APPENDIX I

PPP - Public Private Partnership


VGF -Viability Gap Funding
IIFCL -Indian Infrastructure Finance Limited
TA -Transaction Advisers
IIPDF -Indian Infrastructure Project Development Fund
O&M -Operation and Maintenance
MCA -Model Concession Agreement
NPV - Net Present Value
GHIAL - GMR-Hyderabad International Airport Ltd.
MAHB - Malaysia Airports Holding Berhad
GoI - Government of India
GoAP - Government of Andhra Pradesh
GoR - Government of Rajasthan
AAI -Airport Authority of India
ICAO -International Civil Aviation Organization
IRA -Independent Regulatory Authority
NHAI - National Highway Authority of India
SPV - Special Purpose Vehicle
CA - Concession Agreement
MCA - Model Concession Agreement
SPCD - Scheduled Project Completion Date
LOA - Letter of Acceptance
COD - Commercial Operation Date
MOU - Memorandum of Understanding

1
Chapter 1
ABOUT THE STUDY

1.1 INTRODUCTION:
In recent years countries around the world have met the challenge of developing and
maintaining critical infrastructure by restructuring public utilities and expanding private
sector participation in the infrastructure sectors. Recognizing the importance of adequate
infrastructure services, and given the constraints on public budgets to finance these growing
infrastructure needs, governments have sought to shift part of the burden of new infrastructure
investment to the private sector. Government has been actively engaged finding the
appropriate policy framework, which would give the private sector adequate confidence in
investing into infrastructure projects and at the same time, have adequate checks and balances
through transparency, regulation and competition. Consequently, Public Private Partnerships
(PPPs) are being actively encouraged for execution, operation and maintenance of
infrastructure projects in India.

Over the lifespan of these projects the legislative, political, social, market and
economic environment could all change significantly. This is especially the case in
developing countries, where the social, political and economic conditions are unstable. Thus
a high degree of risk and uncertainty surround PPPs and it is critical that adequate
identification, assessment, and evaluation of these risks take place. These risks have a high
degree of impact on the feasibility of the project, which is a key parameter in the successful
implementation of the project.

The concession agreement plays a very important role in PPP. The concession
agreement provides a regulatory framework of how the PPP should be implemented. It defines
the relation between the parties and can be considered as the core of PPP project. It addresses
issues which are very important for the successful completion of project such as mitigation
and unbundling of risks and allocation of risks.

2
Considering the importance of all the above, in this thesis, the various types of PPP
models, concession agreements and risk management are studied.

1.2 SCOPE OF THE STUDY:

In this thesis it has been attempted to study the

• Different types of PPP models


• Various risks associated with PPP and their impact on the feasibility of the project
• Concession agreements of PPP in three sectors viz. aviation, highways and urban
infrastructure
• The provisions for risk mitigation in the agreements

An attempt to give some recommendations for risk mitigation and enhancement of


productivity of PPPs has also been made.

1.3 METHODOLOGY OF STUDY:


• Detailed literature survey
• Prepared rough draft on types of PPP models, various risks, its assessment and mitigation
methods
• Obtained Case Study materials
• Detailed study of project and concession agreement of the cases
• Observations and Recommendations
• Preparation of pre-final drafts
• Final Report Writing

3
Chapter 2
PUBLIC PRIVATE PARTNERSHIPS

2.1 INTRODUCTION:
Public Private Partnership (PPP) project, which is based on a contract or concession
agreement between a government or statutory entity on one side and a private sector company
on the other side, for delivering an infrastructure service on payment of user charges. The goal
is to combine the best capabilities of the public and private sectors for mutual benefit. PPPs
are used to build new and upgrade existing public facilities. Compared with traditional
procurement models, in PPP the private sector assumes a greater role in the planning,
financing, design, construction, operation, and maintenance of these facilities.
For a country of India’s size, provision of quality infrastructure becomes a must to maintain
and continue towards higher growth trajectory. To meet this need, the government has stepped
up investments towards infrastructure through PPP. The Eleventh Five Year Plan has set an
ambitious target of increasing total investment in infrastructure from around 5% of GDP in
the base year of the plan 2006-07 to 9% by the terminal 2011-12. Around 30% of the required
investment of around Rs 2,056,150 crore will have to come from private capital.
The confluence of rising infrastructure needs and social demands, combined with tight
governmental budgets and public resistance to additional tax increases, has made it essential
for public authorities to turn to the innovative qualities and access to operating capital
possessed by the private sector in order to fulfill responsibilities.

2.2 TYPES OF PPP

2.2.1 Design-Build (DB):


Under this model, the government contracts with a private partner to design and build a
facility in accordance with the requirements set by the government. After completing the
facility, the government assumes the responsibility for operating and maintaining the facility.
This method is also referred to as Build-Transfer (BT)
2.2.2 Build Own Operate (BOO):

4
The government grants the right to finance, design, build, operate and maintain a project to a
private entity, which retains ownership of the project. The private entity is not required to
transfer the facility back to the government.

2.2.3 Build Operate Transfer (BOT):


The private business builds and operates the public facility for a significant time period. At
the end of the time period, the facility ownership transfers to the public.

2.2.4 Build-Own-Operate-Transfer (BOOT):


The government grants a franchise to a private partner to finance, design, build and operate a
facility for a specific period of time. Ownership of the facility is transferred back to the public
sector at the end of that period.

2.2.5 Buy Build Operate (BBO):


The government sells the facility to the private business. The private business refurbishes and
operates the facility.

2.2.6 Design Build-Operate (DBO):


A single contract is awarded to a private business which designs, builds, and operates the
public facility, but the public retains legal ownership.

2.2.7 Design-Build-Maintain (DBM):


This model is similar to Design-Build except that the private sector also maintains the facility.
The public sector retains responsibility for operations.

2.2.8 Build-Develop-Operate (BDO):


The private business buys the public facility, refurbishes it with its own resources, and then
operates it through a government contract.

2.2.9 Build-Own-Lease-Transfer (BOLT):

5
The government grants the right to finance and build a project which is then leased back to the
government for an agreed term and fee. The facility is operated by the government. At the end
of the agreed tenure the project is transferred to the government.

2.2.10 Contract Add and Operate (CAO):


CAO can be said to be a contractual agreement whereby the project developer adds to an
existing infrastructure facility which it rents from the government and operates the expanded
project over an agreed as a period franchise. There may or may not be a transfer arrangement
with regard to the added facility provided by the project developer.

2.2.11 Develop Operate and Transfer (DOT):


DOT can be said to be a contractual arrangement whereby favourable conditions external to
the new infrastructure project which is to be built by a private developer are integrated into
the arrangement by giving that entity the right to develop adjoining property, and thus, enjoy
some of the benefits created by the investment such as higher property or rent values.

2.2.12 Rehabilitate Operate and Transfer (ROT):


ROT can be said to be a contractual arrangement whereby an existing facility is turned over to
a private entity to refurbish, operate and maintain for a specific period as a franchisee, on the
expiry of which, the legal title to the facility is turned over to the government. The term is
also used to describe the purchase of an existing facility from abroad, refurbishing, erecting
and consuming it within the host country.

2.2.13 Rehabilitate Own and Operate (ROO):


ROO can be said to be a contractual arrangement whereby an existing facility is turned over
to the private sector for refurbishing and operation with no time limit on ownership. As long
as the operator has not violated the franchise, it can continue to operate the facility in
perpetuity.

2.2.14 Lease Renovate Operate and Transfer (LROT):

6
LROT can be said to be a contractual arrangement whereby an existing infrastructure facility
is handed over to private, parties on lease, for a particular period of time for the specific
purpose of renovating the facility and operating it for a specific period of time; on such terms
and conditions as may be agreed to with the government for recovering the costs with an
agreed return and thereafter, transferring the facility to the government. The Ministry of
Power has adopted this route for the renovation of existing power plants.

2.2.15 Design-Build-Operate (DBO):


Under this model, the private sector design and builds a facility on the turn-key basis. Once
the facility is completed, the title for the new facility is transferred to the public sector, while
the private sector operates the facility for a specified period. This model is also referred to as
Build-Transfer-Operate (BTO).

2.2.16 Design-Build-Finance-Operate/Maintain (DBFO, DBFM or DBFO/M):


Under this model, the private sector designs, builds, finances, operates and/or maintains a new
facility under a long-term lease. At the end of the lease term, the facility is transferred to the
public sector. In some countries, DBFO/M covers both BOO and BOOT.

2.3 BENEFITS OF PPP:

The issue of private sector participation is high on the political, economic, and social agenda
of many countries, with the key challenge being to devise arrangements that are predictable
and sustainable, while delivering better services. Infrastructure is essential to supporting
economic growth.

Private sector participation in this sector offers clear benefits, as follows:


• Stimulate economic growth
• Improved and expanded infrastructure services that would not be there otherwise
• Technology transfer, training of local personal and development of national capital
markets

7
• Competition and innovation
• Improved efficiency
• Faster implementation
• Relieving the government budget and borrowing
• Providing a benchmark with which to judge the public sector’s performance
• Better allocation of risk between the public and private sectors
• Improve service delivery
• Improve cost-effectiveness
• Increase investment in public infrastructure
• Reduce public sector risk
• Deliver capital projects faster
• Improve budget certainty
• Make better use of assets

Private sector participation brings with it a more commercial approach to infrastructure


provision, reducing political intervention. Governments, distanced from their responsibility of
providing the infrastructure service itself, can tackle other issues such as tariff reform.

2.4 IMPLEMENTATION OF PPP PROJECTS:

Implementation of PPP involves sharing of the risk from public to private party. The Roles,
Skill Requirements and Risks for public and private parties in different types of contracts are
shown in the figure

8
Operation & Design Buy Build
Maintenance Build Build Operate
contract Operate Operate Transfer
Fully Fully
Public Private
Design Lease Build Build
Build Develop Transfer Own
Operate Operate Operate
Low High
Roles, Skill Requirements, and Risks of Private Sector

Fig 2.1 Risks of Private Parties in PPP Projects

2.5 FRAMEWORK FOR PPPS IN INDIA

To address various constraints in the PPP model, several initiatives have been taken by the
Government of India to create an enabling framework for PPPs by addressing issues relating
to policy and regulatory environment. Progressively, more sectors have been opened to
private and foreign investments levy of user charges is being promoted, regulatory institutions
are being set up and strengthened, and fiscal incentives are given to infrastructure projects.
Therefore the government has come out with various initiatives such as:
• Scheme for financial support to PPP in infrastructure- viability gap funding (VGF)

• Scheme for financing viable infrastructure projects through a special purpose vehicle-
Indian Infrastructure Finance Company Limited (IIFCL)

• Establishment of the Indian Infrastructure Development Fund

• Empanelment of Transaction Advisers (TAs) for PPP projects

2.5.1 Viability Gap Funding (VGF) Scheme:

The VGF Scheme of the government of India provides financial support in the form of
grants to infrastructure projects undertaken on PPP mode-a capital grant at the stage of project

9
construction. These grants are either one time or deferred basis, and are strictly restricted for
the purpose of making the projects commercially viable. The ministry of finance administers
this scheme. The scheme restricts its applicability to ‘infrastructure service’, which includes
roads and bridges, railways, seaports, airports, inland waterways, power, urban transport,
water supply, sewerage, solid waste management and other physical infrastructure in urban
infrastructure projects in special economic zones, international convention centres and other
tourism infrastructure projects. Another prerequisite for the applicability of the scheme is that
the project should provide the infrastructure service against the payment of a pre-determined
tariff or user charge.
Under this scheme, the support of the government in the mode of VGF shall not
exceed 20% of the total project cost; but the government or statutory entity may grant an
additional 20%, only out of its own budget.

