SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Cast-In-Place Concrete Finishing and Curing Inspection SAIC-Q-1015 18-May-05 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Concrete Finishing Inspection

Qualifications of the concrete finishing workers shall be submitted. (ACI SAES-Q-001


A1
301M-99, Sec. 5.1.2.1(e) Sec. 9.0

Scratch Finish - After the concrete has been placed, consolidated,


stricken-off, leveled and high/low spots eliminated, a Scratch Finish shall SAES-Q-001
A2
be applied by roughening with stiff brushes or rakes before final set. Sec. 9.0
(ACI 301M-99, Sec. 5.3.4.2(a))

Floated Finish - After the concrete has been placed, consolidated,


stricken-off, leveled, high/low spots eliminated and the bleed water has
SAES-Q-001
A3 disappeared and the concrete hard enough to allow finishing, a Floated
Sec. 9.0
Finish shall be applied with hand floats, bladed power float with shoes or
a power disk float. (ACI 301M-99, Sec. 5.3.4.2(b))

Trowel Finish- After the concrete has been placed, consolidated,


stricken-off, leveled, high/low spots eliminated and floated off with a bull
float, a Trowel Finish shall be applied by power trowel or hand trowel SAES-Q-001
A4
smooth and free of trowel marks. Hand troweling shall proceed until the Sec. 9.0
trowel produces a ringing sound as the floor is worked.
(ACI 301M-99, Sec. 5.3.4.2(c))

Broom or Bell Finish- After the concrete has been placed, consolidated,
stricken-off, leveled, high/low spots eliminated and floated off with a bull
SAES-Q-001
A5 float, its surface can be given a coarse transverse scored texture by
Sec. 9.0
drawing a broom or burlap belt across the surface.
(ACI 301M-99, Sec. 5.3.4.2(d))
When not shown on IFC Drawings or Required by Project Specifications,
a Scratched Finish shall be applied on surfaces to receive bonded SAES-Q-001
A6
cementitious mixtures. Sec. 9.0
(ACI 301M-99 Sec. 5.3.4.2(j))
When not shown on IFC Drawings or Required by Project Specifications,
a Floated Finish shall be applied on surfaces to receive waterproofing, SAES-Q-001
A7
roofing, insulation, or sand-bed terrazzo. Sec. 9.0
(ACI 301M-99, Sec. 5.3.4.2(j))
When not shown on IFC Drawings or Required by Project Specifications
SAES-Q-001
A8 a Floated Finish shall be applied on walks, drives, steps, and ramps.
Sec. 9.0
(ACI 301M-99, Sec. 5.3.4.2(j))
When not shown on IFC Drawings or Required by Project Specifications,
a Trowel Finish shall be applied on walking surfaces in manufacturing, SAES-Q-001
A9
storage, warehousing or surfaces to receive a floor covering. (ACI 301M- Sec. 9.0
99, Sec. 5.3.4.2(j))
Initial floating shall be completed after concrete placement. (ACI 302.1R- SAES-Q-001
A10
01, Sec. 8.3.3) Sec. 9.0

The second floating operation shall take place after initial set but before
SAES-Q-001
A11 final set has occurred (usually performed using a power trowel with float
Sec. 9.0
shoes or a pan attached). (ACI 302.1R, Sec. 8.3.3)

Page 1 of 2
SAUDI ARAMCO ID/PID - 18-May-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Cast-In-Place Concrete Finishing and Curing Inspection SAIC-Q-1015 18-May-05 Civil
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

The use of any floating or troweling machine that has a water attachment
for wetting the concrete surface during finishing shall be prohibited
SAES-Q-001
A12 (Application of water during finishing can damage the top few millimeters
Sec. 9.0
of concrete, causing delamination).
(ACI 302.1R, Sec. 8.3.3)

B Curing Inspection

Maximum total dissolved solids in water used for moist curing shall not SAES-Q-001
B1
exceed 1000 parts per million. Sec. 10.2

Water curing shall be continuous until the compressive strength has


SAES-Q-001
B2 reached 70% of the specified strength, but not less than 7 days after
Sec. 10.3
placement.

Continuous water cure can be provided by covering with wet burlap and
plastic; The saturated burlap shall be covered with a plasticized sheet SAES-Q-001
B3
vapor barrier, minimum 0.15 mm (6 mils) in thickness (Polyethylene Sec. 10.4
Sheeting).

Where appearance is important, concrete curing by 0.15 mm


SAES-Q-001
B4 polyethylene film shall be avoided; film over damp burlap may be used.
Sec. 3.2
(ACI 308, Sec. 2.4.2.1)

During the moist curing period, saturated cover materials should not be SAES-Q-001
B5
allowed to dry and absorb water from the concrete. (ACI 308, Sec. 2.5) Sec. 3.2

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-Q-001 -- Criteria for Design and Construction of Concrete Structures, 29 October 2003

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 2 of 2