Vous êtes sur la page 1sur 28

A New Gold Producer in Malaysia

TSXV: MMY FSE: D7Q1

Executing the Next Stage of Growth


November 2010
Cautionary Statement
TSXV: MMY FSE: D7Q1

This presentation includes certain estimates, projections and “forward


looking statements” within the meaning of Section 21E of the Securities
Exchange Act of 1934, as amended that have been provided by the Company
with respect to its anticipated future performance. Such forward looking
statements reflect various assumptions by the Company concerning
anticipated results, which assumptions may or may not prove to be correct.
No representations are made as to the accuracy of such statements,
estimates or projections. These forward-looking statements are made
pursuant to the “safe harbor” provisions of the Private Securities Litigation
Reform Act of 1995. While these statements are made to convey the
Company's progress, business opportunities and growth prospects, such
forward-looking statements represent management's opinion. Whereas
management believes such representations to be true and accurate based on
information and data available to the Company at this time, actual results
may differ materially from those described. The Company's operations and
business prospects are always subject to risks and uncertainties.

www.monumentmining.com 2
The Company
TSXV: MMY FSE: D7Q1

 Focused on gold production and exploration


operating in Pahang State in the Central Gold Belt
District in Malaysia

 Proven Mine Builders

 Three projects, 100% owned:


 Selinsing Mine
 Damar Buffalo Reef
 Famehub

 Established platform for Future Growth


 Low cost gold production at 100% Selinsing Gold Property
 Additional reserves at 100% owned Damar Buffalo Reef
 Years of gold exploration ahead at large Famehub land
package
 Attractive valuation

www.monumentmining.com 3
Capital Structure
TSXV: MMY FSE: D7Q1
Shares Outstanding: 171.2 M
Warrants: 82.8 M
Options: 24.9M
Convertible Note Shares: 20.0 M
Convertible Note Warrants: 20.0 M
Fully Diluted: 318.9 M
Share Price (November 11, 2010): $0.65
52 Week High/Low: $0.70 / 0.235
Market Capitalization: $111.28 M
Convertible Notes: $8.00 M
Insiders: 11%

Major Shareholders
Orifer S.A.
Wira Mas Trust (Selinsing Gold Project Original Vendors)
European Investors Group

www.monumentmining.com 4
Malaysia
TSXV: MMY FSE: D7Q1

 Government: Federal Parliamentary democracy with a constitutional


monarchy

 Population (2009): 28.3 million

 Annual Growth Rate: 2%

 Nominal GDP (2009): $191.5 billion


 Annual real GDP growth rate: 5.9% (2006); 6.3% (2007); 4.6% (2008); - 1.7% (2009)
 Nominal per capita income (GNI): $6,897

 Workforce (10.89 million, 2007):


 Services: 57%
 Industry: 28% (Manufacturing: 19%; Mining and Construction: 9%; agriculture: 15%)

(Source: Wikipedia)

www.monumentmining.com 5
Land Position
TSXV: MMY FSE: D7Q1

 100% owned Selinsing


& Damar Buffalo Reef
properties totaling
over 2,000 acres along
a 4.5 km strike zone

 100% owned Famehub


land package totalling
32,000 acres to the
North and East of the
Selinsing mine site

www.monumentmining.com 6
Malaysia Geological Survey
TSXV: MMY FSE: D7Q1

 Selinsing has secured a partnership with Australian University Geology


Department to fully fund a program in which they will survey the country
for large metal deposits

 Once this survey is complete, the data will be compiled into a


comprehensive database/report and donated to the Malaysian
Government and kept private for three years, before becoming public data

 The company being the sponsor of this program will be in a position of


advance knowledge regarding results and seek to secure and increase an
appropriate land tenure position

www.monumentmining.com 7
Management Team
TSXV: MMY FSE: D7Q1

 Robert Baldock – President & CEO


25 years of experiences of raising equity and mining project finance, directing mining project development and mill
construction.

 Cathy Zhai – CFO, Corporate Secretary & VP Corporate Finance


13 years experience with publicly listed companies at CFO’s capacity or equivalent in corporate finance, public reporting and
business strategic planning.

 Kevin Wright – Project Mining Engineer and General Manager


33 years experience in designing, building and managing safe, profitable mines.

 Zaidi Harun – VP Exploration


15 years of exploration experiences, 8 years at Selinsing Gold project.