2.5.2 Indian Infrastructure Finance Company Limited (IIFCL):

Indian Infrastructure Finance Company Limited (IIFCL) has been set up with the
specific mandate to play a catalytic role in the infrastructure sector by providing long-term
financing to infrastructure projects in India. IIFCL raises funds both from the domestic as well
as external markets on the strength of the government guarantees. An offshore SPV, Indian
Infrastructure Finance Company (UK) Limited has been set up to utilise part of foreign
exchange reserves for infrastructure development. Lending by IIFCL is again restricted to
projects involving ‘infrastructure services’. IIFCL finances only commercially viable projects.
IIFCL therefore, also finances those PPP projects, which become viable after receiving the
VGF. IIFCL restricts its lending to only projects implemented i.e., developed, financed and
operated for the project term by a public sector company, a private sector company selected
under a PPP initiative or a private sector company. The project company borrowing from
IIFCL should be set up on a ‘non resource basis’ (should be a special purpose vehicle for the
project). The scheme provides for option of seeking ‘n principle’ approval for financial
assistance by the sponsoring entity.
Under this scheme, the actual lending is governed by appraisal of the lead bank before
financial closure of projects. The lead bank is responsible for regular monitoring and periodic

10
evaluation of project compliance with agreed milestones and performance levels especially
with respect to disbursement of IIFCL funds. IIFCL provides for funding viable infrastructure
projects through long term debt, or refinancing to banks and financial institutions for loans
granted by them or with tenure exceeding 10 years, or any other mode, which may be from
time-to-time, be approved by the government. The lead bank further takes the responsibility
of disbursing the loans advanced by IIFCL and also the recovery of the same. For smooth
conduct, IIFCL enters into a tripartite agreement with the lead bank and the project company
for every individual project.

2.5.3 Indian Infrastructure Project Development Fund (IIPDF)

Quality advisory services are fundamental to procuring affordable, value-for-money


PPPs. The cost of procuring these transactions advisers for the PPPs is also significant. IIPDF
is corpus fund set up for the purpose of providing financial support for quality project
development activities to the states and the central ministries. IIPDF has been created in the
Department of Economic Affairs, Ministry of Finance, and Government of India for
supporting the development of credible and bankable PPP projects that can be offered to the
private sector. IIPDF is the scheme for funding to cover a portion of the PPP transaction costs,
thereby reducing the impact of costs related to procurement on their budgets.
IIPDF is not aimed to act as a source of grant funding for the sponsoring authorities
but to assist the sponsoring authorities with up to 75% of their project development expenses.
It has also been mentioned in the scheme that as the IIPDF matures with experience and time,
a suitable autonomous legal structure is considered by the government for the management of
the IIPDF. Therefore, IIPDF is to assist project that closely support the best practices in PPP
project identification and preparation as set out in guidance to be issued by the Department of
Economic Affairs from time-to-time.

2.5.4 Transaction advisers for PPP Projects

11
PPPs are still in their infancy stage in India. A systematic compilation of knowledge and
experiences on PPP projects across sectors, greater awareness of good examples and
established procedures will certainly add execution clarity of the sponsoring entity and also
will provide quality information to investors on PPP schemes and incentives.

12
Chapter 3
RISKS IN PPP

3.1 CLASSIFICATION OF RISK


Understanding and addressing the risks of a PPP project early on is important for both the
parties in PPP. This chapter presents many of the risks involved and actions that can be taken
to mitigate them.

Promoters would invest in a project only if the risks in the project are less than the reward
which the project fetches. PPP projects carry several risks that are unique to this type of
delivery system in addition to the risks associated with more traditional assignments. Some of
the risks in PPP are

• Market and revenue risks.


• Design risks
• Construction risks
• Operating risks
• Financial risks
• Political risks
• Legal risks
• Environment risks
• Force Majeure risks

3.1.1 Market and Revenue risks


Revenue risk is the uncertainty in relation to the revenue that a project would actually
generate. The market and revenue risks that a PPP project may face can be grouped into the
three broad areas discussed below.

• Insufficient Income from Fares or Tolls. In the case of a PPP project operating under a
government concession, it would be expected that that the concession company would
request a cash compensation from the government for a deficiency in income from fares

13
or tolls, request authority to increase tolls or fares, or extend the concession period. Here it
is necessary to identify its risks clearly with respect to cash flow or its returns, as they
may be affected by an extended concession period.
• Insufficient Income from Other Operations. In this case, similar opportunities exist for
requesting the government to provide cash compensation for deficiencies and/or extending
the concession period. In addition, the concession company would have opportunities to
increase rents or pursue different business strategies, including alternate uses of major
portions of the concession facility.
• Insufficient Traffic. It is important for the PPP contractor to obtain a commitment from the
government, to the extent possible, with respect to anticipated traffic levels and to
negotiate a sufficient compensation arrangement for deficiencies. In the event that the
government has not offered to provide such additional compensation, needs review its role
carefully as it relates to traffic and earnings forecasts for a PPP project.

3.1.2 Design Risks


This risk relates to any defect in the design of the infrastructure facility or the design
requirements stipulated for the project. This is an inherent risk in the project as it is very
difficult to conclusively ascertain that damage to the facility is actually caused due to the
defect in the design parameters or the very design itself. Generally it is the design contractor
who is responsible for the design aspects of the project. In the event of the design parameters
being stipulated by the grantor of the concession or license, the risk would be within the
control of the grantor.

3.1.3 Construction Risks


The construction risks are essentially a bundle of various individual risk factors that adversely
affect the construction of a project within the time frame and costs projected and at the
standards specified for the facility. Construction risks are associated with PPP projects, more
traditional construction projects and the simpler forms of design/build projects. They include:

14
• Land Expropriation. These risks may flow to both the government and concession
company. Available actions include claims under expropriation legislation or claims by the
concession company of liquidated damages from the contractor.
• Cost Overruns and Time and Quality. These risks affect the concession company directly.
The available actions are to either claim liquidated damages from the contractor or draw
down standby finance from the project lenders. (A major issue is that design requirements
in PPP projects are different than those for a traditional owner.)
• Cost and Scope of Identified but Unspecified Work and Variations. These risks flow
directly to the contractor and the concession company and represent a potential area of
future disputes.
• Increased Financing Costs. This risk flows directly to the concession company, which
may attempt to mitigate the risk either by a new injection of equity or subordinated debt
from the sponsors. Alternatively, the concession company may draw down standby
finance from project lenders.
• Contractor Default. This is a risk to the concession company, which may claim liquidated
damages from the contractor or make a claim against the contractor’s performance bond
and bonding company.
• Default by Concession Company. This is the flip side of the prior risk. This risk is to the
contractor, with the primary mitigating measure being claim of liquidated damages from
the concession company.
• Environmental Damage. This risk accrues to the concession company primarily and may
result in claims on insurers or the party causing the damage.
• Force Majeure Event. This risk accrues to the concession company primarily and would
result typically in a claim to the project insurers.

3.1.4 Operating Risks


Some of the risks that we may face in a PPP project apply also when we are providing
operations and maintenance (O&M) -type services. Except for termination of the concession
by the concession company, these risks flow directly to the concession company. Some of the
risks and actions available to the concession company include:

15
• Performance risk: The completed facility cannot be effectively operated or maintained to
produce the expected capacity, output or efficiency.
• Operation cost overrun: The operating costs exceed the original estimates
• Operating Contractor Default: The concession company may terminate the operations
and maintenance contract and appoint a new O&M contractor
• Force Majeure or Environmental Damage: In this type of event, the concession company
would most likely place a claim with its insurers because risks of this type would be
normally insurable.
• Default: The default may be caused by the actions of a third party, in which case the
concession company could make claims of damages against that party.

3.1.5 Financial Risks


Financial risks fall into these categories:

• Exchange rate risk relates to the possibility that changes in foreign exchange rates alter
the exchange value of cash flows from the project. Prices and user fees charged to local
users or customers will most likely be paid for in local currency, while the loan facilities
and sometimes also equipment or fuel costs may be denominated in foreign currency. This
risk may be considerable, since exchange rates are particularly unstable in many
developing countries or countries whose economies are in transition. In addition to
exchange rate fluctuations, the project company may face the risk that foreign exchange
control or lowering reserves of foreign exchange may limit the availability in the local
market of foreign currency needed by the project company to service its debt or repay the
original investment.
• Interest rate risk. Force the project to bear additional financing costs. This risk may be
significant in infrastructure projects given the usually large sums borrowed and the long
duration of projects, with some loans extending over a period of several years. Loans are
often given at a fixed rate of interest (for example, fixed-rate bonds) to reduce the interest
rate risk. In addition, the finance package may include hedging facilities against interest
rate risks, for example, by way of interest rate swaps or interest rate caps.

3.1.6 Political Risks

16
The project company and the lenders face the risk that the project execution may be
negatively affected by acts of the contracting authority (Government), another agency of the
Government or the host country’s legislature. Such risks are often referred to as political risks

• Nationalisation of project
• Changes in law
• Development approvals
• Adverse government action or inaction
• Payment failure by government
• Increases in taxes
• Political force majeure (including changes in government)
• Termination of concession by government (or unplanned competition).

3.1.7 Legal Risks


Some of the legal risks that a PPP project can face are related to:

• Title/lease of property
• Ownership of assets
• Corporate and security structure
• Financial failure or insolvency of concession company
• Breach of financing documents
• Enforceability of security.

