Point Table Point Table


Point # Elevation Northing Easting Description Point # Elevation Northing Easting Description

162 373.91 269392.66 489920.01 CAMISA-0.81 1 375.00 269365.59 489910.29 EST


164 374.45 269387.91 489914.88 OJUSTE-0.82 3 371.63 269334.85 489929.31 EST
165 374.66 269390.31 489914.83 TEMPISQUE-1.2 11 375.63 269390.75 489909.91 EST
172 375.32 269371.59 489909.60 PL 12 369.82 269298.71 489934.93 EST
173 375.43 269370.95 489907.00 PL 13 368.93 269274.81 489942.45 EST
174 374.59 269371.28 489929.99 TAMARINDO-0.4

175 374.21 269373.99 489926.19 TAMARINDO-0.4

176 374.40 269378.51 489923.53 TAMARINDO-0.4

185 374.85 269381.82 489912.07 ARBOL

187 374.57 269375.17 489911.26 ARBOL

189 374.60 269372.25 489913.18 PL

221 376.61 269399.79 489907.78 COPINOL-1.3 ESQUEMA DE UBICACIÓN SIN ESC.


238 373.16 269327.38 489940.34 CONTADO

239 372.46 269327.90 489938.57 PL

240 372.71 269330.63 489937.18 CAJ-AP

279 374.53 269343.12 489915.63 PL

306 370.42 269273.39 489944.22 PAPATURRO

310 370.30 269272.57 489933.39 HUEBO-GATO-0.6

MAPA CATASTRAL 0801U04 377


.00

489900.00 489900.00 489900.00 489900.00

376.0
TE
269275.00

269275.00

269300.00

269325.00

269350.00

269375.00

269400.00
0
E N
T A
IS T
EX TA NE
CO U NE CU
CE
R C ON
DON ORD 37
R C 7.
00
CO 37
37
6.0
0
5.
00
173
1 11
EST EST 221
172
37
.00 5.0
375 0 374.0 37
5.
0

37
374. 00
00

4.0
187

AL

0
185

R
189 FLUJO NATURAL

TU
NA
JO
164 165

37
37

U
279
373.00 6.0

FL

3.0
374.00 0 0
73.0

0
3
374.00
TE
S T EN 0
XI 373
.0
C OE CER

37
ER CO E

37
372

4.
HW

.00 C FLUJO NATURAL

0
HW

2.
162 XIST

0
HW

00
HW

ENT
HW

HW

E
HW

372 HW

O
HW
.00 HW

375.00
489925.00 489925.00 NTE 489925.00
HW

S
L
HW

RA
37
ISTE
HW

CE
371.00
HW
3.0
371 U
37
IA
HW

AT EX
0
.00
HW

2.
ER
HW

N
CO 176
0

AC
HW

0
O T
HW

373.00
CER
J
OS
HW

LU
HW

HW

F P HW

AM
HW

HW

HW

CER 372.00 M HW

376.00
RO
HW

370
175
HW

.00 CO E 3
HW

371.00
MU
HW

XIST
HW

HW

E NTE
37
1.0 EST HW
HW

RAL
HW

0
NATU
HW

HW

FLUJO
HW 375
AP
HW

HW
00 .
B. E
HW

TU
AJ
HW

HW

OD 174
HW

HW

HW

ER
HW

HW

370
HW

AD
HW

TENTE
.00
12 371.00 L
369 RIL
370.00
EST ERIA JE
372. O
MPOST
.00 00
310 370.00
M A A T E
MU R O D EN

EXIS
.00
RO 240 373
I ST
369
.00 DE EX
A
O

371.00 239
ILL

ERCO
CO
S

0 R
CE

371.0 O R
CE
AC

372.00 238

C
37
0.0
0
369.00 13
EST

369.0 37
0
CASA
1.0
0
37 373
0.0 .00
0
306
CERCO
37
1.0
E0XISTE
N
489950.00
TE
372.
00
489950.00 489950.00 489950.00 ESC 1:200
269275.00

269275.00

269300.00

269325.00

269350.00

269375.00

269400.00
CERCO EXISTENTE

FIRMA /SELLO PROYECTO: CONSTRUCCIÓN DE OBRA DE PASO EN PLANO: TOPOGRAFIA EXISTENTE LEVANTAMIENTO: DISEÑADOR: HOJA:
ACCESO A CASERÍO BELLA VISTA, MUNICIPIO TEC. FIDEL RIVERA TP-1
DE CUYULTITAN. FECHA: OCTUBRE 2021

Página 133
DEPARTAMENTO DE LA PAZ

377
.00

376.0
E
NT

0
T E
IS TA
EX TA E
CO NE C UN
E R CU N
C
ON DO

0+150.00
R
RD
37
CO 7.
00
CO 37

0+140.00
6.0

0+
37 0
5.
00

1
173

60.
11

00
1
EST EST 221
172

0+
37

0+
5.0

13
.00
375 0 374.0 37

170
5.

0.0
0

37
374.0 00

0+120.00
ESQUEMA DE UBICACIÓN SIN ESC.

