SAUDI ARAMCO ID/PID -18-MAY-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Gypsum Wall Board System Plastering, Finishing and Final
SAIC-M-1039 18-May-05 CIVIL-
Inspection
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Gypsum Wall Board System Plastering/Finishing Inspection

Interior plastering with gypsum plaster or cement plaster shall not be less
than three coats when applied over metal lath or wire fabric lath SAES-M-100
A1
and shall not be less than two coats when applied over concrete or Sec. D
masonry base materials. (1997 UBC, Sec. 2507.1)

Gypsum plaster shall not be applied directly to fiber insulation board and
SAES-M-100
A2 cement plaster shall not be applied directly to gypsum lath, gypsum
Sec. D
masonry, or gypsum plaster. (1997 UBC, Sec. 2507.1)

The finished thickness of gypsum plaster shall be 15.9mm (5/8")


minimum where applied to expanded metal lath or wire fabric, 12.7mm
(1/2") minimum when applied over gypsum lath or masonry walls and a SAES-M-100
A3
maximum thickness of 15.9mm (5/8") applied to monolithic concrete Sec. D
walls or 9.5mm (3/8") on monolithic concrete ceilings.
(1997 UBC, Table 25-D)

The finished thickness of Portland cement plaster shall be 15.9mm (5/8")


minimum where applied to expanded metal lath; 19.1mm(3/4") minimum
over wire fabric lath; 22mm (7/8") minimum applied to exterior gypsum
SAES-M-100
A4 lath; 12.7mm(1/2") minimum when applied to masonry walls, a maximum
Sec. D
of 22mm(7/8") applied to monolithic concrete walls and a maximum of
12.7mm (1/2") applied to monolithic concrete ceilings.
(1997 UBC, Table 25-D)

Should ceiling surfaces require thicker coating of plaster than listed in


SAES-M-100
A5 items 3 or 4 above, metal lath or wire fabric shall be installed before
Sec. D
plastering. (1997 UBC, Sec. 2507.5)

Proportions of aggregate to cementitious materials shall be as SAES-M-100


A6
recommended by the manufacturer. (1997 UBC, Sec. 2507.2 & 2508.2) Sec. D

Two coat gypsum plaster shall be applied so that the first coat is brought
out to grounds and straightened to a true surface, leaving a rough
SAES-M-100
A7 surface for the finish coat and permitted to dry before the finish coat is
Sec. D
applied. The second coat is similarly applied.
(1997 UBC, Sec. 2507.3.2)

The finish coat shall be applied with sufficient pressure to bond, 1.6mm
SAES-M-100
A8 (1/16") minimum thickness after the second base coat has dried.
Sec. D
(1997 UBC, Sec. 2507.3.2)

The first two coats of cement plaster shall be applied as required for
gypsum plaster except that each coat will be allowed 24 hours of moist
curing between coats; Moist curing shall not be required where job and SAES-M-100
A9
weather conditions are favorable to the retention of moisture in the Sec. D
cement plaster for the full 24 hours curing time.
(1997 UBC, Sec. 2507.3.3)

Page 1 of 4
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Gypsum Wall Board System Plastering, Finishing and Final
SAIC-M-1039 18-May-05 Civil
Inspection
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Saudi Aramco approved acoustical finish plaster may be applied over


SAES-M-100
A10 any base coat plaster, clean masonry, concrete or other manufacturer
Sec. D
recommended substrate. (1997 UBC, Sec. 2507.4)

Exterior cement plaster shall not be less than 3 coats applied over metal
SAES-M-100
A11 lath or wire lath and 2 coats applied over masonry, concrete or gypsum
Sec. D
backing board. (1997 UBC, Sec. 2508.1)

Wood frame or metal stud construction with an on-grade concrete floor


slab system, shall have exterior cement plaster applied to cover, but not SAES-M-100
A12
extend below, lath and weather proofing membrane. Sec. D
(1997 UBC, Sec. 2508.1)

Exterior cement plaster shall be applied the same as interior cement


plaster with the exception that the second coat shall be rodded and
floated sufficiently to provide adequate bond for the finish coat; The SAES-M-100
A13
second coat shall have no variation greater than 6.4mm (1/4") in any Sec. D
direction under a 1524mm (5 foot) straight edge.
(1997 UBC, Sec. 2508.3)

Portland cement based plaster shall not be applied to frozen base or


those bases containing frost; Plaster mixes shall not contain frozen SAES-M-100
A14
ingredients. Plaster coats shall be protected from freezing during their Sec. D
24 hour curing periods. (1997 UBC, Sec. 2508.4)

When cement plaster is applied over gypsum backing or masonry, the


SAES-M-100
A15 second coat may be applied as soon as the first coat has attained
Sec. D
sufficient hardness. (1997 UBC, Sec. 2508.5)

Dash bond coats, when applied, shall be a part of the total cement SAES-M-100
A16
plaster thickness noted on IFC Drawings. (1997 UBC, Sec. 2508.8) Sec. D

B Final Inspection

Interior gypsum wallboard single-layer fire rated assemblies shall have all
SAES-M-100
B1 joints taped and plastered before application of decorative surface
Sec. D
treatments. (1997 UBC, Sec. 2511.5)

Gypsum plaster shall not be used on exterior surfaces. SAES-M-100


B2
(1997 UBC, Sec. 2508.1) Sec. D

End joints of adjacent courses of gypsum lath, veneer base, sheathing


SAES-M-100
B3 board or wallboard shall not occur over the same stud in framed
Sec. D
construction. (1997 UBC, Sec. 2513.5)

Wood frame or metal stud construction with an on-grade concrete floor


slab system, shall have exterior cement plaster applied to cover, but not SAES-M-100
B4
extend below, lath and weather proofing membrane. Sec. D
(1997 UBC, Sec. 2508.1)

The finished plaster shall bring the surface out to the required
SAES-M-100
B5 dimensions, straightened to a true surface as required by the IFC
Sec. D
Drawings. (1997 UBC, Sec. 2507.3.2)

REMARKS:

Page 2 of 4
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Gypsum Wall Board System Plastering, Finishing and Final
SAIC-M-1039 18-May-05 Civil
Inspection
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

REFERENCE DOCUMENTS:
1- SAES-M-100 -- Saudi Aramco Building Code, 31 August 2002
2- 1997 UBC -- Uniform Building Code, 01 January 1997

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 3 of 4
SAUDI ARAMCO ID/PID -18-MAY-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Gypsum Wall Board System Plastering, Finishing and Final
SAIC-M-1039 18-May-05 CIVIL-
Inspection

Attachment 1
Re-Instatement Punch List Form SATR NUMBER DATE APPROVED DISCIPLINE

(Punch List by the Contractor ) SATR-A-2011 Civil


PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR

MCC No.: Test Packs No.


System Description:
Covered Verified/
ITEM Originator / Completion
Description By Accepte Remarks
No. Y N Agency Date
dBy:

Page 4 of 4