3.1.8 Environment Risk


These are risks relating to occurrence of environmental incidents during the course of
implementation of the project. These risks are generally within the control of the construction,
and the operation and maintenance consortium. This risk has increased due to the presence of
strict legal liability in relation to such environmental incidents, which can result not only in
adverse affects on the financials of a project but may also cause a closure of any work or
operations of and in relation to the facility.
3.1.9 Force Majeure Risks

17
These risks are regarding the events that are outside the control of any party and cannot be
reasonably prevented by the concerned party. These risks generally arise due to causes
extraneous to the project. The defining of force majeure events, these include:

• Natural force majeure events


• Direct political force majeure events
• Indirect political force majeure events

Natural force majeure events comprise of all events that can be attributed to natural conditions
or acts of God such as earthquakes, floods, cyclones and typhoons. These risks should be
shared equally among the parties.

Direct political force majeure events are events attributable to political events that are specific
to the project itself such as exploration, nationalization.

Indirect political force majeure events are events that have their origins in political events but
are not project specific such as war, riots etc.
However, the mechanism of managing and mitigating such risks cannot be categorically
stated as they vary with each project and the circumstances surrounding each project.

3.2 RISK MITIGATION:

18
3.2.1 Risk Mitigation Steps
Table 3.1

Determine
Identify risk Allocate the risk Mitigate the risk Price the risk
severity of risk
Identifying Steps / Cost of
Identifying In Case the the risk
and actions
the events Event occur addressing have
allocating which can
or Actions the effect of to be
the risk to be taking to
which the same on determined
the party reduce the
Effects the the cost /
who can chances of
Viability of time of the
manage it the event
the Project project
best occurring

3.2.2 RISK MITIGATION STRATEGIES:

• Infrastructure Facility: The main aim of the government should be to ensure the
construction, operation and maintenance of the required infrastructure facility at specific
standards, within a certain time frame and ensure its transfer at certain standards, upon the
developer obtaining the agreed returns.

• Certain Costs: The government should ensure that the cost of construction, operation and
maintenance of the infrastructure facility are certain and can adequately balance the
requirements of the private developer and those of the general users or consumers and the
lenders.

• Prevent unjust enrichment by Developer: The government should ensure that the
private parties vested with the control and operation of a public service or a public facility
should not abuse their position to unjustly profit from the venture at the expense of public
money.

19
• Prevent Abuse of Monopoly: The government should ensure that the private developers
do not abuse their natural monopoly position in respect of the provision of an
infrastructure facility and that they exercise their rights specifically vested with a public
character in the interests of the public, as a public utility.

• Return of the Facility to Public: The government should ensure that the facility is
transferred for use to the public after the satisfaction of the terms on the basis of which
private participation had been based.

• Environment: The government should ensure that the facility is constructed, operated and
maintained with the minimum possible impact on the environment or an acceptable level
of impact on the environment.

• Rehabilitation and Social impact: The government should ensure that the persons
displaced by the implementation of a project are adequately rehabilitated and the social
impact of the project is ascertained prior to its planning and implementation as to provide
for suitable mitigation measures.

• The government should support the development of infrastructure projects as it does


not have the revenue or the technical resources to develop the required infrastructure in
various sectors.

• The government should provide for a suitable legal framework and policies within
which the specific concerns relating to the development of infrastructure projects through
private participation and bankability of projects can be addressed.

• The private developer should not become the basket for storing all risks simply on the
basis that it is obtaining a commercial return. It should be kept in mind that the
commercial return would be derived over a long period of time and at the risk of a high
degree of upfront investment. This also enables the government revenues from becoming

20
free from the demands of providing such infrastructure facilities and at the same time
allowing for the development of such facilities.

• Certainty of Costs: Each application, each risk and each uncertainty has an attached cost.
The aim of the developer should be to ensure that project costs can be determined and
controlled in a certain manner.

• Return on Investment: The project and the documentation should be capable of


providing an adequate return to investors in the project. This is a universal necessity in
order to justify any private investment in any venture.

• Bankability: The project and the documentation should be bankable so as to enable the
developer to arrange for the required debt facilities to implement the project.

• Distribution and Management of Risk: The documentation in relation to the project


should be such so as to enable passage of various risks that are not within the control of
Special Purpose Vehicle but it has been allocated to it under the main concession or
license. The developer should not be straddled between the various documents with risks
it has no control over or is not capable of absorbing. Thus, the risks allotted under the
concession or license should flow down to the various contractors under the relevant
documentation with the contractors.

• Vesting of Adequate Rights: The special purpose vehicle should be vested with all the
rights required for enabling it to develop the project. This includes the right to create
adequate security in favour of the lenders.

• Control over the Revenue Stream: The special purpose vehicle should have adequate
control over the revenue stream to create security in favour of the lenders.

• Provision of level playing field: In most infrastructure sectors, there is a great conflict of
interest between the government as the service provider and government as the grantor of
21
the concession. There should be specific arrangements provided for minimizing the
adverse impact of such a potential conflicts of interests.

22
CHAPTER 4
CASE STUDIES

4.1 INTRODUCTION
An understanding between a company and the host government that specifies the rules
under which the company can operate locally is known as Concession Agreement. The
objective of a Concession Agreement shall be to secure value for public money and provide
efficient and cost effective services to the users. The concession agreement addresses the
issues like obligations between the principal parties, conditions, rights, concession fee,
revenue, representations and warranties, charges, dispute resolution, force majeure, and
termination etc. It also deals adequately with other important concerns such as user
protection; transparent and fair procedures; and financial support from the Government.
The concession (or project) agreement sets the stage for risk allocation for the
underlying project agreements. It is important for the concession company and the
construction contractor and the operator to identify and appropriately deal with any risk or
obligation set out in the concession agreement.

Although the construction contractor and the operator are not parties to the concession
agreement, the final form of concession agreement shall reflect the design and construction
risks and the operational risks that are accepted by the construction contractor and the
operator and will "flow down" or "step down" into the underlying project agreements. During
the bid preparation and contract negotiations phase, it is crucial that there is a co-ordinate
approach towards finalising the project documents from the concession agreement down to
the construction contract and operation and maintenance agreement.

Therefore, the drafting of a concession agreement shall be done with a great care. Any
mismatch in risk allocation is most likely to result in adverse contractual (and monetary)
consequences for those parties who have not adequately priced in or managed those risks.
Hence in this chapter we would first discuss how a concession agreement has to be drafted for
a better execution of the project. Later a detailed study of concession agreements of two
different projects is done.

23
4.2 OVERVIEW OF THE FRAMEWORK

The highways sector in India is witnessing a significant interest from both Transformation
domestic as well as foreign investors following the policy initiatives taken by of the highways
the Government of India to promote Public Private Partnership (PPP) on sector is essential
various models. However, the inflow of investment will depend on a
comprehensive policy and regulatory framework necessary for addressing the
complexities of PPP.
For sustaining private investment in up gradation and maintenance of the
Infrastructure projects on PPP basis, a precise policy and regulatory framework
is being spelt out in a Model Concession Agreement (MCA). This framework
addresses the issues which are typically important for limited recourse
financing of infrastructure projects, such as mitigation and unbundling of risks;
allocation of risks and rewards; symmetry of obligations between the principal
parties; precision and predictability of costs and obligations; reduction of
transaction costs; force majeure; and termination. It also deals adequately with
other important concerns such as user protection; transparent and fair
procedures; and financial support from the Government.
The MCA also elaborates on the basis for commercialising highways in a A comprehensive
planned and phased manner through optimal utilisation of resources on the one framework is a
hand and adoption of international best practices on the other. The objective is prerequisite for
to secure value for public money and provide efficient and cost effective PPP
services to the users.

Rationale for phased development


The four critical elements that determine the financial viability of a
Highway project are traffic volumes, user fee, concession period and capital
costs. As the existing highways have dedicated traffic and the Government has
prescribed the user fee for uniform application across India, revenue streams
for a Highway project can be assessed with reasonable accuracy. The
concession period, on the other hand, can be extended only marginally for

24
improving project viability as the growth of traffic would not permit unduly
long concession periods. In any case, the net present value (NPV) of projected
revenues after say, 15 years, is comparatively low from the Concessionaire’s
perspective.
As three of the four above-stated parameters are predetermined, capital
cost is the only variable that is available for the bidders to determine the
financial viability of a project, and they would seek an appropriate capital
grant/subsidy from the National Highways Authority of India (Authority) in
order to reduce the capital cost for arriving at an acceptable rate of return.
In the given scenario, higher the capital cost, greater would be the
compulsion of project sponsors to seek larger grants from the Authority. This, Phased
development
in turn, would restrict the ability of the Government to leverage a larger pool of will be affordable
extra budgetary resources, including private investment, and would hence and cost-effective
result in a curtailed programme of highway development.
In view of the foregoing, it is important to rely on cost effective designs
and to combine them with a phased investment programme to enable a more
efficient and sustainable programme of highway development.
The emphasis should be on phased development rather than on
providing high cost projects for catering to the projected growth in the long
term.
Where traffic intensity is comparatively low, limited expansion of
highways should be provided with further expansion after 7-12 years
depending on realistic projections of traffic growth. Up gradation of designs
and standards, construction of bypasses in urban and semi-urban areas and
other improvements may also be planned in phases depending on traffic
intensity. As an alternative, comparatively shorter concession periods may be
stipulated so that the Authority can augment the capacity when it is due. These
issues would be subjected to in-depth examination and reflected in a Manual of
Standards and Specifications that would form part of the standard documents
associated with the MCA.

25
Technical parameters
Unlike the normal practice of focussing on construction specifications,
the technical parameters proposed in the MCA are based mainly on output Technical
specifications, as these have a direct bearing on the level of service for users. parameters
will
Only the core requirements of design, construction, operation and maintenance focus on the
of the Project are to be specified and enough room would be left for the level of
service for
Concessionaire to innovate and add value.
the users
In sum, the framework focuses on the ‘what’ rather than the ‘how’ in
relation to the delivery of services by the Concessionaire. This would provide
the requisite flexibility to the Concessionaire in evolving and adopting cost-
effective designs without compromising with the quality of service for the
users. Cost efficiencies would occur because the shift to output-based
specifications would provide the private sector with a greater opportunity to
innovate and optimise designs in a way normally denied to it under
conventional input-based procurement techniques.

Concession period
The guiding principle for determining project-specific
concession period is the carrying capacity of the respective
highway at the end of the concession period. As such, the
Concession Period is proposed to be determined on a project- Concession
period will be
specific basis depending on the volume of present and linked to
projected traffic. projected
traffic
Toll paying users should not be subjected to congested
highways and the Concession should, therefore, cease when
full capacity of the road is reached, unless further
augmentation is built into the MCA. The time required for
construction (about two years) has been included in the
concession period so as to incentivise early completion,
leading to maximisation of toll revenues.

26
Selection of Concessionaire
Competitive
Selection of the Concessionaire will be based on open competitive bidding on
single
bidding. All project parameters such as the concession period, toll rates, price
parameter
indexation and technical parameters are to be clearly stated upfront, and short- will
listed bidders will be required to specify only the amount of grant sought by be the norm
them. The bidder who seeks the lowest grant should win the contract. In
exceptional cases, instead of seeking a grant, a bidder may offer to share the
project revenues with the Authority.