4.0
0
187

0
0+100.0

0+110.00

.00
0
189 185 0+150
0+
160

0+
0+140

09

0+
0.0
164 165

180
37
37

279
373.00 6.0

3.0
0
374.00 .00 0

.00
373

0
0+
374.00 377.0
13 0

0+080
TE
0
0+
S TEN 17 0

EXI 373
.00

.
O

0+070
CER

00
RC

37
CE CO E

37
372

4.
.00
HW

0+120

00
2.
162 XIST
HW

0+100

00
HW

09
0+ HW

0+110 ENT

.00
HW

0+060
372 0 HW

SO
HW
.00 HW
375.00 0+
489925.00 TE 489925.00 180
HW

TEN
37 HW

CE
371.00
3.0 HW

371 S
EXI
37
IA
HW

.00
0
.00

0+050
2.
ER
HW

CO 176
00
0+
HW

AC
ST
HW

375.00 184
373.00
CER
HW

PO
HW

HW

AM
HW

.
HW

0+040

00
0+080 M
HW

CER 372.00 376.00


RO
HW

370
175
HW

.00 CO E 3
MU
HW

371.00
XIST
HW

HW

ENT 37 HW

EST
.0
1.0 HW

E 0 0+070
HW
0

HW

HW 375
AP
HW .00
B. E
HW

TU J
HW

DA
0+01

HW
0+0

0+060 174
HW

O
HW
0+020.00

ER
HW
30.

HW

370 HW
0.00

AD

TENTE
.00
371.00
00

12
0+050 L
369 370.00
EST IA 372.0 O RIL
.00
310 370.00 AM POSTER AJ
E 0
TE
0+040 MURO M D N

O EXIS
.00
RO 240 373 TE
0+00
0
DE IS
EX
369
.00
A

SO
371.00 239
ILL CO

CERC
OR
0

CE
371.0 R
CE
0+0
30
0+01

AC
0 372.00 238
37
0+020 0
0.0
369.00 13
EST

369.0 37
0
CASA
1.0
0
37 373
0.0 .00
0
306
CERCO
37
1.0
E0XISTE
NTE
0
372.0

CERCO EXISTENTE

CASA

ESC 1:250
380

STA:0+184.11
ELEV:375.12
STA:0+179.25
ELEV:375.17
376

STA:0+108.10
ELEV:372.43
STA:0+095.49
ELEV:371.76
372
SUPERFICIE DE
RODAJE EXISTENTE STA:0+108.37
H ESC 1:250 ELEV:372.26

V ESC 1:500 STA:0+095.47


ELEV:371.54

STA:0+000.00
ELEV:368.18

368

DATUM ELEV
364.000
368.481

368.951

369.391

372.201

372.931

373.501

375.171
369.432

370.952

373.142

374.072
368.314

369.096

368.954

369.070

369.820

370.336

371.080

370.926

370.773

370.619

371.167

371.508

372.284

372.366

372.448

372.470

372.573

373.339

373.434

373.760

374.309

374.667

375.118
368.185

368.615

370.835

371.965

0+000 0+010 0+020 0+030 0+040 0+050 0+060 0+070 0+080 0+090 0+100 0+110 0+120 0+130 0+140 0+150 0+160 0+170 0+180 0+184.11

FIRMA /SELLO PROYECTO: CONSTRUCCIÓN DE OBRA DE PASO EN PLANO: PLANTA - PERFIL LEVANTAMIENTO: DISEÑADOR: HOJA:
ACCESO A CASERÍO BELLA VISTA, MUNICIPIO QUEBRADA TEC. FIDEL RIVERA TP-2
DECUYULTITAN. FECHA: OCTUBRE 2021

Página 134
0+060.00 0+160.00 DEPARTAMENTO DE LA PAZ
0+010.00
376 380 380
374 375
0+110.00 379
373 374 378
372 373 376 377
371 372 375 376
370 370 371 374 375
369 370 370 373 374
368 369 372 373
367 368 371 372
366 366 367 367 370 370 371 371
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

0+170.00
0+020.00 0+070.00 ESQUEMA DE UBICACIÓN SIN ESC.
0+120.00 381
374 376 380 380
373 375 377 379
372 374 376 378
371 373 375 377
370 370 372 374 376
369 371 373 375
368 370 370 372 374
367 369 371 373
366 366 368 368 370 370 372 372
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

0+080.00 0+130.00 0+180.00


0+030.00
376 378 380 380
374 375 377 379
373 374 376 378
372 373 375 377
371 372 374 376
370 370 371 373 375
369 370 370 372 374
368 369 371 373
367 367 368 368 370 370 372 372
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

0+040.00 0+090.00
0+140.00
374 377
373 376 378
372 375 377
371 374 376
370 370 373 375
369 372 374
368 371 373
367 370 370 372
366 366 369 369 371 371
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10

