Presentation Energy Wise House. A joint project with SplitVision Development AB, Anders Nyquist Arkitektkontor AB,
and MRD Sälj & Bygg AB. For: Climate technology company 12 Bill Gates - GlobalFOCUS. Sundsvall 20/11/2007.
Welcome to an Energy Wise House that yields
profits for both the climate and your wallet.
Questions to ask that form the basis of an Energy Wise House
• How does our society look today?
• What is the state of the housing stock?
• How does new construction look today?
• How could future dwellings look?
Energy Wise Houses are entirely environmental and ecocycle adapted. As supporting
documentation for the project we have used a checklist that is a result of the evaluations
of the ecocycle projects we have conducted in Sweden and abroad.
Energy Wise Houses show how we can incorporate environmental and ecocycle adapted houses
in existing developments with antiquated infrastructure. Completed projects that involve single
family houses where the existing vegetation has been preserved to the greatest possible extent.
The houses are located to ensure a minimum of excavation work. The solution for Energy Wise
Houses also works for apartment blocks, offices, schools and commercial constructions.
Energy Wise Houses have been created by combining the SplitBox and Koljern techniques
SplitBox is an energy and waste system that through modern Koljern is available as basement slabs, suspended foundations
ecocycle technology is designed to handle the total energy needs and full climatic barrier. The products are manufactured of
of a property. The 2 x 1 x 2 m format makes SplitBox simple cellular glass panes (foam glass), aluminium sheet, lightweight
to integrate in the housing. steel beams as cladding, such as Steniskiva.
Presentation Energy Wise House. A joint project with SplitVision Development AB, Anders Nyquist Arkitektkontor AB, 2
and MRD Sälj & Bygg AB. For: Climate technology company 12 Bill Gates - GlobalFOCUS. Sundsvall 20/11/2007.
SplitBox - combined energy and waste system
for minimal environmental impacts
SplitBox is an energy and waste system that through modern ecocycle technology is designed to
handle the total energy needs of a property using a combination of technology for ventilation,
heat recovery and handling of water and drainage. The system has been developed to totally
eliminate the risk of contamination to water from drainage in properties with private drainage
systems, and to reduce energy needs and the environmental load by using reliable technology.
The system solution is available for secondary residences, homes and apartment blocks.
The technical solution means that you are not dependent on the connection to a communal
drainage grid and that the dry fraction that the process produces has a high nutritional value
and can be used as soil improvement material for fertilizer.
The SplitBox patent, drying process and cleaning method have been ”productised” into one
system that will be manufactured as a prefabricated unit and can be sold as a turnkey product.
The placement of the SplitBox is adaptable and is based on how the housing space is utilised.
Our turnkey delivery includes the technical solution for placement and adaptation of
components such as piping. The SplitBox format is 2 x 1 x 2 m.
Presentation Energy Wise House. A joint project with SplitVision Development AB, Anders Nyquist Arkitektkontor AB, 3
and MRD Sälj & Bygg AB. For: Climate technology company 12 Bill Gates - GlobalFOCUS. Sundsvall 20/11/2007.
Koljern - glass ground and climatic barrier for sound
indoor environments and reduced energy consumption
The Koljern technique offers the entire construction industry a superb solution for its environ-
mental and quality work. Our products are available as basement slabs, suspended foundations
and full climatic barrier. The structural engineering benefits and the long-term gains benefit
consultants, contractors, building proprietors, private house owners and ultimately society and
the environment.
The products are manufactured of cellular glass panes (foam glass), aluminium sheet, light-
weight steel beams as cladding, such as Steniskiva. These materials have no capillary absorbency
which might lead to damp damage. Problems with damp are often caused by the construction
material not drying out properly, or that the material is subject to damp from capillary absorp-
tion. Tight schedules are another reason.
Koljern satisfies the new damp and energy demands from BBR and:
• Provides a sound indoor environment by preventing problems with odours, damp and radon.
• Cannot rot or grow mouldy, not affected by vermin
• Produces no thermal bridge on the floor in relation to the outer walls.
By way of example, concrete slabs on the ground give cold floors to external walls.
• Retains its insulation capacity over time.
• Good working environment without any risk of allergies and no heavy lifting.
• Sturdy design and maintenance free.
• Good compressive strength, supports up to a five floor timber house
• Reduces energy consumption.
• Long sustainability with 25 year guarantee.
• Rapid construction time, no desiccation
• Dry construction.
• Keep outs noxious animals such as mice and ants.
• Manufactured exclusively of natural material and can be recycled when the house is demolished.
Climatic barrier
The Koljern climatic barrier includes walls, floor structures out to the open, primary, support-
ing and secondary, infill walls. The climatic barrier is specially designed for buildings in damp
environments, such as public baths and the timber industry as well as buildings in countries
with warm and damp climates. The Koljern technique was awarded the Swedish Building
Industry's Environmental Prize in Västernorrland in 2005.
