SECTION: N2-S6
SUBJECT: Micropiling to Anak Bukit Station
BOQ
Item Description Unit Quantity Rate
(RM)
1.7 Dewatering and keeping site dry and maintain site L.S 1.00
cleanliness
BOQ
Item Description Unit Quantity Rate
(RM)
2 200MM Ø MICROPILE
** bored hole of 200mm dia, ms casing of 178mm
internal diameter.
2.2 Exrta for internal mob & idling time on slope L.S 1.00
2.2 bore vertical hole for whatever soil stara lin.m 300.00 65
(200mm diameter hole)
2.3 Extra over for boring vertical thtough rock lin.m Rate Only 350
2.5 Temporary / Permanent casing, 178mm internal diasq.m Rate Only 300
CARRIED TO COLLECTION
PROJECT: ELECTRIFIED DOUBLE TRACK PROJECT - IPOH TO PADANG BESAR
SECTION: N2-S6
SUBJECT: Micropiling to Anak Bukit Station
BOQ
Item Description Unit Quantity Rate
(RM)
COLLECTION :-
2- 200 Ø MICROPILE
PROJECT: ELECTRIFIED DOUBLE TRACK PROJECT - IPOH TO PADANG BESAR
SECTION: N2-S6
SUBJECT: Micropiling to Anak Bukit Station
TOTAL
PROJECT: ELECTRIFIED DOUBLE TRACK PROJECT - IPOH TO PADANG BESAR
SECTION: N2-S6
SUBJECT: Micropiling to Anak Bukit Station
BOQ
Amount
7,020
2,000
1,000
2,000
4,500
3,000
4,500
3,000
5,000
PROJECT: ELECTRIFIED DOUBLE TRACK PROJECT - IPOH TO PADANG BESAR
SECTION: N2-S6
SUBJECT: Micropiling to Anak Bukit Station
32,020
BOQ
Amount
15,000
5,000
19,500
40,500
30,000
4,500
900
115,400
PROJECT: ELECTRIFIED DOUBLE TRACK PROJECT - IPOH TO PADANG BESAR
SECTION: N2-S6
SUBJECT: Micropiling to Anak Bukit Station
BOQ
Amount
PROJECT: ELECTRIFIED DOUBLE TRACK PROJECT - IPOH TO PADANG BESAR
SECTION: N2-S6
SUBJECT: Micropiling to Anak Bukit Station
147,420