0+050.00 0+100.00 0+150.00

375 377 379


374 376 378
373 375 377
372 374 376
371 373 375
370 370 372 374
369 371 373
368 370 370 372
367
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
367 369
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
369 371
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10
371 H ESC 1:150
V ESC 1:150
FIRMA /SELLO PROYECTO: CONSTRUCCIÓN DE OBRA DE PASO EN PLANO: SECCIONES QUEBRADA LEVANTAMIENTO: DISEÑADOR: HOJA:
ACCESO A CASERÍO BELLA VISTA, MUNICIPIO TEC. FIDEL RIVERA TP-3
DECUYULTITAN. FECHA: OCTUBRE 2021

Página 135
37
2
37 .00
DEPARTAMENTO DE LA PAZ
1.0
0
12
ES
T 373.00

371 37
.00 0.0
0

37 MU
CA 1.
00 RO
SA MA
MP
OS 0
372.0
37
T ER CER 4.0
0
37 IA 375
ST 2.
00 37
C O EX .00
E 1.0 ISTE
NT 37
1.0
0 NTE
E 0 373
.00

0+005.00

0+075.00
27

0+070.00
0+010.00

0+065.00
0+015.00
CERCO EXISTENTE

9
0+020.00

0+060.00
0+025.00

0+055.00
0+030.00
MURO

0+050.00
MAMP ESQUEMA DE UBICACIÓN SIN ESC.

0+035.00
ORILLA DE RODAJE

0+045.00
OSTER

0+038.65

0+040.00
HW
HW
HW
HW
HW
HW
HW
HW
HW

IA CORDON CUNETA
HW
HW
HW
HW
HW
HW
HW
HW
HW
HW
HW

TUB. AP
HW
HW
HW
HW
HW
HW
HW
HW
HW
HW
HW
HW
HW
HW
HW
HW

3
HW
HW
HW
HW
HW
HW
HW
HW
HW
HW
HW
HW

0+000
HW
HW
HW
HW
HW

0+079
37

HW

ES
HW

0+005
HW
HW

0+075
HW
HW
HW
HW
HW
HW

0+010 0+070
HW
HW
HW
HW
HW
3.0

37
0+015 0+065

372.00
0+020 0+060

2.
0

374.00
CORDON CUNETA

00

37
0+025

375.
0+055

SO
37

3.
0+030

37
0
6.
CE
0+050

0
00
ORILLA D

00

7.0
1
0+035

AC E RODAJ 0+040
0+045

ES

0
23 24 3 E T
9 0 73.00 17
23 3
8 372.00
373
.00
CERCO EXISTENTE E SO 17 ESC 1:150
A CC 2

18
9 18
7

380

STA:0+061.04
ELEV:374.78

STA:0+078.67
376 ELEV:375.83

STA:0+000.00
ELEV:372.94

STA:0+040.03
ELEV:372.00

STA:0+028.62
ELEV:371.64

372

368

H ESC 1:150
DATUM ELEV
V ESC 1:300 364.000
371.671

373.171
372.650

373.840

374.622
372.938

372.376

372.128

371.855

371.685

371.798

371.999

372.545

375.015

375.309

375.606

375.825
375.31

375.61
374.62

375.02
372.94

372.65

372.38

372.13

371.85

371.69

371.67

371.80

372.00

372.55

373.17

373.84

375.83
0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+78.67

FIRMA /SELLO PROYECTO: CONSTRUCCIÓN DE OBRA DE PASO EN PLANO: PLANTA - PERFIL CALLE LEVANTAMIENTO: DISEÑADOR : HOJA:
ACCESO A CASERÍO BELLA VISTA, MUNICIPIO TEC. FIDEL RIVERA TP-4
DE CUYULTITAN. FECHA: OCTUBRE 2021

Página 136
DEPARTAMENTO DE LA PAZ

0+025.00

377
0+060.00

376 378
0+005.00 0+040.00

376 375 376 377

375 374 375 376

374 373 374 375

373 372 373 374

372 371 372 373

371 370 370 371 372

370 370 369 370 370 371

369
-5 -4 -3 -2 -1 0 1 2 3 4 5
369 368
-5 -4 -3 -2 -1 0 1 2 3 4 5
368 369
-5 -4 -3 -2 -1 0 1 2 3 4 5
369 370
-5 -4 -3 -2 -1 0 1 2 3 4 5
370
ESQUEMA DE UBICACIÓN SIN ESC.

0+065.00

378
0+010.00 0+030.00

376 376 377


0+045.00

375 375 376 376

374 374 375 375

373 373 374 374

372 372 373 373

371 371 372 372

370 370 370 370 371 371

369 369 369 369 370 370 370 370


-5 -4 -3 -2 -1 0 1 2 3 4 5 -5 -4 -3 -2 -1 0 1 2 3 4 5 -5 -4 -3 -2 -1 0 1 2 3 4 5 -5 -4 -3 -2 -1 0 1 2 3 4 5

0+070.00

379
0+015.00

376 378
0+035.00 0+050.00

375 376 377 377

374 375 376 376

373 374 375 375

372 373 374 374

371 372 373 373

370 370 371 372 372

369 370 370 371 371

368 368 369 369 370 370 370 370


-5 -4 -3 -2 -1 0 1 2 3 4 5 -5 -4 -3 -2 -1 0 1 2 3 4 5 -5 -4 -3 -2 -1 0 1 2 3 4 5 -5 -4 -3 -2 -1 0 1 2 3 4 5

