Lignite Drying: New Coal-Drying Technology Promises Higher

Efficiency Plus Lower Costs and Emissions


Dr. Sai Gollakota (sai.gollakota@netl.doe.gov) is a project manager with NETL. Charles Bullinger (cbullinger@grenergy.com)
is a senior principal engin

The U.S. Department of Energy (DOE) and Great River Energy are testing a new coal-drying technology that could dramatically
reduce the emissions of lignite-burning power plants. The project was selected for funding during Round I of the DOE’s Clean
Coal Power Initiative (CCPI), a series of competitions to demonstrate a range of promising clean-coal technologies. To date, the
DOE has run two CCPI rounds and given financial assistance to eight projects.
Great River Energy (GRE) is conducting the $31.5 million project at its Coal Creek Station (Figure 1). The Lignite Fuel
Enhancement System (LFES) project is being administered by the DOE’s Office of Fossil Energy and managed by its National
Energy Technology Laboratory (NETL). The DOE is expected to provide $13.5 million for the project over its 54-month duration.
(See box at end of story for project participants.)

1. Aerial view of Coal Creek Station, in Underwood, N.D., 50 miles north of Bismark. Courtesy: Great River Energy
 
Coal Creek Station, a 1,092-MW lignite-fired power plant in Underwood, North Dakota, supplies baseload electricity wholesale
to 28 GRE distribution cooperatives in Minnesota and Wisconsin. Its two identical 546-MW units are both powered by a
tangentially fired subcritical boiler from Combustion Engineering and a single-reheat, tandem-compound turbine-generator from
General Electric. Both units have design steam conditions of 1,005F (main and reheat steam) and 2,520 psi.
At Coal Creek, electrostatic precipitators remove more than 99.5% of particulates, while wet-lime countercurrent spray tower
scrubbers remove 90% of SO2 from 60% of the plant’s flue gas. The boiler fires lignite from the nearby Falkirk mine with a heat
content of 6,200 Btu/lb (HHV) and a total moisture content of 38%. Coal Creek burns 7.5 million tons of the fuel annually.
Using Waste Heat for Drying
The project is demonstrating the Lignite Fuel Enhancement System, which uses waste heat to dry fuel before it is fed into the
boiler. Typically, about 45% of the fuel heat put into a conventional pulverized coal-fired power plant is lost in the condenser;
another 20% exits the stack. The LFES (Figure 2) exploits this heat, which otherwise has little use because of its low quality.
The box lists some advantages of predrying coal.
2. A schematic of the Lignite Fuel Enhancement System, which uses waste heat from condener water and flue gas. Source:
Great River Energy
 
In 2001, prior to launching the CCPI project, GRE performed test burns of partially dried coals to assess handling issues and to
demonstrate the benefits of using drier coals. Based on encouraging results, GRE, with the support of the Lignite Energy
Council and the North Dakota Industrial Development Commission, designed and built a 2-ton/hr pilot-scale lignite dryer.
GRE tested a number of lignites in the pilot-scale dryer to evaluate the drying potential of different feedstocks. Tests confirmed
the viability of lignite drying and provided a basis for a larger-scale demonstration under the CCPI.
The CCPI project is progressing in phases. In the first phase, a 115-ton/hr prototype capable of drying up to 25% of the lignite
fed to Coal Creek Station’s 546-MW Unit 2 was designed, built, and tested. It was a smashing success, so Great River Energy
designed four full-scale (135-ton/hr) dryers able to supply 100% of Unit 2’s fuel needs. Construction of the full-scale dryer is in
progress.
A Two-Stage Process
The heart of the LFES is a two-stage fluidized bed inside a single vessel. Hot fluidizing air and hot water in coils heat the lignite
in each stage. The first stage separates fluidizable from nonfluidizable lignite, preheats the former, and sends a uniform flow of
fluidizable lignite over a weir to the second stage. The second further heats this lignite, drying it to a target moisture level.
Optimally, the full-scale dryer will use a combination of fluidized-bed mixing, segregation, and drying techniques. In the
prototype dryer, the stream of dried lignite from the second stage is sent over a weir into a hopper. From the discharge hopper,
the lignite is put on a conveyor by three rotary air lock feeders. The full-scale dryer will be sized so its throughput is 20% higher
than that of the prototype unit, to meet 100% of Coal Creek’s fuel needs.
In the LFES, hot air fluidizes and heats the lignite to remove moisture from it. The air stream is cooled and humidified as it flows
upward through the fluidized bed. The amount of moisture that can be removed is limited by air stream’s drying capacity, which
is supplemented by an in-bed hot water coil. Figure 3 is an external view of the prototype dryer’s plenum area and the inlets and
outlets of its hot water coils.
3. The prototype dryer's plenum area. Note the see-through window. Courtesy: Great River Energy
 
