Essar PMS Process My Performance Tracker

Status In Planning
Appraisers S E Lokhandwala
Employee Ashit Modi
Part Appraiser SUBBA RAO NAMALA Higher-Level Manager
S E Lokhandwala Manager
Ashit Modi Self (Employee)
Further Participants
Appraisal Cycle for the year Apr 1, 2010 To Mar 31, 2011
Execution Period Apr 1, 2010 To Dec 31, 2011
Objective Setting Date Aug 7, 2010
Review Date
My Performance Tracker

1 SAFETY

1.1 Adopting work procedure as per safety norms

Note Employee to describe above KPI: PC

Stenghtn safety awarness job safety training competence monitaring and pro-active communication for effective
opearatinal control toolbox talk and reporting to nearmisses

Timelines (By When) (*) Quarter 4

2 Site execution at Plate Mill area

2.1 Mat lab at Plate Mill

Note Employee to describe above KPI: PC

water proofing 4000 Sq.ft


flooring (Granite /Morbi /glazed) 6500 Sq.ft
false ceilling 3000 Sq.Ft
painting 10000 Sq.Ft
Door/window/partition 1500 Sq.Ft
Stuctural Galzing with ACP 1500 Sq.Ft
Toilet Block No.1
wooden type furniture table 400 Sq.Ft
Timelines (By When) (*) Quarter 1

2.2 ECR 4 ,ECR 2,ECR 5 and hot leveller cellar

Note Employee to describe above KPI: PC

Flooring (Granite /Kota/Galze ) 10000 SqFt


painting 1500 Sq.Ft
Door/window/partition 500 Sq.Ft
woodden type furniture table 200 Sq Ft

Timelines (By When) (*) Quarter 1

2.3 5CS Pulpit

Note Employee to describe above KPI: PC

Flooring (Granite ) 1000 Sq.ft


false ceilling 700 Sq.Ft
painting 500 Sq.Ft
Door/window/partition 800 Sq.Ft
ACP work 600 Sq.Ft

Timelines (By When) (*) Quarter 1


3 Site execution at SMP area

3.1 LBSS 1,LBSS 2,LBSS 4

Note Employee to describe above KPI: PC

water proofing 50000 Sq.ft


flooring (Granite /Kota/Glaze ) 20000 Sq.ft
false ceilling 31000 Sq.Ft
painting 55000 Sq.Ft
Door/window/partition 1000 Sq.Ft
Toilet Block No.6

Timelines (By When) (*) Quarter 1

3.2 LBSS 4,LBSS 2,RMIM Lab,Transformer bldg1,Tunnel furnace,CWPH ECR 1,Firefighting

Note Employee to describe above KPI: PC

water proofing 5000 Sq.ft


flooring (Granite/Kota ) 9500 Sq.ft
false ceilling 10000 Sq.Ft
painting 60000 Sq.Ft
Door/window/partition 6000 Sq.Ft
Stuctural Galzing 2000 Sq.Ft
false Flooring 4000 Sq.ft

Timelines (By When) (*) Quarter 2

3.3 INI Caster,LCSS 5,STOD bldg,Fire Safety,HMPS and CSP Caster

Note Employee to describe above KPI: PC

water proofing 4000 Sq.ft


flooring (Granite /Morbi/Kota ) 40000 Sq.ft
false ceilling 24000 Sq.Ft
painting 70000 Sq.Ft
Door/window/partition 14500 Sq.Ft
Toilet Block No.6

Timelines (By When) (*) Quarter 2

3.4 Conarc 1 (Control Room,ECR, Analyser,RIO,LF 1.1 & 1.2 )

Note Employee to describe above KPI: PC

water proofing 700 Sq.ft


flooring (Granite /Glaze/Kota ) 6500 Sq.ft
false ceilling 9000 Sq.Ft
painting 15000 Sq.Ft
Door/window/partition 3000 Sq.Ft
Elevation work with ACP 7000 Sq.Ft
False Flooring 8000 Sq.ft

Timelines (By When) (*) Quarter 2

3.5 LBSS 1,LBSS 2,tunnel Furnace,CSP Caster,Conarc 1 (Valve room 1 & 2 ),FinFan 1
Note Employee to describe above KPI: PC

water proofing 13000 Sq.ft


flooring (Granite /Morbi/Kota ) 12500 Sq.ft
false ceilling 18000 Sq.Ft
painting 30000 Sq.Ft
Door/window/partition 3500 Sq.Ft
Stuctural Galzing with ACP 3000 Sq.Ft
False Flooring 5000 Sq.ft
Toilet Block No.2
Timelines (By When) (*) Quarter 3

