Vous êtes sur la page 1sur 2

Uniworld Gardens-II Update January, 2011

Dear Customer,

Greetings!
We would like to bring you up-to-date
with what’s happening in and around
your privileged Unitech property.

CONSTRUCTION UPDATE

Disclaimer: The above photographs have been taken in January 2011. Actual status of this project as on date may be at variance from these photographs.
A BLOCK B BLOCK C BLOCK
• Masonry work has commenced • Masonry work is in advance stage • Masonry work is in advance stage

D BLOCK UNDERGROUND TANK BASEMENT


• External Plaster work is in progress • Under Ground Water Tank work is • Structure work in front of Tower
for D3, D4 and D5 blocks in progress D3, D4 and D5 is in final stages of
• External painting has commenced completion
• Lower Basement roof slab work is
in progress for A, B and C block

UPDATES WILL BE AVAILABLE ONLINE AT: www.unitechgroup.com/cr-construction-updates.asp


CONSTRUCTION MILESTONE TABLE
TOWER
S. No. PARTICULARS
D C B A
A STRUCTURAL COMPLETION D5 D4 D3 D2 D1 C4 C3 C2 C1 B3 B2 B1 A4 A3 A2 A1
1 Excavation C C C C C C C C C C C C C C C C
2 Completion of foundation C C C C C C C C C C C C C C C C
3 Completion of ground floor roof C C C C C C C C C C C C C C C C
4 Completion of first floor roof C C C C C C C C C C C C C C C C
5 Completion of typical floor roof C C C C C C C C C C C C C C C C
6 Completion of top floor roof C C C C C C C C C C C C C C C C
7 Completion of masonry work within flat c c c 1st-13th Floor 1st-13th Floor 1st-9th Floor 1st-6th Floor 1st-6th Floor 1st-7th Floor 1st-13th Floor 1st-12th Floor 1st-7th Floor
8 Completion of internal plaster within flat 1st-11th Floor 1st-13th Floor 1st-11th Floor 1st-6th Floor 1st-9th Floor 1st-6th Floor 1st-3rd Floor 1st-6th Floor 1st-7th Floor 1st-2nd Floor
9 Completion of plumbing work within flat 1st Floor
10 Completion of electrical work within flat 1st-4th Floor 1st Floor

C: Complete, W: Work in progress

FOR MORE DETAILS ON THIS PROJECT AND SITE VISIT, PLEASE CALL: 0124 - 4552103

NEW LAUNCHES
NIRVANA COUNTRY 2 SECTOR - 117, NOIDA
SECTOR - 71, GURGAON
• Part of 70+ acres Unitech development
• 3 BR apts & duplex penthouses
• 2, 3 & 4 bedroom apartments
• Sizes from 2250-2475 sq. ft.
• Sizes from 1140 - 1980 sq. ft.
• Theme garden & landscaped greens
• Split ACs in living & master bedroom
• Putting green & kid’s play area
• Secured and gated community
• Exclusive club house
• Modern clubhouse with
• Close to world class schools & hospitals
large swimming pool
• Well connected to NH-8 & Golf course
extension road

NIRVANA COUNTRY 2
SECTOR - 117, NOIDA
SECTOR - 71, GURGAON
• 3 to 5 Bedroom villas • 12 acres development
• Floor areas of 1523 - 5252 sq.ft. • Located near the FNG expressway
• Neighbourhood shopping centres • 1, 2 & 3 bedroom apartments
• Landscaped surroundings • Sizes from 747 - 1408 sq.ft.
• Exclusive club house • Landscaped surroundings
• Metro connectivity • Swimming pool
• Exclusive club house
• Kid’s play area

SECTOR - 70, GURGAON UNIWORLD CITY, MOHALI

• 3 bedroom apartments
• 3 bedroom independent floors
• Sizes from 1530-1560 sq. ft.
• Floor area of 1796 sq. ft.
• Extensive landscaped greens
• Part of 300 acres township
• Club house
• Clubhouse and amenities
• Swimming pool
• Landscaped greens
• 24X7 Power back-up
• Swimming pool

For information on new launches,


E-mail: sales@unitechgroup.com Call: Gurgaon 0124 - 4552000, Noida 0120 - 3985100, Mohali 0172 - 4686200
www.unitechgroup.com

Vous aimerez peut-être aussi