Grant
It is proposed that based on competitive bidding, the Authority should
provide a capital grant of up to a maximum of 20 per cent of the project cost.
Grants must
This would help in bridging the viability gap of the PPP projects. Where such be
assistance is inadequate for making a project commercially viable, an fully
leveraged
additional grant not exceeding 20 per cent of the project costs may be given
during the period following the commissioning of the Project.

Concession fee
Concession Fee will be a fixed sum of Re. 1 per annum for the first
nine years of the Concession Period. During the tenth year, the Concession Fee
will be equal to 1% of the project revenues and for each subsequent year, it will
increase by an additional 1%. Concession
The rationale for the above fee structure is that in the initial years, debt fee should be
levied when
service obligations would entail substantial outflows. Over the years, however, revenue
the Concessionaire will have an increasing surplus in his hand owing to the streams can
sustain it
declining debt service and rising revenues. Recognising this cash flow pattern,
the Concession Fee to be paid by the Concessionaire will be on an ascending
revenue-sharing basis.

27
Risk allocation
As an underlying principle, risks have been allocated to the parties that
are best suited to manage them. Project risks have, therefore, been assigned to
the private sector, and to the extent it is capable of managing them. The
transfer of such risks and responsibilities to the private sector would increase
the scope of innovation leading to efficiencies in costs and services. The
Risk
commercial and technical risks relating to construction, operation and alleviation
maintenance are being allocated to the Concessionaire, as it is best suited to and
mitigation is
manage them. Other commercial risks, such as the rate of growth of traffic, are critical to
also being allocated to the Concessionaire. The traffic risk, however, is private
investment
significantly mitigated as the Project Highway is a natural monopoly where
existing traffic volumes can be measured with reasonable accuracy. On the
other hand, all direct and indirect political risks are being assigned to the
Authority.
It is generally recognised that economic growth will have a direct
influence on the growth of traffic and that the Concessionaire cannot in any
manner manage or control this growth rate. By way of risk mitigation, the
MCA provides for extension of the concession period in the event of a lower
than expected growth in traffic. Conversely, the concession period is proposed
to be reduced if the traffic growth exceeds the expected level.
The MCA provides for a target traffic growth and stipulates an increase of
up to 20% in the Concession Period if the growth rate is lower than projected.
Thus, a shortfall of 5% in the target traffic after 10 years will lead to extension
of the Concession Period by 7.5% thereof. On the other hand, an increase of
5% in the target traffic will reduce the Concession Period by 3.75% thereof.

Financial close
Unlike other agreements for private infrastructure projects which neither define
a time-frame for achieving financial close, nor specify the penal consequences
for failure to do so, the MCA stipulates a time limit of 180 days (extendable up
to another 120 days on payment of a penalty), failing which the bid security

28
shall be forfeited. By prevalent standards, this is a tight schedule, which is
achievable only if all the parameters are well defined and the requisite
preparatory work has been undertaken.
Project
The MCA represents the comprehensive framework necessary for
implementati
enabling financial close within the stipulated period. Adherence to such time on
schedules will usher in a significant reduction in costs besides providing the must
commence as
over-due infrastructure. This approach would also address the present trend per agreed
where infrastructure projects do not achieve financial close for long periods. timeframe

User fee
A balanced and precise mechanism for fixation of user fee has been
specified for the entire Concession Period since this would be of fundamental
importance in determining the revenue streams of the project and, therefore, its
viability. The user fee shall be based on the rates to be notified by the
Government.
The MCA provides for indexation of the user fee to the extent of 40 per
cent thereof linked to WPI. Since repayment of domestic debt would be neutral
to inflation, the said indexation of 40 per cent is considered adequate. A higher
level of indexation is not favoured, as that would require the users to pay more
for a declining (more congested) level of service when they should be User fee
should be
receiving the benefit of a depreciated fee. A higher indexation would also add determined
to uncertainties in the financial projections of the project. At the time of second with great
care and
phase, however, a one-time increase in toll rates would be allowed for
precision
neutralising inflation occurring between project commencement and second
phase. The above elements would be examined further and firmed up during
the proposed review of the toll policy.

Local traffic
It is proposed that the highways should be allowed to be used by local residents

29
without any payment of tolls (owing to the absence of an alternative road) until
free service lanes are provided. This would ensure local support for the project
and avoid any legal challenge or local opposition arising out of easement
rights. Frequent users should be entitled to discounted rates, in accordance with
the tolling policy.

Construction

Handing over possession of at least 80% of the required land


and obtaining of environmental clearances are being proposed
as conditions precedent to be satisfied by the Authority before
financial close. Captive local
residents
The MCA defines the scope of the project with precision must be
and predictability in order to enable the Concessionaire to exempt from
user charges
determine his costs and obligations. Additional works may be
undertaken within a specified limit, only if the entire cost
thereof is borne by the Authority.
Before commencing the collection of user fee, the
Concessionaire will be required to subject the Project Highway
to specified tests for ensuring compliance with the
Quality and
specifications relating to the level and safety of service for the safety
users. of service
must be
Operation and maintenance ensured
Operation and maintenance of the Project Highway is proposed to be
governed by strict standards with a view to ensuring a high level of service for
the users, and any violations thereof would attract stiff penalties. In sum,
operational performance would be the most important test of service delivery.
The MCA provides for an elaborate and dynamic mechanism to evaluate
and upgrade safety requirements on a continuing basis. The MCA also provides
for traffic regulation, police assistance, emergency medical services and rescue
operations.

30
Right of substitution
In the highways sector, the project assets do not constitute adequate security
for the lenders. It is the project revenue streams that constitute the mainstay of Maintenance
standards
their security. The lenders would, therefore, require assignment and
will be
substitution rights so that the concession can be transferred to enforced
another company in the event of failure of the Concessionaire strictly
to operate the project successfully. The MCA accordingly
provides for such substitution rights.

Force Majeure
The MCA contains the requisite provisions for dealing with force majeure
events. In particular, it affords adequate protection to the Concessionaire
against political actions that may have a material adverse effect on the project.
Lenders will
have the right
Termination of
In the event of termination, the MCA provides for a Substitution
compulsory buy-out by the Authority, as neither the
Concessionaire nor the lenders can use the highway in any
other manner for recovering their investments.
Termination payments have been quantified precisely as
compared to the complex formulations in most agreements
relating to private infrastructure projects.Political force Concessionair
majeure and defaults by the Authority are proposed to Qualify e will be
protected
for adequate compensatory payments to the Concessionaire against
and thus guard against any discriminatory or arbitrary action political
actions
by the Government or the Authority. Further, the project debt
would be fully protected by the Authority in the event of
termination, except for two situations, namely, Pre-
(a) when termination occurs as a result of default by the determined
Termination
Concessionaire, 90 per cent of the debt will be protected payments
(b) In the event of non-political force majeure such as Act of should
31
God (normally covered by insurance), 90 per cent of the debt provide
Predictability
beyond the insurance cover will be protected.

Monitoring and supervision

Day-to-day interaction between the Authority and the


Concessionaire has been kept to the bare minimum following a
‘hands-off’ approach, and the Authority shall be entitled to
intervene only in the event of default. Checks and balances
have, however, been provided for ensuring full accountability
of the Concessionaire.
Monitoring and supervision of construction, operation and
maintenance is proposed to be undertaken through an
Independent Engineer (a qualified firm) that will be selected by
the Authority through a transparent process. Its independence
would provide added comfort to all stakeholders, besides
improving the efficiency of project operations. If required, a
A credible and
public sector consulting firm may discharge the functions of fair
arrangement
the Independent Engineer.
for
The MCA provides for a transparent procedure to ensure supervision is
essential
selection of well-reputed statutory auditors, as they would play
a critical role in ensuring financial discipline. As a safeguard,
the MCA also provides for appointment of additional or
concurrent auditors.
To provide enhanced security to the lenders and greater
stability to the project operations, all financial inflows and
outflows of the project are proposed to be routed through an
escrow account.

Support and guarantees by the Authority


By way of comfort to the lenders, a loan assistance from

32
the Authority has been stipulated for supporting debt service
obligations in the event of a revenue shortfall resulting from
political force majeure or default by the Authority.
Guarantees have also been provided to protect the
Concessionaire from construction of competing roads, which
can upset the revenue streams of the project. Additional toll
ways would be allowed, but only after a specified period and
Support and
upon compensation to the Concessionaire by way of an
guarantees
extended concession period and reduced concession fee. by the
Authority are
essential
Miscellaneous
A regular traffic census and annual survey has been
stipulated for keeping track of traffic growth. Sample checks
by the Authority have also been provided for. As a safeguard
against leakage of revenue share, a floor level in present and
projected traffic has also been stipulated.
The MCA also addresses issues relating to dispute
resolution, suspension of rights, change in law, insurance,
An effective
defects liability, and indemnity, redressal of public grievances
dispute
and disclosure of project documents. resolution
mechanism is
critical
Conclusion
Together with the Schedules, the proposed framework
addresses the issues that are likely to arise in financing of
highway projects on BOT basis. The proposed regulatory and
policy framework contained in the MCA is critical for attracting
private investment with improved efficiencies and reduced
Private
costs, aimed at accelerating growth. participation
should
improve
efficiencies
and reduce

33
costs

34
4.3 Case Study: HYDERABAD INTERNATIONAL AIRPORT LIMITED

Project: Development, Construction, Operation and Maintenance of the Hyderabad


International Airport
Location: Shamshabad, Andhra Pradesh, India
Client: Ministry of civil aviation, Government of India.
Consortium: GMR-Hyderabad International Airport Limited (GHIAL) is a joint venture
company promoted by GMR Group (63%) with Malaysia Airports Holding Berhad (MAHB)
(11%), Government of Andhra Pradesh (13%) and the Airports Authority of India (13%) as
the other consortium partners. GHIAL won the bid to develop and operate the Greenfield
international airport at Shamshabad in Hyderabad through an international competitive
bidding process conducted by the Government of Andhra Pradesh and the Government of
India in 2003.
Concession Period: 30 years from the date of commencement of the operation on extension
basis
EPC Contract: The main EPC contractors were Larsen & Toubro for airside and landside
works, and China State Construction & Engineering (Hong Kong) for the construction of the
passenger terminal building and the ATC Tower. Menzies Aviation Plc was chosen for the
development and operation of cargo facilities. The in-flight catering contract was awarded to
LSG Sky Chef and Sky Gourmet.
Total project cost: Rs. 2478 crores
Consultancy services: COWI A/S, in association with Aviaplan of Norway and STUP of
India, provided consulting services for preparing the master plan, engineering / architectural
design and tender documents for the construction of the new airport.
Completion Period: Within 36 months from the date of commencement of work (Phase I)

35
The detailed overview of the concession agreement is as follows.
This agreement is made in New Delhi on 20th day of December 2004 between the president
of India, acting through the secretary, ministry of civil aviation of government of India and
Hyderabad international airport limited, a joint sector company established for the purpose of
implementing the project. It is the endeavor of the parties to develop an international standard
airport where all airport activities are carried out in a timely manner with requisite
performance standards.
In the context of a project being undertaken through a public/private sector approach, it is
critical that the terms and conditions upon which such a project will be implemented are set
out and therefore the parties enter into this concession agreement.

