IT Strategy Plan
Executive Summary
RNR Consulting developed an Information Technology Strategic Plan for the Antelope Valley
Transit Authority to support the organization’s objective of utilizing information technology to
execute organizational and business processes. The Information Technology Strategic Plan
serves as a road map to provide AVTA with a methodology to achieve not only this objective,
but also to help it achieve its overall vision of being the “best transit authority in the United
States, serving the community with safe and secure rides, and providing the best service possible
to the community.” The IT Strategic Plan includes the initiation of information technology-
related activities that focus on supporting all agency departments by implementing efficient
systems, providing seamless integration, and dispensing accurate information throughout the
agency. The IT Strategic Plan aims to enhance the efficiency of current processes and
applications by automating processes and implementing information technology initiatives and
systems that will help AVTA maximize customer satisfaction and achieve its vision.
Currently, the Authority faces a number of critical issues that directly impact the operations of
the organization and its ability to serve the community efficiently including manual processes, a
lack of documented procedures and policies, the underutilization of existing technology and
systems within the organization, and the lack of information technology staff and IT-related
policies for the organization. The Authority currently executes a number of processes manually,
which results in redundancy of efforts, increases the probability of errors and inaccurate data,
and contributes to inefficiency in the utilization of human and technological resources.
Furthermore, a number of procedures and policies are not documented. This could potentially
result in loss of knowledge if there is turnover within the organization or lead to employees
executing processes in disparate methods, which may lead to incongruent data or inconsistent
information being collected. The combination of manual processes and the lack of documented
procedures contribute to a lack of tangible audit trails, which further lead to a lack of
accountability among employees within the organization (AVTA & MV). Furthermore, existing
technology and software applications currently existing within the organization are underutilized.
Applications such as Collective Data and Fuel Force are only being utilized from 4 to 9% of their
Page 1 of 217
Draft for discussion purposes only
full capability. This further exacerbates the inefficiency of the execution of processes within the
organization and hinders the delivery of timely information and reports to management, which
impinges upon management’s informed decision making capabilities. Also, there is a lack of
information technology policies and procedures as well as a lack of information technology staff
that could serve the organization which further contributes to the underutilization of technology.
If the staff could refer to an in-house expert on information technology, existing technology
systems could be better utilized by the staff because they would have a resource whom they
could immediately contact for help with the system. Also, information technology systems could
be maintained and upgraded more readily by an IT Director or database administrator.
Furthermore, this individual (IT Director or database administrator) could develop a clear set of
IT-related policies and procedures for AVTA employees to follow. This would help establish
how information technology is to be used within the organization and the protocol for such
utilization of technology within the organization.
Thus, RNR Consulting formulated the IT Strategic Plan to help address these issues and
delineate the steps necessary to achieving the overall goals and objectives of the organization.
The implementation of automated and integrated systems would allow AVTA to eliminate
manual and redundant processes, provide detailed audit trails to management which would
increase accountability of staff, generate real-time data and reports to management which would
enhance their decision-making ability, more effectively utilize existing technology available in
the marketplace, and provide the technological infrastructure necessary to serve the community
more efficiently and effectively. Furthermore, the presence of information technology staff and
IT-related procedures would help facilitate the implementation of these systems and provide
assistance to the staff as these systems ‘Go Live’ throughout the Authority. Therefore, an IT
Strategic Plan illustrates not only the benefits which could be derived from the automation of
systems, but also understand specifically how such a plan could improve the infrastructure
necessary to better serve the community.
Page 2 of 217
Draft for discussion purposes only
Activities Conducted
The activities conducted helped formulate a comprehensive view of the Information Technology
Strategic Plan from a people, process, and technology perspective. Interviews, FTE analysis,
shadowing activities, and organizational structure analysis delineated how people are being
utilized to execute the processes of the Authority. These activities also highlighted potential
areas for reallocation of resources. “As-Is” and “To-Be” process maps helped analyze how
processes are currently executed and areas for potential streamlining, automation, and efficiency
gains. The development of IT policies and procedures, systems audit, hardware infrastructure,
mapping of network architecture, application architecture, and gap analysis of IT systems and
processes helped depict how technology is currently utilized by the Authority and where
technology could most impact the functions and business processes of the organization. Overall,
benchmarking, SWOT analysis, and the formulation of the action plan then supplemented the
findings of the individual activities to help RNR Consulting develop the IT Strategic Plan for the
organization. The individual activities conducted included the following:
1. Conducting interviews with key managerial personnel and employees
2. Conducting FTE analysis of management at AVTA and MV transportation
3. Developing “As-Is” process maps for critical processes
4. Conducting shadowing activities to identify actual operations and processes and further
understand how people are utilized to execute such organizational business processes
5. Proposing “To-Be” process maps for critical processes
6. Developing IT policies and procedures
7. Analyzing organizational structure
8. Performing systems audit of critical existing applications
9. Delineating hardware infrastructure
10. Mapping network architecture
11. Depicting application architecture
12. Performing gap analysis of IT systems and processes
13. Conducting benchmarking activities across similar sized organizations
14. Conducting SWOT analyses
15. Developing IT Strategic Plan and action plan
Page 3 of 217
Draft for discussion purposes only
1. Interviews
RNR Consulting conducted interviews with the management and staff of AVTA and MV
Transportation. The interviews with AVTA management provided insight about employee views
and opinions of the mission/vision of AVTA, the issues faced by different departments, and MV
Transportation’s performance at different levels of service, operations, and maintenance. The
overall perception of AVTA employees regarding processes, procedures, and MV
Transportation’s performance were similar. This helped RNR Consulting initially obtain
qualitative data regarding employee viewpoints about the current state of AVTA and the
utilization of information technology, what they wished to have in terms of information
technology systems, and initially identify and review the personnel involved in processes.
(Please review the Interviews tab for more detail.)
2. FTE Analysis
FTE analysis of AVTA and MV Transportation management personnel were conducted to
delineate the current resource utilization and work efficiency within the agency and compare the
actual job duties performed versus their published job duties and responsibilities. FTE analysis
depicts what percentage of a typical eight hour day is allocated to various job tasks. This activity
helped us understand how time is currently allocated to the processes executed on a daily basis.
Furthermore, these analyses provided data on how new systems could potentially lead to
efficiency gains by reducing the amount of time allocated to manual processes. (Please review
the FTE analysis tab for more detail.)
Page 4 of 217
Draft for discussion purposes only
and servicing and detailing process. (Please review the “As-Is” process maps tab for more
detail.)
Page 5 of 217
Draft for discussion purposes only
most basic of operations thereby utilizing manpower and IT resources. As AVTA is in the midst
of various technological upgrades and implementations, we believe that it is imperative for the
agency to have defined policies and procedures that would aid the transition of the Authority to
multiple integrated systems. The information technology policies and procedures for AVTA
detail development and implementation of information security policies, standards, controls,
procedures, and practices defined in information technology resources in order to protect AVTA
IT resources. RNR Consulting formulated IT polices and procedures for E-mail management,
archiving, configuration, account administration, password integrity, Internet usage policy,
hardware/software procurement, system and data integrity, data backup policy, wireless
networking policy, and license management procedures. In order to safeguard significant agency
information and set standards across the agency, AVTA needs to implement these policies and
procedures in the short term and update them on a regular basis. (Please review the IT policies
and procedures tab for more detail.)
8. Systems Audit
The systems audit compares the potential usage and current usage of existing software
applications in AVTA. RNR Consulting conducted a comprehensive review of existing systems
currently utilized by department and assessed their functionality. This activity highlighted which
specific functionalities of the current systems are utilized and not utilized. It also helped us
identify why certain functionalities and modules in certain applications are not utilized. We also
Page 6 of 217
Draft for discussion purposes only
identified and reviewed key systems used by the departments to determine any potential
interfaces with other systems. (Please review the systems audit tab for more detail.)
9. Hardware Infrastructure
The hardware infrastructure provides a detailed inventory of the existing IT equipment used by
AVTA, including the operating system, RAM capacity, hard disk capacity, type of monitor,
server configuration, type of printer, fax machine, and copier. This activity helped us analyze
how the existing infrastructure would have to be modified to implement new systems.
Additionally, this helped us determine if there is efficient utilization of IT resources within the
Authority. This activity also helped us identify outdated computers and recommend upgrades
that would be compatible with the technology AVTA plans to implement. (Please review the
hardware infrastructure tab for more detail.)
Page 7 of 217
Draft for discussion purposes only
13. Benchmarking
RNR Consulting conducted benchmarking activities to compare and analyze where AVTA was
in terms of technology applications in relation to similar sized transit authorities in the United
States. The benchmarking activity conducted helped elucidate how technology is currently being
utilized by other similarly sized transit authorities to accomplish business processes. (Please
review the benchmarking tab for more detail.)
Page 8 of 217
Draft for discussion purposes only
vision and goal of the Antelope Valley Transit Authority. (Please review the project profiles tab
for more detail.)
Page 9 of 217
Draft for discussion purposes only
INTERVIEW TRENDS
Page 10 of 217
Interview Trends
RNR Consulting conducted interviews with the management and staff of AVTA to evaluate their understanding of the vision/mission
of the organization as well as their views on areas such as management, MV Transportation, employee morale, utilization of
resources, and processes. The interview trends delineate the views of AVTA employees across the organization. Sample quotes are
also detailed to provide a representation of the range of comments raised during the interview process.