0+020.00

377

376
0+055.00

375 377
0+038.65 0+075.00

374 375 376 379

373 374 375 378

372 373 374 377

371 372 373 376

370 370 371 372 375

369 370 370 371 374

368
-5 -4 -3 -2 -1 0 1 2 3 4 5
368 369
-5 -4 -3 -2 -1 0 1 2 3 4 5
369 370
-5 -4 -3 -2 -1 0 1 2 3 4 5
370 373
-5 -4 -3 -2 -1 0 1 2 3 4 5
373
H ESC 1:100
V ESC 1:100
FIRMA /SELLO PROYECTO: CONSTRUCCIÓN DE OBRA DE PASO EN PLANO: SECCIONES CALLE LEVANTAMIENTO: DISEÑADOR: HOJA:
ACCESO A CASERÍO BELLA VISTA, MUNICIPIO TEC. FIDEL RIVERA TP-5
DECUYULTITAN. FECHA: OCTUBRE 2021

Página 137
DEPARTAMENTO DE LA PAZ
PLANTA DE UBICACION ODT
. 00
55
0+

37
4.0
0
.00
50
0+

ALIGNMENT=ALIGNMENT - EJE DE ODT


STATION=0+019.01
ALIGNMENT=ALIGNMENT - EJE DE ODT

37
OFFSET=0.00m L
STATION=0+000.17
ALIGNMENT=ALIGNMENT - EJE DE ODT NORTHING=269340.15

3.5
STATION=0+020.50 EASTING=489923.08 OFFSET=4.23m R
NORTHING=269359.12

0+
OFFSET=0.00m

0
03
NORTHING=269338.66 EASTING=489919.45

EL:373.50
5.0
EASTING=489923.03

0
0 ESQUEMA DE UBICACIÓN SIN ESC.
ALIGNMENT=ALIGNMENT - EJE DE ODT
STATION=0+017.80 5.0 .1
5
ALIGNMENT=ALIGNMENT - EJE DE ODT
.53
4 06
0+
STATION=0+023.82 OFFSET=2.60m R 0
OFFSET=2.00m R NORTHING=269341.44 016 0+
NORTHING=269334.79 EASTING=489920.51 0+
EASTING=489923.07

0+015 0+010 0+005

EL:372.96
0+
03
0.0
0

EL:371.42
0+020
00

EL:371.42
0.
0+000

EL:370.96
ALIGNMENT=ALIGNMENT - EJE DE ODT
4 ALIGNMENT=ALIGNMENT - EJE DE ODT

0+
STATION=0+023.89 STATION=0+000.00
OFFSET=0.00m OFFSET=0.00m
NORTHING=269335.78 37 NORTHING=269359.15
EASTING=489924.80 3. EASTING=489923.68
00
0+
ALIGNMENT=ALIGNMENT - EJE DE ODT 02
5
STATION=0+026.76
OFFSET=0.00m 5
.1
.00
NORTHING=269333.33 6
EASTING=489926.31 0+
.53 00
7
02
16 3 5 0+ ALIGNMENT=ALIGNMENT - EJE DE ODT

0+
0
0+ STATION=0+001.00
OFFSET=2.40m L
NORTHING=269358.08
ALIGNMENT=ALIGNMENT - EJE DE ODT
EASTING=489926.05
STATION=0+017.80
OFFSET=2.04m L
NORTHING=269341.29
EASTING=489925.16 ALIGNMENT=ALIGNMENT - EJE DE ODT
0.40
7.93
STATION=0+003.00
OFFSET=0.01m R
NORTHING=269356.15
0.80
0
0.0
EASTING=489923.58

3 4.00 2.80
0+
ALIGNMENT=ALIGNMENT - EJE DE ODT
STATION=0+023.95
1.41
0.40
OFFSET=2.00m L A 1.00
NORTHING=269336.77
EASTING=489926.54
1.50
1.00 0.50
2.80 2.00
372.50 2.00
2.38
4.50 0.65

.0 0 0.29 1.64
0+020.00 (16)

25
0+ 2.41

0+010.94

0+002.17
0+
02

SECCION A-A VISTA FRONTAL


2.9

3.79 DE CABEZAL DE
8

0.40
A ENTRADA
CABEZAL DE ENTRADA

0.00 ESC 1:75 S/N ESC


2
0+
4.64

10.5175
PERFIL DE EJE DE ODT B

0.40 2.80
374 374
4.57
2.80 0.40
4.57 2.23
2.08
GRADE BREAK STA = 0+003.00 2.38
A 3.00
PR OYECTAD ELEV = 373.017
RASANTE 0.00
B 0.30
GRADE BREAK STA = 0+019.00 3.90
ELEV = 372.562 -2.84%
STA:0+000.00 0.70
CONTROL DE ENTRADA ELEV:372.36 2.38

