PAGE NO. 1
****************************************************
* *
* STAAD.Pro V8i SELECTseries6 *
* Version 20.07.11.33 *
* Proprietary Program of *
* Bentley Systems, Inc. *
* Date= APR 21, 2021 *
* Time= 0:12:22 *
* *
* USER ID: *
****************************************************
1. STAAD SPACE
INPUT FILE: D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Eleva.. .STD
2. START JOB INFORMATION
3. ENGINEER DATE 20-APR-21
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT METER KN
7. JOINT COORDINATES
8. 2 3 0 0; 3 2.12132 0 -2.12132; 4 1.83691E-016 0 -3; 5 -2.12132 0 -2.12132
9. 6 -3 0 -3.67382E-016; 7 -2.12132 0 2.12132; 8 -5.51073E-016 0 3
10. 9 2.12132 0 2.12132; 10 3 4 0; 11 2.12132 4 -2.12132; 12 1.83691E-016 4 -3
11. 13 -2.12132 4 -2.12132; 14 -3 4 -3.67382E-016; 15 -2.12132 4 2.12132
12. 16 -5.51073E-016 4 3; 17 2.12132 4 2.12132; 18 3 8 0; 19 2.12132 8 -2.12132
13. 20 1.83691E-016 8 -3; 21 -2.12132 8 -2.12132; 22 -3 8 -3.67382E-016
14. 23 -2.12132 8 2.12132; 24 -5.51073E-016 8 3; 25 2.12132 8 2.12132; 26 3 12 0
15. 27 2.12132 12 -2.12132; 28 1.83691E-016 12 -3; 29 -2.12132 12 -2.12132
16. 30 -3 12 -3.67382E-016; 31 -2.12132 12 2.12132; 32 -5.51073E-016 12 3
17. 33 2.12132 12 2.12132; 34 3 16 0; 35 2.12132 16 -2.12132
18. 36 1.83691E-016 16 -3; 37 -2.12132 16 -2.12132; 38 -3 16 -3.67382E-016
19. 39 -2.12132 16 2.12132; 40 -5.51073E-016 16 3; 41 2.12132 16 2.12132
20. 43 5 18 0; 45 3.53553 18 -3.53553; 46 3.06152E-016 18 -5
21. 47 -3.53553 18 -3.53553; 48 -5 18 -6.12303E-016; 49 -3.53553 18 3.53553
22. 50 -9.18455E-016 18 5; 51 3.53553 18 3.53553; 52 0 17.6 0; 53 5 24 0
23. 54 3.53553 24 -3.53553; 55 3.06152E-016 24 -5; 56 -3.53553 24 -3.53553
24. 57 -5 24 -6.12303E-016; 58 -3.53553 24 3.53553; 59 -9.18455E-016 24 5
25. 60 3.53553 24 3.53553; 62 0.75 26 0; 63 0.53033 26 -0.53033
26. 64 4.59227E-017 26 -0.75; 65 -0.53033 26 -0.53033; 66 -0.75 26 -9.18455E-017
27. 67 -0.53033 26 0.53033; 68 -1.37768E-016 26 0.75; 69 0.53033 26 0.53033
28. 70 5 21 0; 71 3.53553 21 -3.53553; 72 3.06152E-016 21 -5
29. 73 -3.53553 21 -3.53553; 74 -5 21 -6.12303E-016; 75 -3.53553 21 3.53553
30. 76 -9.18455E-016 21 5; 77 3.53553 21 3.53553
31. MEMBER INCIDENCES
32. 1 2 10; 2 3 11; 3 4 12; 4 5 13; 5 6 14; 6 7 15; 7 8 16; 8 9 17; 9 14 15
33. 10 15 16; 11 16 17; 12 17 10; 13 11 10; 14 11 12; 15 13 12; 16 13 14; 17 10 18
34. 18 11 19; 19 12 20; 20 13 21; 21 14 22; 22 15 23; 23 16 24; 24 17 25; 25 22 23
35. 26 23 24; 27 24 25; 28 25 18; 29 19 18; 30 19 20; 31 21 20; 32 21 22; 33 18 26
36. 34 19 27; 35 20 28; 36 21 29; 37 22 30; 38 23 31; 39 24 32; 40 25 33; 49 30 31
37. 50 31 32; 51 32 33; 52 33 26; 53 27 26; 54 27 28; 55 29 28; 56 29 30; 57 26 34
38. 58 27 35; 59 28 36; 60 29 37; 61 30 38; 62 31 39; 63 32 40; 64 33 41; 73 38 39
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water Page
Tank 1NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 2
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water Page
Tank 2NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 3
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water Page
Tank 3NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 4
P R O B L E M S T A T I S T I C S
-----------------------------------
*********************************************************
* *
* TIME PERIOD FOR X 1893 LOADING = 0.86356 SEC *
* SA/G PER 1893= 1.575, LOAD FACTOR= 1.000 *
* VB PER 1893= 0.0378 X 11063.92= 418.18 KN *
* *
*********************************************************
160. CHANGE
161. LOAD 2 LOADTYPE SEISMIC TITLE SEISMIC LOAD X -
162. 1893 LOAD X -1.