3 AVTA’s view AVTA’s staff also believes that MV “AVTA has not been pleased with MV in the last six
of MV Transportation does not perform per the to seven months—in respect to maintenance, drivers,
Transportation requirements stated in the contract and dispatches.”
agreement. The differences include areas
such as operation level, maintenance level, “It is a combination of management and line staff that
and proper data delivery. is a problem. The biggest problem is that they (MV
transportation) don’t follow up.”
Draft for discussion purposes only
6 Process The staff believes that processes need to be “Interface between dispatch and maintenance is really
Page 12 of 217
Draft for discussion purposes only
Page 13 of 217
Draft for discussion purposes only
s
Vision
cu
fo
in
e
nc
re
ffe
Di
Page 14 of 217
FTE ANALYSIS
Draft for discussion purposes only
Administrative Assistant
6.25%
18.75%
Administrative
Customer Service
Planning
75.00%
Handling correspondences
9%
Processing bus passes
Handling complaints
8%
11% Filing paperwork
Page 16 of 217
Draft for discussion purposes only
Analysis:
1. Plan, coordinate, and manage special and 1. Process and filing bus pass paperwork
on-going projects and programs 2. Record and follow up customer complaints
Page 17 of 217
Draft for discussion purposes only
25.0% 25.0%
37.5%
Developing marketing
budget
Special projects
10% 14%
Advertising: Radio/TV
Creating scripts
15%
10% Preparing brochures/flyers
Public spokesperson
8% Attending meetings
14%
Website management
5%
File management
15% 9%
• The job time study of the Public Information Officer depends on the time of the year
and the priority of the job function. The tasks cited above entail the Public Information
Officer’s scope of duties and responsibilities.
• The Public Information Officer meets the safety team and bus operators once a month to
provide guidelines to the bus operators on how to interact effectively/politely with
customers.
Page 18 of 217
Draft for discussion purposes only
• The Public Information Officer performs website management on a regular basis which
does not entail her job description. This time could be utilized to provide assistance to
improve the service and marketing efforts of AVTA.
Analysis:
1. Coordinate the sale and maintenance of 1. Work on website update from time to time.
AVTA advertisement bus panels 2. Update data files and add new information
on the website
* This activity takes precedence when there is a social event or public meeting, and the time
frame could exceed the specified hours.
Page 19 of 217
Draft for discussion purposes only
Finance Assistant
37.50%
45.00% Administrative
Human resources
Accounting and Finance
17.50%
Special projects
• The Finance Assistant conducts a number of financial activities daily that are manually
driven and take considerable time. If processes were automated, significant time could
be saved or allocated to other duties or responsibilities.
Page 20 of 217
Draft for discussion purposes only
Analysis:
Page 21 of 217
Draft for discussion purposes only
Senior Analyst
25.00%
43.75% Administrative
Research and development
Analysis and auditing
31.25%
13%
19% Invoice Analysis
Data Analysis
13%
Coordination with MV
Transportation
Project Assistance
Meetings
Administrative paperwork
6%
24%
• Note: The Senior Analyst is the representative for AVTA at MTA. She attends MTA
meetings once a month.
• The Senior Analyst allocates significant time everyday resolving the discrepancy in data
provided by MV transportation. This job function can be eliminated if data is generated
and verified using a software application. This will also streamline the process and save
time for AVTA as well as MV transportation.
Page 22 of 217
Draft for discussion purposes only
Analysis:
1. Manage staff engaged in monitoring 1. Proofread papers and reports for AVTA
operational contract compliance of staff
operator, monitoring efficiency of transit
system and customer service
2. Develop and oversee the distribution of
discount and courtesy passes to increase
ridership by targeted areas
3. Maintain bus stop sign and amenity log
4. Oversee periodic system inventory of bus
stops
Projects
• Reviewing new and
existing projects:
o Assisting in
Route Match
upgrade
o Marketing and
public
information
about GFI
system and Research and development 2.5 Hours
swipe cards
o Outreach
program:
Page 23 of 217
Draft for discussion purposes only
Extending user
community for
the paratransit
program
• Co-coordinating and
assisting colleagues at
AVTA in different
projects, such as
assisting in developing
brochures, assisting in
ITS implementation
Management
• Attending daily Administrative 2 Hours
meetings
• Analyzing, auditing
and proofreading
papers and reports for
AVTA staff
Page 24 of 217
Draft for discussion purposes only
Facilities Engineer
12.50% 12.50%
Administrative
Supervisory
25.00%
Information Technology
Support
Procurement
50.00%
Generating reports
5% 6% Documenting assets
8% 6%
Updating facilities record
Inspecting facility
13% 14%
Software management
Troubleshooting equipment
Monitoring system
11% performance
Vendor management
22%
Hardware/Software
15% procurement
Page 25 of 217
Draft for discussion purposes only
Analysis:
2. Troubleshoot equipment
3. Load software in systems
4. Monitor on-time systems performance
5. Repair hardware systems
Page 26 of 217
Draft for discussion purposes only
0.63%
12.50%
37.50% Administrative
Research and development
18.75%
Contract complaince
Information Technology
Managerial
25.00%
Vendor management
Project research
6%
Implementation: special
11% projects
Analysis: real time efficiency
11%
Hardware/software
management
8%
Troubleshoot: IT issues
• The Contract Compliance Manager performs bus inspections every two weeks which
last up to 5 hours.
• The Contract Compliance Manager also represents AVTA in outside meetings and
conferences.
Page 27 of 217
Draft for discussion purposes only
• The Contract Compliance Manager has to troubleshoot IT related issues on a daily basis
which is not a part of his job description. This time could be re-allocated to perform
contract compliance activities to inspect and improve operations performed by MV
transportation.
Analysis:
1. Monitor and verify all necessary safety and 6. Install update and review
training activities. Verify contractor hardware/software
maintains a sensitivity and empathy- 7. Troubleshoot equipments and other IT
training program related problems
2. Coordinate with the Planning Manager to
establish a five and ten year plan for
vehicle procurement
Contract compliance
• Security check of the Contract compliance 1.5 Hours
facility
• Inspect/analyze real time
efficiency and
performance of MV
Page 28 of 217
Draft for discussion purposes only
transportation
IT management
• Install, update and review Information technology 1 Hour
hardware/software support
• Troubleshoot IT issues
Operations
• Supervise the Facility
Engineer in his activities Managerial .5 Hours
• Coordinate job functions
with Facility Engineer,
for e.g. software updates,
hardware/software
procurement, etc.
Page 29 of 217
Draft for discussion purposes only
General Manager
12.50%
Administrative
Managerial
25.00% 50.00%
Planning
Team building
12.50%
• Currently, the General Manager allocates 50% of his time or approximately four hours
per day to administrative duties.
Page 30 of 217
Draft for discussion purposes only
Budgeting
• Prepare budget for the Planning 2 Hours
fiscal year
• Conduct cost analysis by
breaking cost into dollars
and cents
• Prepare task list
- 5 things to accomplish for
the day
Page 31 of 217
Draft for discussion purposes only
Page 32 of 217
Draft for discussion purposes only
Paratransit Manager
18.75%
37.50%
Administrative
Managerial
Planning
Troubleshooting
25.00%
18.75%
Currently, the Paratransit Manager allocates 18.75% of his time or approximately 1.5 hours/day
to troubleshooting, which represents significant time spent on troubleshooting.
Page 33 of 217
Draft for discussion purposes only
Page 34 of 217
Draft for discussion purposes only
Maintenance Manager
12.50%
Adm inistrative
18.75% 43.75%
Managerial
Planning
Troubleshooting
25.00%
Page 35 of 217
Draft for discussion purposes only
Managerial
• Inspect the shop floor at Managerial 2 Hours
the start of the shift
regarding activities/issues
during last shift
• Inspect the facility to
make sure physical
infrastructure is in order
• Supervise preparation
work for afternoon
pullout
• Supervise utilities and
maintenance crew
Planning
• Meet with the General Planning 1.5 Hours
Manager to review any
issues regarding
maintenance from
AVTA’s side
• Update General Manager
with regards to issues on
Page 36 of 217
Draft for discussion purposes only
Page 37 of 217
Draft for discussion purposes only
Page 38 of 217
Draft for discussion purposes only
LEGEND
Indicates Redundancy in
Process
Page 39 of 217
“As-Is” Process Map for Bus Pass ordering
Start
A
Draft for discussion purposes only
End
Page 41 of 217
Draft for discussion purposes only
Start
Complaints via
Customer complaint is received email are directly
by MV customer service received by
department via phone Administrative
assistant in her
inbox
Page 42 of 217
Draft for discussion purposes only
Start
Yes No
Does Department of Labor
approve the grant?
Page 43 of 217
Draft for discussion purposes only
Do Union Organizations No 1
approve the grant?
Yes
30-40 days
Once the unions approve the
grant, the file is sent to
Department of Labor to send
it to FTA
Reimbursement can be
Finance Department files submitted only 3 days after
reimbursement for the the grant is executed. FTA
expenses already incurred. requires this time period for
file processing
End
Page 44 of 217
Draft for discussion purposes only
Start
What is the
invoice for?
