Vous êtes sur la page 1sur 5

SHREE MADHAV INSTITUTE OF COMPUTER

INFORMATION & TECHNOLOGY,


PANDESARA.

VEER NARMAD SOUTH GUJARAT UNIVERSITY,


SURAT.

PROJECT REPORT

ON

ONLINE REAL ESTATE PORTAL USING GOOGLE MAP

AS A PARTIAL REQUIREMENT FOR THE DEGREE

OF

BACHELOR OF COMPUTER APPLICATION


(B.C.A.)

SUBMITTED BY: GUIDED BY:


Dhameliya Meghdoot D. Miss.Kavita Ahuja
Mendpara Sagar P. Mr.Narendra Patel

::: ORGANIZATION :::


.NET EXPERT WEB SOLUTIONS
FF14, First Floor,
Emperor Building,
Fatehgunj, Vadodara
Ph No (M): 9898163779, 9638271222
ACKNOWLEDGEMENT
When I reach the completion of the Project giving Credit becomes a
must, as without the support of other so many People’s help and guidance, this project
could not be completed successfully.

First I would like to thank my Parents, with their great support I can reach
at this stage. Then my humble thanks to all professors and all staff members of our
college “Shree Madhav Institute of Computer Information & Technology, Pandesara”
for the co-operation and keep interest extended by them, throughout my degree course. It
is the base that they have built, which sustains such good jobs.

I would like to thank the Owner of .Dot Net Expert Web Solution, Mr.
Bhavin Rana for granting us an opportunity to work on this project. We would also like
to thank him to be our External guide for helping us lot through this beginning. He has
extended her full co-operation and has trained us through the whole process of software
development.

At the outset, I express my sincere thank and gratitude to Miss. Kavita


Ahuja, our internal guide for her valuable personal guidance towards developing of our
“Online Real Estate Portal Using Google Map” web Application.

Last but not least, our heartfelt appreciation goes to all those not named
here, but who have rendered their co-operation, little or more, directly or indirectly in
the course of development of this system & preparation of this document.

Thanking All.

Dhameliya Meghdoot D.
Mendpara Sagar P.
PREFACE
Before taking the project work for foundation, it is quit necessary to
have an exact idea the work “PROJECT”. The project consists of seven letters. Each
letters has its own significance as follow.

‘P’ - Stands for PLANNING

Planning is the word with idea of work proposed to be done as a fact;


any work without planning is just like a ship without the radar and compass.

‘R’ – Implies RESOURSED

Resources are the means which guide to promote the function of the
plant, without suitable resources, a project can not work satisfactorily. There
must be all necessary resources in order to maintain good project work.

‘O’ – Denotes OPERATION

Operation is actually all the types of works which are promoted by the
Worker to complete the project.

‘J’- Stands for JOINT EFFROTS

It means that combine efforts of worker and other staff to complete the
work.

‘E’ – Denotes ENGINEERING FUNCTION

Both the bodies i.e. Planning and engineering bodies work together with
engineers through there techniques for good production. All technical work is
based on engineering function so it is very important. .

‘C’ – Signifies COMMUNICATION

For execution of plan, the communication is very necessary. The


material required for project work can be brought when proper communication
is available.

‘T’ – Symbolizes TASK OF WORKING

Task of working is co-operation of the working body and control


working body.
As a matter of fact, the work ‘PROJECT’ is used specially for
construction purpose.

A project is neither a Physical objective, nor it is the result. It has


Something to do with going on between. A project is a combination of human and non
human resources pooled together in temporary organization to achieve the specific
purpose.
Change is an essence of life and this applies to information
technology too. Keeping in pace with the current market requirements is the major
challenge computer word is facing. The need of the business world is to organize the
data.
Just to decades back all the development in the world was
determined by the electrical and electronic technocrats. Now the situation has changed
sharply and decisively. Now a day it is the computer professionals who are holding the
key to development. These people are involved in the development of new models from
bicycles to lanching of space shutters.
INDEX
PAGE NO.
(From-To)

1. Introduction
Project Profile…………………………………………………….………1
Company Profile…………………………………………………….……3
2. Environment Description
Hardware and Software Requirements…………………………………...5
Technology Used…………………………………..……………………..6
3. Existing System
System Components………………………………..……………...……19
Drawbacks of Existing System……………………..………………...…20
4. System Planning
Feasibility Study……………………..………………………………….23
Requirements Analysis and Data Gathering………………..…………...25
5. Proposed System
Scope……………………..……………..………………………………27
Objectives……………………..…………..…………………………….28
Constraints……………………..…………..……………………………29
Expected Advantages…………..…………..…………………………...30
Benefits………………………………………………………………….32
Module………………………………………………………………….33
6. Detail Planning
Data Flow Diagram…………..…………….…………………………...39
Process Specification………..………………..…………………………53
Data Dictionary…………..……………………..………………………60
Entity-Relationship Diagram……………………..……………………..62
7. System Design
Database Design……………………..………………………………….65
Directory Structure……………………………………………………...71
Input Design…………………………………………………………….76
8. Application Testing……..………………………………………...101
9. Limitations and System Enhancement………………..………...116
10. References……………………………………………..….............119

Vous aimerez peut-être aussi