 Scott Ladd – VP Business Development


15 years of mining company experience with Kinross Gold, Vale Inco, Grande Cache Coal and Hudson Bay Mining and
Smelting.

 Charlie Northfield – Processing Manager


A hands on Mineral Processing Engineer with 30 years broad experience throughout the mining industry in gold, metal
sulphides and oxides in addition to industrial minerals processing.

www.monumentmining.com 8
Selinsing Gold Mine
TSXV: MMY FSE: D7Q1

Team over 150 at the Mine Site

www.monumentmining.com 9
Selinsing Cross Section
(First Pit)
TSXV: MMY FSE: D7Q1

www.monumentmining.com 10
Selinsing Deposit
TSXV: MMY FSE: D7Q1

Resource Tonnes Grade (g/t) Oz/Au Oxide Sulphide


Indicated 4.82 M 1.49 230,000 134,000 96,000
Inferred 10.32 M 1.17 388,000 20,000 368,000

 First Gold Pour – October 2009  Recovery rate ranged between 92% -
95% over both oxide & sulphide
 Commercial Production announced in material
September 2010
 Cash cost estimated at U$317 for
 400,000 tonnes/year plant initial year

 40,000 oz/Au year capacity  First pit estimated 5-year mine life

 Mill Upgrade planned: 75,000 – 100,000 oz  Currently drilling for further


Au resources at Selinsing property

www.monumentmining.com 11
Proven Mine Builders
TSXV: MMY FSE: D7Q1

Selinsing Gold Mine Project:

 From greenfield acquisition to First Gold Pour


 28 Months

 Complete Plant Construction


 24 months

 Low Capital Expenditure


 $20 Million

 Gravity Circuit in Production


 January 2010

 Full Commercial Production Zaidi Harun (VP Exploration),Kevin Wright (Project Mining Engineer & GM), and
Jimee Shah (Selinsing Gold Mine Manager Sdn Bhd)
 September 2010

www.monumentmining.com 12
Selinsing Open Pit
TSXV: MMY FSE: D7Q1

Open Pit – June 2007

Open Pit – June 2010

www.monumentmining.com 13
Selinsing Plant
TSXV: MMY FSE: D7Q1

Plant Site – June 2007

Plant Site – June 2010

www.monumentmining.com 14
The Production Process
TSXV: MMY FSE: D7Q1

Trucking ore to the plant

Gold bar Treatment Plant

Gold Pour Crusher

Processing Facilities

www.monumentmining.com 15
Production Data 2009
TSXV: MMY FSE: D7Q1

Q1 Q2 Q3 Q4 Total
Ore Mined (tons) 69,524 165,823 229,495 197,488 662,330
Ore Processed (tons) 3,524 82,828 95,022 90,746 272,120
Ore Stockpiled (tons) 64,533 145,034 280,737 387,545 387,545

Q1 Q2 Q3 Q4 Total
Gold produced (oz) - 1,400 4,127 8,266 13,793
Gold Sold (oz) - 660 3,716 9,417 13,793
Cash Cost/oz (US$/oz) - 371 234 198 226

www.monumentmining.com 16
Future Cash Flow Estimates
TSXV: MMY FSE: D7Q1

Financial Overview US$


US$1,000 Gold *

In US$ millions 2009 2010 2011 2012 2013 2014 Total Project
Cash Injection 18.30 - - - - - 18.30
Revenue - 29.60 47.60 33.50 39.90 38.40 189.00
Total Cash Inward 18.30 29.60 47.60 33.50 39.90 38.40 207.30
Total Expenses 17.80 15.60 17.10 16.60 16.80 10.80 94.70
Surplus Cash 0.50 14.00 30.50 16.90 23.10 27.60 112.60
NPV (discounted @ 10%): 84
IRR: 104%
Low Malaysian Operating costs:
Average cash cost per ounce: US$317/oz
Labour: Approx. 25% of Australian or Canadian rates allowing for a 2:1 efficiency factor.
Contractors: Hourly rate for 30 ton pull CAT excavator with driver and fully maintained is under US$20/per hour
* At $1,400 gold the surplus would increase to $176.0 Million.

www.monumentmining.com 17
Grand Opening Ceremony
October 25, 2010
TSXV: MMY FSE: D7Q1

 Selinsing Gold Mine Opening


Ceremony was officiated by
the Chief Minister of Pahang
State Dato’ Sri Di Raja Yang
Amat Berhormat Dato Sri Hji
Adnan Bin Hji Jakob