3.6 CSP Caster & Hydraulic room,CWPH ECR2,Chiller Plant,Chemical House 2 and LBSS 3

Note Employee to describe above KPI: PC

water proofing 12000 Sq.ft


flooring (Granite /Morbi/Kota ) 25000 Sq.ft
false ceilling 14000 Sq.Ft
painting 40000 Sq.Ft
Door/window/partition 6000 Sq.Ft
Toilet Block No.1

Timelines (By When) (*) Quarter 3

3.7 FM & DC Pulpit

Note Employee to describe above KPI: PC

water proofing 300 Sq.ft


flooring (Granite /Morbi ) 5000 Sq.ft
false ceilling 3000 Sq.Ft
painting 6000 Sq.Ft
Door/window/partition 6000 Sq.Ft
Toilet Block No.2
ACP work 10000 Sq.Ft
M.S & S.S cladding 10000 Sq.Ft
false flooring 6000 Sq.Ft
s.s. railing 600 R.Ft
Timelines (By When) (*) Quarter 3

3.8 Conarc 2,CSP Caster Controll room ,FES ECR 2,Transfromer bldg 2&3,Finfan coller2

Note Employee to describe above KPI: PC

water proofing 9000 Sq.ft


flooring (Granite /Morbi /Kota) 20000 Sq.ft
false ceilling 26000 Sq.Ft
painting 90000 Sq.Ft
Door/window/partition 5000 Sq.Ft
elevation work with ACP work 10000 Sq.ft
Toilet Block No.3
False Flooring 5000 Sq.Ft
Timelines (By When) (*) Quarter 4

3.9 CSP Mill,QA/QC Lab,Chemical House 1,compressor house 1


Note Employee to describe above KPI: PC

water proofing 50000 Sq.ft


flooring (Granite /Morbi/Kota/Glaze ) 105000 Sq.ft
false ceilling 45000 Sq.Ft
painting 67000 Sq.Ft
Door/window/partition 21000 Sq.Ft
Stuctural Galzing 5000 Sq.Ft
Toilet Block No.3
False Flooring 2500 Sq.ft
Timelines (By When) (*) Quarter 4

4 Site Execution work at Lime Plant Area

4.1 RMHS ECR 1,Blower House 6

Note Employee to describe above KPI: PC

water proofing 4000 Sq.ft


flooring (Granite /Morbi/Kota ) 15500 Sq.ft
false ceilling 18000 Sq.Ft
painting 50000 Sq.Ft
Door/window/partition 3000 Sq.Ft
Stuctural Galzing 1000 Sq.Ft

Timelines (By When) (*) Quarter 2

4.2 Blower House 5

Note Employee to describe above KPI: PC

water proofing 4000 Sq.ft


flooring (Granite /Morbi ) 3500 Sq.ft
false ceilling 4000 Sq.Ft
painting 18000 Sq.Ft
Door/window/partition 600 Sq.Ft

Timelines (By When) (*) Quarter 3

5 Site Execution At Corex /Corex area

5.1 Stock house Pulpit A & B -Corex Tower 2

Note Employee to describe above KPI: PC

wall Cladding 200 Sq.Ft


Painting work 1000 Sq.Ft
False ceilling 500 Sq.Ft
ACP work 700 Sq.Ft

Timelines (By When) (*) Quarter 2

5.2 Corex Tower 1

Note Employee to describe above KPI: PC

false ceilling 2500 Sq.Ft


false Flooring 2500 Sq.ft
Painting 1000 Sq.ft
Door/window /partition 1000 Sq.Ft

Timelines (By When) (*) Quarter 4

5.3 Cast House Pulpit A &B/corex tower 1


Note Employee to describe above KPI: PC

False Flooring 1500 Sq.Ft


False celiing 1500 Sq.Ft
Painting 1200 Sq.Ft
Flooring 900 Sq.Ft
Wall cladding 2000 Sq.Ft
ACP work 800 Sq.ft
Door/window/partition 1000 Sq.Ft

Timelines (By When) (*) Quarter 4

6 Essar Capabilities

6.1 Entrepreneurial Orientation

Note Comments by Emp. on this Capability

INNOVATION

6.2 Project Management

Note Comments by Emp. on this Capability

GETTING RESULT

6.3 Operational Excellance

Note Comments by Emp. on this Capability

FLEXIBILITY

6.4 Negotiation

Note Comments by Emp. on this Capability

INFLUENCING OTHERS

6.5 Customer Focus

Note Comments by Emp. on this Capability

PRIORITIES ON CUSTOMER NEED

6.6 Nurturing

Note Comments by Emp. on this Capability

CONTINEOUS LEARNING

7 Billing & Quantity survey

7.1 Billing work & estimate work quantity.

Note Employee to describe above KPI: PC

prepare contractor`s monthly bills as per work progress & prepare quantity survey for making P.R/workorder

Timelines (By When) (*) Quarter 4