Next Day
A D G
Page 45 of 217
Draft for discussion purposes only
Next Day
YES
Customer service Customer service
employee reviews and Call taker supervisor
employee manually initials the manifest sheet
cross checks if the enters the revenue
information entered was and leaves it for
information form the TIC customer service
accurate sheet into the service log employee from MV
spreadsheet Transportation to pick it
up
spreadsheet in the
shared drive
Customer service
employee accesses the
service log spreadsheet The employee hand
delivers the reports to
MV Transportations
office manager Customer service
employee hand delivers
Customer service the manifest sheet to
employee manually totals AVTA’s Senior Analyst
the number of hours from
dispatch spreadsheet for
The office manager
each route and enters it
reviews the reports
in the service log
spreadsheet
B E H
Page 46 of 217
Draft for discussion purposes only
office manager
Is all makes the
information NO necessary
entered changes in the
correct? service log
spreadsheet
Page 47 of 217
Draft for discussion purposes only
C F I
Finance assistant uses Finance assistant uses
information from service log information from service log
spreadsheet to calculate the spreadsheet to calculate the
variable cost amount cost
Page 48 of 217
Draft for discussion purposes only
End
Finance Assistant fixes
the discrepancy
Page 49 of 217
Draft for discussion purposes only
Start
Passes are sold through Passes are sold through Passes are sold at the counter
Kiosks Vendors in AVTA
Page 50 of 217
Draft for discussion purposes only
A C
MV Transportation Office
Manager forwards the
spreadsheet to the Finance
Assistant
End
Page 51 of 217
Draft for discussion purposes only
Start
External Accountants
process payroll checks
Page 52 of 217
Draft for discussion purposes only
End
Page 53 of 217
Draft for discussion purposes only
Start
Operations Department
Utilities Department
Page 54 of 217
Draft for discussion purposes only
1.
Page 55 of 217
Draft for discussion purposes only
Y
Bus is washed
Utilities Department
Maintenance Department
Page 56 of 217
Draft for discussion purposes only
Assistant Maintenance
Manager (AMM) picks up all
DVI reports from dispatch at
the end of the day
Lack of tracking
mechanism to follow
up on the repair NO Is the bus to be YES
repaired
immediately?
End C
Page 57 of 217
Draft for discussion purposes only
E D
Page 58 of 217
Draft for discussion purposes only
E D
Next Day
Maintenance Department
End
Page 59 of 217
Draft for discussion purposes only
Start
Page 60 of 217
Draft for discussion purposes only
Maintenance department
assigns a mechanic to
handle the road call
B End
Page 61 of 217
Draft for discussion purposes only
Dispatcher also
sends a switch out
bus and the bus
operator continues
with the scheduled
Dispatcher sends a tow truck route
to the road call location to
tow the bus back to the yard
End
Page 62 of 217
Draft for discussion purposes only
Start
Page 63 of 217
Draft for discussion purposes only
NO A YES B
Page 64 of 217
Draft for discussion purposes only
Scheduling employee
towards the end of day
accesses the scheduling
Customer is declined a ride module Employee manually checks if
multiple passengers can be
picked up around the same
time
Page 65 of 217
Draft for discussion purposes only
The following
day, if there
are any
cancellations
the Access
riders trip is Can the
covered, or NO employee YES
the Access allocate a
rider is picked time?
up late
Each operator
receives a
manifest sheet
with the days
schedule in it
The employee prints out a
manifest sheet and places it
in the bin
End
Page 66 of 217
Draft for discussion purposes only
The following
day, if there
are any
cancellations
the Access
riders trip is Can the
covered, or NO employee YES
the Access allocate a
rider is picked time?
up late
Each operator
receives a
manifest sheet
with the days
schedule in it
The employee prints out a
manifest sheet and places it
in the bin
End
Page 67 of 217
Draft for discussion purposes only
Start
Next Day
Page 68 of 217
Draft for discussion purposes only
This can be a
vendor with
Parts Manager contacts whom the
multiple vendors to get the maintenance
lowest price quote department has
purchased before
or a new vendor
Page 69 of 217
Draft for discussion purposes only
End
Page 70 of 217
Draft for discussion purposes only
Start
Page 71 of 217
Draft for discussion purposes only
Two stand by
drivers are
present. Existing
drivers are paid
overtime if they
are assigned shift
The Operations Manager
reviews the schedule
Operations Manager
Bus operators continue on
reschedules using excel
scheduled routes
spreadsheet
Operations Manager
forwards the shift
End
acknowledgement receipt to
dispatch
Bus operators do
Shift acknowledgement
not check their
forms are placed in the bus
mail boxes most
operators mail boxes
of the times
End
Page 72 of 217
Draft for discussion purposes only
Start
End
The bus operator writes any
defects during the post-trip
inspection on the DVI log
Page 73 of 217
Draft for discussion purposes only
No Yes
Is the bus repaired?
End
Are all the defects in the
buses repaired?
Page 74 of 217
Draft for discussion purposes only
No Yes
1
The Maintenance Manager
reviews all the DVIs on a daily
basis including the assistant
managers log to follow up on
open DVIs
No Yes
End
Page 75 of 217
Draft for discussion purposes only
Start
A mechanic is dispatched to
the bus within 15 minutes of
the bus operator reporting
the road call
Page 76 of 217
Draft for discussion purposes only
No report is A
issued because
the bus remained
in service, that is
noted on the work
order
End
Page 77 of 217
Draft for discussion purposes only
End
Page 78 of 217
Draft for discussion purposes only
Start
Monday thru
Friday shifts
consist of both Evening servicing Mid day servicing
service and detail and detailing and detailing
crew. Saturday
and Sunday there
is limited service
crew
Page 79 of 217
Draft for discussion purposes only
End
Page 80 of 217
Draft for discussion purposes only
Page 81 of 217
Draft for discussion purposes only
Start
Commuter
buses have GFI
systems
installed in it.
A C
Page 82 of 217
Draft for discussion purposes only
Next Day
Finance Assistant makes the
payment to MV
Transportation
Office Manager verifies the
reports
Contacts MV
Is the information No department to
accuratet? correct the
information
End
Page 83 of 217
Draft for discussion purposes only
Start
End
Page 84 of 217
Draft for discussion purposes only
Start
Maintenance Manager
creates parts request
There is a
specified list of
Vendors from
whom the parts No Yes
are purchased Are parts in inventory?
End
Parts are received by the
Shift Manager
Page 85 of 217
Draft for discussion purposes only
Inventory is automatically
updated with new parts
End
Page 86 of 217
Draft for discussion purposes only
Start
End
Purchase order is approved
by the Parts Manager
Page 87 of 217
Draft for discussion purposes only
Inventory is automatically
updated with new parts
End
Page 88 of 217
Draft for discussion purposes only
Start
Scanner is a part of
Inventory management
application
Parts Supervisor scans the
parts through the scanner
and hands them to the
Mechanic
The information is
transferred from the scanner
to inventory database
Parts information is
automatically updated in the
inventory database
Page 89 of 217
Draft for discussion purposes only
1
No Is the purchase order Yes
sent to the Vendor?
Maintenance
Manager can also
Parts Manager emails all the
access the reports Parts department bar codes
reports of the day to the
using the inventory the parts
Maintenance Manager
management
application
The inventory is
End automatically updated with
the new parts
Page 90 of 217
Draft for discussion purposes only
Start
Page 91 of 217
Draft for discussion purposes only
Utility Supervisor
troubleshoots the problem
Page 92 of 217
Draft for discussion purposes only
Bus is washed
Page 93 of 217
Draft for discussion purposes only
Page 94 of 217
Draft for discussion purposes only
Maintenance Shift
Supervisor picks up all DVI
reports from dispatch at the
end of the day
Page 95 of 217
Draft for discussion purposes only
NO E YES
3
Is the bus to be
NO YES
repaired
Maintenance application immediately?
automatically sends an E-
Mail to the Maintenance
Manger and the Shift
Supervisors a week before
the repair is due
Page 96 of 217
Draft for discussion purposes only
NO YES
Are parts
needed?
Next Day
End
Page 97 of 217
Draft for discussion purposes only
End
Note: There are a lot of process breaks currently in the operations without road calls. The To-Be map
delineates step by step how each activity in the process needs to be performed.
Page 98 of 217
Draft for discussion purposes only
Start
The information is
entered in the
‘road calls’ module
of maintenance
software
Dispatcher enters the
information in the
Maintenance Software
Page 99 of 217
Draft for discussion purposes only
Maintenance department
prints out the road call
information from the
maintenance software
Can the
NO YES
Mechanic repair
the bus?
Dispatchers enters
the information in
Mechanic repairs the bus maintenance
Mechanic informs dispatch software
and informs dispatch via
via radio that bus cannot be
radio after the repair is
repaired on road
completed
B End
Repair order is
generated using
A repair order is generated the maintenance
and the bus is assigned to software
the Mechanic for repair
Maintenance Manager
reviews road call/repair
information for the day using
maintenance software
Contract Compliance
Manager can also
access the maintenance
Maintenance Manager mails software for updated
the report for road calls to reports anytime
the Contract Compliance
Manager on a daily basis
End
The information technology policies and procedures for AVTA detail development and
implementation of information security policies, standards, controls, procedures, and practices
defined in Information Technology Resources in order to protect AVTA IT resources. It is
essential for AVTA to have IT polices and procedures for:
The purpose of this policy is to ensure the proper use of e-mail system by the management, staff
and employees of AVTA. Users have the responsibility to use this resource in an efficient,
effective, ethical and lawful manner. Use of the AVTA's e-mail system confirms the user's
agreement to be bound by this policy. Violations of the policy may result in restriction of access
to AVTA’s e-mail system and/or other appropriate disciplinary action. Further, AVTA reserves
the right to amend this policy at its discretion. In case of amendments, users will be informed
appropriately.
It is strictly prohibited:
• If you send emails with any libelous, defamatory, offensive, racist or obscene remarks,
you and AVTA can be held liable.