SECCION B-B VISTA FRONTAL


ENTRADA DE CABEZAL DE
EXISTEN
TE STA:0+003.00 2.84
372 RODAJE ELEV:371.82 372 SALIDA

SALIDA
STA:0+019.00
ELEV:371.36 6.40

STA:0+023.89
3.20 0.40
ELEV:370.96

CABEZAL DE SALIDA
S/N ESC

370 370
ESPECIFICACIONES:
370.980

371.468

371.839

372.068

372.396

372.358
371.84

372.40
370.98

371.47

372.07

372.36

H ESC 1:75 MORTERO PARA MAMPOSTERIA DE PIEDRA SERA 140 KG/CM2


V ESC 1:150 TUBERIA DE CONCRETO CLASE 2, DIAMETRO 36 PULGADAS
0+030 0+025 0+020 0+015 0+010 0+005 0+000 RELLENO CON LODOCRETO
MAMPOSTERIA DE PIEDRA CLASE B

FIRMA /SELLO PROYECTO: CONSTRUCCIÓN DE OBRA DE PASO EN PLANO: PLANTA PERFIL ODT LEVANTAMIENTO: DISEÑADOR: HOJA:
ACCESO A CASERÍO BELLA VISTA, MUNICIPIO TEC:FIDE RIVERA HI-1
DE CUYULTITAN. FECHA: OCTUBRE 2021

Página 158
FIRMA /SELLO
375
375

369
373
376
377
369
373
376
377

370
374
370
374

372
372

371
371

OFF:-10.00 OFF:-10.00

-10
-10
ELEV:372.88 ELEV:372.16

-9
-9

-8
-8

-7
-7

-6
-6

-5
-5

375

369
370
373
374
376

372

371
OFF:-3.09 OFF:-3.09
ELEV:372.19 ELEV:373.23

OFF:-4.02

-4
-4
-4

ELEV:373.13
OFF:-3.60
ELEV:371.42

-3
-3
-3

OFF:-2.23
ELEV:371.82

-2
-2
-2

DECUYULTITAN.
-1
-1
-1

OFF:0.00 OFF:0.00 OFF:0.00 OFF:0.00 OFF:0.00


OFF:0.00
OFF:0.00

0
0
0

ELEV:372.02 ELEV:373.14 ELEV:372.33 ELEV:373.47 ELEV:371.42


ELEV:371.82
ELEV:372.31
0+006.15
0+002.17

0+010.94

1
1
1

2
2
2

OFF:2.23
ELEV:371.82

OFF:2.92
OFF:2.92

3
3
3

ELEV:372.69
ELEV:373.27

OFF:3.92
OFF:4.04

4
4
4

ELEV:371.42
ELEV:374.02
OFF:4.37
ELEV:373.54 OFF:3.29 OFF:3.29
ELEV:372.79ELEV:373.83

5
5

369
370

6
6

7
7

8
8

9
9

OFF:10.00 OFF:10.00
OFF:10.00

10
10

ELEV:374.59 ELEV:373.72
ELEV:374.18

369
370
369
370

375
375

368
369
373
376
377
368
369
373
376
377
378

370
372
374
370
372
374

371
371

OFF:-10.00 OFF:-10.00
OFF:-10.00

-10
-10

ELEV:372.39 ELEV:372.04
ELEV:372.57

ACCESO A CASERÍO BELLA VISTA, MUNICIPIO


PROYECTO: CONSTRUCCIÓN DE OBRA DE PASO EN
-9
-9

OFF:-8.68
ELEV:372.72

-8
-8
368
369
375

370
373
374
376

372

371

OFF:-3.74
-7
-7

ELEV:371.11
OFF:-3.62
ELEV:371.26

Página 159
-6
-6
-6

-5
-5
-5

-4
-4
-4

OFF:-3.50
ELEV:370.96
OFF:-3.20
ELEV:370.96
-3
-3
-3

OFF:-2.30
OFF:-2.20
ELEV:372.79
ELEV:372.72
-2
-2
-2

OFF:-0.81
ELEV:370.96
-1
-1
-1

OFF:0.00
OFF:0.00 OFF:0.00
OFF:0.00 OFF:0.00
0
0
0

ELEV:370.96
ELEV:371.12 ELEV:370.96
ELEV:371.47 ELEV:371.54
0+022.98
0+020.00
0+016.53

PLANO: SECCIONES
1
1
1

FECHA: OCTUBRE 2021


2
2
2

OFF:2.60
ELEV:370.96
3
3
3

OFF:3.20
TRANSVERSALES ELEV:370.96

OFF:2.34
OFF:2.34
4
4
4

ELEV:372.86
ELEV:373.26

OFF:2.70
ELEV:372.26
5
5
368
370

6
6

7
7

8
8

9
9

OFF:9.76
OFF:9.90 ELEV:375.23
10
10

ELEV:374.84
368
370
368
370

LEVANTAMIENTO:
TEC. FIDEL RIVERA
DISEÑADOR:
DEPARTAMENTO DE LA PAZ

HI-2
ESQUEMA DE UBICACIÓN SIN ESC.

