TO GACHIE SHOPPING CENTRE (ABOUT 500m FROM JUNCTION) TO UNEP JUNCTION (ABOUT 2KM) GENERAL NOTES
68,260 Nairobi Block 94/236 1.01 All work to be carried out in accordance with local
r v e
3,700 835 7,050 2,915 3,600 225 3,600 3,600 3,600 3,600 3,600 225 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,600 3,045 Nyari
Nairobi Block 94/237 Police council regulations.
2,400
p.v
Laundry
Post 1.02 All figure dimensions to be taken in preference to
e
2,475
g.t
NORTH DIRECTION
3,705
p.v
I.C s.v.p
00
p.v
p.v g.t I.C I.C
3,6
r v
p.v p.v
Screen wall to details scaled dimensions.
r e s e
Cook Area
p.v
p.v
Nairobi Block 94/206
p.v
Yard
7,550
1.03 All dimensions to be approved on site and setting
2,500
Laundry
Kitchen/Laundry Yard
p.v p.v p.v
e
Kitchen
00
Dining room
3,600
p.v
out approved by the Architect.
3,6
p.v
Screen wall
s
Fridge
2,500
to details Kitchen Store
1.04 No trees to be cut down without the prior consent
p.v
p.v
r e
p.v
g.t
I.C
9,690
00
3,200 3,200 3,200 Nairobi Block 94/207 of the Architect.
3,6
3,600
d
Foyer
23,600
240 0
p.v
Terrace
28, 3,60
p.v
a
ceramic tiles floor finish
r o
g.t
Nairobi Block 94/208
(DPM) under ground floor slabs.
p.v
I.C I.C Septic tank I.C I.C
00
2,100 I.C
3,6
s.v.p
150 1,800 150
I.C 1.07 Provide approved damp proof course (DPC)
e
R 1,250
w i d e
4,225
00
i d
house Terrace
Nairobi Block 94/328
3,6
Bath
1.08 All walls below 200mm to be reinforced with whoop
R 1,200 p.v
w
p.v
p.v s.v.p Nairobi Block 94/319
Terrace
00
p.v g.t
3,635
3,600
1,100
3,6
Steel gate to details I.C I.C I.C 1.09 All reinforced concrete works to be in accordance
1,105
m
with S.E‘s details.
2,400
40
Nairobi Block 94/210
1 2 m
3,0
1.10 Permanent ventilation (PV) to be provided as
0
1,185 3,600 3,600 3,600 3,600 3,600 225 3,600 3,600 3,600 3,600 3,600 225 3,600 3,600 3,600 3,600 3,700 82,1
indicated in drawings.
80
6
40
26,4
55,920 SITE FOR THE
1.11 All sanitary installations to be in accordance with
SITE LAYOUT PLAN Nairobi Block 94/91 PROPOSED Nairobi Block 94/327
68,2
MOH regulations.
00
DEVELOPMENT 60
23,6
0
,76
31
Nairobi Block 94/328 1.12 All plumbing and drainage works to be carried out
0
,24
55,9
20 28
in accordance with M.E’s details.
300 750
750
1,200
walling to details
chambers, ICs, in drives.
Cement render to SITE LOCATION PLAN (Scale 1: 1,750) 1.16 Water meters to be at least 300mm above the
concrete work to
details ground level.
d.o.s
Boundary Wall Part Elevation
200 3,400 200 3,400 200 200 3,400 200 3,400 200 FIRE NOTES
200
600
Sectional Elavation 2.01 Provide 1130 litres dedicated water storage
tank and a booster pump
2.02 Provide 1 No: hydraulic hosereel with spray/jet
Boundary Wall Part Plan nozzle on each floor
8mm O DISTR. BARS AT 200mm CENTRES
12mm O MAIN BARS AT 300mm CENTRES
2.03 Provide emegency lighting with independent
450X600mm MANHOLE 8mm O MAIN BAR AT
COVER AND FRAME 300mm C/C 450X600mm MANHOLE power supply
120
INLET MANHOLE
PERSONS at each hosereel point
350
300 1360 UPTO TO 10 400 300 1300 2200 700 900 1360
100
IL 600 2720 11-20 750 600 1350 2900 900 1100 2720
250
250
WATER LEVEL 900 4080 21-30 900 750 1350 3200 1100 1200 4080
150
TWL
1200 5440 31-40 900 850 1350 3300 1300 1300 5440
1500 6800 41-50 1000 950 1350 3500 1400 1400 6800
150
150
500
550
BLOCK WORK
200mm THK
PROPOSED RESIDENTIAL HOUSE AT NYARI
1,400
BLOCK WORK
NOTES
12mm WATER PROOF
CEMENT -SAND RENDERING AREA ON PLOT No: NAIROBI BLOCK 94/328
12mm WATER PROOF CEMENT-
12mm WATER PROOF
CEMENT-SAND PLASTER
1. CONCRETE TO BE 1:2;3 3/4" GRADED AND TO BE ACCORDING FOR Mr. MAHMOOD MAWJI & Mrs. RAHEEL
SAND PLASTER TO GENERAL SPECIFICATION. MAWJI IN NAIROBI DISTRICT
2. REINFORCEMENT TO BE MILD STEEL TO BS 785.
150
SECTION Y-Y
400
COMPACTED MURRAM
E
1000 C/C
200
TO FRENCH DRAIN OR
A B C
SOAK PIT AS SPECIFIED POLYTHENE SHEET OR
ANY OTHER APPROVED Site/Location plan
MATERIAL
'H' Varries
P.N.M
150mm THK STONE
12mm O MAIN BARS
P.N.M
150
600
'H' DEPTH OF SOAK PIT AS SPECIFIED
OR DIRECTED BY DRAWING
6" PERFORATED CLAY OR
PITCH FIBRE PIPES 600mm
Checked: M. N. Approved: M. N
LONG WITH 50mm OPEN JOINTS
JUNE, 2009
150 600 200
Y-Y Date:
D
1:200,1:20 & 1:1,750
PLAN WITH COVER SLAB REINFORCEMENT SOAK PIT DETAIL FRENCH DRAIN DETAIL SCALE/S:
JOB No.:
PNM(B)6-09 DRG. No.: Sheet 2 of 2