Definitions and Interpretations


The agreement starts with definitions and interpretations wherein the terms that are followed
in the next part of the agreement are well explained and abbreviations are expanded,
providing clarity and avoiding ambiguity. The definitions given here are applicable to the
whole agreement except to the extent that the context otherwise requires.

Scope of the project


The concession agreement defines the scope of the project to the point clearly covering every
detail though in a brief way.
The scope of the Project:
• The development and construction of the Airport on the Site in accordance with the
provisions of the Agreement;
• The operation and maintenance of the Airport and performance of the Airport Activities
and Non-Airport Activities in accordance with the provisions of the Agreement
• The performance and fulfillment of all other obligations of HIAL in accordance with the
provisions of the Agreement

Grant of Concession

36
This is a clause whereby the Government of India grants HIAL the exclusive right and
privilege to carry out the development, design, financing, construction, commissioning,
maintenance, operation and management of the Airport subject to and in accordance with the
provisions of this Agreement and Applicable Law.

Recognition of Rights
The rights of the HIAL are defined as follows:
(a) Any activity or business related or ancillary to the activities referred
In the concession or which HIAL considers desirable or appropriate to be carried on or
engaged in connection therewith
(b) Any activity or business in connection with or related to the arrival, departure and/or
handling of aircraft, passengers, baggage, cargo and/or mail at the Airport; and
(c) Any activity or business in connection with or related to the development of the Site or
operation of the Airport to generate revenues including the development of commercial
ventures such as hotels, restaurants, conference venues, meeting facilities, business centres,
trade fairs, real estate, theme parks, amusement arcades, golf courses and other sports and/or
entertainment facilities, banks and exchanges and shopping malls.
The agreement also permits HIAL to give service provider rights for carrying out few
activities and businesses to any person subject to such terms and conditions as HIAL may
determine are reasonably appropriate, subject to the same being within the framework of this
Agreement and not being contrary to the terms and conditions of this Agreement provided
that, if and to the extent required by any Applicable Law

Concession Fee
The Parties agree that HIAL shall, in consideration for the grant by GoI of the Concession to
pay to GoI a fee amounting to four per cent (4%) of Gross Revenue annually on the terms
specified in this Article
The concession fee clause clearly defines each and every part of the concession fee explaining
the meaning of every term and what it actually covers. It explains gross revenue and what all
it consists of, the time of payment, payment account nad provisional payment, interest and
taxes etc.

37
Conditions precedent
It says that the provisions of this Agreement shall take effect and become binding on the
Parties from the date upon which the following conditions precedent are satisfied in full:
• Amendments to the Aircraft Rules, 1937;
• The receipt by GoI of irrevocable notice from HIAL and its Lenders that Financial
Close has occurred which notice shall be final and binding on the Parties
The clause also explains Obligations to Satisfy Conditions Precedent.
About the Non-fulfilment of Conditions Precedent the agreement says that if the condition
precedent set out has not been satisfied in full or not been waived by the date falling twelve
(12) months after the date of this Agreement, HIAL or GoI shall have the right to terminate
this Agreement by giving twenty-one (21) days' notice in writing to the other Party and upon
expiry of such notice this Agreement shall terminate without any consequent cost or
consequence upon either Party.
At any time prior to the date specified, the Parties shall, by mutual agreement in writing, have
the right to extend the date for satisfaction or waiver of the conditions precedent by such
period as the Parties may agree.

Obligations Of Goi
The obligations of the government are clearly defined in this clause as follows:
• GoI shall, at its own cost and expense undertakes, comply with and perform all its
obligations set out in this Agreement and shall not instruct any statutory body under the
direct control and direction of the Ministry of Civil Aviation to take any action that would
constitute a breach of this Agreement if such body were party to this Agreement in place
of GoI.
• GoI shall limit its responsibilities to the permissions within its domain and not take any
responsibility for the permission within the domain of Govt. of Andhra Pradesh.
• No new or existing airport shall be permitted by GoI to be developed as, or improved or
upgraded into, an International Airport within an aerial distance of 150 kilometres of the
Airport before the twenty-fifth anniversary of the Airport Opening Date.

38
• Post commencement of operations of the Airport GoI shall not act, or omit to act, in a
manner which discriminates against the Airport or HIAL in a way that provides other
Major Airports with an unfair competitive advantage when compared to the Airport or
HIAL, as the case may be.
• From and with effect from the date on which Airport Opening occurs GoI will ensure that
the Existing Airport shall not be open or available for use for civil aviation operations. that
neither HIAL nor GoI shall be responsible for or made to account for such costs,
expenses, liabilities, loss of profit and/or claims made by third parties in connection with
or pursuant to such closure.

Representations and Warranties


• In this clause, each Party represents and warrants to the other Party that it has the power
and authority to validly execute and deliver this Agreement and it is subject to the laws of
India during the term of this Agreement. Many such warranties and representations are
given by both the parties and some additions warranties are given by HIAL to GoI about
the shares and shareholding pattern of HIAL.
• With regard to the representation and warranties made by either party, each party
undertakes to disclose to the other party any alteration/ change in the Representation and
Warranties made within a period of seven days of the occurrence of such change/
alteration. This disclosure by the parties shall be without prejudice to their respective
rights and contention. The lock-in restrictions to which the shareholding of Sponsors and
State Promoters are subject to are also given.
• HIAL shall at all times obtain and maintain all Clearances and Approvals, including
registrations, licenses and permits (including immigration, temporary residence, work and
exit permits), which are required by Applicable Law for the performance of the Project.
• DISCLAIMER: HIAL acknowledges that prior to the execution of this Agreement, it has,
after a complete and careful examination, made an independent evaluation of the Scope of
the Project and has determined the nature and extent of the difficulties, risks and hazards
that are likely to arise or may be faced by it in the course of the performance of its
obligations in this Agreement. HIAL acknowledges and hereby accepts the difficulties,

39
risks and hazards associated with the Scope of the Project and hereby agrees that GoI shall
not be liable for the same in any manner whatsoever to HIAL.
• For the avoidance of doubt the difficulties, risks and hazards accepted by HIAL shall
exclude any obligations for which GoI is responsible pursuant to the terms of this
Agreement.

Construction Of The Airport


The clause states the following:
• HIAL shall review the Master Plan every five years
• HIAL shall design, procure, construct, complete, test and commission the Initial Phase,
and remedy any defects in respect thereof, in accordance with the Master Plan, Good
Industry Practice and Applicable Law. HIAL shall ensure that the Works shall conform
with the Specifications and Good Industry Practice.
• HIAL will organize the Site during the period of construction with regard to safety
precautions, fire protection, security, transportation, delivery of goods, materials, plant
and equipment, control of pollution, maintenance of competent personnel and labour and
industrial relations and general site services including, without limitation, access to and on
the Site, allocation of space for contractors' and sub-contractors' offices and compounds
and the restriction of access to the Site to authorised Persons only.
• HIAL will ensure that the Works will comprise only materials and goods which are of
sound and merchantable quality and which are manufactured and prepared in accordance
with Applicable Law and that all workmanship shall be in accordance with Applicable
Law and with Good Industry Practice applicable at the time of construction and/or
installation.

40
Airport Operation and Maintenance
• This clause says that HIAL shall at all times comply with Applicable Law in the operation
and maintenance of the Airport and will operate, maintain, keep in good operating repair
and condition in accordance with Good Industry Practice and, in accordance with the
Standards and renew, replace and upgrade to the extent reasonably necessary, the Airport
which for these purposes shall exclude any systems or equipment to be operated and
maintained by AAI in accordance with the terms of the Communication Navigation
Surveillance/ Air Traffic Management Agreement. All maintenance, repair and other
works shall be carried out in such a way as to minimize inconvenience to users of the
Airport.
• In order to assist HIAL and GoI achieve their objectives under this Agreement a joint
coordination committee shall be formed comprising HIAL, GoI, GoAP and the other
Relevant Authorities providing the Reserved Activities.
• The Parties wish to develop and operate the Airport to standards consistent with those
achieved at other leading international airports and in this regard, customs, immigration
and quarantine procedures shall be established by GoI, at its own cost.
• GoI and HIAL after mutual discussions may enter into arrangements to jointly provide
aviation security services at the Airport.
• GoI confirms that it shall provide meteorological services at the Airport in accordance
with the practices established or recommended from time to time pursuant to the Chicago
Convention and on the same terms as it provides such services at all other Major Airports.
• Subject to any law, regulation or international treaty obligations as in force from time to
time, GoI shall follow a policy of non-discrimination with regard to the classes or
descriptions of air traffic that are permitted to use the Airport and subject to regulation by
Regulatory Authority or under Independent Regulatory Legislation, shall not impose
limitations on aircraft movements at the Airport or otherwise restrict the capacity at the
Airport.
• The clause says that HIAL shall keep the Airport open at all times for the take-off and
landing of aircraft unless and so long as HIAL is unable to do so as a result of a failure by
any Relevant Authority to provide a Reserved Activity and it shall be responsible for, and

41
promptly pay, all expenses incurred by it in respect of the operation of the Airport
including, without limitation, in respect of Tax, insurance and the provision of all services
or utilities to or at the Airport such as electricity, water, gas, refuse collection, sewerage,
foul water, drainage and telephone.
• If following the Airport Opening Date, HIAL ceases or substantially ceases the operation
of the Airport for more than forty-eight hours, other than in accordance with its rights
under this Agreement and not being due to GoI or any Relevant Authority, without the
written consent of GoI, at the request of either Party GoI will meet with HIAL to discuss
and agree a plan and the appointment of a joint operation and management committee, to
procure that operation of the Airport recommences as soon as practicable.