• If you forward emails with any libelous, defamatory, offensive, racist or obscene
remarks, you and AVTA can be held liable.
• If you unlawfully forward confidential information, you and AVTA can be held liable.
• If you unlawfully forward or copy messages without permission, you and AVTA can be
held liable for copyright infringement.
• If you send an attachment that contains a virus, you and AVTA can be held liable.
-Account Creation
E-mail accounts will be created based on the official name of the staff and management as
reflected in Human Resource and Payroll. The account ID will be created by taking the first
initial of the first name followed by the last name. In case of same names--numeric digits (1, 2,
etc) will be used after the last name. For e.g. the account ID for Harold Williams will be
hwilliams@avta.com
Requests for mail aliases will be based on name preference, middle name, nicknames, etc.,
cannot be accommodated.
-Personal Use
Although the company’s email system is meant for business use, AVTA allows personal usage if
it is reasonable and does not interfere with work.
-Disclaimer
All messages will be appended with the following disclaimer: ‘This message is intended only for
the named recipient. If you are not the intended recipient you are notified that disclosing,
copying, distributing or taking any action in reliance on the contents of this information is strictly
prohibited.’
-Email retention
All emails related to AVTA have to be retained. Further, emails will be archived based on the
standards set by AVTA management.
-Email Accounts
All email accounts maintained in the system are property of AVTA. Passwords should not be
given to other people and should be changed once a month. Email accounts not used for 60 days
will be deactivated and possibly deleted.
-Privacy
Users expressly waive any right of privacy in anything they create, store, send or receive on the
company’s computer system. AVTA can, but is not obliged to, monitor emails without prior
notification. If there is evidence that you are not adhering to the guidelines set out in this policy,
AVTA reserves the right to take disciplinary action, including termination and/or legal action.
-Questions
If you have any questions or comments about this Email Policy, please contact [Name], [Tel],
and [Email]. If you do not have any questions AVTA presumes that you understand and are
aware of the rules and guidelines in this Email Policy and will adhere to them.
- Declaration
I have read, understand and acknowledge receipt of the Email policy. I will comply with the
guidelines set out in this policy and understand that failure to do so might result in disciplinary or
legal action.
Access to the internet has been provided to staff member for the benefit of AVTA and its
customers. It allows employees to connect to information resources around the world. Every staff
member has the responsibility to maintain and enhance the public image of AVTA, and use the
internet in a productive manner. To ensure that all employees are responsible, productive internet
users and are protecting the public image of AVTA, the following guidelines have been
established for using the internet.
-Responsible Official:
It is the responsibility of the IT department, Human resources and managers or supervisors to
ensure timely and effective intake, processing, and resolution of all matter and/or issues related
to the internet.
-Uses of Internet:
-Communications:
Each employee is responsible for the content of all text or images that they place or send over the
internet. Fraudulent, harassing or obscene messages are prohibited and will result in disciplinary
action, up to including termination. All messages communicated on the internet should have your
name attached. No messages will be transmitted under an assumed name. Users may not attempt
to obscure the origin of any message. Information published on the internet should not violate or
infringe upon the rights of others. No abusive, profane or offensive language is transmitted
through the system. Employees who wish to express personal opinions on the internet are
encouraged to obtain their own user names on internet systems.
-Software
To prevent computer viruses from being transmitted through the system there will be no
unauthorized downloading of software. All software downloads will be done by IT department.
-Copyright Issues:
Copyrighted materials belonging to entities other than AVTA may not be transmitted by staff
members on the internet. Users are not permitted to copy, transfer, rename, add, or delete
information or programs belonging to other users unless given express permission to do so by the
owner. Failure to observe copyright or license agreements may result in disciplinary action from
the agency and/or legal action of the copyright owner.
-Security:
All messages created, sent or retrieved over the internet are the property of AVTA, and should be
considered public information. AVTA reserves the right to access and monitor all messages and
files on the computer system as deemed necessary and appropriate. Internet messages are public
communication and are not private. All communications including text and images can be
disclosed to law enforcement or the third parties without prior consent of the sender or the
receiver.
-Harassment
Harassment of any kind is prohibited. No messages with derogatory or inflammatory remarks
about the individual or group’s race, religion, national origin, physical attributes, or sexual
preference will be transmitted.
-Violations:
Violations of any guidelines listed above may result in disciplinary action and up to and
including termination. In addition, if necessary AVTA will advise appropriate legal officials of
any illegal violations.
- Declaration
I have read, understand and acknowledge receipt of the Internet usage policy. I will comply with
the guidelines set out in this policy and understand that failure to do so might result in
disciplinary or legal action.
C. Hardware/Software Procurement:
- Purpose:
The purpose of this policy is to provide requirements for the acquisition of information
technology (IT) resources which:
• Meet Departments' functional & business needs while providing timeliness, cost
efficiency and flexibility in the acquisition process.
• Allow Departments to obtain the best value for money by considering multiple
alternatives, giving consideration to a range of technical factors, functional & business
requirements and the quality.
- General IT Procurement:
A contract, Service Level Agreement (SLA) or Statement of Work (SOW), as appropriate,
will be in place for every significant purchase of IT goods and services or ongoing relationship
with a supplier. All IT services and assets procurement will follow AVTA’s managed acquisition
process for IT.
-Procurement of IT Infrastructure:
AVTA shall establish sole supplier and panel contracts with approved vendors to provide IT
infrastructure on an ongoing basis. The effectiveness of each contract will be reviewed annually
and a major review shall be undertaken on a triennial basis.
-Procurement of IT Services:
All IT services, where practicable, will be acquired from reputable service providers in
the market that have an established, local support presence. All external IT contractors and
consultants will:
Management and Enforcement: All procurement related processes, practices, standards and
guidelines must be derived from and compliant with, the policies stated in this document.
Compliance: All AVTA employees who procure IT related products and services for AVTA
shall comply with these policies.
Data and Information stored and maintained on AVTA's computers belongs to AVTA and its
distribution and use should comply with policies set by AVTA.
AVTA recognizes that access to information facilitates better and faster decision making,
improves effectiveness, saves time, and most importantly provides all AVTA constituents with
consistent and up-to-date information. Therefore AVTA encourages access to information by all
its constituents as long as it's doesn't violate required security, doesn't jeopardize the integrity
and accuracy of the data, and protects individuals' right to privacy.
Users with permission to access any part of AVTA’s information repository may not distribute
any information to non authorized users within AVTA or to outside persons or organizations
without the prior permission of the IT department.
While AVTA is the owner of the information stored on its computers, the IT department is
responsible for specific components of the information repository. The IT department has
responsibility for operating computer systems that manipulate logical entities of the AVTA's data
base. Their responsibilities include
Data users are responsible for notifying data custodians when they suspect or realize that the data
they are retrieving is incorrect.
1. Policy Statement:
AVTA believes that data is ‘everything’ to the Information Economy of the agency and will
ensure that AVTA’s data, which represents all levels of activities within the entire authority
through networks, software applications, multi-media applications, individual files, emails, and
mission-critical business systems such as financials, human resource, operations, customer
service, and maintenance, are protected adequately.
2. Policy Objective:
The objective of the backup policy is to adopt and implement data backup best practices to the
data environment, including hardware, software, operating systems, multi-media applications
and all business process applications to ensure that costly data losses are reduced to the
minimum, and if possible avoided entirely in the likelihood of a disaster. The policy is also to
provide information to help users of AVTA’s systems understand the nature of the backup
procedures and enforce accountability amongst AVTA personnel.
To ensure that AVTA maintains backup best practices while minimizing costs, it is imperative to
prioritize data protection, which is based upon consideration of the right level rather than best
level of importance, which means that the technical process of data backup and AVTA’s
business processes must be coordinated. The key focus of data backup and recovery operations is
protection of data from loss and speedy restoration of data in the event of data loss.
AVTA implements tape back ups every night which are checked every 3-4 days. The same
procedure is followed for virus protection. For proper backup of data AVTA can follow a back
policy that comprises of the following routine:
• Four tapes labeled for Monday, Tuesday, Wednesday, and Thursday. Each tape is
recalled for use and rotated for their respective labeled day for the whole year.
• One tape for the first, second and third Friday of every month for the whole year.
• Only the tape for the fourth Friday of every month is permanently archived.
• All data at AVTA servers are to be backed up onto backup tapes on a nightly basis
• All backup tapes are to be taken offsite every morning to a secure building or property
trusted by AVTA.
• Only IT Personnel and senior management have access to the tapes.
AVTA, by resolution of the Board of members, can adopt and follow a retention schedule. Per
retention schedule, system backup files, copies of master files or databases, application software,
logs, directories, and other records, needed to restore a system in case of disaster or inadvertent
destruction will be retained for a minimum of three (3) years. After the three years, the
Information technology department shall consider each document for further action. Based on
best practices, most backup media shall be retained for a period of 7 years and will be image
refreshed every 3.5 years.
All data assets are prioritized and categorized based on business operation needs of AVTA and
ease of deploying systems to full functionality in the event of a system failure.
AVTA’s policy is to perform Weekly Full Backup on operating system data, Backup and
Restoration data, content data, configuration files, registry files and application software data.
Weekly data will be retained through the end of the month. Any changes made to files since the
last full backup will be backed up on a daily basis. Daily incremental data will be retained
through the end of the week.