HOJA:
DEPARTAMENTO DE LA PAZ

ESQUEMA DE UBICACIÓN SIN ESC.

VISTAS 3D NORTE - OESTE VISTAS 3D NORTE - ESTE

VISTAS 3D SUR - OESTE


VISTAS 3D SUR - ESTE

FIRMA /SELLO PROYECTO: CONSTRUCCIÓN DE OBRA DE PASO EN PLANO: VISTAS 3D LEVANTAMIENTO: DISEÑADOR: HOJA:
ACCESO A CASERÍO BELLA VISTA, MUNICIPIO TEC.FIDEL RIVERA HI-3
DE CUYULTITAN. FECHA: OCTUBRE 2021

Página 160
DEPARTAMENTO DE LA PAZ

ESC 1:150

AL
IG
NME
N T=
AL
IG
NM
EN
T
ST - CA

0+075.00
0+005.00

0+070.00
NO AT LL

0+065.00
0+010.00
IO E
EA RTH OFF N= EX

0+012.00

0+060.00
0+014.00

0+016.00
ST IN SE 0+ IST

0+018.00
IN G= T= 078 EN

0+055.00
0+020.00

0+022.00
G= 26 0. .6 T

0+025.00
48 93 00m 4 E

0+050.00
98 76

0+030.00

0+048.00
98 .82

0+035.00

0+045.00
.04

0+040.00
MURO
IZQUIERDO ESQUEMA DE UBICACIÓN SIN ESC.

374.50
0+15.00
L3

374.00
BP: 0+000.00

EP: 0+078.64
C2

373.50

PT: 0+068.51
L1

Mid: 0+061.00
37
2.5
0
L2

PC: 0+05
37
2.5 C1

373.
0

PT: 0+04
PC: 0+037.01

Mid: 0+041.01
00

3.50
5.02
A
S LIG
OF TAT NM
N FS IO EN MURO
A
EA ORT ET N=0 T=A DERECHO
S LIG
ST HI =0 +0 LI OF TAT NM
IN NG .00 00. GN A N FS IO EN
G= = m 00 M
48 269 L EN S LIG A EA ORT ET N=0 T=A
99 31 T OF TAT NM ST LIG ST HI =0 +0 LI
44 3. -C N FS IO EN O AT NM IN NG .00 61. GN
.69 90 AL EA ORT ET N=0 T=A NO FFS ION EN G= = m 00 M
L E ST HI =0 +0 LI EA RT ET =0 T=A 48 269 EN
EX IN NG .00 37. GN ST HI =0 +0 LI 99 36 T
-C
IS G= = m 01 M IN NG .00 45. GN 09 3.
TE 48 269 R EN G= = m 00 M .29 24 AL
NT 99 34 T L
E 25 5. -C 48 269 L EN E
EX
.26 40 AL 99 35 T
20 1. -C IS
L E .35 69 AL TE
EX LE NT
IS EX E
TE IS
NT TE
E NT
E

PROYECCION DE RASANTE DE DISEÑO 0.50 0.54 2.20 2.20 0.54 0.50


LOW PT STA: 0+24.17
LOW PT ELEV: 372.47 Width:2.200m Width:2.200m
Slope:-2.00% Slope:-2.00%
PVI STA:0+030.00
PVI ELEV:372.31
K:1.98 0.45
LVC:20.00 4.40
BVCE: 372.52
BVCS: 0+020.00

EVCS: 0+040.00
EVCE: 373.10
0.35 0.35
6.48
376 376

TRABAJO AREALIAZAR, SE DEBERA DEMOLER EL PAVIMENTO EXISTENTE EN LOS ESTACIONAMIENTOS DE


INICIO Y FINAL DE LA NUEVA RASANTE PROYECTADA, PARA EMPALMAR EL NUEVO RODAJE CON EL EXISTENTE
GRADE BREAK STA = 0+000.00 ES UNA DISTANCIA DE 1.5 METROS ADELANTE O ATRAS DES ESTACIONAMIENTO QUE CORESPONDA.
374 ELEV = 372.938 7.98% 374 SE MANTENDRA LA SECCION TIPICA DEL CORDON CUNETA EXISTENTE,

ESTRCUTURA DE PAVIMENTO:
LOSA DE CONCRETO DE 12 CM DE ESPESOR CONCRETO 210 KG/CM2 O SU
EQUIVALENTE EN MODULO DE ROTURA (MR).
-2.10%
RELLENO CON RELLENO DE RESISTENCIA BAJA CONTROLADA (LODOCRETO) ENTRE LA
GRADE BREAK STA = 0+061.00 SUPERFICIE DE RODAJE EXISTENTE Y EL NIVEL DE BASE TERMINADA, ESTE MATERIAL
ELEV = 374.780
372 372 ESTARA CONFINADO LATERALMENTE POR MUROS DE RETENCIÓN NUEVO A
CONSTRUIR PARA CONFORMACIÓN DE LA VIA DONDE SEAN NECESARIOS.

CORDON CUNETA, BORDILLO Y ACERAS SERAN DE CONCRETO CON UNA


RESISTECIA DE 180 KG/CM2.