163. PERFORM ANALYSIS
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water Page
Tank 4NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 5
*********************************************************
* *
* TIME PERIOD FOR X 1893 LOADING = 0.86356 SEC *
* SA/G PER 1893= 1.575, LOAD FACTOR=-1.000 *
* VB PER 1893= 0.0378 X 11063.92= -418.18 KN *
* *
*********************************************************
164. CHANGE
165. LOAD 3 LOADTYPE SEISMIC TITLE SEISMIC LOAD Z+
166. 1893 LOAD Z 1
167. PERFORM ANALYSIS
*********************************************************
* *
* TIME PERIOD FOR Z 1893 LOADING = 0.86356 SEC *
* SA/G PER 1893= 1.575, LOAD FACTOR= 1.000 *
* VB PER 1893= 0.0378 X 11063.92= 418.18 KN *
* *
*********************************************************
168. CHANGE
169. LOAD 4 LOADTYPE SEISMIC TITLE SEISMIC LOAD Z -
170. 1893 LOAD Z -1.
171. PERFORM ANALYSIS
*********************************************************
* *
* TIME PERIOD FOR Z 1893 LOADING = 0.86356 SEC *
* SA/G PER 1893= 1.575, LOAD FACTOR=-1.000 *
* VB PER 1893= 0.0378 X 11063.92= -418.18 KN *
* *
*********************************************************
172. CHANGE
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water Page
Tank 5NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 6
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water Page
Tank 6NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 7
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water Page
Tank 7NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 8
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water Page
Tank 8NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 9
============================================================================
B E A M N O. 9 D E S I G N R E S U L T S
SHEAR 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í
REINF. @ 180 mm c/c @ 205 mm c/c @ 160 mm c/c @ 205 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 10 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water Page
Tank 9NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 10
SHEAR 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í
REINF. @ 180 mm c/c @ 205 mm c/c @ 160 mm c/c @ 205 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 11 D E S I G N R E S U L T S
SHEAR 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í
REINF. @ 180 mm c/c @ 205 mm c/c @ 160 mm c/c @ 205 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 12 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
10NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 11
SHEAR 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í
REINF. @ 180 mm c/c @ 205 mm c/c @ 205 mm c/c @ 205 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 13 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
11NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 12
SHEAR 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í
REINF. @ 180 mm c/c @ 205 mm c/c @ 205 mm c/c @ 205 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 14 D E S I G N R E S U L T S
SHEAR 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í
REINF. @ 180 mm c/c @ 205 mm c/c @ 160 mm c/c @ 205 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 15 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
12NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 13
SHEAR 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í
REINF. @ 180 mm c/c @ 205 mm c/c @ 205 mm c/c @ 205 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 16 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
13NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 14
SHEAR 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í
REINF. @ 180 mm c/c @ 205 mm c/c @ 205 mm c/c @ 205 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 25 D E S I G N R E S U L T S
SHEAR 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í
REINF. @ 180 mm c/c @ 190 mm c/c @ 130 mm c/c @ 190 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 26 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
14NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 15
SHEAR 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í
REINF. @ 180 mm c/c @ 190 mm c/c @ 130 mm c/c @ 190 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 27 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
15NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 16
SHEAR 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í
REINF. @ 180 mm c/c @ 190 mm c/c @ 130 mm c/c @ 190 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 28 D E S I G N R E S U L T S
SHEAR 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í
REINF. @ 180 mm c/c @ 190 mm c/c @ 220 mm c/c @ 190 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 29 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
16NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 17
SHEAR 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í
REINF. @ 180 mm c/c @ 190 mm c/c @ 220 mm c/c @ 190 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 30 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
17NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 18
SHEAR 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í