Annual Full Backup operations will be performed on all data contents and files. The media
should be returned for image refresh after 3.5 years. In case of all media, manufacturers
recommended finite shelf life will be followed. When there are instances of significant hardware
upgrade, AVTA will retain sufficient legacy hardware components, such as tape drives,
interconnects, computers, and backup software, to perform data restoration in the future.
• Backups of the user file systems should run on a daily basis, usually starting around
midnight and finishing a couple of hours after that. Certain systems/disks may be backed
up earlier and/or take longer to finish.
• Each daily backup saves the contents of files and directories at the time the backup was
performed. Therefore the backups do not potentially record all activities or contents of
users' files throughout the day or week. A backup is simply a snapshot in time of the data
present on the system at the time the backup ran. Therefore it is completely possible for a
user to create and delete a file during the course of a day which will never appear on a
backup. This is also true of e-mail messages; a user may receive, read and delete an email
message without the daily backup of the e-mail storage ever recording that message
(although there would normally be a record of who sent and received an email message
(without the contents) in the system mail server logs).
• Daily backups of user files are retained for 5 days and weekly backups are retained for 1
year 30 days. Therefore daily backups can be retrieved for up to 5 consecutive days
before the tapes are rotated. Users are urged to back up any critical information
themselves for archival purposes.
• For better control, retention for corporately managed data, such as project files, and some
e-mails should be managed at the server level.
5. Backup Procedures:
The general rule pertaining to backing up databases and systems is to ensure that situations will
not arise in which data will be rendered unrecoverable. Consequently, all backup steps should
guarantee the following:
• Prevent Data Corruption through viruses – Stringent steps must be taken to ensure that
during backup routines, the impacts of viruses are not transferred from one media to
another.
• Adhere to Media usage and shelf life – IT Personnel must review all tape/media
manufacturers’ recommendations regarding appropriate usage (e.g. the maximum number
of times the tape could be read / written upon) and shelf life to maximize effective tape
longevity.
• Prevent Loss of Vaulted Media – IT Personnel must continually monitor upgrades of
hardware and/or software to ensure that if older versions become mooted, compatible
devices such as; tape drives, backup/recovery software, operating system versions, and
application packages would be found.
• Prevent Poor Handling of Media – All backup actions must prevent media becoming
broken or corrupted through poor treatment.
-Purpose
The purpose of this policy is to provide reliable and secure wireless network access at AVTA.
Wireless networking uses the shared resource of the unlicensed radio frequencies in AVTA.
Careful planning is required to support the implementation of wireless access across AVTA
property.
A wireless networking policy is needed:
• To support the mission of AVTA
• To limit interference with the AVTA's network infrastructure
• To promote greater security in AVTA networking
-Scope
This policy applies to all wireless network users at AVTA.
-Policy
Ownership and Management of wireless network
• AVTA is the owner of the wireless network on AVTA property. The IT department of
AVTA is responsible for managing this wireless network for the benefit of AVTA staff
and management. The IT department at AVTA may restrict use of any devices that can
cause interference in the wireless frequencies ranges. These include cordless phones,
microwave ovens, high voltage audio speakers, etc.
• AVTA is solely responsible for providing wireless networking services on the property.
No other individual/business entity may deploy wireless network access points or other
wireless service on the property.
• AVTA is responsible for maintaining a secure network and will deploy adequate security
procedures to support wireless networking on site.
• AVTA will deploy a site wireless network, based on the 802.11 standards. AVTA will
work with departments to accommodate special needs, where technically feasible.
• AVTA will develop a procedure for the temporary use of a wireless access point to
support on-site events.
-Standards supported
-Status
• This policy will be reviewed on a regular basis. Changes to be made to this document
must be approved by the AVTA's IT department.
AVTA will create procedures to execute this document, and inform AVTA’s staff and
management of its existence and importance.
G. License Management:
5. Regular Reviews
AVTA must institute a policy of regular reviews to ensure that AVTA and its various
departments maintain compliance with license management. Moreover AVTA must ensure that
a disciplined process of cataloging all existing/installed software and purchased software licenses
across users, groups, and departments remains in force.
References:
-www.email-policy.com
-http://www.rmit.edu.au/ITS
-www.itsecurity.com/
- http://rucs.rutgers.edu/wireless-policy.html
- http://unit.villanova.edu/policies/policy/wireless.html
Hardware Infrastructure
2 Battery Back-ups `
2 switches
1 software server, 1 data
server, 1 email server,
plus 4 phone system
11 CPU’s and 11 Monitors 3 printer and scanners 8 printers
servers
2 Firewalls
`
4 Laptops
2 Gateways
1 CPU and 1 monitor
Printer/Copier Room
Board room
Conference Room
1 Color Copier and Printer
1 Fax machine
` 1 Laminate machine
2 Conference phone
1 Projector stations
1 CPU and 8 Monitors
RNR Consulting conducted a detailed inventory audit of the current hardware infrastructure present in AVTA, including MV
Transportation. Based on the analysis of the infrastructure, RNR Consulting documented the following issues and findings for AVTA
Management and MV Transportation:
AVTA Management
Number Issue Recommendation
1 The current printer/copier in the printer room is AVTA should purchase a new printer/copier for staff members in
often utilized for printing brochures/flyers for the event that the first printer/copier is busy. Also, the second
AVTA. printer/copier could be utilized as a back-up printer in the event the
first printer does not function properly.
2 AVTA has a printer for each employee in the Employees should utilize the central printers.
administrative office, which is not a necessary
requirement.
3 AVTA purchases new printers for each new AVTA should not purchase new printers for each new employee.
employee when he/she is hired. New employees should utilize the central printers.
4 AVTA currently does not possess a document AVTA should purchase a document shredder to dispose of
shredder. confidential documents. This would help ensure that important
information is safeguarded.
Draft for discussion purposes only
MV Transportation
Number Issue Recommendation
1 Document Scanners are not currently being utilized. MV Transportation should utilize a central scanner in the future, and
re-allocate unused scanners to departments or functional areas
which could utilize such scanners. Thus, optimum resource
allocation would aid MV Transportation in more effectively
allocating existing resources and facilitate more effective
procurement strategies.
2 Currently, there is not one central printer/copier There should be one central printer/copier shared by the General
serving the General Manager’s office, training Manager’s office, training department and operations department.
department, and the operations department. Furthermore, dispatch should have one central printer/copier which
should be used by the dispatcher, call takers, and paratransit
manager.
3 The maintenance department currently does not The maintenance department should have one central printer/copier
possess one central printer/copier. shared among the maintenance manager’s office, shift supervisor’s
office and parts manager’s office.
Overall AVTA should adopt a standard hardware procurement policy that would aid the Authority in getting better hardware deals and
also simplify the maintenance of hardware across the Authority.
Systems Configuration
#131 Dell P4, 1500Mhz 392,208 KB 20Gb Dell Yes Upgrade the
Precision 330 MS Windows operating system
2000 to XP Pro
Facilities Sony VAIO Athlon,500 256 Mb 10Gb N/A Yes Slow processor
Engineer- MHz
(machine 2)
MV Transportation (Desktops):
Room # Computer Processor RAM Disc Monitor Replace/Upgrade: Comments
type Capacity Yes/No
Customer
Service
Customer Compaq Athlon, 129,456 Kb 20Gb KDS Yes Outdated operating
Service Windows NT system
Representative
I
Customer Gateway E P4, 2.60 GHz 244,464 Kb 40Gb Gateway No
Service
Representative
II
System for Compaq P4, 2.00GHz 523,696 Kb 80Gb Compaq No
GFI
#213 Gateway P4, 1.9 GHz 256Mb 80Gb Gateway No
Front Office XP Pro
Manager
#223 Gateway E P4, 2.6GHz 240Mb 40Gb Dell No
General XP pro
Manager
Training
Department
#224 Compaq Athlon, 129,332 Kb 2Gb Compaq Yes Outdated operating
Safety and Windows NT system
training
supervisors
room
(machine 1)
#227 Gateway P3, Windows 64Mb 13Gb N/A Yes Slow processor (P4
Training 98 required)
classroom
Operations
Department
#215 Gateway E P4, 2.6Ghz 240Mb 40Gb Dell No
Operations XP Pro
Manager
#216 Compaq Athlon, 129,456 Kb 20Gb Gateway Yes Outdated processor
Road Windows
Supervisor 2000
(machine 1)
MV Transportation (Laptops):
Room # Computer Processor RAM Disc Monitor Replace/Upgrade: Comments
type Capacity Yes/No
Safety Vision Dell P(M), XP 512Mb 40Gb N/A No
laptop Pro, 1300
MHz
MV Dell P(M), XP 512Mb 40Gb N/A No
Administration Pro, 1300
MHz
Servers:
Area Description
Operating System Microsoft Windows 2000 server 10 pack license
Processor Intel Xeon 2.4GHz with 512K L2 cache and 533MHz FSB (dual processor upgradeable)
Memory 1024MB PC2100 DDR ECC SDRAM (4-256MB modules)
Hard Drive RAID Cage – (2) 36GB Ultra 320 SCSI SCA 10K rpm hot swappable hard drives
Tape Backup 20/40GB TR-40 IDE TBU with media tape and 1 cleaning cartridge
Tapes 5 TRS tape cartridges
RAID Card LSI Mega RAID U320-2 two channels Ultra 320 SCSI RAID controller with 128MB cache
RAID Level Raid Level-1 mirroring
Standard Disk Controller Integrated dual channel Ultra 320 SCSI
Floppy Drive 3.5” 1.44MB diskette drive
Optical Drive 20Xmin/48X max. IDE CD-ROM
Server Management Server manager
Monitor 15” color monitor
Keyboard and mouse 104+keyboard & PS/2 Mouse & Pad
Video Integrated PCI graphics- 8MB
Power Supply 450 watt PS2 power supply
Modem 56K PCI data/fax modem
Network Card Integrated PCI 10/100/1000 twisted pair Ethernet
Extended and On-site Service 4 Yr Parts, Labor, 4 Yr/4 our Onsite 7X24, Limited HW&SW Tech Support for as long as it is
Program owned
Power Protection APC Smart-UPS 1000RM 2U
Fib t ic
er Op
O ptic er
Fi b
CENTRAL HUB
AVTA Main building INTERNET/PHONE
SYSTEM
ic F ib
O pt er
Op
er tic
Fib
` ` ` `` ` `
Executive Director Administrative Assistant Public Information Officer Finance Manager Finance Assistant #124
CAT 6
Facilities Engineer
` CAT 6
CAT 6 Internet
Contract Compliance
CAT 6 CAT 6
Manager
CAT 6 Firewall
` CAT 6
2 stackable switches B
CAT 6
0
21
ic
pt
Senior Analyst
#
O
m
er
oo
b
Fi
R
ity
A
tic
r
` r Op
cu
2 Ports Fibe
Se
2 Gateways
306
na nce #
ainte
MV Server MV m
Planning Manager
Fu
D
Planning
Fi
el
be
Fo
rO
`
rc
pt
e
ic
#
50
3
C
06
#1
TA
AV
To
` ` `
2 Computers 3 Computers
CAT 6
CAT 6
1 Switch
s To
re les Maintenance Data com #306 AV
Wi TA
# 10
E 6
A
CAT 6
1 Port
1 Switch
Antenna 1 Port
s
Fuel Force - Data Centre #503
es
rel
Wi
E
• AVTA does not have a detailed network diagram; this impinges on the Authority’s ability
to troubleshoot network issues and recover connectivity efficiently during network
outages
• The firewall at AVTA seems to be mis-configured, it allows access to Adult sites and we
also observed an instance when a virus breached the firewall
• The wireless network in AVTA is not secure
We believe that it will be crucial for AVTA to have a detailed network diagram to assist AVTA
in the midst of technology upgrade. We developed a detailed network architecture diagram to
understand the network topology in place at AVTA. The network architecture diagram depicts
how each department and workstations in each office are connected to the servers and the type of
wiring and switches used to connect them. In case of any upgrades/changes demanded, the
network architecture can be used to evaluate the areas where the changes are to be made by
analyzing the hardware/network infrastructure. Also, this activity was undertaken to understand
about any networking issues that AVTA might currently face and potential networking problems
AVTA might face in the light of new systems and applications being implemented.