LOS RELLENOS CON MATERIAL DEL LUGAR DEBERAN CUMPLIR CON EL 80% DE SU
DENSIDAD DEFINIDO POR EL ENSAYO DE PROCTOR

370 370 RELLENO CON MATERIAL DEL LUGAR

0.20

TERRENO NATURAL
372.141

371.881

371.701

371.791

375.311
372.938

372.378

371.658

371.999

373.179

374.628

375.018

375.609
372.645

372.555

373.845
0.47 PERFILAR CAJA PARA CORDON CUNETA

TERRENO NATURAL
375.31

375.61
375.02
372.94

372.64

372.14

371.70

371.66

372.00

372.56

373.84

374.63
372.38

371.88

371.79

373.18
CR

0+000 0+005 0+010 0+015 0+020 0+025 0+030 0+035 0+040 0+045 0+050 0+055 0+060 0+065 0+070 0+075 0+080 CR CR

RASANTE EXISTENTE

Vertical Geometry 20.00 20.00 21.00


CUNETA REVISTIDA
RELLENO LODOCRETO
CUNETA REVISTIDA
DRENA HACIA QUEBRADA DRENA HACIA QUEBRADA

H ESC 1:150
372.141

371.881

371.701

371.791

375.311
372.938

372.378

371.658

371.999

373.179

374.628

375.018

375.609
372.645

372.555

373.845
372.62

372.52
372.94

372.83

372.73

372.48

372.56

372.77

373.10

373.50

373.90

374.30

374.70
V ESC 1:300 Alignment - CALLE EXISTENTE

Number Radius Length Line/Chord Direction A Value


-0+005 0+000 0+005 0+010 0+015 0+020 0+025 0+030 0+035 0+040 0+045 0+050 0+055 0+060 0+065 0+070 0+075 0+080 0+085
L1 37.01 N31° 40' 14.11"W

L=37.01 L=8.48 L=10.13 C1 36.18 8.02 N38° 01' 05.35"W


1
Curve 1: Radius=36.180, Length=8.016, Delta=167.3049
Horizontal Geometry 2
L2 8.48 N44° 21' 56.59"W
Curve 1: Radius=162.199, Length=15.005, Delta=174.6994
C2 162.20 15.01 N41° 42' 55.57"W

L3 10.13 N39° 03' 54.56"W

FIRMA /SELLO PROYECTO: CONSTRUCCIÓN DE OBRA DE PASO EN PLANO: DISEÑO GEOMETRICO LEVANTAMIENTO: DISEÑADOR: HOJA:
ACCESO A CASERÍO BELLA VISTA, MUNICIPIO DE PLANTA - PERFIL TEC. FIDEL RIVERA DG-1
CUYULTITAN. FECHA: OCTUBRE 2021

Página 193
DEPARTAMENTO DE LA PAZ
0+005.00 0+018.00 0+035.00

376 376 376


0+055.00
375 375 375

374 374 374 377

:1
00

:1
1.

00
373 373 373 376

1.
372 372 372 375

1
0:
.0

-1
-1

.0
371 371 371 374

0:
1
370 370 370 370 370 370 373

369 369 369 372

368 368 368 368 368 368 371 371


-7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -5 -4 -3 -2 -1 0 1 2 3 4 5

0+010.00 0+020.00
0+040.00 0+060.00 ESQUEMA DE UBICACIÓN SIN ESC.
376 376

375 375 376 378

374 374 375 377


:1
00

:1
1.

00
373 373 374 376

1.

1.
00
372 372 373 375

-1
:1

.0
0:
1
371 371 372 374

370 370 370 370 371 373 SECCIONES TIPICAS


369 369 370 370 372

368 368 368 368 369 369 371 371


-7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -5 -4 -3 -2 -1 0 1 2 3 4 5

0+022.00
0+012.00 0+045.00
376

376 375 377


0+065.00
375 374 376

:1
374 373 375 378

00
1.
1
0:
373 1.0 372 374 377

372 371 373 376

371 370 370 372 375

370 370 369 371 374

369 368 370 370 373

368 368 367 367 369 369 372 372


-7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -5 -4 -3 -2 -1 0 1 2 3 4 5

0+014.00 0+025.00
0+048.00
376 375
0+070.00
375 374 376

374 373 375 379

ESC 1:50
:1
00

373 372 374 378


1.

372 371 373 377

371 370 370 372 376

370 370 369 371 375

369 368 370 370 374

368 368 367 367 369 369 373 373


-7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -5 -4 -3 -2 -1 0 1 2 3 4 5 -5 -4 -3 -2 -1 0 1 2 3 4 5

0+016.00
0+030.00 0+050.00
376
0+075.00
375 375 377

374 374 376 379


:1
00
373 1. 373 375 378

372 372 374 377

371 371 373 376

370 370 370 370 372 375

369 369 371 374

368 368 368 368 370 370 373 373


-7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 -5 -4 -3 -2 -1 0 1 2 3 4 5 -5 -4 -3 -2 -1 0 1 2 3 4 5

H ESC 1:150
V ESC 1:150
FIRMA /SELLO PROYECTO: CONSTRUCCIÓN DE OBRA DE PASO EN PLANO: SECCIONES DISEÑO LEVANTAMIENTO: DISEÑADOR: HOJA:
ACCESO A CASERÍO BELLA VISTA, MUNICIPIO DE GEOMETRICO TEC. FIDEL RIVERA DG-2
CUYULTITAN. FECHA: OCTUBRE 2021

Página 194
DEPARTAMENTO DE LA PAZ

PANTALLA DE MURO IZQUIERDO


378 378

376 376

374 374

372 372

370 370

ESQUEMA DE UBICACIÓN SIN ESC.