 About 500 people in


attendance, including the
Chief Minister along with State
Cabinet members, about 120
state officials and local
community leaders,
shareholders, the Company’s
Directors and officers, and Bob Baldock, President & CEO of Monument Mining; Chief Minister of Pahang State
guests from Europe, Australia Dato’ Sri Di Raja Yang Amat Berhormat Dato Sri Hji Adnan Bin Hji Jakob; YH Dato’ Haji
Lias b. Mohd Noor, CEO of Pahang State Development Corp. (PASDEC); and Zaidi Harun,
and Canada
VP Exploration of Monument Mining

www.monumentmining.com 18
Damar Buffalo Reef
TSXV: MMY FSE: D7Q1

www.monumentmining.com 19
Damar Buffalo Reef
TSXV: MMY FSE: D7Q1

 Highly prospective geology trend north from Selinsing deposit

 Approximately 2,000 acres (> 4.5 continuous Km)

 Historical Resource totaling 2,512,000 tonnes at 2.29 g/t Au

 Existing historical resource of 185,400 oz/Au

 Drill program to date suggests a much larger gold camp which stretches
from Selinsing in the south to the north for over a 4.2 km long shear zone

 Damar (Famehub) continues, in part, further North along trend for another
12 km

www.monumentmining.com 20
Damar Buffalo Reef
Grade Highlights
TSXV: MMY FSE: D7Q1

www.monumentmining.com 21
Famehub Acquisition
TSXV: MMY FSE: D7Q1

32,000 acres of prospective land adjacent to Selinsing and Buffalo Reef


providing significant upside potential

www.monumentmining.com 22
Agressive Drilling Program
TSXV: MMY FSE: D7Q1

 $3.4 Million Exploration program for 2010/2011


approved

 12 months: 116 drill holes; 18,390 m aimed at:


 Increase Gold reserves
 Build up gold resource pipeline in Malaysia

 Selinsing: Drilling at Selinsing


 Convert inferred resources to reserves

 Damar Buffalo Reef:


 Convert inferred into measured and indicated
 Update NI 43-101

 Famehub:
 Select prospective drill targets

www.monumentmining.com 23
Goals
TSXV: MMY FSE: D7Q1

 Extension of Selinsing plant to


increase output capacity to
approximately 1 M tonnes per
year

 Complete new NI 43-101


technical reports on Selinsing and
Damar Buffalo Reef

 Aggressive drilling
 to increase resource inventory to
> 1 M oz/Au by ongoing and
further exploration

www.monumentmining.com 24
Corporate Social
Responsibility
TSXV: MMY FSE: D7Q1

 Job Creation
 Over 150 Malaysian employees at the site, the creation of local jobs for community
residents is key

 Goods & Services


 construction and expansion programs, operation of plant and mine provide a constant
demand for labor, contract services and supplier goods and services from the local
communities of Koyan and Kuala Lipis

 Training and Education


 Encouraging local young people to seek full education and improve their skills and
professional capabilities

 Offering scholarships to local students to attend Universities and gain degree status
education for professional roles such as underground and surface mining engineers,
geologists, metallurgists, chemists and similar mining industry roles

 Offer work experience while they undertake their degree education and upon
completion offer full employment

www.monumentmining.com 25
Investment Opportunity
TSXV: MMY FSE: D7Q1

 Building value with cash flow from operations

 Gold exposure at a low producing cost


 US$ 317.00 oz/Au

 There is only a 5,000 oz hedging on gold sales

 MMY benefits from the high price of gold on the open market

 Exploration upside

 Acquisition growth potential

www.monumentmining.com 26
Contact Information
TSXV: MMY FSE: D7Q1

CHF Investor Relations


Monument Mining Limited AXINO AG
Jeanny So
Director of Operations
Richard Cushing (Tel) 1-416-868-1079 x 225 Wolfgang Seybold
Investor Relations jeanny@chfir.com President and CEO
(Tel) 1-604-638-1661 (Tel) 49-711-2535-9240
info@monumentmining.com Robin Cook
Senior Account Manager wolfgang.seybold@axino.de
(Tel) 1-416-868-1079 ext. 228
robin@chfir.com

www.monumentmining.com 27
Thank you!
TSXV: MMY FSE: D7Q1

www.monumentmining.com 28

Vous aimerez peut-être aussi