The climatic barrier reduces the need of adding energy and emissions of carbon monoxide
content in buildings, maintains an even cold temperature in housing in warm climates and
is a sustainable insulation material in buildings as it does not mould or is affected by noxious
animals. It is also fire proof and the construction makes it simple to correct any damage. Any
internal water damage does not impair the insulation.
s -INSKAR UTSLËPP AV KOLOXIDHALTER I BYG
s -ÚGLAR INTE OCH ANGRIPS INTE AV OHYRA
s "JËLKLAG MOT DET
s %VENTUELL INVËNDIG VATTENSKADA SKADAR
På vår webbplats hit
+,)-!43+¾2-%.3 &«2$%,!2
s (ÍLLER EN JËMN KYLA I BOSTËDER I VARMT
Byggnadsindustrins,
s 0RIMËRA BËRAND
pågående byggproje
Byggnadsindustrins,
Koljerntekniken bel
Koljerntekniken bel
s ¾R ETT HÍLLBART ISOLERINGSMATERIAL I BYG
s 3EKUNDËRA UTFA
s "EHÍLLER ISOLERINGSFÚRMÍGAN ÚVER TID
s %NKELT ATT ÍTGËRDA EVENTUELLA SKADOR
+LIMATS
s -INSKAR BEHOVET ATT TILLFÚRD ENERGI
WWWKOLJERNSE
WWWKOLJERNSE
M s 6ËGGAR Two world-unique techniques have become a turnkey solution +LIMATSKËRM
klimat.
s 6ËGGAR
Sanitary wastewater
s "JËLKLAG MOT DET FRIA
Extract air
s "RANDSËKERT
Kitchen
s 0RIMËRA BËRANDE
Lavatory water
Air
s 3EKUNDËRA UTFACKNINGS
Klimatskärmen
Koljern climatic barrier är särskilt ut
K
i fuktig miljö, exempelvis bad
samt byggnader i länder med
klimat.
Hot water SplitBox Energy
Koljerntekniken belönades 2
s 'OD ARBETSMILJÚ UTAN RISK FÚR ALLERGIER OCH UTAN TUNGA LYFT
-ONTERINGSBAR GLASGRUND GER SUND INOMHUSMILJÚ
s 'OD TRYCKHÍLLFASTHET BËR UPP TILL FEM VÍNINGARS TRËHUS
Byggnadsindustrins,
OCH MINSKAD ENERGIFÚRBRUKNING
Water Miljöpr
s 'ER INGEN KÚLDBRYGGA PÍ GOLVET MOT YTTERVËGGARNA
På vår webbplats hittar du re
s 5PPFYLLER DE NYA FUKT
OCH ENERGIKRAVEN FRÍN ""2
Genom Koljerntekniken erbjuder vi hela byggindustrin utmärkta
s 'ER EN SUND INOMHUSMILJÚ GENOM ATT FÚRHINDRA
%XEMPELVIS GER BETONGPLATTA PÍ MARK KALLA GOLV
s +AN INTE RUTTNA ELLER MÚGLA ANGRIPS EJ AV OHYRA
Air-geothermal
förutsättningar i sitt miljö-och kvalitetsarbete. Våra produkter
pågående byggprojekt.
finns som platta på mark, varmgrund och hel klimatskärm.
De byggnadstekniska fördelarna och de långsiktiga vinsterna gör
såväl konsulter och entreprenörer som byggherrar och enskilda Dry fraction
husägare till vinnare.
s "EHÍLLER ISOLERINGSFÚRMÍGAN ÚVER TID
plåt, plåtlättbalkar samt beklädnad, exempelvis steniskiva.
PROBLEM MED LUKT FUKT OCH RADON
s -INSKAR ENERGIFÚRBRUKNINGEN
fukten. Pressade tidplaner är en annan orsak. FÚRKORTAR BYGGTIDEN OCH GER SNABB INmYTTNING
s &ORMSTABIL OCH UNDERHÍLLSFRI
&!+4! /- +/,*%2.
0LATTA PÍ MARK
KLIMATSKËRM
+LIMATSKËRM
MOT YTTERVËGGAR
+LIMATSKËRM
+OLJERN
Koljern
+LIMATSKËRM
"EKLËDNAD
climatic barrier
,UFTNING
Koljern
s 6ËGGARsuspended
+OLJERN Part 1
+OLJERN
Koljern
$ISTANS
Climatic barrier
+LIMATSKËRM $EL
Assembled on building site
+OLJERN
foundations
VARMGRUND
s "JËLKLAG MOT DET FRIA PLATTA
basement
PÍ MARKslabs
Climatic barrier
+LIMATSKËRM -ONTERAS PÍ BYGGPLATSEN
Spacer
$ISTANS s 0RIMËRA BËRANDE Part 2
$EL
U-plate lightweight beam
5
PLÍT LËTTBALK A Manufactured in the factory
Nailing batten
3PIKREGEL s 3EKUNDËRA UTFACKNINGSVËGGAR
Cladding
"EKLËDNAD ! 4ILLVERKAS I FABRIK
B supplied as finished
Cladding Foam glass "