1. Operator: Perform audit daily for 1 week and document any findings and corrections made below. 4. Production Manager: Perform the Layer 3 audit once during the month.
2. Supervisor: Perform the Layer 2 audit once per week 5. Production Manager: See the QA manager for any nonconformances listed.
3. Supervisor: Document any findings and corrections made below. 6. QA Manager: Issue CAR’s to the Production Manager as required based on the 3 audits performed.
Should Be →
1. Process Parameter #1 (Pressure,
Load, Time, Temp, etc.) Actual →
Should Be →
3. Process Parameter #2 (Pressure,
Load, Time, Temp, etc.) Actual →
Should Be →
5. Process Parameter #3 (Pressure,
Load, Time, Temp, etc.) Actual →
Should Be →
7. Process Parameter #4 (Pressure,
Load, Time, Temp, etc.) Actual →
Should Be →
9. Process Parameter #5 (Pressure,
Load, Time, Temp, etc.) Actual →