Vous êtes sur la page 1sur 12

Población 25200 hab. Aportación 150 it/had/dia Qmin= 21.

88
Dotación 200 It/had/dia CS 1.5 M= 2.55
Long. Total 2428 m Qmd 43.75 lps Qmax= 111.65
Cotas de terreno (m) Longitudes (m)
Tramo Long(m) St (al millar) Sp (al millar)
inicial Final Tributoria Acumulada
3-4 112 23.2 23.1 0.9 0 112 2
4-8 75 23.1 19.01 54.5 112 187 52.9
2-3 92 25.42 23.2 24.1 0 92 24.1
3-7 75 23.2 21.8 18.7 92 167 18.7
7-8 112 21.8 19.01 24.9 167 279 24.9
8 - 12 93 19.01 17.7 14.1 466 559 14.1
1-2 87 26.5 25.42 12.4 0 87 12.4
2-6 75 25.42 24 18.9 87 162 18.9
6-7 92 24 21.8 23.9 162 254 23.9
7 - 11 93 21.8 19.8 21.5 254 347 21.6
11 - 12 112 19.8 17.7 18.8 347 459 18.7
12 - 16 118 17.7 15.19 21.3 1018 1136 21.3
9 - 13 118 22.11 20.15 16.6 0 118 16.6
13 - 14 87 20.15 18.3 21.3 118 205 21.3
5-9 93 24.9 22.11 30.0 0 93 30
9 - 10 87 22.11 21.15 11.0 93 180 11
10 - 14 118 21.15 18.3 24.2 180 298 24.2
14 - 15 92 18.3 17.58 7.8 503 595 11.6
1-5 75 26.5 24.9 21.3 0 75 21.3
5-6 87 24.9 24 10.3 75 162 10.4
6 - 10 93 24 21.15 30.6 162 255 30.6
10 - 11 92 21.15 19.8 14.7 255 347 14.7
11 - 15 118 19.8 17.58 18.8 347 465 18.8
15 - 16 112 17.58 15.19 21.3 1060 1172 18.7
16 - 17 120 15.19 11.4 31.6 2308 2428 31.6
lps Qmext= 167.48 lps n= 0.012 para PVC
Qu= 0.018 lps/m
lps Pu= 10.38 hab/m
Cotas de Plantilla (m) Gastos (lps)
Diametro (m) excavacion (m)
Inicial Final Tramo Minimo M
0.2 22.10 21.88 1.22 2.02 1.50 3.76
0.2 21.88 17.91 1.10 3.37 1.68 3.60
0.2 24.32 22.10 1.10 1.66 1.50 3.80
0.2 22.10 20.70 1.10 3.01 1.50 3.63
0.2 20.70 17.91 1.10 5.03 2.51 3.46
0.25 17.86 16.55 1.15 10.07 5.04 3.18
0.2 25.40 24.32 1.10 1.57 1.50 3.80
0.2 24.32 22.90 1.10 2.92 1.50 3.64
0.2 22.90 20.70 1.10 4.58 2.29 3.49
0.2 20.70 18.70 1.10 6.25 3.13 3.37
0.25 18.65 16.55 1.15 8.27 4.14 3.26
0.3 16.50 13.99 1.20 20.47 10.23 2.88
0.2 21.01 19.05 1.10 2.13 1.50 3.74
0.2 19.05 17.20 1.10 3.69 1.85 3.56
0.2 23.80 21.01 1.10 1.68 1.50 3.80
0.2 21.01 20.05 1.10 3.24 1.62 3.61
0.2 20.05 17.20 1.10 5.37 2.68 3.43
0.25 17.15 16.08 1.50 10.72 5.36 3.16
0.2 25.40 23.80 1.10 1.35 1.50 3.80
0.2 23.80 22.90 1.10 2.92 1.50 3.64
0.2 22.90 20.05 1.10 4.59 2.30 3.49
0.2 20.05 18.70 1.10 6.25 3.13 3.37
0.25 18.65 16.43 1.15 8.38 4.19 3.26
0.3 16.08 13.99 1.20 21.12 10.56 2.87
0.35 13.94 10.14 1.26 43.75 21.88 2.55
(lps) 1a.Revision. Para Qmin
QTLL(lps) VTLL(m/s)
Máximo Max. Ext Gasto Velocidad Kh Vmin (m/s)
7.58 11.37 15.89 0.51 Correcto 1 0.03 0.32
12.12 18.17 81.73 2.60 Correcto 1 0.01 1.05
6.30 9.45 55.16 1.76 Correcto 1 0.01 0.77
10.93 16.40 48.59 1.55 Correcto 1 0.01 0.71
17.37 26.06 56.07 1.79 Correcto 1 0.01 0.91
32.08 48.11 76.50 1.56 Correcto 1 0.02 0.89
5.96 8.94 39.57 1.26 Correcto 1 0.01 0.61
10.63 15.95 48.85 1.56 Correcto 1 0.01 0.71