Charges
This clause details about the parties having right to impose charges, what the airport charges
consist of and payment of taxes.
• Subject to Applicable Law, no Person other than HIAL, any Service Provider Right
Holder granted a relevant Service Provider Right or the AAI may impose any charge or
fee (a) in respect of the provision at the Airport of any facilities and/or services which are
included within Airport Activities or (b) in respect of the movement of passenger, or
vehicular traffic on the Airport or the Site.
• The Airport Charges shall be consistent with ICAO Policies.
• The Regulated Charges set out in Schedule 6 shall be the indicative charges at the Airport.
Prior to Airport Opening HIAL shall seek approval from the Ministry of Civil Aviation for
the Regulated Charges, which shall be based on the final audited Project cost.
• If at any time prior to the date the IRA has the power to approve the Regulated Charges
HIAL wishes to amend such charges it shall seek consent from the Ministry of Civil
Aviation for such amendments.
• HIAL and/or Service Provider Right Holders shall be free without any restriction to
determine the charges to be imposed in respect of the facilities and services provided at
the Airport or on the Site, other than the facilities and services in respect of which
Regulated Charges are levied.

42
• All Taxes as may be due and payable by HIAL pursuant to Applicable Law, shall be paid
on a priority basis prior to any disbursements by HIAL to any party including Lenders.

Maintenance of Insurance
• HIAL shall effect and maintain at its own cost, at all times the insurances required under
the Financing Agreements and such additional insurances, as HIAL may reasonably
consider necessary or prudent in accordance with Good Industry Practice.
• HIAL shall furnish to GoI, copies of such policy certificates, copies of the insurance
policies and evidence that the insurance premia have been paid in respect of such
insurance. No insurance shall be cancelled, modified or allowed to expire or lapse until
the expiration of at least forty-five days notice of such cancellation, modification or non-
renewal has been provided by HIAL to GoI.
• If HIAL fails to effect and keep in force all insurances for which it is responsible pursuant
hereto, GoI shall have the option to keep in force any such insurance, and pay such premia
and recover the costs thereof from HIAL.

Accounts and Audit


The clause says that HIAL shall maintain books of accounts recording its income and
expenditure, receipts and payments, and assets and liabilities, in accordance with Applicable
Law. It shall provide to GoI two copies of its Balance Sheet and Profit and Loss Account
along with a report thereon by its Statutory Auditors, as soon as reasonably available.

Force Majeure
This clause shall apply if the performance by any Party of its obligations under this
Agreement is prevented, hindered or delayed in whole or in part by reason of Force Majeure.
• The clause says that neither Party shall be liable for any failure to comply, or delay in
complying, with any obligation under or pursuant to this Agreement and they shall not be
required to perform their obligations to the extent that the performance by either Party of
its obligations under this Agreement is prevented, hindered, impeded or delayed in whole

43
or in part by reason of Force Majeure and in particular, but without limitation, the time
allowed for the performance of any such obligations shall be extended accordingly.
• As soon as reasonably practicable but not more than 72 hours following the date of
commencement of any event of Force Majeure, if either Party desires to invoke such event
of Force Majeure as a cause for delay or failure in the performance of any obligation
hereunder, it shall notify the other Party in writing of such date and the nature and
expected duration of such event of Force Majeure. Within a reasonable time following the
date of such notice of such event of Force Majeure, the Party having invoked such event
of Force Majeure as a cause for such delay shall submit to the other Party sufficient proof
of the nature of such delay or failure and its anticipated effect upon the time for
performance.
• The Affected Party shall take all reasonable steps to prevent, reduce to a minimum and
mitigate the effect of the event of Force Majeure.
• The clause also speaks about the default i.e., HIAL default events, GoI Default Events,
consequences of default. The default may also lead to termination according to the terms
given in the clause. The clause clearly explains when GoI and HIAL can terminate the
contract

Liability and Indemnity


This clause explains about the liability of HIAL and GoI and compensation payable and limit.
• HIAL alone will bear any responsibility there may be for any cost, expense, loss, liability
or damage suffered for incurred by any user(s) at the Airport or any other Person(s) or
otherwise and arising out of or in connection with the design, construction, maintenance
and operation of the Airport and Non-Airport Neither GoI nor HIAL shall be liable for any
special, indirect, incidental or consequential damages arising out of or in connection with
this Concession Agreement.
• GoI and HIAL will be obliged to give information to the other party, if any legal
proceeding is initiated in any court or tribunal against them relating to this Concession
Agreement.

44
If as a result of Change in Law, HIAL suffers an increase in costs or reduction in net after tax
return or other financial burden, loss, liability or damage in connection with its development
or operation of the Airport, the aggregate financial effect of which exceeds Rupees ten million
in any financial year, HIAL may notify GoI and propose amendments to this Agreement so as
to put HIAL in the same financial position as it would have occupied had there been no such
Change in Law resulting in such cost increase, reduction in return or other financial burden,
loss, liability or damage as aforesaid.

HIAL shall in the first instance and in accordance with Applicable Law, take all reasonable
steps including, to the extent feasible, an increase in the charge to be levied on users of
Airport to mitigate the adverse effect of a Change in Law.

Dispute Resolution
This clause describes negotiation, conciliation and reference to arbitrator. The parties shall use
their own respective reasonable endeavors to settle any dispute. Any Dispute which the
Parties are unable to resolve within a period (as the Parties may agree) of the written
notification by one Party to the other of the existence of a Dispute shall be finally determined
by arbitration in accordance with the Indian Arbitration and Conciliation Act, 1996 and in
accordance with the UNCITRAL rules (the "Rules") by three arbitrators appointed in
accordance with the Rules. Any decision or award of an arbitral tribunal appointed shall be
final and binding upon the Parties.

Partial Invalidity
If at any time any provision of this Agreement is or becomes illegal, invalid or unenforceable
in any respect under any law of any jurisdiction, neither the legality, validity or enforceability
of the remaining provisions nor the legality, validity or enforceability of such provision under
the law of any other jurisdiction will, in any way, be affected or impaired and the legality,
validity and enforceability of the remainder of this Agreement shall not be affected.

No Partnership

45
No Party shall have any authority, unless expressly conferred in writing by virtue of this
Agreement or otherwise and not revoked to bind any other Party as its agent or otherwise.
Time is of the Essence
Time shall be of the essence of this Agreement, both as regards the dates, periods or times of
day mentioned which may be substituted for them in accordance with this Agreement.

Computation of Time
Times referred to in this Agreement are times in Hyderabad, India. In computing any period
of time prescribed or allowed under this Agreement, the day of the act, event or default from
which the designated period of time begins to run shall be included. If the last day of the
period so computed is not a Business Day, then the period shall run until the end of the next
Business Day.

46
47
4.4 Case Study: JAIPUR - KISHANGARH EXPRESSWAY

Project: Strengthening the existing two lanes and widening it to six lanes in the Jaipur
Kishangarh stretch of NH-8
Client: National Highway Authority of India (NHAI)
Consortium: The consortium is formed by the GVK group and B.Seenaiah and company
(Projects) Ltd (BSCPL) known as GVK Jaipur Kishangarh Expressway Private Limited
(GVK) which is a Special Purpose Vehicle (SPV). The Consortium won the bid and had
signed the Concession Agreement (CA) with NHAI on May 8, 2002 for the development and
implementation of the Project. L&T later joined the Consortium.
Concession Period: 20 years including the construction period of 30 months.
EPC Contract: GVK entered into EPC agreement with M/s Larsen & Toubro Limited- ECC
division for the stretch KM 273.5 to KM 313.5 and M/s Seenaiah & Company (Projects)
Limited for the stretch KM 313.5 to KM 363.9.
The EPC contract was a fixed time fixed price contract.
GVK has decided to carry out O&M function on its own.
Total project cost: Rs.615 crore funded by
Rs.101 crore Equity,
Rs.211 crore Equity support grant from NHAI
Rs.302 crore debt.
The total cost of the EPC contract given to L&T Limited ECC division was Rs.296 crore
while the cost of the contract awarded to BSCPL was Rs.239crore.
Financial Advisor: IDFC, which also acted as the arranger for the entire debt.
The project achieved financial closure on March 17, 2003 with IDFC having sanctioned the
entire debt. Subsequently, a part of the debt component amounting to Rs.193 crore was picked
up by a consortium of 8 banks.
Completion Period: For both the contracts (L&T and BSCPL) it was 24 months ending 28th
March 2005, much ahead of SPCD of 14th September, 2005.

48
Detailed study of the concession agreement of Jaipur - Kishangarh Expressway

Scope of Project
The consortium has been given limited liability to enter into the concession agreement in
agreement to the LOA for undertaking the design, engineering, financing, procurement,
construction, operation and maintenance of the project highway which shall include
strengthening of the existing two lanes of NH-8 from Km. 273/500 to Km. 366/200, six lanng
thereof in accordance with the specifications and standards.

Definitions and interpretations


The agreement defines all the terms that are used in this agreement whose meaning remains
the same throughout until stated specifically at any other part of the agreement.

Conditions Precedent
The concessionaire has to obtain all the permits for a certain period of time from the state and
central government, after which it shall be granted way leaves required in connection to
project such as right of way for alignment and permissions to enter and utilize the site for the
construction as stated in the agreement. The concessionaire has to provide all the financial
documents, the EPC contract, O&M Contract, Tolling contract, performance security, copies
of the resolution system adopted by the board of directors etc. to NHAI.

Performance Security
A performance security of Rs.100 million has to be paid to NHAI within 120 days failing
which, the NHAI is entitled to terminate the agreement. If the concessionaire is in breach of
this agreement, the client has the right to hold the performance guarantee till the Commercial
Operation Date or till the breach is cured. An Escrow account has to be created by the
concessionaire within 60 days from the date of signing this agreement, which shall contain all
inflows and outflows of cash on account of capital and revenue receipts and expenditures,
funds constituting the financing package, fees collected by concessionaire during operation
period, fees collected by NHAI in exercise of its rights shall be deposited in the account.
Obligations of the Concessionaire

49
The concessionaire shall submit the project completion schedules, scheduled completion
date, design and engineering before starting the construction and the project documents within
seven days of their execution and shall not make any replacements or amendments without
prior notice to NHAI. If any replacements have to be made, a 30 days prior notice to NHAI
shall be given. The concessionaire has to promptly remove all the surplus construction and
wastes from the project site for neat construction. It has to provide a regular report of the
progress of work to NHAI. It has to also acquire any real estate which shall be used for
additional facilities in the project site.

Obligations of NHAI
NHAI shall give the concessionaire the right to access the site without any encumbrances,
provide facilities like water, electricity etc, to assist the concessionaire in obtaining necessary
permissions at the cost of concessionaire and to regulate the traffic. It even allows the
concessionaire to conduct any tests on the highway without causing any problem to the traffic
prior to the start of the project.

Independent Consultant
NHAI shall appoint an independent consultant initially for a period of four years and the
appointment shall be given within 120 days from the date of agreement. NHAI may terminate
the appointment of the Independent Consultant at any time subject to appointment of their
replacement by another Independent Consultant. If the concessionaire finds that the
independent consultant is not fair in his duties or is not efficient, it can make a written
representation to NHAI. First the concessionaire and the consultant are called for a meeting
by the NHAI to resolve the dispute amicably. If the dispute is not solved by this way, it shall
be resolved in accordance with the dispute resolution procedure.