REINF. @ 180 mm c/c @ 190 mm c/c @ 130 mm c/c @ 190 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 31 D E S I G N R E S U L T S
SHEAR 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í
REINF. @ 180 mm c/c @ 190 mm c/c @ 220 mm c/c @ 190 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 32 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
18NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 19
SHEAR 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í
REINF. @ 180 mm c/c @ 170 mm c/c @ 220 mm c/c @ 190 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 49 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
19NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 20
SHEAR 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í
REINF. @ 180 mm c/c @ 135 mm c/c @ 225 mm c/c @ 135 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 50 D E S I G N R E S U L T S
SHEAR 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í
REINF. @ 180 mm c/c @ 135 mm c/c @ 225 mm c/c @ 135 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 51 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
20NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 21
SHEAR 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í
REINF. @ 180 mm c/c @ 135 mm c/c @ 225 mm c/c @ 135 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 52 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
21NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 22
SHEAR 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í
REINF. @ 180 mm c/c @ 135 mm c/c @ 190 mm c/c @ 135 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 53 D E S I G N R E S U L T S
SHEAR 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í
REINF. @ 180 mm c/c @ 135 mm c/c @ 190 mm c/c @ 135 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 54 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
22NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 23
SHEAR 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í
REINF. @ 180 mm c/c @ 135 mm c/c @ 225 mm c/c @ 135 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 55 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
23NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 24
SHEAR 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í 2 legged 10í
REINF. @ 180 mm c/c @ 135 mm c/c @ 190 mm c/c @ 135 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 56 D E S I G N R E S U L T S
SHEAR 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í 2 legged 12í
REINF. @ 180 mm c/c @ 135 mm c/c @ 225 mm c/c @ 135 mm c/c @ 180 mm c/c
----------------------------------------------------------------------------
============================================================================
============================================================================
B E A M N O. 73 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
24NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 25
Provide 3-16í along each face of the beam (Side face reinf.)
============================================================================
============================================================================
B E A M N O. 74 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
25NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 26
Provide 3-16í along each face of the beam (Side face reinf.)
============================================================================
============================================================================
B E A M N O. 75 D E S I G N R E S U L T S
Provide 3-16í along each face of the beam (Side face reinf.)
============================================================================
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
26NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 27
============================================================================
B E A M N O. 76 D E S I G N R E S U L T S
Provide 3-16í along each face of the beam (Side face reinf.)
============================================================================
============================================================================
B E A M N O. 77 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
27NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 28
Provide 3-16í along each face of the beam (Side face reinf.)
============================================================================
============================================================================
B E A M N O. 78 D E S I G N R E S U L T S
Provide 3-16í along each face of the beam (Side face reinf.)
============================================================================
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
28NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 29
============================================================================
B E A M N O. 79 D E S I G N R E S U L T S
Provide 3-16í along each face of the beam (Side face reinf.)
============================================================================
============================================================================
B E A M N O. 80 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
29NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 30
Provide 3-16í along each face of the beam (Side face reinf.)