15.97 23.96 54.93 1.75 Correcto 1 0.01 0.87
21.09 31.64 52.22 1.66 Correcto 1 0.02 0.93
27.00 40.50 88.10 1.80 Correcto 1 0.01 0.93
59.02 88.53 152.90 2.16 Correcto 1 0.02 1.24
7.96 11.93 45.78 1.46 Correcto 1 0.01 0.68
13.17 19.75 51.86 1.65 Correcto 1 0.01 0.79
6.37 9.55 61.55 1.96 Correcto 1 0.01 0.83
11.70 17.56 37.27 1.19 Correcto 1 0.01 0.60
18.42 27.64 55.28 1.76 Correcto 1 0.02 0.92
33.87 50.80 69.39 1.41 Correcto 1 0.02 0.85
5.14 7.70 51.86 1.65 Correcto 1 0.01 0.74
10.63 15.95 36.24 1.15 Correcto 1 0.01 0.57
16.03 24.04 62.16 1.98 Correcto 1 0.01 0.95
21.09 31.64 43.08 1.37 Correcto 1 0.02 0.81
27.31 40.96 88.34 1.80 Correcto 1 0.01 0.93
60.60 90.91 143.26 2.03 Correcto 1 0.02 1.20
111.65 167.48 280.92 2.92 Correcto 1 0.02 1.76
Para Qmin Para Qmext
θ (rad) d (cm) kh Vmext (m/s) θ (rad) d (cm)
1.93 4.29 0.22 0.54 3.61 12.31
1.32 2.10 0.07 2.11 2.42 6.46
1.41 2.39 0.05 1.33 2.25 5.69
1.46 2.54 0.11 1.40 2.73 7.97
1.60 3.02 0.14 1.75 3.03 9.46
1.76 4.53 0.20 1.63 3.40 14.14
1.53 2.80 0.07 1.03 2.43 6.51
1.46 2.53 0.10 1.40 2.71 7.84
1.57 2.92 0.14 1.69 2.97 9.14
1.72 3.46 0.19 1.72 3.35 11.05
1.62 3.86 0.14 1.75 3.02 11.76
1.77 5.47 0.18 2.22 3.29 16.12
1.48 2.61 0.08 1.24 2.53 6.99
1.51 2.72 0.12 1.54 2.84 8.49
1.38 2.27 0.05 1.44 2.19 5.43
1.59 2.98 0.15 1.17 3.05 9.54
1.63 3.14 0.16 1.75 3.11 9.86
1.83 4.88 0.23 1.52 3.65 15.62
1.43 2.46 0.05 1.20 2.17 5.32
1.57 2.91 0.14 1.12 2.98 9.18
1.52 2.76 0.12 1.85 2.85 8.56
1.80 3.79 0.23 1.48 3.65 12.53
1.62 3.88 0.14 1.76 3.03 11.81
1.81 5.73 0.20 2.12 3.42 17.06
1.83 6.85 0.19 3.02 3.33 19.14
Población 6760 hab. Aportación 150 it/had/dia Qmin= 5.87
Dotación 200 It/had/dia CS 1.5 M= 3.12
Long. Total 1724.26 m Qmd 11.7361111111 lps Qmax= 36.63
Cotas de terreno (m) Longitudes (m)
Tramo Long(m) St (al millar) Sp (al millar)
inicial Final Tributoria Acumulada
1-3 141.42 42.55 42.1 3.2 0 141.42 3.2
2-3 100 42.2 40.93 12.7 0 100 1.7
3-5 100 42.1 41.74 3.6 241.42 341.42 2.9
4-5 100 41.75 41.74 0.1 0 100 1.7
5-8 100 41.74 41.58 1.6 441.42 541.42 1.7
1-2 100 42.55 42.2 3.5 0 100 3.5
2-4 100 42.2 41.75 4.5 100 200 4.5
4-7 100 41.75 41.6 1.5 200 300 1.9
7-8 100 41.6 41.58 0.2 300 400 1.8
8-9 100 41.58 41.68 - 1.0 941.42 1041.42 2.1
5-6 100 41.74 41.72 0.2 0 100 1.7
3-6 141.42 42.1 41.72 2.7 0 141.42 2.7
6-9 100 41.72 41.68 0.4 241.42 341.42 2.4
9-10 100 41.68 41.81 - 1.3 1382.84 1482.84 1.7
6-10 141.42 41.72 41.81 - 0.6 0 141.42 1.7
10-E 100 41.81 40.55 12.6 1624.26 1724.26 6
lps Qmext= 54.95 lps n= 0.012 para PVC
Qu= 0.007 lps/m
lps Pu= 3.92 hab/m
Cotas de Plantilla (m) Gastos (lps)
Diametro (m) excavacion (m)
Inicial Final Tramo Minimo M
0.2 41.45 41.00 1.10 0.96 1.50 3.80
0.2 41.10 40.93 - 0.68 1.50 3.80
0.2 41.00 40.71 1.03 2.32 1.50 3.71