Monitoring and supervision of construction


Proper monitoring of the quality of work is done frequently by testing the work whenever
required by the independent consultant. If the project completes with small items of work yet
pending, the concessionaire shall ask the consultant to issue a provisional certificate along
with a list which shall contain the list of all works yet to be completed (punch list). Then the

50
concessionaire along with payment for damage of Rs. 200,000 shall be given a period of 120
days. If the NHAI is not satisfied with the results of the tests conducted, it shall not issue the
completion certificate. It shall notify the concessionaire within7 days and the concessionaire
shall take respective measures to correct the damages after which the completion certificate
shall be issued.
If at all the progress of the work was observed to be slow an immediate notice from NHAI
was given to the concessionaire and the concessionaire was required to inform within 15 days
what steps would be taken by it to expedite the progress. If the Concessionaire fails to achieve
any Project milestone other than Project Completion, within a period of 90 (ninety) days from
the date set forth, then it shall pay Damages to NHAI at the rate of Rs.1,000,000 (Rs. One
million) per day until such milestone is achieved.
If the suspension of project is caused by
• Any reason other than default or breach of the Agreement by the Concessionaire including
breach of any of the obligations of the Concessionaire under this Agreement, the
Preservation Costs shall be borne by NHAI;
• Reason of default or breach of this Agreement by NHAI the Preservation Costs shall be
borne by NHAI; or
• Reason of any Force Majeure Event, the Preservation Costs shall be borne by the
Concessionaire save and except to the extent otherwise expressly provided in force
majeure clause

Completion
The Completion certificate to the concessionaire shall be given when the project is complete
and is open to the traffic until which the concessionaire shall not be entitled to levy or collect
any fee. If the project shall not be completed by the scheduled date the concessionaire shall
pay an amount of 0.01% of the total project cost per week and if this exceeds 12 months from
the scheduled date then NHAI shall be entitled to terminate this agreement.

Change of Scope
Any additional work to be performed by the concessionaire shall be informed by the NHAI in
a written document known as “Change of Scope Order”. The concessionaire can accept the

51
additional only if it does not exceed 5% of the total project cost and if it does not adversely
affect the Commercial Operation Stage.

Operation and Maintenance


• The Operation and Maintenance of the Highway shall be done by the concessionaire or by
its O&M contractor so that safe, smooth and uninterrupted flow of traffic can be ensured
and the tolls and fees can be collected. The O&M contractor shall even maintain the
highway by resurfacing the pavements, repairing the structures, horticulture, extension of
any existing pavements, bridges etc.
• It even shall have the responsibility to maintain a public relations unit to interface with
and attend to suggestions from users, media, government agencies etc. During the
operation period the concessionaire shall not carry out any material change unless it is
required to operate the highway with the standard specifications.
• The concessionaire shall not close any lane of the project highway for undertaking
maintenance or repair works except with prior written approval of the NHAI. The
concessionaire shall seek the approval at least seven days before the scheduled date of
close of the highway.
• NHAI shall grant permission for the above within 5 days of the receipt of the request. The
concessionaire shall reopen the lane within the stipulated time mentioned in the
permission. For any delay caused by the concessionaire in reopening the lane, it shall be
charged at Rs. 10,000 per day for every 100m stretch until the stretch is been re-opened
for traffic.
• The consultant shall inspect the work of the concessionaire every month and prepare an
O&M inspection report which shall be submitted to both the parties. The concessionaire
within 30 days of the receipt of this report, shall modify the defects and shall resubmit its
report to NHAI once in every fortnight.

52
Force Majeure
Force majeure events are classified as three different types in this agreement. They are :
• Non Political Force Majeure Events (floods, lightning, earthquake, cyclone, volcanic
eruption or fire, radioactive contamination, strikes or boycotts other than those by the
contractor or concessionaire). In such a case the parties shall bear their respective costs.
• Indirect Political Force Majeure Events (war, invasion, armed conflict, blockade, industry
wide or state wide or country wide strikes, any public agitation which prevents collection
of fees for more than 7 days continuously in an accounting year). In this case the
concessionaire shall bear the cost directly related to project if that is to the extent of
insurance claims, else one half of the same shall be reimbursed by the NHAI.
• Political Force Majeure Events (change in law, expropriation or compulsory acquisition
etc.). In this case the force majeure cost shall be reimbursed by the NHAI only if the
concession period is not extended.
If a force majeure event occurs before Financial Close there shall not be any termination
unless such a situation extends to 180 days of 365 days and the date of the financial close
shall be extended by the period for which such force majeure event shall exist. Each party
shall bare its own cost.
If a force majeure event occurs after the financial close and before COD, the concession
period shall be extended to a period till which the force measure subsists. If such a situation
arises after the COD, The concessionaire shall try to collect the fees from the users but if it
fails to do so the concession period shall be extended by the period for which the collection of
fees remains suspended. For avoidance of doubt, Force Majeure Costs shall not include loss
of Fee revenues or any debt repayment obligations but shall include interest payments on such
debt, O&M Expenses and all other costs directly attributable to the Force Majeure Event.
Termination of the agreement is done if the force majeure occurs for more than 180 days
continuously. In such a case the payments are made as follows.
• If the Termination is on account of a Non Political Event, the Concessionaire shall be
entitled to receive from NHAI by way of Termination Payment an amount equal to 90% of
the Debt Due and the entire Subordinated Debt less due insurance claims, if any.

53
• If the termination is on account of a Indirect Political Event, the concessionaire shall be
entitled to receive the total debt less due insurance claims, outstanding subordinated debt,
110% of the equity spent on the project
• If the termination is on account of a direct political event, The concessionaire shall be
entitled to receive total debt due, 120% of the subordinated debt and 150% of the equity.
In such a event if the parties are unable to agree in good faith about the occurrence of a force
majeure, such a dispute shall be settled by following the dispute resolution procedure. No
party is liable to other party in respect of any loss, damage, cost expense, claims that may
arise out of such force majeure. The affected party cannot claim for any payment during such
an event except if it has informed in writing to the other party regarding such an event within
7 days after it knew about the event. The affected party is excused for not performing its
obligations only if it makes reasonable efforts to mitigate the limit of damage to the other
party. If the affected party is able to resume from its obligations it should give a written
notice stating that affect and then can resume from its performance.
If the concessionaire is in a material breach and if it has cured it before termination, then the
concessionaire has to pay to the NHAI compensation equal to all the direct additional costs
incurred by NHAI in one lumpsum or in 3 equal semi-annual installments with an interest of
2%.

Termination
Termination of the agreement can take place
• If the concessionaire fails to achieve Financial Close
• If the concessionaire fails to achieve any project mile stones other than Scheduled Project
Completion Date within the set date and fail to cure it in a period of 180 days from the
date of its occurrence.
• If the concessionaire is in Material Breach
• If the shareholding of the consortium members falls below the minimum prescribed
• If the concessionaire is adjudged bankrupt or insolvent

54
The concessionaire may give a written notice of termination to NHAI if
• NHAI is in breach of this Agreement and such breach has a Material Adverse Effect on
the Concessionaire and NHAI has failed to cure such breach or take effective steps for
curing such breach within 90 (ninety) days of receipt of notice in this behalf from the
Concessionaire;

• NHAI repudiates this Agreement or otherwise evidences an irrevocable intention not to be


bound by this Agreement;

• GOI or GOR or any Governmental Agency have by an act of commission or omission


created circumstances that have a Material Adverse Effect on the performance of its
obligations by the Concessionaire and have failed to cure the same within 90 (ninety) days
of receipt of notice by NHAI in this behalf from the Concessionaire;

• NHAI has delayed any payment that has fallen due under this Agreement if such delay
exceeds 90 (ninety) days.
If the Concessionaire terminates the agreement because of an NHAI event of default, it is
entitled to receive from NHAI
• The total debt due
• 120% of the total subordinated due
• 150% of the equity
These payments have to be paid within 30 days of a demand made by the concessionaire.
Such payments have to be made by way of credit to the Escrow account.

Defects and Liabilities


The first inspection of the project highway and all project facilities shall be done between 30
and 36 months prior to the expiry of the concession period. Within 90 days from the initial
inspection a report is submitted to independent consultant and any renewal works shall be
done. The second inspection shall be done between 9 months and 12 months prior to the
expiry of the concession period. Within 30 days after the completion of the inspection a report
shall be submitted to the independent consultant after which if any renewals to be done shall
be made.

55
Change in Law
If there is any change in law due to which the concessionaire suffers a financial burden which
exceeds Rs. 10 million, then it shall notify NHAI and propose amendments in the agreement
so as to maintain its financial position and vice versa.

Dispute Resolution
If there is a chance of a dispute to arise between the two parties, it is first informed to the
independent consultant who tries to solve the dispute in a amicable manner. If still the dispute
is not solved the chairman of the board of directors of NHAI tries to settle down the dispute.
If still the parties are not happy with the solution, the dispute is taken to the notice of the
arbitration board which consists of three members of which two are appointed by the parties
individually and the third arbitrator shall be appointed

56
Chapter 5
RISK MITIGATION

5.1 OBSERVATIONS
The framework involved in the concession agreement addresses issues which are
typically important for limited resource financial of infrastructure projects, such as mitigation
and unbundling of risks, allocation of risks and rewards, symmetry of obligations between the
principal parties, precision and predictability of cost and obligations, reduction of transaction
cost, force majeure and termination. It also deals with other concerns such as user protection,
transparent and fair procedures and financial support from the government.
The concession agreement allocates risks to the best party suited to manage them as
against the earlier policy of the concessionaire bearing the maximum risk. While the technical
and commercial risks are still assigned to the concessionaire, the direct and indirect risks are
borne by the government authority. The concession agreement specifies technical parameters
for construction, revenue-sharing agreements between the government and the concessionaire,
concession period, tolling mechanism, etc. It also states that detail design studies are to be
undertaken by the concessionaire based on the core requirements given by the NHAI. Land
and environmental clearances continue to be provided by the government. Other
responsibilities of the government include compulsory buyout in case of contract termination;
compensatory payments to concessionaire in case of force majeure situations; default by the
NHAI or in the event of an additional tollway/competing road etc.
One of the key features of this concession agreement is that the risks have been
allocated to the party best suited to handle them as risk alleviation and mitigation is
considered to be critical for private investment. Project risks have been assigned to the private
sector to the extent it is capable of managing them. The transfer of these risks is expected to
result in innovations and efficiencies in costs and services. The commercial, technical and
traffic risks are also assigned to the concessionaire. All direct and indirect political risks are
allocated to the authority/government.
Some of the key features include protection against force majeure events, compulsory
buy-out by the government in case of termination, minimum interaction between the

57
government and concessionaire, monitoring vision to be done by an independent engineer, all
financial flows to be routed through an escrow account to provide security to lenders and
greater stability to project operations, stipulation of a regular traffic census and annual survey
for keeping track of traffic growth etc.

