Vous êtes sur la page 1sur 2
DRAFT ‘Alberta Health Act iming and Process Map iming uly 5: ‘ating Minister Zaczcesky July 12 Stampede Caucus, Calgary July27: Capital Ex Caucus, Eemonton ‘Aug. 1531 Release F. Horne “What Was Heard Repo” Sept. 15:0: ABP, CPC, Cabinet (2) Process: July ——_Brlefing Ministor Zwozdesky Materials required: Process and Timing Map ‘Draft AHA PowerPoint Presenation “AHA Draft 3 Column Document Foundation Elements July 12: Stampede Caucus, Calgary: Update on Health Consultations and Proposed Alberta Health Act Alberta Health Ac (AHA) Consultation Process Praiminary Report “Geeperminataneoncs aon ees ONT Ne vous reviow/iscussion of Pha PowerPom presentation aig major poicy ‘ecisions roquired-YesiNo format) Materials required: AHA Consultation Process Prelmnary Report deca beh rn cSourneTUSLARK Riot “PowerPoint presentation outining major poley decisions require YosINo format July27: Capital Ex Caucus, Edmonton; caucus dccussontdecision on slecussion paper outing Phase it elements “IRapproved, declsions required regarding consultation proeses and timing (Curent mandate ‘or post-event) Materials requited: 0% sslon paper (white pape) outining Phase Il elements ‘August 45.1 (Date TBD) + F:Home ‘What Was Heard report released on webs 1 News release announcing reper is posted; AHA drafting now begins; Advisory Comite to review ‘ane provide feedback ta government throughout dafing proses. Materials required: What Was Heard Report News Release RAFT ‘September 16-80 (Date TBD) «=F. Home and Advisory Comite release further report recommensng suppor for AHA (May net be needed) + AVA tabled in laisatre Materials required: 3 column document “erat Act “raft Patients Charter “Provese for Phase IL ofthe ANA “Final Discussion Paper (White Paver) “Communication Strstegy Undecided! ‘+ Consttation process on Phase elements 1 Ata amendment Actor equivalent amnous bil) abled cutning futher amendments toleistation and regulations Date: (T80) rociaim the Act ays

Vous aimerez peut-être aussi