============================================================================
============================================================================
B E A M N O. 81 D E S I G N R E S U L T S
============================================================================
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
30NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 31
============================================================================
B E A M N O. 82 D E S I G N R E S U L T S
============================================================================
============================================================================
B E A M N O. 83 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
31NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 32
============================================================================
============================================================================
B E A M N O. 84 D E S I G N R E S U L T S
============================================================================
============================================================================
B E A M N O. 85 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
32NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 33
============================================================================
============================================================================
B E A M N O. 86 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
33NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 34
============================================================================
============================================================================
B E A M N O. 87 D E S I G N R E S U L T S
============================================================================
============================================================================
B E A M N O. 88 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
34NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 35
============================================================================
============================================================================
B E A M N O. 113 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
35NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 36
============================================================================
============================================================================
B E A M N O. 114 D E S I G N R E S U L T S
============================================================================
============================================================================
B E A M N O. 115 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
36NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 37
============================================================================
============================================================================
B E A M N O. 116 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
37NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 38
============================================================================
============================================================================
B E A M N O. 117 D E S I G N R E S U L T S
============================================================================
============================================================================
B E A M N O. 118 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
38NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 39
============================================================================
============================================================================
B E A M N O. 119 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
39NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 40
============================================================================
============================================================================
B E A M N O. 120 D E S I G N R E S U L T S
============================================================================
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
40NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 41
============================================================================
C O L U M N N O. 1 D E S I G N R E S U L T S
============================================================================
C O L U M N N O. 2 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
41NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 42
============================================================================
C O L U M N N O. 3 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
42NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 43
============================================================================
============================================================================
C O L U M N N O. 4 D E S I G N R E S U L T S
============================================================================
C O L U M N N O. 5 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
43NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 44
============================================================================
C O L U M N N O. 6 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
44NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 45
============================================================================
============================================================================
C O L U M N N O. 7 D E S I G N R E S U L T S
============================================================================
C O L U M N N O. 8 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
45NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 46
============================================================================
C O L U M N N O. 17 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
46NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 47
============================================================================
============================================================================
C O L U M N N O. 18 D E S I G N R E S U L T S
============================================================================
C O L U M N N O. 19 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
47NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 48
============================================================================
C O L U M N N O. 20 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
48NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 49
============================================================================
============================================================================
C O L U M N N O. 21 D E S I G N R E S U L T S
============================================================================
C O L U M N N O. 22 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
49NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 50
============================================================================
C O L U M N N O. 23 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
50NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 51
============================================================================
============================================================================
C O L U M N N O. 24 D E S I G N R E S U L T S
============================================================================
C O L U M N N O. 33 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
51NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 52
============================================================================
C O L U M N N O. 34 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
52NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 53
============================================================================
============================================================================
C O L U M N N O. 35 D E S I G N R E S U L T S
============================================================================
C O L U M N N O. 36 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
53NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 54
============================================================================
C O L U M N N O. 37 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
54NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 55
============================================================================
============================================================================
C O L U M N N O. 38 D E S I G N R E S U L T S
============================================================================
C O L U M N N O. 39 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
55NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 56
============================================================================
C O L U M N N O. 40 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
56NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 57
============================================================================
============================================================================
C O L U M N N O. 57 D E S I G N R E S U L T S
============================================================================
C O L U M N N O. 58 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
57NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 58
============================================================================
C O L U M N N O. 59 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
58NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 59
============================================================================
============================================================================
C O L U M N N O. 60 D E S I G N R E S U L T S
============================================================================
C O L U M N N O. 61 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
59NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 60
============================================================================
C O L U M N N O. 62 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
60NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 61
============================================================================
============================================================================
C O L U M N N O. 63 D E S I G N R E S U L T S
============================================================================
C O L U M N N O. 64 D E S I G N R E S U L T S
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
61NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 62
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
62NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 63
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
63NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 64
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
64NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:15 AM
STAAD SPACE -- PAGE NO. 65
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
65NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:16 AM
STAAD SPACE -- PAGE NO. 66
288. FINISH
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
66NEW
of AP.anl
67
Wednesday, April 21, 2021, 12:16 AM
STAAD SPACE -- PAGE NO. 67
************************************************************
* For technical assistance on STAAD.Pro, please visit *
* http://selectservices.bentley.com/en-US/ *
* *
* Details about additional assistance from *
* Bentley and Partners can be found at program menu *
* Help->Technical Support *
* *
* Copyright (c) 1997-2015 Bentley Systems, Inc.
* http://www.bentley.com *
************************************************************
D:\Shreejay Projects\Staad Projects\Elevated Circular Water Tank NEW Aishwarya Patil\Elevated Circular Water
Page
Tank
67NEW
of AP.anl