5.2 STUDY OF PROVISIONS FOR RISK MITIGATION IN THE AGREEMENTS

The concession agreement has provisions for risk mitigation in various clauses. It
allocates risk to the party that is best suitable to handle that risk. After a detailed study of the
concession agreements the following provisions in the concession agreement for risk
mitigation have been observed:

• The concession agreement clearly specifies and defines the rights of the either party thus
avoiding risks of conflict and interference between the parties. It clearly defines the right
of each party thus allocating particular rights to one party which can handle, for example
land acquisition to private party avoiding political risks etc.

• It clearly specifies the obligations of both the parties and clearly defines the
responsibilities each party is limited to. The obligations are so designed that a symmetry is
maintained in the obligations between the parties

• In the agreement, each Party represents and warrants to the other Party that it has the
power and authority to validly execute and deliver this Agreement and it is subject to the
laws of India during the term of this Agreement avoiding legal risks.

• To cater for the design risk, it has provisions which clearly impose the damage on the
party which causes the damage

• The concession agreement states the default of both the parties in detail and mentions the
remedies and consequences of the defaults which covers the construction risk

• Clauses on insurance are well designed to cater for the environmental damage and
reduction of construction risk

58
• The clause on force majeure gives protection against the force majeure risks

• There are clauses which cater for the operations and maintenance risks such as cases when
operating costs exceed the original estimates or when completed facility cannot be
effectively operated or maintained to produce the expected capacity, output or efficiency

• Exchange rate risk and interest rate risk are reduced by clearly mentioning the currency
exchange

5.3 RECOMMENDATIONS FOR RISK MITIGATION THROUGH CONCESSION


AGREEMENT:
• The documentation in relation to the project should be such so as to enable passage of
various risks that are not within the control of Special Purpose Vehicle but it has been
allocated to it under the main concession or license. The developer should not be straddled
between the various documents with risks it has no control over or is not capable of
absorbing. Thus, the risks allotted under the concession or license should flow down to the
various contractors under the relevant documentation with the contractors

• Concession agreements need to be more transparent and inclusive of public acceptance for
the success of the project for the satisfaction of the end users.

• The documents incorporating the risk sharing framework enable the investor to evaluate
the risks and decide whether and how to participate in the bidding process.

• In order to avoid market and revenue risk, the concession agreement should clearly give
the solution for insufficient income from fares or tolls and insufficient traffic

• The MCA should have provisions for selecting the competent bidder who can procure the
funds required for the project within the stipulated time to cater for the financial closure
risk

• The concession agreement should be extended by the government if the land acquisition
time taken by the concessionaire is more than the estimated time

59
Proper provisions must be provided in the concession agreement to cater for Regulatory Risk,
Greenfield Risk, Execution Risk, Feasibility Risk etc. and their mitigation for successful
implementation of PPPs.

Chapter 6

CONCLUSIONS AND RECOMMENDATIONS

6.1 LIMITATIONS
• Currently the PPP model has not matured largely due to lack of clarity and assurances in
terms of the stakeholders interests derived from the revenue models so far developed for
roads, ports and airport projects.

• At a conceptual level, clarity is clearly missing in understanding and structuring a PPP


framework from a strategic, financial, tax, legal and business perspective

• PPP structures are still skewed towards the largest monopoly- the government

• Ecosystem still ignores the Risk Matrix and their multiplier effect on projects and their
viability. PPPs still run more than ordinary business risks like Political Risk, Regulatory
Risk, Green-field Risk, Financial Closure Risk, Execution Risks, Feasibility Risks etc and
the interplay of this could be in geometric proportions leading to disproportionate Risk-
Reward and unfavorable investment ecosystem.

• Risk capital is still averse. Large Private Equity prefer participating at grow stage when
the cash flows are visible, and the very nature of the PPPs are that they are front-loaded
with huge capital, long gestations, cash flow visibility typically after 4 to 7 years and
steady cash flows during the concession. What India needs is venture capital at pre-
operative stage once the definitive agreements are signed with the government.

• Many lenders have already shot over the headroom in the infrastructure space leading to
many projects facing delays in financial closures. Clearly this requires a big push from the
Ministry of Finance and RBI in terms of dedicated pipeline for funding PPPs

60
Despite all the challenges, Public Private Partnerships have become increasingly attractive
as reflected in many global infrastructure initiatives. As PPPs can also achieve social and
environmental objectives, PPPs can emerge as a major mechanism to raise the standard of
living of the society.

6.2 RECOMMENDATIONS
• The Public Private Partnership agreements clearly need to specify the role of the State and
the Developer.
• The Developer should be given the autonomy in handling and executing the projects. In
this regard, it is imperative that the operation and maintenance performance criteria be
fixed.
• The project risks need to be identified up-front. The risks should be distributed among
stakeholders with mitigation mechanism.
• The applicable income tax benefits should be made automatic or built into the concession
agreement
• Infrastructure Coordination Committee should be constituted in order to clear projects at
national level
• The States should also float Special Purpose Vehicles (SPVs) to attract strategic investors
for commercially viable projects.
• There should be a clear dispute resolving mechanism in order to resolve any disputes
arising between the Government and the promoters
• There is need for a stronger institutional mechanism in the areas if policy, regulation,
operation and Maintenance in order to promote private projects in the entire sub sectors of
Infrastructure.
• Any approach to determining capital outlay for the PPPs should endeavour to balance the
conflicting objectives of allowing market driven resource allocation, ensuring objective
bid evaluation combined with reasonable scope for timely remedial action to cure any
failure on part of the concessionaire.
• An integrated approach for addressing the regulatory framework of PPPs is required as the
regulatory framework is interlinked with the issue of regulated monopolies. The approach

61
finally adopted must take into account the degree of maturity the industry has achieved,
the future scenarios based on the past experiences of other countries and comparable
sectors, as also the features specific to the project under consideration
• Grading of developers and contractors by reputed rating agencies and the pre-qualification
should be based on technical and financial evaluation.
• For capital-intensive projects, Governments should consider providing guarantees towards
foreign exchange risk on behalf of the sponsor so that project cost is minimized on
account of interest cost
• Project Development Fund should be developed to cover the cost of: Preliminary due
diligence, land acquisition and statutory clearances
• The Government should be encouraged to sign MOUs on projects with a Special Purpose
Vehicle (SPV)
• Investment by multilateral institutions (like IFC, World Bank, etc.) should be set up on
Public –Private Partnership mode for the purposes of direct investment or lending for
Project SPVs
• There should be collective understanding about the political constraints of the government
and the commercial obligations of the private promoters.

• The government should consider progressive levy of appropriate user charges and tax
holidays to investors to boost the growth of PPP projects.

• Globally a variety of new and innovative PPP infrastructure delivery models have been
developed in recent years to address various challenges posed to PPPs in specific
situations and sectors. Some of these hybrid PPP models are alliancing, bundling,
competitive partnership, integrator and development.

• Setting up of independent regulator, PPP cell and policy at state level to closely monitor
PPPs

6.3 CONCLUSION
Public Private Partnerships are aimed in large part at increasing the delivery of
services in an era of public financial constraints by using resources of the private sector for

62
public aims. In that sense, it aims to improve the efficiency of service delivery, by providing
more service for less government outlay. However, it has been limited because for a variety of
reasons, there is a clear reluctance of the public sector to fully privatize services. The risks of
course are that the public and private sectors have different interests; the government is
ideally concerned with maximizing welfare, while firms aim for profit. We observe that
successful PPPs have well-defined roles that both improve the quality and quantity of
transportation and provide at least a normal profit to private participants. We measured
success across a number of criteria, including a general assessment of the support for the
project by the various stakeholders: public, government (civil service), political, and private;
looking at adherence to initial forecasts (on-time, on-budget, demand realized); considering
whether the project was extended or the parties undertook additional projects (success breeds
success); and considering more objective assessments of whether the project served the public
good (was efficiency, equity, the environment, and the experience of users and non-users alike
improved?). Public Private Partnerships represent a flexible solution to establish infrastructure
services. Moreover, PPPs involve the sharing of risks and responsibilities between public and
private sectors.
Despite all the challenges, Public Private Partnerships have become increasingly
attractive as reflected in many global infrastructure initiatives. As PPPs can also achieve
social and environmental objectives, PPPs can emerge as a major mechanism to raise the
standard of living of the society.

63
BIBILOGRAPHY

RECOMMENDED READINGS

1) “Concession agreement of Hyderabad international airport”,


http://civilaviation.nic.in/hial/CA_HIAL_singned_20122004.pdf

2) “Concession agreement of Jaipur-Kishangarh Expressway”,


http://www.nhai.org/fvb.pdf

3) “Model Concession Agreement”, Public Private Partnership in National Highways,


Planning commission

BOOKS

1) Yogendra Sharma (2008), “Public Private Partnership in Infrastructure”, Vitasta


Publishing Pvt. Ltd., New Delhi.
2) Prasanna Chandra (2002),’ Projects’, Tata McGraw-Hill Publishing Company Ltd.,
New Delhi.

ARTICLES

1) Rohit das, (January 2008), “Organized policies”, Times Journal of construction and
Design of India, pg 32-36
2) “Enabling framework for PPP”, Indian Infrastructure Journal (November 2008), pg
34-38

3) David Levinson, Reinaldo C. Garcia, Kathy Carlson, “A Framework for Assessing


Public Private Partnerships”

64
4) Overview (23 rd February - 1st March), “PPP Push- Stimulating Growth through PPP
and Infra projects”, Weekly on Projects Info. of India

5) Cover story, (February 2009),“Public Private Partnerships – The big push”,


Infrastructure today Journal of India, pg 26 & 27 and 39 & 40
6) Siddhartha Das, (February 2009), “PPP works for India”, Infrastructure today Journal
of India, pg 41-44
7) Sunil Srivastava, (February 2009), “Railways- The track forward”, Infrastructure
today Journal of India, pg 48 & 49
8) Shrinivas V Kowligi, (February 2009), “Urban Development-Moving Urbania”,
Infrastructure today Journal of India, pg 50-52
9) R Ramakrishnan, (February 2009), “Partnership mode”, Infrastructure today Journal
of India, pg 53

WEBSITES

1) www.pppinindia.com
2) www.pppindiadatabase.com
3) www.finmin.nic.in
4) www.infrastructure.gov.in
5) http://business.gov.in/infrastructure/state_level.php
6) www.nhai.org
7) www.civilaviation.nic.in
8) www.airporttechnology.com