Vous êtes sur la page 1sur 2

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Placement/Pouring and Testing Inspection SAIC-Q-1014 18-May-05 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Equipment made of aluminum alloys shall not be used for pump lines, SAES-Q-001
A1
tremies or chutes used to discharge concrete from a truck mixer. Sec. 7.2

Concrete shall not be placed prior to a recorded pre-placement SAES-Q-001


A2
inspection and authorization to proceed by Saudi Aramco. Sec. 7.3

Experienced form watchers shall be provided during concrete placement


SAES-Q-001
A3 to detect form displacement or the beginning of failure.
Sec. 8.0
(ACI 347, Sec. 3.1)

SAES-Q-001
A4 Raking shall not be used for movement of concrete after placement.
Sec. 7.4

SAES-Q-001
A5 Vibrators shall not be used to move concrete inside forms.
Sec. 7.5

SAES-Q-001
A6 Retempering of concrete after placement is prohibited.
Sec. 7.6

Concrete that has partially hardened or been contaminated by foreign 1997 UBC
A7
materials shall not be deposited in the structure. Sec. 1905.10.4

Concrete shall not be dropped freely where reinforcing will cause SAES-Q-001
A8
segregation nor where it would fall freely for more than 1 meter. Sec. 7.7

Concrete shall be deposited as near as possible to its final position to SAES-Q-001


A9
avoid segregation due to re-handling or flowing. Sec. 7.8

Placed concrete shall be consolidated by mechanical vibration SAES-Q-001


A10
equipment supplemented by hand spading, rodding or tamping. Sec. 7.9
When Immersion type vibrators are used to consolidate concrete around
epoxy coated reinforcing bars, the vibrators should be equipped with 09-SAMSS-106
A11
rubber or non-metalic vibrator heads. Sec. V
(ASTM A775/A775M, Sec. XI3.15)
Place concrete in layers not to exceed 450mm thick and consolidate. SAES-Q-001
A12
(ACI 301, Sec. 8.3.1.3) Sec. 3.2

SAES-Q-001
A13 Concrete shall be placed on a clean surface free of standing water.
Sec. 7.10

SAES-Q-001
A14 Precast concrete or mortar spacing blocks or bar supports are prohibited.
Sec. 7.11

After completing placing and finishing operations, efforts must continue


SAES-Q-001
A15 to protect concrete from high temperatures, direct sunlight, low humidity,
Sec. 13
and drying winds. (ACI 305R, Sec. 4.4.1)

Concrete paving shall have control joints or construction joints located at SAES-Q-001
A16
a maximum spacing of 6 meters on center in both directions. Sec. 4.19.e

Page 1 of 2
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Placement/Pouring and Testing Inspection SAIC-Q-1014 18-May-05 Civil
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Expansion joints shall be used in paving adjacent to all poured in place SAES-Q-001
A17
concrete members. Sec. 4.19.f

Paving or slab construction joints not specified on the IFC Drawings,


SAES-Q-001
A18 shall be located at column centerlines and at intermediate intervals so
Sec. 14.2
that each panel shall not be more than 55m 2 in area.

Contraction or isolation joints shall be provided to divide structurally plain


SAES-Q-001
A19 concrete members into flexurally discontinuous elements.
Sec. 4.10
(ACI 318M, Sec. 2.2.3.1)

Paving or slab construction joints not specified on the IFC Drawings,


SAES-Q-001
A20 shall meet all requirements for architectural concrete matching the grade
Sec. 14.1
and type of finish present in the adjacent concrete.

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-Q-001 -- Criteria for Design and Construction of Concrete Structures, 29 October 2003
2- 09-SAMSS-106 -- Epoxy Coating of Steel Reinforcing Bars, 31 October 2000

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 2 of 2