0.2 40.65 40.48 1.26 0.68 1.50 3.80
0.25 40.48 40.31 1.27 3.69 1.84 3.57
0.2 41.45 41.10 1.10 0.68 1.50 3.80
0.2 41.10 40.65 1.10 1.36 1.50 3.80
0.2 40.65 40.46 1.14 2.04 1.50 3.75
0.25 40.46 40.28 1.30 2.72 1.50 3.67
0.3 40.28 40.07 1.61 7.09 3.54 3.33
0.2 40.64 40.47 1.25 0.68 1.50 3.80
0.2 41.00 40.62 1.10 0.96 1.50 3.80
0.2 40.47 40.23 1.45 2.32 1.50 3.71
0.35 40.07 39.90 1.91 10.09 5.05 3.18
0.2 40.62 40.38 1.43 0.96 1.50 3.80
0.35 39.90 39.30 1.25 11.74 5.87 3.12
(lps) 1a.Revision. Para Qmin
QTLL(lps) VTLL(m/s)
Máximo Max. Ext Gasto Velocidad Kh
3.66 5.49 20.10 0.64 Correcto 1 0.02
2.59 3.88 14.65 0.47 Correcto 1 0.03
8.63 12.95 19.14 0.61 Correcto 1 0.02
2.59 3.88 14.65 0.47 Correcto 1 0.03
13.14 19.71 26.56 0.54 Correcto 1 0.02
2.59 3.88 21.02 0.67 Correcto 1 0.02
5.17 7.76 23.84 0.76 Correcto 1 0.02
7.66 11.50 15.49 0.49 Correcto 1 0.03
9.98 14.97 27.33 0.56 Correcto 1 0.02
23.57 35.36 48.01 0.68 Correcto 1 0.02
2.59 3.88 14.65 0.47 Correcto 1 0.03
3.66 5.49 18.46 0.59 Correcto 1 0.03
8.63 12.95 17.41 0.55 Correcto 1 0.03
32.13 48.20 65.16 0.68 Correcto 1 0.02
3.66 5.49 14.65 0.47 Correcto 1 0.03
36.63 54.95 122.41 1.27 Correcto 1 0.01
Para Qmin Para Qmext
Vmin (m/s) θ (rad) d (cm) kh Vmext (m/s) θ (rad) d (cm)
0.38 1.81 3.84 0.09 0.55 2.56 7.16
0.30 1.97 4.46 0.08 0.40 2.54 7.05
0.37 1.84 3.93 0.21 0.65 3.51 11.85
0.30 1.97 4.46 0.08 0.40 2.54 7.05
0.31 1.78 4.64 0.23 0.58 3.67 15.77
0.39 1.79 3.76 0.06 0.52 2.30 5.90
0.43 1.74 3.54 0.10 0.68 2.70 7.83
0.32 1.94 4.34 0.23 0.53 3.67 12.62
0.30 1.68 4.16 0.17 0.57 3.22 12.99
0.40 1.81 5.73 0.23 0.73 3.66 18.83
0.30 1.97 4.46 0.08 0.40 2.54 7.05
0.36 1.85 4.00 0.09 0.52 2.63 7.47
0.34 1.88 4.11 0.23 0.60 3.68 12.64
0.41 1.83 6.84 0.23 0.73 3.67 22.03
0.30 1.97 4.46 0.12 0.43 2.82 8.42
0.66 1.62 5.46 0.14 1.24 3.00 16.25
Población 18000 hab. Aportación 187.5 it/had/dia Qmin= 19.53
Dotación 250 It/had/dia CS 1.5 M= 2.70
Long. Total 2786 m Qmd 39.0625 lps Qmax= 105.41
Cotas de terreno (m) Longitudes (m)
Tramo Long(m) St (al millar) Sp (al millar)
inicial Final Tributoria Acumulada
3-4 112 23.2 23.1 0.9 0 112 2
4-8 75 23.1 19.01 54.5 112 187 52.9
lps Qmext= 158.11 lps n= 0.012 para PVC
Qu= 0.014 lps/m
lps Pu= 6.46 hab/m
Cotas de Plantilla (m) Gastos (lps)
Diametro (m) excavacion (m)
Inicial Final Tramo Minimo M
0.2 22.10 21.88 1.22 1.57 1.50 3.80
0.2 21.88 17.91 1.10 2.62 1.50 3.75
(lps) 1a.Revision. Para Qmin
QTLL(lps) VTLL(m/s)
Máximo Max. Ext Gasto Velocidad Kh Vmin (m/s)
5.97 8.95 15.89 0.51 Correcto 1 0.03 0.32
9.82 14.73 81.73 2.60 Correcto 1 0.01 1.01
Para Qmin Para Qmext
θ (rad) d (cm) kh Vmext (m/s) θ (rad) d (cm)
1.93 4.29 0.18 0.52 3.26 10.57
1.28 1.99 0.06 1.99 2.28 5.83

Vous aimerez peut-être aussi