Further, based on the network analysis RNR Consulting proposes the following:
• AVTA should conduct a detailed network analysis using tools such as:
- Sniffers
- Etherpeek
• AVTA should conduct an analysis to identify and rectify bottlenecks and mis-
configurations in an attempt to optimize network capabilities.
• AVTA should secure its wireless networks with minimum 128 bit encryption.
Application Architecture
LEGEND
Potential Interfaces
Systems Audit
Collective Data
120%
100%
100%
80%
60%
40%
20%
4.34%
0%
Potential Usage Current Usage
Route Match
120%
100%
100%
76.08%
80%
60%
40%
20%
0%
Potential Usage Current Usage
Fuel Force
120%
100%
100%
80%
60%
40%
20% 9.52%
0%
Potential Usage Current Usage
Gap Analysis
Gap Analysis
attendance system
that will meet needs
of agency
3. Implement new time
and attendance
system and related
policies and
procedures
8. Information from GFI Explore the possibility of 1. Review the
system has to be manually interfacing the GFI system functionalities of
inputted into Excel to with the finance software the GFI system
calculate ridership 2. Review the
information. functionality of the
finance system
3. Explore the
possibility of
interface between
the two systems
9. Numerous applications AVTA should strongly 1. Review current
are not interfaced, which consider implementing a application
increases the need for software application architecture
manual and paper-based management initiative that 2. Identify avenues of
processes. is largely based on creating interfaces
integrated systems, which between systems
would reduce the amount of 3. Identify systems that
manual and paper-based can be replaced and
processes. include in IT
Strategic Plan
4. Develop and test
interfaces and select
appropriate systems
5. Implement
interfaces and
systems
10. There is currently no AVTA should implement 1. Conduct a thorough
procedure to track and and maintain a and comprehensive
maintain usage of licenses comprehensive license IT audit,
throughout the authority. management procedure documenting the
number of
applications used
within AVTA
2. Document software
user and number of
licenses
3. Formalize procedure
for in-house license
management
4. Develop a software
library for each
application
including original
installation media,
purchasing
documentation, and
a copy of the license
agreement
5. Develop a software
register
documenting the
title and publisher of
software, number of
licenses owned, date
and acquisition
source of software,
physical location of
computer on which
each copy of
software is installed,
license key and
location of back-up
copies
6. Conduct regular
reviews, test checks
and updates
15. Route Match software Review the canned reports 1. Review the reports
does not provide accurate in the software and ensure module in Route
and reliable reports. As a that the information Match software
result, the paratransit reported is accurate 2. Verify that
manager has to manually information is
create user defined reports. accurate
16. Route Match software Explore the possibility of 1. Work with route
does not allow you to edit customizing the edit match developers to
scheduled paratransit trips scheduled paratransit trips explore the
once they are saved. As a functionality possibility of
result, if there is a request in customizing an edit
change of time, the old functionality
request has to be cancelled 2. Evaluate security
and a new one has to be access and
created. privileges for editing
trips
“SWOT Analysis”
SWOT Analysis
RNR Consulting conducted a SWOT analysis to delineate and identify the various issues that
affect AVTA with reference to Information Technology and infrastructure. We have classified
these into Strengths, Weakness, Opportunities and Threats.
• Strengths (S) – Activities that are efficient in terms of time and/or resources utilization.
• Weaknesses (W) – Activities that are inefficient in terms of time and/or resources utilization.
• Opportunities (O) – Activities that are currently not in practice by AVTA or which are not
emphasized enough. These activities are seen as opportunities for growth, development and
cost-reduction.
• Threats (T) – Activities that are currently not in AVTA’s radar or which are not emphasized
upon; the difference between threats and opportunities being that if threats are not tackled in
the near future, they can definitely affect the smooth functioning of the business. Threats can
be classified as obstacles to the process.
The following is a table of Strengths, Weakness, Opportunities and Threats for AVTA:
SWOT Analysis:
POSITIVE NEGATIVE
Strengths Weaknesses
1. AVTA has one of the best infrastructure facilities 1. There is a lack of expertise in staff both in-house and
and resources. The management recognizes this contracted to exploit the Information Technology
and envisions AVTA as the best transit authority resources of the agency
in the region 2. Inadequate staff training manuals in place to train the
2. Management foresees Information Technology as staff on new softwares and programs
an enabler that will help make AVTA more 3. All the operations are outsourced to MV which gives
efficient and better serve its customers AVTA little control on productivity and quality of
3. AVTA has a very positive work culture composed service
of highly dedicated, motivated, and competent 4. There are no IT policies and procedures set in place
administrators who exhibit a high level of to guide and support IT related activities
camaraderie 5. AVTA should have a HR department in place to
4. The management and staff of AVTA share the make finance department more efficient by
same vision of making AVTA the best transit delegating HR activities to HR department.
authority in the country 6. AVTA has a lot of processes that are driven
5. AVTA is firmly committed to allocating necessary manually despite of the fact that the agency has
resources to develop an IT strategy initiative that adequate technology and resources for automated
will improve the overall efficiencies of AVTA as processes
an institution, which will, in turn, allow AVTA to 7. Lack of license management makes it difficult to
continue to provide superior service track software usage
6. AVTA has a new fleet of buses thus reducing the 8. There is break in processes in most of the processes
cost of maintenance and helps in providing better in all departments
service to the community 9. Many accounting activities are outsourced, and
finance department does not have immediate access
to all information
10. No accountability on the part of the contractor if
there is a break in processes
Opportunities Threats
1. AVTA should make effective and efficient use of 1. No IT policies and procedure set in place to guide
existing hardware and software resources for e.g. work procedures and act as standards to the agency
Route Match, Collective Data and Fuel force 2. Non aligned interests and vision between MV and
2. Implementation of ERP/Agency-wide systems can AVTA
lead to better interfaces and integration. 3. Lack of documented back-up procedures for various
3. Implement new policies and procedures for systems could have an adverse effect on agency
efficient functioning of all departments operations
4. Develop new process procedures to avoid breaks 4. Lack of an effective “filtering” procedure regarding
in processes troubleshooting/ help desk functions increase strain
upon facilities engineer and contract compliance
manager
SWOT Strategy:
TOWS Matrix1
Strengths Weakness
S-O Strategies pursue opportunities that are a good fit to the organizations strengths
S-T Strategies identify ways that the organization can use its strengths to reduce its vulnerability
to external threats
W-T Strategies establish a defensive plan to prevent the organization’s weakness from making it
highly susceptible to external threats
Based on the above Matrix, AVTA should adopt a combination of S-O and S-T strategy. AVTA
should utilize its strengths to leverage on the opportunities available to it to enable all the
departments to function effectively and efficiently. By using the strengths to leverage the
available opportunities, AVTA would indirectly address the threats that it faces currently.
One of the strengths of AVTA is that it has good infrastructure facilities and human resources.
