Académique Documents
Professionnel Documents
Culture Documents
1]
Applies to:
Oracle GoldenGate - Version: 5.0.0 and later [Release: 5.0.0 and later ]
Information in this document applies to any platform.
Solution
Attached is a document that provides details on Running Golden Gate with an
Oracle RAC
The software is installed on shared drives that all the RAC nodes have access
to.
The manager and E/R processes can be started from one of the nodes.
If the node that the E/R processes were started from fails, the checkpoints
are maintained, so the
manager and E/R processes then can be started from another node without
making any
modifications to any parameter files.
If the database alone crashes on the node that GoldenGate was installed, then
the manager
process will need to be stopped on the node that started the manager and E/R
processes, before
it can be restarted on another node.
For extract, the oracle logs will need to be located on shared disk that this
server has access to.
Attachments
Related
Products
Back to top
Copyright (c) 2007, 2010, Oracle. All rights reserved. Legal Notices and Terms of Use | Privacy
Statement
Excellent
Good
Poor
Yes
Very easy
Somewhat easy
Not easy
Cancel
Bottom of Form