It is the only
key figure
available that
will offer the
necessary
translation
functionality
Currency Translation and Authorization Groups
Currency Translation-Report Development

• As a result of using SWZG, the translation section


will appear at the bottom of your selection screen
• Enter the target currency, exchange rate date and
the rate type
• Output for the translation will be the target key
figure
Currency Translation and Authorization Groups
Currency Translation-Report Development

• Example of report run in USD


Currency Translation and Authorization Groups
Currency Translation-Report Development

• Same report
run in MXN
• Same report
layout; same
transaction
code for
execution;
unique
result
Currency Translation and Authorization Groups
Currency Translation in Report Painter

• Another option to currency translation reporting is


to leverage the Reporting Currency Key Figure
! SWKG – Costs in Reporting Currency
• Basic development will establish currency
translation defaults for the key figure
• There is a unique transaction code within each CO
sub-module:
! Cost Center Accounting – RPC0
! Cost Element Accounting – RPA0
! Internal Order Accounting – RPO0
Currency Translation and Authorization Groups
Currency Translation-Report Currency

• Establish default
setting for key
figure SWKG
• For translation,
enter a target
currency (i.e. Euro) Enter a Target
• Enter the Currency
translation basis
information
! This is the Maintain the
reference translation
information from basis.
which translation
will occur
Currency Translation and Authorization Groups
Currency Translation-Report Currency

• Settings for
converting CCA
reports from the
object currency to
Euros
• Remember to use key
figure SWKG as the
converted currency
• You will more likely
know the key figure
SWKG by its title
“Costs”
Currency Translation and Authorization Groups
Report Painter Variables: Parameter ID
Currency Translation and Authorization Groups
Currency Translation-Report Currency

• Output from a report utilizing both Object Currency


($USD) and Euros -- Simple to build and maintain
Currency Translation and Authorization Groups
Authorization Groups in Report Painter

• What is an Authorization Group?


! Little used tool to grant authorization control to a very
specific level.
! Linked to an authorization object, the authorization
group can give you control over
Creation/Change/Display/Execution transactions.
• Where in report painter can it be maintained?
! Authorization group settings can be maintained at the
following levels:
Library
Report group
Sets/Variables
Report Painter Reports
Currency Translation and Authorization Groups
Authorization Groups in Reporting

• A view of a Report Painter Library


Currency Translation and Authorization Groups
Authorization Groups in Reporting

 A view of a Report
Group

 And Report Painter


Header
Currency Translation and Authorization Groups
Authorization Groups in Report Painter

• Great for limiting access to certain reports, without


taking it to a transaction level
• Because authorization control can be extended to
an individual object, tremendous flexibility is
available
! Example: Report Group “A” can be maintained and
executed by your team, while Report Group “B” cannot
• Work with your authorization team to develop a
strategy
The 7 Key Points to Take Home!

• Identify all the reporting requirements before


beginning the development
• Look to using an info structure as your reporting
source if a useful reporting table cannot be found
• Consider the functionality of linking statistical key
figures to LIS structures
• Familiarize yourself with the concepts of variables
to give yourself more flexibility
The 7 Key Points to Take Home! (cont.)

• Save yourself some development time by applying


SAP’s currency translation functionality
• If security is an issue, consider developing the
Authorization Group functionality
• Report Painter is an important tool in your toolbox
(in addition to BW) that you can use to meet your
tactical and operational reporting requirements
Your Turn!

Questions?

How to Contact Me:


danowak@Virtuosollc.com
Appendix A

Potential Appendix Section.


If we want, we could include some of the information from
the prior reporting presentations I removed.

If you would like to provide additional material


for attendees, please send the slides as a
separate file and we will include them on the
CD, but, not as part of the presentation
3 - Use the Export/Import Tool

• Simplifies the transport process


! Transaction Codes: GR27 – Export; GR28 - Import
! No need to use the CTS system to move reports between
clients/instances
! Allows for more flexibility in your choice of location for report
development
! You can quickly move reports to other R/3 systems

Check with your administrator for any policies on transporting


Painter reports in this way!
3 - Use the Export/Import Tool: Example
Export Report
Group

 Report Group
Export –
Transaction
GR57
 Remember: in
this case The
Presentation
Server would
be your
desktop hard
drive Hard drive location

T-code
GR27
3 - Use the Export/Import Tool: Example (cont’d)
Import Report
Group

 Report Group
Import –
Transaction
GR58
 Remember: in
this case The
Presentation
Server would
be your
desktop hard
drive

T-code
GR28
3 - Use the Export/Import Tool: Example (cont’d)
Import Report
Group

 Output report
from after the
import cycle
has run
 Watch out for
sets that failed
during import
 If sets fail to
import, export
and import
them
separately T-code
GR28
3 - Export/Import Tool: Tips for Success

• This approach is the fastest way to transport


! Exporting/Importing groups is by far the quickest way to move
reports through your landscape
• Controls and Procedures are important
! Controls and procedures are important to maintaining report
integrity
! You should have established a report migration strategy
! Always move your report development through your pristine/gold
configuration client
• Report groups are the only objects that can be moved
! Summarization hierarchies, drill-down reports, ABAP lists, and
queries all must be transported in the standard way
Icon Collection

Don't
Forget
Note

GOTCHA!
Solution
Warning Client
Tip Issue