AVTA should utilize this to develop procedures so that existing software applications are used
effectively by all the employees.
With the strong commitment from the management of AVTA to ensure that Information
Technology is an enabler to conduct business rather than a hindrance, AVTA should implement
Agency wide systems that would lead to better interfaces and integration.
1
Reference from Quick MBA- Knowledge to power your business
With the dedicated team AVTA has, an employee should be charged to ensure that the new
policies and procedures developed are properly enforced and followed across all departments.
Benchmarking
Benchmarking
We researched the Federal Transit Administration resource database and based on our past
experiences in the transit industry, chose a random sample of similar sized transit authorities in
terms of fleet size and number of routes served to compare AVTA to other transits in terms of
use of important software applications. In order to compare transit authorities, we compiled a list
of applications that a transit organization should optimally possess to execute organizational
functions. The information technology system(s) of various transits were evaluated on the basis
of whether the transit possessed systems or modules such as financial software, payroll, time and
attendance, human resources, maintenance/inventory (for example, parts, fuel management),
operations/dispatch (for example, fixed route and para-transit), fleet-oriented systems
(intelligence and security systems) and building security systems such as proximity card readers.
This allowed us to then compare AVTA to other transit authorities in terms of the number of
systems utilized. The study highlighted which systems are currently being utilized by these
transit organizations. The benchmarking activity delineates how those transit organizations are
utilizing technology to enable their business processes, what systems or applications they are
using, and illustrates how those applications could be potentially incorporated into the
information technology strategic plan. We asked the selected random samples if they had the
following software applications to capture the areas cited above in order to compare the transit
authorities:
• Maintenance software
• Fixed route software
• Para-transit software
• Fuel tracking software
• Finance software
• HR software
• Payroll software
• Intelligent transit system
The following chart depicts where AVTA stands with respect to other transits in terms of number
applications/software systems utilized and how AVTA compares to other transits in terms of its
goal to be technologically superior in the industry with regard to software applications.
IT Strategy Plan
In
fo
rm
ed
de
ci s
ion
s
En
ha
nc
ed
mo
ra
le
External
`
Internal
Draft for discussion purposes only
Project Duration: The approximate time period from start to finish of the project.
2
Project Name: Re- Implementation of Collective Data Maintenance Application
Priority: A Project Duration: Mar ’05- Apr ‘05
Complexity: M Lead: Maintenance (AVTA)
Project Scope:
Re-Implementing the Collective Data Maintenance Application and effectively training the end
users to use the implemented software.
3
Project Name: Re- Implementation of Collective Data Maintenance Application
Priority: A Project Duration: Mar ’05- Apr ‘05
Complexity: M Lead: Maintenance (AVTA)
4
Project Name: Re- Implementation of Collective Data Maintenance Application
Priority: A Project Duration: Mar ’05- Apr ‘05
Complexity: M Lead: Maintenance (AVTA)
Project Cost:
Software and Training: $15,000
•Will allow the management to accurately track the Miles/Gallon statistic of all the vehicles in
the agency
• Accurately provide information to the management about the when Preventive Maintenance is
due on a vehicle
• Can provide the management with accurate and reliable data for contract compliance
purposes
• Data can be effectively retrieved for CHP audit purposes
• Enhanced worker efficiency and productivity
5
Project Name: Selection & Implementation of Enterprise Resource Planning Software
Priority: A Project Duration: May ’05- Dec ‘05
Complexity: H Lead: Finance (AVTA)
Project Scope:
The project involves selection of a finance application which will aid the Authority in performing the
accounting function directly rather than having to contract with an outside firm. The finance application to be
selected will have a module specifically utilized for allocation accounting and aid in the budgeting process.
The application will also support functions such as payroll , HR and purchasing functions for AVTA.
6
Project Name: Selection & Implementation of Enterprise Resource Planning Software
Priority: A Project Duration: May ’05- Dec ‘05
Complexity: H Lead: Finance (AVTA)
7
Project Name: Selection & Implementation of Enterprise Resource Planning Software
Priority: A Project Duration: May ’05- Dec ‘05
Complexity: H Lead: Finance (AVTA)
Pre-Implementation:
1. Develop project work plan
8
Project Name: Selection & Implementation of Enterprise Resource Planning Software
Priority: A Project Duration: May ’05- Dec ‘05
Complexity: H Lead: Finance (AVTA)
Action Steps:
2. Software:
- Installation
- Set up global parameters
- Define chart of accounts
- Develop GL account codes
- Accounts Payable payment options
- 1099 information
- Set up profiles
- Set up master flags
- Acceptance testing
3. Training:
- Concepts
- Software overview/ Issues identification
- Executive level: Super users,
departmental heads and executive
management
9
Project Name: Selection & Implementation of Enterprise Resource Planning Software
Priority: A Project Duration: May ’05- Dec ‘05
Complexity: H Lead: Finance (AVTA)
Action Steps:
Design:
1. Conduct application training
2. Design pilot script
3. Build files and conduct pilot
4. Design modifications
5. Management review
Rollout:
1. Build/Test interface modifications: Test
interface with maintenance application, fuel
tracking application and Intelligent Transit
System
2. Build/ Test software modifications
3. Conduct integrated pilot
4. Conduct user training: Systems training,
Module and department based training, and
train the trainer sessions
5. Administer user certification tests
6. Convert data
7. Perform post conversion review
10
Project Name: Selection & Implementation of Enterprise Resource Planning Software
Priority: A Project Duration: May ’05- Dec ‘05
Complexity: H Lead: Finance (AVTA)
Project Cost:
Software- $80,000-$120,000
Implementation cost- $150,000-$200,000
Currently, AVTA outsources a variety of its central accounting functions to an external accounting
firm. The cost of the service is approximately $700 per month. After the software is implemented,
the potential cost savings by not outsourcing the accounting functions is approximately $8,400 per
year.
The finance department will also be able to access reports without having to contact the external
accounting company. The new application would also aid the agency in processing payroll.
Total potential cost savings/ year: $ 36,799
11
Project Name: Selection & Implementation of Enterprise Resource Planning Software
Priority: A Project Duration: May ’05- Dec ‘05
Complexity: H Lead: Finance (AVTA)
12
Project Name: Selection and Implementation of Intelligent Transit System
Priority: A Project Duration: Feb ’05- Aug ’05( Phase I)
Complexity: H Lead: Operations (AVTA)
Project Scope:
Project involves selection and implementation of ITS. This includes APC, Annunciators and AVL/CAD. This
will enable AVTA to get accurate passenger counts, ensure that customers get information on stops and aid
dispatch in finding the precise location of the bus, thus improving the efficiency of operations.
13
Project Name: Selection and Implementation of Intelligent Transit System
Priority: A Project Duration: Feb ’05- Aug ’05( Phase I)
Complexity: H Lead: Operations (AVTA)
14
Project Name: Selection and Implementation of Intelligent Transit System
Priority: A Project Duration: Feb ’05- Aug ’05( Phase I)
Complexity: M Lead: Operations (AVTA)
Action Steps:
Contracting
Implementation Considerations:
• Develop negotiations document 1. Ensure ITS interfaces with the fixed route
• Negotiate contract in conjunction with AVTA dispatch software and the paratransit
• Signed ACS Contract dispatch software
2. ITS should be ADA compliant
Conceive and Plan 3. ITS should interface with the ERP application
• Construct ITS design drawings to create invoices for the three modes of
• Develop system integration plan transits
• Define roles and communication plan 4. ITS should interface with maintenance
• Create risk mitigation and contingency plan application to capture road call/ pull out
• Develop “wins” document for FTA information
• Develop project administration plans
• Develop workplans
• Determine system performance measures and
audit controls
Diagnostic
• Develop testing plans
• Execute equipment testing trails at
manufacturer location
15
Project Name: Selection and Implementation of Intelligent Transit System
Priority: A Project Duration: Feb ’05- Aug ’05( Phase I)
Complexity: M Lead: Operations (AVTA)
Action Steps:
Commission
16
Project Name: Selection and Implementation of Intelligent Transit System
Priority: A Project Duration: Feb ’05- Aug ’05( Phase I)
Complexity: M Lead: Operations (AVTA)
Project Cost:
Software and Hardware Cost: $1,500,000 - $2,000,000 (Entire project)
Implementation Cost: $500,000 - $800,000 (Entire project)
17
Project Name: Selection and Implementation of Intelligent Transit System
Priority: A Project Duration: Feb ’05- Aug ’05( Phase I)
Complexity: M Lead: Operations (AVTA)
Implementation of the ITS would provide AVTA other qualitative benefits such as:
18
Project Name: Selection and Implementation of Dispatch Software
Priority: A Project Duration: Feb ’06- Sept ‘06
Complexity: M Lead: Operations (AVTA)
Project Scope:
Selection and implementation of a dispatch software which would aid in development of fixed routes and
assigning bus operator schedules. Furthermore, we will also assess the paratransit dispatch software within
this initiative because Route Match application does not fulfill AVTA’s business needs.