374.681
372.412
372.874

372.664

372.454

373.064

373.496

374.290
372.769

372.559

372.495

372.705

373.895
372.41

372.71
372.66

372.56

372.50

373.06

373.50

373.90
372.87

372.77

372.45

374.29

374.68
H ESC 1:150 0+000 0+005 0+010 0+015 0+020 0+025 0+030 0+035 0+040 0+045 0+050 0+055 0+060 0+065 0+070 0+075 0+080
V ESC 1:150

PLANTA DE UBICACION DE MUROS

AL
IG
NM
EN
T=
AL
AL IG
ST IGN
OF AT ME
NM
EN PARED DE
NO FS ION NT T
EA RT ET= =0+ =AL
-C
ST ALL
BLOQUE

0+075.00
0+005.00

ST HI 0.0 04 IG

0+070.00
AT E E
IN NG 0m 5.0 NM NO 20X20X40

0+065.00
IO XI REMATE DE CONCRETO PARA
0+010.00

G= =2 0 EN R
EA TH OFF N=0 STE
0+012.00

48 69 L

0+060.00
0+014.00

T
0+016.00

99 35 -C ST ING SE +0 NT
NIVELACION CON ACERA
0+018.00

20 1.6 IN =2 T= 78 E

0+055.00
0+020.00
AL

0+022.00
.35 9 LE G= 6 0. .64
48 937 00m

0+025.00
EX

0+050.00
IS 98 6.

0+030.00
98 82

0+048.00
TE .04

0+035.00
NT

0+045.00
0+040.00
E
Ej
e
OD
T
RELLENO CON
MURO #3
IZQUIERDO LODOCRETO

374.50
0+15.00

L3

374.00
Mid: 0+041.01
BP: 0+000.00

EP: 0+078.64
C2

373.50

PT: 0+068.51
L1

Mid: 0+061.0
37
2.5

°
.14
0
S.I.3

50
L2

PC: 0+05
je
37

via
2. C1

es
50

de
373.0

ulo

0
PT: 0+04
PC: 0+037.01

3.50
An
0
BASTONES #4 TODAS LAS

5.02
AL
ST IGN
CELDAS, CONCRETO 140 KG/CM2
OF AT ME
NO FS ION NT MURO
AL #3
EA RT ET= =0+ =AL DERECHO
ST IGN
ST HI 0.0 00 IG
IN NG 0m 0.0 NM Ej
e OF AT ME
G= =2 0 EN AL OD NO FS ION NT
48 69 L T ST IGN T EA RT ET= =0+ =AL
99 31 -C OF AT ME ST HI 0.0 06 IG
44 3.9 AL NO FS ION NT
.69 0 LE IN NG 0m 1.0 NM
EX EA RT ET= =0+ =AL G= =2 0 EN
ST HI 0.0 03 IG 48 69 T
IS IN NG 0m 7.0 NM 99 36 -C
TE
N TE
G= =2
48 69 R
1 EN
T
09 .23
.29 4
AL
LE #3
99 34 -C EX
25 .45
.26 0
AL
LE
IS
TE
NT
RELLENO CON MATERIAL
ESC 1:150 EX
IS
TE
NT
E
E
DEL LUGAR

SOLERA DE FUNDACION
CONCRETO 210 KG/CM2
PANTALLA DE MURO DERECHO REFUERZO #5 @15cm AMBOS
SENTIDOS
378 378

376 376 DETALLE TIPO


SECCION MURO
374 374
SIN
ESCALA
372 372

370 370
372.412

373.022

373.782

374.182
372.874

372.664

372.454
372.769

372.559

372.495

372.705

373.388

374.589
372.41

372.71

373.02
372.50
372.87

372.77

372.66

372.56

372.45

373.39

373.78

374.18

374.59
0+000 0+005 0+010 0+015 0+020 0+025 0+030 0+035 0+040 0+045 0+050 0+055 0+060 0+065 0+070 0+075 0+080
H ESC 1:150
V ESC 1:150

FIRMA /SELLO PROYECTO: CONSTRUCCIÓN DE OBRA DE PASO EN PLANO: PANTALLLAS DE MUROS LEVANTAMIENTO: DISEÑADOR: HOJA:
ACCESO A CASERÍO BELLA VISTA, MUNICIPIO TEC. FIDEL RIVERA DG-3
DECUYULTITAN. FECHA: OCTUBRE 2021