To prevent condensation in the freeboard region of the prototype dryer, its outlet was designed to have a relative humidity of
less than 100%. Particulate control equipment — a dust collector (baghouse) and a discharge fan — remove elutriated fines
from the moist air stream leaving the dryer. Collected particulate matter is mixed with the coal product stream, and particle-free
air of 99% relative humidity is discharged to the atmosphere.
Drier Means Cleaner
During the first phase of the project, GRE built the prototype dryer and used it for one year to process about 300,000 tons of
lignite. Usually, the dryer was operated at a throughput of 75 tons/hr, but dryer capacity tests were conducted over a range of 75
to 105 tons/hr. The dryer’s optimum operating conditions and the effects of partially dried lignite on unit performance were
determined by running a series of paired performance tests (with the dryer on and off) under carefully controlled conditions.
The dried lignite was directed to one of Coal Creek Station’s eight pulverizers, each of which provides about 14% of the plant’s
total fuel. Although the dryer reduced the moisture content of the overall fuel feed by just 1.1%, its use provided many significant
operating benefits:
 NOx emissions decreased 7.5%
 CO2 emissions fell 0.5%
 Boiler efficiency increased 0.5%
 Pulverizer power consumption decreased 3.3%
 SO2 emissions fell 1.9%
 Mercury emissions decreased 0.5%
Why did drying the lignite before burning it produce lower pollutant emissions and higher efficiencies? The 7.5% NO x reduction
can be attributed mostly to a 12% reduction in the primary air (PA) consumption of the mill pulverizing the partially dried lignite.
This reduction also lowered the pulverizer’s power consumption. Following the performance tests, all eight mills were modified
so they can run on 30% less primary air and contribute to further reductions in NO x emissions. The 0.5% drop in unit
CO2 emissions was caused by the 0.5% rise in boiler efficiency.
The 1.9% decrease in unit SO2 emissions can be explained as follows. Because Coal Creek’s existing wet-lime spray dryers
have limited flow rates, some flue gas must bypass them. When the LFES is running, the lower moisture content of the lignite
fed to the boiler increases the amount of flue gas that the spray dryers can handle, raising their overall SO 2 removal efficiency.
The full-scale dryer is expected to have a significantly higher SO 2 reduction rate than the prototype because the full-scale unit
will segregate sulfur-rich components of lignite such as pyrites in its first stage for removal and separate handling.
The sulfur content of the dryer’s segregated stream is much higher than that of its product stream because pyrites are denser
than lignite (see table and Figure 4). The full-scale dryer will process this segregated stream. After processing, the stream would
not be returned to the boiler, reducing the overall sulfur input to the boiler by 7% to 12%. With the full-scale coal-drying system
operating at the target moisture reduction level, the flue gas flow rate to the spray towers will be reduced by about 4%, further
lowering SO2 emissions.

Characteristics of the prototype lignite dryer's output. Source: Great River Energy

 
 

4. The prototype lignite-drying system met its goals for moisture removal, increased heating value, and reduced sulfur and
mercury content. The term "segregated coal" refers to the nonfluidizable portion. The full-scale unit will separate fluidizable from
nonfluidizable lignite. Source: Great River Energy
 
 
 
 
 