19
Project Name: Selection and Implementation of Dispatch Software
Priority: A Project Duration: Feb ’06- Sept ‘06
Complexity: M Lead: Operations (AVTA)
Pre-Implementation:
1. Finalize project scope
2. Develop project work plan
3. Software:
- Installation and set up of global parameters
- Set up profiles
- Set up master flags
- Acceptance testing
20
Project Name: Selection and Implementation of Dispatch Software
Priority: A Project Duration: Feb ’06- Sept ‘06
Complexity: M Lead: Operations (AVTA)
Action Steps:
• Training:
- Concepts
- Software overview/ Issues identification
- Executive level
5. Data Analysis:
- Collect data
- Verify and clean up data
- Obtain sign-offs on data
- Import data into system
Design:
1. Conduct application training and testing
2. Design pilot script
3. Build files and conduct pilot
4. Design modifications
5. Management review
Roll out:
1. Build/Test software modifications
2. Conduct integrated pilot
3. Conduct user training
4. Administer user certification tests
5. Perform post conversion review
21
Project Name: Selection and Implementation of Dispatch Software
Priority: A Project Duration: Feb ’06- Sept ‘06
Complexity: M Lead: Operations (AVTA)
Project Cost:
Software Costs: $100,000 - $150,000
Implementation Costs: $150,000- $250,000
Designation Time spent on Time to be spent Pay Rate Annual Cost Savings
activity currently yearly on activity (Hourly)
(hours per year) after dispatch software
is implemented
Road Supervisor I 200 Hours 10 Hours $ 15 $ 2,850
22
Project Name: Selection and Implementation of Dispatch Software
Priority: A Project Duration: Feb ’06- Sept ‘06
Complexity: M Lead: Operations (AVTA)
23
Project Name: Selection and Implementation of Time and Attendance System
Priority: A Project Duration: May’05- Sep ‘05
Complexity: M Lead: HR (AVTA)
Project Scope:
Selection and implementation of a time and attendance system to track the attendance of Bus
Operators, Mechanics and Administrative employees, capture labor time, eliminate current manual
and duplicative data entry, and integrate/automate processes across departments
24
Project Name: Selection and Implementation of Time and Attendance System
Priority: A Project Duration: May’05- Sep ‘05
Complexity: M Lead: HR (AVTA)
Pre-Implementation:
1. Develop project work plan
2. Software:
- Install
- Set up global parameters
- Set up profiles
- Set up master flags
- Acceptance testing
3. Training:
- Concepts
- Software overview/ Issues identification
- Executive level
25
Project Name: Selection and Implementation of Time and Attendance System
Priority: A Project Duration: May’05- Sep ‘05
Complexity: M Lead: HR (AVTA)
Action Steps:
5. Data Analysis:
- Collect data
- Verify and clean up data
- Obtain sign-offs on data
- Import data into system
Design:
1. Conduct application training
2. Design pilot script
3. Build files and conduct pilot session
4. Design modifications
5. Management review
Roll out:
1. Build/Test interface modifications
2. Build/Test software modifications
3. Conduct integrated pilot
4. Conduct user training
5. Administer user certification tests
6. Perform post conversion review
26
Project Name: Selection and Implementation of Time and Attendance System
Priority: A Project Duration: May’05- Sep ‘05
Complexity: M Lead: HR (AVTA)
Project Cost:
27
Project Name: Upgrade of Interactive Voice Response System
Priority: A Project Duration: April ’05- May ‘05
Complexity: M Lead: Customer Service (AVTA)
Project Scope:
The project involves the upgrade of the Cisco Interactive Voice Response system. This system will aid the
customer service and paratransit dispatch department in more effectively serving the community.
28
Project Name: Upgrade of Interactive Voice Response System
Priority: A Project Duration: April ’05- May ‘05
Complexity: M Lead: Customer Service (AVTA)
29
Project Name: Upgrade of Interactive Voice Response System
Priority: A Project Duration: April ’05- May ‘05
Complexity: M Lead: Customer Service (AVTA)
30
Project Name: Selection and Implementation of Document Management System
Priority: A Project Duration: Mar ’05- Apr ‘05
Complexity: M Lead: Finance ( AVTA)
Project Scope: Select and implement a document management system which could
automatically scan and maintain all files and documents in a central database and could be
retrieved anytime electronically.
31
Project Name: Selection and Implementation of Document Management System
Priority: A Project Duration: Mar ’05- Apr ‘05
Complexity: M Lead: Finance ( AVTA)
32
Project Name: Selection and Implementation of Document Management System
Priority: A Project Duration: Mar ’05- Apr ‘05
Complexity: M Lead: Finance ( AVTA)
Project Cost:
$ 75,000- $ 100,000 Software Only
The implementation of a document management system would offer qualitative benefits such as:
33
Project Name: Maintenance Application
Priority: B Project Duration: Jan ’07- Aug ’07
Complexity: H Lead: Maintenance (AVTA)
Project Scope:
Review the current Collective Data Maintenance application in conjunction with the needs of AVTA and with
the functionalities a maintenance application should possess. Select and implement a new maintenance
application if the current application does not meet the needs of AVTA.
34
Project Name: Maintenance Application
Priority: B Project Duration: Jan ’07- Aug ’07
Complexity: H Lead: Maintenance (AVTA)
35
Project Name: Maintenance Application
Priority: B Project Duration: Jan ’07- Aug ’07
Complexity: H Lead: Maintenance (AVTA)
36
Project Name: Maintenance Application
Priority: B Project Duration: Jan ’07- Aug ’07
Complexity: H Lead: Maintenance (AVTA)
37
Project Name: Maintenance Application
Priority: B Project Duration: Jan ’07- Aug ’07
Complexity: H Lead: Maintenance (AVTA)
Action Steps:
3. Training:
- Concepts
- Software overview/ Issues identification
- Executive level
4. Data Analysis:
- Begin data clean-up activities
Design:
1. Conduct application training
2. Design pilot script
3. Build files and conduct pilot session
4. Design modifications
5. Management review
Rollout:
1. Build/ Test interface modifications: Test
interface with fuel tracking system, ERP
application and Intelligent Transit System
38
Project Name: Maintenance Application
Priority: B Project Duration: Jan ’07- Aug ’07
Complexity: H Lead: Maintenance (AVTA)
Action Steps:
2. Build/ Test software modifications
3. Conduct integrated pilot
4. Conduct user training: Super user training,
train the trainer approach, systems training
5. Administer user certification tests
6. Convert data
7. Perform post conversion review
39
Project Name: Maintenance Application
Priority: B Project Duration: Jan ’07- Aug ’07
Complexity: H Lead: Maintenance (AVTA)
Cost:
Software: $100,000- $125,000 (Includes interface with financial and fuel tracking systems)
Implementation Costs: $175,000-$225,000
The maintenance clerk I currently spends four hours per day inputting mileage information and work
order information in Excel spreadsheets. If an maintenance application is utilized, manual entry of data
would be eliminated and the approximate cost savings would be $11,287/year.
40
Project Name: Maintenance Application
Priority: B Project Duration: Jan ’07- Aug ’07
Complexity: H Lead: Maintenance (AVTA)
The current average inventory stock level is approximately $417,000. Currently, parts are ordered based
on the judgment of the parts manager and not based on Economic Order Quantity or a pre-set re-order
level. An inventory management system could potentially help maintain the average stock level at a
minimum of 40% of the current cost. This would save approximately at least $292,000 a year in inventory
costs.
The other benefits that would accrue to the agency by implementing a maintenance application include:
•Reduced stock out of parts
•Maintaining buses on the road
41
Project Name: Maintenance Application
Priority: B Project Duration: Jan ’07- Aug ’07
Complexity: H Lead: Maintenance (AVTA)
42
Project Name: Selection and Implementation of Training Simulator
Priority: C Project Duration: Sept ’07- Jan ‘08
Complexity: M Lead: Safety and Training (AVTA)
Project Scope:
Implementing a training simulator and creating a virtual classroom with a high level of “event modeling” that
simulates the actual sights, sounds, and motions that are the equivalent of those experienced in the actual
operation of buses.
43
Project Name: Selection and Implementation of Training Simulator
Priority: C Project Duration: Sept ’07- Jan ‘08
Complexity: M Lead: Safety and Training (AVTA)
System Selection:
1. Determine evaluation criteria
2. Develop RFP and vendor information packet
3. Determine training requirements
4. Quantitative and qualitative cost benefit
analysis
5. Address change management issues
6. Selection of new system
Pre-Implementation:
1. Develop project work plan
2. Software:
- Install
- Set up global parameters
- Set up profiles
- Acceptance testing
44
Project Name: Selection and Implementation of Training Simulator
Priority: C Project Duration: Sept ’07- Jan ‘08
Complexity: M Lead: Safety and Training (AVTA)
Action Steps:
4. Training:
- Concepts
- Software overview/ Issues identification
- Executive level
5. Data Analysis:
- Collect data
- Verify and clean up data
- Obtain sign-offs on data
- Import data into system
Design:
1. Conduct application training
2. Design pilot script
3. Build files and conduct pilot session
4. Design modifications
5. Management review
Roll out:
1. Build/Test software modifications
2. Conduct integrated pilot
3. Conduct user training
4. Administer user certification tests
5. Convert data
6. Perform post conversion review
45
Project Name: Selection and Implementation of Training Simulator
Priority: C Project Duration: Sept ’07- Jan ‘08
Complexity: M Lead: Safety and Training (AVTA)
Project Cost:
$ 400,000- $ 475,000
The implementation of a training simulator would offer qualitative benefits such as:
•The training cost per student will reduce as much as 40%
•Reduced insurance costs due to reduction in liability exposure
•Reduced maintenance costs since learners/operators spend less time in actual vehicles
•Reduced accident rates and accident damages and reduced vehicle repairs
•Reduced capital investment for vehicles
•Reduced fuel usage
•The new system will reduce the number of training days when compared to actual on the road
training
•Student and instructor time can be scheduled more efficiently
- End of Report -