As with SO2, the 0.5% reduction in mercury emissions produced by operating the prototype dryer mirrors the 0.5% improvement
in boiler efficiency. And, for reasons similar to those cited for SO2 reduction, it is expected that the full-scale dryer will capture
much more mercury than the prototype.
As the table and Figure 4 also show, tests of the prototype dryer indicated that the nonfluidizable lignite entering it contained
about three times more mercury than the feed coal stream. That’s because the nonfluidizable heavy materials in Falkirk lignite
are rich in mercury. Segregating the streams reduces the mercury concentration of the fuel feed prior to combustion, in turn
reducing the downstream mercury capture load.
The use of drier lignite also increases mercury oxidation during the combustion process. This oxidized mercury, which is water-
soluble, is removed by the wet-lime spray towers.
Scaling Up
Phase II of the project envisions designing and building a full-scale demonstration unit with four integrated dryers whose
combined throughput of 3.75 million tons of lignite per year will be sufficient to fully fuel Unit 2. The design has already been
completed, and fabrication of the dryer began this April.
The project schedule calls for finishing and installing the four-dryer system by March 2008 and testing it beginning the following
month. The system then will be demonstrated through the end of 2008. If the demo produces the hoped-for results, the system
will be commissioned as part of Coal Creek Unit 2.
What will constitute those hoped-for results? Based on the results of using the prototype dryer to process 14% of Coal Creek’s
total fuel feed, engineers project that the full-scale integrated four-dryer system will be able to reduce by 8.5% the moisture
content of all lignite burned at the plant. Such a reduction would:
 Reduce NOx emissions by 10%
 Reduce SO2 emissions by 10% to 15%
 Reduce mercury emissions by 15% to 20%
 Reduce CO2 emissions by 2%
These lower numbers will produce considerable savings. By themselves, the expected reductions in fuel and auxiliary power
consumption, wear and tear on equipment, and desulfurization requirements from operating the full-scale dryer are expected to
cut Unit 2’s production cost by $3/MWh. Other benefits whose economic value has yet to be evaluated include NO x and mercury
reductions.
Paying the Freight
Having seen first-hand the benefits of lignite drying, GRE now is planning to install a separate drying system on Unit 1. This
installation is outside the scope of the CCPI demonstration project and will be funded entirely by GRE.
In addition to the price of the full-capacity integrated dryer and associated coal-handling equipment, the demonstration project
includes the one-time cost of developing the prototype dryer. So the cost of building another dryer and retrofitting it will be
substantially lower.
The estimated installed cost of the four dryers for Unit 2 is about $8 million. That figure does not include the costs of associated
coal-handling equipment and control systems because they are site-specific. The dryer technology is available for licensing by
GRE.
Successful commercial application of the technology could produce striking benefits nationwide. In the U.S. today, more than
100,000 MW of generating capacity burn high-moisture fuels such as lignite and Powder River Basin subbituminous coal. The
GRE dryer technology is potentially applicable to these units. Including the coal dryer in a new plant design could reduce the
capital costs of auxiliary equipment and emission control systems. The dryer also may prove suitable for increasing the
efficiency of gasifying high-moisture coals used as feedstocks.
The data reported in this article were produced with the support of the U.S. DOE’s National Energy Technology Laboratory
under Award No. DE-FC26-04NT41763.

Participants in the Lignite Fuel Enhancement System Project


Great River Energy (www.greatriverenergy.com): Host utility
NETL (www.netl.doe.gov): Project administration and matching funding
Barr Engineering Co. (www.barr.com): Integrated dryer system design
Heyl & Patterson Inc. (www.heylpatterson.com): Dryer design and construction
EPRI (www.epri.com): Design consultation, test planning, market study
Lehigh University (www.lehigh.edu): Test planning and data analysis
Falkirk Mining Co. (www.nacoal.com/operations/falkirk.html): Coal supplier

The Benefits of Using Waste Heat to Dry Lignite


 Eliminates the need for premium alternative heat sources (for example, steam or additional fuel).
 Reduces unit NOx emissions by increasing lignite’s heating value and reducing the flow rates of coal and primary air to
pulverizers.
 Reduces unit emissions of SO2 and mercury by reducing the concentration of those pollutants in the lignite reaching the
boiler.
 Reduces CO2 emissions by increasing unit efficiency.
 Increases boiler efficiency by reducing the flue gas flow rate via precombustion moisture removal. Reducing this flow rate
also facilitates additional SO2 capture by a scrubber.
 Lowers unit auxiliary power consumption by reducing the flow rates of coal and flue gas.
 Raises overall unit efficiency and heat rate by increasing boiler efficiency and reducing auxiliary power consumption.